TRAFFIC MODEL AT-SK. 6. Fachbeiratsitzung Gyor

Similar documents
Infrastructure development: Vienna Vienna Int. Airport Bruck/Leitha state border near Nickelsdorf ( airport link )

WP4 Assessment of the Adriatic port system and its integration with hinterland

THE DANUBE CORRIDOR A DEVELEOPMENT GENERATOR. a company of

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

BRT in Developed Countries The Brisbane Experience

BRATISLAVA. and its urban development along the river Danube

Borders Railway - Scottish Borders Work Plan

Sharing the Way with Sustainable Transport Options

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

Lower Thames Crossing consultation response

OBERWART CONVENTION CENTRE OBERWART

Railroad Safety in the United States. Ian Savage

Phase 1 opening July 2009 Phase 2 opening Summer 2010 ARAD ROMANIA

CURRENT SITUATION AND DEVELOPMENT PROSPECTS OF INTERNATIONAL PASSENGER CARRIAGE ON EAST WEST DIRECTION

MEASURING ACCESSIBILITY TO PASSENGER FLIGHTS IN EUROPE: TOWARDS HARMONISED INDICATORS AT THE REGIONAL LEVEL. Regional Focus.

OBERWART CENTRE OBERWART

Draft Greater Sydney Region Plan

From rail timetables to regional and urban indicators on rail passenger services

LACE-Phare CBC. Assessment Report: SLOVAKIA AUSTRIA

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005

Passenger movement simulation in intermodal air-rail terminal

CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE. By Mike Curran, Manager Strategic Policy, Transit New Zealand

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

Fast Lanes Study Phase III Telephone Survey Results

PCAL Case Study Retail Areas: Rouse Hill Town Centre

TRANSDANUBE Sustainable Mobility and Tourism along the Danube

The Public Transport System of Zurich Achievements and Challenges

The National Transport Authority

UK Experience with Bus Restructuring

Tourism Satellite Account: Demand-Supply Reconciliation

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Provincial Railway Technical Standards

Tram Passenger Survey

BETTER FASTER SMARTER

Hungary (Euro Atlas) READ ONLINE

Federal Subsidies to Passenger Transportation December 2004

CITY OF BELGRADE BELGRADE LAND DEVELOPMENT PUBLIC AGENCY

The strategic importance of the Danube for a sustainable development of the region. Transnational pilot-workshop Cross-programme ETC Danube projects

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

500 X Parramatta & Ryde to City via Victoria Road. Description of routes in this timetable. Route 500. Route X00. Route 508.

Tourism Industry Council Tasmania Community Survey 2018 Research Report. May 2018

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

001 Town Centre Arterials

Bratislava the capital of slovakia. by students of III.C

ACSP 57th Annual Conference Denver, Colorado, October 2017 TRACK 14 TRANSPORTATION & INFRASTRUCTURE PLANNING

Cooperation with the Region

Reimagining Central Station Precinct

3. Coach Supporting Statement

Structure of presentation

HOW TO REACH THE CONFERENCE VENUE

2.2 USER CENSUS DATA A site census estimated on 19/01/2016, together with Sky high 9 day census March 2014.

The Importance of the geographical position of Kosovo in increasing the Trade, Transit and International Transport in the Balkans

Flughafen Wien Group handles 34.4 million passengers in 2018 (+11.3%) Vienna Airport: 27 million passengers (+10.8%)

Stagecoach South. annual performance. May 2010 to April greener smarter travel

Technical considerations on rapid transit mode selection BRT / LRT potentialities in France

CONNECT WORKSHOP MANCHESTER NOVEMBER 9, 2005

Advocacy. Review of the Queensland State Budget

Establishment of a cross border socioeconomic monitoring in Šumava and Bavarian Forest National Parks

There are no planned or apparent developments near the crossing which may lead to a change or increase in use or risk.

