2 / BMW BMW South Africa Presentation 2014.03.17 Sheer Driving Pleasure
ents cont LOCALITY Menlyn Maine is situated in the heart of Pretoria s eastern suburbs and is ideally located to make full usage of the newly upgraded Garsfontein and A tterbury highway intersections. Menlyn Maine is a re-development of ± 100 residential erven located in the current townships of Waterkloof Glen Extension 2, Menlyn Extension 3 and 11. The previous residential houses were dismantled through the salvaging of all recyclable / re-usable building material while endemic trees were located to an on-site nursery for later replanting as the precinct develops. Menlyn Shopping Centre Menlyn Maine locality model photographs urban framework area schedule perspectives floor plans
CENTRAL SQUARE BMW REGUS s Locality Locality Master plan
Model Photographs s s January Masilela Constellation Aramist North Precinct As seen from the South - Aramist Boulevard North Precinct As seen from the South-East - January Masilela Ave.
Menlyn Maine Green Strategy Site Analysis Building located at gateway into precinct. South Building defines Urban Space at Gateway into All buildings in the Menlyn Maine precinct will be required to obtain a 4 Star As-Built Green Star SA rating. The Green Building Council of SA is an independent body whose rating system aims to assess the environmental attributes of a new commercial space and is based on building design and construction. spatial massing Eastern and Western corners are significant in terms of urban design. Main Vehicular Entrance to site from Mercy avenue Visitors parking on ground floor (at main entrance) precinct External seating activates streetscape and assists with pedestrianizing the precinct. The rating tool helps owners, developers and consultants to responsibly inform design; minimizing their impact on the environment and gain official recognition for their efforts. The tool consists of 8 environmental impact categories and an innovation category, with points being awarded per category based in the buildings potential to minimise it s environmental impact range within the following key areas: Management Indoor environment quality Energy Transport Water Materials Land Use & Ecology Emissions & Innovation BMW Orion Amarand Boulevard Pegasus Regus BMW Building Efficiencies & Operational Cost Savings % water saving achieved = 46% % energy saving achieved = 51% - Total combined savings on monthly utilities +/- R10.50m 2 rentable area Urban Framework Going Green Urban Framework Massing
Why Menlyn Maine? Site Plan Locality & accessibility Part of a mixed-use precinct, offering: Retail Residential Hotel Offices Showroom and Park Areas Green Building in a sustainable precinct development: Green Star SA Accreditation Leed Neighbourhood Clinton Climate Initiative Mercy Avenue Mercy Avenue Naming rights (Signage) on building: Expandability into Building and into Precinct Social Capital - Attracting and retaining talent Urban Framework Orion Building Regus Building BMW Building
perspectives North Western Facade As seen from Mercy Avenue South Western Facade Main Vehicular Entrance from Mercy Avenue
perspectives Northern Eastern Facade As seen from January Masilela Avenue South Eastern Facade View from January Masilela Ave.
Regus Building Possible Sub-Tenant Office Space Useable Office Area Ablutions Circulation Core Landscaped Balcony Visitors Parking Main Entrance (From Mercy Avenue) Ground Floor Level Orthographic Ground Level
Regus Building Useable Office Area Ablutions Circulation Core First Floor Level Orthographic Typical Level
Second Floor Level Third Floor Level
Services Area Regus Building Store Rooms Fire Escape Circulation Core Security & Access Control Store Room Rainwater Harvesting Tank Basement Lvl -1 Orthographic Basement Level
Basement Lvl -2
Boogertman + Partners Architects Nicol Main Office Park 2 Bruton Road Bryanston Tel: +27 (0)11 790 1600 Fax: +27 (0)11 463 1197 E-mail: mail@boogertmanjhb.co.za web: www.boogertmanandpartners.co.za