Terms of Reference: Introduction

Similar documents
Enhanced Engagement Terms of Reference:

Airlines UK 24 May 2018: Speech by Richard Moriarty

Decision Strategic Plan Commission Paper 5/ th May 2017

2. Our response follows the structure of the consultation document and covers the following issues in turn:

Economic regulation: A review of Gatwick Airport Limited s commitments framework

ACTION: Notice of a new task assignment for the Aviation Rulemaking Advisory Committee

ISBN no Project no /13545

2 THE MASTER PLAN 23

Air Operator Certification

Invitation to participate in the ATOL Reporting Accountants scheme CAP 1288

FUTURE AIRSPACE CHANGE

COMMISSION IMPLEMENTING REGULATION (EU)

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada

Criteria for an application for and grant of, or variation to, an ATOL: Financial

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003

CAA consultation on its Environmental Programme

Assessment of Flight and Duty Time Schemes Procedure

The Government s Aviation Strategy Transport for the North (TfN) response

Seminario internacional sobre gestiόn privada de aeropuertos

Economic regulation at Gatwick from April 2014: Notice granting the licence

Scotland s Water Industry: Past, Present and Future

A Master Plan is one of the most important documents that can be prepared by an Airport.

Economic regulation: A review of Gatwick Airport Limited s commitments framework

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur

ANGLIAN WATER GREEN BOND

Response to CAA Consultation on Strategic Themes for the Review of Heathrow Airport Limited Charges (H7)

easyjet response to CAA Q6 Gatwick final proposals

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

Civil Aviation Authority. Information Notice. Number: IN 2016/052

Airservices Australia Long Term Pricing Agreement. Discussion Paper April Submission by Australia Pacific Airport Corporation (APAC)

Update on implementation of Taking Revalidation Forward recommendations

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Safety & Airspace Regulation Group Code of Practice. Issue 13, August 2013 CAP 1089

Official Journal of the European Union L 7/3

Economic Development Sub- Committee

The Strategic Commercial and Procurement Manager

GATWICK AIRPORT LIMITED

MAXIMUM LEVELS OF AVIATION TERMINAL SERVICE CHARGES that may be imposed by the Irish Aviation Authority ISSUE PAPER CP3/2010 COMMENTS OF AER LINGUS

CAA stakeholder engagement Draft airspace modernisation strategy

Communication and consultation protocol

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

SUBMISSION BY. TO THE TRANSPORT AND INFRASTRUCTURE SELECT COMMITTEE ON THE COMMERCE AMENDMENT BILL

Government consultations : Airports National Policy Statement, UK Airspace Policy, Night Flights

Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

Monarch airlines response to the CAA s review on Gatwick s commitment framework

AUDIT COMMITTEE CHARTER

Draft airspace design guidance consultation

Local Development Scheme

Review of Christchurch International Airport s pricing decisions and expected performance (July 2017 June 2022)

AERODROME SAFETY COORDINATION

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

Performance monitoring report for 2014/15

Consultation on air display and low flying permission charges

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

Airways New Zealand Queenstown lights proposal Public submissions document

Safety and Airspace Regulation Group

ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC

Working Draft: Time-share Revenue Recognition Implementation Issue. Financial Reporting Center Revenue Recognition

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

EDIT THIS TEXT IN INSERT > HEADER / FOOTER. INCLUDE TEAM NAME, SECURITY CLASSIFICATION AND DRAFT STATUS. CLICK APPLY TO ALL. 02 February

Our Ref.: Let September Paul Logan Acting Chief Financial Officer Airservices Australia PO Box 367 Canberra ACT 2600.

Response to CAA Guidance for Heathrow Airport Limited in preparing its business plans for the H7 price control

Terms of Reference for a rulemaking task

The private financing of airport infrastructure expansions

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

TOR FOR THE DEVELOPMENT OF A ECOTOURISM BUSINESS PLAN FOR FAYOUM

Ref: New Tariff for the Water and sewerage Company Inc. (WASCO) Page 1 of 9

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA

ENVIRONMENT ACTION PLAN

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

Re: CAP 1541 Consultation on core elements of the regulatory framework to support capacity expansion at Heathrow

(Non-legislative acts) REGULATIONS

Queensland Competition Authority

CAA Stakeholder Survey Results. Part 139 Aerodromes. Introduction:

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

Director, External Trade, CARICOM Secretariat. CARICOM Secretariat, Guyana

European Aviation Safety Agency. Opinion No 10/2017

Gatwick Airport Limited operator determination

Consumer Council for Northern Ireland response to Department for Transport Developing a sustainable framework for UK aviation: Scoping document

GATWICK AIRPORT LIMITED REGULATORY ACCOUNTS FOR THE YEAR ENDED 31 MARCH 2014

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction

Guidance on criteria for assessing the financial resources of new applicants and holders of operating licences

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Revalidation: Recommendations from the Task and Finish Group

Airport Master Planning Process & Update

Response to CAA Consultation on the Future of Service Quality Regulation for Heathrow Airport Limited

THIRTEENTH AIR NAVIGATION CONFERENCE

STANSTED AIRPORT LIMITED REGULATORY ACCOUNTS PERFORMANCE REPORT FOR THE YEAR ENDED 31 MARCH Financial Review...1. Performance Report...

