Similar documents
GROWTH IN THE TOURISM INDUSTRY

AGRICULTURE DEPARTMENT Field Accounting and Statistics Division. An Inventory of Its Audit Reports and Records of County Agricultural Societies

DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP

FY 2018-FY 2021 STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

SNAPSHOT Investing in Roads and Bridges 2016 Budget for a Better Minnesota

Postal Verification Card Report for November 2010 General Election

Base Governor (Updated 4/20/17) First Special Session HF 3 Transportation - Ch. 3. Conference Position 5/1/2017. Conf Position Changes FY 18-19

2009 Regional Solicitation Selected Projects*

108 miles/1,427 Average ADT miles/613 Average ADT miles/1,851 Average ADT

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

REGIONAL PARKS & TRAILS COMMISSION

MINNESOTA DEPARTMENT OF TRANSPORTATION BRIDGE MANAGEMENT UNIT BRIDGE ROSTER - SHOWING DEFICIENT T.H. BRIDGES STATEWIDE 08/02/2007 PAGE: 1 YEAR

Current Corridor Characteristics

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Project Summary 2009

Community Development Committee

ACTION TRANSMITTAL

Non-Motorized Transportation

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

Update of MDX Open Road Tolling

2016 Regional Transportation Alternatives Program (TAP) Grant Application

NORTHEAST CARLTON COUNTY BICYCLE ROUTE PLAN

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

TXDOT AVIATION DIVISION

Cascade River State Park Management Plan Amendment

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

*Note: This data is preliminary and subject to change*

University Region Non-Motorized Plan 2015

Greater Minnesota Regional Parks and Trails Commission Designation Application

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

TRANSPORTATION Budget FY FY Governor Recs Senate - SF 1060 (3/21/17) FY 2017 Change Items FY 2018 FY 2019

Aviation Tax Report. June 30, 2016

Highways: Interstate. Highways: State Highways

Aviation, Rail, & Trucking 6-1

I-94 East Corridor Performance

FY Transit Needs Assessment. Ventura County Transportation Commission

CITY OF BROOKFIELD Capital Improvement Fund Budget

METROPOLITAN PLANNING ORGANIZATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION

Chapter 1 Introduction and Project Overview

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Report on Project Cost Comparisons

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

1.2 Corridor History and Current Characteristics

CHAPTER 1: INTRODUCTION

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

Preferred Alternative Summary

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

APPENDIX A: Planning Consistency Checklist

Report to the Dulles Corridor Advisory Committee

HUMUNA 2016 GROUP AND BENEFIT NUMBERS AGENT USE ONLY PLAN NAME STATE SERVICE AREA

RUSHMORE CONNECTOR TRAIL PROPOSAL

Draft for approval by TCC on 2/3, TAQC on 2/9 and ARC Board on 2/22. Regional Trail Plan. Mike Alexander, Director, Center for Livable Communities

TRANSPORTATION IMPROVEMENT PROGRAM

Glacial Lakes State Trail Master Plan Amendment Trail Extension into Downtown Willmar

BOARD OF AIRPORT COMMISSIONERS

MADERA COUNTY TRANSPORTATION COMMISSION EXECUTIVE MINUTES

2014 LEGISLATIVE AGENDA

Michigan s Engineering Safety Program for Local Roadways

The Corporation of the City of Kawartha Lakes Council Report

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

Northaven Trail Phase 2 Initial Project Overview

Airport Master Plan Update June 15, 2017

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

Airport Master Plan Update June 15, 2017

WESTERN EL DORADO COUNTY SHORT AND LONG-RANGE TRANSIT PLAN Executive Summary

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

CITY OF ORR TRANSPORTATION IMPROVEMENT PLAN JUNE Prepared by: Arrowhead Regional Development Commission Regional Planning Division

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING

Minnesota Great River Road Transportation Alternatives Local Project Summaries December 19, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Finance and Implementation

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Chapter 1 Introduction and Project Overview

