Chapter 12 Route window W15 Dog Kennel bridge. Transport for London

Similar documents
Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Chapter 13 Route Window NE12 Harold Wood station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Maidenhead Bridge. Proposed Work

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Improving rail links to Heathrow from the West and beyond

Chapter 26 Route Window SE6A Manor Wharf. Transport for London

Chapter 9 Route Window C8 Whitechapel station. Transport for London

Chapter 7 Route Window C6 Farringdon station. Transport for London

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

Felixstowe Branch Line FAQ

Hospital Link Project Project Update September 2015

Transport Assessment Appendix M: Avonmouth Impacts

Business Forum. 16 March 2016

Concord Road Interchange. Standard hours of work

Port MacKenzie Rail Extension

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

Construction Staging Area Blue Jays Way (357 King Street West)

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

H1: BIRMINGHAM CURZON STREET STATION

Lake Erie Commerce Center Traffic Analysis

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Port MacKenzie Rail Extension

Crossrail: Socio-Economic Technical Report

5.7 Local road upgrades

Consultation Round 2: Results and Crossrail s Response

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys

The Point Roundabout Improvement Scheme

Level Crossing Risk Assessment Polegate MCB

Berkshire Local Transport Body. Pro- forma for Consideration of a Transport Scheme at Programme Entry Stage. Section 1: Headline Description

ACORNS PROJECTS LIMITED

HORTON WHARF HORTON ROAD, WEST DRAYTON, UB7 AN EXCEPTIONAL WATERFRONT DEVELOPMENT OPPORTUNITY BENEFITTING FROM PLANNING PERMISSION FOR 87 RESIDENCES.

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line.

Airport Planning Area

EXPLANATORY STATEMENT

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Centurion Way Chichester

Union Station Rail Corridor East

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

A. CONCLUSIONS OF THE FGEIS

25 th Avenue Grade Separation. December 13, 2017

Pedestrian Safety Review Spadina Avenue

D L R C C T R A F F I C N E W S

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

Non-technical summary

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

Transport Impact Assessment

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must:

25 th Avenue Grade Separation. Community Meeting November 13, 2018

Route Windows Central route section

Prince Albert Road Towpath Ramp, Camden Feasibility Report

History of Vauxhall Bridge

HS2 in Buckinghamshire

Sky Temporary Car Park Transport Statement

E40. Temporary activities

SLOUGH BOROUGH COUNCIL. Haymill & Lynch Hill, Britwell & Northborough and Cippenham Green PART I FOR COMMENT

The Network Rail (Suffolk Level Crossing Reduction) Order

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment

EXHIBIT LIST No Exhibit Name Page 1 A417 Presentation.pdf (A417) 2-42

THE GATE IS OPEN 10,245 32,312 sq ft

Section 3.6 Recreation

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Roberts Bank Terminal 2 Project

Part four. In this part you will find: The next steps to deliver the master plan

Grade Crossings in High Speed Rail Corridors

Unlocking Our Coastal Heritage Project: Crane Castle Promontory Fort, Illogan, Cornwall

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

SWINGING OVER SCHUYLKILL THE HISTORY OF THE PW&B AND BRIDGE NO. 31

Construction Staging Adelaide Street West

BRENT CROSS THAMESLINK

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PUBLIC WORKS AND UTILITIES DEPARTMENT

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

ATTRACTIVE GATED OFFICE SCHEME WITH SHORT TO MEDIUM TERM ASSET MANAGEMENT AND DEVELOPMENT POTENTIAL BRITANNIA COURT THE GREEN, WEST DRAYTON, UB7 7PN

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

The 5Ws route. Wolverhampton City Centre Options WOLVERHAMPTON, WEDNESFIELD, WILLENHALL, WALSALL AND WEDNESBURY

Exposition Light Rail Transit Project

Open Report on behalf of Richard Wills Executive Director for Communities. Planning and Regulation Committee. County Matter Application - S38/0590/13

Planning Approval Consistency Assessment Form

Long water shutdown scheduled for Tuesday, September 18

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

All reports. 1. Governance Service receive draft report Name of GSO DPR

Striving for resilience in the face of climate change

Basic Project Information

Transcription:

