underground car park Stachus, Munich European Parking Award 2015 Renovated Parking Structures

Similar documents
Multi-storey station car park opens in New Year

Thier-Galerie Dortmund

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Construction Staging Area Blue Jays Way (357 King Street West)

TORONTO TRANSIT COMMISSION REPORT NO.

Comfortable living in a Smart Home

Shopping gallery Anger 1 in Erfurt

Sustainable Brisbane Walking Tour

This is the entrance to the ticket office.

Olympia-Einkaufszentrum Munich

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Promenaden Hauptbahnhof Leipzig

Kansas City Aviation Department. August 25, 2015

Königsbau Passagen Stuttgart

EUROPEAN PARKING AWARD COMPETITION 2003

State of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update

Construction Staging Area 19 Western Battery Road

Osaka International Airport Terminal Renovation Project Begins

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

Anchor Family Product Manual for the Rifton Anchors

CONFERENCE CENTER NORD WITH HALL C6. Connecting Global Competence

Ernst-August-Galerie Hanover

Setup. Assembling. Attaching the sharpening stone

Bellevue Estate ~ Lake Rosseau 306 Burgess Road Rosseau Features

Stadtgalerie Passau 1

Altmarkt-Galerie Dresden

A A A A MEN'S ROOM EQUIPMENT 117 EXISTING HOTEL TOWER WOMEN'S ROOM 115 EXISTING HOTEL TOWER AREA APPROX 23 STORIES

Airport advertising Berlin Tegel (TXL) 2017 wtm-outdoor

AIRPORT ADVERTISING Berlin Tegel (TXL)

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Los Angeles International Airport (LAX) Airside $907M

TORONTO TRANSIT COMMISSION REPORT NO.

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

TWO BALLSTON PLAZA AVAILABLE SPACE AMENITIES. Leasing Information: 1110 N. Glebe Road, Arlington, VA 22201

Railway Level Crossings. Keeping you Safe! Information Pack

Digital Signage & Advertising Opportunities

The cultural heart of York Central

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report

EXHIBITION HALL 2 CONGRESS CENTER LEIPZIG CONGRESS CENTER LEIPZIG. Just a good feeling!

PROPERTY DESCRIPTION

Improving our roads to drive our future

MANOMAV SHOWCASE PROJECTS PORTFOLIO

KANSAS CITY CONVENTION CENTER

Sow Management. Modern housing and feeding systems

visits4u Case Studies: Historical Centre of Athens Athens, Greece

CHAPTER FIVE PROSPECTS FOR FUTURE ECONOMIC DEVELOPMENT

Abbey Chesterton bridge Questions & Answers

TORONTO TRANSIT COMMISSION REPORT NO.

Business needs consumers! Get people back in to Port by attracting them!

Hamburger Meile Hamburg

Phase One. Phase Two. Phase Three

Measure 67: Intermodality for people First page:

The Bethany INCLUDED ELEVATION A

information memorandum Business and Technology Precinct Westlink Green Darra

Compliance Report. Halifax Stanfield International Airport. available in multiple formats

TORONTO TRANSIT COMMISSION REPORT NO.

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

RamirentClimateSolve TM WE RENT OUT TENTS SO YOU ARE COVERED

Presentation by John Brennan, Car Parks Manager, Dublin Airport

APPENDIX TO THE INSTALLATION AND OPERATING MANUAL OF STOVEMAN SAUNA STOVE

Introduction. Access statement for Jurys Inn Christchurch

TEMPE BEACH PARK - RECOMMENDATIONS

TORONTO TRANSIT COMMISSION REPORT NO.

MERIDIAN MALL PATNA S FIRST LIFE STYLE MALL

The tried-and-tested complete range

Alexandra pier: New terminal in an old port

Welcome to the Pacific Spas family!

L EAF L AKE RV P ARK. Guideline Book.

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport

Tokyo Station. History of Tokyo Station (Opening 1970s) 4 November Prime Minister Takashi Hara assassinated on station concourse

Frequently Asked Questions (FAQs)

PROGRESSIVE. YOUR LIFESTYLE. YOUR HOTEL. YOUR MEETING.

The Ħal Saflieni Hypogeum Access Statement

2017 Football Parking Policy Manual

Property. Jurys Inn Cheltenham Introduction

Elbe-Einkaufszentrum Hamburg

Ossington Station Easier Access Project - Construction & Public Art Concept Update

5. Site Analysis. Fig 5.1 Site indicated on road map. Fig 5.2 Museum Park (Tshwane Inner City Programme Spatial Development Framework Presentation)

Welcome To arrive is to be welcomed

Prestige Business Park Development Opportunity

EDINBURGH AIRPORT LTD COACHPARK

User Guide. Building networks. Online application. exporeal.net

An Bord Pleanála STRATEGIC INFRASTRUCTURE DEVELOPMENT PLANNING AND DEVELOPMENT ACTS 2000 TO An Bord Pleanála Reference Number: 29N.