Corridor Investment Management Strategy Duluth Meeting Summary 6/4/2012

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

DWRF Principal Forgiveness Awarded / Resvd. WIF Grant Awarded or Reserved

SENATE, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED FEBRUARY 8, 2016

Metropolitan Parks and Open Space Commission Subject District(s), Member(s): Policy/Legal Reference: Staff Prepared/Presented: Division/Department:

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

AGENDA GUEMES ISLAND FERRY OPERATIONS PUBLIC FORUM

SMART Southeast Minnesota Association of Regional Trails

SAMTRANS TITLE VI STANDARDS AND POLICIES

I-95/395 HOV/Bus/HOT Lanes Project Overview

Proposed Dulles Toll Road Rate Adjustments

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Transcription:

This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Minnesota Department of Transportation 395 John Ireland Blvd. St. Paul, MN 55155 To the Reader: The State Transportation Improvement Program (STIP) is a comprehensive four-year schedule of planned transportation projects in Minnesota for state fiscal years 214, 215, 216, and 217. These projects are for state trunk highways, local roads and bridges, rail crossings and transit capital and operating assistance. This document represents an investment of over $6.1 billion in federal, state, and local funds over the four years. This document is the statewide transportation program in which MnDOT, local governments, and community and business interest groups worked together in eight District Area Transportation Partnerships (ATPs) to discuss regional priorities and reach agreement on important transportation investments. This state process was developed in response to the Federal Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991 which focused on enhanced planning processes, greater state and local government responsibility, and more citizen input to decision making. The process has continued under the three following acts: The 1998 Transportation Equity Act for the 21 st Century (TEA-21); the 25 Safe, Accountable, Flexible, Efficient Transportation Equity Act: A legacy for Users (SAFETEA-LU); and we are currently working under a two year bill, Moving Ahead for Progress in the 21 st Century Act (MAP-21), signed into law July 6, 212. Any questions and comments on specific projects included in this program may be directed to the identified MnDOT District Transportation office listed in the Program Listing sections of the document. To further assist you in using this information, a searchable database will be available by November 213 on the Internet at: http://www.dot.state.mn.us/planning/program/stip.html General questions or comments can be directed to the Office of Transportation System Management in St. Paul (651-366-3798). Thank you for your interest and support in Minnesota s Transportation System.

Minnesota State Transportation Improvement Program (STIP) 214-217 Recommended for Approval by: MnDOT's Transportation Program Investment Committee usan M. Mulvihill, P.E. Deputy Commissioner Chief Engineer cl~c!bb Tracy Ha h Deputy Commissioner Chief Operating Officer Chief Financial Officer Approved by: MnDOT Commissioner ~

Minnesota State Transportation Improvement Program (STIP) Table of Contents I. INTRODUCTION..I-2 II. III. STATE TRANSPORTATION PROGRAM (STIP)... II-1 Certification... II-1 The 2 Year Highway Investment Plan... II-1 Public Involvement... II-2 Minnesota Transportation Process for Investment Decisions... II-3 Financial Plan... II-4 Project Selection... II-7 PROGRAM LISTING... III-1 APPENDICES A. Selected Highway and Transit Programs Greater Minnesota MPO Programs... A-1 Transportation Alternatives Program (TAP)... A-2 Highway Safety Improvement Program (HSIP)... A-3 Transit Programs... A-4 Tribal Transportation Program (TTP)... A-5 Recreational Trails Program... A-6 MnDOT State Road Construction Program (SRC)... A-7 B. Other Modal Programs Minnesota Rail Service Improvement Program... B-1 Port Development Assistance Program... B-2 Minnesota Aeronautics Airport Capital Improvement Program... B-3 C. MnDOT S Detailed Federal Fiscal Constraint Plan... C-1

