NOAA s Office of Marine and Aviation Operations

Similar documents
NOAA s s Ship and Aircraft Support Office of Marine and Aviation Operations (OMAO)

Great Lakes Association of Science Ships Annual Meeting, Traverse City, MI 11 Jan 11

NOAA UAS Alaska/Arctic Flight Operations NOAA Office of Marine and Aviation Operations (OMAO) CAPT Philip Hall, OMAO

April 20, 2010 Arlington, VA. Kathy Crane

4 Picture of USS BREMERTON (SSN698) ( 5 ) USS BREMERTON (SSN698 ) Commissioning Program

3.3 Specific Developments in Air Navigation CNS AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) (Presented by the United States of America) SUMMARY

Command Ship. USS WRIGHT (CC-2)

CARRIER STRIKE GROUPS

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

Bremerton National Airport Airport Master Plan Project Update February 12, 2013

Airborne Remote Sensing Component of Marine Debris Monitoring

ECOTOURISM AND BIODIVERSITY CONSERVATION

U.S. Navy Global Class AGOR Mid-Life Refits Managed by the Office of Naval Research (ONR) UNOLS Annual Meeting November 1, 2018

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

Honoring the value, accomplishments and contributions of U.S. Navy aircraft carriers, and the men and women who serve aboard them.

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

LONG-RANGE STATE AIRCRAFT FLEET REPLACEMENT PLAN

Aviation Program Features by Category: Aircraft, Facilities, Personnel, and Cost for Fiscal Year

Chapter 1: Introduction Draft

Appendix B CLEAR ZONES AND ACCIDENT POTENTIAL ZONES

Applewood Heights Community Open House

Dallas Executive Airport Town Hall Meeting April 3, 2014

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

EUR/SAM corridor airspace concept

General Aviation Master Plan Update

Project Kickoff. Agenda. Pete Sechler AECOM. Randy Goers City of Tampa

CHAPTER 1 EXECUTIVE SUMMARY

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Chapter 1: Introduction

SAN JOSE CAPITAL OF SILICON VALLEY

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

Airport Strategic Planning Board (Airport Advisory Board) MEETING AGENDA

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

THE COMMAND SHIP CONCEPT

Safety Enhancement 186R3.2 TCAS-Sensitivity Level Command

Water Resources Update after NCGA Long Session

DEPARTMENT OF THE NAVY USS MARYLAND (SSBN 738) FPO AA Ser NAV/ Mar 94 From: Commanding Officer, USS MARYLAND (SSBN 738) (GOLD) To

Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project

Report to Congress Aviation Security Aircraft Hardening Program

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

AIRFIELD SAFETY IN THE UNITED STATES

Naples Noise and FAA Updates

Amendment of Restricted Areas R-3004A and R-3004B and Establishment of R-3004C;

AVIATION > ICAO NAT PBCS/2. Inmarsat Update. ICAO NAT PBCS Workshop/2 Paris June th, 2015 Presented by Andrew Ives

Physical Oceanographic Real-Time System (PORTS ) Funding Model

Military Aviation Fleet & MRO Forecast

City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018

AGENCY SCOPING MEETING

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

Alternatives. Introduction. Range of Alternatives

License Requirements and Leased Aircraft

2017 Recap. Market Temperature. Piston Singles The single engine piston

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport

Agenda: SASP SAC Meeting 3

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. Ultimate Operations 5th Working Group Briefing 9/25/18

Community Noise Consortium Meeting (CNC)

RE: Draft AC , titled Determining the Classification of a Change to Type Design

BUSINESS AVIATION SUPPORT SERVICES AIRCRAFT MANAGEMENT. Taking You Under Our Wing

Study Advisory Committee Meeting No. 2

Quantile Regression Based Estimation of Statistical Contingency Fuel. Lei Kang, Mark Hansen June 29, 2017

PURPOSE AND NEED. Introduction

City Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016

National Transportation Safety Board Recommendation and FAA Air Traffic Orders

Planning for State Parks

From: Commanding Officer, USS FLORIDA (SSBN 728) (BLUE) To: Director, Naval Historical Center (N09BH)

WHEREAS, a parking rate analysis was completed as part of the Boise Airport Master

Chapter Two FORECAST OF AVIATION DEMAND A. DESCRIPTION OF FORECAST ELEMENTS

Transportation TRANSPORTATION PROJECTS

Update on the Aspen/Pitkin County Airport Improvements

AGENCY: Office of National Marine Sanctuaries (ONMS), National Ocean Service (NOS),

(Presented by IATA) SUMMARY S

2008 Arctic Icebreaker and AICC Activities. Carin Ashjian, AICC Chair

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Oceans and Fisheries Working Group Work Plan

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Presidential Aircraft Recapitalization

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

What does Multi-Use mean for the Tourism Sector?

