SERVICIOS A LA NAVEGACIÓN EN EL ESPACIO AÉREO MEXICANO MEXICO ADS-B PROJECT PREVIEW

Similar documents
Mexico ATFM Development

SEAT CAPACITY MEXICO MARKET ANALYSIS. June International Seats 51% Domestic Seats 49%

3.3 Specific Developments in Air Navigation CNS AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) (Presented by the United States of America) SUMMARY

UBS Latin American New Opportunities Conference. June 11 th -12 th, 2007

Santander Conference Acapulco. January 2007

International Civil Aviation Organization Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force

Harris Experience in the U.S. Surveillance Broadcast Systems (SBS)

First Quarter 2016 Results

Surveillance and. Program Status. Federal Aviation Administration Broadcast Services. To: By:

Benefits of CNS/ATM Implementation for the Region

Caribbean Sky Tours Summary Review of Mexico Airspace and ATC Over-Time Fees

3.6 Surveillance Data Exchange Activities. (Presented by the United States of America) SUMMARY

3 DECEMBER 2012 UPDATE GULF OF MEXICO 50 NM LATERAL SEPARATION / RNAV ROUTES PROJECT OPERATIONAL POLICY AND PROCEDURES

Regional Review: Mexico and the Caribbean

Mode S & ACAS Programme Operational Introduction of SSR Mode S

Results of Tourist Activity

Change to Automatic Dependent Surveillance Broadcast Services. SUMMARY: This action announces changes in ADS-B services, including Traffic Information

Surveillance and Broadcast Services

AIP PORTUGAL ENR NOV-2007

INVESTOR PRESENTATION FOURTH QUARTER 2017 RESULTS

OVERVIEW OF THE FAA ADS-B LINK DECISION

NASA s Automatic Dependent Surveillance Broadcast: ADS-B Sense-and-Avoid System

PBN Airspace Concept. ATS requirements

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Results of Tourism Activity

Next Generation of Airline Alliances

Results of Tourism Activity

INVESTOR PRESENTATION THIRD QUARTER 2017 RESULTS

Results of Tourism Activity

Curriculum. Update: 2017

ADS-B/IMP IP/05 21/04/15 Automatic dependent surveillance broadcast (ADS-B) Implementation Meeting (ADS-B/IMP) Mexico City, Mexico, April 2015

INVESTOR PRESENTATION SECOND QUARTER 2017 RESULTS

TDR Mode S and ADS-B Transponders

Results of Tourism Activity

FAA GBAS Program Update January 29, 2010

International Civil Aviation Organization

NextGen Priorities: Multiple Runway Operations & RECAT

Grupo Aeroportuario del Centro Norte SAB de CV SECOND QUARTER 2018 RESULTS

Results of Tourism Activity

ORGANISER HOST LEAD SPONSOR

THE BAHAMAS FLIGHT INFORMATION REGION (FIR) (Presented by Bahamas) SUMMARY

Results of Tourism Activity

Results of Tourism Activity

ARCHIVED REPORT. ADS-B (U.S. FAA) - Archived 12/2010

THE EXECUTIVE REFERENCE GUIDE TO SPACE-BASED ADS-B

ATC automation: facts and steps ahead

New York Aviation Management Association Conference

Christchurch, New Zealand, April 2015

Projected Supply and Demand for Natural Gas over the next 10 years and Plans for Major LNG Receiving Terminals March 11, 2003 Houston, Texas

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

GNSS/RNAV Non- Radar Longitudinal Separation in the Caribbean

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR

Introduction of New CANSO Member Simon Li Director General CAD Hong Cong

Performance Based Navigation Operational End-State 2023

U.S. NAVY CNS/ATM Program Status

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Space Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015

CMATS The Civil Military ATM System

Civil-Military Cooperation in Germany. Roland Mallwitz German Air Navigation Services Head of Surveillance Services

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

Related Rules This Advisory Circular relates specifically to Civil Aviation Rule Part (b)

Private Pilot Ground School Syllabus

COMMUNICATIONS PANEL. WG-I 20 Meeting

Federal Aviation. Administration. FAA Overview. Federal Aviation. Administration

PBN Implementation CAR/NAM Regions

USE OF RADAR IN THE APPROACH CONTROL SERVICE

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION.

BEFORE THE U.S. DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C.

PBN and Procedure Design training

EGOA Enhanced General Aviation Operations by ADS-B

Organization and Services. AIXM 5 Public Design Review February 7-8, 2006 Washington DC

Air Traffic Management

Implementing Downlink Aircraft Parameters

ATLANTIC TRAVEL AGENCY

Russian Federation ATM modernization program

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

IMPLEMENTATION OF ADS-B BY NAV CANADA

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

Wake Turbulence Recategorization (RECAT) ATC Human Factors Issues During Implementation. Terminal Services

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

First Quarter Grupo Aeroportuario del Centro Norte S.A.B. de C.V.

