ZOO INTERCHANGE PROJECT GET AROUND GUIDE

Similar documents
Providing public transportation since 1999 between Washington and Milwaukee Counties

PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

2018 Service Implementation Plan Executive Summary

State Project Reconstruction I-84

Guide to. Road Construction Projects

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Goodfellow & Dr. Federal Center. ML King. Garage

Multimodal Planning Studies

PRELIMINARY DRAFT ALTERNATIVE PLAN I RAPID TRANSIT LINES AND STATIONS M I L W A U K E E C O. MILWAUKEE WAUWATOSA WAUKESHA CO.

Independence: overview

RIDESHARE: A transportation tool connecting people and jobs.

RELATED SANTA CLARA SANTA CLARA, CALIFORNIA. RELATED SANTA CLARA Santa Clara, CA

2 Construction Program

10 Free Airport Flyer: Santa Clara Transit Center to Metro Airport LRT Station via San Jose International Airport Effective Date 10/9/2017 Route Map

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

PRIORITIES COMMITTEE MEETING

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Long water shutdown scheduled for Tuesday, September 18

Evaluation of Ramp Meter Effectiveness for Wisconsin Freeways, A Milwaukee Case Study: Part 2, Ramp Metering Effect on Traffic Operations and Crashes

NDG-Westmount Neighbourhood Committee. November 16, 2015

V. DATA COLLECTION PROGRAM

Work in 2015 and Annual Mobility- Management Plan

5.1 Traffic and Transportation

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

PENNSYLVANIA TURNPIKE FUEL & FOOD LOGO PROGRAM

N Prime Retail Pads w/ Direct CA-99 & Betty Dr Access. Direct Access to Upgraded HWY 99 Off/On Ramps

First rail. August 2011

Major Projects Overview

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 10/11/2018 5:24:09 PM

Road Construction Ahead January-April 2015 NORTHWEST REGION

METRO Green Line ridership has already exceeded expectations in its first month.

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2)

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)

Pre-Construction Public Meeting July 2017

AGENDA ITEM I-6 Public Works

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

RACINE COUNTY PUBLIC TRANSIT PLAN:

A VISION FOR I-95. January 12, Delaware Department of Transportation

City of Tampa Traffic & Parking Advisory for the Gasparilla Parade of Pirates - Saturday, January 28

Street Affected Delayed/ Closed From To Time Closed Time Open. Quarry Ln 58th Ave Lake Cahuilla Pilot Car 6:30AM 58th Ave ( Closed) Van Buren

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/5/2018 2:12:06 PM

Transform66 Transportation Management Plan: Transit & TDM Strategies

6 HIGH-OCCUPANCY-VEHICLE (HOV) LANES AND TRAVEL DEMAND MANAGEMENT (TDM) PROGRAMS

Pardon Our Dust Public Information Meeting

Raytown: overview. map. Santa Fe, Oregon, and California National Historic Trails KANSAS CITY KANSAS CITY. 38 Trail alignments: Raytown.

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

ROUTE EVALUATION ROUTE 21 Denton County Transportation Authority

Middleton Youth Hockey Rink Directory

Constructor: Joseph B. Fay

COMPLETE TRANSPORTATION GUIDE TO SUPER BOWL LII IN THE BOLD NORTH

Neighbourdhood Committee NDG-Westmount. October 16, 2017

Strategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze

Capital Beltway HOT Lanes Project

2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017

FROM THE SEATAC AIRPORT (509 NORTHBOUND - ALTERNATE ROUTE)

APPENDIX F List of Commitments

Visiting Team Information Guide

Existing Transportation Facilities

Eleven things you should know about the carpool lanes in Los Angeles County.

