Bihar Rajya Pul Nirman Nigam Ltd, Patna Details of Mega Progress Report

ह उस ग ए ड अर बन ड वलपम ट क प र शन सलसमट ड

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

Development of Road Infrastructure in India

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

Afghanistan. Supply, Installation, Rehabilitation, Construction Testing and Commissioning of Gardez To Khost Road in Afghanistan, Funded by USAID

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS.

Article 13, clause no of the Concession Agreement states that:

Office of the Accountant General(Audit), Bihar, Patna

Alternatives Study of Alignment

SECTION DESCRPTIONS PAGE NOS.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement

SECTION DESCRPTIONS PAGE NOS.


Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

MINUTES OF PROJECT REVIEW MEETING HELD ON

# WHAT DO YOU MEAN BY EXTRA MILEAGE ALLOWANCE (EMA)? # WHEN WE HAVE TO CHECK FOR EXTRA MILEAGE ALLOWANCE (EMA)?

Office of the Accountant General (Audit), Mahalekhakar Bhawan, R. Block, Beer Chand Patel Marg, Patna

Business Case Approved. Under Construction. Business Case Approved. Under Construction

G. D. Goenka Public School, Gwalior Holiday Assignments, Class - 4

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Combined Report Combined Report. Sl No. Fertilizer. Differ. (+/-) % age. Sample Received.

PPP Days 2010 PPPs Lessons from the Last 18 Months

Network Size and Growth

GMR Infrastructure Limited (GIL) FY17 Performance Highlights

NATIONAL HIGHWAYS AUTHORITY OF INDIA

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

IRONTON-RUSSELL BRIDGE REPLACEMENT

DETAIL NOTE ON PROJECT

ICT LIBRARY UPDATE. Bi-monthly March June 2016 Vol. 14 : No. 2 & 3. Contents

5.7 Local road upgrades

11 th Annual Conference Road Development in India Telangana State Initiatives

Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra

PROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period)

STATUS OF PPP PROJECTS AS OF 05 OCTOBER 2011

ROAD DEVELOPMENT IN INDIA 2015

LAND VALUE CAPTURE FOR RAILWAY STATION DEVELOPMENT. Changing perception of Railways

CIVIL AVIATION AUTHORITY

ROC, GURGAON S&T SBU, DETAILS OF CONTRACTS MORE THAN 02 (TWO) CRORES IN VALUE

EIA for Development of New Civil Enclave at Air Force Base. Annexure 2

DLF Ltd. Q1 Analyst Presentation

G.O.Ms.No.142 Dated:

NATIONAL HIGHWAYS AUTHORITY OF INDIA

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

25 th Avenue Grade Separation. September 13, 2017

KANNUR INTERNATIONAL AIRPORT LIMITED (KIAL) Status Report as on 5 May Total land planned for the project acres

N25 New Ross Bypass PPP Project

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

BY NHIDCL. 25 t h MAY, 2018

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

25 th Avenue Grade Separation. December 13, 2017

The presentation has been prepared for information purpose, it is not a solicitation of any offer to buy or sell any security or instruments.

MORMUGAO PORT TRUST ENGINEERING MECHANICAL DEPARTMENT

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

Karnataka Evaluation Policy and Karnataka Evaluation Authority

Ohio Department of Transportation Construction Update

DETAIL OF THE PROJECT

Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~

ICT LIBRARY UPDATE. Bi-monthly Sept. Dec Vol. 14 : No Contents

Bandra Worli Sea Link

Ferrovial increases net profit by 12%, to 287 million euro

SmartCity (Kochi) Infrastructure Private Limited SEZ

Indiabulls Real Estate Limited (CIN : L45101DL2006PLC148314)

ROADS April Contents. Advantage India. Market overview. Investments. Regulatory framework. Opportunities. Industry associations

Mundeshwari Living Transformed. Bishwanath COMPLEX

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

Port MacKenzie Rail Extension

History of Posting Place From To. Father s Name (Shri) Name(S/Sri/Smt.), Designation, Date of Birth, Home Town. Date of Promotio ns, If any

Dufferin Jog Elimination Project

IN THE MATTER OF. SCOTTISH WIDOWS LIMITED (Transferor) and. RL360 LIFE INSURANCE COMPANY LIMITED (Transferee)

RL (+) 82m to RL (+) 105m. Single Crop & Barren Land. Breakup of ownership: Private Land: 737 Acre Government Land: 123 Acre Forest Land: Nil

Public Information Center August 12, 2010

GMR Infrastructure Limited, Q1-FY 11 Performance Highlights. Financial Highlights for Q (Rs. Cr.)

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

JAIPUR METRO. One of the world s fastest project completions. A presentation by. Nihal Chand Goel Chairman & MD Jaipur Metro Rail Corporation

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

Provincial Railway Guides Section:

TORONTO TRANSIT COMMISSION REPORT NO.

26 APPLICATION FOR APPROVAL TO EXPROPRIATE WIDENING AND RECONSTRUCTION OF ST. JOHN'S SIDEROAD PROJECT 97100, TOWN OF AURORA

N11 Arklow / Rathnew & N7 Newlands Cross PPP Contract. Kieran Kelly

EXPLANATORY STATEMENT

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

Multimodal Logistics Professionals

Corridor of growth. Corridor Description and Rating NEW GURGAON. Areas Included:

BIHAR THE LAND OF BUDDHA

IAT Annual Conference 'Driving Forward

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

2010 FIFA WORLD CUP HOST CITY: CAPE TOWN

National Conference on

DECONGESTION OF ROADS IN NAIROBI

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

Maidenhead Bridge. Proposed Work

MEXICO CITY S NEW INTERNATIONAL AIRPORT 2017 ACI-LAC Conference. November 2017

PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders. February 18 th, Presented To:

ACORNS PROJECTS LIMITED

Comparison of Bangkok & Kuala Lumpur

Railways in India 2012

Transcription:

Road Construction Department AT A GLANCE 01.08.2017

Road Network under RCD (in Km) Category Total Length Single lane Intermediate Lane 2-Lane More than 2 lane National Highways 4917.19 729.21 819.95 2045.57 1322.47 State Highways 4005.56 757.13 570.23 2654.64 23.56 Major District Roads 11145.28 6044.23 3392.05 1543.26 165.74 Total 20068.03 7530.57 4782.23 6243.47 1511.77

The turnaround of the Road Construction Department is reflected in these accelerated graphs of development Rs. in Crores 3791 3782 3309 3304 4097 4086 4695 4640 4820 4532 5713 5512 6000 Outlay & Expenditure 5000 4000 Outlay 3000 2000 1000 Expenditure 0 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 Financial Year

PHYSICAL ACHIEVEMENT (KM) [UNDER ALL HEADS] Financial Year

Sl. No. PLAN OUTLAY FOR 2017-18 Name of Scheme Outlay (Crores) Expenditure (Crores) 1 Training 0.40 0.00 2 Machine and equipment 0.15 0.00 3 State Plan (Major Roads) 1150.00 416.16 4 Major Roads (SC Component) 912.54 156.16 5 Mukhya Mantri Setu Nirman Yojana 100.00 0.00 6 Central Road Fund (State Share) 0.0001 0.00 7 Indo-Nepal Border Road 450.00 396.16 8 State Plan (Bridge) 689.74 125.42 9 Central Road Fund (Central Share) 197.00 5.47 10 RIDF (NABARD) 1236.71 42.07 11 Road (ADB Loan Project) 1013.32 334.00 12 LWE (State Share) 10.00 0.00 13 LWE (Central Share) 10.00 0.00 Total 5769.86 1475.44 % Expenditure 25.57%

ONGOING PROJECTS Sr. No. Sector No. of schemes A/A Amount (in Crores) 1. Road Sector 122 2971.19 2. Bridge Sector 153 3173.78 3. NABARD (RIDF) 123 5108.04 4. ADB 12 16316.66 5. CRF 3 56.42 6. Indo-Nepal Border Road 11 1650.32

NATIONAL HIGHWAYS Total length of NHs in Bihar : 4917.19 Kms. a) Length of NHs with RCD : 2584.92 Kms. b) Length of NHs with NHAI : 2332.27 Kms.

NATIONAL HIGHWAYS Annual Plan 2016-17 Total length - 618.39 Kms Total provision - 1023.38 Crores Expenditure - 1440.93 Crores Annual Plan 2017-18 Total length - 198.50 Kms Total provision - 588.00 Crores Expenditure - 297.43 Crores

NHs under WORLD BANK PROJECTS [NHIIP] World Bank Projects (NHIIP) Sl. NH. Length Name of Project No. No. (Km) 1 2 3 4 Rehabilitation and upgrading to 2 lanes/2 lane with paved shoulders 1 98 configuration and Strengthening to Anishabad-Aurangabad-Hariharganj Section (Km 0.00 to Km 154.625) of NH-98 in State of Bihar for Lot-1 (Km 0.00 to Km 62.00) and Lot-II (Km 62.00 to Km 154.625) under Phase-I of NHIIP. 154.625 2 106 3 30A Rehabilitation and upgrading to 2 lanes/2 lane with paved shoulders configuration and Strengthening to Birpur-Bihpur Section (Km 0.0 to Km 106) of NH-106 inthe State of Bihar under Phase-I of NHIIP. Rehabilitation and upgrading to 2 lanes/2 lane with paved shoulders configuration and Strengthening to Fathua-Harnaut-Barh Section (Km 0.0 to Km 69.0) of NH-30A inthe State of Bihar under Phase-I of NHIIP. 106 69 4 104 Rehabilitation and upgrading to 2 lanes/2 lane with paved shoulders configuration and Strengthening to Sheohar - Sitamarhi - Jainagar - Narahia (Km 40 to Km 214) of NH-104 in the State of Bihar under Phase-I of NHIIP. 175 Total 504.625 Say 505.00

NATIONAL HIGHWAYS 37 various roads comprising of MDRs & SH of total length 2241 Km declared in-principle NH by MoRTH DPR preparation /submission is under different stages In addition to this Feasibility Study of 22 various roads categorised as MDRs & SHs of total length of 1694.35 Km is being done for consideration & upgradation as NH by MoRT&H Tender for preparation of PPR with feasibility report is under process.