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015

OPEN ACCESS PASSENGER RAIL COMPETITION THE CASE STUDY OF AUSTRIA

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN NOVEMBER 2018

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT

Connecting the Barcelona tramway network

the UK s most influential, national, environmental campaigning organisation

Member-led Review of Cycling Infrastructure

Policy Transport. Policy highlights. Our plan

PLAN MAESTRO DE TRANSPORTE SOSTENIBLE EN GUATEMALA

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN FEBRUARY 2018

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN OCTOBER 2017

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN NOVEMBER 2017

The Coalition s Policy

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN JANUARY 2018

PUBLIC TRANSPORTATION INTRODUCTION

Integrated tourism and travel statistics

Transport Infrastructure Construction and RMI Market Report - UK Analysis

DEVELOPMENT A NATIONAL RAIL NETWORK: THE ISRAELI CASE. YORAM SHIFTAN Technion, Israel Institute of Technology ETH May 2015

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

LIFE IN METROPOLITAN AREAS IN THE 21 ST CENTURY

Workplace Parking Levies: the contribution of commuters to funding public transport. Sue Flack Consultant

Aviation Taxes and Charges

Present-Day. History. Future. Contents. References

I n t e r m o d a l i t y

Bus Reliability and Punctuality Performance

TRANSPORTATION ELEMENT

Berkshire Flyer Working Group. February 13, 2018

SAMTRANS TITLE VI STANDARDS AND POLICIES

Treasure Island Supplemental Information Report Addendum

PROJECT CHARTER IN THE FOOTSTEPS OF NOBLE FAMILIES PÁLFFY AND ESTERHÁZY

Sample enumeration model for airport ground access

STATUS QUO ANALYSIS / STATE OF THE ART EXECUTIVE SUMMARY GYŐR-MOSON-SOPRON COUNTY

Riverside Heights, Norwich. Travel Plan

FSUE ROSMORPORT CONSTRUCTION OF THE INTERNATIONAL MARINE TERMINAL WITH YACHT MARINA IN THE CITY OF PIONERSKY, KALININGRAD REGION

Investment project «Creation of an amusement park with an extreme zone»

Building the future trade potential of the Wide Bay Burnett

JOINING INSTRUCTIONS

Outlook. küchenwohntrends together with möbel austria

Transcription:

TRAFFIC MODEL AT-SK 6. Fachbeiratsitzung 13.6.2012 Gyor

Content Results of the Transport - Targeted households mobility survey evaluation Calibration Trip chains Description of transport scenarios for modeling Next steps

Targeted households mobility survey MALACKY - BSK - 360 households PIESTANY - TSK - 750 households Statistically significant sample of 5% of households Standard day: 01/12/2011 Malacky 346 returned questionaires, 96% Piešťany 737 returned questionaires, 98%

Gender Number of persons: 2808 Number of households: 1052 Number of trips: 7625 Date of the trips: 1.12.2012 Average mobility: 2,72 PRE VŠETKY MESTÁ Počet mužov/žien - tab. 3. 1 osoby staršie ako 6 rokov Both towns - No. of male/female over 6 years pohlavie abs. % S% muži 1296 46 46 ženy 1487 53 99 neudané 25 1 100 n= 2808 100 2 4 6 8 10 muži ženy neudané MESTO MALACKY Počet mužov/žien - tab. 3. 2 osoby staršie ako 6 rokov Malacky - No. of male/female over 6 years pohlavie abs. % S% muži 398 47 47 ženy 436 52 99 neudané 7 1 100 n= 841 100 2 4 6 8 10 muži ženy neudané MESTO PIEŠŤANY Počet mužov/žien - tab. 3. 3 osoby staršie ako 6 rokov Piešťany - No. of male/female over 6 years pohlavie abs. % S% muži 898 46 46 ženy 1051 53 99 neudané 18 1 100 n= 1967 100 2 4 6 8 10 muži ženy neudané

Distribution of persons by age in comparism with statistical office data Both towns without calibration with calibration Both towns 3 25% 2 15% 1 5% 2 18% 16% 14% 12% 1 8% 6% 4% 2% 25% 2 15% 1 5% MALACKY 25% 2 15% 1 5% MALACKY 3 25% 2 15% 1 5% PIEŠŤANY PIEŠŤANY 18% 16% 14% 12% 1 8% 6% 4% 2%