Chapter 12 Route window W15

DOG KENNEL BRIDGE 12 Route window W15 12.6 southwards to North Park Road and Richings Park Golf Course. To the west side of this route window is the built-up edge of Slough and housing fronting Market Lane. Market Lane / Hollow Hill Lane is an unclassified road that passes under Chequer bridge in a north/south direction carrying a relatively small amount of traffic. The road links the B470Langley Park Road in the north with Parlaunt Road in the south. Chequer bridge 12.7 Chequer Bridge lies within the Borough of Slough, located approximately 0.5 km east of Langley Station. The bridge carries the Great Western Main Line over Hollow Hill Lane/Market Lane. Market Lane is an unclassified road that passes underneath the Great Western Main Line in a north-south direction as shown in figure 12.1. 12.8 Dog Kennel footbridge is located to the west of Iver Station and is in the District of South Buckinghamshire. The bridge provides a link between stretches of public right of way north and south of the crossing. The bridge however, is no public right of way. The permanent works Introduction Embankment widening 12.1 12.2 12.3 Within this route window the main Crossrail works will involve: Embankment widening to allow for an additional track on the northern side of the alignment; Providing an additional span on Chequer bridge to carry the extra track; and Demolition of. The embankment widening and Chequer bridge works will be served by Hollow Hill Lane to worksite. This worksite will also provide access to worksite south, located south of the tracks. It is estimated that the embankment widening works will take six months. It is estimated that the Chequer bridge works will take one year and one month and the demolition of Dog Kennel bridge three months. 12.9 12.10 A new single-track relief line will be constructed on the northern side of the alignment over about 1.2 km between Chequer bridge (in Route Window W16) and. This will link the existing freight lines that exist to the west and east, so creating a continuous loop between Langley and West Drayton stations and providing additional capacity both for freight and passenger trains by increasing the route from four tracks to five along this section. To accommodate this additional track, the embankment between Chequer bridge and Dog Kennel bridge will be widened by approximately 7 m. Chequer bridge At Chequer bridge, a new single track railway bridge will be built to the north of the existing structure to carry the new track over Hollow Hill Lane/Market Lane east of Langley. 12.4 12.5 The drawings provided at the end of this chapter present the main features of the route window and the assessed construction lorry routes. Baseline conditions This route window is located within the Borough of Slough and the District of South Buckinghamshire. The rail corridor crosses an area of open countryside on a low embankment and in shallow cutting lined with patchy mature trees and scrub. To the north lies a large open arable field, the Bison Works including warehousing, outdoor storage areas and cranes, and the Mansion Caravan and Mobile Home Site adjacent to the Grand Union Canal (Slough Arm). To the south of the line, the land comprises a number of large open arable fields extending 12.11 12.12 will be demolished and not replaced. Chequer bridge pipeline diversion The works at Chequer bridge will need to be preceded by the diversion of two gas mains and an oil pipeline, which are currently located in the vicinity of the most easterly bridge support. W15 page 3

ROUTE WINDOW W15 12.13 Worksite assessment All worksites in this route window will be accessed off Market Lane/Hollow Hill Lane and are described below. The lorry route is shown on Map W15 (iv). Hollow Hill Lane to worksite 12.14 The works at Chequer bridge will use the Hollow Hill Lane to Dog Kennel Bridge worksite that is also associated with the embankment widening works. This site is to the north of the bridge and will be accessed north of the bridge. is shown in figure 12.1. Figure 12.2: worksite south 12.19 The closure of the bridge during construction will result in pedestrians being diverted either to the west via Chequer bridge or to the east via Thorney Lane footbridge. The diversion lengths of 1.5 km and 3.5 km respectively will result in a temporary significant impact. Chequer bridge pipeline diversion worksites Figure 12.1: Hollow Hill Lane to South side of Chequer bridge 12.20 The pipeline diversion will require an initial ten month period of trench digging, pipe laying and backfilling. The works will require a half road closure of Market Lane for a three week period and the use of shuttle working. This does not constitute a significant temporary impact. 12.15 12.16 12.17 12.18 Market Lane will have to be closed at some point during construction. It is envisaged that the road closures will only be short-term, typically over a weekend or overnight. No significant traffic and transport impacts have been identified that are associated with this worksite. worksite south There is one worksite associated with the works at, worksite south. It is situated to the south of the Great Western Main Line and occupies areas of land immediately east and west of the footpath shown in figure 12.2 above. The site will be accessed from the Hollow Hill Lane to worksite from the north side of the tracks. 12.21 12.22 12.23 12.24 Lorry route assessment Access to the worksites will be from the A4 London Road, Sutton Lane, Parlaunt Road, and Market Lane. Peak construction activities at the Hollow Hill Lane to worksite will occur for a period of approximately 13 weeks, during which time the number of lorries generated by the worksite will be 64 per day. At other times the typical number of lorries will be approximately 44 per day. During the whole construction period at worksite the number of lorries generated by the construction activities is expected to remain constant at an estimated rate of four lorries per day. No significant traffic and transport impacts have been identified as a result of these lorry routes and cumulative lorry traffic volumes. W15 page 4

DOG KENNEL BRIDGE 12.25 12.26 12.27 12.28 During the peak construction traffic period of the pipeline diversion works, there will be 36 lorry movements to take excavated material away for approximately eight weeks. These works will happen at the start of the construction period before any other construction is undertaken, hence there will be no cumulative lorry impact. Mitigation and temporary impacts In summary, the only significant traffic and transport impact that occurs during construction in this route window is the delay to pedestrians as a result of the demolition of Dog Kennel Bridge. Mitigation and permanent impacts The significant operational impacts and mitigation measures are indicated in table 12.2. The permanent closure of Dog Kennel footbridge will result in a significant permanent impact. The diversionary distance for pedestrians using this bridge would be over 1 km. Table 12.1: Route window W15 Temporary impacts Potential impact Significance Committed Mitigation Residual Impact Worksite Impacts Vulnerable Road user Delay CT5b Demolition of Dog Kennel bridge results in a significant pedestrian diversion of about 1.5 km under Chequer bridge Description Significant N/a Diversion via Chequer bridge Significance Significant Table 12.2: Route window W15 Permanent impacts Potential impact Significance Committed Mitigation Residual Impact Pedestrian Delay and Loss of Amenity OT3f Demolition of Dog Kennel bridge results in a significant pedestrian diversion of about 1.5 km Description Significant N/a Diversion via Chequer bridge Significance Significant W15 page 5