Status of NHs under NHAI 1. Projects under implementation: S. No Name of Project Length (Km) TPC/ Annuity/ Grant 1 2 3 4 5 6 4L Hazipur - Muzaffarpur and construction of Muzaffarpur Bypass NH-77 4L Patna Bakhtiarpur NH-30 2L with PS Piprakothi-Motihari- Raxaul NH-28A 4L Forbesganj- Jogbani NH-57A 2L with PS Khagaria-Purena NH-31 2L with PS Gopalganj- Chapra NH-85 Concessionaire/ Concession Period 63.17 671/ M/s Gammon Semi -Infrastructure Annuity-94.6 Projects Ltd./ 50.65 574/Grant- 113 Cr. 68.79 373.03/Grant -149.8 Appointed Date Schedule /likely date of completion 12.08.2010 06.03.2013/ June,2018 (PCC issued on 01.09.2016) Physical Progress (in % age)/length completed 78.32%/ 47.75 Km M/s BSC-C&C JV 26.09.2011 24.03.2014/ Sept., 17 99.45%/ 49.95 Km (PCC issued on 10.04.2015) M/s Tantiya10.10.2011 07/04/2014/ 50.98%/ Construction Ltd. 31.12.2017 42.526 Km 9.258 247.36 M/s JKM Infra. 18.04.2016 17.04.2018 5%/ 0.63 Projects Ltd. Km (EPC) 140 664/ Semi Annuity-56 Cr. M/s Punj Lloyd05.10.2011 02/04/2014/ 99.14% / Ltd. June, 17 (PCC138.80 Km issued on 04.11.2013 07.12.2015 06.12.2017 45.78%/ 66.45 Km 94.26 644.27 M/s G R Infra. Project Ltd.(EPC)

S. No Name of Project Length (Km) 7 8 9 10 11 12 13 14 4L Patna to Koilwar section NH-30 4L Koilwar to Bhojpur NH- 30&84 4L Bhojpur - Buxar section NH-84 4L Bakhtiyarpur- Mokama NH-31 4L Simaria- Khagaria NH-31 4/2L Chhapra- Hazipur NH-19 2L with PS Muzaffarpur Sonbarsa NH-77 2L with PS Mokama-Munger NH-80 Status of NHs under NHAI TPC/ Annuity/ Grant Concessionaire/Co ncession Period Appointed Date Schedule /likely Physical Progress date of completion (in % age)/length completed 33.25 597.96 M/s MadhuconAgreement signed on 09.09.2015 with M/s. Projects Ltd. Madhucon Projects Ltd. Appointed Date is yet (EPC) to be fixed. 43.85 825.17 M/s PNC-Agreement signed on 09.09.2015 with M/s. SPSCPL(JV) PNC-SPSCPL (JV). Appointed Date is being (EPC) fixed with 62% length with the consent of the Contractor. 47.90 681.67 M/s PNC-Agreement signed on 09.09.2015 with M/s. SPSCPL(JV) PNC-SPSCPL(JV). Appointed Date is yet to be (EPC) fixed. 44.60 837.09 M/s BSCPL14.06.2017 13.12.2019 (EPC) 60.23 567 M/s Punj Lloyd05.10.2016 03.04.2019 Subgrade work Ltd. (EPC) in progress 66.74 575/ M/s Muducon27.01.2011 25/11/2013 / 61.00% / Semi Projects Ltd. March,2018 23.50 Km Annuity- 65.43Cr. 82.697 512/ Semi Annuity 52.40 Cr. 69.27 351.5/ Semi Annuity 39.94 Cr. M/s BSC-C&C JV 30.05.2011 25.11.2013/29.06 96.68% / 81.15.2015(PCC)/31.1 Km 2.2017 M/s BSC-C&C JV 15.05.2011 14/05/2013(PCC 88.19 % / 60.48 issued onkm (Balance 19.01.2013) work under negative CoS)

S. No Name of Project Length (Km) 15 16 17 18 19 4L Patna - Gaya- Dobhi NH-83 2L with PS Chapra- Rewaghat- Muzzafarpur NH- 102 2L with PS Biharsharif - Barbigha Mokama NH-82 6L Varanasi Aurangabad NH- 2 4L Gopalganj- Muzzafarpur LMNHP-10 NH- 28 Status of NHs under NHAI TPC/ Annuity/ Grant Concessionaire/C oncession Period 127.12 1232 M/s IL&FS Engineering and Construction ltd.(item Rate) Appointed Date Schedule /likely date of completion Physical Progress (in % age)/length completed 10.04.2015 09.04.2018 1.12 % / 0.96 Km 73.08 397.29 M/s G R Infra. 05.04.2016 04.04. 2018 70.00% / 58.35 Project Km Ltd.(EPC) 54.76 297.27 M/s G R Infra. Agreement signed on 09.09.2015 with M/s GR Project Ltd.(EPC) Infra projects Ltd. Appointed date is yet to be fixed. Appointed date delayed due to stage I forest clearance which has been now obtained 192 (57 km in UP and 135 km in Bihar) 2848/ Grant- 565 Cr. M/s Soma Isolux (JV) 38 263.97 Balance work be awarded vide MoEF letter dated 20.06.2017.. 12.09.2011 09/03/2014 / March,2018 42.60 % / 90.85 Km(58.54 Km in Bihar & 32.29 Km in UP) All works completed except 2 lane bridge at Gandak river and approaches. Due to nonperformance of contractor the contract was terminated on 14.01.2016. Length completed 37.50 Km. DPR for remaining work is under progress.

S. No Name of Project Length (Km) 20 21. 22. 4L Gorakhpur- Gopalganj LMNHP-9 NH-28 2L with PS Maheshkoot- Saharsa- Purnea (Pkg- II) NH-107.(on EPC) Construction of 2-lane approach road to Munger Ghat Road cum Rail Bridge at Munger NH- 333B.(on EPC) Status of NHs under NHAI TPC/ Annuity/ Grant Concessionaire/C oncession Period Appointed Date 19.195 357.14 M/s PCL October- 2005 21.89 541.84 M/s Punj Lloyd 30.06.201 Ltd./Item Rate 5 M/s Gammon India Ltd 87.96 736.01 Cr. 14.517 227.27 Cr. M/s S.P. Singla Constructions Pvt. Ltd. Schedule /likely date of completion 27.10.2008/ Terminated on 11.11.2013. Physical Progress (in % age)/length completed 46%/ 19.195 Km 29.06.2017 59.00%/ 16.96 Km LOA issued on 31.03.2017.Agreement to be signed which is delayed due to change in name of the bidder. Agreement signed on 17.04.2017. Appointed date yet to be fixed.

2. Projects yet to be awarded : Sl. No 1 2. 3. 4. 5. Name of Project 2L with PS Maheshkoot- Saharsa-Purnea (Pkg-I) NH-107 4L Aunta- Simaria (including 6 lane Ganga bridge) NH-31 Development of newly declared NH-527C from Majholi to Charout Section to 2lane Standard Upgradation to 4-lane standard of NH-131A from km 34.578 near Narenpur to km 81.00 near Purnea (design chainage km 6.00 to km 55.00) Construction of 4 Lane bypass around Kishanganj Town on NH-31 Status of NHs under NHAI Length (km) TPC/ Civil Cost (in cr.) Target for Award 90 573.70 July, 2017 8.150 64.2 0 714.53 July, 2017 551.60 March 2018 49 978.71 March 2018 15 340.79 March 2018 Present Status 2 nos. of Bids on EPC received on bid due date of 12.05.2017. Evaluation is underway. 03 nos. of bids on HAM received on due date 23.05.2017. Evaluation is underway. EFC proposal was submitted to the Ministry which was returned due to non-availability of adequate land. 3D in progress Revised PPPAC proposal was submitted to the Ministry which was returned for want of sufficient land. 3D in progress. EFC proposal was submitted to the Ministry which was returned due to non-availability of adequate land. 3D in progress

Sl. No 6. 7. 8. 9. 10 Name of Project 4-laning of Munger- Mirzachowki section of NH-80 Patna Ring Road ( M/s CES India Pvt Ltd) 2L with PS Ekangarsarai- Jehanabad Arwal NH-110 4-laning of Bakhtiyarpur- Biharsharif-Rajauli- Barhi section of NH- 31 from km 47.723 to km 154.500 6L of Aurangabad Barachatti- Bihar/JH border NH-02 Status of NHs under NHAI Length (km) 125 65 55 106.77 7 70 TPC/ Civil Cost (in cr.) To be updated To be updated To be updated To be updated Target for Award March 2018 March 2018 March 2018 March 2018 Present Status The DPR of the project was being undertaken by the Ministry which transferred the project to NHAI in June, 2016. 3(a) done for Bihar portion and 3A in progress. For Jharkhand portion, 3(a) is in progress. Design Consultant M/s SAI Engineers Pvt. Ltd. Feasibility report is under preparation by consultant in consultation with State Govt. reg alignment which is yet to be finalized Since entire stretch has been taken up by Ministry. It was proposed to drop this stretch from NHDP. However, the same has not been agreed to. The project was with BSRDC which has been transferred to NHAI recently. DPR is to be updated. Under finalization of contract The project is under RO-Jharkhand package