Minnesota State Transportation Improvement Program (STIP) List of Figures Page Figure 1 State Transportation Improvement Program Funding by Program... I-3 Figure 2 Transportation Investment Process... II-3 Figure 3 State Transportation Improvement Program Funding by Source... II-9 Figure 4 State Transportation Improvement Program Funding by District/ATP... II-9 Figure 5 System Categories... III-1 Figure 6 Program Categories... III-2 Figure 7 Smart Code... III-3 Figure 8 Fund Categories... III-3 Figure A-1 Figure A-2 Figure A-3 Figure A-4 Figure A-5 Figure B-1 Figure B-2 Figure C-1 Figure C-2 Appendix Figures Greater Minnesota MPO Funding... A-1(2) Highway Safety Improvement Program Funding... A-3(2) Transit Funding by Source... A-4(2) State Road Construction Program Funding by Source... A-7(2) State Road Construction Program Funding by District/ATP... A-7(2) Minnesota Rail Service Improvement Program... B-1(2) Port Development Assistance Program... B-2(2) Minnesota Detailed Financial Plan 214-217... C-1(2) Minnesota Federal Advance Construction Forecast... C-1(4)

PREFACE State of Minnesota State Transportation Improvement Program (STIP) 214-217 This document is the State of Minnesota State Transportation Improvement Program (STIP) for state fiscal years 214-217. It includes an introduction, or overview, of the anticipated expenditures for all modes of transportation under the authority of the Minnesota Department of Transportation (MnDOT). The document is organized into three chapters and three appendices. Chapter I of this document is the introduction to MnDOT. It provides information on MnDOT s vision for its transportation system and the factors that help shape MnDOT s policies and programs. Chapter II is the formal response to the federal requirements for the STIP developed under the Safe, Accountable, Flexible, and Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) and continued under MAP-21. The programming process to develop this STIP began in the fall of 212 and was developed under the requirements outlined in SAFETEA-LU with a conservative estimate of federal funds anticipated. Chapter III includes the project listing of all projects using federal-aid highway or transit funding. Projects using only local dollars are not included. These listings are organized by MnDOT District/Area Transportation Partnership (ATP) areas. Appendix A includes a description, expenditure summary and project listing for several federal-aid highway and transit categories. A description of the MnDOT State Road Construction Program (SRC) is also included, but without a repeat of the project listing of state trunk highway projects. Appendix B includes, for information purposes only, a description, financial summary, and project listing for other modal programs that are not subject to the federal planning requirements under SAFETEA-LU and continued under MAP- 21. Appendix C includes a detailed financial plan for the STIP. The 214-217 STIP was developed using programs specified under MAP-21 which was signed into law July 6, 212. Once approved by the US DOT, the State Transportation Improvement Program for Minnesota is available on the Internet at the following address: http://www.dot.state.mn.us/planning/program/stip.html

I. INTRODUCTION The Minnesota Department of Transportation (MnDOT) was established and operates a transportation system that includes aeronautics, highways, motor carriers, ports, public transit, railroads and pipelines. MnDOT is the principal agency in the state for development, implementation, administration, consolidation, and coordination of state transportation policies, plans, and programs. These policies, plans, and programs are developed in cooperation with the public and a variety of transportation partners, including the Twin Cities Metropolitan Council, seven Metropolitan Planning Organizations (MPOs) established in areas with populations exceeding 5,, the nine Regional Development Commissions (RDCs), county, city, and Indian tribal governments throughout the state. The MnDOT vision is that Minnesota s multimodal transportation system maximizes the health of people, the environment and our economy. The system: connects Minnesota s primary assets the people, natural resources and businesses within the state to each other and to markets and resources outside the state and country; provides safe, convenient, efficient and effective movement of people and goods; and is flexible and nimble enough to adapt to changes in society, technology, the environment and the economy. A number of factors are shaping the development of MnDOT policies and programs. These include safety, the integration of transportation modes, service and investment preservation, customer focus, economic development, technology, environmental partnerships, and federal actions. This document addresses these factors and provides a multimodal focus. This document and the investment levels summarized in Figure 1 do not include the expenditures for infrastructure maintenance. In addition, unless federal funding is a part of the investment, the investments in this document and Figure 1 do not include improvements made by local levels of government. government investment in transportation infrastructure could be two to three times the investment level included in this document. The investment in transportation infrastructure improvements included in this document is summarized in Figure 1. I-2

