ENGR : Roller Coaster Project

Similar documents
Paper Roller Coasters Engineering Journal. Name: Group: Period: Due date:

UNIT 2 ENERGY. Driving Question: How are the physics principles of energy transfer used in the safety of roller coasters?

Integrated Science. 5. Working electromagnet start switch. [Must be designed so the person starting it does

Wright Stuff Glider Competition

Roller Coasters. Each team must successfully complete this challenge in order to be eligible for the final challenge and the prize.

ABSTRACT TIES TO CURRICULUM TIME REQUIREMENT

Single Line Tethered Glider

IMPETUS: Engineering Workbook Model Roller Coaster Competition

Names of Lab Team Members. Scorpion Worksheet

RUAT Junior Glider Design Competition Version 1.5

Kings Dominion Coaster Mania Building Contest 2017

Roller Coaster Design

Contracting of continuing airworthiness management tasks

Keele Street Draft Plan of Standard Condominium Application Status Report

Coaster Creators. Science/Math Module. Grades 6-8

Islamic Online University

2018 WSGC WISCONSIN COLLEGIATE ROCKET DESIGN COMPETITION

MESA DAY CONTEST RULES (Revised 12/7/17)

PRECALCULUS Learning Period 1: Aug. 18, 2014-Sept. 12, 2014 (19 Days) KTL Independent Study Assignment Checklist and Work Sample

The Hamburger. by Benjamin Wing Will Bullock Ted Kocak

REVIEW SCIENTIFIC METHOD. Parachutes

Aircraft Design Project Memorandum

Sequential approach and data quality

ROLLER COASTER POLYNOMIALS Due: Thursday, March 30th

OPERATIONAL BULLETIN

Jeppesen Instrument/Commercial Manual (JS )

MESA DAY CONTEST RULES

ROLLER COASTER POLYNOMIALS

Math 3 Polynomials Project

You can also include elements from around the classroom, like tables, chairs, yardsticks, string, etc.

Subpart H. 2042/2003

Lesson 1: Rolling and moving with Science

Paper Roller Coaster Cut Outs

Seychelles Civil Aviation Authority

SEMESTER AT SEA COURSE SYLLABUS

REPUBLIC of SAN MARINO CIVIL AVIATION AUTHORITY

Kiffin s Crazy Coaster

Drawing A Roller Coaster Activity

SERVICE LETTER REVISION

Team Shananigans: The Funnelcoaster

The second change is that the ball needs to remain in contact with the track at all times.

Rolling with Roller Coasters

UNCLASSIFIED//FOR OFFICIAL USE ONLY

CENTRAL TEXAS COLLEGE AIR AGENCY No DU8S099Q SYLLABUS FOR AIRP 1255 INTERMEDIATE FLIGHT Semester Hours Credit: 2

Model Roller Coaster Contest 2017

The Twentieth Annual EPICS User Conference

PHYSICS DAY AT BUSCH GARDENS DATA COLLECTION WORKSHEET

An individual LEAP Response is required for this event and must be submitted at event check-in (see LEAP Program).

PHY 133 Lab 6 - Conservation of Momentum

Engineering Fundamentals 151. Roller Coaster Project. December 2 nd, Wesley Jones. Chris Kibler. Ryan Moran. Evan Sutton

Design Challenge: Building a Roller Coaster


September 13, Dear Teacher:

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION N

(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY

Notice of Requirement

Title ID Number Sequence and Duration. Age Level Essential Question Learning Objectives

University of Colorado, Colorado Springs Mechanical & Aerospace Engineering Department. MAE 4415/5415 Project #1 Glider Design. Due: March 11, 2008

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

PRIVATE PILOT GROUND SCHOOL SYLLABUS. Part 61. Revision 1 03/01/2017. Steffen Franz ADVANCED GROUND INSTRUCTOR BELMONT, CA, 94002,

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

FLIGHT ENDURANCE. Participants analyze flight principles with rubber band powered model aircraft.

Revision 2 03/15/2017. North Coast Flight School Inc.

Registry Publication 11

Revision 3 03/15/2017. North Coast Flight School Inc.

CAAC China. CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision Oct-2017

Course Information MW: 4 to 5.30pm Contact hours 60 Instruction in English. Contact Information

CENTRAL TEXAS COLLEGE AIR AGENCY No. DU8S099Q SYLLABUS FOR AIRP 2251 FLIGHT MULTI-ENGINE Semester Hours Credit: 2_

Spider Cage to Support Cerebral Palsy Patient

NATIONAL ASSOCIATION OF UNCLAIMED PROPERTY ADMINISTRATORS (NAUPA) NETWORK STRATEGIC PLAN ( )

UNCLASSIFIED//FOR OFFICIAL USE ONLY

21H.301 The Ancient World: Greece Fall 2004

NASA S SPACE GRANT MIDWEST HIGH-POWER ROCKET COMPETITION THE ROLL/ORIENTATION CHALLENGE

Important! You need to print out the 2 page worksheet you find by clicking on this link and take it with you to your lab session.

QUALITY ASSURANCE PROTOCOLS. Competency Based Assessment in Architecture. Architectural Practice Examination (APE) for the AACA

AIRCRAFT SERVICE CHANGE

Project 6 Roller Coaster

Grade 6 Sample Items

Aim: What is the Height and Co-Height functions of a Ferris Wheel?

