Wicking Geosynthetic Used for Frost Heave Prevention Pioneer Mountain Scenic Byway

Similar documents
Abstract. Introduction

Reader. Scott Foresman Reading Street Labels Photo Captions. Adjectives That Compare. Ranges. Mountain. Animals and Plants Exploring Nature

Permeable RECREATIONAL TRAILS

Runway Roughness Evaluation- Boeing Bump Methodology

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

Pavement Strength Analysis Prepared by Molzen Corbin September 2016

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Comparison Study between Vault Seismometers and a New Posthole Seismometer

FULL DEPTH RECLAMATION (FDR)

4.0 Context for the Crossing Project

Whitney Bridge. A rare tax free business. FOR SALE Freehold. Whitney-on-Wye, Herefordshire HR3 6EW

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number

Tunnel design underneath the operating runway of Incheon airport

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT

Runway Roughness Evaluation- Boeing Bump Methodology

FHWA ALF Update & Performance Testing. Nelson Gibson Spring 2016 ETG Salt Lake City, UT

Runway Roughness Evaluation- Boeing Bump Methodology

SRT system stabilizes levee at power plant

Slot Couloir Accident, Snoqualmie Mt

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.

American Avalanche Association Forest Service National Avalanche Center Avalanche Incident Report: Long Form

Preliminary Information on the 2003 Tokachi-oki Earthquake

1.2 Corridor History and Current Characteristics

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report

Chapter 14. Design of Flexible Airport Pavements AC 150/5320-6D

Peace Project Water Use Plan

City Park Mile High Loop 2015 Trail Condition and Assessment

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits

Boeing Aircraft and the Impact on Airports

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

General Overview: Acreage:

for for HotValley TM TM

FARMINGTON PLANNING BOARD 153 Farmington Falls Road March 14, :00 P.M. Minutes

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS

Fibre Mesh Wedge User Instructions. Simple Stuff Works

Effect of Support Conditions on Static Behavior of 1400m main span and 700m side span Cable-stayed Bridge

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting

Understanding user expectations And planning for long term sustainability 1

EXPLORE ALASKA. What is Alaska like? Page 1

RETAIL OPPORTUNITY. A new retail destination. Riverside Building Riverside Way, Nottingham NG2 1DP

International Snow Science Workshop

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

Excelsior Pass Avalanche Accident January 1, 2008

Outdoor Clothing: The Layering System

Thank you for this third opportunity to comment on the proposed revisions to the Coconino National Forest Management plan.

COUNTY OF ORANGE, CALIFORNIA AIRPORT REVENUE BONDS, SERIES 2009 A & B ANNUAL REPORT FOR FISCAL YEAR ENDED JUNE 30, 2013

Budapest, Hungary 2015

Alternatives Analysis City of Newport Beach Sunset Ridge Park Project December 14, 2011

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

Specification for Grip blocking using Peat Dams

Wild Pacific Trail Society

APPENDIX X: RUNWAY LENGTH ANALYSIS

Rugby Portobello Centre Dymchurch Road, St Mary s Bay, Kent

Funding Package TOTAL $15,172,000

! African-Rainbow-Minerals- Nkomati!Mine!

Kindergarten Science Unit C: Earth Science Chapter 5: Our Land, Air, and Water Lesson 1: What makes up the Earth?

Wärtsilä. Oil to Water Lubricated Hydro Turbine Bearing Conversions 2018 CONTENTS. Introduction Function of the turbine guide bearing...

Working Draft: Time-share Revenue Recognition Implementation Issue. Financial Reporting Center Revenue Recognition

Exemplar for Internal Achievement Standard Geography Level 1. Conduct geographic research, with direction

Field Investigation: Evaluation of Non-Destructive Density Testing Devices on Hot Mix Asphalt. December 14, By:

Introduction Presentation

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

The Okewood Hill Estate. Surrey

TOWPLOW TIME-SAVING, SAFE ADDITION TO CONVENTIONAL SNOW PLOWING TRUCKS. Clearing The Way To Keep America Moving

Aspen Skiing Company Policy for Use of Other Power-Driven Mobility Devices And Service Animals

Newton of Drumduan, Dess, Aboyne, Royal Deeside

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT

Mainelli Wagner & Associates, Inc.

Check Out Our Web Site at: To Order, Call Toll-Free From anywhere in North America

,271

The real value of Non-Profit Airfares

Final Report FHWA/IN/JTRP-2004/35 NON-DESTRUCTIVE ESTIMATION OF PAVEMENT THICKNESS, STRUCTURAL NUMBER AND SUBGRADE RESILIENCE ALONG INDOT HIGHWAYS

Chapter 7 Snow and ice

Port of Friday Harbor

Maintenance Cost Estimation Method of an Aircraft Manufacturer

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.

