COON CREEK WATERSHED DISTRICT Request for Board Action

Similar documents
ADDENDUM NO. TWO AB


THREE RIVERS PARK DISTRICT

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

Meeting opened 7:03PM 9/20/18. Secretary Report: Approve June 2018 Minutes: No quorum to approve

KP Lasnaya 1 River

APPENDIX F List of Commitments

DRAFT. Dorabelle Campground Rehabilitation

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

AGAWAM CONSERVATION COMMISSION April 26, 2018

RIO VISTA MUNICIPAL AIRPORT

Bear Creek Habitat Improvement Project

Peace Project Water Use Plan

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project

FURTHER TO AUTHORITY MEETING #5/13 To Be Held June 21, 2013

CITY COUNCIL AGENDA MEMORANDUM

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

Action Recommendation: Budget Impact:

Request for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal

CITY COUNCIL AGENDA MEMORANDUM

BRENT KNOLL PARISH COUNCIL

PacifiCorp North Umpqua Hydroelectric Project FERC Project No VOLUME 1 EXHIBITS

Community Development

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

January 19, 2018 Project No C Via

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Open Meeting. To update the Board on issues arising from the previous meeting.

Appendix A2 Traffic and Transportation Management Plan

TRANSMITTAL. Please contact me with any questions. 7 Spruce Road, Freeport, ME T: (207)

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY

Mainelli Wagner & Associates, Inc.

BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS MINUTES OF MEETING May 22, 2017 APPROVED 6/28/17

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

DISTRICT OF SQUAMISH

Mainelli Wagner & Associates, Inc.

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Proposed Project 1: Kimble Loop East Horse Trail Reroute (1). Horse Trail Reroute: March 14, 2012

Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS. Notice of intent to prepare an Environmental Impact Statement.

ENVIRONMENTAL SERVICES COMMITTEE TUESDAY 22 NOVEMBER 2016 MINUTES

Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

Trail Feasibility Study

Appendix E: Railroad Route Evaluation, Maps and Tables

II. Purpose and Need. 2.1 Background

To propose the demolition of the former St. Ann School Education Resource Centre building located at 2123 Hixon Street, Oakville.

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan

DATA BOOK IV : COST ESTIMATE

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT

To obtain Board approval to demolish the former St. Ann School Education Resource Centre building located at 2123 Hixon Street, Oakville.

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013

Morrison County Board of Adjustment. Minutes. July 7, 2015

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON

Section XIII. Cost Estimates

80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS

COATING AND STRUCTURAL CONCRETE COATING (ANTI-GRAFFITI) 1'-3" FINISHED GRADE 1'-3" 3" VENEER ALLOWANCE LEDGER W/ MECHANICAL ANCHOR BOLT

STREAKED HORNED LARK. Conservation of a threatened species in an industrial landscape. Cat Brown US Fish and Wildlife Service

ROAD AND TRAIL PROJECT APPROVAL

Community Park Capital Project. February 6, 2017

BURLEIGH COUNTY PARK BOARD MEETING MINUTES

LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT

9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE

National Forests and Grasslands in Texas

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R

MILBORNE PORT PARISH COUNCIL

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Indiana Department of Natural Resources / Division of Water

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

The Whitefish Trail

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

Survey of Littleton Down

Motion Passed. Questions on Agenda Items: None

related to temporary banners, flags, A-frame signs, and other temporary sign devices for commercial advertising. (Lee Plemel,

U.S. Army Corps of Engineers Fiscal Year 2013 Handshake Program Application

Briarhill Neighborhood Polecat Priority List. Exhibit D-4

MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, April 4, 2017

FINAL REPORT Papplewick Playing Field Skate Park Project

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

MEETING OF JUNE 27, 2016 OF THE TRUSTEES OF THE FREEHOLDERS AND COMMONALTY OF THE TOWN OF EAST HAMPTON

MP : Headwaters of the Fraser River

Chorley Park Trail Connection New Design Options. Information Booklet Prepared for June 9, 2014 Public Meeting

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Project Management, Environmental Assessment, Stormwater Management. Hydrologic Modelling. Natural Heritage. Fluvial Geomorphology

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must:

Moraine Valley Community College Campus Tree Care Plan Table of Contents

CITY PLANNING COMMISSION AGENDA ITEM NOS: 5.A, 5.B STAFF: MICHAEL SCHULTZ

Flood History. Floodplain Descriptions

Project Focus Group (PFG) Meeting Notes- Final Meeting #1

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

Transcription:

Item 13: Request to Award Work on Woodcrest Creek Bank Stabilization Project Page 1 of 6 COON CREEK WATERSHED DISTRICT Request for Board Action MEETING DATE: December 8, 2014 AGENDA NUMBER: 13 ITEM: Request to Award Work-Woodcrest Creek Bank Stab Proj. FISCAL IMPACT: $136,500 POLICY IMPACT: Policy REQUEST Review Quotes and Award contract for Woodcrest Creek Bank Stabilization Project BACKGROUND As part of the Comprehensive and Capital Improvement planning process, the Woodcrest Bank Stabilization project was prioritized and budgeted $136,500 for work in 2014 as part of the District Bank Stabilization Program. The project is intended to address very severe bank erosion, incised channel and approximately 20 foot vertical bank walls either side of the channel. Top of bank is densely wooded with mature trees. At the September 9, 2013 Board meeting the Board approved the 2014 budget. At the February 10, 2014 Board meeting the Board received an itemization of projects commencing in 2014, including the Woodcrest Bank Stabilization Project. On March 3, 2014 staff met with City of Coon Rapids staff to discuss project details. On March 5, 2014 an open house was held at Coon Rapids City Hall. Residents from 4 properties attended. Residents concluded that a project is warranted and that the District should proceed with survey and design. Staff attempted contacting residents who did not attend by phone and mailed a follow-up letter and copy of the open house handouts. On April 22, 2014 staff attempted to conduct a site survey but was unsuccessful due to tree canopy and high banks. On April 28, 2014 Wenck conducted a site survey using equipment specialized for the site conditions. On July 16, 2014 Wenck completed preliminary design options. On July 22, 2014 staff met with City of Coon Rapids staff to discuss project details. On September 3, 2014 an open house was held at Coon Rapids City Hall. Residents from 3 properties attended. Resident concerns were addressed and design options were presented. A vegetated riprap design was determined to be the most feasible design. Staff attempted contacting residents who did not attend by phone and mailed a follow-up letter and copy of the open house handouts.

Item 13: Request to Award Work on Woodcrest Creek Bank Stabilization Project Page 2 of 6 At the September 22, 2014 Board meeting the board authorized staff to seek quotes for the project. From November 7, 2014 through November 14, 2014 an advertisement for bids was published in the Anoka County Union Herald and Sun Focus Columbia Heights/Fridley newspapers. The advertisement for bids was also made available through QuestCDN. On November 18, 2014 a prebid meeting was held onsite. 9 contractors attended. ISSUES/CONCERNS Construction Budget: is $136,500 Engineers Estimate: is $178,160 North bank: 14 single family properties. Fences, sheds, tress and other issues limit design options and present difficulties in modifying this bank or working from this side. All residents agree a project is needed to address the bank erosion. South bank: Woodcrest Park. Densely wooded adjacent to the channel with many problem trees. Design: Reshape south bank to a gentler slope. Place vegetated riprap along toe of either bank to a height of 4 feet above the channel bottom. Install 4 rate control structures. Place additional rock at pedestrian bridge and end of culverts. Tree Removal: Trees will be marked for removal that interfere with rock placement, obstruct access or pose hazardous. Flagging has been provided to the residents to mark trees they wish to save. Staff has explained that saved trees will be the responsibility of the residents should they cause issues in the future. Access: South side of project completely within park. Piping Design Alternative: during the March 3, 2014 open house residents expressed concern that previous attempts to stabilize the bank have failed. Residents requested the District explore piping the channel. At the September 5, 2014 open house the design alternative for piping the channel was presented. Piping the channel was estimated to cost $528,960; which exceeds the district budget by $392,460. Publication: notice for quotes required to be published in official District newspapers as project estimated cost exceeds statutory minimum. Quotes: 13 contractors submitted quotes.

