CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

Similar documents
PBN Implementation CAR/NAM Regions

ASSEMBLY 39TH SESSION

AVIATION SECURITY (AVSEC) AND FACILITATION (FAL) TRAINING AND ASSISTANCE ACTIVITIES IN THE NAM/CAR REGIONS. (Presented by the Secretariat)

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

ANI/WG/3 WP/23 5/04/16 Third NAM/CAR Air Navigation Implementation Working Group Meeting (ANI/WG/3) Mexico City, Mexico, 4 to 6 April 2016

Aviation Security (AVSEC) and Facilitation (FAL) 7.3 Other Aviation Security and Facilitation Matters

Presented by: Trinidad and Tobago

P/01REV. Accountability and Performance Report of the ICAO NACC Regional Office to Member States. Nassau, Bahamas, May 2016

TWELFTH AIR NAVIGATION CONFERENCE

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

Agenda Item 3: Review Conclusions from the E/CAR/DCA/24, RASG-PA/6 and GREPECAS PPRC/2 Meetings

(Presented by the Secretariat) EXECUTIVE SUMMARY

2012 Performance Framework AFI

(Presented by the Secretariat) SUMMARY. This Working Paper presents for the Meeting s consideration, the Draft Agenda and suggested schedule

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

PROPOSED CHANGES FOR THE CAR REGION ATS ROUTE STRUCTURE. (Presented by the Secretariat) SUMMARY

REVIEW OF THE IMPLEMENTATION REQUIREMENTS IN AIR NAVIGATION SERVICES. (Presented by the Secretariat)

ASSEMBLY 39TH SESSION

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

Review of air navigation matters 2.3 Air navigation specific activities: Aerodromes and Ground Aids (AGA)

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

21 States 19 Territories 26 Civil Aviation Authorities (CAAs) 44 Flight Information Regions (FIRs) 29 FIRs in NAM 15 FIRs in CAR.

30 SEP - 02 OCT, 2014

Russian Federation ATM modernization program

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

AIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop. ICAO NACC Office

ASBU Block 0 Implementation and Regional ANPs

NACC/WG/4 WP/16 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

Follow-up on Valid Conclusions and Decisions from NACC/DCA Meetings, Sub regional DCA Meetings and Regional Implementation Groups

Air navigation deficiencies in the CAR/SAM Regions with high risk ( U priority) (Presented by the Secretariat)

ICAO No Country Left Behind (NCLB) Campaign: NACC Regional Assistance Strategy

NAM/CAR REGIONAL ACTIVITY ON AVIATION SECURITY AND FACILITATION. (Presented by Secretariat) EXECUTIVE SUMMARY

Countries of the World

5.2 Port-of-Spain Declaration PORT-OF-SPAIN DECLARATION. (Presented by the Secretariat) EXECUTIVE SUMMARY

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

IMO/IHO World-Wide Navigational Warning Service NAVAREA IV / XII

ANI/WG/2 WP/11 22/05/15 Second NAM/CAR Air Navigation Implementation Working Group Meeting (ANI/WG/2) Puntarenas, Costa Rica, 1 to 4 June 2015

What is safety oversight?

Work Programme of ICAO Panels and Study Groups

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Performance Based Navigation (PBN) Implementation Plan. The Gambia

TWELFTH AIR NAVIGATION CONFERENCE

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

CARIBBEAN TOURISM ORGANIZATION LATEST STATISTICS 2008

UK Implementation of PBN

Review of Air Navigation Matters 2.1 Global Air Navigation and CAR/SAM developments NAM/CAR Regional Air Navigation Implementation Plan

When replying please quote: Ref.: NT-NS2-35, N E.OSG - NACC February 2016

PRESENTATION ASSET RECOVERY INTER-AGENCY NETWORK FOR THE CARIBBEAN (ARIN-CARIB)

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

TWELFTH AIR NAVIGATION CONFERENCE

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

World Tourism Organization Leading organization in the field of tourism today. Global forum for tourism policy issues and a practical source of

FLIGHT OPERATIONS PANEL (FLTOPSP)

INTERNATIONAL CIVIL AVIATION ORGANIZATION

CARIBBEAN TOURISM ORGANIZATION LATEST STATISTICS December 4, 2014

ICAO GANP Requirements and Evolution

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Proposal for the updating of the FASID ATM Evolution Tables

