r--, ' ' ',MESA \ I t OPENS TONGS L MESA - SRC BOX STOWAGE r MESA - EXTERNAL STOWAGE ALHTC STOWAGE

Similar documents
Thanks for shopping with Improvements! 10 Solar Lighted Gazebo Item #531753

An Improved Pedestal To A Version One Worksurface

VEPR Round Drum Disassembly and Assembly

MYRIAD Banner Stand is a trademark of Skyline Exhibits. Patent Pending PN32294-B. MYRIAD Banner Stand

PR-429BF-600M. Bell 429 Blade Fold Kit Operations Manual

UTV SNOW FORCE TM PUSH TUBE KIT OWNER S MANUAL

Closet and Specialty Hardware

FREEDOM BUTTON KIT INSTALLATION GUIDE STEP 1

Operation, Cleaning & Maintenance. For Aluminium Secondary

INSTRUCTIONS INSTALLATION UNIVERSAL SERIES PATIO AWNING HARDWARE , , ,

Assembly TOOLS REQUIRED: 17mm and 14mm or equivalent wrenches.

Crimp & Cleave Termination Instructions

OPERATOR INSTRUCTION MANUAL INCLUDING REPAIR PARTS FOR MODULAR GENERAL PURPOSE TENT SYSTEM (MGPTS) TYPE I

M129 SERVICE MANUAL- M129 MODEL #G-2 MANUAL CAN OPENER

Crimp & Cleave Termination Instructions

UTV BLADE MOUNT HARDWARE

42" SNOW BLADE. Owner's Manual. Model No Safety Assembly Operation Maintenance Parts

BEV-TENT COMPONENTS. Made in South Africa

functionality with the necessary maintenance tools stored in a convenient built in tool box, as well as parallel handles for

PRODUCT MANUAL - M096

Crimp & Cleave Termination Instructions

Crimp & Cleave Termination Instructions for 200 µm Factory5 Cable with ST and SMA Connectors

KAWNEER 1786 RIM EXIT DEVICE

Knives, Cutters & Scrapers

Re Keying R1200RT Cases Re Keying R1200RT R1200ST K1200GT Cases Created 29/01/ Amended 04/09/2012

Crimp & Cleave Termination Instructions for 200 µm F07 Connectors

Installation and User s Manual 12 x 10 MOTORIZED AWNING

BEV-TENT COMPONENTS. Made in South Africa

ASSEMBLY & CARE INSTRUCTIONS

Assembly and Installation Instructions

Compass Home 8' x 8' No Tools Gazebo with Awning and Anchor Bags Assembly Instruction for Gazebo (no tools required)

/ Tool and Equipment Safety Tether System (T.E.S.T.S)

Auto Rewind Hose Reel 10M / 20M / 30M Models

FORM (Apr. 2006)

ASSEMBLY & CARE INSTRUCTIONS. 7 x4 TRAILER TENT SERIES 4 9. OPTIONAL SUNROOM Wall and floor kit. OPTIONAL SPARE ROOM Roof, wall and floor kit

4A1-114/114KR & 4A1-2 MANUAL TENSIONERS

OWNER S MANUAL: G5000 SLIDE-OUT AWNING SYSTEM

10x Corrosion Resistance 5x Abrasion Resistance 2x Chip Resistance 2x Scratch Resistance. 10x 5x 2x 2x. Textured Powder Paint Finish

Seven-eighths-spacing Rackmount Kit/Chassis Rackmount Kit. Techmar enclosure designs include interchangeable modular components,

Otter Pro XT Cabin Installation and Set-Up Instructions

Crimp & Cleave Termination Instructions for 200 µm Harsh Environment SMA

Assembly and Installation Instructions

INSTALLATION INSTRUCTIONS AND OWNER'S MANUAL AWNINGS. For trailers & motor homes with straight sides TOOLS REQUIRED

JARVIS. Model 70 Airsnip Air Powered Scissors

Instruction Manual Remote Swabbing and Microbiological Sampling and Teflon template tools Version , Rev.0

Operating Instructions

Mandolin Slicer Quite possibly the safest mandolin in the world

Product instruction manual Ream Cutting Systems RE3943, RE3946, RE3947, RE3971, RE3952E

Gas Go Anywhere /23/01

Assembly instructions for Eurotramp trampolines Series: Ultimate, Grand Master Exclusiv, Grand Master, Master