*May not total correctly due to rounding. Figure 1 STATE TRANSPORTATION PROGRAM FUNDING INCLUDING RAIL, PORTS, AND AIR BY PROGRAM AND YEAR ($ MILLIONS) PROGRAM 214 215 216 217 TOTAL* Highway Assistance Program 1 1,462 1,71 1,18 976 4,527 Transit Assistance Program 2 38 488 344 376 1,516 SUBTOTAL* 1,77 1,559 1,362 1,352 6,43 Rail Service Improvement Program 3 2 2 1 2 7 Port Development Assistance Program 4 2 2 4 Airport Development Program 5 15 114 12 96 417 SUBTOTAL* 17 118 15 98 428 TOTAL* 1,877 1,678 1,467 1,45 6,471 1 The Highway Assistance Program includes all federal-aid for highways received through the Federal Highway Administration (FHWA) of the U.S. Department of Transportation (USDOT). It includes all federal apportionment, allocation or special funding. It also includes all state trunk highway funds appropriated for construction, other state appropriated investments and any local funding utilized as match for federal projects. A list of projects is included in Page III of the STIP. 2 The Transit Assistance Program includes all federal-aid for transit received through the Federal Transit Administration (FTA) of the USDOT. It also includes all state and local funds necessary to match the federal funds and operate the transit systems. All transit projects are included in Page III of the STIP and an estimated funding summary is included in Appendix A-4. 4 The Port Development Assistance Program was created in 1991. The 1996, 1998, 2, 21, 23, 25, 26, 28, 29, 211 and 212 Legislatures set aside a total of $25. million to fund this program. The total port development assistance program anticipated expenditures is included in Appendix B-2. 5 The Airport Development Program figures shown above include federal and state grant funds plus the local share or match. The project listing in Appendix B-3 is not financially constrained to the anticipated funding, and totals about $417 million in candidate airport projects statewide over the next 4 years. 3 The Minnesota Rail Service Improvement Program (MRSI) was established in 1976 to prevent the loss of rail service on lines potentially subject to railroad abandonment. Projects that fall within the MRSI are divided among 6 programs: rail line rehabilitation, capital improvements for rail shippers, capital improvement for railroads, purchase assistance to rail authorities, loan guarantees and state rail banking. The MRSI Program does not include funding for rail-highway safety projects included in the highway assistance program. The number of rail service assistance projects is estimated and shown in Appendix B-1. I-3

II. STATE TRANSPORTATION PROGRAM (STIP) Certification In accordance with 23 CFR 45.218, the Minnesota Department of Transportation (MnDOT), as the Governor s designee, certifies that the transportation planning process is being carried out in accordance with the following requirements: 1. 23 U.S.C. 134 and 135, 49 U.S.C. 533 and 534, and this part; 2. Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2d-1) and 49 CFR part 21; 3. 49 U.S.C. 5332, prohibiting discrimination on the basis of race, color, creed, national origin, sex, or age in employment or business opportunity; 4. Section 111(b) of the SAFETEA-LU (Pub. L. 19-59) and 49 CFR part 26 regarding the involvement of disadvantaged business enterprises in USDOT funded projects; 5. 23 CFR part 23, regarding implementation of an equal employment opportunity program on Federal and Federal-aid highway construction contracts; 6. The provisions of the Americans with Disabilities Act of 199 (42 U.S.C. 1211 et. seq.) and 49 CFR parts 27, 37, and 38; 7. Sections 174 and 176 (c) and (d) of the Clean Air Act, as amended (42 U.S.C. 754, 756 (c) and (d) and 4 CFR part 93; 8. The Older Americans Act, as amended (42 U.S.C. 611), prohibiting discrimination on the basis of age in programs or activities receiving Federal financial assistance; 9. Section 324 of title 23 U.S.C., regarding the prohibition of discrimination based on gender; and 1. Section 54 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR part 27 regarding discrimination against individuals with disabilities. MnDOT also concurs with the MPO s determination that the air quality conformity analysis has been completed by the necessary MPOs and has been reviewed and accepted by the Minnesota Pollution Control Agency. The 2-Year State Highway Investment Plan Projects in the STIP are consistent with the 2-Year State Highway Investment Plan (MnSHIP), a long-term, fiscally constrained and statewide plan. The Plan addresses federal planning requirements, the transportation goals identified in state law, and reflects MnDOT s Statewide Multimodal Transportation Plan and the Minnesota GO 5-Year Statewide Vision. The process for developing and updating the Plan provides early and continuous opportunities for the involvement of the public and other potentially affected parties. In accordance with Minnesota Statutes 174.3, Subdivision 1c, the Plan is updated every 4 years beginning January 15, 213, with interim updates as needed by MnDOT to promote statewide transportation planning. II-1