Total length - 4005 Km 2-laning already done under- State Highways RSVY - 1702.10 Km ADB - 544.24 Km CRF/LWE - 125.58 Km Others - 144.04 Km 2-laning ongoing under ADB - 866.25 Km Maintained under OPRMC - 1569.00 Km SBD/CMBD (ongoing) - 419.82 Km Under process for AAP 2017-18 (3 rd Phase) [SH-70, 71, 96, 54, 74 & 75] - 360.05 Km

State Highways in process of ADB financing Sl. No. SH No. Name of SH Length Total Project Cost (Rs. In Cr.) District Covered 1 58 Kishunganj Vijay Ghat Road 29.48 182.75 Madhepura & Bhagalpur 2 82 Kadirganj Sonho Road Upto Khaira ) 75 432.19 Nawada and Jamui Districts 3 84 Ghogha Barahat Road (Up to Pinjwara) 43.35 265.53 Bhagalpur and Banka 4 85 Akabarnagar Amarpur Road. 29.3 145.54 Bhagalpur & Banka 5 102 Bihia (NH-84)-Jagdishpur Piro Bihta (SH-81) 54.519 404.69 Bhojpur 6 105 Betiah to Bhikhnathori 74.6 381.03 West Champaran

Major District Roads Total length - 11145 Km Length maintained under OPRMC - 6516.00 Km Periodic Maintenance done - 3872 Km Length under different ongoing schemes - 1793.22 Km Plan - 1308.52 Km NABARD - 189.56 Km LWE - 30.50 Km Under Tender Process - 264.64 Km Approved in AAP 2017-18 (Upto 2 nd Phase) - 569.77 Km Under process for AAP 2017-18 (3 rd Phase) - 45.93 Km

Long term Output and Performance Based Road Maintenance Contract (OPRMC) Provision of Initial Rectification, Ordinary Maintenance, Minor Improvement, Periodic Maintenance & Emergency Works in roads taken up under OPRMC Road Maintenance Grievance Redressal System working at HQ GPS enabled Road Ambulance working. Online OPRMC Monitoring System working. Toll Free Helpline Number 1800-345-6233 Schemes Details: Sanctioned Length 9,064 km No. of packages 76 Sanctioned Amount 2,579 crore Currently maintained: SH : MDR : PM Work done till date : 1569 Km 6516 Km 5790.84 Km

Patrol Maintenance Units

Maintenance work in progress

Status of Bridge Schemes under Road Division Year Total no. of sanctioned bridge Completed Ongoing Under Tender 2014-15 86 53 33-2015-16 5 2 3-2016-17 26 2 12 12 TOTAL 117 57 48 12

Indo-Nepal Border Road Project under Road Divisions

SALIENT FEATURES: Approval by Cabinet Committee on Security (CCS) so far For portion within Bihar Length - 564 Km Cost - 1702.00 Cr. Average cost per km 3.02 cr. Approval communicated to Govt. of Bihar vide Ministry of Home Affairs, Govt. of India letter no. 11012/11/2010 BM-V dt. 01.12.10. State Govt. to bear cost of : i) Land Acquisition ii) Statutory clearances including Environment, Forest & Wildlife iii) Maintenance of road assets after completion of project. 121 no. of bridges additionally required for the road has been sanctioned under Nabard,the State Plan cost Rs. 983.81 Cr.

ALIGNMENT Road alignment in Bihar (NW to SE) : Madanpur (near Gobarahiya) on NH 28B (Distt- West Champaran 111.098 Km) near UP Border. The adjacent BOP in UP is Patlawa. East Champaran -77.242 Km, Sitamarhi 89.925 Km, Madhubani 39.21 Km, Supaul 40.99 Km, Araria 102.128 km Galgalia (District Kishanganj 91.70 Km) on Bihar West Bengal Border. The adjacent BOP in West Bengal is Dangujote.

Stretch wise revised tentative cost & time line Road District Length (in km) 1. Madanpur near Gobarahiya to Bhangaha. 2. Bhangaha to Dhutaha River Bridge. 3. Dhutaha River Bridge to Phulwaria Ghat at Lalbakiya River. West Champaran West Champaran East Champaran Cost (in cr.) Tentative revised cost( in cr) Revised target of completion 80.10 237.96 415.492 31.03.2019 30.998 93.44 142.609 31.03.2019 77.242 238.34 356.500 31.03.2019 4. Phulbaria Ghat at Lalbakiya River to Bahar Village. 5. Bahar Village to Kanhauli. 6. Kanhauli to Sursand Sitamarhi 24.05 70.56 131.628 31.03.2018 Sitamarhi 10.925 36.71 57.186 31.03.2019 Sitamarhi 49.15 147.75 223.226 31.03.2019 7. Bhittha More to Parsa Sitamarhi 5.80 16.81 26.987 31.03.2019

Stretch wise revised tentative cost & time line Road District Length (in km) Cost (in cr.) Tentative revised cost ( in cr) Revised target of completion 8. Parsa to Akharar Ghat Madhubani 10.61 31.52 48.935 31.03.2019 9. Jhori Chowk to Bhutaha Chowk 10. Saraigarh (Gariya Chowk) to Refugee Colony 11. Refugee Colony to Mirganj Chowk on NH-57A 12. Mirganj Rly. crossing to kuari Bypass (33.70 km) & Sikti to Dhabeli (12.10 km) Madhubani 28.60 85.11 121.100 31.03.2019 Supaul 40.99 117.70 167.370 31.03.2018 Araria 44.328 128.03 174.310 31.03.2018 Araria 45.80 134.007 152.620 31.03.2018 13. Kuari to Sikti Araria 12.00 30.080 35.815 30.06.2016 14. Dhabeli to Fatehpur Kisanganj 12.20 29.200 28.839 31.03.2017 15. Fatehpur to Galgalia Kishanganj 79.50 258.770 355.330 31.03.2019 Total 552.293 1655.987 2437.947 i.e @ Rs 4.41 cr. / km

Status of Annual Action Plan 2016-17 Category As per A/A issued Present Status No. / Length (Km) Cost (Crores) Tender Status NIT Not NIT Work in progress Completed Road Schemes 73 nos. (721.05 Km) 1600.10 20 5 45 3 Bridges Schemes 27 nos. 140.64 15 1 10 1

Status of Annual Action Plan 2017-18 (1 st & 2 nd Phase) Category As per approved Action Plan As per A/A issued Status of Tender invitation Length (Km) Cost (Crores) Length (Km) Cost (Crores) (No/Length) Major District Roads (including NABARD, CRF) 569.77 Km (69 nos.) 1453.236 132.47 Km (23 nos) 285.91 10 (91.64 Km) Bridges (nos) 20 nos. 162.93 1 nos. 2.89 -

Contractor's Performance Evaluation based on work done from 2012-13 to 2016-17: Sl. No. Reported by No. of contractors 1. Road & NH Divisions (As per report received from56 divisions) Defaulter contractors 2. BSRDC 13 Nil 3. BRPNNL 38 07 Remarks 50 06 Evaluation of performance going on Disciplinary action against defaulter contractors under RCD 1. Blacklisting - 09 Nos. (i) For 10 years - 07 Nos. (ii) For 15 years - 01 Nos. (iii) For Indefinite period - 01 Nos. 2. Suspended Contractors - 03 Nos. 3. Demoted Contractors from Class I to II - 02 Nos. 4. Debarred Contractors - 71 Nos.

ifkksa ds vf/kxzg.k,oa dk;z ;kstuk dh LohÑfr gsrq fuxzr ekxznf'kzdk ds eq[; fcunq jkt; ljdkj ds n`f"v ifk 2020 (Vision 2020) ds v/khu jkt; ds fdlh Hkh dksus ls jkt/kkuh ivuk vkus esa vf/kdre ik p?k.vs dk le; yxs] bl fu.kz; ds vkyksd esa ifk fuekz.k fohkkx }kjk fueu izkfkfedrk fu/kkzfjr dh x;h gs%& (i) (ii) (iii) (iv) lhkh jkt; mpp ifkksa dks U;wure 2&ysu (7-00 ehœ) esa pksm+hdj.k dk;za lhkh o`gn ftyk ifkksa dk U;wure buvjesfm,v ysu (5-50 ehœ) esa pksm+hdj.k dk;za fohkkxh; ifkksa ij flfkr ladh.kz,oa ttzj iqy@iqfy;ksasa dks vkj0lh0lh0 iqy@iqfy;k ls izfrlfkkiua jkt; mpp ifkksa,oa o`gn ftyk ifkksa ij c<+ s gq, ;krk;kr?kuro (Traffic Density),oa O;kolkf;d Hkkjh okgu (Axle Load) ds dkj.k ifkksa ij flfkr LØww ikbzy iqyksa ds LFkku ij mpp Lrjh; vkj0lh0lh0 iqy dk pj.kc) rjhds ls fuekz.ka

(v) ckjgeklh lm+d leidz (All-weather road connectivity) ds eísutj ck/kk;qdr iqy&iqfy;ksa (;Fkk submersible bridge, (vi) (vii) causeway, low level culverts etc.) ds LFkku ij ck/kk jfgr pksm+s iqyksa dk fuekz.ka jkt; ds fdlh Hkh dksus ls jkt/kkuh ivuk igq pus esa vf/kdre ik p?kavs le; yxs] bl fufeùk lacaf/kr fohkkxh; ifkksa ds lkfk&lkfk osdfyid ekxksza dk vf/kxzg.k,oa rn~uqlkj ;krk;kr?kuro,oa okgu Hkkj ds vuqlkj i;kzir Js.kh (adequate configuration) esa fodflr djuka jkt; ds ifkks a ij c<+rs ;krk;kr?kuro (Traffic Density),oa Hkkjh okguksa (Axle Load) dks ns[krs gq, NH, SH,oa MDR ds Missing Link dks tksm+ +dj Star-Grid Pattern ij mpp xfr xfy;kjk (High Speed Corridor) fodflr djuka (viii) 'kgjksa esa tke dh lel;k dks ns[krs gq, ;krk;kr dks lqxe cukus gsrq fohkktd lfgr cgq ysu ifk (Multi Lane with Divider),oa nzqr xfr ls ty fudklh gsrq ukyk dk fuekz.k djuka

