MIAMI RIVER COMMISSION

Similar documents
CITY OF NORTH MIAMI BEACH REGISTERED LOBBYIST 2017

FESTIVAL PARK REDESIGN

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

CITY OF NORTH MIAMI BEACH REGISTERED LOBBYIST 2018

City of Clearwater East Gateway District

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

French Regional Park Creative Play Area

Memorable Designs, Unforgettable places

Trails, steps, & P-Patch to be south of I- 5 Colonnade

NORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

CLAREMONT CLUB, SPA & RESIDENCES

East Coast Greenway (ECG) Southeast Region Miami-Dade/Broward/Palm Beach/Martin/St. Lucie/Indian River

Corktown Parks. Public Meeting. City of Toronto

The Narrows Waterfront Park A Crown Jewel for Southern Brooklyn

Ralph C. Wilson, Jr. Centennial Park Ralph C. Wilson, Jr. Foundation University at Buffalo Regional Institute 17 January 2019

PARKS & BEACHES PROJECTS

WEST CENTRAL SECTION CONTENTS: FARWELL PARK NORTH COMMONS PARK OLIVER TRIANGLE RUSSELL PARK THEODORE WIRTH REGIONAL PARK VALLEY VIEW PARK WILLARD PARK

STORY MILL COMMUNITY PARK

2600 COLORADO ENTRY DESIGN

More than just express lanes

FOREIGN EMBASSIES AND CONSULATES nearest to Florida Polytechnic University

M E S T I Z O C U R T I S P A R K

Organizing an event that your attendees rave about long after the team-building selfies

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

Recreation and Park Commission, Capital Committee. Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager

Please find this Instruction package to participants for the 25 th Anniversary St. Stephen s Art Show, February 15-17, 2014.

BEACH & DOWNTOWN VisiTOr MAp & GuiDE Revised July 2017

Public Information Center August 12, 2010

LANDING S PARK CONCEPTUAL PLAN HAMILTON ANDERSON JANUARY City of Novi, Michigan. The Park at 13 Mile and Old Novi Road

Classes Other locations & Parks

Concert Tent Anderson Building Entry

COCONUT GROVE WATERFRONT MASTER PLAN. ERA / Curtis Rogers / ConsulTech / Paul George Ph.D.

November 21, 2012 Barbara Kelleher, (954)

25 th Avenue Grade Separation. September 13, 2017

riverlandingmiami.com


635 Wilmer Ave. Orlando, Fl Ph Fx

Coralville Limestone

CODE COMPLIANCE UNIT

a new urban landscape class a office & retail district murfreesboro, tennessee

01. PRIMARY MONUMENT WAYFINDING, TYP. 03. RULES/REGULATIONS, INTERPRETIVE SIGN, TYP. PARK MAP, WAYFINDING

PONCE DE LEON CORAL GABLES OFFICES

Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019

Schachtner Street. Village Park Somerset, Wisconsin

2850 GREEN STREET HOLLYWOOD, FLORIDA 33020

MOSCONE EXPANSION AND IMPROVEMENT PROJECT

Surgical Services and Observation Unit Project Given by Highland Hospital to the Highland Park Community.

Electro-Optical Imaging, Inc Fortune Place, Suite C West Melbourne, FL (321)

OVERVIEW ROY H. MURPHY COMMUNITY CENTER AND POOL. May 2016 NEW CENTER PARK NEW POOL

AT THE HEART OF YOUR BUSINESS MARCH M A CC M IAMI A IRPORT C ONVENTION C E NTE R M IAM I, F L O RIDA, U S A

CITY OF SARASOTA DOWNTOWN ECONOMIC DEVELOPMENT STATUS OF REAL ESTATE DEVELOPMENT PROJECTS** March 10, 2014

Miami River Corridor Restaurant List December 2017

Interested in learning more? Global Information Assurance Certification Paper. Copyright SANS Institute Author Retains Full Rights

I-579 Urban Open Space CAP Project. Final Land Development Plan (FLDP) Pittsburgh Department of City Planning

EAST CITY PARK. 900 East Third Street 7.04 Acres

Fair Park Comprehensive Development Plan Update. City Council Briefing November 5, 2007

RIDGEFIELD PARKS February 2016

No 30 x 48 space is provided for a wheelchair under the picnic table.

