December Prosafe orders harsh environment semisubmersible

Similar documents
Aker ASA and Aker Drilling ASA

Contents CONCRETE SUBSTRUCTURES ONSHORE FACILITIES STEEL JACKET SUBSTRUCTURES STRUCTURES

ATWOOD OCEANICS, INC.

WORLD LARGEST VISITS SINGAPORE

The 3 platforms are called Tchatamba-A (MOPU), Tchatamba South and the Tchatamba West and the FSO is called MADIELA and is owned by MODEC.

AerCap Holdings N.V. April 11, 2015

Fleet Status Report. 2nd January 2019

Pareto Oil & Offshore Service Conference. CEO Alf C Thorkildsen September 2, 2009

AerCap Holdings N.V. Keith Helming Chief Financial Officer. Wachovia Securities Equity Conference June 23, 2008

1H 2003 Results Announcement. August 1, 2003 SUMMARY

Pareto s annual Oil & Offshore Conference: Presentation of Kværner ASA Jan Arve Haugan, President & CEO

Full Steam Ahead. Vectis Eagle. New Game GREEN MACHINE WASTE HEAT RECOVERY STANDARD HOPPERS. SBI 2012 volume 6 ISSue 1

Fleet Status Report. 5th March 2019

Fleet Status Report. 2nd January 2019

Fleet Status Report. 21st November 2018

WӒRTSILӒ SHIP DESIGN COMPANY INTRODUCTION. Andrew Loh. Presentation name / Author. Day Month Year

Wizz Air aims to increase market share with F17 capacity growth of 20% Q3 passenger growth of 20%, Load Factor of 88% (+2.3ppt)

ANCHOR-LINE TENSION CALIBRATION SERVICE OVERVIEW

Design of the Chilean Antarctic Vessel. Arctic Passion Seminar, Mar 2018 By Dan McGreer, Vard Marine

Zaliv Ship Design LLC

DPIII FLOTEL ICE MAIDEN 1

Aker companies investor day, London Jan Arve Haugan, President & CEO Eiliv Gjesdal, CFO

LEPN license map Producing fields

Worldwide Shipyards Vard

Capital Markets Day 10 January 2013

RADA Electronic Industries Ltd. (Nasdaq: RADA) March 2019

Offshore Construction Vessels

AerCap Holdings N.V. Aengus Kelly, CEO. January 2017

Rederi AB TransAtlantic. Årsstämma. Annual General Meeting CEO Henning E. Jensen. TransAtlantic Company presentation

Kvaerner s yard at Stord. 19 March 2018 Steinar Røgenes, EVP EPCI

102' (31.09m) Cantiere delle Marche

IAG results presentation. Quarter One th May 2018

American Airlines Group Inc.

HK GAAP RESULTS RELEASE 25 February 2008 STAR CRUISES GROUP ANNOUNCES FOURTH QUARTER AND FULL YEAR RESULTS FOR 2007

Growth and strategic development. 3 January 2019

Fourth Quarter 2015 Financial Results

MARITIME. Protect Your Assets. Lay-up seminar MOU - CEFOR. Dec. 2016, Oslo, Ungraded SAFER, SMARTER, GREENER

Dedicated to Electric & Hybrid Propulsion. A Future-Oriented Automation Platform. Scaldis Fully Self-Propelled Crane Vessel

SIGNIFICANT EVENTS. 3 rd. 15 th. 8 th. 16 th. 9 th. 19 th. 12 th. 22 nd. Delivery of Safe Boreas, a harshenvironment

Half Year F1 Results. November 4, 2015

HK GAAP RESULTS RELEASE 12 August 2008 STAR CRUISES GROUP ANNOUNCES FIRST HALF RESULTS FOR 2008

Atlantic Trawler ATR66

Global Transportation Conference. New York June 18, 2008

Q FLEET STATUS REPORT

2Q 2008 INTERIM REPORT Unaudited

SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 6-K

Corporate Presentation 5 March 2003

TUI GROUP INVESTOR PRESENTATION

FLEET STATUS REPORT. Seadrill Limited. Drilling depth (feet) Location Current contract Client Start Expire Dayrate US$ D a.