Westover Metropolitan Airport Master Plan Update

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018

Martin Pastucha, Director of Public Works/Airport Director

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC)

Proposed Establishment of and Modification to Restricted Areas; Fort Sill, OK

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

Department of Legislative Services Maryland General Assembly 2009 Session

Business Aviation Providing Tools Not Toys

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO

Kansas City Aviation Department. Airport Committee July 19, 2018

Review of Air Traffic Services Montreal International Mirabel (CYMX) TERMS OF REFERENCE. Review of Air Traffic Services

Airport Safety Management Systems: Integrating Planning Into the Process

Baltimore Harbor & Channels, Maryland and Virginia

DAVID BAXT Co-Founder & President Wheels Up, LLC O: E:

Transcription:

NOAA s Office of Marine and Aviation Operations UNOLS Annual Meeting October 2 & 3, 2008 Rear Admiral Jonathan W. Bailey, Director, NOAA Corps and Office of Marine and Aviation Operations

Agenda 2 FY 2008 Ship & Aircraft Accomplishments NOAA Ships & Aircraft in FY2009 Status of Okeanos Explorer Status of Recapitalization Plan NOAA Survey Vessel (NSV) Study

FY 2008 Accomplishments 3 Operated 21 vessels which provided 4,960 total ship operating days (reported thru August and planned for September): 3,640 NOAA ship days using OMAO and Program funds and 1,320 charter days using OMAO and Program funds Operated 12 aircraft which provided 4210 flight hours (reported thru August and planned for September): 2,430 hours using OMAO funds and 1,780 hours using Line Office program funds and reimbursable funds. Continued the recapitalization of NOAA ships: FSV 5 preliminary design moving forward FSV 6 requirements being refined in anticipation of funding Rude decommissioned in March John N. Cobb decommissioned in August Okeanos Explorer commissioned in August Bell M. Shimada (FSV 4) launched in September PISCES (FSV 3) projected delivery in October Completed Cone housing modifications for the Tail Doppler Radar on the Gulfstream IV Damage Assessment aircraft departed Beechcraft and going through modifications at AvCon

NOAA Ships in FY09 (19 Ships) 4 Fairweather Oscar Dyson KODIAK (1) & KETCHIKAN (1) Miller Freeman Rainier MOC-Pacific (4) Delaware II MISSIONS Nautical Charting Fisheries Research WOODS HOLE (1) QUONSET POINT (proposed (1)) Bell M. Shimada McArthur II Oceanographic Research Coastal Monitoring Ocean Exploration MOC NORFOLK (1) Okeanos Explorer SAN DIEGO (1) CHARLESTON (2) PASCAGOULA (3) Thomas Jefferson Hi ialakai David Starr Jordan Gordon Gunter Ronald H. Brown Nancy Foster Homeport TBD: Oscar Elton Sette Henry B. Bigelow PEARL HARBOR (3) Pisces Oregon II Ka imimoana

NOAA Aircraft in FY09 (12 Aircraft) 5 SHRIKE COMMANDER JET PROP COMMANDER Minneapolis (2) MISSIONS Charting and Mapping Fisheries Research Hurricane Research Environmental Assessment Dulles, VA (1) Damage Assessment Aircraft (to replace Citation) AOC Tampa (9) P-3 (3) SHRIKE COMMANDER GULFSTREAM IV TWIN OTTER (4)

Status of Okeanos Explorer 6 May 2008 Completed Conversion Phase II in Bellingham, WA May 2008 Ship Integration begins in Seattle, WA July to August 2008 Conducted ship shakedown August 2008 Commissioned in Seattle, WA September 2008 Completed Mapping Shakedown October to November 2008 ROV and Telepresence Performance Acceptance Testing April 2009 Begin field trials in the Pacific Ocean

Status of Recapitalization Plan 7 Chronology of Ship Recapitalization Plan Approved by NOAA January 2008 Approved by DOC May 2008 Approved by OMB September 2008 Awaiting transmittal of report to the Hill Recommendation FY2010 to FY2024 Replace nine active NOAA ships with either Fisheries Survey Vessel (FSV) or NOAA Survey Vessel (NSV) class and conduct service life extension on one other active NOAA ship

NOAA Survey Vessel Study 8 Background Congressional Language in 2008 Appropriations Act Report, dated 1/2008: NOAA is directed to provide to the House and Senate Appropriations Committees, within 18 months of enactment of this Act, a study that evaluates the design and operations of future research vessels in the form of a NOAA Survey Vessel for multi-mission operations, to maximize on-site activities and modularize for versatile platform availability. OMAO to lead formulation of NOAA Survey Vessel (NSV) study scope, action plan and report preparation. Report due to Congress in June 2009. Study report will adhere to recommendations in NOAA Ship Recapitalization Plan approved by NOAA/DOC.

NOAA Survey Vessel Study 9 Schedule March 26, 2008 - NSV Kickoff Meeting with NOAA Goal leads April to August 2008 - Collected and analyzed NSV mission activities/requirements from NOAA Mission Goals August 27, 2008 - Presented results of initial analysis to Goal teams September 18, 2008 - Held NSV Workshop to discuss NSV Strategy and NSV ship size alternatives; need to further define requirements September to December 2008 - Conduct follow-on workshops on Goal requirements December 2008 to February 2009 (estimate) - Finalize NSV ship concept; develop NSV Concept of Operations March 2009 to June 2009 Complete and review NSV report before sending to Congress