Item 13: Request to Award Work on Woodcrest Creek Bank Stabilization Project Page 3 of 6 Quote Completeness: Staff reviewed the quotes for completeness Plan Holders Quote Signed Quote Schedule Information Required Filled Out of Quoters Sunram Construction Yes Yes Yes Blackstone Contractors Yes Yes Yes New Look Contracting Yes Yes Yes Fitzgerald Excavating Yes Yes Yes MNL Inc Yes Yes Yes Peterson Companies Yes Yes Yes North Pine Aggregate Yes Yes Yes Meyer Contracting Yes Yes Yes RJ Valek Yes Yes Yes Rachel Contracting Yes Yes Yes GF Jedlicki Yes Yes Yes Cobalt Contracting Yes Yes Yes RLP Services No No No Costs: Company Quote Sunram Construction $138,285.00 Blackstone Contractors $161,294.00 New Look Contracting $176,873.70 Fitzgerald Excavating $178,110.00 MNL Inc $179,400.00 Peterson Companies $184,391.70 North Pine Aggregate $208,051.00 Meyer Contracting $217,646.00 RJ Valek $237,850.00 Rachel Contracting $277,226.00 GF Jedlicki $278,973.50 Cobalt Contracting $367,055.00 RLP Services $412,493.00 Note-Quotes detailed by unit price at end to staff report RECOMMENDATION Award contract to Sunram Construction

Item 13: Request to Award Work on Woodcrest Creek Bank Stabilization Project Page 4 of 6

Item 13: Request to Award Work on Woodcrest Creek Bank Stabilization Project Page 5 of 6

Item 13: Request to Award Work on Woodcrest Creek Bank Stabilization Project Page 6 of 6 Item Unit Qty Sunram Blackstone New Look Fitzgerald Peterson North Pine MNL Inc Construction Contractors Contracting Excavating Companies Aggregate Mobilization LS 1 $5,300 $7,500 $7,500 $25,000 $8,000 $9,166 $4,195 Temp Erosion Control LS 1 $2,875 $2,000 $7,800 $2,000 $1,000 $3,283 $1,475 Temp Rock Entrance EA 2 $200 $1,000 $1,100 $1,000 $1,750 $1,500 $1,450 Site access and staging area(s) LS 1 $3,700 $5,000 $7,500 $1,000 $2,500 $12,000 $7,615 Tree Clearing & Disposal LS 1 $15,750 $10,000 $19,500 $10,000 $11,000 $30,324 $12,515 Site Grading LS 1 $8,800 $10,500 $15,500 $60,000 $16,000 $37,388 $70,000 Geotextile Fabric SY 1350 $2 $2 $2 $2 $5 $5 $3 Class III Riprap (No Limestone) TON 1440 $61 $75 $68 $44 $80 $46 $65 Native Seed Mix SY 4230 $0 $2 $2 $1 $1 $1 $1 Turf Grass Seed SY 1340 $1 $2 $2 $1 $1 $1 $1 Straw Mulch SY 880 $1 $2 $1 $1 $1 $3 $2 Erosion Control Blanket SY 2000 $3 $1 $3 $2 $3 $3 $1 Street Sweeper HR 20 $150 $100 $0 $80 $150 $146 $135 Total $138,285 $161,294 $176,874 $178,110 $179,400 $184,392 $208,051 Item Unit Qty Meyer Rachel GF Cobalt RLP RJ Valek Contracting Contracting Jedlicki Contracting Services Mobilization LS 1 $10,800 $10,000 $20,000 $13,370 $18,000 $10,000 Temp Erosion Control LS 1 $1,501 $10,000 $5,000 $3,500 $13,000 $35,000 Temp Rock Entrance EA 2 $2,385 $500 $1,200 $640 $1,000 $575 Site access and staging area(s) LS 1 $10,069 $5,000 $15,500 $7,800 $25,000 $45,000 Tree Clearing & Disposal LS 1 $15,000 $35,000 $72,500 $33,000 $10,000 $115,000 Site Grading LS 1 $58,581 $17,000 $33,000 $25,000 $153,000 $35,000 Geotextile Fabric SY 1350 $2 $4 $7 $4 $6 $12 Class III Riprap (No Limestone) TON 1440 $73 $98 $70 $125 $83 $95 Native Seed Mix SY 4230 $0 $1 $2 $0 $2 $2 Turf Grass Seed SY 1340 $1 $1 $2 $1 $2 $3 Straw Mulch SY 880 $1 $2 $1 $1 $4 $2 Erosion Control Blanket SY 2000 $2 $2 $3 $3 $3 $2 Street Sweeper HR 20 $143 $100 $150 $60 $100 $125 Total $217,646 $237,850 $277,226 $278,974 $367,055 $412,493