Pump Fillage Calculation (PFC) Algorithm for Well Control

Rural Rustic Road Program

National Model Railroad Association

This Is the. W e s t

Texas Transportation Institute The Texas A&M University System College Station, Texas

Kona Folding Arm Awnings. Product Information

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

The Evolution of the YOW De-Icing Facility SWIFT Conference & Trade Show September 14-17, Hyatt Regency Montreal

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

GROUND TRANSPORTATION REGULATION

City of Redding Airports

2009 Model Sports RV Features

CHALMINGTON MANOR. Chalmington Dorchester Dorset

RETAIL/LEISURE TO LET

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

Guidelines for Constructing Local Roads in New York's Adirondack Park

Appendix C AIRPORT LAYOUT PLANS

MORGAN CREEK GREENWAY Final Report APPENDICES

The Whitefish Trail

U.S. 33 Ravenswood Connector

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Transcription:

Wicking Geosynthetic Used for Frost Heave Prevention Pioneer Mountain Scenic Byway Mark Sikkema TenCate 365 South Holland Drive Pendergrass, GA 30567 (760)-693-1800 m.sikkema@tencate.com James B. Carpita, P.E. Beaverhead County 2 South Pacific Street #12 Dillon, MT 59725 (406) 683-3724 jcarpita@beaverheadcounty.org Prepared for the 65 th Highway Geology Symposium, July, 2014

65 th HGS 2014: Mark Sikkema and Jim Carpita 2 Acknowledgements The authors would like to thank the individuals for their contributions in the work described: Greg Gifford, Robert Kraig, and Marty Martinez FHWA Western Federal Lands Disclaimer Statements and views presented in this paper are strictly those of the authors, and do not necessarily reflect positions held by their affiliations, the Highway Geology Symposium (HGS), or others acknowledged above. The mention of trade names for commercial products does not imply the approval or endorsement by HGS. Copyright Notice Copyright 2014 Highway Geology Symposium (HGS) All Rights Reserved. Printed in the United States of America. No part of this publication may be reproduced or copied in any form or by any means graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without prior written permission of the HGS. This excludes the original authors.

65 th HGS 2014: Mark Sikkema and Jim Carpita 3 ABSTRACT Problem The Pioneer Mountain Scenic Byway, located just 30 miles West of Dillon Montana, seasonally experiences frost heave over a 20 mile stretch of roadway. The road is closed to winter traffic and typically opened in May. Longitudinal cracks are commonly found. The Moose Park location experiences the most dramatic problems and had been recently repaired in 2004. Solution & Design Federal Highways subsurface investigations indicate a high water table and a variable subgrade strength consisting of silts and pit run materials. The preference is to minimize over excavation and looked to geosynthetics as an option. The new wicking geosynthetic provided by TenCate was recently used on an Alaska DOT project with early indications of success. Three design solutions were proposed and presented to the county for review. The dual layer solution was selected to minimize the cross section depth and keep the wicking geosynthetic above the water table to mitigate the frost heave effects. Construction In the fall of 2013, the site was excavated to the required depth finding a mix of materials to include 4 drain tiles and miscellaneous geosynthetics used in previous repairs. The first layer of wicking geosynthetic was installed and covered with select pit run aggregate. Early wicking was witnessed shortly after installation. The project was put on hold as snow started falling and temperatures dropped at this 7625 foot elevation. The final installation will be completed in early summer of 2014.

65 th HGS 2014: Mark Sikkema and Jim Carpita 4 INTRODUCTION Pioneer Scenic Byway near Dillon, Montana is a seasonally open road travelled by tourists, ranchers, snow enthusiasts and makes a connection between Polaris and Wise River, Montana. The road traverses through an elevation differential of 2000-7500 ft and grants access to locations such as Maverick Mountain Ski Resort, Elkhorn Hot Springs, and the Gem Field. The road is typically cleared from snow in late April-early May (Figure 1). Once uncovered, a longitudinal crack forms during the freeze-thaw cycle (Figure 2), and extends for over 20 miles, some of which are wider than a motorcycle tire and requires immediate maintenance attention for safety. The Moose Park location displays the most severe of these cracks generated by freeze thaw. Figure 1 Road Clearing

65 th HGS 2014: Mark Sikkema and Jim Carpita 5 Figure 2 Longitudinal Crack, Moose Park

65 th HGS 2014: Mark Sikkema and Jim Carpita 6 Construction 2004 In 2004, the repair of the Moose Park location utilized traditional methods to combat frost heave. This included sub-excavation, geotextile, and a drain system. (Figure 3) Figure 3 2004 Typical Detail In 2008, the longitudinal cracks began re-appearing, and maintenance sub-excavation and chip sealing was used to repair the sections. DESIGN Background In discussions with Federal Highways, Western Federal Lands in Vancouver, Washington, a geosynthetic solution would be reviewed. A new wicking geosynthetic from TenCate was recently used in Alaska to mitigate the effects of frost heave. Early testing conducted by Xiong Zhang, at the University of Alaska Fairbanks, Beaver Slide, provided the design guidance, (Figure 4).

