Implementation Plan For Air Traffic Control Procedures

Similar documents
SE-17, 18, 19 and 20 9/25/00 Approach and Landing Accident Reduction Joint Safety Implementation Team. Implementation Plan For Maintenance Procedures

Loss of Control Joint Safety Implementation Team. Implementation Plan for Training - Advanced Maneuvers

Approach and Landing Accident Reduction Joint Safety Implementation Team

Approach and Landing Accident Reduction Joint Safety Implementation Team. Implementation Plan For Policies for ALAR (Safety Culture)

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures


Runway Incursion Joint Safety Implementation Team. Detailed Implementation Plan For Commercial Aircraft Upgrade and Installation

Turbulence Joint Safety Implementation Team. Detailed Implementation Plan For Improve the Quality of Turbulence Information

OPS 1 Standard Operating Procedures

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13)

International Civil Aviation Organization. Runway and Ground Safety Working Group

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2

RNAV Departures and STAR Operations Joint Safety Analysis and Implementation Team

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1

Appendix F ICAO MODEL RUNWAY INCURSION INITIAL REPORT FORM

Safety Enhancement SE ASA Training - Policy and Training for Non-Normal Situations

Appendix A COMMUNICATION BEST PRACTICES

ATM 1 Understanding the Causes of Level Busts

Safety Enhancement SE ASA Design Virtual Day-VMC Displays

International Civil Aviation Organization. First Meeting of the RASG-MID Steering Committee (RSC/1) Global Developments related to Aviation Safety

IFALPA. International Federation of Air Line Pilots Associations

Safety Enhancement SE RE Airports Policies and Procedures to Mitigate Runway Excursion Consequences & Severity

International Civil Aviation Organization. Regional Aviation Safety Group - Middle East

Aviation Safety Information Analysis and Sharing ASIAS Overview PA-RAST Meeting March 2016 ASIAS Proprietary Do Not Distribute

Air-Ground Communications Briefing Note

AERODROME SAFETY COORDINATION

II.B. Runway Incursion Avoidance

FAA/HSAC PART 135 SYSTEM SAFETY RISK MANAGEMENT SAFETY ELEMENT TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1

RUNWAY INCURSION PREVENTION PROGRAM ICAO NAM/CAR/SAM RUNWAY SAFETY/INCURSION CONFERENCE Mexico City, 22 to 25 October 2002

RUNWAY SAFETY MINISTRY OF TRANSPORT REPUBLIC OF INDONESIA DIRECTORATE GENERAL OF CIVIL AVIATION DIRECTORATE OF AIRWORTHINESS AND AIRCRAFT OPERATIONS

Human Factors in ATS. United Kingdom Overseas Territories Aviation Circular OTAC Issue 1 2 November Effective on issue

RLatSM. Reduced Lateral Separation Trial. FAQs. 4 September 15

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Safety Enhancement 186R3.2 TCAS-Sensitivity Level Command

DHMI GENERAL DIRECTORATE OF STATE AIRPORTS AUTHORITY. Suat YILDIRIM ATC Expert

Safety Enhancement SE 226 Cargo Hazardous Material Fires Enhanced Protection of Occupants and Aircraft

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

1.0 PURPOSE 2.0 REFERENCES 3.0 BACKGROUND

Safety Information Analysis Program Update. Marc Champion, UAL FOQA/ASAP Project Team Lead

AIRSPACE INFRINGEMENTS

ROLLS-ROYCE PLC

The Aviation Rulemaking Committee is changing. how airworthiness directives are developed and implemented.

STANDARD AIRPORT TAXI ROUTES (SATR) INDIRA GANDHI INTERNATIONAL AIRPORT NEW DELHI (VIDP)

EVERY AIRPORT CAN BENEFIT AND EVERY AIRPORT CAN CONTRIBUTE.

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

F L I G H T S A F E T Y F O U N D A T I O N. For Everyone Concerned with the Safety of Flight

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

Dave Burr - AFS-260. Steve Gibbs AFS-300

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

Optimized Profile Descents A.K.A. CDA A New Concept RTCA Airspace Working Group

A PILOT S GUIDE To understanding ATC operations at Lancaster Airport

Commercial Aviation Safety Team (CAST) Overview

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

ATM 4 Airspace & Procedure Design

Commercial Aviation Safety Team

[Docket No. FAA ; Product Identifier 2017-NM-069-AD; Amendment. AGENCY: Federal Aviation Administration (FAA), Department of Transportation

[Docket No. FAA ; Directorate Identifier 2013-NM-081-AD] Airworthiness Directives; The Boeing Company Airplanes

Flight Operations Briefing Notes

7/30/2013. Air Crew Preflight Operations. Introduction. Preflight briefing

THE BOEING COMPANY

OPERATIONS CIRCULAR 4 OF 2011

Takeoff and Landing Performance Assessment (TALPA) Status Briefing March 31, 2016