POLICY & STRATEGIES The Vancouver Park Board approves major changes in Vancouver parks, including the design and development of parks.

FOR LEASE 7999 Gateway Boulevard, Newark CA

Community Input Meeting. Fairgrounds Master Planning Update. January 7, 2016, 7 pm

Plaza Park, Village Park, and Community Clubhouse

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

RENOVATIONS UNDERWAY. CITIGROUP CENTER New Name! New Look! New Building! BY WORLD RENOWNED ARCHITECT RICHARD MEIER 2017 COMPLETION

Frederickson LUAC. Community Plan Update. Parks & Recreation. September 25, 2017

Walking Tour: Capitol Building & Playa Peña

Let'sPlaySF! SERGEANT JOHN MACAULAY PARK. Recreation and Park Commission Approval of Concept Design November 1, 2017

Customer Service:

723 n. lincoln lane, miami beach, fl

places esplanade Distinctive Destinations Healthy,Active and Event Ready Family Friendly Foreshore Evolution five


Calendar of Events

Southwest Chief Fact Sheet

SITE & BUILDING ANALYSIS

MOSCONE EXPANSION PROJECT PUBLIC MEETING 2 OCTOBER 16, 2013

A NEW ANGLE ON LUXURY LIVING.

Date Name Address City State Zip Purpose Amount 4/12/17 Florida Democratic Party 214 S. Bronough Street Tallahassee FL Contribution ($

SAN ANTONIO RIVER IMPROVEMENTS PROJECT. August 6, 2008

201 E LAS OLAS BLVD DOWNTOWN FORT LAUDERDALE S NEWEST LUXURY OFFICE TOWER

Popular Areas with Shops and Restaurants

25150 SW 227 th AVENUE Homestead, FL 33031

FLORIDA CITY, FLORIDA

SOUTH LAKE TAHOE, CALIFORNIA REGAN BEACH PRELIMINARY DESIGN NOVEMBER 2015

4. Improvement Plan Elements

THINGS TO DO IN MIAMI

25 th Avenue Grade Separation. December 13, 2017

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP

Interested in learning more? Global Information Assurance Certification Paper. Copyright SANS Institute Author Retains Full Rights

Community Advisory Committee Meeting #3 April 21, 2015

Date Name Address City State Zip Purpose Amount 4/12/17 Florida Democratic Party 214 S. Bronough Street Tallahassee FL Contribution ($

HEARST GARDENS BERKELEY, CA 94702

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

For Lease ±38,392 SF. indy Lin CA RE License # im Randolph CA RE License #

Muncipal Park Areas - Map Locator:

BLUE ROAD COMPANY PROFILE

Imagery 2017 Google, Map data 2017 Google Commercial Land with finished offsites

SOUTH PARK AT FRESHKILLS PARK ANCHOR PARKS PROGRAM COMMUNITY VISIONING. JCC of Staten Island February 1, 2017

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,

RENOVATIONS COMPLETED

Transcription:

COMMISSION July 13, 2015 CG LLC L-0 1.1

PROJECT TEAM OWNERSHIP CG, LLC 3200 STIRLING ROAD HOLLYWOOD, FL 33021 ARCHITECT KOBI KARP AND 2915 BISCAYNE BLVD SUITE 200 MIAMI, FL 33137 ER CG LLC ROMAN AND WILLIAMS BUILDINGS AND INTERIORS 324 LAFAYETTE STREET, 6TH FLOOR NEW YORK, NY 10012 LANDSCAPE ARCHITECTS KIMLEY HORN 1221 BRICKELL AVENUE SUITE 400 MIAMI, FL 33131 CIVIL / TRAFFIC ENGINEER RAYMOND JUNGLES 242 SW 5TH STREET MIAMI, FL 33130 KIMLEY HORN 1221 BRICKELL AVENUE SUITE 400 MIAMI, FL 33131 COASTAL ENGINEER COASTAL SYSTEMS INTERNATIONAL, INC 464 SOUTH DIXIE HIGHWAY CORAL GABLES, FL 33146 LAND USE ATTORNEY BERCOW RADELL & FERNANDEZ, PA 200 SOUTH BISCAYNE BLVD SUITE 850 MIAMI, FL 33131