Q3 FY18 Business Highlights

DAILY COLLECTION OF MARITIME PRESS CLIPPINGS SPECIAL REPORT *** COLLECTION OF MARITIME PRESS CLIPPINGS *** SPECIAL REPORT. Text / Photo s : Piet Sinke

69' (21.20m) FERRETTI

OCIMF Report Template OVID OVPQ

Financial Position (consolidated)

E190 REPLACEMENT & FLEET UPDATE JULY 11, 2018

Parques Reunidos Expands to Australia with the Acquisition of Wet n Wild Sydney July 2018

INVESTOR PRESENTATION. Imperial Capital Global Opportunities Conference September 2015

MARKET FORECAST BOMBARDIER COMMERCIAL AIRCRAFT COMMERCIALAIRCRAFT.BOMBARDIER.COM BOMBARDIER COMMERCIAL AIRCRAFT MARKET FORECAST

Vessels for Charter and/or Purchase 17 November 2017 update Text in red shows updates from the previous newsletter

400 Man / 8 Point / 300MT+25MT Crane / Accommodation/Work Barge

Elling E3 Nautibelle

Licensing rounds and awards

Third Quarter November 7, 2008

Jack-Up Barge THE CLIMBING DUTCHMAN THE INDEPENDENT MAGAZINE FOR PROFESSIONALS IN THE ONSHORE AND OFFSHORE OIL AND GAS INDUSTRY volume 2 ISSUE 4

Parques Reunidos Corporate Presentation March 2016

Mooring with HMPE rope. Jorn Boesten Segment Manager Offshore for DSM Dyneema FPSO Forum Monaco March

Management Presentation. November 2018

Kinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008

Propulsion Solutions for Fishing Vessels SERVICES

TUGS TOWING & OFFSHORE NEWS SPECIAL

Technology s Role in the Development of Frontier Resources

PRINCESS ANNA PRINCESS YACHTS

10TH ANNUAL WOLFE RESEARCH GLOBAL TRANSPORTATION CONFERENCE MAY 23, 2017

Montreal September 24, 2008

DSM Dyneema The world s strongest fiber

MOTORSAILOR LUNAR C115

Joe Randell President and Chief Executive Officer Jolene Mahody Executive Vice President and Chief Financial Officer

Gerry Laderman SVP Finance, Procurement and Treasurer

ECOLOCK LIFETIME CORROSION PROTECTION FOR OFFSHORE UNITS

Jazz Air Air Income Fund Fund

AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter

Italia Super Yacht 358 Hull No. 002

Dutch guide to your maritime solutions Stay updated on the latest Dutch maritime news! Subscribe to our Newsletter on

Ships designed by Wartsila, a powerful proposition. Wilco van der Linden Sales director Wärtsilä Ship Design

DEVELOPMENT IN ENGINE TECHNOLOGY FOR THE FUTURE MARINE MARKET. ELIAS BOLETIS Director, Programs & Technologies Propulsion WÄRTSILÄ CORPORATION

Korean Air Q Financial Results. Jul 28, 2011

Bahamas (BMA) Flag. Eagle Shipping Ltd

ASL Marine Holdings Ltd.

John S. Christensen Marketing & Sales Director / NFLB Winter conference / Vilnius

THE STYLE OF OUR COMPANY IS BASED ON SAFETY, RELIABILITY AND QUALITY

2019 SEASON RATES PUERTO PIRÁMIDES - PENÍNSULA VALDÉS

Nordic Energy Summit, Oslo Jan Arve Haugan, President & CEO

Citigroup Investor Conference October 2010

Montie Brewer, President and CEO Joshua Koshy, Executive VP and CFO UBS Transport Conference

SHIP RECYCLING. Your guide to compliance. Move Forward with Confidence

Interim Report 6m 2014

KOREAN AIR 4Q17 FINANCIAL RESULTS

2014 IMS PRESENTATION

Acquisition of Singapore Cruise Centre

Transportation and Logistics Conference. Toronto March 18, 2008

Transcription:

December 2011 Prosafe orders harsh environment semisubmersible accommodation rig

2 Disclaimer All statements in this presentation other than statements of historical fact are forward-looking statements, which are subject to a number of risks, uncertainties, and assumptions that are difficult to predict and are based upon assumptions as to future events that may not prove accurate. Certain such forward-looking statements can be identified by the use of forwardlooking terminology such as believe, may, will, should, would be, expect or anticipate or similar expressions, or the negative thereof, or other variations thereof, or comparable terminology, or by discussions of strategy, plans or intentions. Should one or more of these risks or uncertainties materialise, or should underlying assumptions prove incorrect, actual results may vary materially from those described in this presentation as anticipated, believed or expected. Prosafe does not intend, and does not assume any obligation to update any industry information or forward-looking statements set forth in this presentation to reflect subsequent events or circumstances.

3 The world s most advanced and efficient harshenvironment semi-submersible accommodation rig Compliant with stringent Norwegian regulations Turnkey contract with Jurong Shipyard in Singapore GVA 3000E design DP3 and 12pt mooring Accommodation capacity of 450 persons Delivery from yard in Q2 2014 Total cost estimated at USD 350 million 20/80 payment structure on yard cost (yard cost USD 292 million) Options for two more units Valid for approximately 12 and 18 months Robust long-term market outlook for rigs capable of operating in Norway/North Sea

4 Key suppliers Jurong Shipyard Pte Ltd. (Singapore) One of the world s top offshore yards 13 semis delivered to date three more under construction Experience in building according to Norwegian regulations GVA (Gothenburg, Sweden) GVA 3000E design - enhanced version of previous GVA designs Experienced designer with long track record Prosafe currently has three GVA rigs in the fleet

5 Key specifications GVA 3000E design DP3 (dynamic positioning) and 12- point mooring Allowing for operations both in DP and anchored mode Provides maximum flexibility and cost efficiency Accommodation capacity of 450 persons All in single man cabins Free fall lifeboats Displacement of 30,940 Mt Good hydrodynamic design with superior motion characteristics

6 The world s largest and most efficient semisubmersible accommodation rig PRS TBA Regalia Safe Scandinavia Floatel Superior COSL Reval Design GVA 3000E GVA 3000 Aker H-3.2 E KFELS DSS20 Aker H-3 DP DP3 DP3 N/A DP3 N/A Thrusters 6 x 4.4MW 6 x 2.6MW N/A 6 x 3.2MW N/A Anchormooring 12pt90mm (wire) N/A 12pt 76mm (chain) 8pt 76mm (wire) 12pt76mm (chain) Power 33.6MW 19.1MW 7.5MW 22.8MW 6.8MW Displacement 30,940Mt 21,030Mt 27,784Mt 29,030Mt 22,335Mt Acc. cap. NCS 450 282 292 440 310

7 Investment and financing Dividend policy not impacted Total project cost USDm Yard cost 292 Owner-furnished equipment, project mgmt, WC, financing 58 Total 350 Yard cost payment terms: 20 per cent at signing of contract 80 per cent at delivery Total investment can be funded over current balance sheet without impacting the dividend policy

8 Strengthening of fleet Further improving Prosafe s ability to meet clients needs Rest of World New build 3 1 Regalia 3 1 Safe Scandinavia 3 1 Safe Caledonia 2 1 Safe Bristolia 2 1 Safe Esbjerg 2 1 Safe Concordia 1 1 Safe Britannia 1 2 Safe Regency 1 2 Safe Lancia 1 2 Safe Astoria 1 3 Safe Hibernia 1 3 Jasminia 1 3 Regional capabilities UK Norway DP

9 Supply Prosafe reinforces its leading position Prosafe largest player by far Three vessels under construction delivery scheduled for 2012 (African Challenger) and 2014 (Prosafe and Floatel Victory) 22 20 18 No. of accommodation semis by owner Marine Subsea/Yantai ETESCO No. of accommodation semis by regional capabilites 22 20 18 Rest of World 16 14 12 Fred. Olsen Energy COSL 16 14 12 10 8 6 4 2 0 Pemex Cotemar Floatel International Consafe Offshore Prosafe 10 8 6 4 2 0 Rest of North Sea Norway