(Presented by United States) EXECUTIVE SUMMARY

FIRST EASTERN CARIBBEAN CIVIL AVIATION TECHNICAL GROUP MANAGEMENT E/CAR/CATG/1 FINAL REPORT

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

PREPARATION AND UPDATE OF THE STATES ACTION PLANS ON CO2 EMISSIONS REDUCTION ACTIVITIES. (Presented by Secretariat) EXECUTIVE SUMMARY

AIXM/WXXM CONFERENCE 2010

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

International Civil Aviation Organization. Regional Aviation Safety Group - Middle East

ENHANCE RUNWAY SAFETY. (Presented by the Secretariat)

NPF/SIP/2011 NPF/SIP/2011--WP/20 WP/20

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

(Presented by ECCAA) EXECUTIVE SUMMARY. This information paper, first presented as E/CAR/NTG/5 & E/CAR/RD/3 as IP/02 (22-24October 2014), presents:

Packaging Tomorrow s Aviation System

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

International Civil Aviation Organization. Runway and Ground Safety Working Group

SAMPLE TEMPLATE APPENDIX 3.5C-1

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

TWELFTH AIR NAVIGATION CONFERENCE

Central American Agency for Aviation Safety

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

TWELFTH AIR NAVIGATION CONFERENCE

Review of the measures adopted during December January 2014 period for mitigation of errors (recommended actions)

International Civil Aviation Organization. Runway and Ground Safety Working Group. Third Meeting (RGS WG/3) (Cairo, Egypt, September 2016)

Air Navigation Bureau ICAO Headquarters, Montreal

SAFETY. Global Safety Network (GSN) Diploma Programme

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Researched and compiled by Ms. Elvira Doyle, UNDESA, 27 April 2004

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

International Civil Aviation Organization. Aerodrome Certification Implementation Task Force (ADCI TF)

Participant Presentations (Topics of Interest to the Meeting) GASP SAFETY PERFORMANCE INDICATORS. (Presented by the Secretariat) EXECUTIVE SUMMARY

Many thanks to our host

Enhancing capacity beyond infrastrucutre

ASSEMBLY 39TH SESSION

COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA (AFI PLAN) NINETEENTH AFI PLAN STEERING COMMITTEE MEETING

Transcription:

E/CAR/DCA/25 WP/10 International Civil Aviation Organization 13/11/13 North American, Central American and Caribbean Office (NACC) Twenty-fifth Meeting of Directors of Civil Aviation of the Eastern Caribbean (E/CAR/DCA/25) St. John s, Antigua and Barbuda, 3 5 December 2013 Agenda Item 5: Air Navigation Matters 5.5 NAM/CAR RPBANIP version 3.0: ASBU oriented update of the Regional Implementation Plan CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION (Presented by the Secretariat) SUMMARY This working paper presents a review of the critical implementation requirements for the Eastern Caribbean (E/CAR) States/Territories related to Air Navigation Systems (ANS) associated with Performance-Based Navigation (PBN), Aeronautical Information Management Quality Management Systems (AIM QMS), Aeronautical Meteorology Quality Management Systems (MET QMS) and Aerodrome Certification. Action is presented in paragraph 3.1. References: Annex 3 - Meteorological Service for International Air Navigation Annex 15 Aeronautical Information Services Doc 9750 - Global Air Navigation Plan Doc 9854 - Global Air Traffic Management Operational Concept Doc 9882 - Manual on Air Traffic Management System Requirements Doc 9883 - Manual on Global Performance of the Air Navigation System Doc 9774 - Manual on Certification of Aerodromes Doc 8733 - Caribbean and South American Regions Air Navigation Plan Doc 9883 - Manual on Global Performance of the Air Navigation System Doc 9839 Guidelines for Electronic Terrain, Obstacle and Aerodrome Mapping Information (draft) Doc 9674 World Geodetic System 1984 (WGS-84) Manual Doc 9881 Guidelines for Electronic Terrain, Obstacle and Aerodrome Mapping Information (draft) NAM/CAR Regional Performance-Based Air Navigation Implementation Plan (NAM/CAR RPBANIP) http://www.icao.int/nacc/pages/nacc-regionalgroups-aniwg.aspx ICAO Roadmap for the transition of AIS to AIM Strategic This working paper is related to Strategic Objectives: Objectives A. Safety Enhance Global Civil Aviation Safety C. Environmental Protection and Sustainable Development of Air Transport

