Estimating Avoidable Delay in the NAS

Similar documents
Combining Control by CTA and Dynamic En Route Speed Adjustment to Improve Ground Delay Program Performance

Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling

A Study of Tradeoffs in Airport Coordinated Surface Operations

Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations

ATM Seminar 2015 OPTIMIZING INTEGRATED ARRIVAL, DEPARTURE AND SURFACE OPERATIONS UNDER UNCERTAINTY. Wednesday, June 24 nd 2015

Fuel Burn Impacts of Taxi-out Delay and their Implications for Gate-hold Benefits

Analysis of Gaming Issues in Collaborative Trajectory Options Program (CTOP)

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Integrated Optimization of Arrival, Departure, and Surface Operations

PRESENTATION OVERVIEW

Optimized Itinerary Generation for NAS Performance Analysis

Automatic Aircraft Cargo Load Planning with Pick-up and Delivery

Strategic airspace capacity planning in a network under demand uncertainty (COCTA project results)

Approximate Network Delays Model

A RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE AIRPORT GROUND-HOLDING PROBLEM

Surface Congestion Management. Hamsa Balakrishnan Massachusetts Institute of Technology

Quantile Regression Based Estimation of Statistical Contingency Fuel. Lei Kang, Mark Hansen June 29, 2017

Decentralized Path Planning For Air Traffic Management Wei Zhang

System Wide Modeling for the JPDO. Shahab Hasan, LMI Presented on behalf of Dr. Sherry Borener, JPDO EAD Director Nov. 16, 2006

KJFK Runway 13R-31L Rehabilitation ATFM Strategies

! Figure 1. Proposed Cargo Ramp at the end of Taxiway Echo.! Assignment 7: Airport Capacity and Geometric Design. Problem 1

Fuel Cost, Delay and Throughput Tradeoffs in Runway Scheduling

Evaluating the Robustness and Feasibility of Integer Programming and Dynamic Programming in Aircraft Sequencing Optimization

Proceedings of the 2014 Winter Simulation Conference A. Tolk, S. Y. Diallo, I. O. Ryzhov, L. Yilmaz, S. Buckley, and J. A. Miller, eds.

A Review of Airport Runway Scheduling

Validation of Runway Capacity Models

An Econometric Study of Flight Delay Causes at O Hare International Airport Nathan Daniel Boettcher, Dr. Don Thompson*

Airport Characterization for the Adaptation of Surface Congestion Management Approaches*

Inter-modal Substitution (IMS) in Airline Collaborative Decision Making

Analysis of ATM Performance during Equipment Outages

Airport Capacity, Airport Delay, and Airline Service Supply: The Case of DFW

making air travel smarter 2016 Resilient Ops, Inc.

Traffic Management Initiative Interaction

Free Flight En Route Metrics. Mike Bennett The CNA Corporation

Data Analysis and Simula/on Tools Prof. Hamsa Balakrishnan

Traffic Flow Management

Clustering radar tracks to evaluate efficiency indicators Roland Winkler Annette Temme, Christoph Bösel, Rudolf Kruse

Airline Schedule Development Overview Dr. Peter Belobaba

An Automated Airspace Concept for the Next Generation Air Traffic Control System

Metrics for Evaluating the Impact of Weather on Jet Routes J. Krozel, M. Ganji, S. Yang, J.S.B., Mitchell, and V. Polishchuk 15 th Conf.

Surveillance and Broadcast Services

Evaluation of Predictability as a Performance Measure

Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds.

Wake Turbulence Research Modeling

Airspace Complexity Measurement: An Air Traffic Control Simulation Analysis

Development of Flight Inefficiency Metrics for Environmental Performance Assessment of ATM

UC Berkeley Working Papers

Introduction Runways delay analysis Runways scheduling integration Results Conclusion. Raphaël Deau, Jean-Baptiste Gotteland, Nicolas Durand

Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation

Weather Integrated into 4D Trajectory Tools

A Simulation Approach to Airline Cost Benefit Analysis

IMPLEMENTING AND EVALUATING ALTERNATIVE AIRSPACE RATIONING METHODS. Jason Matthew Burke

Evidence for the Safety- Capacity Trade-Off in the Air Transportation System

Large-Scale Network Slot Allocation with Dynamic Time Horizons

Estimating Sources of Temporal Deviations from Flight Plans

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Semantic Representation and Scale-up of Integrated Air Traffic Management Data

