P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

Similar documents
PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

NEW PFC APPLICATION #5

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017

Public Notice Passenger Facility Charge PFC Application No. 2 Amendment No. 2 Charlotte Douglas International Airport. Effective: February 22, 2019

New PFC Application #13

Section (a)(1). Description of Projects Impose and Use

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

City of Tallahassee, FL Department of Aviation

Passenger Facility Charge Application #1

BOARD OF AIRPORT COMMISSIONERS

Notice of Air Carrier Consultation Meeting for PFC Application Niagara Falls International Airport (NFIA/IAG)

Public Notice July 14, 2017

THE CASE OF A SUCCESSFUL PFC APPLICATION

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico.

Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

COMMONWEALTH PORTS AUTHORITY

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

PFC Application #2 Niagara Falls International Airport

Yakima Air Terminal/McAllister Field Airport Master Plan Update

GREATER ORLANDO AVIATION AUTHORITY

PEE DEE REGIONAL AIRPORT AUTHORITY FLORENCE REGIONAL AIRPORT

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport

Session 6 Airport Finance 101 Funding Sources for Airports

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

AIRLINE CONSULTATION MEETING

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

FINAL AGENCY DECISION CITY OF CHARLOTTE CHARLOTTE, NORTH CAROLINA

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

FAA Reauthorization Issues & Impacts on Airports

RESOLUTION NO

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

FORECASTING FUTURE ACTIVITY

Finance and Implementation

Amendments to PFC Applications C 03 LAX and C 00 LAX

Table of Contents. Overview Objectives Key Issues Process...1-3

Current and Forecast Demand

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

RAPID CITY REGIONAL AIRPORT

Project Descriptions, Justifications and Other Supporting Information Provided for Notice Inviting Public Comment to PFC Application C-00-VPS

ASIP2 AIR SERVICE INCENTIVE PROGRAM

PFC Quarterly Status Report September 30, 2016

PENSACOLA INTERNATIONAL AIRPORT MASTER PLAN UPDATE WORKING PAPER 8 FINANCIAL PLAN

Office of Airport Safety and Standards

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS MINUTES OF MEETING May 22, 2017 APPROVED 6/28/17

Funding Package TOTAL $15,172,000

Port of Friday Harbor

MOST aircraft need a runway for landing and takeout.

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

Financial Feasibility Analysis Terminal Programming Study Des Moines Airport Authority

SECTION 2 - GENERAL REGULATIONS

STANDARD RATES AND FEES AT BALTIMORE/WASHINGTON INTERNATIONAL THURGOOD MARSHALL (BWI MARSHALL) AIRPORT

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

AIRPORT WITH NO RUNWAYS IS A MALL

Punta Gorda Airport Master Plan Update

DALLAS LOVE FIELD MAY 2015 DRAFT

Chapter 8.0 Implementation Plan

Airport Master Plan Open House Front Range Airport February 23, 2017

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

NON MOVEMENT AREA DRIVERS TRAINING

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

I. COMMUNICATIONS II. RESOLUTIONS, MOTIONS AND NOTICES

LOVE FIELD MODERNIZATION PROGRAM (LFMP)

AIRPORT NOISE AND CAPACITY ACT OF 1990

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

B.C. MINISTRY OF TRANSPORTATION. SA17 Local Area Specification #2 SMALL AIRPORT WINTER MAINTENANCE

PFC Program Update: Eligibility Refinements, Supporting the PFC Increase, and Preparing for the Future

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

EXHIBIT E to Signatory Airline Agreement for Palm Beach International Airport RATE AND FEE SCHEDULE

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

Delta Air Lines, Inc. How Airports and Airlines Can Enhance Collaboration in Operations

Aviation, Rail, & Trucking 6-1

Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting

AVIATION. MichiganReportCard.com 5

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

AirportInfo. Airport Operating Expenses

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Nantucket Memorial Airport Master Plan Update

