The DfT also offered stakeholders the opportunity to meet with the DfT team and SENRUG confirms it would like such a meeting.

Similar documents
Cross Country Passenger Rail Franchise Public Consultation

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee

Passengers priorities for new franchises

To Berwick, Dunbar & Edinburgh Chathill. Alnmouth for Alnwick. Acklington. Widdrington. Pegswood. Morpeth. Cramlington. Manors. Newcastle.

Re: Invitation to comment on CrossCountry December 2008 Timetable Proposals

To Berwick, Dunbar & Edinburgh Chathill. Alnmouth for Alnwick. Acklington. Widdrington. Pegswood. Morpeth. Cramlington. Manors. Newcastle.

Office of Utility Regulation

Highland Mainline Journey Time Improvements Phase 2

RAILFUTURE CORRESPONDENCE EAST-COAST EUREKA TIMETABLE

1.1 We note that the following WCML access applications have been made:

RE: PROPOSED MAXIMUM LEVELS OF AIRPORT CHARGES DRAFT DETERMINATION /COMMISSION PAPER CP6/2001

Passenger Focus Bus Punctuality Project Bus Punctuality seminar, 19 September 2013

Changes to train times Alnmouth and Morpeth to Newcastle

To provide the best possible service during the Thameslink construction work at London Bridge;

National Passenger Survey Spring putting rail passengers first

National Rail Passenger Survey Autumn 2013 Main Report

Transport Delivery Committee

National Passenger Survey Spring putting rail passengers first

December 2018 timetable consultation outcome report

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir,

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

NOTES OF A PUBLIC MEETING ON THE FUTURE OF PERSHORE S TRAIN SERVICES.

What passengers want from the InterCity West Coast rail franchise: A submission from Passenger Focus

National Rail Passenger Survey Autumn 2015 Main Report

Draft airspace design guidance consultation

CAA consultation on its Environmental Programme

JULY 2017 NEWSLETTER

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Cabinet. South Western Railway Timetable Consultation Response. Date of Meeting 6 December 2017

Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise.

2017 Proposed Service Changes. For Public Meetings January 2017

West Coast Main Line Track Access Applications Consultation:

CAA Strategy and Policy

Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems

SRA FUTURE FARES POLICY

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

Network Rail 2014 Customer Survey Report

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE

conference community transport creating sustainable in northumberland

Timetable Change Research. Re-contact survey key findings

HOW TO USE THE NATIONAL ROUTEING GUIDE

Submission to. Southland District Council on. Draft Stewart Island/Rakiura Visitor Levy Policy and Bylaw

The case for rail devolution in London. Submission to the London Assembly Transport Committee. June Response.

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

LOCAL GOVERNMENT AND TRANSPORT COMMITTEE PETITION PE This paper invites the Committee to consider for the third time the following Petition:

Analogue Commercial Radio Licence: Format Change Request Form

Submission to. Queenstown Lakes District Council. on the

CAMBRIAN LINES FRANCHISE 2018 FINAL DRAFT FOR COMMENT

Appendix 8: Coding of Interchanges for PTSS

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

Consumer Council for Northern Ireland response to Department for Transport Developing a sustainable framework for UK aviation: Scoping document

Regulatory Committee

Terms of Reference: Introduction

Report of the Executive

May 2019 Timetable. Highlights and Response to Feedback

CAMBRIAN LINES FRANCHISE 2018

National Passenger Survey Autumn putting rail passengers first

2. Our response follows the structure of the consultation document and covers the following issues in turn:

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

National Rail Passenger Survey Main Report Spring 2018

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement

BARNSLEY METROPOLITAN BOROUGH COUNCIL

ASLEF s Response to the East Anglia Rail Franchise Consultation

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

National Passenger Survey Autumn putting rail passengers first

FirstGroup plc South Western

CAA Consultation on issues affecting passengers access to UK airports: a review of surface access

Supporting information to an application for preapplication 3 rd February 2017

ATC PROCEDURES WORKING GROUP. Transition Level

Buy before you board Ways to buy your ticket Train times

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act.

Schedule Compression by Fair Allocation Methods

Summary of Public Submissions. Received on

December 2018 timetable consultation outcome report. Published April 2018

Railway performance and subsidy statistics

ECONOMIC REGULATION OF THE NEW RUNWAY AND CAPACITY EXPANSION AT HEATHROW AIRPORT: CONSULTATION ON CAA PRIORITIES AND TIMETABLE CAP 1510

Map showing location of public transport projects in vicinity of railway station

Follow us on

Letting Rail Franchises

International Air Connectivity for Business. How well connected are UK airports to the world s main business destinations?

