Navalimpianti Spa was established; at first there were only a small office in Via Ruffini 10 in Genova and a tiny pipes workshop in San Quirico, but

Similar documents
advanced marine solutions

global leader in DESIGNING MANUFACTURING SUPPLYING INSTALLING COMMISIONING various marine equipments for different types of vessels

SHIPBUILDING INDUSTRY

Republic of Turkey - Ministry of Economy,

Y O U R N E E D S M A K E O U R D I F F E R E N C E

THE STYLE OF OUR COMPANY IS BASED ON SAFETY, RELIABILITY AND QUALITY

WORLD PASSENGER AND PASSENGER CARGO FLEET DEVELOPMENT / THE ISL CRUISE FLEET

High Quality Interiors. Turn key custom solutions. Engineering - Production - Installation. 1 Contents

FD S E R I E S ORDER BOOK

Full Steam Ahead. Vectis Eagle. New Game GREEN MACHINE WASTE HEAT RECOVERY STANDARD HOPPERS. SBI 2012 volume 6 ISSue 1

General Announcement::Media Release - Marina Bay Cruise Centre Singapore Celebrates...

WÄRTSILÄ TO ACQUIRE L-3 MARINE SYSTEMS INTERNATIONAL

Orkun OZEK. Board Treasurer

Azura. Azura: Quick facts. Digital Signage Maximizes Cruising Experience on Floating Resort Hotel

Developing the Shipping Ecosystem Ship Repair and Dry Docks. R.V.Vimal Head Offshore & Commercial Chowgule Lavgan Yard.

SCC and partners launch Cruise 360 to support cruise lines

WE BUILD GREAT SPACES. INTERIORS

ALBERT LOH consultants. m a r i n e s p e c i a l i s t

HK GAAP RESULTS RELEASE 12 August 2008 STAR CRUISES GROUP ANNOUNCES FIRST HALF RESULTS FOR 2008

World-Class. World-Wide.

Berlitz Cruising & Cruise Ships 2015 (Berlitz Cruising And Cruise Ships) By Douglas Ward READ ONLINE

MAIN AREAS OF EXPERTISE:

ARCTIC PASSION 2018 Torkild Skjong - VARD Conceptual Design Department VARD`s ENTRY INTO EXPEDITION CRUISE DESIGN

Shipbuilding market in France. Property of Belon Trade Consulting 1

MAIN AREAS OF EXPERTIES: GEOGRAPHICAL LOCATIONS. Newbuildings outfitting, refurbishment

James Stangroom Chair, CruiseBritain

Viking Cruises. - A Different Approach - September 2017 VIKING OCEAN CRUISES

I.S.MAKINEN OY. Building new and refurbishing existing cruise ship cabins and public spaces.


WORLD LARGEST VISITS SINGAPORE

R&M Ship Tec Group. Our core competencies: TURNKEY SOLUTIONS SHIP OUTFITTING INSULATION HEATING, VENTILATION AND AIR CONDITIONING PREFABRICATED CABINS

High Quality Interiors. Naval industry references list

COSCO CORPORATION. (SINGAPORE) LTD FY2003 Full Year Results. Presentation

Table 1 shows the number of licensed SBSR firms in the country by category and geographical division.

END OF YEAR RESULTS 2016 INVESTOR CONSULTING

PRESS RELEASE October 21 st, 2000 STAR CRUISES ANNOUNCES DEPLOYMENT PLANS FOR STAR AQUARIUS, SUPERSTAR ARIES AND NORWEGIAN STAR

Overview of Industrial Holding BLRT Grupp

1 Wärtsilä 17 June 2007 WÄRTSILÄ CORPORATION THIS IS WÄRTSILÄ

Sean Treacy. Commercial Director Asia Pacific Royal Caribbean Cruises Ltd. September 2014

Long Term Trends in Shipbuilding HVB Press Conference. 20 th September 2006 Stephen Gordon, Clarkson Research