4 3 1 1 CG LLC 2 2 3 3A 1 Dec. 19, 2014 2 Jan. 28, 2015 3 Feb. 26, 2015 4 Apr. 01, 2015 5 Apr. 30, 2015 4 AIA ASID NCARB EXISTING RIVERWALK CONDITIONS L-1

CG LLC 5 6 5 5A 6 6A EXISTING RIVERWALK CONDITIONS L-2

POOL AND PLAYGROUND ENLARGEMENT JOSE MARTI PARK LAWN PHASE 2 5TH STREET EXISTING POOL JOSE MARTI GYM PHASE 2 RIVERWALK ART PLAZA ENLARGEMENT CG LLC 7TH STREET 3RD AVENUE 6TH STREET PHASE 3 PHASE 1 NORTH PLAZA ENLARGEMENT 2.5 AVE ENLARGEMENT 2.5 AVENUE PHASE 2 MAIN PLAZA ENLARGEMENT PHASE 4 PHASE 5 RIVERWALK SOUTH PLAZA ENLARGEMENT OVERALL DEVELOPMENT PLAN WITH CANOPY L-3

SW4TH ST SW 3RD ST SW 2ND ST CUBAN PALM COLLECTION ACCESSIBLE + SECURITY PARKING OUTDOOR GYM AREA CHILDREN S PLAY AREA WITH OVERHEAD SHADE STRUCTURE SW 4TH AVE 15 LAWN - OPEN GATHERING/ PLAY JOSE MARTI MEMORIAL WALL + RESTROOMS NEW OVERHEAD TRELLIS STRUCTURE RENOVATED SWIMMING POOL + DECK 25 17 30 25 20 19 21 28 28 15 NEW WALKWAYS WITH INTEGRAL COLORED PAVING PATTERN PUBLIC RIVERWALK 15 MIN. WIDTH 3 SAFETY ZONE CG LLC PUBLIC ART PLAZA 17 18 PUBLIC RIVERWALK 15 MIN. WIDTH 20 3 SAFETY ZONE 35 0 15 30 60 SCALE: 1 =30 N JOSE MARTI PARK PLAN WITH DIMENSIONS L-4

SW4TH ST SW 3RD ST SW 2ND ST CUBAN PALM COLLECTION ACCESSIBLE + SECURITY PARKING OUTDOOR GYM AREA SW 4TH AVE CHILDREN S PLAY AREA WITH OVERHEAD SHADE STRUCTURE LAWN - OPEN GATHERING/ PLAY JOSE MARTI MEMORIAL WALL + RESTROOMS NEW OVERHEAD TRELLIS STRUCTURE NEW WALKWAYS WITH INTEGRAL COLORED PAVING PATTERN CG LLC RENOVATED SWIMMING POOL + DECK PUBLIC RIVERWALK WITH 15 MIN. WIDTH PUBLIC ART PLAZA FOOD TRUCK PARKING PUBLIC RIVERWALK WITH 15 MIN. WIDTH 0 15 30 60 SCALE: 1 =30 N JOSE MARTI PARK PLAN WITH TREE CANOPY L-5

SW 2ND ST SW 3RD ST SW4TH ST SW 4TH AVE CONNECTOR TO EXISTING GREENWAY 3 TYP. SAFETY ZONE PUBLIC RIVERWALK AND BIKEPATH WITH 15 MINIMUM CLEARANCE. THE RIVERWALK WILL BE CLEARLY DILENEATED WITH IN-GROUND PATH MARKERS. CG LLC EXISTING BULKHEAD PUBLIC RIVERWALK AND BIKEPATH WITH 15 MINIMUM CLEARANCE. THE RIVERWALK WILL BE CLEARLY DILENEATED WITH IN-GROUND PATH MARKERS. 3 TYP. SAFETY ZONE CONNECTOR TO EXISTING GREENWAY I-195 HIGHWAY STRUCTURE ABOVE CONNECTOR TO EXISTING WALK PUBLIC RIVERWALK AND BIKEPATH WITH 15 MINIMUM CLEARANCE. THE RIVERWALK WILL BE CLEARLY DILENEATED WITH IN-GROUND PATH MARKERS. 0 15 30 60 SCALE: 1 =30 N THE RIVERWALK @ JOSE MARTI PARK L-6