MID-Region. Standard Operating Procedures Effectiveness and Adherence

Chapter 16. Airports Authority of India Manual of Air Traffic Services Part RESPONSIBILITY IN REGARD TO MILITARY TRAFFIC

RUNWAY INCURSION JOINT SAFETY ANALYSIS TEAM (JSAT) Results and Analysis

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM. April 10 th 2017

Amendment Docket No. FAA ; Directorate Identifier 2010-NM-256-AD

ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA to 2004

[Docket No. FAA ; Product Identifier 2016-NM-208-AD; Amendment ; AD ]

This Advisory Circular provides guidance to facilitate compliance with the requirements for a Flight Radiotelephone Operator rating.

ICAO EUR Region Performance Framework

BOMBARDIER, INC.

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

KJFK Runway 13R-31L Rehabilitation ATFM Strategies

[Docket No. FAA ; Directorate Identifier 2016-NM-116-AD; Amendment ; AD ]

Safety and the Private Aircraft Owner

[EFFECTIVE DATE: 23 AUG 2012]

RADIO COMMUNICATIONS AND ATC LIGHT SIGNALS

Paperless Aircraft Operations - IATA s Vision and Actions - Chris MARKOU IATA Operational Costs Management

Human Factors in Aviation. A CAANZ Perspective

Point A to Point B Arrival By Jim Sweeney

TWELFTH AIR NAVIGATION CONFERENCE

LARGE HEIGHT DEVIATION ANALYSIS FOR THE WESTERN ATLANTIC ROUTE SYSTEM (WATRS) AIRSPACE CALENDAR YEAR 2016

STATEMENT OF THE NATIONAL BUSINESS AVIATION ASSOCIATION ED BOLEN PRESIDENT AND CEO BEFORE THE COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE

[Docket No. FAA ; Product Identifier 2017-NE-40-AD; Amendment ; AD ]

North America Limited International Procedures Initial Detailed Syllabus

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION N

Summary of Public Submissions Received on

Human Factors Considerations for Rotorcraft

FAA Call to Action on Runway Safety Short-term Actions. By Glenn Michaël (FAA)

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

[Docket No. FAA ; Product Identifier 2017-NM-173-AD; Amendment ; AD ]

[Docket No. FAA ; Product Identifier 2017-NM-124-AD; Amendment ; AD ]

[Docket No. FAA ; Directorate Identifier 2015-NM-124-AD] Airworthiness Directives; The Boeing Company Airplanes

Martin Robinson CEO AOPA UK Deputy Vice President IAOPA Europe. Airspace Infringements Workshop Eurocontrol 24 th January 2008

Airspace Infringement

Crew Resource Management

[Docket No. FAA ; Directorate Identifier 2012-NM-002-AD; Amendment ; AD ]

Transcription:

Runway Incursion Joint Safety Implementation Team Implementation Plan For Air Traffic Control Procedures Statement of Work: The purposes of this project are: To review and develop national Air Traffic Control Procedures that will require tower controllers to maintain a high level of situational awareness To review the impact and recommend changes as necessary to Reduced Separation on Final (FAAH 7110.65 para. 5-5-3f) and Land and Hold Short Operations (LAHSO) as they pertain to surface incidents and runway incursions; and to review phraseology used for terminal operations, recommending changes to unnecessary or confusing phraseology. To initiate rule-making to amend FAR 91.129 (i); and to require pilots to read back any clearance to enter a specific runway, hold short of a specific runway, or taxi into position and hold instructions. Lead Organization for Overall Project Coordination (LOOPC): FAA, ATS-1 SAFETY ENHANCEMENT 1: (SE-55) Runway incursions will be substantially reduced and aviation safety improved through the use of nationally standardized procedures that focus on situational awareness in the control tower. Total Resource Requirements: Resources to perform these functions currently exist within the FAA. Organizational time of approximately one labor-year. Cost for any product development and distribution will be dependent on the projects identified by the LOOPC to accomplish this safety enhancement. Completion Date: 12 Months Output 1: Implement national standardized requirements for tower positions to ensure uniform, effective and sustained situational awareness practices relating to surface operations. Resources: AAT-1 (LOOC), ATP-1 Timeline: 12 Months Actions: Review applicable Air Traffic Control Procedures. Develop national standards to ensure tower controllers maintain situational awareness. Eliminate unnecessary distractions in the operating quarters. Goal: Increased situational awareness of tower controllers with the use of national standardized procedures. Indicator: Reduction in rate/number of runway incursions caused by controller error where loss of situational awareness, such as aircraft landing over another on a runway ( Landovers ), or memory lapses were factors. SE 55, 56, 57, 58, 59 p. 1