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

RESIDENCE INN BY MARRIOTT WAUWATOSA, WISCONSIN

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

2016 RACES AND EVENTS CITY OF LAKEWOOD

Important Lane Closures, April 3 9, 2011

West Seattle / Downtown Seattle

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

Sarasota County Area Transit Express Bus and North Port Park and Ride

U.S. DEPARTMENT OF HUD 04/11/2017 STATE: WISCONSIN ADJUSTED HOME INCOME LIMITS

1 PERSON 2 PERSON 3 PERSON 4 PERSON 5 PERSON 6 PERSON 7 PERSON 8 PERSON

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

Public Information Meetings. October 5, 6, 7, and 15, 2015

Downtown to Defiance Trolley Key Messages Jan. 2017

HEFT/I-75 INTERCHANGE ROADWAY PLAN HEFT WB Feet WETLAND IW95 POND MD6-3 POND MD6-2 PROP. L/A R/W LINE CS MD-6

Understanding Your I-66 Trip

Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan

I-405 Express Toll Lanes Coming in 2015

Aurora Hills. Getting There

State Route 8 Corridor. Northern Summit County s Path to Success

I-579 Urban Open Space CAP Project. Final Land Development Plan (FLDP) Pittsburgh Department of City Planning

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Arlington County Board Meeting Project Briefing. October 20, 2015

Caroline County / King George County Transit Studies. Meeting November 1, 2017

Head to University Avenue and save!

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/14/ :00:05 PM

Northeast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

Transportation Guide

Southwest LRT Alignment Video Narration

East Palomar Street Transit Station and Park & Ride Public Meeting Thursday, June 23, :00 to 8:00 p.m.

Possible traffic snarls ahead for 60 Freeway with lane/ramp closures on the weekends in Diamond Bar

BEVERLY HILLS STAFF REPORT

Transcription:

front FROT ZOO ITERCHAGE PROJECT GET AROUD GUIDE spring 0 - fall 0 TAKE A LOOK ISIDE FOR CLOSURE IFORMATIO, ALTERATE ROUTES, TRASPORTATIO OPTIOS, HOW TO STAY COECTED TO THE ZOO ITERCHAGE PROJECT AD MUCH MORE!

THE SHORT STORY MAJOR UPCOMIG CLOSURES EARLY SPRIG 0 I-8/US orth to I- West Zoo Interchange system ramp closed through late 0 I- West to I-8/US South Zoo Interchange system ramp closed through late 07 WIS 00 entrance ramp to I- East closed through late spring 0 LATE SPRIG 0 70th Street entrance ramp to I- West closed through mid summer 0 I- West exit to WIS 00 SUMMER 0 Avenue over US closed through early fall 06 MAJOR UPCOMIG OPEIGS LATE SPRIG 0 Bluemound Road over US I- West exit ramp to 8th Street 8th Street entrance ramp to I- West FALL 0 US South exit ramp to Bluemound Road 0 HIGHLIGHTS WATERTOW PLAK ROAD ITERCHAGE OPEED LATE 0 WIS 00 ITERCHAGE OPEED LATE 0

SYSTEM RAMP CLOSURE ALTERATE ROUTES WESTBOUD TO SOUTHBOUD ORTHBOUD TO WESTBOUD Moorland Rd. WIS 00 WIS 00 MRMC Zoo 8 Fair Park Beloit Rd. Lisbon Ave. Miller Park Miller Park Wy. 7 ational Ave. Walnut St. Moorland Rd. I-8 East (southbound) to I- West system ramp closed through late 0 WIS 00 WIS 00 MRMC Zoo 8 Fair Park Beloit Rd. Lisbon Ave. Miller Park Miller Park Wy. 7 ational Ave. Walnut St. 8 8 LOCAL ALTERATE ROUTE (MARCH-LATE SPRIG 0) I- West to WIS 00 south to Greenfield Avenue east to I-8 LOCAL ALTERATE ROUTES (LATE SPRIG 0-LATE 07) I- West to 8th Street south to Greenfield Avenue west to I-8 I- West to Miller Park Way south to Lincoln Avenue west to Beloit Road south/west to I-8 REGIOAL ALTERATE ROUTE I-/I- South to I-/I-8 West LOCAL PRIMARY ALTERATE ROUTE I-8/US orth to Greenfield Avenue west to WIS 00 north to I- West LOCAL SECODARY ALTERATE ROUTE I-8/US orth to Watertown Plank Road west to WIS 00 south to I- West REGIOAL ALTERATE ROUTES I- South to Moorland Road north to I- West I-/I- orth to I- West EARLY SPRIG - EARLY FALL 0 PROJECT SCHEDULE EARLY SPRIG 0 LATE SPRIG 0 SUMMER 0 EARLY FALL 0 BLUEMOUD ROAD OVER US 9D STREET OVER I- WISCOSI AVEUE OVER US 8TH STREET ITERCHAGE I- LAE RESTRICTIOS I- WEST TO I-8/US SOUTH SYSTEM RAMP I-8/US ORTH TO I- WEST SYSTEM RAMP FOR A OVERALL PROJECT SCHEDULE, PLEASE VISIT: projects.wi.gov/web/zoo-interchange-project/overview

