Signaling System and Communication System on Shinkansen of JR-EAST

Similar documents
High-Speed Rail Operations in Japan Takao NISHIYAMA

JR East: Earthquake Measures

Improving Safety at Level Crossings - JR East Developments

High Speed Network in Asian Countries: China, Korea and Japan. Naoto YANASE UIC, Senior Advisor High Speed Paris, France

High Speed Lines Operation in Japan

EXECUTIVE VICE PRESIDENT. Masaki OGATA. Copyright 2010 East Japan Railway Company. All rights reserved 1

Shinkansen Network in Japan and OutlineO of East Japan Railway Company. East Japan Railway Company

Education for Pedestrians at Level Crossings. Taro KITAMURA Takuji HONZAWA Transport Safety Department East Japan Railway Company

Special edition paper Development of a Crew Schedule Data Transfer System

Construction Scheme of Shinkansen

RailTokyo March 2015 Japan High-Density Metropolitan and Intercity Railway Transportation

Overview of Hokkaido Shinkansen (Opening between Shin-Aomori and Shin-Hakodate-Hokuto)

CENTRAL JAPAN RAILWAY (JRC) A TOTAL SYSTEM APPROACH TO HIGH- SPEED RAIL PRESENTED BY: RICHARD P. LAWLESS CEO, U.S.-JAPAN HIGH-SPEED RAIL

We have been pursuing initiatives in light of the Group Philosophy since 1987.

ASSEMBLY 39TH SESSION

JR East: International and Domestic Perspectives

Quality Transport - Key to enhance Connectivity and Sustainability -

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

High Speed System in Japan

Effectiveness of Electrical Safety Management Service proven by the Great East Japan Earthquake

34 Review of Operations. 46 To Achieve Sustainable Growth. 65 Facts and Figures. Contents

JR East: Domestic and International Perspectives

Evaluation of the National Railway Reform in Japan

Promoting JR EAST Groupʼs Inbound Initiatives

TRANSPORTATION BUSINESS SUPPORTS JR EAST AS A STABLE PROFIT RESOURCE

Feature: Priority Initiative 01 Railway Network Expansion

FRA CDM. Airport Collaborative Decision Making (A-CDM) Flight Crew Briefing FRANKFURT AIRPORT. German Harmonisation

A new multimedia platform for in-room TV technology

1. Launch of the Tokyo-Osaka Hokuriku Arch Pass. November 4, 2015 East Japan Railway Company

Station Development Eki-naka concept and practice. Hironori Tsujimura East Japan Railway Company London Office

Hiway Gateway Specification and Technical Data

Transportation >Tokyo Metropolitan Area Network

Construction of Ueno Tokyo Line

Weathering the Storms, Where to Go, What to Do

Railway Master Plan in Tokyo (2016)

From Planning to Operations Dr. Peter Belobaba

The Asian evolution of high speed rail

NextGen Priorities: Multiple Runway Operations & RECAT

New York Aviation Management Association Conference

Maximizing the Potential of Station Locations in Japan. Emiko Sayama Director, JR East NY Office New York, NY

The Challenge of Surface Conditions. AST: A New Solution to a Global Aviation Problem. Benefits and Business Value to Airports and Operators

The organisation of the Airbus. A330/340 flight control system. Ian Sommerville 2001 Airbus flight control system Slide 1

Pan Pacific Hotels Group rolls out Milestone IP video technology to ensure guest safety

3rd Asia Pacific Conference on Luminescence and Electron Spin Resonance dating: including

NextGen and GA 2014 Welcome Outline Safety Seminars Safety Seminars

Air Navigation Bureau ICAO Headquarters, Montreal

Roadmapping Breakout Session Overview

Network Safeworking Rules and Procedures

Virgin Australia 2017 Review on Indian Ocean Territories Operations

A-CDM A SUCCESS CASE OF COLLABORATION GRUAIRPORT & GOL. Capt Miguel Dau - COO

CASCADE OPERATIONAL FOCUS GROUP (OFG)

High-Density Transport Systems Supporting Giant Metropolis of Tokyo

National Rail Performance Report - Quarter /14

ASDA Session 3: Airport Performance More Punctuality. 11-November-2016 Chris Schneider

PCH Hotels and Resorts Delivers State-of-the-Art Guest Experience

e- Check in project at Narita Airport

Glacier National Park: Going-to-the-Sun Road Rehabilitation

Cities Necessity to build intercity networks for their self-sustainability : Lessons learned from the Great East Japan Earthquake

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

Measures Perpetuating JR East s Unlimited Growth Potential

(For Arrival at Tokyo Haneda Airport. Taking Tokyo Monorail to downtown.)

Services for Air Transport. The mobile satellite company

JAPAN RAIL PASS Exchange Order cannot be purchased inside Japan.