Caravan Notes. Contents. Caravan_User_Notes.doc Page 1 10/01/18

4.2 Assembly Instructions

Product Description of Klozit Sliding Glass Door Closing and Latching System

SERVICE INFORMATION LETTER

U S A S O C S T A T I C L I N E J U M P M A S T E R C O U R S E N O M E N C L A T U R E S T U D Y G U I D E

FORM Rev. A (Feb. 2004)

Installation & Operation Manual VHM Variable Height Series Arms with Fixed Angle Front End

Kontrol Kube Advanced Owners Manual

Termination Procedure LC 1.6mm & 2.0mm Connectors: 1060XX Series

Solar Power Shade INSTRUCTION MANUAL

quick and easy installation guide

BEV-TENT COMPONENTS AGENTS. GAUTENG REB MARKETING-Nick Tel:- (011) Fax:- (011)

Wenger Corporation 2014 Printed in USA 05/14 Part #049B015-09

Installation Guide: Round Trampoline

WIDESPREAD LAVATORY MODELS WITH HI-ARC SPOUT

OWNER'S MANUAL FREEDOM AWNINGS

Patagonia Transport Roller Telescoping Handle Replacement

Installation Instructions

Written By: Sam Lionheart

AUTO REWIND HOSE REEL USER MANUAL

MASTER LOCK MASTER LOCK

MORE IMPACT PRO PRODUCTS EXPANDED S2 SCREWDRIVING BIT OFFERING NEW LOWER PRICING ON MOST SCREWDRIVING PRODUCTS UPDATED AND NEW PRODUCT SETS

RUPHIS Blade Clamp. Instruction Manual

Knives & Cutting Tools

How to Set up Your Configurable (Home and Camping) Stir Fry Stove

ELE-3COP-375 Title - Braid termination using a Band Strap Adaptor.

HANDLES AND CONTROL CABLES

Otter Pro X-Over Lodge Installation and Set-Up Instructions

Instructional Booklet

FEATHER-LITE ROOF TOP TENT SET-UP GUIDE

Roller Bar End Cap (w/round Drive Shaft) Replacement Instructions for Vista and Motorized Awnings * Helpers needed *

* * 4023 KR. Step 1 Prepare the Keyed Removable Unit. Not for use on electric or fire rated removable mullions

* * KR54-F, KR9854 & KR9954 Installation Instructions. Read All Warnings Before Starting Installation! Index:

INFRARED BURNER KIT INSTRUCTIONS

INSTALLATION MANUAL ECLIPSE ARMS UPGRADE FOR ONE-TOUCH

Product Overview... 1 Specifications Canopy Replacement... 2 Removing the Fabric and Roller Tube... 2 Installing the Fabric and Roller Tube...

BERYL Service Guide. Travel Adjust OTT Change

STOP BOX SCRAPER/GRADER BLADE. Owner's Manual. Model No Safety Assembly Operation Maintenance Parts

ASSEMBLY GUIDE. Customer Service: INCH² 2-BURNER & 864 INCH² 2-BURNER

ALPINE SLIDEOUT COVER

Shut off combine and remove key before installing the hopper extension. Make sure the combine is on a level surface. Engage parking brake.

Design Standards. Utility Manhole Covers

LBH18BPK. Instruction Sheet

1612P MODEL 1612P SLICER MODEL EXECUTIVE OFFICES 701 RIDGE AVENUE TROY, OHIO FORM (4-95)

RETRACTABLE AWNING w/ OPTIONAL HOOD ASSEMBLY INSTRUCTIONS

Design Standard. Utility Manhole Covers

FORCE 10 MARINE BARBEQUES

PLATINUM MODEL WITH AUTO-RETRACT AND REMOTE CONTROL. Owner s Manual

SERVICE MANUAL- M126

Thomas Scientific Swedesboro, NJ U.S.A.