E/CAR/DCA/25 WP/10 2 1. Introduction 1.1 States and Territories agreed on the implementation of operational improvement strategies for Air Navigation Services (ANS) reflected as Regional Performance Objectives (RPOs) in the NAM/CAR RPBANIP, approved at the Third Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/3). The RPOs maintain a short and medium term dynamic and systemic implementation approach, identifying ANS operational improvements. The following activities should be considered of critical compliance to achieve these operational improvements. 2. Discussion PBN Implementation 2.1 The implementation of a PBN airspace concept in the E/CAR requires coordination by a multidisciplinary team to analyze Airspace Organization and Management (AOM) redesign. Airspace organization is related to providing flight, radio communication and service requirements as specified in Annex 11, Appendix 4, Table of Air Traffic Service (ATS), Airspace Classes. Airspace Management is related to Air Traffic Control (ATC) management techniques, which together are key components of the Global ATM Operational Concept, ICAO Doc 9854. 2.2 To achieve implementation of a comprehensive PBN airspace concept, States are required to implement Area Navigation (RNAV) 5/2 routes in the continental upper airspace and publish Continuous Descent Operations (CDOs) and Continuous Climb Operations (CCOs) criteria in terminal area Standard Instrument Departures (SIDS) and Standard Instrument Arrivals (STARS) with RNAV/Required Navigation Performance (RNP) navigation specifications. In addition, pursuant to Assembly Resolution A37-11, States are required to publish RNP approach procedures. The Appendix to this working paper shows the progress of PBN approach procedures in the NAM/CAR Regions. 2.3 To assist States with PBN implementation, the ICAO NACC Regional Office, in coordination with IATA and CANSO, organized the Regional PBN Airspace Concept Workshop in Miami, United States, from 11 to 22 March 2013, and the Regional PBN Operational Approval (Trainthe-Trainer) Course in Miami, United States, from 11 to 15 March 2013. Additionally, a Regional Workshop on Airspace Concept Redesign and Operational Approval of Performance-Based Navigation (PBN) was held in Mexico City, Mexico, from 25 to 29 November 2013. 2.4 As an outcome, Costa Rica, Honduras, Jamaica, Mexico, Trinidad and Tobago, and COCESNA provided information on implementing new PBN airspace projects with clear dates and milestones. The ICAO NACC Regional Office will continue to provide assistance in accordance with particular needs; however, all States and Territories from the E/CAR area should take further action to implement a comprehensive PBN airspace concept in the area. 2.5 Implementation of the PBN airspace concept is in compliance with ICAO provisions and the NAM/CAR RPBANIP regional objectives as follows: Significant improvements have been achieved in the CAR Region ATS route network with 21 new RNAV routes implemented in the Gulf of Mexico in January 2013 States will follow ICAO Standards States will develop training programmes for all concerned staff (Civil Aviation Authority, ATS, airlines, etc.) for better understanding of PBN fundamentals

3 E/CAR/DCA/25 WP/10 States will develop and implement PBN operational approval processes States will promote collaborative PBN efforts with all stakeholders States will ensure high quality aeronautical information and data associated with the publication of PBN aeronautical charts States will review their communication and navigation infrastructure, Distance Measuring Equipment/ VHF Omnidirectional Radio Range (DME/DME, VOR, etc.) coverage for PBN implementation in terminal areas 2.6 According to Resolution A37-19, all States should submit accomplishments in reducing CO 2 emissions through PBN implementation by using the online ICAO Fuel Savings Estimation Tool (IFSET). The estimation should be based on operational improvements obtained in air traffic management operational efficiency, use of infrastructure and alternative fuels. Current Status of MET QMS Implementation in the Eastern Caribbean States 2.7 The Meeting is invited to take note that the establishment of a Quality Management System for aeronautical meteorology is a requirement in support of global air traffic management. Therefore, Standard 2.2.2 of Annex 3 mandates the implementation of a properly organized quality system to provide quality management of meteorological information being supplied to aeronautical users. 2.8 It is important to emphasize the need for E/CAR States/Territories to implement MET QMS since it is essential to improve the quality and timeliness of aeronautical meteorological information provided to users in accordance with Annex 13 ICAO Standards and Recommended Practices (SARPs). 2.9 The following updated table presents the current implementation status of MET QMS processes for E/CAR States/Territories. Status of Quality Management System/Aeronautical Meteorology (QMS / MET) Implementation in the Eastern Caribbean States (E/CAR) Anguilla Antigua and Barbuda completed Barbados slightly above British Virgin Islands advanced-stage French Antilles: Guadeloupe, advanced-stage Martinique, Saint Barthélemy, Saint Martin Grenada 75% completed with assistance from Trinidad and Tobago Montserrat Saba Saint Kitts and Nevis slightly above starter stage Saint Lucia 65% complete Saint Vincent and the Grenadines 70% complete with the assistance of Trinidad and Tobago Sint Eustatius Sint Maarten Trinidad and Tobago 90% complete United States, Puerto Rico, completed Virgin Islands