Public Notice Savannah Airport Commission Passenger Facility Charge Application No C-00-SAV Effective Date of Public Notice: April 4, 2018

Airport Finance 101 Session 3 - Capital Funding

PUBLIC NOTICE Passenger Facility Charge Application #8 San Francisco International Airport. December 28, 2017

AIRLINE CONSULTATION MEETING

Transcription:

P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation Administration (FAA) requirement for Passenger Facility Charge Applications as directed by changes to the PFC Program resulting from the Non-Hub Pilot Program and Related Streamlining Changes Final Rule that was published on March 23, 2005 and which went into effect on May 9, 2005. The MBS International Airport Commission (the public agency) must provide a notice and opportunity for public comment before submitting (1) a PFC Application, (2) a notice of intent under the non-hub program, or (3) an amendment request to change the scope of a project or projects, increase the PFC level to be collected, or increase the PFC amount for a project by more than 25 percent. The public notice and comment period may be run concurrently with the air carrier consultation period. The notice must allow the public to file comments for at least 30 days, but no more than 45 days after the date of publication of the notice or posting on the public agency s Web site. PFC COLLECTION REVIEW: The MBS International Airport Commission has used Passenger Facility Charge (PFC) revenue on Airport Improvement Program projects since February 1997, and is authorized to impose a PFC until the date on which the total net PFC revenue plus interest equals the allowable cost of approved projects. PFC Application Amendment 03-05-C-01-MBS raised the level of collection from $3.00 to $4.50 and reset the anticipated expiration date. The PFC Application addressed in this Public Notice has a $4.50 level of collection with a proposed effective date of February 1, 2011 and an estimated expiration date of February 1, 2029, with total estimated PFC revenue of $10,449,784.00. Carriers may keep a portion of the collected PFC revenue as Carrier Compensation for Collection. An air carrier consultation meeting to discuss this Application was held on June 23, 2010. Written Notice to Air Carriers was sent out on May 17, 2010. APPLICATION STATUS: The PFC Application will be submitted upon expiration of the public notice and comment period. The public agency is required to submit evidence of compliance with the public notice and comment requirement in its PFC Application, notice of intent or amendment request. DESCRIPTION OF PROJECTS: The description of Capital Improvement Projects that this current Application Number 7 addresses are as follows: Impose and Use Projects: Phase IV Terminal Construction Project; Taxiway Construction: The construction of a connector taxiway between existing Taxiway C and the location for the new airline terminal ramp. This project also includes the removal of Taxiway B, removal of Taxiway G and taxiway electrical circuit repairs. Page 1 of 6

Reimbursement of PFC Application Fees Project: Reimbursement of PFC costs incurred from July 2007 through September 2009 for the preparation of other PFC applications. Reimbursement of Administration Expenses for PFC Program Project: Reimbursement of administrative expenses for the PFC program incurred from July 2007 through September 2009. Airfield Pavement Marking Project: Airfield pavement marking remarks the entire airfield. All Phases of Terminal Construction Project: This project will include all phases of new terminal construction including the build-out of the terminal, building shell, interiors, electrical, HVAC, and other associated work. This work specifically excludes site work and utilities, as well as concrete foundation and steel. Impose Only Projects Partial Parallel Taxiway and Apron Connector Project: This project constructs the northwest portion of a parallel taxiway to Runway 14/32 and constructs a second access to the airline ramp at the new terminal building location. Completion of the Perimeter Road Project: Completion of the perimeter road to the north around Runway 5/23. The completed perimeter road will tie the east side to the west side of the airport together. Snow Removal Equipment Procurement, High Speed Airport Broom Project: This project consists of the purchase of a twenty (20) feet wide airport high speed broom mounted on a vehicle. Alternate Projects for the Impose Only Projects Listed Bituminous Overlay of Runway 5/23 Alternate Project: This project constructs a bituminous overlay of Runway 5/23 and includes necessary pavement marking. Snow Removal Equipment Procurement, Airport Snow Plow Alternate Project: This project purchases a heavy duty truck with a twenty (20) foot runway plow. Snow Removal Equipment Procurement, Airport Snow Blower Alternate Project: This project purchases a dedicated high-speed snow blower vehicle. EXPLANATION OF THE NEED FOR THE PROJECTS: The justification of the Capital Improvement Projects that this current Application Number 7 addresses are as follows: Impose and Use Projects: Phase IV Terminal Construction Project; Taxiway Construction: The connector taxiway is required to allow aircraft to taxi from the existing airfield to the new apron area of the new terminal building. The removal of Taxiway B and G are related to the construction of the new terminal and/or comments received during the FAA Runway Safety Action Team meeting held at MBS. The improvements of the taxiway electrical circuits are also related to the construction of the new terminal building and needed to ensure taxiway/runway safety. Reimbursement of PFC Application Fees Project: Local funds used to cover the cost to prepare past PFC applications will now be reimbursed by PFC revenue. Page 2 of 6

