T5 case study. Seminar 136 held at the Cavendish Conference Centre, London 23rd October Summary

Similar documents
The Strategic Commercial and Procurement Manager

Terms of Reference: Introduction

Update on the Thameslink programme

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Response to CAA Consultation on Strategic Themes for the Review of Heathrow Airport Limited Charges (H7)

ANGLIAN WATER GREEN BOND

LESSONS FROM A SUCCESSFUL SECTOR UK PORTS AS AN EXAMPLE. Report of seminar 180 held on 4th September 2013 Church House, London SUMMARY

Revalidation: initial consultation

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Enhancing customer service Offering the right services Improving integrated journeys Facilitating local

Presentation. Progress, Process & Lessons Learned with IDBB (ECI) Jeff Schramm Gilbane Building Company

Sustainable Procurement Policy for Heathrow Airport Limited

30 th January Local Government s critical role in driving the tourism economy. January 2016 de Waal

ENVIRONMENT ACTION PLAN

Preparatory Course in Business (RMIT) SIM Global Education. Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia

Air Operator Certification

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Response to the London Heathrow Airport Expansion Public Consultation

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

PERTH AND KINROSS COUNCIL. 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS

TWELFTH AIR NAVIGATION CONFERENCE

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Strategic Transport Forum 7 th December 2018

Director, External Trade, CARICOM Secretariat. CARICOM Secretariat, Guyana

Revalidation: Recommendations from the Task and Finish Group

MAXIMUM LEVELS OF AVIATION TERMINAL SERVICE CHARGES that may be imposed by the Irish Aviation Authority ISSUE PAPER CP3/2010 COMMENTS OF AER LINGUS

ACI EUROPE POSITION PAPER. Airport Slot Allocation

Tourism Quality and Standards: A Sustainable Tourism Policy Perspective

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

Heathrow Consultation January March 2018

4 Rights and duties in connection with the conduct of petroleum activities

Economic regulation: A review of Gatwick Airport Limited s commitments framework

AIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers

COMMISSION IMPLEMENTING REGULATION (EU)

RUNWAY SAFETY GO-TEAM METHODOLOGY

AIRPORT OF THE FUTURE

The Government s Aviation Strategy Transport for the North (TfN) response

Strategic Transport Forum

E-RECORDS. Heading towards a Paperless operation SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT

Agenda Item 6: Aviation Security and Facilitation

Safety & Airspace Regulation Group Code of Practice. Issue 13, August 2013 CAP 1089

LINCOLNSHIRE PARKING POLICY DRAFT

BHP Billiton Global Indigenous Peoples Strategy

UK Implementation of PBN

TWELFTH AIR NAVIGATION CONFERENCE

The recovery of costs associated with obtaining planning permission for new runway capacity: initial proposals Heathrow s response

Re: CAP 1541 Consultation on core elements of the regulatory framework to support capacity expansion at Heathrow

PERTH AND KINROSS COUNCIL. 5 October 2016 COMMUNITY PLANNING PARTNERSHIP UPDATE

2009 Sustainability performance summary. Towards a sustainable Heathrow

QUÉBEC DECLARATION ON ECOTOURISM World Ecotourism Summit Québec City, Canada, 2002

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan

Submission to. Southland District Council on. Draft Stewart Island/Rakiura Visitor Levy Policy and Bylaw

ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015

Civil Approach Procedural Controller Military Terminal Radar Controller

Response to CAA Consultation on the Future of Service Quality Regulation for Heathrow Airport Limited

SUSTAINABLE AIR TRANSPORT IN THE FUTURE TEN-T

Transport Infrastructure Construction and RMI Market Report - UK Analysis

LINCOLNSHIRE PARKING POLICY DRAFT

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

STANSTED AIRPORT LIMITED REGULATORY ACCOUNTS PERFORMANCE REPORT FOR THE YEAR ENDED 31 MARCH Financial Review...1. Performance Report...