Modal split - MALACKY without calibration with calibration MESTO MALACKY - vnútorné cesty Malacky - inner trips 5% 3% MESTO MALACKY - vnútorné cesty Malacky - inner trips 5% 3% 26% 53% 26% 51% 13% 15% MESTO MALACKY - vonkajšie cesty Malacky - external trips Malacky - external trips MESTO MALACKY - vonkajšie cesty 18% 27% 9% 46% 18% 25% 9% 48%

Modal split - PIEŠŤANY without calibration with calibration 6% 7% Piešťany - inner trips MESTO PIEŠŤANY - vnútorné cesty 4% 8% Piešťany - inner trips MESTO PIEŠŤANY - vnútorné cesty 3 19% 38% 32% 19% 37% Piešťany - external trips 1% MESTO PIEŠŤANY - vonkajšie cesty 1% MESTO PIEŠŤANY - vonkajšie cesty Piešťany- external trips 13% 6% 15% 65% 12% 5% 15% 67%

Modal split BOTH TOWNS without calibration with calibration Both towns - inner trips PRE VŠETKY MESTÁ - vnútorné cesty 6% 6% peši 29% 42% bicykel auto 17% spolujazdec v aute autobus Both towns - inner trips PRE VŠETKY MESTÁ - vnútorné cesty 5% 6% peši 3 41% bicykel auto 18% spolujazdec v aute autobus Both towns - external trips PRE VŠETKY MESTÁ - vonkajšie cesty Both towns - external trips PRE VŠETKY MESTÁ - vonkajšie cesty 15% 7% 21% 1% 57% bicykel auto spolujazdec v aute autobus vlak 15% 7% 19% 1% 59% bicykel auto spolujazdec v aute autobus vlak

Trips travel time by a vehicle type in Malacky without calibration with calibration Inner trips Inner trips Vnútorné cesty podľa ich trvania a dopr. prostriedku Vnútorné cesty podľa ich trvania a dopr. prostriedku 10 10 9 9 8 7 6 5 4 3 2 1 PEŠI BICYKEL BUS 8 7 6 5 4 3 2 1 PEŠI BICYKEL BUS 0-5 5-10 10-15 15-20 20-25 25-30 30-45 45-60 60-90 90-120 120-150 150-180 >180 External trips External trips 10 9 8 7 6 5 4 3 2 1 Vonkajšie cesty podľa ich trvania a dopr. prostriedku BUS VLAK 10 9 8 7 6 5 4 3 2 1 Vonkajšie cesty podľa ich trvania a dopr. prostriedku BUS VLAK

Trips travel time by a vehicle type in Piešťany without calibration with calibration Inner trips Inner trips 10 9 8 7 6 5 4 3 2 1 Vnútorné cesty podľa ich trvania a dopr. prostriedku PEŠI BICYKEL BUS 10 9 8 7 6 5 4 3 2 1 Vnútorné cesty podľa ich trvania a dopr. prostriedku PEŠI BICYKEL BUS External trips External trips 10 9 8 7 6 5 4 3 2 1 Vonkajšie cesty podľa ich trvania a dopr. prostriedku BUS VLAK 10 9 8 7 6 5 4 3 2 1 Vonkajšie cesty podľa ich trvania a dopr. prostriedku BUS VLAK

Trips lenght by a vehicle type in Malacky without calibration with calibration Inner trips Inner trips 10 Vnútorné cesty podľa ich vzdialenosti a dopr. prostriedku 10 Vnútorné cesty podľa ich vzdialenosti a dopr. prostriedku 9 9 8 8 7 6 5 4 3 PEŠI BICYKEL 7 6 5 4 3 PEŠI BICYKEL BUS 2 BUS 2 1 1 0-0,5 0,5-1,0 1,0-1,5 1,5-2,0 2,0-2,5 2,5-3,0 3,0-4,0 4,0-5,0 >5,0 0-0,5 0,5-1,0 1,0-1,5 1,5-2,0 2,0-2,5 2,5-3,0 3,0-4,0 4,0-5,0 >5,0 External trips External trips 10 Vonkajšie cesty podľa ich vzdialenosti a dopr. prostriedku 10 Vonkajšie cesty podľa ich vdialenosti a dopr. prostriedku 9 9 8 8 7 7 6 5 4 3 6 5 4 3 BUS VLAK 2 BUS 2 1 VLAK 1 0-5 5-10 10-15 15-20 20-30 30-40 40-50 50-60 >60 0-5 5-10 10-15 15-20 20-30 30-40 40-50 50-60 >60