The plan is available for downloading at the following web address: http://www.dot.state.mn.us/planning/mnship/index.html Public Involvement The last three Federal Transportation Acts have created less of a federal presence in many transportation decisions. The diminished federal role results in more state/local authority and responsibility for these decisions. The funding flexibility and expanded project eligibility under these acts has given decision makers more options to address transportation priorities. Public involvement in transportation issues and decision making is vital because of this expanded eligibility and diversity. Federal Law requires an opportunity for early and continuous involvement in the development of the Statewide Transportation Plan and the STIP. Public involvement is also a mandatory component of the MPO planning process. state by the ATP partners, MnDOT and modal partners such as transit, rail and bike/pedestrian. Other methods used to encourage public involvement included the use of newspaper articles, informational mailings, press releases, websites and social media. A notice of the availability of the draft 214-217 STIP was placed in the State Register on June 1, 213. This notice provided a 3 day comment period to the public. Minnesota s transportation investment process (Figure 2), with the Area Transportation Partnerships (ATPs) provides for early and continuous involvement in the development of the STIP. The process incorporates the public involvement activities of the partners (MPOs, RDCs, counties, cities and others) into their roles on the ATP. MPOs in accordance with federal requirements have developed public participation processes and use them in conjunction with the development of their Transportation Improvement Programs (TIPs). The MPO TIPs include detailed discussion of public involvement. In addition to the public input derived through Minnesota s transportation investment process, public meetings, forums, conferences and focus groups have been held throughout the II-2

Figure 2 Transportation Investment Process State Goals *Milestone *Blueprint Transportation Strategies Transportation Planning *Statewide Transportation Plan Target Regional $ *Federal *State *Local Public Input District Planning *Solicit/Nominate Applications *Evaluate Transportation Priorities County City Township Transit Other Metropolitan Planning Organization Public Input Metropolitan Planning *Solicit/Nominate Applications *Evaluate Transportation Priorities Area Transportation; Partnerships *Integrate Priority Needs *Recommend Investments/Program (ATIP) Regional Development Organization Public Input RDO Planning *Solicit/Nominate Applications *Evaluate Other Eligible Transportation Elements Transportation Priorities The Metropolitan Council and its Transportation Advisory Board (TAB) make a concerted effort to ensure all interested and concerned parties are offered opportunities to participate in the preparation of the TIP for the Twin Cities metropolitan area. Public comment is solicited at public meetings, at a public hearing, and in a 45-day public comment period where comments are also accepted by email, phone, fax, or mail. At the TAB s regular public meeting on May 15, 213, the TAB adopted the draft TIP for the purpose of public comment; the public comment period was from May 15-June 28, 213. The TAB hosted a public hearing on June 19, 213, to hear comments on the draft TIP. In preparation for these meetings and the public comment period, Metropolitan Council emailed notification to groups representing a diverse set of stakeholders ranging from private transit providers to representatives of people with disabilities. In addition, Council published information on the Council s web site and in its newsletters sent to local elected officials and legislators. Notification of the public hearing for the 214-217 TIP was included in the State Register. State Transportation Program (Draft) *State Goals *Regional Priorities *Modal Balance *Equity Analysis State Transportation Program *Recommended by Transportation Program Committee *Approved by Transportation Commissioner Area Transportation Partnership *Re-evaluate DRAFT Program *Respond DRAFT Program Metropolitan Planning Organizations *TIP s finalized Area Transportation Partnership Federal Highway Administration Federal Transit Administration Announce Implement Minnesota Transportation Process for Investment Decisions The STIP is developed in accordance with the Guidance for the Development of the State Transportation Improvement Program published by MnDOT and with the memo on STIP Funding Guidance dated January 18, 213. Minnesota s STIP is developed through a regional geographic model for making investment decisions. The process chart on this page, (Figure 2), displays the partnerships and transportation activities necessary to produce a STIP. II-3