Recognition for Defence Aviation; what, why and how

CAA Stakeholder Survey Results. Part 139 Aerodromes. Introduction:

The way we run our business The marketplace

Airport Privatization:

The Cobham Room, Novotel Hamilton Tainui, 7 Alma Street, Hamilton

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009

Transport Delivery Committee

Community Transport update

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

POLICE AND FIRE & RESCUE SCRUTINY SUB-COMMITTEE. Consultation, Annual Review of Policing 2017/18 by Scottish Police Authority (SPA)

Gatwick Airport Limited operator determination

Phase 1 Report: Summary of Economic Development Policies, Plans, Projects and Priorities

PAGE 602

Submission to. Palmerston North City Council. on the. Draft Long Term Plan Date: 23 April 2018

Consumer Council for Northern Ireland response to Department for Transport Developing a sustainable framework for UK aviation: Scoping document

JOB DESCRIPTION FBO Manager

ACI EUROPE POSITION. on the revision of. EU DIRECTIVE 2002/30 (noise-related operating restrictions at community airports)

THE CARICOM REGIONAL IMPLEMENTATION PLAN

2. Our response follows the structure of the consultation document and covers the following issues in turn:

Decision Strategic Plan Commission Paper 5/ th May 2017

Response to CAA Guidance for Heathrow Airport Limited in preparing its business plans for the H7 price control

Appendix 1: Blackpool Fylde and Wyre Economic Development Company Ltd

Seminario internacional sobre gestiόn privada de aeropuertos

Gold Coast: Modelled Future PIA Queensland Awards for Planning Excellence 2014 Nomination under Cutting Edge Research category

EXPRESSION OF INTEREST EOI 0008

Tel.: +1 (514) ext Ref.: SWG 21/1-09/94 16 December 2009

CAA Consultation on issues affecting passengers access to UK airports: a review of surface access

GATWICK AIRPORT LIMITED REGULATORY ACCOUNTS FOR THE YEAR ENDED 31 MARCH 2014

Total Airport Management Solution DELIVERING THE NEXT GENERATION AIRPORT

Cable & Wireless International Response to Ofcom Discussion Paper Mobile Services on Aircraft

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

CAPABILITY STATEMENT TRANSPORT

Assessment of Flight and Duty Time Schemes Procedure

Research Briefing Flood and Coastal Erosion Risk Management in Wales

CAA AIRSPACE CHANGE DECISION

TERMS OF REFERENCE WHITSUNDAY ROC LIMITED. Adopted 17 th October These Terms of Reference are underpinned by the Constitution of the

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

LAMP 2 - FASI(S) Network

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

Bartlett Square Welcome. Investment Framework. London Airport Ltd

Transcription:

T5 case study Seminar 136 held at the Cavendish Conference Centre, London 23rd October 2007 Summary 1

Introduction Following on from the longest public inquiry in UK planning history, in the late summer of 2002 BAA started the five year assembly phase of the 4.3 billion Terminal 5 (T5) programme at Heathrow Airport. In September 2007 the works were formally handed over to the operator, Heathrow Airport, for a six month operational readiness period prior to opening on 27 March 2008. The seminar focused on how this complex programme of works located on a site the size of Hyde Park between the world s most heavily utilised runways has been delivered whilst remaining on course to achieve its stated objectives of cost, time, quality and safety. Key figures from BAA and first tier suppliers involved in running the project provided an insight into their experiences, observations and lessons learned. Particular focus was given to the T5 s team s unique approach to project management, enabled through the bespoke T5 Agreement. Setting the scene The T5 programme is effectively a series of major projects in their own right, involving many disciplines and a variety of stakeholders. The first presentation provided an overview of the history and background to the T5 project, and what it comprises in terms of size and complexity. For instance there is more to the project than simply the creation of the assets: planning requirements imposed a number of obligations, such as landscaping, environmental and archaeological considerations and the building of several logistical centres, including a railhead and an off-site factory for the fabrication of reinforcement steel structures. T5 has two delivery phases. Phase 1 consists of the main concourse building (T5A), at which people will arrive and check in and the first satellite building concourse (T5B), together with the air traffic control tower and other infrastructure and buildings supporting the facility; phase 1 provides a capacity for about 27 million passengers per annum. Phase 2 comprises the second satellite building concourse (T5C) and when completed will add a further three million annual passenger capacity. continued 2