Transitioning to ICAO Flight Plan why, when, what, how

Surveillance and Broadcast Services

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

NextGen and GA 2014 Welcome Outline Safety Seminars Safety Seminars

Issues related to the provision of surveillance service

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

SYNERGISING ATC-AIRPORTS-AIRLINES TO MEET CONTEMPORARY CHALLENGES OF CIVIL AVIATION

ADS-B Seminar. National Institutes of Aviation Management and Research (NIAMAR) Rangpuri, Maharuli, New Delhi

Surveillance Opportunities and Challenges

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

The Mexican Momentum. Tuesday, March 22 nd 11:00 a.m. 11:30 a.m. Presented by: Manuel RomeroVargas

ASBU IMPLEMENTATION. ASBU industry consideration. Date 16/08/2017. Edson Fagundes Gomes

Organización de Aviación Civil Internacional. Международная организация гражданской авиации

Industria, Innovazione e Ricerca: Le nuove frontiere del volo a pilotaggio remoto

Precision and Basic RNAV (P-RNAV [RNP-1]/B-RNAV [RNP-5]) in Europe

What are we trying to achieve with this presentation:

About This Report. For More Information on These Opportunities

ADS-B. Not just a mandate! Forrest Colliver Becker Avionics GmbH Becker Avionics GmbH All rights reserved -

US-India Aviation Cooperation Program (ACP) Overview. April 2014

Transcription:

SERVICIOS A LA NAVEGACIÓN EN EL ESPACIO AÉREO MEXICANO MEXICO ADS-B PROJECT PREVIEW

SENEAM Syllabus 1 2 Previous SENEAM ADS-B Program 3 SENEAM-FAA ADS-B Program 4 SENEAM ADS-B Schedule 5 SENEAM ADS-B 2014-2018 2

SENEAM Syllabus: 6 7 SENEAM ADS-B Sites. ADS-B Track Symbols. Mexico s ATM System. 3

SENEAM 1 Previous

PREVIOUS 1 Mexico as member of ICAO and in accordance with the 2013 2016 Activities. Plan of the Regional Technical Cooperation Project for the Caribbean Region implementation of the Performance Based Air Navigation Systems for the CAR Region, have designed an implementation plan to install a first set of 10 ADS-B radio stations on strategic sites, to feed with ADS-B data meet DO-260 and DO- 260A and Asterix Cat 21 forward to four ATM systems in FDRG through our country. The four ATM systems are being updated for accepting and processing ADS-B data and fusing them with ATC radar sensors. The implementation plan, obeys the need of increasing safety and efficiency of air / ground operations, mainly about surveillance, separation, coverage redundancy and getting surveillance data in non radar areas. 5

PREVIOUS 1 Also, in parallel, SENEAM is working together with FAA to develop and deploy of Automatic Dependent Surveillance Broadcast (ADS-B) as a means of providing satellite based surveillance for air traffic control (ATC) systems that serve the Gulf of Mexico region. New ADS-B services will be beneficial to both parties in areas where radar coverage may be nonexistent or can be enhanced by ADS-B sensors. 6

PREVIOUS 1 The joint use of ADS-B will enhance the development and performance of air traffic control and pilot applications. Safety levels, efficiency, and capacity will also be enhanced by providing new and expanded surveillance coverage for the airspace in the United States and Mexico. 7

SENEAM 2 SENEAM ADS-B Program

SENEAM ADS-B Program 2 Up to date, SENEAM has installed 10 ADS-B stations at the following sites: 5 in Mexico s City Valley (Toluca s Airport, Cerro Peñon, Cerro Catedral, Cerro Gordo & Mexico s ATC TWR Control) 1 in Radar Station of Cerro Los Gallos, Aguascalientes (LGS), at Central of Mexico 1 in Southeast of Mexico at Ciudad del Carmen (CME) 2 in Northeast of Mexico at Monterrey s Terminal Airport (MTY) & in Radar station of Cerro de Potosi (CPT) 1 in Radar station of Puerto Peñasco Sonora (PPE), at the Northwest of México 9

SENEAM ADS-B Program 2 SENEAM is also executing a software updating all four main ATM systems based on each ACC: Mérida: The ATM system has been updated since Dec 4 2013, full ADS-B capable. One ADS-B station at Ciudad del Carmen, Campeche has been installed. México: Five ADS-B stations are working and they are integrated to T&E platform Data gathering is taking place to begin the evaluation for data integration on ATM systems (Radars and ADS-B sensors). Monterrey & Mazatlán: The ATM system has been updated last year, full ADS-B capable. ADS-B stations at Puerto Peñasco, Sonora, Cerro de los Gallos, Ags.,Cerro del Potosí and Monterrey, NL. have been installed. FAA ADS-B stations on Tampico, Mérida and Cancún will be installed on 2015 and will be operative until 2016. 10