65 th HGS 2014: Mark Sikkema and Jim Carpita 7 Figure 4 Temperature and Moisture Contours on the Beaver Slide Study Another project of a much larger scale was installed in 2012 by the Alaska DOT on the Dalton Highway 30 miles north of Coldfoot, Alaska. This road experiences severe frost heave and early success of the geosynthetics wicking capability was seen during the first spring breakup. (Figure 5)

65 th HGS 2014: Mark Sikkema and Jim Carpita 8 Figure 5 Dalton Highway - Mirafi H2Ri capillary break and wicking seen May 30, 2013 Moose Park Data such as borings, piezometer, and a gradation analysis were provided by FHWA to come up with design scenarios. Design constraints were listed as the following. Budget High water table Blend in with the surroundings (important for daylight considerations) These items were reviewed with associate engineers from TenCate. The wicking geosynthetic (Mirafi H 2 Ri) also performs sub-grade stabilization, however needs to be located above the water table to perform wicking and act as a capillary break to the pavement structure. Three solutions to repair the 1,100 feet of Moose Park roadway proposed by WFLHD are shown in Figure 6. Option #1 would not be an improvement over the existing roadway design conditions. Although better, Option #2 would not significantly extend the pavement life. The option chosen was Option #3. This option is anticipated to result in less differential deformation at the surface, fewer surface cracks and lower long-term maintenance cost according to WFLHD. The estimated repair costs were $475,000, $585,000 and $675,000 for options #1, #2 & #3 respectively.

65 th HGS 2014: Mark Sikkema and Jim Carpita 9 The maintenance of the Scenic Byway roadway falls to Beaverhead County which in addition to this roadway has over 1600 miles of county roads spread over 5560 square miles to maintain with a annual road budget of less than $2.4 million. Beaverhead County s matching share for the three options ranged from $70,000 for the no improvement option #1 to $99,650 for the extended longevity associated with Option #3. Beaverhead County determined that the minimal increase in matching funds far out weighted the added long-term maintenance costs associated with the other two options. In addition upon reviewing the initial costs estimates for the three option, that due to the hauling of the aggregates to the remote site location, the actual cost difference in construction between the options was only the costs of the geosynthetics. This reinforced the decision to install the two layer system; a wicking geosynthetic layer on top of the subgrade fill and a second layer of geosynthetic under the base aggregates.

65 th HGS 2014: Mark Sikkema and Jim Carpita 10 Construction 2013 Figure 6 Typical Cross-section Repair Options Construction began in October 2013 by the Beaverhead County maintenance department. Excavation uncovered the drainage pipe and geosynthetic that was utilized in 2004.

65 th HGS 2014: Mark Sikkema and Jim Carpita 11 Beaverhead County Engineer was onsite along with technical representation from TenCate. Often geosynthetics are installed with a minimum overlap requirement. In the case of the wicking geosynthetic, the overlaps were installed shingle style so as to optimize water movement to the sides of the road. In super elevation cases, the material was overlapped from one side of the road to the next (Figure 7), and for a typical crown, the material was installed with the middle roll at the highest point similar to a roof shingle. (Figure 8) Figure 7 Overlap in Super Elevation

65 th HGS 2014: Mark Sikkema and Jim Carpita 12 Figure 8 Overlaps transitioning from Super Elevation to Crown The select borrow was placed in a compacted 10 lift. At this point the project was put on hold through as winter in Montana began to set in. Final construction is expected in June of 2014.

65 th HGS 2014: Mark Sikkema and Jim Carpita 13 REFERENCES: Xiong Zhang A.M. ASCE, and Nicholas Belmont. Use of Wicking Fabric to Help Prevent Differential Settlements in Expansive Soil Embankments. Department of Civil and Environmental Engineering, University of Alaska, Fairbanks, 2011. Geo-Frontiers 2011 ASCE 2011, pp 3923. Xiong Zhang, M. ASCE, Wendy Presler, Lin Li, David Jones, and Brett Odgers. Use of Wicking Fabric to Help Prevent Frost Boils in Alaskan Pavements. Journal of Materials in Civil Engineering ASCE 2014, pp 739.