Europa Passage Hamburg

Arkády Pankrác Prague

AIRPORT VOLUNTARY COMMITMENT ON AIR PASSENGER SERVICE

MANUFACTURER OF QUALITY BLEACHERS, BENCHES, & PICNIC TABLES FOR OVER 25 YEARS

Property. Introduction. Pre-Arrival

Chapter 2 Route window W25 Maidenhead station. Transport for London

Quality Transport - Key to enhance Connectivity and Sustainability -

Our hotel provides a camera-controlled subsurface garage. In case of using it, the price is 9,- EUR/night/car.

AIRPORTS DIVISION. The Hawaii Airports System Is Self-Supporting

Accessibility Guide. Gold Coast Convention and Exhibition Centre Accessibility Guide

Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

JAKARTA TRANSPORTATION

Waterfront Concept Plan: Community Survey Summary

ONECROYDON. Offices To Let In Croydon s Most Iconic Building

Union Station Queens Quay Transit Link Study

Transcription:

underground car park Stachus, Munich European Parking Award 2015 Renovated Parking Structures

LOCATION The car park Stachus is part of the stachus building and is located underneath the Karlsplatz in Munich, that has long been a magnet for local residents and tourists. At the end of the 60 s 1.6 million road users passed the Stachus each day. To unbundle the different transport functions (car traffic, S- and U-Bahn, pedestrians), the building was dimensioned to five basement levels. The Stachus building is a combination of a shopping center, car park and railway station. 25.02.2015 CONTIPARK car park Stachus, Munich renovated car park 2

RENOVATION PROJECT The 2 storey car park was built in 1970 and suffered a lot during the past years. CONTIPARK and the owner of the Stachus building, the Stadtwerke München GmbH, renovated the car park within two years during ongoing operation. The renovation was completed in December 2013. The main focus was a complex concrete restoration. Furthermore the parking levels were modified and upgraded. The spaces have been enlarged. All technical installations were renewed. Modern parking equipment and a new signage system have been installed. before after 25.02.2015 CONTIPARK car park Stachus, Munich renovated car park 3

ADDED STRUCTURAL FEATURES For more transparency and a higher sense of security glass walls have been installed in the parking area and in the foyer. Therewith dark niches were eliminated. The new glass walls allow an open view to the rest of the building and to the elevators. The entrance situation has been changed and the 2 lanes have been relocated to an area that improves the flow of traffic. before after 25.02.2015 CONTIPARK car park Stachus, Munich renovated car park 4

LIGHTING SYSTEM A backlit ceiling over the central walkways and a new lighting concept contribute to a much brighter and customer-friendly garage. The lighting system at each level was divided into separate zones that are activated by movement dispatch riders or by time intervals. During the times with less traffic the lights are dimmed to a minimum. The activation of the light is customer-behavior-oriented and extremely power-saving. before after 25.02.2015 CONTIPARK car park Stachus, Munich renovated car park 5

TECHNICAL EQUIPMENT All technical systems (eg. fire alarm-, sprinkler-, ventilation-, electrical- and videoequipment) have been renewed. A new modern parking system has been installed with an integrated license plate recognition system by Scheidt & Bachmann. before after 25.02.2015 CONTIPARK car park Stachus, Munich renovated car park 6

ROUTING & ORIENTATION For vehicles and pedestrians a complete new leading system has been implemented to ensure better orientation. Exits, lifts and CO-alarm tips are indicated by eye-catching signs in house stile colors and pictograms. The backlit ceiling over the central walkways is a central part of the guiding system. before after 25.02.2015 CONTIPARK car park Stachus, Munich renovated car park 7

ENVIRONMENTAL IMPACT For environmental reasons, no excessive harmful emissions should be produced in underground car parks. Here, the installed LPR-system makes a considerable contribution. Using the LPR system, entrance traffic and thus CO2 emissions are drastically reduced and, at the same time, customer convenience is significantly enhanced. Also the new demand-oriented lighting system consumes less energy. 25.02.2015 CONTIPARK car park Stachus, Munich renovated car park 8

SUPERVISION Along with the renovation itself the management of the car park has been updated to Contipark standards. Due to the connection to Contiparks control center the car park is monitored 24/7 and customers will receive immediate help. 25.02.2015 CONTIPARK car park Stachus, Munich renovated car park 9