Summary of Life-Style Service Business Growth Vision (NEXT10)

A STUDY ON OPERATION CONCEPT FOR NEXT GENERATION AIR VEHICLES IN KOREA

Arriving at Narita Airport and Traveling to Aizu-Wakamatsu

Ultra s Experience with A-CDM

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

National Rail Performance Report - Quarter /16 (January-March 2016)

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

Evaluation of Quality of Service in airport Terminals

Changi Airport A-CDM Handbook

AVIATION INVESTIGATION REPORT A04Q0041 CONTROL DIFFICULTY

Quality Infrastructure Investment

CLEARANCE INSTRUCTION READ BACK

Release of Tokaido Sanyo Shinkansen Reservation App

Japan Railways Successful Financing Models

Gogo Connected Aircraft Services

High Speed Rail & SHINKANSEN Nobukazu NAGAI Railway Bureau, MLIT May 11, 2015

WELCOME TO THE AGE OF THE CONNECTED AIRCRAFT

(Presented by Japan) SUMMARY

TRANSPORT INFRASTRUCTURE

THE REAL-TIME AIRLINE TAKES FLIGHT

DOT 3-Hour Rule Master Plan

Special feature article Toward the World's Safest Railway that Passengers can Ride Free From Anxiety

Name Plate Design of Japanese Express Trains

The leading airport systems integrator serving the civilian

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

Japanese Station Lunchbox Wrappers

Chapter 1 EXECUTIVE SUMMARY

Tokyo-Aomori 3.0 million passengers. per year. Shin-Aomori. Aomori. Hachinohe (631.9km) Airport. Odate-Noshiro. Airport. Akita (662.

ASSEMBLY 37TH SESSION

With the first portion of this process complete, we anticipate the general timeline for the remainder of the process to be:

Boeing 787 Dreamliner Flight Deck Safety, Comfort, Efficiency

YOUR BUSINESS OUR PRIORITY CORPORATE PRIORITY ACCOUNTS

Surveillance and Broadcast Services

Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~

UNLOCKING THE BRIGHTON MAINLINE

Target Off-Block Time (TOBT)

Transit Vehicle Scheduling: Problem Description

Transcription:

Signaling System and Communication System on Shinkansen of JR-EAST Hiroshi KANEKO Manager, East Japan Railway Company, Japan 12th July, Session: Infrastructure 3 - Power supply & Signaling

Contents Outline of Shinkansen of JR-East Signal (Automatic Train Control ) Train radio COSMOS (Computerized safety maintenance and operation s of Shinkansen) Counter measures for heavy snowfall 2

Overview of our Shinkansen Length of network Shinkansen Mini ー Shinkansen Total 1134.7km 275.9km 1410.6km Akita Mini- Shinkansen Shin-Aomori Average number of passengers About 260,000 pre day Number of trains per day 320 Maximum number of trains per day 415 (as of 16/8/09) Number of trains between Tokyo and Omiya per hour 15 Average time delay per train Less than 1minute Yamagata Mini ー Shinkansen

Outline of the JR-EAST Shinkansen Characteristic of the JR-EAST Shinkansen Through operation between Shinkansen lines and converted conventional lines - Includes several types of rolling stock - Coupling and uncoupling operation performed at some stations en route Complicated train operation - Operates five routes from Tokyo Station - All trains run between Tokyo and Omiya(trains run frequently) - Minor trouble can affect punctuality of trains We had replaced it Digital one for safety,customer satisfaction and efficiency,which can exchange lots of dates. 4

Innovations in Train Control System - 1 - Conventional ATC - 275 210 Allowed speed 160 110 Train speed 70 30 Travel time and train headway are both longer. Any progressed train brake performance is not effective. Replace with Digital ATC 5

Innovations in Train Control System - 2 - Digital ATC - Allowed speed(emergency brake) Allowed speed(normal brake) Train speed JR E2-MATSUKI Optimal brake control fit for each brake performance. The travel time and train headway can be reduced. Coping with disruptions in the time schedule is becoming flexible. Maintenance ー free due to monitor it remotely from OCC. 6

Innovations in Train Operation -1 COMTRAC (Computer aided traffic control ) COSMOS (Computerized safety maintenance and operation s of Shinkansen) It is difficult for support for through operation between Shinkansen lines and converted conventional lines and Coupling and uncoupling operation at some en route stations. Difficult to support for opening the new line. Development of new COSMOS with latest technology 7

COSMOS Innovations in Train Operation - 2 Switching from centralized PRC to stationdistributed-type PRC. CRT operation displays and control boards. Train dispatchers and operators operate trains, conduct temporary speed control, and operate shunting and maintenance vehicles directly. Yard management Rolling stock management Centralized monitoring Transport planning COSMOS Electric power control Operation control Maintenance work management 8

Onboard-wayside communication Analog train radio - Voice call only - Shortage of channels Digital train radio - All data lines flexibly configured for packet transmission - 37 channels instead of 24 channels - High ー quality voice call 9

New data-based applications Train maintenance support Monitoring terminals are set up at the control center and all the trains to monitor the operation of running Shinkansen trains in real time. OCC terminal Train radio ground station equipment Operation command notice Train radio ground station equipment The monitor in the trains driver s cab displays messages,slow-down instructions and other data to the train crew issued by a controller in the control center. Train operation changes in a railway emergency, for example, can be quickly and reliably conveyed for safer, accident-free runs. Displayed on onboard monitor screen OCC terminal Train radio mobile station equipment Notices messages displayed on onboard monitor unit 10

Countermeasures for heavy snowfall Areas of heavy snowfall Niigata and Aomori are areas of heavy snowfall in Japan. - Heavy snowfall damages ground equipment, posing problems maintenance. (Snow adhering to train in cold region and heavy snow areas, falls to grand level.) - Improving maintenance efficiency to install protectors for transpnders and cables near the track. 11

JR East will continue to take on new challenges with technological innovations in its efforts to realize safe and stable transport....thank you for your kind attention