HOW DO I GET AROUD THE PROJECT? RIDESHARE PARK & RIDE th St. Burleigh St. Hank Aaron Trail Curtis Rd. Take advantage of multiple Park & Ride lots throughout the Zoo Interchange to meet your carpool, vanpool or bike buddies. The Watertown Plank Road Park & Ride lot has been temporarily relocated to US and Burleigh Street. dot.wisconsin.gov/travel/parkride Future Park & Ride Map does not depict closures. RIDESHARE brings commuters together and is a free service provided by the of. rideshare.wisconsin.gov Burleigh Street Park & Ride Mayfair Rd. Researc h WIS 00 Dr. County Underwood Pkwy. Discovery Pkwy. & Ride Harwood Ave. Burleigh St. St. Ave. TRASIT SERVICES The following transit services are available as an alternative: BIKE MILWAUKEE Coach USA provides transport options to the public throughout the cities of, Waukesha, Kenosha, and Racine. coachusa.com The County Transit System connects 0 million riders a year with jobs, schools, shopping, healthcare and recreation in County. ridemcts.com The Washington County Commuter Express provides express motor coach weekday service with free Wi-Fi between Washington & County. ridewcce.com Waukesha Metro Transit operates service throughout the Waukesha area and also administers Waukesha County Transit. www.ci.waukesha.wi.us/web/guest/ waukeshametro/transit_home Bicycling is a great option for short distance trips! Make a positive impact on the environment and contribute to your health. With 0 miles of bike lanes and 66 miles of signed bike routes throughout, it makes bicycling a nobrainer for your next commute. city.milwaukee.gov/bike

EARLY SPRIG 0 th St. Union Pacific Railroad WIS 00/Mayfair Rd. Discovery Pkwy. Harwoo d Ave. Ave. St. Research Dr. County 9th St. Hank Aaron Trail 6 th St. ational Ave. LEGED Exit/Entrance Ramps Freeway Closed Detour Routes Lane Restrictions BLUEMOUD ROAD ITERCHAGE (ALTERATE ROUTES: WIS 00 or / to ) Bluemound Road over US closed through late spring 0 8TH STREET ITERCHAGE (ALTERATE ROUTES: I- East exit to, entrance to I- West) 8th Street entrance ramp to I- WB closed through late spring 0 I- WB exit ramp to 8th Street closed through late spring 0 O Connor Street from 80th Street to 8th Street closed through late summer 0 9D STREET OVER I- (ALTERATE ROUTES: or to ) 9nd Street over I- closed through late 0 WIS 00 ITERCHAGE (ALTERATE ROUTES: or entrance ramp to I- East) WIS 00 entrance ramp to I- EB closed early spring 0 through late spring 0 SYSTEM RAMPS (ALTERATE ROUTES: See reverse side for local and regional alternate routes) S-W system ramp (I-8/US B to I- WB) closed early 0 through late 0 E-S system ramp (I- WB to I-8/US SB) closed early 0 through fall 07 SCHLIGER AVEUE UDER I-8 6 (ALTERATE ROUTES: or WIS 00 to ) Schlinger Avenue under I-8 closed long term