Heathrow Consultation January March 2018

easyjet response to the European Commission consultation on the aviation package for improving the competitiveness of the EU aviation sector

Short-Haul Operations Route Support Scheme (RSS)

ANA Traffic Growth Incentives Programme Terms and Conditions

Chapter 1: Introduction Draft

Transcription:

Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS consultation Introduction In accordance with the Secretary of State s (SoS) power under section 16(1) of the Civil Aviation Act 1982, the SoS and Department for Transport (DfT) require the Civil Aviation Authority (CAA) to provide advice in connection with the duty of the SoS to develop civil aviation. This advice will comprise: Views from the CAA on how well, in the CAA s opinion, Heathrow Airport Limited (HAL) has engaged with and responded to the airline community on the appropriate scope, design and costing of new runway capacity at Heathrow airport; and If required, support from the CAA in analysing technical responses to the government s draft Airports National Policy Statement (Airports NPS) consultation, where the CAA has access to technical expertise not readily available to the DfT. The SoS will take into account the CAA s advice on HAL-airline engagement, amongst other factors, when deciding whether to recommend that the government supports the Heathrow Northwest Runway scheme in Parliament, through designation of an Airports NPS, expected to take place in the first half of 2018 (subject to the outcome of a further consultation). The CAA is requested to produce a written report on the HAL-airline engagement process for the SoS. Completion of this report may require the CAA to procure specialist advice on cost efficiency. These Terms of Reference outline the outputs required from this arrangement.

Assessment of HAL-airline engagement Background One of the most important objectives of economic regulation is to secure efficient investment by regulated firms. The CAA already has a number of regulatory tools to aid cost efficiency including constructive engagement, capex triggers linked to the delivery of projects, separate categories of core and development capex, the option of ex ante and ex post efficiency reviews and the use of an Independent Fund Surveyor to review major projects as they are being implemented. The CAA is also currently considering new methods and mechanisms, within the existing regulatory framework, for securing cost efficient delivery of new runway capacity, including the potential for ex-ante financial incentives, strengthening ex-post reviews and enhancing governance oversight. An illustration of how it is examining new approaches can be seen in its policy decision on planning costs, where it has implemented an incentives-based regime to the treatment of costs. The CAA and the DfT agreed with the conclusion of the Airports Commission that the current regulatory regime is capable of supporting the delivery of new airport capacity. The CAA and the DfT continue to keep this matter under review. In particular, the CAA continues to consider whether it might be appropriate to implement more structural changes to licensing and financing aimed at incentivising cost efficiency, such as a split RAB approach. Overarching this objective of cost efficiency is the CAA s primary duty under the Civil Aviation Act 2012 to further the interests of users of air transport services regarding the range, availability, continuity, cost and quality of airport operation services. Following the government announcement that the Heathrow Northwest Runway is its preferred scheme, HAL and the airline community have commenced engagement in a detailed process to review the scope, design and cost of the scheme. The purpose of this process is to ensure that the scheme meets the reasonable needs of airlines and consumers and, in particular, that the design of the scheme is cost efficient. The CAA will be actively involved in the airport-airline engagement process, observing and advising on the format and quality of engagement throughout the process. The DfT may wish to observe and potentially participate in elements of the engagement process, but will only do so: With the CAA s prior written agreement and within the bounds of any limits/conditions agreed between the CAA and the DfT; Subject to any relevant propriety or governance arrangements; and In a manner which does not impinge upon the CAA s independence in carrying out its regulatory duties. 2