HK GAAP RESULTS RELEASE 25 February 2008 STAR CRUISES GROUP ANNOUNCES FOURTH QUARTER AND FULL YEAR RESULTS FOR 2007

Ship Owner Expectations

Beyond Gateway Ports Navigating New Destinations

Arena C1 Vers des nouveaux horizons avec le nouveau modèle commercial de MSC Cruises

IT S A BENETTI. GIOVANNI BIZZARRI Head of R&D Azimut Benetti Head of Benetti Engineering Basic Design

HERMAN EIJKELENBOOM. Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, P.R. China

FIRE SAFE FUEL HOSES INTRODUCING INNOVATION

The Big Picture of Itinerary Planning Cruise Down Under Conference

High Quality Interiors. Naval industry references list

Signing of Friendship Agreement with Taiwan Railways Administration and Associated Initiatives

AIRCRAFT CHARTERS FOR THE OIL AND GAS INDUSTRY

KEEL MARINE LTD Naval Architects, Marine Engineers and Surveyors

In this presentation you will find about: Who we are Our Activities & Services Some of our Customers Our Certificates Contact us

Meyer Turku Oy MEC-E Mechanical Engineering in Society. Mika Heiskanen October 6, 2017

Flagging-up. The UK Ship Register s quarterly newsletter. Issue # 26

Dutch guide to your maritime solutions Stay updated on the latest Dutch maritime news! Subscribe to our Newsletter on

The cruise ship season is in full swing! Last week was yet another eventful one for the cruise season, with three ships calling at our port.

JAL Group Announces its FY Medium-Term Business Plan

THE STATE OF THE CRUISE INDUSTRY IN 2014: GLOBAL GROWTH IN PASSENGER NUMBERS AND PRODUCT OFFERINGS

LOA: 163' 9" (49.90m) Beam: 30' 2" (9.19m) Min Draft: 6' 7" (2.00m) Max Draft: 9' 3" (2.80m) Cruise Speed: 14 Kts. (16 MPH)

CASE STUDY AIR-CONDITIONERS

CSL WORLDWIDE. 11 Conversation with Gerry Carter. 10 A Typical Day at Chengxi Shipyard. 2 Message from Rod Jones

Environmental Ship Design & Systems

Second Quarter 2016 Presentation

Discover the epitome of luxury exploration... under the French flag.

BK Maritime. Making plans is working together. Provides a safe work environment. Qualify your fleet for a Green Passport and gain entry to all ports

STAR CRUISES CREATES HISTORY IN CHINA WITH THE DUAL ARRIVAL OF SUPERSTAR LEO AND SUPERSTAR ARIES IN SHANGHAI

AN INTRODUCTION TO THE MSC GROUP

Isporuke hrvatskih brodogradilišta / Croatian Shipyards Deliveries

Nikita V. VOROSHILOV Head of Marketing Department, Vyborg Shipyard JSC. 1. Brief background of collaboration in the past:

400 Man / 8 Point / 300MT+25MT Crane / Accommodation/Work Barge

Scanship Holding ASA Trading update 1Q 2018

SWIBER AND RAWABI LAUNCHES 500MT DERRICK PIPE-LAY BARGE AZIZ

Zaliv Ship Design LLC

For personal use only

ASL Marine Holdings Ltd.

GPD Australia Pty Ltd COMPANY PROFILE

Sunshine 55 UAE 2,400,000. uaeboattrading.com

WӒRTSILӒ SHIP DESIGN COMPANY INTRODUCTION. Andrew Loh. Presentation name / Author. Day Month Year

A FULL RANGE OF NAUTICAL SERVICES

MOVING TO THE NEXT STAGE

N E W S L E T T E R. July 2013

Challenges and Developments in Global Shipbuilding Industry

SHIP DIRECTORY AUCKLAND TAURANGA BAY OF ISLANDS

KEEL MARINE LTD Naval Architects, Marine Engineers and Surveyors

Globus Maritime Limited Trading Update and Financial Highlights for the Three Months and Nine Months Ended September 30, 2007.

