Commuter Rail Facility Scenarios

Similar documents
Rail Transit Maintenance Facility

Wildlife and Vegetation Fauna y Vegetación

FUTURE HIGH CAPACITY TRANSIT CORRIDORS FUTUROS CORREDORES DE TRANSPORTE DE ALTA CAPACIDAD

Youth Workshop/Taller de Jovenes

Colorado Department of Transportation The Role of State Departments of Tr of T ansportation

I Have A Problem Text and Photos by Rich Mahaney, EID Superintendent

Mobile Farebox Repair Program: Setting Standards & Maximizing Regained Revenue

City of Sacramento Sacramento Intermodal Transportation Facility Draft WP # 3 Transit Operational Requirements

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW

DHS Consolidation at St. Elizabeths Master Plan Amendment. Transportation Interstate 295 / Malcolm X Avenue Interchange

OFFERING MEMORANDUM East Arapahoe Road, Greenwood Village, CO. JEFF HALLBERG PRINCIPAL

SCOPING INFORMATION PACKET

A Public Transportation Review Evaluating Metro s Operational Efficiency, Service Capacity and Fiscal Impact

Regional Planning for Tri-Rail Coastal Link

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

TTI REVIEW OF FARE POLICY: PRELIMINARY FINDINGS

Approval of August 2019 Service Changes

COMMUNITY CONVERSATION: POLICE SERVICES AND LEADERSHIP

Having trouble reading this ? View it in your browser. Welcome

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

in the heart of THE HEARTLAND

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

Airport Planning Area

Santa Clarita Transit. Accessibility Advisory Committee Meeting. May 7, Meeting location: City of Santa Clarita, Transit Maintenance Facility

Yucca Mountain Nuclear Fuel Locations and Associated Rail Facilities. Rancho Seco Nuclear Generating Station, California

Request Conditional Use Permit (Indoor Recreational Facility) Staff Planner Kevin Kemp

WHAT IS AN ALTERNATIVES ANALYSIS STUDY?

Making the TOD Vision a Reality: Two US Case Studies

CA CA CA CA CA CA CA CA CA CA Educational facilities - public elementary and high schools and private schools with a curriculum similar to public

RELATED SANTA CLARA SANTA CLARA, CALIFORNIA. RELATED SANTA CLARA Santa Clara, CA

ACI LEGAL COMMITTEE MEETING

HIGH SPEED RAIL CROSSING WITH FLANGE-BEARING CROSS TRAFFIC. UPRR/TPW Crossing in Chenoa, IL

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

DOWNTOWN BRT ALTERNATIVE - 19th AVE

QUIET ZONE IMPLEMENTATION PLAN

Meeting Notes Public Open House

DEN is the #1 Economic Engine of the State of Colorado and the Rocky Mountain region Generating over $26 Billion annually in economic benefit DEN

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

PROPOSED PARK ALTERNATIVES

Presentation to the DRCOG Board August 16, 2017

Arlington County Board Meeting Project Briefing. October 20, 2015

2015 Bond Proposal Model Airplane Parks (PR96) Alternative Model Airplane Park Location

Norwalk H.S. Norwalk Green Line Station. Lakewood Green Line Station NORWALK. Bellflower H.S. Studebaker Rd. Cerritos College. Gahr H.S.

CHAPTER 5: Operations Plan

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

DOWNTOWN EAST RESTAURANT AND RETAIL SPACE. Matt Friday. Senior Vice President

Lake Erie Commerce Center Traffic Analysis

Pre-Leasing. 3 Highland Park Green NE. State of the Art Distribution Facility for Lease. Airdrie, Alberta. Now Available for Pre-Lease.

DE LA PLATA OCEANSIDE, CA

SOUTH INTERCHANGE AREA

TGS CEDAR PORT INDUSTRIAL PARK

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

DEMOGRAPHICS AND EXISTING SERVICE

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

Project Planning, Compliance, and Funding

Oakland A s Gondola Economic Impact

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

FEASIBILITY CRITERIA

Report on Installation of Wayside Horns at Railroad Crossings and Railroad Trench System

IMPACT OF NORTH-SOUTH TRAFFIC

High Capacity Transit System Sistema de Transporte de Gran Capacidad

447 Route 28 West Yarmouth MA 02673

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

AIRPORT MASTER PLAN UPDATE

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP Power Sweeping Services for Metro Facilities

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

STUDY PROCESS. Study. PHASE I Research. PHASE II Develop & Analyze Options. PHASE III Recommendations. Regional Transit

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

N VANCOUVER AVE PARCEL

Hotel accessibility pack

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Like many transit service providers, the Port Authority of Allegheny County (Port Authority) uses a set of service level guidelines to determine