10 Demand North Sea Maintenance & modifications Field life expectancy increasing many installations approaching original design life Large redevelopments Maintenance, IOR projects and tie-ins Hook-ups and commissioning Significant exploration activity Recent large discoveries (Aldous, Avaldnes, Skrugaard) Decommissioning Examples of changes in field life expectancy Norway Latest year of production as of 1992-95 estimate Latest year of production as of 2002 estimate Latest year of production as of 2010 estimate Source: NPD Brage Draugen Ekofisk Gullfaks Statfjord Varg Veslefrikk 2000 2010 2020 2030 2040 2050

11 Appendix Specifications Drawings Contract status Fleet overview

12 Specifications World wide operations including NCS IMO DP Class 3 12 point 90mm wire mooring Equipped for DNV POSMOOR ATA 450 single man cabins 8 freefall lifeboats Telescopic hydraulic gangway 38.5m +/- 7.5m The hull will be designed for a fatigue life of 30 years (class require 20 years and most rig designs have 20 years)

13 Specifications Generators 6 x 5.6MW, Emergency generator Azimuth thrusters 6 x min 4.4MW Open work deck area is approximately 2,100m2 Cranes are 2 x 50 tonnes Length over all Beam over all Operation condition displacement 103.90 m 88.70 m 30,940 tonnes

GVA 3000E Side view 14

GVA 3000E Top view 15

16 Contract status Safe TBA Safe Scandinavia Regalia Safe Caledonia Safe Bristolia Safe Astoria Safe Concordia Safe Esbjerg Safe Hibernia Safe Britannia Safe Regency Safe Lancia Jasminia 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Contract Option Yard

17 Fleet overview Name Regalia Safe Scandinavia Safe Caledonia Geographical area Harsh environment, NCS Harsh environment, NCS Harsh environment Mooring system None 12 point chain winches 10 point wire winches Station keeping NMD3 (DP) Moored DP2 / TAMS No of beds 306 (NCS: 282) 583 (NCS: 292) 387 Deck area 380 m 2 618 m 2 350m 2 Payload 430 t 1,000 t 700 t Current contract Client Talisman BP BG Group Field Yme, NCS Valhall, NCS Everest, UK NS Water depth 90m 70m 90m Type of installation MOPU Store Steel Jacket Steel jacket

18 Fleet overview Name Safe Astoria Safe Bristolia Safe Esbjerg Geographical area Moderately harsh env. Moderately harsh env. Moderately harsh env. Mooring system 8 point wire winches 8 point wire winches 4 point wire winches Station keeping Moored Moored Jack-up (50m) No of beds 245 587 (UK: 316) 139 Deck area 620 m 2 400 m 2 750 m 2 Payload 1,800 t 1,800 t variable, max 725 t Current contract Client Woodside from spring 2012 end user Pemex Field North Rankin Cantarell Water depth 40-50m Type of installation Jacket structure platform

19 Fleet overview Name Safe Britannia Safe Lancia Safe Hibernia Geographical area Harsh environment Moderately harsh env. Harsh environment Mooring system 9 point wire winches 8 point chain winches 12 point wire winches Station keeping DP2 / TAMS DP2 Moored No of beds 812 600 500 Deck area 1,300 m 2 1,100 m 2 750 m 2 Payload 1,245 t (620 DP mode) 626 t 1,000 t Current contract Client end user Pemex end user Pemex end user Pemex Field Cantarell, GoM Cantarell, GoM Cantarell, GoM Water depth 40-50m 40-50m 40-50m Type of installation Jacket structure platform Jacket structure platform Jacket structure platform

20 Fleet overview Name Safe Regency Safe Concordia Jasminia Geographical area Harsh environment Benign environment Benign environment Mooring system 8 point wire winches 4 point wire winches 8 point wire winches Station keeping DP2 DP2 Moored No of beds 771 390 535 Deck area 800 m 2 1,300 m 2 690 m 2 Payload 550 t 1,400 t 640 t Current contract Client end user Pemex Petrobras end user Pemex Field Cantarell, GoM Campos basin, Brazil Cantarell, GoM Water depth 40-50m 900m 40-50m Type of installation Jacket structure platform Turret-moored FPSO Jacket structure platform