GROUND DELAY PROGRAM PLANNING UNDER UNCERTAINTY BASED ON THE RATION-BY-DISTANCE PRINCIPLE. October 25, 2007

Evaluating the Performance of NextGen Using NASA s Airspace Concepts Evaluation System (ACES)

Impact of Landing Fee Policy on Airlines Service Decisions, Financial Performance and Airport Congestion

Reducing Departure Delays at LaGuardia Airport with Departure-Sensitive Arrival Spacing (DSAS) Operations

Efficiency and Automation

CANSO Workshop on Operational Performance. LATCAR, 2016 John Gulding Manager, ATO Performance Analysis Federal Aviation Administration

Session III Issues for the Future of ATM

Partnership for AiR Transportation Noise and Emissions Reduction. MIT Lincoln Laboratory

APPENDIX D MSP Airfield Simulation Analysis

NAS Performance Models. Michael Ball Yung Nguyen Ravi Sankararaman Paul Schonfeld Luo Ying University of Maryland

Abstract. Introduction

FLIGHT TRANSPORTATION LABORATORY REPORT R87-5 AN AIR TRAFFIC CONTROL SIMULATOR FOR THE EVALUATION OF FLOW MANAGEMENT STRATEGIES JAMES FRANKLIN BUTLER

Equity and Equity Metrics in Air Traffic Flow Management

Collaborative Resource Allocation Strategies for Air Traffic Flow Management. Amy Miyoung Kim. A dissertation submitted in partial satisfaction of the

System Oriented Runway Management: A Research Update

OPTIMAL PUSHBACK TIME WITH EXISTING UNCERTAINTIES AT BUSY AIRPORT

A Methodology for Integrated Conceptual Design of Aircraft Configuration and Operation to Reduce Environmental Impact

Operational Performance and Demand Management. Mark Hansen NEXTOR Short Course 10/14/04

2010 FIFA WORLD CUP ATNS PREPARATIONS

Interval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms

Applications of a Terminal Area Flight Path Library

En-Route Flight Planning: A Mathematical Modeling Approach for Operating Cost Minimization, Dynamic Speed Control and Mid-air Collision Avoidance

NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee

Modeling Crew Itineraries and Delays in the National Air Transportation System

Optimizing Airport Capacity Utilization in Air Traffic Flow Management Subject to Constraints at Arrival and Departure Fixes

AIR/GROUND SIMULATION OF TRAJECTORY-ORIENTED OPERATIONS WITH LIMITED DELEGATION

Wake Turbulence Evolution in the United States

Overview of Congestion Management Issues and Alternatives

A Methodology for Environmental and Energy Assessment of Operational Improvements

Measuring the Business of the NAS

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

Time Benefits of Free-Flight for a Commercial Aircraft

Overview of Boeing Planning Tools Alex Heiter

An optimization model for assigning 4Dtrajectories to flights under the TBO concept

Part 135 Recurrency (B)

Aircraft Arrival Sequencing: Creating order from disorder

MET matters in SESAR. Dennis HART

Integration of Reusable Launch Vehicles (RLV) into the Air Traffic Management System

Integrated Disruption Management and Flight Planning to Trade Off Delays and Fuel Burn

LONG BEACH, CALIFORNIA

ACI-NA Conference NextGen at NAV CANADA. John Crichton President and Chief Executive Officer October 11, 2009

Tailored Arrivals (TA)

Transcription:

Estimating Avoidable Delay in the NAS Bala Chandran Avijit Mukherjee Mark Hansen Jim Evans University of California at Berkeley

Outline Motivation The Bertsimas-Stock model for TFMP. A case study: Aug 24, 2002. Benefits assessment of CIWS echo tops product. Conclusions and contributions. Jan 28, 2004 2

Motivation Given schedule, optimize airspace (sector, airport) usage through effective holding/routing strategies (Bertsimas et. al., 1995) in response to time-varying capacity. Could be viewed as a Decision support tool. Performance evaluation/ benchmarking tool. Benefits assessment tool. Network design system. Pricing support mechanism. Jan 28, 2004 3