LATE SPRIG 0 th St. Union Pacific Railroad WIS 00/Mayfair Rd. Discovery Pkwy. Harwoo d Ave. Ave. St. Research Dr. County 9th St. Hank Aaron Trail 6 th St. ational Ave. LEGED Exit/Entrance Ramps Freeway Closed Detour Routes Lane Restrictions BLUEMOUD ROAD ITERCHAGE (ALTERATE ROUTES: WIS 00 or / to.) Bluemound Road over US closed through late spring 0 8TH STREET ITERCHAGE (ALTERATE ROUTES: WIS 00 entrance ramp to I- West, I- West exit to ) 8th Street entrance ramp to I- WB closed through late spring 0 I- WB exit ramp to 8th Street closed through late spring 0 O Connor Street from 80th Street to 8th Street closed through late summer 0 70th Street entrance ramp to I- WB closed through mid summer 0 (not until 8th Street entrance ramp to I- WB reopens) 9D STREET OVER I- (ALTERATE ROUTES: or to ) 9nd Street over I- closed through late 0 WIS 00 ITERCHAGE (ALTERATE ROUTES: or entrance ramp to I- East) WIS 00 entrance ramp to I- EB closed early spring 0 through late spring 0 SYSTEM RAMPS (ALTERATE ROUTES: See reverse side for local and regional alternate routes) S-W system ramp (I-8/US B to I- WB) closed early 0 through late 0 E-S system ramp (I- WB to I-8/US SB) closed early 0 through fall 07 SCHLIGER AVEUE UDER I-8 6 (ALTERATE ROUTES: or WIS 00 to ) Schlinger Avenue under I-8 closed long term

SUMMER 0 th St. Union Pacific Railroad WIS 00/Mayfair Rd. Discovery Pkwy. Harwoo d Ave. Ave. St. Research Dr. County 9th St. Hank Aaron Trail 6 th St. ational Ave. LEGED Exit/Entrance Ramps Freeway Closed Detour Routes Lane Restrictions WISCOSI AVEUE OVER US (ALTERATE ROUTES: WIS 00 or / to or ) Avenue over US closed through early fall 06 9D STREET OVER I- (ALTERATE ROUTES: or to ) 9nd Street over I- closed through late 0 70TH STREET ETRACE RAMP (ALTERATE ROUTE: entrance ramp to I- West) 70th Street entrance ramp to I- WB closed through mid summer 0 WIS 00 ITERCHAGE (ALTERATE ROUTE: I- West exit ramp to to to WIS 00, I-8/ US orth exit ramp to to WIS 00, US South exit ramp to Watertown Plank Rd. to WIS 00) I- WB exit ramp to WIS 00 closed through early fall 0 SYSTEM RAMPS (ALTERATE ROUTES: See reverse side for local and regional alternate routes) S-W system ramp (I-8/US B to I- WB) closed early 0 through late 0 E-S system ramp (I- WB to I-8/US SB) closed early 0 through fall 07 SCHLIGER AVEUE UDER I-8 6 (ALTERATE ROUTES: or WIS 00 to ) Schlinger Avenue under I-8 closed long term

EARLY FALL 0 th St. Union Pacific Railroad WIS 00/Mayfair Rd. Discovery Pkwy. Harwoo d Ave. Ave. St. Research Dr. County 9th St. Accessible from US SB only Hank Aaron Trail th St. ational Ave. LEGED Exit/Entrance Ramps Freeway Closed Detour Routes Lane Restrictions WISCOSI AVEUE OVER US (ALTERATE ROUTES: WIS 00 or / to or ) Avenue over US closed through early fall 06 9D STREET OVER I- (ALTERATE ROUTES: or to ) 9nd Street over I- closed through late 0 SYSTEM RAMPS (ALTERATE ROUTES: See reverse side for local and regional alternate routes) S-W system ramp (I-8/US B to I- WB) closed early 0 through late 0 E-S system ramp (I- WB to I-8/US SB) closed early 0 through fall 07 SCHLIGER AVEUE UDER I-8 (ALTERATE ROUTES: or WIS 00 to ) Schlinger Avenue under I-8 closed long term WIS 00 ITERCHAGE (ALTERATE ROUTE: I- West exit ramp to to to WIS 00, I-8/ US orth exit ramp to to WIS 00) I- WB exit ramp to WIS 00 closed through late 0 (accessible via US SB only) * Entire freeway system subject to short-term overnight closures. All closures are weather dependent.

zoointerchange.wi.gov