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

1.1. The purpose of this report is to seek approval for the adoption and publication of the Sports Pitches Strategy for East Dunbartonshire.

NHS Dental Commissioning Statistics for England June 2016

TRANSPORT AND WORKS ACT Proof of Evidence. Andrew Wright Planning and Design Manager Taylor Wimpey East Anglia

East Midlands Rail Franchise Public Consultation

National Rail Performance Report - Quarter /14

EAST SUFFOLK LINES. Stations Investment Plan. Produced by the East Suffolk Lines Community Rail Partnership

Material Change Proposal St Pancras International internal bins and external ashtrays Sponsor

Summary of questions and discussion

AIPPI Study Question - Partial designs

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Greater Western franchise. December 2006 timetable. Passenger Focus briefing document

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

CONSULTATION PROCESS AND FEEDBACK - EXECUTIVE SUMMARY

Licence Application Decision Other PDV New Amended

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

Transcription:

RESPONSE TO DEPARTMENT For TRANSPORT CONSULTATION ON PROPOSED DIRECT AWARD FOR CROSSCOUNTRY FRANCHISE FROM OCTOBER 2016 Sent by email to XCDirectAward@dft.gsi.gov.uk on 22 nd October 2015 1. INTRODUCTION The DfT emailed stakeholders on 9 th October 2015 asking for input on their proposal to make a direct award to Arriva Cross Country for the Cross Country rail franchise, from October 2016, for a period of at lest 3 years (email attached at Annex 1). This paper is SENRUG s response to that request. The DfT asked respondents to comment on 3 specific questions and SENRUG s responses to these questions are in Section 3. The DfT also offered stakeholders the opportunity to meet with the DfT team and SENRUG confirms it would like such a meeting. 2. MAIN ISSUE: NUMBER OF CROSS COUNTRY SERVICES CALLING AT MORPETH 2.1 Background The main change SENRUG wants as part of the new award is an increase in the number of services that must call at Morpeth. This key issue dwarfs other points SENRUG would like to make about the new award. Table 1 demonstrates the introduction of the current franchise saw a reduction of Cross Country services at Morpeth. SENRUG wants to reverse that reduction and indeed slightly increase service provision from pre November 2007 levels, from the current 3 services each way per day to 5. SENRUG believes this can be achieved at no overall journey time penalty for through passengers whilst generating more fare revenue. Table 1: Previous, Current and Requested Cross Country Services Per Day (Each Way) At Morpeth Services Per Day Each Way Provided by Previous Operator Immediately 4 Before Start of Current Franchise Current Franchise Requirement 2 Current Provision 3 SENRUG Requirement For New Contract Award. 5 Page 1 of 7 22 nd October 2015

2.2 Commercial Case The reasons why SENRUG wants an increase in Cross Country trains calling at Morpeth are as follows: Population served by station: Morpeth is a thriving town and commercial centre with a population of just under 87,000 within a 5 mile radius as demonstrated by the following table: Table 2: Population served by Morpeth Station Postcode Area Population NE22 Bedlington, Choppington, Cambois 18,163 NE61 Morpeth inc Stannington, Pegswood, Widdrington 32,468 NE62 Choppington, Stakeford 9,507 NE63 Ashington, Woodhorn 27,735 Total 87,873 Source: Data information from http://www.doogal.co.uk/ukpostcodes.php based on 2011 Census. Data includes some very small communities eg Widdrington (within NE61), Woodhorn (within NE63) and Cambois (within NE22) up to 8 miles from Morpeth, though Morpeth is still the nearest intercity station. Existing services are heavily used. See attached photo (Annex 2) demonstrating number of passengers waiting for Cross Country southbound service on Sunday 21 st Dec 2014 at 11.19 Revenue opportunity with no operational penalty: SENRUG believes more services at Morpeth will increase the market and attract new passengers to rail and thus new fare revenue. Because the local service is only hourly, the option of changing at is unattractive and adds a significant time penalty to passengers overall journey times. The additional services SENRUG has identified could stop at Morpeth (see Section 2.2) within current operational timings. Balanced timetable at Morpeth: 2 extra Cross Country services each way per day will make significant progress towards SENRUG s goal of an inter-city service (that is either East Coast or Cross Country) serving Morpeth Station every 2 hours in each direction, throughout the day, every day. Development of Morpeth Edinburgh and Morpeth York markets. The previous Cross Country franchise operator told SENRUG the strongest passenger flows from Morpeth on their services were York and Edinburgh. Both these destinations are about 1 hour 20 minutes by rail. However, lack of suitable off peak services suppresses this market. For Edinburgh, passengers do not wish to travel south to to change onto an inter-city service then pass back through Morpeth around an hour later. Cross Country services are not so heavily loaded north of so additional services at Morpeth represents an opportunity to grow passenger numbers and fare revenue on a less busy section of the route. Page 2 of 7 22 nd October 2015