ENLARGEMENT KEY CG LLC CHILDREN S PLAY AREA WITH OVERHEAD SHADE STRUCTURE MONUMENT WALL, AND RELOCATED BUST OF JOSE MARTI FITNESS AREA NEW RESTROOMS RETAINING WALL AND BENCH AT EXISTING MAHOGANY SPECIMEN NEW OVERHEAD TRELLIS INTERACTIVE FOUNTAIN FEATURE EXISTING CHANGING ROOMS 3 SAFETY ZONE NEW OVERHEAD TRELLIS CUSTOM BENCH AND RIVER VIEW TERRACE RENOVATED SWIMMING POOL + DECK EXISTING BULKHEAD EXTENDED RIVERWALK WITH 3 SAFETY ZONE EXISTING BULKHEAD BELOW 0 7.5 15 30 N JOSE MARTI PARK ENLARGEMENT L-7

TRELLIS WITH FLOWERING VINES NEW RESTROOM BUILDING JOSE MARTI MEMORIAL WALL NEW OVERHEAD FABRIC SHADE STRUCTURE CG LLC PLAY STRUCTURES WITH SLIDE AND CLIMBING SURFACES SWINGSET STONE SEAT WALL PERSPECTIVE @ CHILDREN S PLAY AREA L-8

ENLARGEMENT KEY NEW OVERHEAD TRELLIS EXISTING POOL FOOD TRUCK PARKING RELOCATED PUMP-HOUSE CG LLC PUBLIC ART PLAZA 3 SAFETY ZONE PUBLIC RIVERWALK EXISTING BULKHEAD NEW SCULPTURAL BENCH NEW SCULPTURAL BENCH WITH PLANTER 0 7.5 15 30 N JOSE MARTI PARK ENLARGEMENT L-9

PUBLIC ART INSTALLATION CONCEPT A CG LLC TREES BEYOND TREES + PLANTER BEYOND FOOD TRUCK PARKING PUBLIC ART INSTALLATION CIRCULATION + PLAZA PLANTER + SEATING RIVERWALK 3 SAFETY ZONE RIVER SHIPPING CHANNEL JOSE MARTI PARK SECTION A L-10

B CG LLC STREET TREES LEGACY TREE (BEYOND) PALMS BULKHEAD 4TH AVE SIDEWALK PLANTING OPEN LAWN AREA PLANTING WIDTH VARIES 24 SHOWN. 15 MIN. RIVERWALK RIVER 3 SAFETY ZONE JOSE MARTI PARK SECTION B L-11

C CG LLC CENTER LINE STREET TREES LEGACY TREE NATIVE PLANTINGS SHADE TREES AND PLANTING BEYOND PROPERTY LINE SIDEWALK + PARKING 4TH AVE PLANTING SIDEWALK + CIRCULATION PLANTING PLAY/EXCERCISE AREA PLANTING INTERACTIVE FOUNTAIN PLAZA WIDTH VARIES 30 SHOWN. 15 MIN. RIVERWALK RIVER-VIEW SEATING JOSE MARTI PARK SECTION C L-12

D OVERHEAD SHADE STRUCTURE EXISTING SPECIMEN MAHOGANY TREE CG LLC SHADED TERRACE W/ NEW TRELLIS STRUCTURE SIDEWALK + CIRCULATION PLANTING TRELLIS, RESTROOMS AND JOSE MARTI MONUMENT WALL CHILDREN S PLAY AREA PLANTER WALLS + SEATING AREA SIDEWALK + CIRCULATION JOSE MARTI PARK SECTION D L-13

CG LLC Landscape Architect: Annabau, Wiesbaden, Germany Solar Tree Street Lamp, by Artemide, Milan, Italy Artist: Bill Fitz Gibbons, San Antonio, TX Artist: Cliff Garten, North Hollywood, CA Artist: Light Harvest, Brooklyn Bridge Artist: Teresita Fernandez, New York, NY Artists: Joe O Connell and Blessing Hancock, San Antonio, TX Artist: Janet Echelman, Amsterdam, Netherlands PUBLIC ART PRECEDENT IMAGES L-14

CG LLC Artist: Janet Echelman, Miami, FL - CONCEPT BRIDGE ART PERSPECTIVE - CONCEPT L-15

CG LLC Artist: Janet Echelman, Miami, FL - CONCEPT BRIDGE ART PERSPECTIVE - CONCEPT L-16