scene continued The photographs below show the T5A and T5B buildings: T5A T5B The T5 road and rail interfaces and transport arrangements were outlined. Roads converge into a single facility known as the multi-storey car park (MSCP5), which provides access and parking for buses, coaches, taxis and cars immediately in front of T5A. For rail users, the Piccadilly line extension (PiccEx) and the Heathrow Express extension (HexEx) run into a new station beneath T5A. The T5A building and its satellites T5B and T5C are connected by a sub-surface passenger track transit system, which conveys arriving and departing air passengers in an automated people mover. Some of the numerous work in progress challenges during the five year construction phase were explained. For instance, the requirement to divert the course of two rivers running directly across Heathrow to the airport perimeter meant that the site was effectively bisected in two until the new channels had been constructed. Relocating the rivers also required the capture and relocation of both the habitat and various species living within it, such as the water vole. 3

The T5 Agreement The second presentation described the origins of the development and introduction of the T5 Agreement, a form of contract which represents a significant departure from commonly held concepts about contracting. Various factors shaped BAA s thinking. For instance, events such as the Heathrow tunnel collapse in 1994 pointed to the need for holistic thinking about risk, supported by integrated teams that would solve problems in a multidisciplinary way. During the 1990s numerous major projects were running late, and the construction industry was being challenged by reviews and reports identifying cultural issues that had to be overcome before construction performance would improve, for example the adversarial relationships that existed between construction firms, consultants and clients. Emergent thinking led to the New Engineering Contract (NEC), first published in 1993. BAA became one of the first companies to use it, bringing project management into contract thinking and developing a more relational culture, where the client was starting to work with the contractors to solve problems as and when they arose. The size and scope of the T5 project, where 16 projects were being managed in a single programme, presented a number of challenges that posed potential risks to BAA. The principal aim of the T5 Agreement was as an enabler and a bridge to ensure that the risk to the company could be managed and that it was in the contractor s interests to be involved in managing the risk. This required changes in thinking and approach, as outlined in the following illustration: T5 contracting approach Usual contracting transfer of risk Priced to a defined scope Profit at risk Compliance/remedies driven Silos Cost of failure (?) t5 contracting Cannot transfer risk Remain flexible BAA holds the risk active risk management Success driven Value for money DIFFERENT UNDERLYING ASSUMPTIONS 4

How T5 was delivered The third presentation looked at the procedures and processes required to support the T5 Agreement in practice. This involved a change in people s behaviours and thinking, and the creation of an integrated team environment. BAA took all the risk, all the time: they paid defined costs around the build element, put a ring fence around the contractor s profit and overheads, and thereby eliminated the need for the contractor to price the risk. In return for BAA taking all the risk, the contractors had to think and work differently and embrace the concept of a single integrated team. Although part of the integrated team, BAA ensured that the right person led the teams in some teams this would be BAA, in others a contractor or consultant. Aligned against this structure were the target costs, a shared incentivising mechanism and a set of insurance products that underpinned that whole process. Some of the ways in which BAA engendered goodwill and encouraged personal responsibility amongst an organisation of 8,000 people were considered. For example the health and welfare of the staff was a priority, there were reward schemes for individuals and teams who went beyond the call of duty, and staff at all levels were asked to be accountable for four targets making T5 safe, delivering quality and keeping within budget and schedule. The supplier s view Two senior representatives from two of the leading first tier suppliers provided their perspective on the application of the T5 Agreement. Both suppliers endorsed the view that the T5 Agreement created a very positive environment in which to operate. As integral members of the design and construction team their voices were just as important as anyone else s, and their employees regarded themselves as part of a T5 team rather than seconded employees of particular companies. Everyone was committed to the delivery of the project, and operations were carried out safely, together something that does not always happens within the construction industry. It was felt that the T5 Agreement principles should be replicated in other projects. Two projects were described which demonstrate the value of the Agreement. In the first, as a key member of the delivery team the supplier had the opportunity to raise some concerns about a design which had some inherent programme and cost risks. BAA then facilitated a debate with all the relevant parties, which resulted in changes which satisfied all sides. The second project involved problems in the fabrication and production stage of another part of the programme. BAA s approach to risk, with the emphasis on a solution rather than allocating blame, enabled the team to direct their energies into resolving the issues in a pragmatic, not adversarial, way. 5