(ix) (x) (xi) osls ladh.kz 'kgjh ifk (Bottleneck) tgk yxkrkj tke dh lel;k jgrh gs,oa ifk dk pksm+hdj.k lahko ugha gs] osls 'kgjh {ks= esa osdfyid ekxz ds :i esa ckbzikl dk fuekz.k djuka jkt; ds v/khu i;zvu] lklñfrd egro] fof'kf"v Ñf"k mriknd {ks= rfkk jkt; ds izeq[k cktkj dks fpfugr dj buds mùke lm+d leidzrk (road connectivity) ds fy, izeq[k ekxksza dk p;u,oa rn~uqlkj i;kzir Js.kh (adequate configuration) esa fodkl dk;za ifk iz{ks= esa jk"vªh;,oa vurjkz"vªh; Lrj ij iz;qdr u;s rduhd (technology) dk mi;ksx dj jksm ls Vh (Road Safety) ds ekud izko/kkuks a ds vuq:i jksm usvodz (Road Network) dk O;kid,oa lqn`<+ fodkla

(xii) (xiii) ftyk eq[;ky; dks vuqeamy,oa iz[k.m dk;kzy;ksa ls tksm+us okys fohkkxh; ifkksa dk vko';drk,oa ;krk;kr?kuro ds vuqlkj pksm+hdj.k rfkk lqn`<+hdj.k djuk vksj vkink izca/ku,oa iz'kklfud laosnu'khyrk ds vkyksd esa u;s csdfyid ekxz @ ckbzikl dk fuekz.ka mijksdr y{; dks izkir djus gsrq vke tuksa @ tu izfrfuf/k;ksa ls izkir lq>ko dh leh{kk dj fuekz.k ij fopkj fd;k tk,xka

vu; fohkkxksa ls ifkksa dk vf/kxzg.k ifk fuekz.k fohkkx ds v/khu miyc/k lalk/kuksa ds Optimum mi;ksx,oa lq'kklu ds dk;zøe ds vurxzr fu/kkzfjr y{;] ;Fkk&jkT; ds lqnwj ftys ls ik p?kavs esa jkt/kkuh ivuk igq puk] Traffic Congestion dks nwj djus,oa?kuh vkcknh okys {ks=ksa esa osdfyid ekxz dk fuekz.k vkfn gsrq u;s ifkksa dk vf/kxzg.k fufer fohkkxh; ladyi la0 935¼,l½ fnukad 07-02-2017 }kjk ekinam fueuor~ fu/kkzfjr dh xbz gs%& ¼i½ ¼ii½ ifk] ljdkjh fudk;@lalfkku@i"kzn@fohkkx ds v/khu gks,oa iwoz ls ifk dk ekxz js[kkad.k ¼alignment½ fu/kkzfjr gksa,sls ifk tks nks jk"vªh; mpp ifkksa] nks jkt; mpp ifkksa],d jkt; mpp ifk ls nwljs o`gn~ ftyk ifk],d jk"vªh; mpp ifk ls nwljs jkt; mpp ifk ;k o`gn ftyk ifk vfkok nks o`gn ftyk ifkksa vfkok egroiw.kz LFkkuksa ;Fkk egroiw.kz i;zvu LFky] egroiw.kz Ñf"k mriknu {ks=] fodkl'khy vks ksfxd {ks=] egroiw.kz lkalñfrd {ks= br;kfn dks tksm+rk gksa

¼iii½ ¼iv½ ¼v½ ivuk jkt/kkuh {ks= (Patna Capital Region),oa 'kgjh {ks= esa im+us okys ifkks a ds ekeys esa ifk Hkwfe dh pksm+kbz ¼Right of Way½ 8-5 ehvj okanuh; gksxh] ijurq U;wure 6-0 ehvj ifk pksmkbz ds ifkksa dk Hkh p;u fd;k tk;sxk] c'krsz Hkfo"; esa mldh pksm+hdj.k dh lehkko;rk gksa ifk fodkl n`f"vifk&2020 ds vuq:i fu/kkzfjr uhfr@y{; ds vkyksd esa xzkeh.k {ks= esa im+us okys ifkksa ds ekeys esa ifk Hkwfe dh pksm+kbz ¼Right of Way½ 8-5 ehvj okanuh; gksxh] ijurq U;wure 6-0 ehvj pksm+kbz ds ifkksa dk Hkh p;u fd;k tk,xk] c'krsz Hkfo"; esa mldh pksm+hdj.k dh lehkko;rk gksa lkfk gh ifk esa ;krk;kr?kuro de ls de 2000 PCU@fnu gksa iz/kku ea=h xzke lm+d ;kstuk ds izlrkfor f}rh; pj.k ds vurxzr muu;u gsrq LohÑr@izLrkfor xzkeh.k ifkksa dk vf/kxzg.k ugha fd;k tk,xka

¼vi½ fo'ks"k ifjflfkfr esa ifk _a[kyk ds fodkl ¼Road Network Development½] i;zvu] jkt; lhek ls lacaf/kr ifkks a ds fy, mijksdr fu/kkzfjr ekinam esa NwV fn;k tk ldsxka ¼vii½ osls ifk tks fdlh l?ku vkcknh {ks= okys o`gn ftyk ifk @ jkt; mpp ifk @ jk"vªh; mpp ifk dks ckbzikl djrk gks mls ifk fuekz.k fohkkx }kjk vf/kxzg.k dh tk ldrh gs ftlds fy, vu; 'krksza esa NwV nh tk ldrh gsa ¼viii½ ifk fodkl n`f"vifk&2020 ds vurxzr fcgkj ds fdlh nwjlfk LFkku ls 5?kaVs es a ivuk igq pus ds eísutj osdfyid ifk ds :i esa fdlh xzkeh.k ifkksa dk p;u dj vf/kxzg.k fd;k tk ldsxk, ftlds fy, vf/kxzg.k ds mijksdr 'krksza esa NwV fn;k tk ldsxka ¼ix½ ifk esa dksbz nkf;ro yafcr u gksa vu; fohkkx ls glrkarfjr ifk] tks iwoz esa ljdkj ds fdlh Hkh ;kstuk ds vurxzr fufezr dh x;h gks vksj vke tuksa }kjk ftldk mi;ksx fd;k tkrk gs] osls ifkksa ds ifk fuekz.k fohkkx }kjk vf/kxzg.k ds i'pkr~ oùkzeku ROW (Right of Way) ij fdlh Hkh js;r dk fdlh Hkh izdkj dh Hkwfe vf/kxzg.k ds eqvkots dk nkok jkt; ljdkj vksj ifk fuekz.k fohkkx }kjk eku; ugha gksxka

dk;z ;kstuk p;u gsrq xfbr lfefr orzeku esa ifk fuekz.k fohkkx }kjk mijksdr fu/kkzfjr izkfkfedrk ds vuq:i,oa miyc/k lalk/ku ds eísutj ifkksa @ iqy&iqfy;ksa ds fuekz.k @ muu;u gsrq okf"kzd dk;z ;kstuk LohÑr dj bldk dk;kzuo;u fd;k tkrk gs] ftls cnyrs ifjos'k esa bls ikjn'khz] lalfkkxr,oa ifj;kstuk dk;kzuo;u esa dq'ky izca/ku gsrq ekxzn'khz fl)kar fuxzr fd;k x;k gsa lhfer lalk/ku ls o`gn isekus ij ifkksa @ iqy&iqfy;ksa dks fuekz.k @ muu;u@ j[k&j[kko gsrq fohkkx }kjk LohÑr fd;s tkus okys okf"kzd dk;z ;kstuk dks vksj O;kid] izhkkoh,oa ikjn'khz cukus dh vko';drk eglwl dh tk jgh gsa rn~vkyksd esa fohkkx }kjk okf"kzd dk;z ;kstuk ds LohÑfr,oa vu; fohkkx ds ifkksa ds vf/kxzg.k gsrq fueuor~ ekxzn'kzu fl)kur fu:fir fd;k x;k gs%&

iz/kku lfpo@lfpo] ifk fuekz.k fohkkx dh v/;{krk esa,d lfefr dk xbu fueuor~ fd;k x;k gs%& ¼i½ iz/kku lfpo@lfpo] ifk fuekz.k fohkkx] fcgkj & v/;{k ¼ii½ ¼iii½ vfhk;ark izeq[k&lg&vij vk;qdr&lg&fo'ks"k lfpo] ifk fuekz.k fohkkx] fcgkj & lnl; lfpo vfhk;ark izeq[k&lg&vij vk;qdr&lg&fo'ks"k lfpo] xzkeh.k dk;z fohkkx] fcgkj & fo'ks"k vkeaf=r lnl; ¼iv½ eq[; vfhk;ark] uxj fodkl,o vkokl fohkkx & fo'ks"k vkeaf=r lnl; ¼v½ eq[; vfhk;ark ¼vuqJo.k½] i0fu0fo0 & lnl; ¼vi½ eq[; vfhk;ark] mùkj fcgkj mihkkx] i0fu0fo0 & lnl; ¼vii½ eq[; vfhk;ark] nf{k.k fcgkj mihkkx] i0fu0fo0 & lnl; ¼viii½ eq[; vfhk;ark] jk0m0i0 mihkkx] i0fu0fo0 & lnl;