SAFETY ENHANCEMENT 2: (SE-56) A review of capacity enhancement programs will determine if they are contributory to runway incursions. If found to be causal, these programs will be revised or eliminated. Total Resource Requirements: Organizational time of approximately one labor-year. Completion Date: 12 Months Output 1: Determine through review of available runway incursion data, any impact from capacity enhancement procedures as they pertain to surface incidents and runway incursions. Resources: AAT-1 (LOOC), ATP-1 Timeline: 12 Months Actions: Examine available runway incursion data, focusing on events, procedures, and phraseologies related to capacity enhancement initiatives or techniques to determine impact on surface movements and runway incursions. If found to be causal or contributory amend or change as needed. Goal: Elimination of runway incursions generated by capacity enhancement initiatives or techniques. Indicator: Reduction in rate/number of runway incursions caused by pilot or controller error where capacity enhancement initiatives or techniques have been shown to be factors. SAFETY ENHANCEMENT 3: (SE-57) Runway incursions will be substantially reduced and aviation safety improved through the use of clear, unambiguous phraseologies related to surface operations. Total Resource Requirements: Organizational time of approximately one labor-year. Completion Date: 12 Months Output 1: Delete or change unnecessary and/or confusing phraseology used for surface movement operations. Resources: AAT-1 (LOOC), ATP-1, AFS-1 Timeline: 12 Months Actions: Review phraseology used for surface movement operations and recommend changes. Goal: Update, and increase efficiency of phraseologies used by pilots and controllers. Indicator: Controllers will have more available time on frequency, reducing the need for repeated clearances, thus reducing the chance of read-back errors; this will lead to a reduction in rate/number of runway incursions caused by misunderstandings or readback/hear-back errors. SE 55, 56, 57, 58, 59 p. 2

SAFETY ENHANCEMENT 4: (SE-58) The majority of runway incursions are caused by pilot deviations. Aviation safety will be improved by: Amending the last two sentences of FAR 91.129 (i). This will eliminate any confusion as to whether an aircraft has approval to cross a runway on their way to their departure runway, while repositioning from point to point on the airport, or crossing a runway after landing to reach their destination on the airport. Creating a shared responsibility for clear understanding of instructions between the users and controllers. It is currently the sole responsibility of the controller to seek and receive acknowledgement for these instructions. Total Resource Requirements: Organizational time of approximately two labor-years. Completion Date: 36 Months Output 1: Amend the last two sentences of FAR 91.129 (i). Resources: ATA-1 (LOOC), AAT-1 Timeline: 36 Months Actions: Conduct a study to model the impact of any amendments to the last two sentences of FAR 91.129(i). If expected safety enhancements are realized, initiate the regulatory and procedural process to implement change. NOTE: Runway incursion data used to support these interventions indicated that the incidents linked with FAR 91.129 were not associated with instructions to taxi to a departure runway, but with instructions for taxiing point-to-point on the airport or taxiing to parking after landing. This focuses the need for change on the very last sentence in FAR 91.129 (i). Goal: Eliminate runway incursions generated by crossing runways in error; either while enroute to a departure runway, taxiing point to point on the airport, or taxiing to a point on the airport after landing. Indicator: Elimination of these types of incursions through positive control of runway access in these situations. SAFETY ENHANCEMENT 5: (SE-59) Aviation safety will be improved by creating a shared responsibility to ensure clear understanding of specific control instructions through the use of mandatory read-backs of any clearance to enter a specific runway, hold short of a specific runway, or taxi into position and hold instructions. It is currently the sole responsibility of the controller to seek and receive acknowledgement for these instructions. Total Resource Requirements: Organizational time of approximately two labor-years. Completion Date: 36 Months Output 1: Regulators should require a read-back for control instructions to enter a specific runway, holding short of specific runway, and all taxi-into-position and hold instructions. Resources: ATS-1 (LOOC), AFS-1, AVR-1 SE 55, 56, 57, 58, 59 p. 3

