Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers. Approved by PSAST on

Similar documents
Northfield to Ingle Farm #2 66 kv Sub transmission line

MATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose

M A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts

Electric System Serving Pierce County Current system and future investments

Project Purpose: Project History and Status:

PORT MORESBY POWER PROJECT - UPDATE PNG Mining & Petroleum Investment Conference. 4 th December 2018

Criteria for a Successful Shore Power Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

WELCOME AND AGENDA DOWNTOWN REDMOND LINK EXTENSION

1HFY2015 Results: Media & Analyst Briefing 12 March 2015 T T J HOLDINGS LIMITED STRUCTURES THAT SHAPE THE FUTURE 1HFY2015 RESULTS BRIEFING

Circuit Reliability Review

TORONTO TRANSIT COMMISSION REPORT NO.

Circuit Reliability Review

AXICOM COMPOSITE HOLLOW CORE INSULATORS STANDARD TYPES

South West Scotland Developer Forum

Shore Power at Port of Seattle. A viable solution to curb emissions at berth

Union Station Queens Quay Transit Link Study

Electrical Quarterly Load Update

Circuit Reliability Review

Transmission Investment Programme

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Managing Director of Transmission. Report for the year 2012

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

ELECTRICAL PROPERTIES PVC FILLER NOMINAL VOLTAGE 0,6/1 kv CLOURS CORES CLOURS

23,760 SF ASSEMBLAGE ZONED LR2

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

UCONN 2000 Preliminary Phasing Outline by Fiscal Year Draft Phasing Plan for Informational Purposes Only - Revised 9/25/13 Adjusted 4/13 Adjusted 9/13

2016 SCE Reliability Review. November 27 th, 2017 Irwindale, California

TORONTO TRANSIT COMMISSION REPORT NO.

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Representative (s) in Attendance

Circuit Reliability Review

Circuit Reliability Review

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS

Circuit Reliability Review

Memorandum. Pauline Medrano Mitchell Rasansky Steve Salazar. Power Transmission Lines in the Trinity River Corridor Follow-up CITY OF DALLAS

Circuit Reliability Review

Circuit Reliability Review

Large Disturbances During 2014 in Power System of Serbia

Circuit Reliability Review

Circuit Reliability Review

Whittier Bridge Project

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

APPENDIX H Transportation Projects Considered for Cumulative Impact Analysis

Circuit Reliability Review

Circuit Reliability Review

TREASURE ISLAND AND YERBA BUENA ISLAND Treasure Island Development Authority Board. April 8, 2015

Circuit Reliability Review

ADJUST-A-GRIP INSTALLATION INSTRUCTIONS

Circuit Reliability Review

Circuit Reliability Review

KING STREET TRANSIT PILOT

Circuit Reliability Review

PROGRESS REPORT WATERFRONT PROGRAM. Q (July - September) Highlights from Q3 2017

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

RESOLUTION No APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET. By Board Member Mark Ouimet

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

A New Way to Work in the ERCOT Market

Circuit Reliability Review

BOARD ITO Aide REPORT TO THE AIRPORT COMMISSIONERS

Circuit Reliability Review

(C)Flexible Fare Effective Date: May 1, 2014

Ozaukee County Transit Development Plan

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

Supplemental Information for Application for Transportation and Utility Systems and Facilities on Federal Lands

Circuit Reliability Review

Table of contents. Sound Transit 2 Plan map... A-2

Transcription:

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Approved by PSAST on 4-25-11

Overview Why the Update? Proposed Transmission Expansion Plan TCRM & TTC Results Cost Estimates Next Steps

Why the Update? Additional Scenarios Focus on alternatives to series reactors and Bothell SnoKing Maple Valley upgrades Increased likelihood that Puget Sound Energy will move forward with Sammamish-Lakeside- Talbot project Increased likelihood that Seattle City Light will move forward with their North Downtown Substation Project Seattle area line rating increases

Changes to South North Expansion Plan Original Plan Rebuild Bothell SnoKing Reconductor Maple Valley SnoKing 26 ohm Series Inductors on SCL s 115 kv Cables 3 rd Covington Transformer Extend Northern Intertie RAS Updated Plan Reconductor Bothell SnoKing Lakeside 230 kv Upgrade Project 6 ohm Series Inductors on SCL s 115 kv Cables 3 rd Covington Transformer Extend Northern Intertie RAS Reconductor Delridge Duwamish 230 kv Line NODO