Reduction of significant timetable anomalies on Sundays: This issue is dealt with specifically at Section 2.4. 2.3 Suggested Services Whilst SENRUG recognises it will be up to the commercial discretion of the operator which specific services to choose, SENRUG has identified the following services that both meet its objective of plugging long gaps in the combined inter-city timetable and the services also appear to have sufficient slack in the schedule (evidenced by dwell times at and / or Edinburgh) to make a stop at Morpeth with no overall journey time penalty. Additionally, many of these services actually arrive at or Edinburgh ahead of their scheduled time and are held at signals outside the station, yet still arrive in the station on time. This demonstrates slack within the existing timetable which could be used to support calls at Morpeth. Table 3: Proposed additional Cross Country southbound services: Train Code arrive depart Approx Morpeth time arrive depart Monday to Friday 1V62 12:00 12.08 8 13.20 13.34 13.43 9 1V66 Starts Eh 14.08 n/a 15.20 15.34 15.41 7 Saturday 1V62 11:59 12.04 5 13.20 13.32 13.44 12 1V66 Starts Eh 14.05 n/a 15.20 15.32 15.41 9 Sunday 1V56 Starts Eh 09.08 n/a 10.20 10.36 10.39 3 1V66 13:43 14.08 25 15.20 15.35 15.40 5 Table 4: Proposed additional Cross Country northbound services: Train Code arr dep Approx Morpeth time arrive depart EH Wav Monday to Friday 1S35 11.29 11.40 11 11.45 13.05 13:12 7 1S47 17.30 17.37 7 17.45 19.05 19:11 5 Saturday 1S35 11.29 11.36 7 11.45 13.02 13:12 10 1S47 17.29 17.35 6 17.45 19.06 19:12 6 Sunday n/a 11:28 11:34 6 11:52 12:59 13:10 11 1S47 17.25 17.28 3 17.45 18.56 19:18 22 Page 3 of 7 22 nd October 2015

2.4 Sunday Anomaly The situation on Sundays is a particular anomaly at Morpeth, which currently has no local services at all. The only trains serving the station are those operated by Cross Country and Virgin Trains East Coast. As a result there are no southbound services prior to 11:19 and northbound there are no services for over 4 hours (10:28 to 14:40) then 2 trains within 6 minutes (14:40 VTEC and 14:46 XC). There is then a further 5 hour gap (from 14:46 to 19:58) but 2 trains within 8 minutes at 20:48 (XC) and 20:56 (VTEC). The trains that SENRUG has identified could stop at Morpeth (see Tables 1 and 2) will partly address this anomaly, and in addition to currently scheduled dwell times at of 3 to 7 minutes, additionally have scheduled dwell times at Edinburgh of 25, 11 and 22 minutes (one southbound train starts at Edinburgh). It is clear there is sufficient slack in the current schedule for these trains to call at Morpeth. Indeed, in the case of the 14:08 southbound departure from Edinburgh (arrives 13:43), passengers from stations north of Edinburgh wishing to reach stations between and Birmingham a little bit earlier could easily change at Edinburgh on to the 13.55 Cross Country departure, so there is no case for not adding a Morpeth call to this service. 3. RESPONSES TO SPECIFIC DfT QUESTIONS 3.1 What Level of Involvement Do You Have With The Existing Cross Country Franchise? 3.1.1 SENRUG represents passengers who use CrossCountry services in Northumberland and the North East and potential passengers who would use their services if only trains went where they want to go, at the time they want to go, at a price they can afford, and in a clean, safe, secure, accessible and easy to understand manner. 3.1.2 Passengers in this area both use the CrossCountry services that call at Morpeth, and to a lesser extent change onto Cross Country services at or further south. 3.1.3 SENRUG receives CrossCountry s Stakeholder Newsletter In Focus and has a named contact at CrossCountry with whom the group can correspond or contact as necessary. SENRUG has not been invited to Stakeholder briefings or face to face events held in this region. Cross Country accepted an invitation to speak at a SENRUG public meeting in Morpeth in March 2009 which was well attended. 3.1.4 By far the biggest issue SENRUG has wished to raise with Cross Country management is the need for more of their services to stop at Morpeth. SENRUG has on several occasions submitted proposals for additional stops at Morpeth on existing services. However, SENRUG lacks the conviction that these proposals are ever Page 4 of 7 22 nd October 2015