Trips lenght by a vehicle type in Piešťany without calibration with calibration Inner trips Inner trips 10 Vnútorné cesty podľa ich vzdialenosti a dopr. prostriedku 10 Vnútorné cesty podľa ich vzdialenosti a dopr. prostriedku 9 9 8 8 7 6 5 4 3 PEŠI BICYKEL 7 6 5 4 3 PEŠI BICYKEL BUS 2 1 BUS 0-0,5 0,5-1,0 1,0-1,5 1,5-2,0 2,0-2,5 2,5-3,0 3,0-4,0 4,0-5,0 >5,0 2 1 0-0,5 0,5-1,0 1,0-1,5 1,5-2,0 2,0-2,5 2,5-3,0 3,0-4,0 4,0-5,0 >5,0 External trips External trips 10 Vonkajšie cesty podľa ich vzdialenosti a dopr. prostriedku 10 Vonkajšie cesty podľa ich vdialenosti a dopr. prostriedku 9 9 8 8 7 7 6 5 4 3 6 5 4 3 BUS VLAK 2 BUS 2 1 VLAK 1 0-5 5-10 10-15 15-20 20-30 30-40 40-50 50-60 >60 0-5 5-10 10-15 15-20 20-30 30-40 40-50 50-60 >60

Trip chains Malacky ACTIVITY abs. abs* tpr/inh Nr. Of trips active 471 365 2,45 894,90 passive 128 83 2,27 188,16 student 242 193 2,01 387,20 total 841 641 1470,26 AKTIVITA reťazce-ciest abs. podiel cesty na 1 reťazec spolu ciest podiel*súčet aktívny domov-práca-domov 276 0,7562 2 552 1,51 aktívny domov-nákup-domov 56 0,1534 2 112 0,31 aktívny domov-práca-nákup-domov 27 0,0740 3 81 0,22 aktívny domov-iný-domov 27 0,0740 2 54 0,15 aktívny domov-návšteva-domov 16 0,0438 2 32 0,09 aktívny nevykonaná 14 0,0384 0 0 0,00 aktívny domov-lekár-domov 12 0,0329 2 24 0,07 aktívny domov-práca-jedlo-práca-domov 10 0,0274 4 40 0,11 neaktívny domov-nákup-domov 34 0,4096 2 68 0,82 neaktívny domov-návšteva-domov 24 0,2892 2 48 0,58 neaktívny domov-lekár-domov 20 0,2410 2 40 0,48 neaktívny domov-iný-domov 16 0,1928 2 32 0,39 škola domov-škola-domov 165 0,8549 2 330 1,71 škola domov-iný-domov 29 0,1503 2 58 0,30 škola nevykonaná 12 0,0622 0 0 0,00