Reimbursement of Administration Expenses for PFC Program Project: Local funds used to cover the cost of administrative expenses will now be reimbursed by PFC revenue. Airfield Pavement Marking Project: The project was completed to maintain compliance with FAR Part 139 certification requirements. All Phases of Terminal Construction Project: The terminal study of the existing terminal building was conducted in 2005 and demonstrated that it was cost effective to construct a new terminal building rather than remodel the existing building. A further study in 2006 reinforced the point. Construction of the new terminal building began in 2008 and continues with an anticipated opening in 2013. The new terminal building will increase the number of ticket counters by one and increase the number of gates by two, to enhance airline competition. Impose Only Projects Partial Parallel Taxiway and Apron Connector Project: This project is eligible for both AIP and PFC construction programs. The project provides a second access point to and from the new terminal for any air carrier operation utilizing Runway 14/32. Completion of the Perimeter Road Project: This project is eligible for both AIP and PFC funding. The completed perimeter road will allow access to both sides of the airfield without having to cross runways or taxiways. The completed perimeter road also allows for various security inspections and wildlife control to occur without interfering with air traffic movement. Snow Removal Equipment Procurement, High Speed Airport Broom Project: This project will replace airport broom unit #37 that is over ten years old and will have outlived its usefulness. Alternate Projects for the Impose Only Projects Listed Bituminous Overlay of Runway 5/23 Alternate Project: This bituminous overlay allows continual operation of the runway and maintains the runway for future use. Snow Removal Equipment Procurement, Airport Snow Plow Alternate Project: The new plow truck would be a replacement of MBS Plow #43, which is a 1998 model that has outlived its usefulness. Snow Removal Equipment Procurement, Airport Snow Blower Alternate Project: The new snow blower would be a replacement of MBS Blower #20, which will have outlived its usefulness by the time the purchase is made. FINANCIAL PLAN: The estimated total PFC revenue expected to be collected by this application is $10,449,784.00. The financial plan for each impose and use and impose only project is listed below. Impose and Use Projects: Phase IV Terminal Construction Project; Taxiway Construction: $40,372 in pay-asyou-go PFC funds, $1,534,116 in existing AIP Grant 3-26-0083-4109 funds, and $40,371 in State funds for a Total Project Cost of $1,614,859. The proposed funding level for this project is $4.50. Reimbursement of PFC Application Fees Project: $5,500 in pay-as-you-go PFC funds, which is also the Total Project Cost. The proposed funding level for this project is $4.50. Page 3 of 6