A. CONCLUSIONS OF THE FGEIS

BALLAST CLEANING TO IMPROVE DRAINAGE IN METROLINK S VALLEY SUBDIVISION TUNNEL 25

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

Whangarei Airport. Prepared by Carine Andries 10/20173

DRAFT Service Implementation Plan

Pedestrian Safety Review Spadina Avenue

$866,000. $1,400,000 Health Benefits $13,156,000 TOTAL ANNUAL DIRECT BENEFITS. $10,890,000 Economic Benefits

SECTION 106 ACTIVITIES ANNUAL REPORT

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Connecting the Barcelona tramway network

Yucca Mountain Nuclear Fuel Locations and Associated Rail Facilities. Diablo Canyon Power Plant, California

North Metro Rail Line Elected Officials Briefing. November 16, 2017

The Americas. Port of the Americas. Rhonda M. Castillo Gammill, Esq., P.E. Executive Director, Port of the Americas Authority

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

BOARD OF AIRPORT COMMISSIONERS

Train noise notes April 15, 2017 Bob Kingsnorth

A VISION FOR I-95. January 12, Delaware Department of Transportation

November 9, Society of American Military Engineers

These elements are designed to make service more convenient, connected, and memorable.

FERRY SYSTEM FOR METRO AND ISLAND SERVICES April 20, 2017

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

Northwest Corridor LRT Line to Irving/DFW

Pre-Leasing. 3 Highland Park Green NE. State of the Art Distribution Facility for Lease. Airdrie, Alberta. Now Available for Pre-Lease

Transcription:

Commuter Rail Facility Scenarios Commuter rail lines require a maintenance facility for cleaning, maintenance, and vehicle storage. The maintenance facility could either be a central facility that serves several corridors or a facility that serves only one corridor. Commuter rail lines also require a layover facility at the end of the corridor for routine maintenance and vehicle storage. Several combinations of maintenance facilities and layover facilities are being considered. Central Figure 1 Figure 2 Figure 3 Figure 1 shows the scenario where a central maintenance facility would serve several corridors. This is being considered as an option if two of the three potential commuter rail corridors (US 36, I-70 East Corridor, and North Metro) select commuter rail. Under this scenario, the central facility is at the end of the corridor where the multiple commuter rail lines come together and the layover facilities are at the other end of the corridor. Figures 2 and 3 show the scenario where a maintenance facility would serve one corridor only. Under this scenario, a maintenance facility could be considered at either end of the corridor and the layover facility would be at the opposite end. This is being considered if the US 36 corridor is the only one to select commuter rail.

Split Maintenance Facilities One of the other options evaluated for the commuter rail maintenance facility was to consider splitting it in to two smaller sites. The sites include a heavy maintenance site and a running maintenance site. The heavy maintenance site requires about 40 acres and provides major repair and equipment replacement for locomotives and passenger vehicles. The running maintenance site requires 60 acres and provides daily cleaning, minor repairs, fueling, overnight storage, and offices/parking for employees. Benefits associated with the split facilities include smaller individual site requirements that may create the opportunity for development/redevelopment adjacent to the site. Impacts of the split site include having two sites instead of one, needing more property than the single site, higher operating costs, and a doubling of train movements to move between the sites. All 24 central maintenance facility sites were considered for a split site and five sites were identified. COMBINED (90 acres) SPLIT Running (60 acres) Heavy (40 acres) A cooperative effort between FHWA, FTA, CDOT, RTD, and Denver

Site Requirements Disposición del Área de Mantenimiento Commuter Rail The site requirements for a commuter rail maintenance facility include: Minimize neighborhood impacts - located in existing industrial areas or rail yards On RTD corridor - located along US 36 Corridor, I-70 East Corridor, or North Metro Corridor Certain size and shape - rectangular shaped, up to 90 acres Ability to provide operational needs - tangent track of 7,000 feet Área de Mantenimiento para los Carriles de Transporte Rápido Los requisitos de los sitios para las áreas de mantenimiento para los carriles de transporte rápido incluyen: Minimizar los impactos de los barrios - ubicados en áreas industriales o en yardas existentes En el corredor de RTD - ubicado a lo largo del Corredor US 36, el Corredor Este I-70, o el Corredor North Metro Cierto tamaño y figura - figura réctangular, hasta de 90 acres Habilidad de proporcionar necesidades operacionales - vía tangente de 7,000 pies Commuter Rail Carriles de Transporte Rápido

Commuter Rail Layout Disposición del Área de Mantenimiento para los Carriles de Transporte Rápido Facility Layout / Disposición del Área de Mantenimiento FuelingSanding/ Combustible/Arena Maintenance and Repair Facility/ Área de Mantenimiento y Reparación Storage and Light Maintenance/ Almacenamiento y Mantenimiento de Luz Facility Function / Funciones del Área de Mantenimiento Vehicle storage Engine testing Almacenamiento de los Vehículos Exámen de Motor Washing facility Área de lavado Repair shop Toilet dumping station Limpieza del escuzado Employee parking Taller de Reparación Estacionamiento para empleados Parts storage Dispatch center Almacenamiento de Partes Centro de despacho Fueling/sanding facility Área de Combustible/Arena