Objectives and Outputs The SoS s primary objective for this work is to understand how well HAL has engaged with and responded to the airline community on the appropriate scope, design and costing of new runway capacity. The CAA s work will focus on three phases: (i) reviewing the engagement process; (ii) identifying and evaluating the outputs from the engagement process, predominately the changes made to the design of the scheme; and (iii) assessing the effectiveness of the engagement process. The review will focus on HAL-airline engagement principally through the lens of the CAA s primary duty to ensure that decisions are taken in the best interest of users, i.e. passengers and cargo owners. As the work will be carried out under s.16 and not as part of the CAA s own regulatory duties, the CAA may also take into account other considerations relevant to the SoS s functions where appropriate. (i) Review of the engagement process The first part of the review should consider the engagement process between HAL and the airline community. The key outputs include the following: Summary of the process proposed and undertaken by HAL and the airlines, covering governance arrangements, timetable, key deliverables and outputs; Summary of recommendations put forward by the CAA to improve the engagement process and whether or not those recommendations were implemented by HAL; Summary of the scope and content of HAL-airline engagement, particularly the extent to which discussions were focused on furthering the interests of passengers and cargo owners or only on narrow commercial issues; Assessment of the quality, intensity, maturity and meaningfulness of the engagement between the HAL and the airlines; Assessment of any gaps or weaknesses in the engagement process, particularly with respect to passenger interests (and cargo owners), and whether any steps were taken to overcome these; Identification of any parties to the engagement process who did not engage in the process, particularly those who actively decided not to engage; Feedback on the engagement process from the HAL, airline representative bodies and specific airlines; and Any opportunities identified by the CAA, HAL or the airlines to involve consumers or consumer representative bodies in the process (directly or indirectly) and how and whether those opportunities have been exploited. 3

ii) Identification and evaluation of the outputs from the engagement process The second part of the review involves the CAA critically assessing the extent to which the engagement process has delivered tangible changes to the scope, design and cost of the runway scheme. This will largely involve documenting and analysing the outputs, i.e. the changes to the scheme design. This should include, but not be limited to, outlining: The key changes made to the scheme design as a result of HALairline engagement; The key changes made to delivery and implementation plans, particularly any changes to the approach to construction or to the phasing of the scheme or knock-on effects on the passenger; How these changes are expected to impact on the service offered to existing and future passengers and cargo owners; Areas where there is agreement over scheme design assets, but significant differences of opinion on the costs and efficiency of these elements of the scheme. This should cover the costs, procurement and delivery methods proposed; The key issues identified and discussed during the engagement process, noting any issues which were particularly controversial; Any implicit or explicit trade-offs between types of passenger interests (business, leisure, existing, future) or types of airlines (lowcost, full-service, etc.); Any explicit trade-offs made by HAL and the airlines; Any proposals advocated by HAL or the airlines which were not included in the final design and the rationale for not including them; and A summary of outstanding concerns of the CAA, promoter or airlines about the revised scope, design and cost of new runway capacity. In undertaking this task, the CAA will agree with the DfT the starting design to make its assessment against. This is likely to be either the design detailed in the Statement of Principles or the version presented to the airlines immediately after the government announcement on scheme preference. It may also be necessary to consider the links to or differences as against the design in any draft Airports NPS. As well as gathering the above evidence, the CAA will also make a general assessment of the nature of the arguments put forward by HAL and the airlines on the aspects of the design that they particularly favoured. This will include whether the proposed changes would, in general, improve cost efficiency and reduce risks and reflect the passengers and cargo owners interests rather than promoting the commercial interests of individual airlines only. 4

iii) Assessment of effectiveness of the engagement process The CAA will combine the findings from the review of the engagement process, with the identified outputs, to make an assessment of: The extent to which the reasonable interests of existing and future passengers and cargo owners were reflected; The extent to which any steps taken to involve consumers/consumer representatives in the process aided in identifying, clarifying and implementing those interests; The cost efficiency of the scheme design, with reference to cost benchmarks of other airports and comparable infrastructure projects; The overall effectiveness of the HAL-airline engagement process and any outstanding airline or other stakeholder concerns about the engagement process; The extent to which reasonable airline preferences for the scope, design and cost of new runway capacity have been incorporated; The acceptability to the airlines, investors and other stakeholders of the revised scheme design (i.e. the level of agreement reached); and Any key risks that HAL and its investors, the airlines, the CAA and Government could be exposed to as a result of the engagement process or the revised scheme design. The CAA will set out its conclusions on how well HAL has engaged with and responded to the airline community on cost efficiency of the scheme scope, design and costing. The CAA will also set out its conclusions on whether engagement has led to an appropriate scope, design and cost for the scheme, and an implementation approach, that serves to further the interests of current and future passengers, cargo owners, airlines and other relevant stakeholders. Any lessons from the engagement process that could be used to enhance and inform the regulatory process for setting airport charges in HAL s upcoming H7 price control period and beyond would also be noted by the CAA. 5