Reimbursement of Administration Expenses for PFC Program Project: $1,500 in payas-you-go PFC funds, which is also the Total Project Cost. The proposed funding level for this project is $4.50. Airfield Pavement Marking Project: $2,412 in pay-as-you-go PFC funds, $91,627 in existing AIP Grant 3-26-0083-4109 funds, and $2,411 in State funds for a Total Project Cost of $96,450. The proposed funding level for this project is $4.50. All Phases of Terminal Construction Project: $6,500,000 in pay-as-you-go PFC funds, $2,850,075 in existing AIP Grant 3-26-0083-4209 funds, $3,149,925 in anticipated AIP funds, $5,300,000 in local funds and $200,000 in State funds for a Total Project Cost of $18,000,000. In the event that anticipated AIP and State funds are not available a back-up financing plan has been prepared as follows: $9,849,925 in pay-as-you-go PFC funds, $2,850,075 in existing AIP Grant 3-26-0083-4209 funds, and $5,300,000 in local funds for a Total Project Cost of $18,000,000. The proposed funding level for this project is $4.50. Impose Only Projects Partial Parallel Taxiway and Apron Connector Project: $2,100,000 in pay-as-you-go PFC funds, which is also the Total Project Cost. The proposed funding level for this project is $4.50. Completion of the Perimeter Road Project: $1,300,000 in pay-as-you-go PFC funds, which is also the Total Project Cost. The proposed funding level for this project is $4.50. Snow Removal Equipment Procurement, High Speed Airport Broom Project: $500,000 in pay-as-you-go PFC funds, which is also the Total Project Cost. The proposed funding level for this project is $4.50. CONTACT INFORMATION: The name of and contact information for the person within the public agency to whom comments should be sent is as follows: Mr. Jeff Nagel, Airport Manager MBS International Airport 8500 Garfield Road, Suite 101 Freeland, Michigan 48623 Telephone: (989) 695-5555; Fax: (989) 695-6322 Email: nagel@mbsairport.org Page 4 of 6

APPLICATION CONTENTS: Capital Improvement Projects that will be submitted with the PFC application as Impose and Use Projects are as follows: Description of Projects Brief Justification Estimated Total of PFC Revenue Phase IV Terminal Construction Project; Taxiway Construction Reimbursement of PFC Application Fees Project Reimbursement of Administration Expenses for PFC Program Project Airfield Pavement Marking Project All Phases of Terminal Construction Project 525, FAA Order 5100.38C, AIP Handbook Eligible under specific PFC criteria, preamble to Part 158, Section 158.3, Allowable Costs Eligible under specific PFC criteria, preamble to Part 158, Section 158.3, Allowable Costs 531, FAA Order 5100.38C, AIP Handbook 601, FAA Order 5100.38C, AIP Handbook $40,372.00 $5,500.00 $1,500.00 $2,412.00 $6,500,000.00 Total Amount of Impose and Use Projects $6,549,784.00 Capital Improvement Projects that will be submitted with the PFC application as Impose Only Projects are as follows: Partial Parallel Taxiway and Apron Connector Project Completion of the Perimeter Road Project Snow Removal Equipment Procurement, High Speed Airport Broom Project 525, FAA Order 5100.38C, AIP Handbook 527, FAA Order 5100.38C, AIP Handbook s 541g and 543, FAA Order 5100.38C, AIP Handbook $2,100,000.00 $1,300,000.00 $500,000.00 Total Amount of Impose Only Projects $3,900,000.00 Anticipated Total PFC Revenue $10,449,784.00 Page 5 of 6

Eligible Alternate Projects to cover the value for the Impose Only Projects are as follows: Bituminous Overlay of Runway 5/23 Alternate Project Snow Removal Equipment Procurement, Airport Snow Plow Alternate Project Snow Removal Equipment Airport Snow Blower Procurement 521, FAA Order 5100.38C, AIP Handbook 543, FAA Order 5100.38C, AIP Handbook 543, FAA Order 5100.38C, AIP Handbook $2,900,000.00 $400,000.00 $700,000.00 Total Amount of Eligible Alternate Projects* $4,000,000.00 * In accordance with FAA Order 5500.1, the eligible alternative projects will cover the value of the impose only projects, or five (5) years of collection, whichever is less. In this case the five years of collection is anticipated to be the lesser value. Page 6 of 6