Associated Turkish Shipyards

KOPONEN VICE PRESIDENT, FINANCE & CONTROL, SHIP POWER

More than 2,300 jobs are supported by the supply of equipment and services directly to Boeing s customers (consequential impact).

S I N C E T h e O ce a n Pe o p le

IBS Software Services Private Limited

2018 Annual Press Conference

PRIVATE BOAT CHARTER SERVICES

TSAKOS INDUSTRIAS NAVALES S.A.

This Week s Overview of Shipping Investments SECONDHAND / DEMOLITION / NEW BUILDING MARKET ANALYSIS

Indra In China. Beijing April 2013

Floating Docks & Special Projects. Reference list

SHIPOWNERS USING THORDON SEAWATER LUBRICATED PROPELLER SHAFT BEARINGS

A Unique MEMBERSHIP. DESIGNED WITH you IN MIND

Ships designed by Wartsila, a powerful proposition. Wilco van der Linden Sales director Wärtsilä Ship Design

Transcription:

1971 Navalimpianti Spa was established; at first there were only a small office in Via Ruffini 10 in Genova and a tiny pipes workshop in San Quirico, but only a couple of years later the new company moved to Ceranesi where the actual headquarter is still located.

1972 The strategic Monfalcone branch was established under the direction of Eng. Attilio Dall Osso.

1973 Navalimpianti Spa opened a new office in Palermo to follow the works in the Palermitan shipyard; after a couple of years the new branch Tecnimpianti Spa moved to the new industrial area in Termini Imerese.

1977 The first orders for CAE equipment (cargo access equipment) were secured; in the history of Navalimpianti Tecnimpianti CAE equipment over the years would become among the highlights of the production.

1985 1985 was a momentous date: the aircraft carrier Giuseppe Garibaldi built by the Fincantieri shipyard in Monfalcone was officially handed over to the Italian Navy; we designed and built the two-elevators for the helicopters.

1987 1987 was the year of Micoperi 7000, at the time the largest ship in the world created to build oil platforms for offshore works. Navalimpianti Tecnimpianti built the davits for lifeboats, rescue boats and rafts, the giant fenders to protect the hull against possible impacts of the supply vessels and the pontoon hatches.

1990 On 29th June 1990 Fincantieri Monfalcone delivered to British P&O the unit Crown Princess, followed only a year later by the sistership Regal Princess. And Navalimpianti Tecnimpianti was proudly present with side doors, which the group managed to win after a great battle with foreign competitors, the tender platforms, the Proteus valves remote control system and the lifeboats davits. From that moment on, cruise ships would become a major area of production of the group; only a few years later, for three units of Holland America Line, the Statendaam, the Ryndam and the Maasdam, built in Fincantieri Monfalcone, the group produced, for the first time, the telescopic davits for life and tenderboats, a cutting-edge system designed by the company.

1993 Navalimpianti USA was established in Miami to look after service and maintenance of cruise vessels; today this branch is a productive reality with modern offices and with a cutting edge workshop.

1995 Another great intuition in terms of expansion dates back to mid-nineties: Navalimpianti was facing an overload of work and in the same years the historic shipyard Uljanic in Pula was facing a moment of serious difficulty; our management smelled immediately the potentiality of establishing a new strategic site in Pula... this is how Navalimpianti Pula was established, today a centre of engineering specialized in design and 3D.

1996 Today, after more than 20 years since their first use, the group is still the only worldwide producer of telescopic davits. There are today almost 200 cruise ships featuring the telescopic davit systems by Navalimpianti Tecnimpianti Group.

1997 Navalimpianti Tecnimpianti is also the worldwide leader in the design and production of swimming pool sliding covers; today there are almost 60 ships featuring Navalimpianti skydomes cruising the world s for the most prestigious shipping companies.