CENTRAL TEXAS COLLEGE AIR AGENCY No. DU8S099Q SYLLABUS FOR AIRP 2337 COMMERCIAL GROUND SCHOOL Semester Hours Credit: 3. Instructor: Office Hours:

INSTALLATION GUIDE INTRODUCTION

AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

Part 1. Part 2. airports100.csv contains a list of 100 US airports.

A Master Plan is one of the most important documents that can be prepared by an Airport.

TCEM 309: Cruise Line Management Spring 2017: THIS IS A DRAFT and dates below may change

Bachelor of Science in Aviation Option in Aviation Management

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Rangitīkei District Council

How to Erect a Queensland Ridge Tent

Adding your Aircraft to a 14CFR 135 Operating Certificate

Generic OpSpec A332 - DRAFT

Public-Private Partnerships (P3) for Social Infrastructure. Alberta Schools Alternative Procurement (ASAP Team) Alberta Infrastructure

General Information Applicant Name and Address: Tel./Fax/ Contact Person Name/Tel./Fax/

Roller coasters Thrilling physics

CENTRAL TEXAS COLLEGE AIR AGENCY No. DU8S099Q SYLLABUS FOR AIRP 1451 INSTRUMENT GROUND SCHOOL Semester Hours Credit: 4_. Instructor: Office Hours:

Flight Operations Inspector Manual

Chapter 1 Introduction and Project Overview

FY16 18 CONSTRUCTION ESCORT SUPPORT

Microlight Policy Review. Comment Responses

THIRD RECENT ADVANCES IN QUANTITATIVE REMOTE SENSING Symposium

Transcription:

ENGR1182.01: Roller Coaster Project P. 1

Roller Coaster Project As part of the project in ENGR1182.01, your team will: Innovate, Design, Build, Document, Test a model roller coaster. To obtain these deliverables, you will learn important tools like: Time management and task scheduling, Team communications and meetings, Fair division of labor, Team member responsibilities.

Lab 1 Lab 2 Lab 3 Lab 4 Lab 5 Lab 6 Lab 7 Lab 8 Lab 9 Lab 10 Schedule Review Project Design Description Document. Begin Project notebook Work on paper design. Update Project Notebook Work on paper design. Update Project Notebook Due: Initial paper Design Due: Project Schedule Update Project Notebook Begin construction. Update Project Notebook Construction. Update Project Notebook Construction. Update Project Notebook Preliminary testing. Update Project Notebook Final System testing. Update Project Notebook Oral Presentation Due: Final Written Report Due: Final Design Sketch Due: Completed Project Notebook * Details for items in bold are provided in the Roller Coaster Description document in your lab packet

Configuration Requirements Your team will build an open-loop roller coaster that includes the following minimum required features : Vertical loop Horizontal loop Bump Straight horizontal Any additional features will receive extra points as specified in the RC Description document

Cobra Optional Features Source: coastercommunity.com CorkSrew Source: fr.academic.ru

Operational Requirements In addition to the minimum set of features, your coaster should also meet the following requirements: Your roller coaster design must use the full 25 feet of track Roller coaster track must fit on the lab table top, inside a space that is 5 long, 4 wide The ball must fall into the safety catch bin constructed using cardboard sheet P. 6

Attendance and Grading Policy Attendance is mandatory for ENGR1182.01: For each unexcused absence from a building session, 20 points (20%) will be deducted from the final system test grade. There are no supplemental lab hours. All construction work must be completed within the scheduled lab times. P. 7

Sequential Tasks for the Roller Coaster Project Read project description document and syllabus Team design brainstorming session(s) Team design meetings Initial paper design Revisions from design review meeting incorporated into paper design Initial construction begins Ball rolls through entire roller coaster Mounting of speed sensors Initial testing of completed design Verifying 30 minute build time Final Test Prepare final paper design Performance analysis using speed measurements Final Written report Draft, Final Oral Presentation Outline, Draft, Final, Actual Presentation P. 8

How to satisfy so many tasks? Maintain i a Project Schedule Roller Coaster Project Plan Section: Tues.-9:30 Team: D Revision Date: 9/25/04 Sample Project Schedule Task Team Member Planned Start Actual Start Planned Completion Actual Completion Read syllabus and project description All 23-Sep 24-Sep Team design brainstorming session All 28-Sep 28-Sep Team design meetings All 1-Oct 8-Oct Initial Paper Design All 11-Oct 14-Oct Start project notebook rlk 27-Sep 1-Oct etc. etc. etc. P. 9

Project Notebook The purpose of the project notebook is to document all work undertaken by the team during the course of the semester. Project notebook contains all information required for implementation of the project, in a sequential fashion. The project notebook is worth 50 points. Project notebooks will be checked on a weekly basis in the building sessions Final submission of Project Notebook within the first five minutes of the Oral Presentation session. Any late submissions are subject to a 30% deduction (50 x 0.3 15 points). P. 10

Testing of the Roller Coaster The team will not be graded on the basis of the preliminary test The team will be graded on the basis of the final test Scoring for the Final System Test Each team has up to three trials Best score out of the three trials will be selected Each trial consists of three consecutive runs of the ball along the track. P. 11

Grading Sheet for the Final Test P. 12

Assignment submissions i Various documents/reports etc will be due during the entire project: Initial Paper Design Outline and Draft of Oral Presentation Slides Final Presentation Slides Draft Final Report Final written Report Team Notebook etc. Refer to the course website for due dates P. 13