Trip chains Piešťany ACTIVITY abs. abs* tpr/inh Nr. Of trips active 1134 949 2,38 2700,57 passive 246 211 1,96 482,67 student 587 499 2,35 1382,21 total 1967 1659 4565,46 AKTIVITA reťazce-ciest abs. podiel cesty na 1 reťazec spolu ciest podiel*súčet aktívny House-Work-House 558 0,5880 2 1116 1,18 aktívny House-Shopinng-House 121 0,1275 2 242 0,26 aktívny Not carried out 78 0,0822 0 0 0,00 aktívny House -Others-House 75 0,0790 2 150 0,16 aktívny House Work-Shopinng-House 71 0,0748 3 213 0,22 aktívny House-Visit-House 41 0,0432 2 82 0,09 aktívny House-Work-Lunch-Work-House 31 0,0327 4 124 0,13 aktívny House Bussines House 22 0,0232 2 44 0,05 aktívny House Recreation House 21 0,0221 2 42 0,04 aktívny House Work 18 0,0190 1 18 0,02 aktívny House Shool House 17 0,0179 2 34 0,04 aktívny House Work-Work-House 16 0,0169 3 48 0,05 aktívny House Work-Others-House 14 0,0148 3 42 0,04 aktívny House Others-Work-House 12 0,0126 3 36 0,04 aktívny House Work-Work-House 12 0,0126 3 36 0,04 aktívny House-Work-Visit-House 11 0,0116 3 33 0,03 neaktívny House shopping-house 89 0,4218 2 178 0,84 neaktívny Nevykonana 38 0,1801 0 0 0,00 neaktívny House-Others-House 38 0,1801 2 76 0,36 neaktívny House-Visit-House 30 0,1422 2 60 0,28 neaktívny House Doctor-House 28 0,1327 2 56 0,27 neaktívny House Recreation-House 22 0,1043 2 44 0,21 škola House School- House 397 0,7956 2 794 1,59 škola House - Others- House 73 0,1463 2 146 0,29 škola Nevykonana 47 0,0942 0 0 0,00 škola House Visit-House 23 0,0461 2 46 0,09 škola House schopinng- House 21 0,0421 2 42 0,08 škola House school-others- House 19 0,0381 3 57 0,11 škola House Recreation- House 14 0,0281 2 28 0,06 škola House school-schopinng- House 14 0,0281 3 42 0,08 škola House - Work- House 10 0,0200 2 20 0,04

Scenarios D4 outer road ring of Bratislava BA Eisenstadt railway connection Bridge between Záhorská Ves and Angern Increasing of tact of the BA CityBUS No.901 to Hainburg Rail link: Wien-Bruck-Kittsee-Petrzalka-BA Stadt-Marchegg-Wien

Scenarios: D4 outer road ring of Bratislava The D4 motorway aim: diverting transit traffic from existing congested D1 outside the capital, reduce the negative impacts of transport on the territory contribute to the traffic flow and safety on the existing highway D1. D4 motorway route is divided into 4 sections.

Scenarios: BA Eisenstadt railway connection Incorporation into the existing timetable: tact 1 hour Time saving: 10 min No interchange in Parndorf

Scenarios: Bridge between Záhorská Ves and Angern The proposed action is to bridge the Morava River and its inundation area bridges. The aim is to replace link between Austria and Slovakia. bridge will contribute to stronger economic and tourism development in the border regions of Slovakia and Austria

Scenarios: Bridge between Záhorská Ves and Angern Vehicles with a maximum weight of 7.5t for the buses. Sided sidewalks for pedestrians and cyclists with a width of 2.0 meters. Total length of bridge: 370 m, Height of gabarits 7.0 meters above HSW96 Connection on existing road II/503 Záhorská Ves - Malacky. The total estimated investment costs amount to 11,949,810.

Scenarios: Increasing of tact of the BA CityBUS No.901 to Hainburg No. Of line: 901 Lenght of route: 22min Fare: 1.50 basic, 0.75 discount (under 26 years, over 60 years, handicapped), No charges (under 6 yeard) Lenght: 16,5km Current tact: 60min Planned tact: 20min

Scenarios: Increasing of tact of the BA CityBUS No.901 to Hainburg

Scenarios: Extension of railwaiy link S7 from Wolfstahl Kittsee to Bratislava Petržalka

Scenarios: Rail link Wien-Bruck-Kittsee-Petrzalka-BA Stadt-Marchegg-Wien Effects on cross-border railwais routes between Bratislava and Vienna Variants of comparison: current status increase the frequency of the northern route (while maintaining the frequency of the southern route) increasing frequency on the southern route (while maintaining the frequency of northern Strase) no connections between BA Predmestie BA filiálka BA Petržalka with connections BA Predmestie BA filiálka BA Petržalka with transfer with connections BA Predmestie BA filiálka BA Petržalka without transfer Diferently like in Vienna, in Bratislava are not trains concentrated on one train station, good station could be BA New City. Improving rail service between Vienna and Bratislava will require significant investment in infrastructure, around hundreds of millions to billions of euros

Scenarios: Rail link Wien-Bruck-Kittsee-Petrzalka-BA Stadt-Marchegg-Wien

Next steps Calibration of Model according to trip chains census 2011 Final report and conference

Thanks for Yours attention 6. Fachbeiratsitzung 13.06.2012 Gyor