Model Description (Data) Schedule (OAG) and filed flight plan. Time each aircraft spends in a sector (detailed 3-d trajectory model). Airport departure and arrival rates. Sector capacity (or a penalty function?). Flight connectivity and turnaround time. Cost of delay/cancellation. Jan 28, 2004 4

Model Description (Objective) Minimize Total delay of all aircraft. Weighted sum of ground and airborne delay. Total gate-to-gate time. Total passenger delay. Sector overage. Total system cost. Jan 28, 2004 5

Model Description (Constraints) Sector capacity (hard/soft). Airport capacity (hard/soft). Flight connectivity. Min. and max. time of each aircraft in a sector. Max total delay per aircraft (cancellation). Jan 28, 2004 6

Case Study : Aug 24, 2002 Data Sources Individual flights data: FAA - ASPM. Trajectory information: MIT - Lincoln Lab ETMS Radar Tracks. Preferred routes: FAA - CDR. Nominal sector capacity: FAA, NASA Ames. Weather coverage: MIT - Lincoln Lab CCFP CIWS. Jan 28, 2004 7

Case Study : Aug 24, 2002 Figure 1. Severe weather over N-E United States Jan 28, 2004 8

Assumptions (Airports) Figure 2. Subset of origin-destination pairs considered. Jan 28, 2004 9

Assumptions (Flights) 2422 flights considered between major airports. Time: 1800-2400 Z. Flight plans chosen from Coded Departure Routes (CDR). Long-range flights considered separately and given priority. Jan 28, 2004 10

Assumptions (Trajectory) h Origin α β Destination Parameters were estimated from trajectory data on a goodweather day. Parameters were assumed to be dependent on aircraft type and trip distance. Jan 28, 2004 11

Assumptions (Capacity) Capacity Linear capacity tradeoff function K < 100 % weather coverage Jan 28, 2004 12

Results (shortest route only) Metric Actual Model Airborne time (Minutes) Delay/flight 194,000 (197,000 filed) 0.62 min (-7.07 min on Aug 7) 176,400 4.4 min (3.6 min without connectivity) Interesting: The model assigned NO airborne delay. Jan 28, 2004 13

Additional Routes Figure 3. Added routes shown in black. Jan 28, 2004 14

Results (multiple routes) Metric Airborne time (Minutes) Delay/flight Model (single route) 176,400 4.4 min (3.6 min without connectivity) Model (multiple routes) 177,900 2.7 min (2.1 min without connectivity) Delay for multiple routes is with respect to the flight time on the shortest path for that flight. Again, there was NO airborne holding. Jan 28, 2004 15

Benefits Assessment of Echo-Tops Aircraft appear to be using blocked sectors! Jan 28, 2004 16

CIWS Echo-Tops Product NEXRAD ECHO-TOPS Jan 28, 2004 17

Results (Echo-Tops Single Route) Metric Airborne time (Minutes) Delay/flight Model (single route) 176,400 4.4 min (3.6 min without connectivity) Model echo tops (single route) 176,400 1.8 min (1.1 min without connectivity) High and super high sectors were virtually unaffected. Jan 28, 2004 18

Conclusions (1) It is now possible to answer several questions regarding the performance of the NAS on August 24 th. Decision support: What routes/delays should be assigned to flights to optimize operations (depending on metric)? Benchmarking: How far were the operations from optimal (depending on metric)? Schedule Evaluation: Is the given schedule feasible with full capacity? Jan 28, 2004 19

Some more questions. Conclusions (2) Benefits assessment: What are the benefits of providing echo-tops information to identify situations where aircraft can safely fly over storms? How much would you be willing to invest in it? Network design: How would building an additional runway impact the traffic flows in the NAS? Pricing mechanisms: What is the contribution of each aircraft to the total system cost? [Dual prices of LP give marginal utility of each additional unit of resource capacity and marginal cost of each aircraft to the system.] Jan 28, 2004 20

Contributions of Study First application of the Bertsimas-Stock model to a large-scale real-world scenario. Cancellations explicitly modeled. Problem studied in three dimensions. Uses other than decision support were motivated. Jan 28, 2004 21