lfefr ifj;kstukvksa ;Fkk ifkksa@iqy&iqfy;ksa,oa vu; lajpukvksa ds fuekz.k@muu;u gsrq LFky fujh{k.k,oa lehkko;rk izfrosnu (Feasibility Report) ds lkfk izkir izlrko dh leh{kk dj okf"kzd dk;z ;kstuk dh vuq'kalk djsxha lfefr bl ckr ij Hkh /;ku j[ksxh fd ;kstukvksa ds p;u esa {ks=h; vlekurk HkkSxksfyd n`f"vdks.k ls de ifk /kuro okys {ks= ds lkfk fu/kkzfjr y{; dks gkfly djus gsrq vko';drkuqlkj ifk dks 'kkfey djus dk iz;kl djsxha okf"kzd dk;z ;kstuk dh LohÑfr gsrq ;kstukvksa dk p;u fu/kkzfjr izkfkfedrk,oa ekxzn'khz ekin.m ds vuq:i dh tk;sxha {ks=h; inkf/kdkfj;ksa ls mdr ds vkyksd esa lahkko;rk izfrosnu (feasibility report ) izkir dj lfefr ds le{k fopkjkfkz izlrqr fd;k tk,xk,oa lfefr dh vuq'kalk@earo; ij iz/kku lfpo@lfpo ds ek/;e ls fohkkxh; ea=h ls vuqeksnu izkir djsaxsa

okf"kzd dk;z ;kstuk ds dk;kzuo;u gsrq fuf/k ds lzksr & nh?kzdkyhu n`f"vifk ¼Vision Document½ ds vk/kkj ij ;kstukvksa ds p;u esa okf"kzd mn~o;; dk /;ku j[kk tk;sxk,oa jkt; ;kstuk en] ukckmz ¼RIDF½] dsunzh; lm+d fuf/k] ckg~; leiksf"kr fuf/k ¼;Fkk&,f'k;u fodkl csad ¼ADB½] JICA] fo'o csad ¼World Bank½,oa vu; lalfkkvksa½ ds vurxzr izkir _.k,oa fuos'k dk vkdyu dj blds vurxzr p;u dh tkus okyh ;kstukvksa ds dk;kzuo;u ds fy, dqy lalk/ku ij foùk fohkkx dh lgefr izkir dh tk;sxha fu/kkzfjr izkfkfedrk ds vuq:i p;fur ifk ;fn orzeku esa OPRMC ds v/khu la/kkfjr fd, tk jgs gsa rks vksfpr; ds lkfk foyksiu (Deletion) dh vko';drk dks m)`r djrs gq, fu;ekuqlkj,sls ifk@ifkka'k dks OPRMC isdst ls foyksiu (Deletion) djus ds mijkar gh ifj;kstuk dh LohÑfr fn;k tkuk gs,oa vu; fohkkxksa ls vf/kxzfgr gksusokys ifkksa dks j[k&j[kko dh lwph ls foyksiu Hkh lacaf/kr fohkkx }kjk fd;k tkuk gsa

Bihar Rajya Pul Nirman Nigam Ltd. The Corporation was on the verge of closure on account of massive accumulated losses till 2005. Turnover (work done) Increased from 417.00 Crores in 2007-08 (Actual) to 1750.00 Crores in 2016-17 (Estimated) Profit after tax Increased from 45.44 Crores in 2007-08 (Actual) to 75.00 Crores in 2016-17 (Estimated) 1736 bridges constructed till date Rs. 95.00 Crores contributed to CM s Relief Fund.

Turn over (Rs. crore) 2000 1800 1739.32 1698.99 1750 1600 1158.42 1400 1294.36 858 1200 1158.42 1000 800 756 853 600 400 417.48 200 0 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 (Estimated)

BRIDGES Mega bridges ( above 100 Cr) - (i) Ganges (a) Karjan (Bakhtiyarpur)-Tajpur (1602 Cr) on BOT Work started 8 th Apr-2011 Completion Date July 2019 (as per EOT) Status work in progress. (b) Arrah - Chapra (676 Cr) Work started July-2010 Expected completion June 2017 Status Inaugurated (c) Sultanganj Aguwani Ghat (1710 Cr) Work started May 2015 Scheduled completion Nov 2019 Status work in progress

BRIDGES contd (ii) Gandak (a) Between Bettiah & Gopalganj (Rs. 826 Cr.), Work started June 2009 Revised date of completion March 2016 Status Bridge Inaugurated & Land acquisition for connectivity part is in progress. (b) Sattarghat in 27 th Km of Chakia-Kesaria-Sattarghat Road (Rs. 263 Cr) Work started Oct 2012 Likely Date of Completion June 2018 Status Work in progress (c) Bangraghat between Muzaffarpur and Saran (Rs. 509 Cr) Work started April 2014 Likely Date of Completion December 2018 Status Work in progress

BRIDGES contd.. (iii) Kamla - (iv) Sone - (v) Falgu (Vi) Koshi Bridge between Gandaul and Biraul including other structures and 11 Km approach road (Rs. 332 Cr.) Work started March 2013 Likely date of completion Dec 2017 Status Work in progress Between Daudnagar and Nasriganj (619 Cr) Work started March 2014 Likely date of completion March 2018 Status Work in progress 6-Lane bridge between Gaya and Manpur (65 Cr.) Work started March 2013 Likely completion date Dec 2015 Status Inaugurated 4-Lane HL RCC Bridge at Vijay Ghat with ROB(368 Cr.) Work started July 2010 Likely completion date Sept 2017 Status Bridge Completed & Inaugurated, ROB Parts is in Progress, L.A. Issue in 850m approach at Pratap Nagar Vill.

Mukhya Mantri Setu Nirman Yojana Sanctioned - 6194 nos. Cost - 3674.87 Cr. Completed - 5109 nos.

BRIDGES contd.. FLYOVERS 1. Flyover between Mithapur ROB round about to Chiraiyatanr bridge via Station Road and extension of Exhibition Road arm of Chairaiyatanr bridge upto Gandhi Maidan (168 Cr) Work started June 2013 Likely date of completion June 2016 Status Exhibition Road arm completed and inaugurated Mithapur ROB to Chiraiyatand Arm Work in progress Likely date of completion Sept. 2017 2. Mithapur ROB to Bhikhari Thakur Flyover via R' Block (166 Cr) Work started Nov 2015 Scheduled completion Nov 2018 Status Foun-62%, Sub St 25% (Now work stop due to Design Issue)

BRIDGES contd.. FLYOVERS 3. Mithapur flyover to Chiraiyatand Flyover via Karbigahiya (122 Cr) Work started Nov 2015 Scheduled completion Nov 2018 Status Foundation 36 % (Now work stop due to Design Issue) 4. Lohiya Path Chakra between Lalit Bhawan and Vidyut Bhawan on Bailey Road (392 Cr) Work start date Jan 2016 Scheduled completion Dec 2017 Status Work in progress.

BRIDGES contd.. OTHER IMPORTANT PROJECTS (above 100 Cr) 1. North Road approach of Rail cum Road Bridge over river Ganga between Digha and Sonepur (245 Cr) Work started Dec 2015 Date of completion June, 2017 Status-Inaugurated 2. Extended approach road of Dhanha Ratwal bridge over river Gandak in West Champaran district (125 Cr) Work started Aug 2015 Scheduled completion Nov 2017 Status Work in progress. 3. Const. of Pontoon Bridge in U/S & D/S Parallel to M.Gandhi Setu. Work started Dec 2015 Scheduled completion June 2017 Status One lane completed and Inaugurated. Work of another lane in progress.

Sl. Ongoing Schemes under Bihar Rajya Pul Nirman Nigam Ltd Head No. of Ongoing Schemes Rs in Crore 1 Nabard RCD 29 5003.54 2 Nabard Indo-Nepal RCD 85 607.25 3 Nabard RWD 7 103.22 4 CRF 2 8.30 5 MMSNY 43 147.01 6 ACA 1 187.85 7 BDF 3 40.45 8 Deposit MP Fund 1 4.70 9 Non Plan 3 10.61 10 Plan 41 2496.96 11 ROB 1 27.27 12 World Bank 58 534.47 Total 274 9171.63

Summary of schemes to be completed till March, 2018 by Bihar Rajya Pul Nirman Nigam Ltd Sl. Head Schemes to be completed till March, 2018 Rs in Crore 1 Nabard RCD 27 3249.47 2 Nabard Indo-Nepal RCD 85 607.25 3 Nabard RWD 7 103.22 4 CRF 2 8.30 5 MMSNY 43 147.01 6 ACA 1 187.85 7 BDF 3 40.45 8 Deposit MP Fund 1 4.70 9 Non Plan 3 10.61 10 Plan 33 1951.57 11 ROB 1 27.27 12 World Bank 30 240.71 Total 236 6578.41

Details of Interchanges Flyovers: ROBs: Constructed - 2 Under Construction - 3 Proposed - 1 Constructed - 28 Under Construction - 6 Proposed - 47

Bihar State Road Development Corporation Incorporated on 20 th April, 2009 under Companies Act, 1956. Objectives: To construct, execute, carryout, improve, work, develop, administer, manage, control or maintain in Bihar and elsewhere all types of roads, highways, express routes, paths, streets, bridges, sideways, tunnels and other infrastructure, works and conveniences, approach road, sheds, temporary dwelling huts in case of calamity or any emergency pertaining to all departments of Government of Bihar or any other department, agency, organization or body through Road Construction Department or directly. To undertake projects under PPP (Public Private Partnership) including arranging finances for such projects.