genuinely considered by operational managers, and no detailed response has ever been received. 3.2 What Things Would You Like To See The Current Franchise Continuing To Do? 3.2.1 Cross Country currently has 3 services per weekday stop at Morpeth against a franchise requirement of 2. We want to see this continue and indeed the number of services stopping at Morpeth extended, as explained in Section 2. 3.2.2 SENRUG applauds the introduction of Advance on the Day tickets though thinks the system needs some tweaking as SENRUG believes that when a passenger without a seat reservation boards a train there should be clear information as to whether a vacant seat will remain free for their entire journey. Further, SENRUG has as yet no evidence from anyone ever being able to purchase an Advance on the Day ticket for a journey to / from Morpeth and suspect the system has not yet been rolled out to all services. 3.2.3 SENRUG also applauds the recent introduction of a hot meal offer (though so far only has negative feedback from members who have sought to use this service). SENRUG notes Cross Country say in their introduction to their new offer (In Focus e- magazine issue 24) that fewer people make long journeys but SENRUG submits that if the through journey opportunities (avoiding London) were better promoted (see 3.3.2), there would be longer journeys on CrossCountry services; hence SENRUG s support for this initiative. 3.3 What Would You Like To see Change In The Current Service Provision? 3.3.1 The biggest change SENRUG wants to see is more Cross Country trains calling at Morpeth. This argument is set out in Section 2.1. 3.3.2 SENRUG wants all rail ticket booking systems (but particularly Cross Country s own) amended to better highlight direct journey opportunities on Cross Country services between the North East and the South West. Currently; even Cross Country s own booking system will in most cases default to the via London option. SENRUG believes there are many customers who would appreciate avoiding the inconvenience of crossing London by underground. Even a same platform interchange between Cross Country services (eg at Oxford for Morpeth to Bournemouth) is preferable to many passengers than crossing London by underground. The majority of customers are not savvy enough to realise that Cross Country journeys can often only be identified by specifying via Birmingham. With the trend away from ticket office sales to home booking, SENRUG expects the operator to do more to promote journey opportunities on their own services. End Annexes 1 and 2 follow Annex 1 Text of Email Received From DfT on Friday 9 th October 2015 Annex 2 Photo of Passengers Waiting for Cross Country southbound service at Morpeth on Sunday 21 st Dec 2014 @ 11.19) Page 5 of 7 22 nd October 2015

ANNEX 1: CONSULTATION REQUEST Text of Email Received From DfT on Friday 9 th October 2015 Dear All, We are writing to you as you have been identified as a stakeholder for the Cross Country Trains rail franchise. The current contract expires in October 2016, and the Department is seeking to negotiate a new contract for at least 3 years with the incumbent operator Arriva Cross Country. We are also happy for you to contact other local interest groups as required when preparing your response. As the contract is relatively short and the scope for change is anticipated to be fairly limited, we are seeking views of key stakeholders as we consider the specification for this contract. We would like you to consider the following questions: (a) what level of involvement do you have with the existing Cross Country franchise? (b) what things would you like to see the current franchise continuing to do? (c) what would like to see change in the current franchise service provision? The team are also happy for you and any other relevant local interest group to meet and discuss any aspect of this franchise and the proposed direct award franchise. I would be grateful if you could provide us with a response by 23 rd October 2015 and intimate whether or not you would like to meet the team. Regards, Cross Country Direct Award Team Cross Country Direct Award Project Team 4/12 GMH, Great Minster House 33 Horseferry Road, London, SW1P 4DR XCDirectAward@dft.gsi.gov.uk Page 6 of 7 22 nd October 2015

ANNEX 2: PHOTO: PASSENGERS WAITING TO BOARD CROSSCOUNTRY SOUTHBOUND SERVICE AT MORPETH (Sunday 21 st Dec 2014 @ 11.19) Page 7 of 7 22 nd October 2015