SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM

Similar documents
U.S. Army Corps of Engineers Wilmington District

MOBILE DISTRICT 2018 DREDGING PROGRAM

Norfolk District North Atlantic Division

January 2018 Air Traffic Activity Summary

Norfolk District North Atlantic Division

USACE GALVESTON DISTRICT PROJECT UPDATE

Presented to: City of Petaluma City Council

Alan Steinbrugge (A), Marine Exchange, confirmed the presence of a quorum of the HSC.

TENTATIVE SCHEDULE

Alan Steinbrugge (A), Marine Exchange, confirmed the presence of a quorum of the HSC.

The Corps of Engineers Dredges on the West Coast

Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84

Alan Steinbrugge, Marine Exchange, confirmed the presence of a quorum of the HSC.

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012

GALVESTON DISTRICT Dredging Schedules

Alan Steinbrugge (A), Marine Exchange, confirmed the presence of a quorum of the HSC.

Alan Steinbrugge, Marine Exchange, confirmed the presence of a quorum of the HSC.

Alan Steinbrugge (A), Marine Exchange, confirmed the presence of a quorum of the HSC.

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

Marcus Freeling, Marine Exchange, confirmed the presence of a quorum of the HSC.

Alan Steinbrugge, Marine Exchange, confirmed the presence of a quorum of the HSC.

MARCH 2014 HYDROGRAPHIC REPORT

Report for Jan-Nov-2006 pdf. General Statistics

SYSTEM BRIEF DAILY SUMMARY

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting:

SJC North and South Flow

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015

Hector International Airport

October 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

November 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

Source 2018 COURSE SCHEDULE SGT. MAJ. PHIL FASCETTI GIVES BACK UC SAN DIEGO EXTENSION CELEBRATES 25 YEARS OF MAKING SAFER WORK SPACES SAFETY FEST

METRO OPERATIONS COMMITTEE

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY

December 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

HOTEL INDUSTRY OVERVIEW. Texas

DELHI TRANSCO LIMITED STATE LOAD DESPATCH CENTER (REGD. OFFICE : SHAKTI SADAN BUILDING, KOTLA ROAD, NEW DELHI

Annual Weather Book RECORDED BY NW RESEARCH & OUTREACH CTR. By: Michael Leiseth

Sound Transit Operations December 2014 Service Performance Report. Ridership

September 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

Passenger and Cargo Statistics Report

BOND 2012 PROPOSITION 1

Passenger and Cargo Statistics Report

Passenger and Cargo Statistics Report

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending September 30, Enplaned Passengers by Airline

Town Hall Meeting. July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave.

APPENDIX E ACTION PLAN FOR THE IMPLEMENTATION OF ATFM AT SAM AIRPORTS A: AIRPORT. Task description Start End

Coastal Management: Treasure Island - Long Key Nourishment

Yukon Bureau of Statistics

Alan Steinbrugge (A), Marine Exchange, confirmed the presence of a quorum of the HSC.

Passenger and Cargo Statistics Report

Board Box. October Item # Item Staff Page 1. Key Performance Indicators Sep 2018 M. Mungia Financial Report Aug 2018 H.

Buffalo District Navigation Program Overview

Platted Single-Family Lots in the Town of Windsor as of 02/28/14

Passenger and Cargo Statistics Report

Planned Procurement Opportunities Report. November 2018

Number of tourism trips of residents increased namely for leisure

Port of Kalama, New Approach to Maintenance Dredging

January 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

October 2018 October 2017 Change

BOND 2012 PROPOSITION 1

Sound Transit Operations January 2014 Service Performance Report. Ridership

CORPORATE STEVE BOOKING SMITH CHANNELS

CAPACITY PLANNING. CALENDAR OF MILESTONE DATES DECEMBER 2019 and MAY 2020 TIMETABLES (PRODUCTION SCHEDULE)

March 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

Recovery Now! ANZPHIC 2010 Sydney - July 8, Hotel Performance Back On Track

Advisory Circular. File No.: Z U Issue No.: 01

Planned Procurement Opportunities Report. June 2017

CAPACITY PLANNING. CALENDAR OF MILESTONE DATES DECEMBER 2018 and MAY 2019 TIMETABLES (PRODUCTION SCHEDULE)

Community Work Session #2.1 Ketchikan Upland Planning to Support Expanded Marine Facilities and Larger Cruise Vessels.

ADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) SYSTEM. Presented by the United States of America SUMMARY

1-7(28)-2W Wiring Diagrams Manual 10 Sept.27/ to

Naval Facilities Engineering Command. Environmental Business Line Overview Contracting Opportunities

The Geography of Climate

Supreme Court records, (bulk , )

CITY OF PITT MEADOWS MAYOR AND COUNCIL EXPENSES 2017

Manual Status List DHC-2 to DHC-7

Manual vs. Automatic Operation and Operational Restrictions

CHARACTERISTICS OF TRAVELERS FROM NEW ZEALAND TO CALIFORNIA

Wheat Reference Prices Port Terminal Services 2017/2018

Virginia Ship Repair Assn. Contract Committee Our U.S. Navy s Military Sealift Command Mr. John Thackrah Executive Director May 7, 2015

Measures & Projections October 31, GoToBermuda.com

December 2012 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending August 31, Enplaned Passengers by Airline

Passenger and Cargo Statistics Report

Passenger and Cargo Statistics Report

BABTA PRESENTATION CASSANDRA COSTELLO - MAY 2018

Los Angeles Submarkets

Cruise Schedules. Operations. Last updated: 17 Sep :10pm. 1 of 6 9/17/18, 12:16 PM

Holidays in Malaysia

JANUARY 2018 BOARD INFORMATION PACKAGE

Airline industry outlook remains fragile

Alan Steinbrugge (A), Marine Exchange, confirmed the presence of a quorum of the HSC.

Transcription:

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM 1 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 WEDA PACIFIC CHAPTER 2017 ANNUAL MEETING 131 132 122 PORTLAND, OREGON 239 65 53 80 119 27 110 135 120 252 174.59 112 92 56 62 102 130 102 56 48 130 120 111 Mr. Jay Kinberger Navigation Program Manager 19 October 2017 File Name The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.

FY FY 2016 2017 Updates Updates Humboldt Bar & Entrance O&M: Maintenance dredging performed by Great Lakes Dredging and Dry Dock, and Gov t hopper Essayons in May and June. San Pablo Bay / Mare Island Strait (Pinole Shoal) O&M: Dredging performed by Essayons in June and a second episode is scheduled to begin in November. Oakland Harbor O&M: The third and final option year of the Dutra maintenance dredging contract is currently being performed. Redwood City Harbor O&M: Maintenance dredging contract was awarded in June to Manson Construction and was completed in September.

FY 2016 2017 Updates (cont.) Bodega Bay Harbor O&M: Maintenance dredging contract was awarded to Curtin Maritime in June and was completed in September. Richmond Inner Harbor O&M: Maintenance dredging contract was awarded in June to Manson Construction and is currently ongoing. Outer Harbor O&M: Maintenance dredging deferred to FY18. SF Main Ship Channel O&M: Maintenance dredging performed by Essayons in May/June.

FY FY 2016 2017 Updates (cont.) Suisun Bay Channel O&M: Maintenance dredging contract was awarded to Manson Construction in July and is currently ongoing. Sacramento (Deep Water Ship Channel): Task Order to existing contract for emergency dredging was awarded in May and completed in July. San Joaquin River: Task Order to existing contract for emergency dredging was awarded in May and completed in August. Second Task Order to existing contract for maintenance dredging was awarded in September and is ongoing..

FY FY 2018 2016 New Updates Contracts Humboldt Bar & Entrance (WCH contract) Richmond Inner Harbor Redwood City Harbor Suisun Bay Channel Oakland Harbor Sacramento River (30-ft Project) San Joaquin River, Port of Stockton

FY 2018 FY 2016 Government Updates Hopper Richmond Outer Harbor San Francisco Main Ship Channel Humboldt Harbor

HUMBOLDT BAR & ENTRANCE New Contract: West Coast Hopper contract from Portland District Contractor: TBD Work scheduled to be started in June 2018 Complete prior to July 4 Supplemental dredging by Gov t Hopper in April 2018 Volume: Est 750 KCY Disposal: HOODS Env Window: 15 Mar to 30 Sep