Transcription:

A B c I 18 17 16 e BRUSH/ SCRIBER/HAND LENS 15 14 13 12 11 ALHTC STOWAGE ' 0 INSTRUMENT ST AFF, TOP IE)(TENOEDl A B c I 10 9 8 7 MESA - EXTERNAL STOWAGE @TONGS t OPENS TONGS 24" THitU e EXTENSI ON HANDLE 6 \ I 5 4 3 2 1 MESA - SRC BOX STOWAGE HANDLE CLIPS 1 1 I INTO ~ "" \ A B c ' ' ' ',MESA FORWARD 35- SAMPLE BAG DI SPENSER f"::\ GASC 1!5 FLAP ~!GAS CONTAINER! SAMP L E BAG D ' I. I r--, D D E SCRIBE RE TRACTOR INSTRUMENT STAFF, BOTTOM E CORE TUBE CAPS E SRC BOX F G e COLOR CHART r---- G I ll II ' F EMALE QUICK DISCONNECT FI TTHIIG --------~.----------------T-,--, l 15" 14" CORE TUBE CAt> HOL OER F G L ARGE SCOOP TONGS SAM PLE RETURN CONTAINERS H I L-- H H HARDENED STEEL CUTTING ----. EDGE CORE TUBES L ESC ILUNAR ENVIRONMENT SAMPLE CONTAI NER! 0 GNOMON ASSEMBLY J SMALL SCOOP J LARGE SCOOP J 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 l l

APOLLO LUNAR HAND TOOLS (ALHT) SUBSYSTEM The ALHT Subsystem is a collection of tools and equipment with which the flight crew performs lunar surface observations and lunar surface geologic sampling. The ALHT consists of: l) a hinged foldable carrier (ALHTC) that serves as a: - stowage container for tools during transit to the moon. - hand carrier for tools during lunar surface traverse. - stand to support instruments. The ALHTC is transferred to the lunar surface in a stowed position on the ALSEP Package #2. The ALSEP is carried in the Scientific Equipment Bay (SEQ) of the LM Descent Stage. 2) special tools and equipment for: - selecting and obtaining lunar surface geologic samples. - containing and packaging these samples for earth return. - surveying and photographic activities. Some tools are stowed in the ALHTC during lunar transit. Other tools are stowed in the Modularized Equipment Stowage Assembly (MESA) of the LM Descent Stage during lunar transit and then are transferred to the ALHTC during EVA. Crew Procedures associated with the ALHTC are included and specifically cover: A. Removal of the ALHTC from ALSEP - Procedures #@ @. B. Unfolding of the ALHTC - #(j) @. c. Removal of Tool Retainer Assemblies - # @. D. Tool transfer to ALHT - # E. Equipment transfer to ALHT - # @ 0. F. Tool and equipment usage - # @. 2

CREW OPERATING PROCEDURES THESE PROCEDURES ASSUME: a. ALSEP PKG. #2 HAS BEEN OFF-LOADED FROM THE LM DESCENT STAGE. b. THE ALSEP "HOCKEY STICK" SUSPENSION SUPPORT ~ HAS BEEN REMOVED. A. REMOVAL OF THE ALHTC FROM ALSEP PKG. #2 ~ PULL ALHTC-ALSEP PIP PIN,#l ~ @ -ROTATE GREEN ALSEP LOCK KEY #l ~ CCW TO UNLOCK ALHTC AND REMOVE KEY. -DISCARD KEY #l AND PIP PIN #l THAT ARE TIED TOGETHER FOR ALTERNATE REMOVAL PROCEDURE (THIS RELEASES LEFT SIDE OF THE ALHTC FROM THE ALSEP. ) ~ PULL ALHTC-ALSEP PIP PIN #2 ~ 0 -ROTATE GREEN ALSEP LOCK KEY #2 ~ CCW TO UNLOCK ALHTC AND REMOVE KEY. -DISCARD KEY #2 AND PIP PIN #2 AS IN STEP 0. (THIS RELEASES RIGHT SIDE OF THE ALHTC FROM THE ALSEP. DROP DOWN FROM THE ALSEP BASE. ) THE ALHTC SHOULD 0 GRASP RACK "A" TOOL RETAINER HANDLE ~ WITH ONE HAND, STEADY ALHTC WITH OTHER HAND. -LIFT ALHTC FROM ALSEP BY: -FIRST PUSH ALHTC FORWARD SO THAT THE ALHT GUIDE PINS ~ & ~ CLEAR BASE, -THEN LIFT ALHTC STRAIGHT UP TO CLEAR ALHT BASE PINS ~ ON ALSEP. NOTE: WATCH FOR CLEARANCE OF TOOLS AND SAMPLE CONTAINER ("DIXIE CUP") CLEAT ~ ON LEFT OF ALHTC AS IT IS LIFTED FROM ALSEP. 3