2000 In April 2000, P&O s Aurora, featuring the latest technologies and innovative solutions in terms of design and comfort, was being built at Meyer Werft. Among the orders secured by the group, there was the sliding cover of the pool, one of the most beautiful covers ever made, for its harmonious rounded form.

2001 Navalimpianti China was established offering commercial, technical and service support to shipowners operating in the far east and local shipyards because of the new orders secured since 1998 in China, Japan and Korea and in order to respond more promptly to the always major presence of the Asian market.

2005 2005-2010 In these years from 2005 to 2010 the Aida Cruises series commissioned to Navim by the German shipyard were successfully completed: Navalimpianti Tecnimpianti designed and supplied the side doors, the semi-gravity davits for life and tender boats and the telescopic davits for rescue and rafts.

2007 In 2007 Navim secured the order for the design and delivery of a very complex system for handling, moving and storing pipes on Castorone, the newest and largest pipelaying vessel PLV SAIPEM of the ENI group.

2008 In March 2008 the already leading presence in the maintenance sector is consolidated by the opening of the new strategic site of Tecnimpianti Antwerp in Belgium established to offer full assistance to Northern Europe Clients having the group s equipment on board their ships and/or new owners needing assistance and collaboration. Among the other prestigious orders acquired in these last years, it must be listed also the design and construction of the cabins module for Scarabeo 8, the semi-submersible offshore platform of Saipem, by Eni group.

2009 Among the works of absolute relevance, there is the design and manufacture of a revolutionary automatic securing mechanism to be used with the FOLS system (Fixed Outboard Launching System) realized for the 30 life and tenderboats for 150 people of the Carnival Dream built by Fincantieri Monfalcone and delivered in September 2009. In June 2009, Cavour, the new aircrafts carrier commissioned by Italian Military Navy to Fincantieri entered service; among Navalimpianti Tecnimpianti supplies there are two provisions elevators, one at the bow and one at the stern, the marina platform, the telescopic davits and relative hydraulic system for life, tender and rescue davits, the food and stores elevators, the Stern amphibious vehicles and hovercraft dock door, the bow and lateral ramps.

2010 2009-2010 These were the years of the delivery of the largest cruise ships ever, Royal Caribbean International & Ltd., Oasis of the Seas and Allure of the Seas ; Navalimpianti Tecnimpianti worked with great enthusiasm and designed, manufactured and installed the side doors, the monorail, the mooring platforms and other doors for the loading of different materials as well as the elevators to board on the ship provisions and spare parts.

2011 In consideration of the necessity to reinforce the group s presence in the Far East Navalimpianti Emirates and Navalimpianti Singapore were established at the end of 2010. In 2011 the latest branch of the group was established Navalimpianti Norge AS located in Stavanger, Norway, an Offshore excellence centre.

2012 Tecnimpianti Livorno was established: a brand-new excellence centre dedicated to the design and manufacturing of Mega Yacht systems

2013 Between March and May 2013, Navalimpianti Tecnimpianti Group was involved with majestic and impressive refitting works for the refurbishment of the new Carnival Sunshine (formerly Carnival Destiny), which was carried out at Fincantieri Arsenale Triestino San Marco. On this occasion Navalimpianti designed and created new Telescopic Davits for 300 PAX; these are the first biggest telescopic davits ever built and Navalimpianti Tecnimpianti mantains its position as absolute leader in their production.

2014 The group secured the order for the design, production and installation on the new AIDA buildings, AIDAprima and sistership, which are being built in Japan at Mitsubishi Heavy Industries.

2015 The biggest Skydome ever designed and built by Navalimpianti Tecnimpianti was successfully installed on Viking Star, the first of a long series of new ocean liners presently in construction or recently delivered.

2015 Tecnimpianti Antwerp baptizes the new site and premises offering an even stronger presence and better solutions in Western Europe

2016 Navalimpianti Tecnimpianti secures the orders for the design and supply for the new innovative ships by Virgin Voyages