Products Following the government announcement on 25 October 2016 that the Heathrow Northwest Runway is its preferred scheme, the CAA will provide the SoS with: An initial health check" in February 2017 on whether HAL has made a good start and whether its plans for the remainder of 2017 are appropriate (completed); Summary reports on the CAA s interim findings on a quarterly basis (as of November 2017, interim reports had been provided in May and September 2017); and A final report by April 2018 at the latest (in advance of an Airports NPS being laid before Parliament in the first half of 2018), covering the CAA s conclusions and findings. Timings for a draft of this report will be agreed between the DfT and the CAA in early 2018 when broader Programme timescales are clearer. The timescales for delivery of these products will be subject to the government s schedule for delivery of an Airports NPS and HAL s airline engagement plans. Support in analysing technical responses to the Government s draft NPS consultation Background The government consulted on a draft Airports NPS between 2 February and 25 May 2017. The draft Airports NPS set out the planning policy framework which the applicant for a Northwest Runway at Heathrow airport would have to comply with in order to be granted development consent for the scheme. Over 70,000 responses to the consultation were received and work to analyse them is ongoing. On 7 September 2017, the SoS announced that was to be a short period of further consultation to take into account updated evidence, specifically the revised aviation demand forecasts and the government s final air quality plan. This further consultation commenced on 24 October 2017 and focuses mainly on the specific elements of the draft Airports NPS affected. Scope of Work It is anticipated that some of the responses to the government s draft Airports NPS consultations may be technical in nature and require knowledge or expertise which is not readily available to the DfT. Where the CAA has access to the requisite expertise, the DfT may call on the CAA to support its analysis of those responses. This assistance will be sought on an ad hoc basis. The DfT will agree the scope, outputs and timescales of individual pieces of work with the CAA if and when they are required. 6

Administrative Matters Specialist Advice The CAA will be responsible for delivery of the advice requested and the report on HAL-airline engagement. It is acknowledged, however, that the CAA may wish to draw upon the skills and expertise of firms with experience in the planning and management of complex major construction projects, as well as undertaking cost benchmarking. The CAA will discuss any such engagements with the DfT prior to commissioning them and will be responsible for ensuring that they deliver value for money. The CAA accepts that the DfT will have to conduct its own process to scrutinise and sign off their budget before work is commissioned. In addition, the CAA will be able to access DfT officials and advisors at the DfT s discretion where both parties agree that those officials/advisers could add value to the CAA s activities. Reporting and Monitoring As set out above, the CAA will provide the SoS with quarterly updates on the progress of HAL-airline engagement, beginning with the initial health check in February 2017. Those updates shall be delivered in the first instance to the Commercial Team in the DfT s Airport Capacity Directorate, although the CAA should be prepared to brief other DfT staff and/or governance bodies if requested to do so. There will be regular monthly project management meetings with the DfT to ensure the work remains on track. This will also allow any findings on HALairline engagement to be communicated early and the engagement process revised accordingly. As well as reporting on progress to date and against budget, the CAA should be prepared to provide a forward look on upcoming activities and resource requirements at these meetings. Budgeting, Invoicing and Payment It is acknowledged that the CAA previously provided the DfT with an indicative budget setting out the CAA s expected resource requirement and costs by month for the period from October 2016 to December 2017, when the work was originally planned to conclude. It is expected that a refreshed budget will now be produced and agreed to cover the period to April 2018. The DfT and CAA may by agreement amend that budget from time to time as appropriate in the circumstances. In accordance with section 16(4) of the Civil Aviation Act 1982, the CAA will be entitled to recover from the SoS expenses reasonably incurred by the CAA in providing the advice specified in this terms of reference. The CAA should 7

keep a record of the expenses it incurs in the provision of this advice and support. For CAA staff, expenses will be based on day rates and pro-rated as appropriate; day rates for different bands of CAA staff will be set out in the budget once reviewed and confirmed. For specialist advice, expenses will be those amounts actually and properly paid by the CAA to advisers. In recovering such expenses, the CAA should provide the DfT with draft invoices on a quarterly basis at a minimum. The CAA should be prepared to provide any such information as the DfT may reasonably require in order to determine that expenses have been reasonably and efficiently incurred. This information might include, for example, timesheets detailing time spent by CAA staff on the project or, in the case of external specialist advice, invoices detailing expenditure actually incurred by the CAA. Once the DfT has approved the draft invoices, the CAA should submit final invoices to the appropriate Shared Services Centre for processing: the DfT will provide the requisite details in due course. Changes to Terms of Reference The DfT may, in discussion with the CAA, amend and/or change these terms of reference from time to time, as appropriate in order to meet the SoS s requirements. The CAA will provide an update on the impact any such changes may have on time and/or cost of delivery of the advice. The DfT reserves the right to terminate this commission at any time and will reimburse the CAA for any expenses reasonably incurred in carrying out work prior to termination. 8