PROCEDURES I LLUSTR ATI ONS NOTE: THE ~ IS CONNECTED TO THE 0 ALSEP LOCK KEY BY A LANYARD FOR USE IN UNLOCKING THE ALHTC FROM THE ALSEP WHILE THE ALSEP IS STILL IN THE SEQ BAY AND THE LOCK KEYS ARE OUT OF THE ASTRONAUT'S REACH FOR DIRECT REMOVAL OF THE KEYS. PULLING THE LANYARD WILL ROTATE THE ~ CCW AND RELEASE THE ALHTC. CAUTION: OTHER KEYS SHOULD NOT BE RELEASED.UNTIL TOOt. CARRIER IS REMOVED FROM ALSE P. INSTRUMENT RODS SAMPLE CONTAINER CLEAT ALSEP BASE 4

CREW OPERATING PROCEDURES B. UNFOLDING OF THE ALHTC 0 -ROTATE ALHTC SO THAT LEGS OF CARRIERS ARE FACE-UP AND VISIBLE. -(THIS WILL REQUIRE REVERSING THE HAND GRIP ON TOOL RETAINER BRACKE~~). 0 UNFOLD PIVOT LEG~ UNTIL IT LOCKS IN THE EXTENDED POSITION. 0 PULL OUT PIVOT LEG SLIDES ~ CAUTION: VERIFY SLIDES ARE LOCKED IN PLACE BY PUSHING IN ON SLIDES. @ UNFOLD CORNER LEG ~OF RACK "B" [2iJ UNTIL IT LOCKS IN EXTENDED POSITION. @ UNFOLD CORNER LEG ~OF RACK "A" POSITION. ~ UNTIL IT LOCKS IN EXTENDED @ REMOVE GREEN RETAINER CLIP ~. @ ROTATE YELLOW RACKS RETAINER KEY #1 ~ CCW, LIFT AND DISCARD. -ROTATE YELLOW RACKS RETAINER KEY #2 ~ CCW, LIFT AND DISCARD. -(THESE STEPS UNLOCK AND RELEASE RACKS FOR UNFOLDING.) @ GRASP ALHT BY STOWED INSTRUMENT STAFF AND SAMPLE DISPENSER CLEAT. @ UNFOLD ALHTC UNTIL CARRIER HANDLE 12.{) LOCKS IN EXTENDED POSITION. 0) PLACE ALHTC ON LUNAR SURFACE AS SHOWN IN THE ALHTC "UNFOLDED CONFIGURATION" ~ 5

PROCEDURES ILLUSTRATIONS

CREW OPERATING PROCEDURES C. REMOVAL OF TOOL RETAINER ASSY'S (POSTPONE UNTIL JUST PRIOR TO TOOL TRANSFER) @ ROTATE "RACK A" TOOL RETAINER LOCK KEY ~ & ~ CCW, PULL AND DISCARD. REMOVE "RACK A" TOOL RETAINER ASSY ~ AJIID DISCARD. ROTATE "RACK B" TOOL RETAINER LOCK KEY ~ CCW,... @ REMOVE "RACK B" TOOL RETAINER ASSY ~ AND DISCARD ASSY D. TOOL TRANSFER TO ALHT SOME TOOLS AND EQUIPMENT ARE STOWED IN THE MESA OF THE LM DESCENT STAGE FOR TRANSPORT TO THE LUNAR SURFACE. THESE TOOLS ARE USED DURING EARLY EVA ACTIVITIES AND THEN TRANSFERRED TO THE ALHT FOR USE DURING THE GEOLOGY TRAVERSE. THESE INCLUDE: TONGS @ ARE STOWED IN SPECIAL SLOT ON RACK "A" ~ @ EXTENSION HANDLE EB IS STOWED IN SPECIAL SLOT ON RACK "A" li87l ~ HAMMER ffi IS STOWED IN RACK "B" HAMMER SLOT r237l ll2:.j. @ TONGS & HANDLE MAY BE STOWED TEMPORARILY IN THE TRIANGULAR POUCH B11 @ GNOMON ffi OF THE ALHT COLLECTION BAG DURING EVA ACTIVITIES. IS STOWED IN THE GNOMON CLIP 12271 ll...:j" 7