Revised Plan for Winter South North Transfers

TCRM TTC TCRM & TTC Results: 26 ohm Series Inductor Alternatives 6 ohm Series Inductors 8,666 2044 26 ohm Series Inductors 10,460 1773 Thermal Protection System 22,445 1912 Phase Shifting Transformers 11,500 2136 230 kv Option: Lakeside Delridge Duwamish Reconductor in All Scenarios TPS Unacceptable to Seattle City Light Due to Reduced Reliability Refined Model for Phase Shifters is Needed Preferred: 6 Ohm Series Inductors Good Performance Low Cost Estimate

6 ohm Series Inductors 3rd 115 kv Underground Cable Maple Valley-SnoKing High Temp Lakeside Project TCRM TTC TCRM & TTC Results: 26 ohm Series Inductor Alternatives X X 8,433 2297 X X 19,027 1513 X X 8,666 2044 X X 11,213 2297 6 Ohms Performs Better for TCRM TTC benefits from a Third Cable when Paired with Lakeside Preferred: 6 Ohm Series Inductors Good Performance Low Cost Estimate Replacing the Existing Cables Provides Very Similar Results

TCRM TTC TCRM & TTC Results: 26 ohm Series Inductor Alternatives 6 ohm Series Inductors 8,666 2044 NODO 38,594-832 NODO & 6 ohm Inductors 9,101 2207 230 kv Option: Lakeside 6 Ohm Inductors Needed with NODO NODO Provides Benefit to TTC & Detriment to TCRM NODO Provides Additional Reliability to Seattle s System Preferred: NODO with 6 Ohm Series Inductors Good Performance Adds Reliability to Seattle s System

TCRM TTC TCRM & TTC Results: Maple Valley SnoKing Reconductor Alternatives 115 kv Option: NODO with 6 Ohm Inductors Preferred: Lakeside Good Performance Provides Needed Load Service at Lakeside Substation Maple Valley-SnoKing High Temp 8,778 2672 Maple Valley-SnoKing Rebuild 7,111 2708 Lakeside 9,101 2207 Lakeside & Maple Valley SnoKing High Temp 9,296 2732

TCRM TTC TCRM & TTC Results: Maple Valley SnoKing Reconductor Alternatives Maple Valley- SnoKing High Temp 8,778 2672 Lakeside 9,101 2207 Lakeside & Maple Valley SnoKing High Temp 9,296 2732 Monroe-Echo Lake #2 500kV 4,143 2916 115 kv Option: NODO with 6 Ohm Inductors Monroe Echo Lake #2 Provides the Lowest Overall TCRM & Highest TTC Monroe Echo Lake #2 is Not Preferred Due to a High Cost Estimate ($300 M)

Lakeside Project Bothell - SnoKing Rebuild Bothell - SnoKing High Temp TCRM TTC TCRM & TTC Results: Bothell SnoKing Rebuild Alternatives X X 9,101 2207 115 kv Option: NODO with 6 Ohm Inductors Minor Reduction in Performance with Reconductor Preferred: Lakeside with Bothell SnoKing Reconductor Good Performance Cost Savings from Rebuild X X 10,286 2233

Total Preferred Projects $398 * The majority of these estimates are preliminary estimates. More detailed estimates will be developed by the Puget Sound Area utilities. PSAST Preferred South-to-North Plan Cost Estimate Cost Estimate (M) Reconductor Bothell-SnoKing 230kV #1 & #2 with high temperature conductor Extend the Northern Intertie RAS to trip for the combined outage of the Chief Joseph- Monroe and Monroe-SnoKing-Echo Lake 500 kv lines Add a third Covington 500/230 kv transformer, a 500 kv terminal at Raver for the third Raver-Covington 500 kv line, and a 500 kv Bus at Covington $3 $3 $60 Reconductor Delridge - Duwamish 230 kv Line with high temperature conductor SCL's North Downtown Substation with 6 ohm inductors on all 3 cables (Two sets of inductors may be initially installed for $13 M) $260 Lakeside 230/115 kv Transformer and 230 kv Sammamish - Talbot 230 kv Upgrade Line Work $70 $2

Next Steps Identify Parties Responsible for Each Project Agree on Cost Allocation Further Develop Projects Update Study Work for North South Transfer Conditions Refine Series Inductor Sizes Determine the Longevity of the Proposed Plan Provide Study Support for Proposed Projects Continue to Investigate Cost Effective Ways to Reduce the Remaining Risk of Firm Curtailments

Questions?