SF MAIN SHIP CHANNEL Gov t. Hopper Contractor: N/A Work scheduled to be started in late May 2018 Complete by mid-june 2018 Volume: Est 350 KCY Disposal: OBDS/SF-17 Env Window: N/A

RICHMOND HARBOR Richmond Outer Harbor Gov t Hopper Contractor: N/A Volume: Est 250 KCY Disposal: SF-11 Env Window: 1 June to 30 Nov Richmond Inner Harbor New Contract: Clamshell Contractor: TBD Volume: Est 350 KCY Disposal: SF-DODS Env Window: 1 Jun to 30 Nov

OAKLAND HARBOR New 2-Year Contract Base Year Plus 1 Option Year Volume: Est 700 KCY/Year Work scheduled to begin July 2018 Complete by 30 November 2018 Contractor: TBD Disposal: SF- DODS/Upland Beneficial Use Env Window: 1 Aug to 30 Nov

REDWOOD CITY HARBOR New Contract: Clamshell Work scheduled to begin in mid-june 2018 Complete by late September 2018 Contractor: TBD Volume: Est 350 KCY Disposal: SF-11 Env Window: 1 Jun to 30 Nov

SUISUN BAY CHANNEL New Contract: Clamshell Contractor: TBD Work scheduled to begin 1 August 2018 Complete by mid- November 2018 Volume: Est 175 KCY Disposal: SF-16 Env Window: 1 Aug to 30 Nov

SACRAMENTO RIVER (30 FT PROJECT) New SATOC or IFB Contract (pipeline): Contractor: TBD Work scheduled to begin 1 August 2018 Complete by 30 October 2018 Volume: Est 100 KCY Disposal: Various Env Window: 1 Jul to 31Oct

SAN JOAQUIN RIVER, PORT OF STOCKTON New SATOC or IFB Contract (pipeline): Contractor: TBD Work scheduled to begin 1 August 2018 Complete by 30 November 2018 Disposal: Various Volume: Est 250k Env Window: 1 Aug to 30 Nov

O&M Dredging Plan for FY 2018 O&M DREDGING PLAN FOR FY18* 18-Oct-17 OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Bid Open & Project District Award Dates FY 2017 FY 2018 FY 2019 Volume Placement Site Notes Humboldt Bar & Entrance SPN/NWP N/A SF Main Ship Channel SPN/NWP N/A May 3 Richmond Inner Harbor SPN May19 Richmond Outer Harbor SPN/NWP N/A June 15 Oakland Harbor SPN 2 July Redwood City Harbor SPN Yaquina ** Essayons Essayons 150kcy 350kcy 350kcy 300kcy 700kcy HOODS May 10 1 June 300kcy SF-11 Pinole Shoal SPN/NWP N/A ESSAYONS SF-10 August 5 Suisun Bay Channel SPN August 20 175kcy SF-16 Sacramento River (30 Ft) SPN 100kcy Various Upland Estimated performance period May 20 - June 10 OBDS/ Estimated performance period SF-8 May 15 - May 30 DODS/upland Estimated performance period least cost Jun 20 1- Sep 20 In alignment with last years proposal to alternate Hopper Dredging, Richmond will utilize the Essayons pending HQ SF-11 concurrence DODS/upland Estimated performance period least cost Aug 1- Nov 30 Estimated performance period Jul 1- Sep 15 In alignment with last years proposal to alternate Hopper Dredging, Pinole will be deferred pending HQ concurrence Estimated performance period Sep 21 - Nov 30 San Joaquin, Port of Stockton SPN June 5 June 22 ** 250kcy Various Upland Estimated performance period Aug 1 - Nov 30 Ongoing Contracts Environmental Window New SPN Contract West Coast Hopper Contract Bid Opening Contract Award Government Dredge * Program execution is based on the FY17 President's Budget, Workplan and Federal Standard plan for each project. Date of Update: 10/18/2017 ** Window Extension.

QUESTIONS? Jay Kinberger Navigation Program Manager Jay.H.Kinberger@usace.army.mil (415 ) 503-6742