PROCEDURES ILLUSTRATIONS ~ \::'.1,-EMPORARV TOOL STORAGE 8

CREW OPERATING PROCEDURES E. EQUIPMENT TRANSFER TO ALHT EB CORE TUBE CAP HOLDER IS INSERTED INTO RACK "A" SLOT IN EXTENSION HANDLE HOLDER SLOT. WI IN 3-CORE TUBES EB J\RE PLACED IN RACK "B" HOLES ~ (BIT-END DOWN). ffi ffi LESC CONTAINER AND ~C CONTAINER J\RE PLACED IN COLLECTION BAG MAIN POUCH ~ FOR SAMPLE TAKING DURING GEOLOGY TRAVERSE. EB 35-SAMPLE BAG DISPENSER IS INSTALLED ON RACK "B" DISPENSER CLEAT ~. THE ALHT IS NOW IN "TRAVERSE CONFIGURATION" 1/{J. 15-FLAT SAMPLE BAGSffiARE INSTALLED ON CLIP ON RACK "B". ~ COLOR CHART IS CARRIED IN OUTER POUCH ~ OF COLLECTION BAG. F. TOOL AND EQUIPMENT USAGE ALHT IS DESIGNED TO BE CARRIED IN THE RIGHT HAND FROM BAG-SIDE OF CARRIER. WATCH CLEARANCE OF CARRIER LEGS AND GNOMON DURING TRAVERSE. BEFORE TAKING SAMPLE: UNFOLD SAMPLE BAG HOLDERS. REMOVE DISPENSER COVER/HANDLE FROM DISPENSER. DEPRESS OUTER SHELL OF DISPENSER DOWNWARD TO POSITION TOP BAG FOR REMOVAL. GRASP HANDLE OF SAMPLE BAG, REMOVE THRU DETENTED SLOT AND PLACE IN HOLDER DURING SAMPLE TAKING. AFTER TAKING SAMPLE, SQUEEZE MOUTH OF BAG TOGETHER, ROLL AND Z-CRIMP. 9

------------------~P~R~O~C~E DD-~ U RES ILL US T RAT I ON S BAG CARRY HANDLE FOR USE IN RETURNING SAMPLE AFTER TRAVERSE

CREW OPERATING PROCEDURES F. TOOL AND EQUIPMENT USAGE (CONTINUED) @ REMOVE INSTRUMENT STAFF TOP ~AND BOTTOM 1%1 FROM RACK "A." ASSEMBLE BOTTOM STAFF TO TOP THEN EXTEND THE TOP STAFF. PLACE STAFF THRU TOP AND BOTTOM HOLDER IN RACK "B 11 ~. DUE TO THE DIFFICULTY IN STOOPING AND BENDING WHILE SUITED IN THE EMU, THE EXTENSION HANDLE~ IS USED WITH OTHER TOOLS (COR~ES, LAR~OOP, SMALL SCOOP, & HAMMER) EB. TO MATE CORE TUBES OR SCOOPS WITH EXTENSION HANDLE: ALIGN LOCK PINS ON TUBE OR SCOOP CONNECTOR WITH SLOT ALIGNMENT MARKS ON EXTENSION HANDLE BASE, THEN MATE CONNECTOR WITH HANDLE. ROTATE EXTENSION HANDLE CLOCKWISE TO STOPS. LOCKING SLOTS IN EXTENSION HANDLE BASE.) (THIS POSITIONS PINS IN PUSH EXTENSION HANDLE LOCKING SLEEVE TOWARD CONNECTOR TO LOCK TOOL ASSY. FOR CORE TUBE SAMPLING: PUSH CORE TUBE ASSY. INTO SURFACE AS DEEP AS POSSIBLE SO THAT IT SUPPORTS ITSELF. (THIS MAY BE DIFFICULT IN SHALLOW LUNAR SOIL.) USING FLAT SIDE OF HAMMER 12<1 FOR LARGER CONTACT AREA, DRIVE CORE TUBE ASSY. INTO SURFACE TO GET SAMPLE. REMOVE SAMPLE FROM SURFACE, UNSCREW CORE TUBE BIT, DISCARD AND REPLACE WITH CORE TUBE CAP FROM CAP HOLDER 1%1 DISCONNECT CORE TUBE FROM HANDLE, USE REVERSE STEPS @,,. PLACED CAPPED CORE TUBE IN MAIN COLLECTION BAG ~. FOR SCOOPING OF LOOSE LUNAR SOIL: USE SAME MATING & UNLOCKING PROCEDURES FOR SCOOP [2?1 & HANDLE AS WITH CORE TUBES & HANDLE ( THRU @ ). SCOOP HAS STEEL BLADE, BUT SCOOP/HANDLE ASSY. IS ONLY FOR LIGHT DIGGING. CONNECTION BETWEEN SCOOP AND HANDLE WILL NOT WITHSTAND HEAVY DUTY CHIP PING OR PRYING. L