PROJECTS UNDERTAKEN BSHP-I (Bihar State Highway Project Phase-I) : 2009-12 BSHP-II (Bihar State Highway Project Phase-II) : 2011-18 BSHP-II AF (Addl. Fin. Bihar State Highway Project Phase-II) : 2013-18 Bihar New Ganga Bridge Project : 2016-21 PPP Projects (Public Private Partnership Projects) EPC Turnkey Projects (Engineering Procurement & Construction Projects) 4-Laning of NH-82 (Funded by JICA)

Mega Projects in Patna Metropolitan Area Kachchi Dargah

Flyover Projects in Patna to reduce congestion

PATNA RING ROAD Doriganj Dighwara Chak Sikandar Hajipur Koilwar NH-30 New Kanahuli Zero Mile Kachhi Dargah Legend NHAI Alignment SH-78 NH Portion 6 Lane Bridge Masuri Lakhna Fatuha Dainawan SH-01 NEXT

PPP PROJECTS UNDER BSRDC Bakhtiyarpur-Tajpur Greenfield bridge with approach : 4 Lane Length of Bridge 5.53 Kms. Length of Approach Road 45.75 Kms. Total Project Cost 1600 Crores. Concessionaire M/s Navyuga Jahnavi, Toll Bridge Pvt. Ltd., Hyderabad. Concession period 30 Years (Including 4.5 Years Construction Period) Appointment date 02.04.2011 Scheduled Completion Date May 2016 Completion date as per EOT - 31.07.2019 Status Work in progress Physical Progress : 48.44 % Financial Progress : 53.26 %

Greenfield Bridge across Ganga Connecting Bakhtiyarpur to Tajpur (Bridge Length -5.525 km, Road Length- 45.745 km) BRIEF OVERVIEW A 4-Lane Controlled access Greenfield Bridge & Highway, PPP Project originates at Karjan on new NH-31 crosses old NH-31 (Jamalpur Badahiya), passes through a bridge on river Ganga & terminates at Tajpur on NH-28. The work was scheduled to be commissioned on 29.05.2016. Physical Progress of 48.44% & Financial Progress of 53.26% has been achieved. A total of 190 Ha of land against 299.18 Ha was handed over to Concessionaire. Hence Completion date has been extended to 31.07.2019. without increasing the Concession period. Launching gantry at Main Ganga bridge collapsed on 09.05.2017 due to heavy storm. The work is likely to be further delayed by 6 months. The work has been mainly delayed due to non-handing over of encumbrance free land. Villager demanding RCC Culvert in place of Hume Pipe Culvert due to flooding. Concessionaire instructed to submit justification. Compensation for LA not being accepted by the land owners in Jamalpur Village, Patna. Demanding higher rate of Compensation. LA under new act for 4.98 km is under process.

4 Lane Bakhtiyarpur Tajpur Back

GANGA PATH

Project Details DESCRIPTION Project DETAIL Ganga Path (Digha to Didargunj), Length 21.5 Km. Status Value Contractor Authority Engineer Work in Progress Rs 1777.3715 Crores Navayuga Engineering Company Limited AECOM- RODIC JV Appointed Date 09.09.2013 Completion Date 08.09.2017 Highway Portion Elevated Portion Toll Plaza 13.900 Km 7.600 Km 02 Nos. Physical Progress Pile -325/662, Pile cap- 67/136 Pier - 66/136, Pier cap- 66/136 Segment- 353/2534 Earth work- 2 Km (in progress)/5.9 km

GANGA PATH FROM DIGHA TO DEEDARGANJ AT PATNA (Length- 21.5 km) BRIEF OVERVIEW A 4-Lane Controlled access highway originates from Digha, passes along the river Ganga, crosses old NH-30 & terminates at Deedarganj. 2 Lane Connectivity with Bankipur-Danapur Road and Ashok Rajpath has been proposed at LCT Ghat, Ch. 3.25 km, A.N Sinha Institute, Ch. 5.7 km, Krishna Ghat, Ch. 8.5 km, Gai Ghat, Ch. 12.1 km, Kangan Ghat, Ch. 15.4 km and Patna Ghat, Ch. 16.65 km. Transfer of Govt. land, Land Acquisition, Mining of Soil, Ganga channel, Design of Pile foundation, SEIAA have been the main reason of delay which have been partly resolved. Mainly land issue persists at Ch. 0.0 to 0.7 (Digha), 12.0 to 12.8 (Gai Ghat), 13.6 to 21.5 (from Nauzar Ghat to Deedarganj). Physical Progress :- Pile- 325/662, Pile Cap- 67/136, Pier - 66/136, Pier Cap- 66/136, Segment- 353/2534, Earth work- 2 Km (in progress)/5.9 km Financial Progress:- 20.55% (Rs. 365.36 Crores )

GANGA PATH FROM DIGHA TO DEEDARGANJ AT PATNA (Length- 21.5 km) BRIEF OVERVIEW Possibility of providing connectivity at Khajekalan Ghat is being explored. From Ch. 13.5 onward there was a provision of Embankment in main design of Ganga Path, but due to shifting of river towards City side a detailed study has been conducted by IIT Roorkee, elevated structure has been recommended from km 13.5 to 17.0. Accordingly centre line has been modified & revised proposal has been prepared-

GANGA PATH FROM DIGHA TO DEEDARGANJ AT PATNA (Length- 21.5 km) BRIEF OVERVIEW Elevated Ch. 13.5 (Nauzar Ghat) to 16.0 (west of Patna Ghat) & Ch. 19.9 to 20.4 (Deedarganj) Embankment Ch. 16.0 (west of Patna Ghat) to 19.9 (Deedarganj) & Ch. 20.0 to 20.44 (Deedarganj) Cost as Per Sch.- H (In Crores) Additional Civil Cost* (In Crores) 615 215 * Considering the reduced project length from Ch.21.50 to Ch.20.44 ( Old NH-30 instead of New NH-30) Less private land acquisition will be needed as ROW is reduced to 45m (Land between Ch.15+400 KM to Ch.16+000 KM is private land). This will also resolve the issue of Guest house of Khankahe Munimiya at Mitan Ghat. Re-location of Khajekalan burning Ghat will not be required & free access to river front will be available. Most of the hindrances can be minimized due to less ROW requirement.

Back

Elevated Road from AIIMS to Digha Starting from AIIMS, Patna (NH-98) and terminating at DIGHA (on Ganga Path), the length of the project road is 11.90 km. Important connectivity : NH-98, NH-30, NH-19 & Ganga Path

Project Details DESCRIPTION Project Status Value Contractor Authority Engineer DETAIL Elevated Corridor (AIIMS-DIGHA) Length : 12.27 Km. Work in Progress Rs 1231.06 Crores Gammon India Ltd. AECOM- RODIC JV Appointed Date 21.10.2013 Completion Date 31.03.2018 Physical Progress 87.56% Financial Progress 768.30 Crores

Connectivity to J P Setu Elevated Rd over Bailey Road ROB Elevated Corridor Digha Sonepur Bridge Approach Bailey Rd to B D Rd Connectivity Aerial View of Elevated Corridor

Status of South side approach of Digha Rail-cum-Road Bridge (NHAI left over portion) Length : 10.694 Kms. Administrative Approval : 1231.06 Crores.[Including Elevated corridor and NHAI left over portion Agreement Amount (work) : Rs.157.14 Crores Name of the Contractor : M/s Gammon Engineers and Contractors Pvt. Ltd. Authority Engineer : M/s AECOM-Rodic Consultants Pvt. Ltd. (JV) Connectivity : Bankipur-Danapur Road & South Side of Railcum- Road Bridge Agreement Date : 20.10.2016 Completion Date : 19.04.2018 Physical Progress : 34.06 % Financial Progress : 53.53 Cr. Note: Target to connect Bankipore- Danapur Road Bailey Road by 15 Nov 2017.

Construction of South Side Approach Road, 2 Lane with Paved Shoulder of Digha Rail- Cum-Road Bridge from AIIMS to Digha (NHAI Leftover Portion) Total Length 10.69 km BRIEF OVERVIEW The Project starts from junction of NH-98 (near AIIMS), runs along eastern embankment upto Khagaul, L-2 km and Khagaul to Bailey Road & upto Bankipur- Danapur Road, L 8.5 km runs along western embankment of Rupaspur canal. The connectivity to Digha-Sonepur Bridge provided through One flyover at Bankipur-Danapur Road. The Project was initially assigned to NHAI. Encroachment in different stretches, Court Cases, Relocation of Govt. Buildings & Co-ordination with Railways were the main issues which has been resolved by BSRDCL. BSRDCL started the work in Oct 2016. Connectivity to Bridge from Bankipur-Danapur Road has been provided. Connectivity from Bailey Road to Bankipur Danapur Road is targeted on 15 Nov 2017. Re-location of Electric Poles, Sluice Gates & Mining of Earth are the major issues. Balance work is targeted to be completed in Apr 2018.

ELEVATED CORRIDOR FROM AIIMS TO DIGHA (Length 12.27 km) BRIEF OVERVIEW The Project starts from junction of NH-98 (near AIIMS), runs along eastern embankment upto 2 km (2 Lane), then 4 Lane elevated over the Canal upto Bankipur-Danapur Road & beyond. Vertical alignment near Bailey Road has been modified & now it crosses over present ROB. Launching of 12 nos. Steel Girders over Bailey Road have completed. The issue of 106 m span ROB near Khagaul has been resolved & design is under approval by Railways. Re-location of School buildings, Indira Aawas, underground Electric Cables & Towers have almost been completed. The CWJC Case regarding land dispute near Ch. 11.2 11.5 is running on daily list. The work is targeted to be completed in March 2018.