E/CAR/DCA/25 WP/10 4 AIM QMS Implementation 2.10 Recent follow-up on the assessment of the PIARCO AIS QMS conducted by ICAO (March 2013) with participation and support from ASSI (UK) and ECCAA showed progress in the following documentation prepared by Trinidad and Tobago: QMS Procedure for Control of Non-Conforming Product/Service Manual QMS Procedure for Corrective and Preventive Action (CAPA) Manual 2.11 It is important to emphasize the need for E/CAR States/Territories to implement QMS as it is essential to improve the quality and timeliness of aeronautical information/data provided to users as identified by Annex 15 SARPs and Phases 1 and 2 of the ICAO Roadmap for the transition from Aeronautical Information Service (AIS) to Aeronautical Information Management (AIM). The following updated table presents updated status for both documents (QMS-P/004 and QMS-P/006): Review AIM QMS Implementation - Deployment Procedures Item tasks Action office(s) Due date Status Develop, Issue Quality Management System Procedures (QMS-Ps) QMS-P/001 - Production of a Quality Document QMS-P/002 - Control of Documents QMS-P/003 - Control of Records QMS-P/004 Control of Non-Conforming Product or Service QMS-P/005 Internal Audits QMS-P/006 Corrective Actions & Preventive Actions (CAPA) Chief AIM QMO & Project Team Not started 2.12 The following QMS elements were considered in ICAO Doc 9839, Manual on the Quality Management System for Aeronautical Information Services (Unedited Advance Version) (draft version) and included in the QMS AIM Implementation Plan developed by Trinidad and Tobago: a) QMS implementation plan b) Procedures for QMS Corrective Actions & Preventive Actions (CAPA) c) QMS internal audit procedure d) Procedure for control of AIS management system records e) Procedure for drafting AIM-QMS documents f) Procedure for control of QMS non-conforming services/products Aerodrome Certification Implementation in the Eastern Caribbean (E/CAR) States/Territories 2.13 In 2013, two workshops were carried out - Taxiway Design to Avoid Runway Incursions and Alternative Methods for Runway Excursions (25-28 June 2013); and the Regional Workshop on GREPECAS SMS and Progress Achieved in The Aerodrome Certification Progress in the CAR Region Project F1 Aerodrome Certification Improvements (14-18 October 2013) in the ICAO NACC Regional Office, Mexico City, Mexico. Several aerodrome AGA experts from both regulatory bodies and airport operators attended the above-mentioned events, which facilitated the exchange of knowledge, expertise, and best practices towards the solution of common problems at their aerodromes.

5 E/CAR/DCA/25 WP/10 Conclusion 2.14 To ensure harmonized implementation of air navigation infrastructure and services in the Eastern Caribbean, the Meeting should encourage compliance with air navigation system requirements and other operational improvement initiatives. 2.15 National implementation plans should be harmonized with the NAM/CAR RPBANIP, which also serves as guidance material to harmonize State implementation plans. 3. Suggested Action 3.1 The Meeting is invited to: a) take note of the information presented in this working paper; b) implement the ANS requirements identified in this working paper; c) identify other initiatives and/or operational improvements for a regionally harmonized air navigation system; and d) recommend other actions as deemed necessary.

E/CAR/DCA/25 - WP/10 APPENDIX END