PROCEDURES ILLUSTRATIONS 0 TYPICAL CONNECTOR OF SMALL SCOOP CORE TUBE LARGE SCOOP (i{) TUBE CAP e/ SMALL -,~" STEEL BLADE-TIP ' ::: NOTE: CONNECTION BETWEEN EXTENSION HANDLE AND TOOLS IS NOT DESIGNED FOR HEAVY DUTY HAMMERING OR PRYING WHILE ASSEMBLED. 12

CREW OPERATING PROCEDURES F. TOOL AND EQUIPMENT USAGE (CONTINUED) TO MATE :MMMER {!51 AND EXTENSION HANDLE: SQUEEZE AND HOLD DOWN BOTH LOCKING LATCH ACTUATORS AT BASE OF HAMMER. (THIS RETRACTS LOCKING LATCHES ON HAMMER CONNECTOR.) ALIGN LOCKING PINS ON INTERIOR CONNECTOR OF HAMMER WITH SLOT ALIGNMENT MARKS ON BASE OF EXTENSION HANDLE, THEN MATE HAMMER AND HANDLE. (KEEP LATCH ACTUATORS SQUEEZED. ) ROTATE EXTENSION HANDLE CLOCKWISE TO STOPS. (THIS POSITIONS HAMMER LOCKING PINS INTO LOCKING SLOTS IN HANDLE BASE AND LATCHES INTO LATCHING SLOTS. ) PUSH EXTENSION HANDLE LOCKING SLEEVE TOWARD CONNECTION TO LOCK TOOL ASSY. RELEASE LATCH ACTUATORS. HAMMER ASSEMBLY IS FOR TRENCHING AND LIGHT HOEING WITH HAMMER BLADE. (CAUTION - CONNECTION BETWEEN HAMMER/HANDLE CANNOT WITHSTAND HEAVY DUTY CHIPPING OR PRYING.) TO DISCONNECT HAMMER/HANDLE ASSY., REVERSE ASSY. STEPS i.e.' ' @. 13 THE CORE TUBE MAY BE USED AS A CHISEL BY REPLACING CORE TUBE BIT WITH CHISEL BIT IX). CORE TUBE SAMPLING AND CHISELING MAY BE DONE WITHOUT EXTENSION HANDLE IF ROCK OR SOIL LOCATION DOES NOT REQUIRE ASTRONAUT TO BEND OVER. BRUSH/SCRIBE/LENS IS USED FOR EXAMINING J\ND MARKING SAMPLES. ALL SAMPLES MAY BE RETURNED FROM TRAVERSE BY USING ONLY COLLECTION BAG WITH HANDLES PROVIDED FOR CARRYING.

PROCEDURES ------ HAMMER EXTENSION HANDLE- LOCkiNG. LATCH SLOT T ALIGN MEN MARk NOTE: CTION BETWEENS ENOT XTENSION DESIGNED HANDL CONNEE AND UTY TOOLS HA IMMERING OR FOR HEAVY ~ ASSEMBLED. PRYING WHIL 14

1 2 5 4 3 6 7 9 8 12 13 14 15 16 17 TRIANGULAR POUCH FOR TEMPORARY STOWAGE OF TOOL S!TONGS, EXTENSION HANDLE, ETC. I RACKS RETAINED KEY H!YEL LOW) ALSEP LOCK KEY f2!green! 11 10 18 19 20 21 22 23 24 25 )(TE NSION HANDL E A A A B B B c c c D D D E E E F F RACK " A" TOOL RETAINER LOCK KEY lb PIVOT L EG!RETRACT[()) -z INSTRUMENT STAFF AFT ALHT BASE PINS! ON ALSEPI RACK " A" TOOL RETAINER BRACKET F G G H H TOOL RACK PIVOT LEG fextenoedl "A" 11 RACK "A" CORNER L EG! RETRACT () ) GNOMON I NSTALL ED IN CLIP TOOL RACK "B" G "HOCKEY STICK" SUSPENSION SUPPORT ALHT CARRIER /. '~ "TRANSPORT CONFIGURATION" I 2 3 4 5 6 ALHT CARRI ER 0 "UNFOLDED CONFIGURATION " J J ALHT CARRI ER J' "TRAVERSE CONFIG URATI ON" 15 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25