The client s perspective The final presentation considered the client s perspective of the challenges of the T5 project, and the key lessons learned. It looked at the main themes of BAA s approach to the creation of an environment for success, for example: 1. The contract T5 Agreement The softer people issues presented the greatest challenge. Suppliers and subcontractors were chosen not just for their technical skills but for behavioural competence and an understanding that the Agreement had a fundamentally different set of assumptions to traditional contracting. 2. Risk management A great deal of research was undertaken before deciding on the stance to be taken regarding risk management. BAA chose to hold all the risk all the time because it enabled transparent working arrangements with the supply chain. BAA played an active role in shaping and influencing the outcomes. 3. Influencing behaviours Engendering the right mindset in all of the team members presented one of the most significant challenges of the project. At the outset few people embraced the T5 approach, and a great deal of time was required with senior personnel to explain the behaviours expected. At the highest levels people wanted the same result as BAA: a quality job, an enhanced reputation and a predictable cost outcome. The main challenge was embedding the T5 culture and ways of working across the programme, and BAA spent time with the human resources directors of the top 50 suppliers to ensure that this happened. 4. Communications Influencing behaviour is closely connected with communications. The iconic nature of T5 meant that BAA could remind individual employees to feel proud that they were members of the team that was creating and delivering a large infrastructure project safely, on time, on budget and to a defined quality. 5. Performance management BAA explained some of the many challenges faced in setting up and managing performance at an effective level and depth both within BAA itself and throughout the project teams. For example, T5 was packaged into a large number of separate projects and subprojects, but performance was measured at subproject level. When applying commercial judgement to performance issues these had to be seen in the context of the overall project. The challenge for the client and for the integrated team was to see where there were trade-offs and interdependencies between the various subprojects, a skill that took time to perfect. continued 6

perspective continued BAA is formulating a third generation of agreement frameworks, in which the principles of the T5 Agreement will be maintained: long-term relationship frameworks project awards based on performance progressive dependence on and development of trust in supplier capability pre-agreed commercial models with incentives and targets collaborative working with real-time transparency active management of risk and opportunity an alliance driven by common objectives, behaviours and values Conclusion The Chairman summed up the proceedings by noting that risk management is not simply part of project management, but that project management exists to support risk management. Meeting the challenge of project management in a complex programme such as T5 depends on the flexibility to change and improve the plan when circumstances change. Uncertainty is a synonym for risk and the T5 team clearly got on top of the uncertainties and produced the forecast outcome with creativity, confidence and initiative. 7

Participating organisations Arup BAA plc BAE SYSTEMS, Air BAE SYSTEMS, Submarines Balfour Beatty plc BBC Projects Bircham Dyson Bell British Airways plc British Energy Centre for Research in the Management of Projects (UCL/UoM) CJ Associates CMS Cameron McKenna LLP Comply Serve Ltd Cross London Rail Links Ltd Costain Ltd Denton Wilde Sapte Department for Transport Emcor Rail Ltd Ernst & Young LLP Freshfields Bruckhaus Deringer KPMG LLP Laing O Rourke London 2012 Programme Metronet Rail Ministry of Defence (DPA) Murray & Roberts Holdings Mott MacDonald Group Ltd National Air Traffic Services Ltd National Audit Office Network Rail Infrastructure Ltd Nuclear Decommissioning Authority PA Consulting Group PricewaterhouseCoopers QinetiQ Risk Solutions Rolls-Royce plc Said Business School Sama Contracting Scott Wilson Kirkpatrick & Co, Ltd Severfield-Rowen plc Shadbolt & Co LLP The Nichols Group Transport for London Westfield Shoppingtowns 8