Timeline: 36 Months Actions: Initiate the regulatory and procedural process to require pilots to read back any clearance to enter a specific runway, hold short of a specific runway, or taxi into position and hold instructions. Goal: Ensured clear understanding of specific control instructions through the use of mandatory read-backs. Indicator: Reduction in rate/number of runway incursions caused by pilot or controller error where confusion or ambiguous communications is a factor. Relationship to Current Aviation Community Initiatives: ARI/ATP to model the impact of changing FAR 91.129 (i) in first qtr CY02 FAA Order 7110.118 (LAHSO) FAA Order 7110.65 (Air Traffic Procedures) FAA Order 7210.58 (Runway Safety Program) Runway Safety Program s 10 Near Term Initiatives for Reducing Runway Incursions NATCA-FAA workgroups established to address: Enhanced Operational Tower Controller Training. Memory Enhancement Techniques Training for Tower Controllers. Pilot/Controller Phraseology Review Advisory circulars and bulletins ie; Runway incursion prevention best practices Letter to pilots and examiners dated Sept.18 th 00 AOPA and FAA - Flight instructor refresher training and workshops AOPA and ALPA magazine articles and safety bulletins FAA and Industry regional runway safety workshops NTSB recommendation (A-00-67) that the FAA amend FAR 91.129 (i) Programmatic Approach: Organizational Strategy The Runway Incursion JSIT identified Karen Pontius, ATP-120.10 as the JSIT project lead for Air Traffic Control Procedures. The project lead will act as a point of contact to assist with the implementation of the activities outlined in this plan.. Implementation of this project is viewed as a shared responsibility and tasks will be divided between the FAA and organizations/persons in industry. The Lead Organization for Overall project Coordination (LOOPC) is ATS-1. The Lead Organizations for Output Coordination (LOOC) are identified in each Output of this Implementation Plan. The roles and responsibilities of the LOOPC and LOOC are described in the CAST approved JSIT Process Document. Implementation Activities The FAA, in addressing several NTSB Safety Recommendations and the interventions later identified by the Runway Incursion JSAT established the Office of Runway Safety (ARI). SE 55, 56, 57, 58, 59 p. 4

ARI, in concert with industry partners, launched an awareness campaign using Letters to Airmen, Examiner Updates, Safety Bulletins, Websites, GENOTS, and other means of communication. ARI has already initiated workgroups to address elements of this project as follows: Enhanced Operational Tower Controller Training workgroup addresses Safety Enhancement 1 through emphasis on maintaining situational awareness Memory Enhancement Techniques Training for Tower Controllers workgroup will also address Safety Enhancement 1 through recommendations for use of nationally standardized procedures to help maintain situational awareness Pilot/Controller Phraseology Review will address Safety Enhancement 3 FAA will develop plans to study the following: Impact of implementing changes to FAR 91.129 (i) as called for in Safety Enhancement 4 Impact of instituting mandatory read-backs of clearances mentioned in Safety Enhancement 5 Review capacity enhancement programs to determine if they are contributory to runway incursions. If found to be causal, these programs will be revised or eliminated. If NPRM actions are required for Safety Enhancements 4 & 5, ARI will work to initiate them Key Products and Milestones: Safety Enhancement Timeline S E 3 S E 2 S E 1 S E 4 S E 5 0 6 12 18 24 30 36 Months after CAST "G" Level Approval Risk Description: General opposition to change. This applies to both the controllers and system users. Cost associated with studies and research of issues called for in this plan. Possibility of reduced capacity if capacity enhancement programs are revised or eliminated. Resistance by users to institution of mandatory readbacks If enhancement 4 (mandatory readbacks of clearances onto or holding short of a runway) or 5 (amending FAR 91.129 (i) to require separate clearances to cross each runway) become regulations, the initial transition period could increase controller workload and frequency congestion. Confusion over runway crossing clearances or readbacks could contribute to more incursions. NPRM process could prove lengthy and controversial Difficulty in creating standardized procedures to enhance situational awareness that can be mandated nationwide; currently these procedures are developed at the facility level to better address specific needs SE 55, 56, 57, 58, 59 p. 5

Risk Mitigation Plan: Memory Enhancement Techniques Training for Tower Controllers workgroup is currently compiling information from the field on methods of enhancing situational awareness. They plan to use the information to recommend best practices ; as well as recommend that some methods be nationally standardized. ARI plans to underwrite costs associated with studies. If safety benefits can be gained by revising or eliminating capacity enhancement programs, they will outweigh any losses in airport capacity. NPRM process can be completed in 24 months; we have estimated 36 months for the two enhancements (4 & 5) that would require the process. Assuming enhancements 4 (mandatory readbacks of clearances onto or holding short of a runway) and 5 (amending FAR 91.129 (i) to require separate clearances to cross each runway) become regulations, possible frequency congestion and increased controller workloads can be mitigated by special emphasis on tower supervision or staffing of extra monitor positions. ARI will continue its runway safety awareness campaign: educating controllers and pilots through bulletins, websites, mailings, and notices of change to the FARs. Impact on Non - Part 121 or International Applications: These Safety Enhancements will affect all system users. Any changes to phraseology or FARs may require procedural changes, training and compliance for all system users. Coordination with ICAO is continuous. While ICAO has its own safety agendas, it stays in touch with FAA and routinely exchanges information. FAA is also a member of MAPCOG (the Multiagency Air Traffic Services Procedures Coordination Group formed with NAVCANADA and EUROCONTROL); this group polls all countries for their input on changes to the ICAO handbook (PANRAC, Procedures for Air Navigation Services, Rules of the Air and Air Traffic Service, Doc. 4444-RAC/501). SE 55, 56, 57, 58, 59 p. 6