ELEVATED CORRIDOR (AIIMS-DIGHA) Back

6-Lane Bridge Over River Ganga from Kachhi Dargah (NH-30) to (NH-103) Bidupur Google Earth 76

Project Details DESCRIPTION Project DETAIL 6-Lane Ganga Bridge Length : 22.8 Km. Status Value Contractor Authority Engineer Pre-construction work Progress Rs 4988.4 Crores Daewoo-L&T-JV AECOM- RODIC JV in Length of Project Appointed Date 16.01.2017 Status 22.76 Km (Main Bridge 9.76 Km) L/A in progress. Preconstruction activities in progress

SIX LANE BIHAR NEW GANGA BRIDGE PROJECT (Bridge Length -9.76 km, Approach Length- 13 km) BRIEF OVERVIEW 6-Lane Bridge with approach road originates from New NH-30 (Sabalpur) and passes through Raghopur Diara, Bidupur & terminates at Sarmastpur (Rajapakar) on NH-103. The connectivity has been provided at 1. Old NH-30 / Ganga Path, 2. Raghopur Diara, 3. Bidupur. Provision of 2- Toll Plazas and Highway Museum. The project was awarded to M/s Daewoo-L&T (JV) on 10.02.2016. The appointed date is 16.01.2017 and Schedule of Completion is 15.01.2021. The Contractor has been mobilized and Camp established at Patna & Raghopur. Batch Mix Plant at Patna & Raghopur and Other Machineries have been mobilized. Sufficient construction material has been stored at Raghopur Diara to ensure unintruppted work in monsoon period. A Barge has been mobilized for all weather transportation of Man-Material & Machinaries through Ganga.

SIX LANE BIHAR NEW GANGA BRIDGE PROJECT (Bridge Length -9.76 km, Approach Length- 13 km) BRIEF OVERVIEW Total nos. of Well in main Bridge is 67. The first concreting of Well Kerb has been completed on 20.07.2017. 18 nos. of cutting edge have been fabricated & placed 3 nos. placed in alignment. The 1 st working pile is scheduled on 10.08.2017. 186 Acres out of 313 Acres of land has been handed over to Contractor. The land of Patna Sadar & Raghopur Block has been transferred to BSRDCL by Collector Patna & Raghopur. The land of Bidupur & Rajapakar are yet to be transferred. Payment of compensation is slow. The Villagers of Sabalpur in Patna & Telia, Sarmastpur are demanding higher compensation. Villagers of Sabalpur file Case & hearing is being done by Authority, Patna. The Villagers between North channel of Ganga & Mahnar Road are opposing the approved alignment due to less return value of the land.

New Six Lane Ganga Bridge Back

Proposed Project under Japan International Co-operation Agency (JICA) 4-LANING OF NH - 82 (GAYA - HISUA - RAJGIR -NALANDA - BIHARSHARIF SECTION) (Funded by JICA) Length : 92.93 Km. Project Sanctioned Amount- : INR 1408.85 Cr. JICA Finance Portion (Project cost and Consultancy cost): INR 1216.16 Cr. Balance Amount to be Budgeted by MoRT&H, GOI (R &: INR 192.69 Cr. R, Land Acquisition, Utility shifting and Local taxes.) Approval of PIB : 03.09.2013 Approval of CCI : 26.12.2013 Loan signing between JICA & GoI : 30.01.2014 Date of Agreement : 20.10.2016 Date of Completion : 19.10.2019 (3 years) DLP : 3 Years Upto date Physical Progress : 10% Financial Progress : 7.77 %

NH 82

SH-78 (BIHTA-DANIYAWAN-CHANDI-SARMERA ROAD) SH-78 (Bihta-Daniyawan ) ( Package 1):- Name of Contractor : M/s BSCPL Infrastructure Ltd., Hyderabad Contract Length : 46.70 Km Contract Amount : 393.34 Cr Date of commencement : 29.8.2015 Date of Completion : 28.8.2017 Upto date Physical Progress : 12.12 % Financial Progress : 14.59 % Work Completed : 8.85 Km upto DBM SH-78 (Chandi Sarmera ) ( Package 2):- Name of Contractor : M/s BSCPL Infrastructure Ltd., Hyderabad Contract Length : 47.50 Km Contract Amount : 287.16 Cr Date of commencement : 12.09.2015 Date of Completion : 11.09.2017 Upto date Physical Progress : 13.74 % Financial Progress : 15.15% Work Completed : 14.75 Km upto DBM

BIHTA SARMERA ROAD (SH-78) (Length- 94.2 km) BRIEF OVERVIEW This State Highway starts from Kanhauli on Siwala Bihta Road. Provides direct connectivity to Patna from 1. Naubatpur on NH-98, 2. Dumari on NH-83, 3. Beldarichak on SH-2, 4. Daniyawan on NH-30A, 5. Bhaganbigha on NH-31 & terminates at Sarmera on NH-82. 2- Lane highway with bridges there upon are being constructed where as the land is being acquired for 4-Lane highway i.e. 60 m ROW. The work was awarded to M/s Ranmky Infra Structture Ltd. on 01.04.2010 against agreement value of Rs. 391.76 Crore and was scheduled to be completed on 13.05.2013. Only 35.25 km of Earthwork, GSB-32.82 km, WMM- 26.38 km, DBM- 26.30 km could be done in 4 years. Due to unsatisfactory performance of the Contractor the Agreement was terminated on 25.04.2014. The Contractor also terminated the Contract on 14.04.2014 on the ground of non-handing over of encumbrance free land & non-availability of aggregates in Bihar.

BIHTA SARMERA ROAD (SH-78) (Length- 94.2 km) BRIEF OVERVIEW The Road length was divided into 2 parts i.e from Bihta to Daniyawan (L- 46.7 km) & Chandi to Sarmera (L-47.5km). Daniyawan to Chandi is part of NH-30A. Work of both the Packages was awarded to M/s BSCPL on 16.07.2015 and Targeted date of Completion 28.08.2017 & 11.09.2017 respectively. The work is delayed due to multiple reasons like; Handing Over of Land to Contractor, Soil treatment & sub-grade failure issue and poor financial condition of the Contractor. The Soil stabilization issue has been resolved. 8.5 km Road length of Part-I is severely affected due to different types of Land Acquisition issues. The notification under section 19 of LA act has been notified for the remaining length of 2.7 km of part-ii and is expected to be handed over in Sept 2017. The proposed revised target date of Completion is 31.05.2018. The ADB Loan closure date is 30.06.2018.

SH 78 SH 78 Back

NH-83 (PATNA - GAYA - DOBHI) 4 LANE S. No Name of Project Length (Km) TPC/ Annuity/Gr ant (Crore) Concessionaire/ Concession Period Appointed Date Schedule /likely date of completion Physical Progress (in % age)/length completed 1 4L Patna - Gaya- Dobhi NH-83 127.12 1232 M/s IL&FS Engineering and Construction ltd.(item Rate) 10.04.2015 09.04.2018 1.12 % / 0.96 Km Back

NH-30A (Fatuha Harnaut - Barh) 2 lane with paved shoulders S. No Name of Project Length (Km) Cost (Crore) Agency Appointed Date Schedule /likely date of completion Physical Progress (in % age)/length completed 1 2 lane with paved shoulder Fatuha Harnaut - Barh 69.60 567.00 Monte Carlo Ltd 06.08.16 05.08.19 23 % / 25 Km Back

NH-98 (Anisabad Arwal Aurangabad - Hariharganj) 2 lane with paved shoulders S. No Name of Project Length (Km) Cost (Crore) Agency Appointed Date Schedule /likely date of completion Physical Progress (in % age)/length completed 1 Lot-1 : Anisabad Arwal 2 Lot-2: Arwal Aurangabad Hariharganj 62.00 282.00 DRA-SNP (JV) 30.08.14 29.08.16 60% / 50 Km LA issue in Bikram Bypass and slow progress by the contractor. 89.65 358.00 Monte Carlo Ltd 16.04.14 14.10.16 Work completed except one ROB Back

Replacement of Super-Structure of M.G. Setu S. No Name of Project Length (Km) Cost (Crore) Agency Appointed Date Schedule /likely date of completion Current Status 1 Replacement of Super Structure of M.G. Setu 5.575 1382.40 AFCON SBMOST (JV) 19.11.16 18.05.2020 Dismantling completed in Pier 1 & 4 Dismantling in progress in Pier 2 Back

Construction of Flyover (2x2 lane, carriageway 5.5 m wide) from Mithapur ROB to Chiraiyatand Flyover via Station Road And Extension of Chiraiyatand Flyover (1x2 Lane, Carriageway 7.5 m wide) up to Gandhi Maidan in Exhibition Road Administrative Approval Rs. 167.85 Crore Agreement Value Rs. 91.66 Crore Variation Sanctioned Rs. 81.88 Crore Agreement No. 43/2013-14 dated 31-07-2013 Contractor S.P. Singla Construction Pvt. Ltd. Date of Start 28.06.2013 Schedule Date of Completion 27.12.2015 1 ST Extension up to 30.04.2016 2 nd Extension up to 30.06.2017 Expected Date of Completion 30.09.2017 Supervision Consultant STUP in Association with Transtek

PLAN MITHAPUR ~ CHIRAIYATAND SECTION 94

PHYSICAL PROGRESS A. Foundation - 100% B. Substructure - 100% C. Superstructure - 88% OVERALL PROGRESS OF WORK S.N. DESCRIPTION In terms of Rupees in Crores In terms of % against overall cost 1 2 FINANCIAL PROGRESS 64.28 78.51% PHYSICAL PROGRESS 64.95 79.32%

96 Back

BAILEY ROAD PATNA ZOO HIGH COURT END

1. Administrative approval Vide RCD Letter No. 7192(S) dated 05.08.2015 Under Plan Head Salient features of the Project: 391.48 Crore 2. Agreement No. 02/2015-16 3. Agreement Amount 381.60 Crore 4. Date of Start 19 th Dec. 2015 5. Date of Completion 18 th Dec. 2017 6. Upto date expenditure 4209.21 Lacs

Uptodate Status of Work 1. Extra Dosed Cable Stayed Bridge at Daroga Rai Path Foundation work (a) Piles 64 Nos. Piles of A1, A2, P1, P2 & P3 are completed out of 64 Nos. of total Piles (b) Pile Cap Pile Cap works of P3 is in progress. 2. Integral Spine Beam Bridge Near Lalit Bhawan Junction (i) Foundation Work (a) Piles 83 Nos. Piles of R01 P1, P2, A1, A2 & R02 P1, P2, A1, A2 are completed out of 83 Nos. of total Piles. (b) Pile Cap Pile Cap of R01-P1 & A1 are completed and Pile Cap work of R01-A2 is in progress. (ii) Sub-Structure - Pier Shaft of R01-P1 & A1 are completed. 3. Extra Dosed Cable Stayed Bridge Near BPSC Office (i) Foundation work - (a) Pile 81 Nos. Piles are completed out of total 96 Nos. of Piles. (b) Pile Cap Pile Cap of R03- A1, A2 & P4 are completed & Pile Cap work of R03 P1 is in progress (ii) Sub-Structure - Pier Shaft of R03-A1, A2 & P4 are completed.