SENEAM ADS-B Program 2 Coverage of SENEAM ADS-B 2015 PPE MTY CPT LGS MEX CME 11

SENEAM ADS-B Program 2 Needs to be covered Surveillance of México Valley Air Traffic Control of Mexico City Airport Terminal Area Air Traffic Control of Helicopters flying over Mexico Valley Air Traffic Control of Monterrey Airport Terminal Area Surveillance redundancy on Puerto Peñasco station Air Traffic Control Area of Merida Surveillance of Helicopters flying from/to Oil Platform on Gulf of México 12

SENEAM 3 SENEAM-FAA ADS-B Program

SENEAM-FAA ADS-B Program 3 FAA-SENEAM Agreement ADS-B Stations FAA-SENEAM Agreement considers the installation of ADS-B stations at: Tampico Mérida Cancún FAA and SENEAM are working together to install the Radio Station and equipment for Service Delivering Point at the station mentioned above and 3 of 4 ACC (MEX, MID and MTY) before end of 2015. The data will be shared to feed ACC in Mexico and USA (Houston) 14

SENEAM-FAA ADS-B Program 3 FAA ADS-B current coverage on GOM 15

SENEAM-FAA ADS-B Program 3 FAA-SENEAM ADS-B forecasted coverage 16

SENEAM-FAA ADS-B Program 3 Coverage of SENEAM-FAA ADS-B 2015 PPE MTY CPT TAM LGS MID MEX CUN CME 17

SENEAM-FAA ADS-B Program 3 Needs to be covered Air Traffic Control Area of Merida, Cancún Complete surveillance of Helicopters flying from/to Oil Platform on Gulf of México Sharing data with FAA to have complete surveillance of Gulf of Mexico in order to enhance the Air Traffic Management beetwen FDRG of both countries. 18

SENEAM 4 SENEAM ADS-B Schedule

SENEAM ADS-B Schedule 4 SENEAM ADS-B Schedule PPE MTY CPT LGS MEX CME TAM Date Site ID May 2014 Cerro Gordo CGO May 2014 Cerro Peñón PEN May 2014 AICM MEX May 2014 Toluca TLC May 2014 Cerro Catedral CCD 20

SENEAM ADS-B Schedule 4 Theoretical coverage on Mexico Valley ADS-B coverage area of all 5 selected ADS-B ground stations within Mexico Valley and Toluca Valley at 40000 ft AMSL for aircraft ADS-B transponders Tx power of 250 W 21

SENEAM ADS-B Schedule 4 PPE MTY CPT LGS MEX CME TAM Date Site ID Jan. 2015 Puerto Peñasco PPE Jan. 2015 Monterrey MTY Jan. 2015 Cerro Potosí CPT Jan. 2015 Cd. Carmen CME Jan. 2015 Los Gallos LGS 22

SENEAM 5 SENEAM ADS-B 2014-2018

SENEAM ADS-B 2014-2018 5 ADS-B 2014-2018 2014 2015 2016 2017 5 5+3 13 12 CGO, PEN, MEX, TLC, CCD PPE, MTY, CPT, CME, LGS TAM, CUN, MID TRC, CUU, SEU, ZIH, PVR, TGZ, ACA, MZT, CUL, SLP, BJX, GDL, SJD LAP, CAB, LPD, PTE, CCL, LRS, VER, VSA, ZIJ, HUA, TIJ, HMO Total 2018 35+3 24

SENEAM 6 SENEAM ADS-B Sites.

SENEAM ADS-B Sites 6 TWR MEX 26

SENEAM ADS-B Sites 6 CERRO GORDO 27

SENEAM ADS-B Sites 6 CERRO GORDO 28

SENEAM ADS-B Sites 6 CERRO CATEDRAL, EDO. DE MEXICO 29

SENEAM ADS-B Sites 6 PUERTO PEÑASCO, SONORA 30

SENEAM ADS-B Sites 6 LOS GALLOS, AGUASCALIENTES 31

SENEAM ADS-B Sites 6 MONTERREY, NUEVO LEON 32

SENEAM ADS-B Sites 6 CIUDAD DEL CARMEN, CAMPECHE 33

SENEAM 7 ADS-B Track Symbols on ACC Mexico System & ADS-B Labels from other sites.

ADS-B Only (MEX) 7 35

ADS-B + SSR (MEX) 7 36

ADS-B + SSR + PSR (MEX) 7 37

ADS-B LGS 7 38

ADS-B PPE 7 39

ADS-B CME 7 40

SERVICIOS A LA NAVEGACIÓN EN EL ESPACIO AÉREO MEXICANO MEXICO ADS-B PROJECT PREVIEW THANK YOU! Mexico City. April 27, 2015