Uptodate Status of Work 4. Miscellaneous Work a) Service Road (Traffic Diversion) 1. 452.25m are completed. b) Widening 1. 328.50m PQC Completed. 2. 683m Bituminous road completed. c) Boundary Wall 1. 153m Pre Cast boundary wall Completed at Vishwesharaiya Bhawan. 2. 604m boundary wall completed in between 0+000 to 0+700 along R1 3. Boundary wall work is in progress 5. Load Test a) Initial Load Test 1. Test Piles Casting All Completed (05 Locations). 2. Load Test : All Vertical and Lateral Completed (Result Submitted). b) Routine Load Test on Working Pile 1. Daroga Rai Path Swap Pile 01 No. (Completed). 2. Lalit Bhawan Integral Spine Beam Bridge (R02 A2 P8 Pile) 01 No. (Completed) 3. BPSC Bhawan Extra dosed cable stayed bridge R03 (A1-6 & P3-15) & 02 Nos. (Completed)

Pier & Pier Cap concreting work is in Progress (R03 P4) BPSC Bhawan Pile Cap Concrete work is in Progress (R03 A1) BPSC Bhawan Pile Cap Concreting work is completed ( R03 A1) Lalit Bhawan Abutment Wing Wall Reinforcement Binding work is in Progress (R01 A1) Lalit Bhawan 102 Back

Construction of Flyover connecting with Mithapur flyover to Bhikhari Thakur (Yarpur) Flyover via R. Block Junction including approach road, retaining wall, service road, elevated rotary & electrification etc Project Detail Employer Contractor Contract Price : Bihar Rajya Pul Nirman Nigam Limited : Rachana Construction Company, Gujarat : 104,2087,456/- Rs. Commencement Date : 12 December 2015 Completion Date : 36 Months from date of commencement (11 Nov 2018) Defect Liability Period : 24 Month from date of completio

LINE DIAGRAM PLAN

Salient Features o Elevated Structure Length 1401.273 Meter o Solid Approach Length 347.490 Meter o Total Flyover Length 1748.763 Meter o Span 60 Span o No. of Lanes 4 (2x7.5 mtrs) ARM Nomenclature Details as per site location. :- A. ARM 01 : From GPO to R-Block Junction (628.620 Mtrs.) B. ARM 02 : From Bhikhari Thakur Bridge to R-Block Junction (464.106 Mtrs.) C. ARM 03 : From JDU Office to R-Block Junction (490.498 Mtrs.) D. Rotary Junction : Over R-Block Junction (124.109 Mtrs.) E. Merging Portion : Two Lane merging in Bhikhari Thakur Bridge (41.430 Mtrs.)

Financial Progress Rs.41.57 Crores (As on 30.06.2017) Note : Work is stopped vide letter no BRPNNL/SWD/474, Dated 24.04.2017 of Senior Project Engineer, Special Work Division Patna.

107 Back

Construction of Flyover connecting Mithapur flyover to Chiraiyatand Flyover via Karbigahiya including Approach Road, Service Road and side drain etc in Patna Town Project Detail Employer : Bihar Rajya Pul Nirman Nigam Limited Contractor : Rachana Construction Company, Gujarat Contract Price : 101,75,44,507/- Rs. Commencement Date : 12 November 2015 Completion Date : 36 Months from date of commencement (11 Nov 2018) Defect Liability Period : 24 Month from date of completion

Salient Features o Elevated Structure Length : 1193.425 Meter o Solid Approach Length : 249.182 Meter o Total Flyover Length : 1442.607 Meter o Service road with Junction Improvement : 2 X 1500 Meter o Span : 51 Span o No. of Lanes : 4(2x7.0 mtrs) & 2(1x7.5 mtrs) ARM Nomenclature Details as per site location :- A. ARM 01 : From Mithapur Flyover to Mithapur Bus Stand B. ARM 02 : From Mithapur Flyover to Chirayatand Flyover C. Merging : At End of Mithapur Flyover

Financial Progress Rs.13.63 Crores (As on 30.06.2017) Note : Work is stopped vide letter no BRPNNL/SWD/474, Dated 24.04.2017 of Senior Project Engineer, Special Work Division Patna.

112 Back

Construction of Northern Approach (Sonpur Side) of Rail cum Road Bridge over river Ganga near Digha Ghat Patna. Project Status Administrative approval(5.703 Km) Phase- 1(up to 2.56 km.) Rs. 244.9895 Crore Agreement No. 26/2015-16 dated 12.12.2015 Agreement Value Contractor Rs. 75.49 Crore M/s S.P. Singla Construction Pvt. Ltd. Date of Start 12.12.2015 Date of Completion (As per Agreement) 11.12.2016 Date of Inauguration 11.06.2017

2 Physical Progress Achievement 1 Financial Progress 73.55% (Rs.179.76Crore) Phase- 1(up to 2.56 km.) Foundation - 100% Substructure - 100% Superstructure - 99% Approach Road - 99% Expenditure - Rs.107.51 Cr. 114

Layout Plan 115

Back

Patna Ring Road MORTH Government of India has proposed for construction of 4-Lane Ring Road for Patna. NHAI has engaged M/S Jacob as DPR Consultant. The Consultant has suggested the alignment of SH-78 Bihta-Sarmera Road from Kanhauli to Lakhna and from Lakhna to Kachhi Dargah through Greenfield. This stretch will require huge land acquisition. It has been therefore considered to take up the alignment of SH-78 Bihta- Sarmera Road from Kanhauli to Daniawan (55 Km) for 4-lanning. From Daniawan to Fautha, NH-30A, 7 Km will be widened to 4-lanning which is currently widened to 2 Lane with Paved Shoulders. From Fatuha to Kachhi Dargah, 5 Km which is SH-105 will also be widened to 4-lane. Also SH-01 Sadikpur-Pabheri-Masauri Road (39 Km) is being considered to take-up for 4-lanning under this scheme. The total length, 55+39+8+5=107 Km, does not require any land acquisition for4-lanning.

Sl No. A. Civil Cost NHAI Proposal Particulars Cost Estimate Amount ( In Crore) 1 Roadworks ( Including Earthwork, RE Wall, Pavement, Drainage, Road Furniture, Bus Bays, Toll Plaza and 230 other Miscellaneous items ) 2 Structure Works ( Including Viaduct Ramps, Major Bridge, Minor Bridge, Culvert & Pedestrain and Vehicular Underpass) 196 Total Civil Cost (Roadworks & Structure Works) 426 Total Civil Cost considering PMC IE, Financial Cost, IDC, Escalation @ 25% 533 B. Other Cost 1 Land Acquisition Cost 500 2 Resettlement & Rehablitation Cost 4 3 Environmental Monitoring and Mitigation Cost 3 4 Utility Shifting Cost 4 Total Other Cost 511 Total Project Cost (A+B) ( In Crore) 1,044

Patna Master Plan Proposal Madhopu r (Km 0+000) Kanhauli (Km 6+940) Muradpur (Km 17+710) Manglicha k (Km 27+140) Gopalpur (Km 33+540) Pundadih (Km 42+450)

All Ring Road Proposal Doriganj Dighwara Chak Sikandar Hajipur Koilwar NH-30 New Kanahuli Zero Mile Kachhi Dargah Lakhna Fatuha Legend SH-1 SH-78 NH Portion 6 Lane Bridge Masuri SH-01 Dainawan

Final Ring Road Proposal It starts at Kanhauli on New NH-30, passes through Naubatpur on NH-98, Dumri on NH-83, Beldarichak on SH-01 and ends at Dinawan on NH-30A. It uses NH-30A from Daniawan to Fautha. From Fatuha to Kachhi Dargah via SH-106 Total Length of proposed Ring Road is approx 70 Km from Kanhauli to Kachhi dargah

From Village Madhopur (Old NH-30) Kanhauli (New NH-30) Korra (Danapur- Naubatpur Road) Muradpur (NH-98) Manglichak (NH-83) Gopalpur (SH-01) Pundadih (NH-30) To Village Kanhauli (New NH- 30) Korra (Danapur- Naubatpur Road) Muradpur (NH-98) Manglichak (NH-83) Connecting Villages Narayanpur, Daulatpur Semri, Parkotimpur Painthi Painal, Jaintipur, Goriadera, Makhdumpur Budhgawan, Karagchak, Majhauli Alampur Gonpura, Nadiawan, Nasirpura Length (Km) Land Requirement (Hec.) 6.94 41.6 7.1 42.4 3.47 20.3 9.63 57.4 Gopalpur (SH-01) Chhatna, Chipra 6.4 38.4 Pundadih (NH-30) Mahuli, Gauharpur 8.91 53.5 Khizirpur (SH-106) - 1.91 11.5 Government Land (Hec.) Remaining Land (Hec.) 3.5 261.5 Total 44.36 265.0 3.5 261.5 Back

Feasibility Study for reducing traffic congestions in Bankipur Danapur Road (from Gandhi Maidan (DM Patna residence) to Danapur Auto Stand (11.25 Km stretch) Stretch represented on Google map