The process is driven by federal, state, local, and regional planning goals and objectives. Statewide investment goals have been drawn from statewide planning studies and policies, the Minnesota Statewide Transportation Plan, and an analysis of previous programs. They are offered as an aid in determining areawide priorities. The process builds on the plans and priorities established by MnDOT Districts, MPOs, cities, counties, townships and RDCs. The investment process uses eight regional partnerships whose boundaries are based on MnDOT s State Aid Districts. The partnerships, called Area Transportation Partnerships (ATPs), have as their members both traditional and non-traditional, metropolitan and non-metropolitan stakeholders and can include MPOs, RDCs, cities, counties, townships, transit providers, tribal governments, other interests, and MnDOT. The ATPs integrate the state and local priorities within their region and recommend a minimum four year program for federally funded transportation investments. This four year program, when combined with a list of state highway funded projects is considered the draft Area Transportation Improvement Program (ATIP). Each draft ATIP includes a prioritized list of projects that aid in solving transportation problems and implementing the long range objectives for the area. Balanced investment decisions promote effective and efficient transportation. Safety is a key element of all investments. The principal investment emphasis is preservation and operational improvements in the existing transportation system. Expansion is focused on the state s interregional corridor system that II-4 connects major economic centers and bottlenecks in the Twin Cities metropolitan area. The draft ATIP prepared by each ATP is submitted for inclusion in the draft State Transportation Improvement Program (STIP). Project cost estimates include an adjustment for inflation. The ATIPs are analyzed and compared to statewide goals and objectives, and unique transportation needs. They are also analyzed for completeness and fiscal constraint. From this a draft STIP is developed. The draft STIP is widely circulated for review and comment before final adjustments are made. This STIP covers four state fiscal years and includes all state and local projects financed with federal (highway or transit) assistance. The STIP also includes other regionally significant projects. The final STIP is reviewed and approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) prior to any expenditure of federal funds. Upon approval, the document will be used by each ATP as a starting point in the process for developing their next ATIP. Financial Plan As mentioned in the Preface of this document, this STIP is a formal response to federal requirements. The STIP financial plan addresses fiscal constraint requirements under MAP-21. The principal financial assumption is the continuation of existing revenue sources and levels consistent with SAFETEA- LU authorizations. All of the projects in the 214-217 STIP are deemed affordable for implementation under these reasonable financial assumptions. The financial constraint

requirements under MAP-21 are deemed to be sufficiently flexible to permit the selection of projects from the second and third year of the STIP to replace projects selected for the first year of the STIP. MnDOT reserves the right to make this project selection for the ATPs from within the STIP. Federal Funding. MAP-21 requires that the federal-aid highway and federal-aid transit projects in the STIP shall be based on financing reasonably expected to be available. The 214-217 STIP is based on anticipated federal, state and local funds. The federal-aid revenues are based on estimates of apportionment (formula), allocations, and high priority project funding. Federal-Aid Highway Formula Funding: Federal-aid highway formula funding is apportioned to the states by formulas established in law. Federal-aid highway apportionments have been highly variable. Minnesota developed this STIP based on a forecast estimate for obligation authority. Under MAP-21, the federal-aid highway obligation authority estimate for the development of this STIP is between $533 million and $537 million for all four years. Federal-Aid Highway Allocation Funding: Funding available from allocated funding is included in the STIP. Federal-aid highway allocation funding is distributed to the states by administrative formula or by means of a competitive application. Allocated funds include many varied categories of federal-aid, including, but not limited to Public Lands, Indian Reservation Roads, Forest Highways, TIGER and Scenic Byways. II-5 Allocations of categorical funding generally consist of several small projects that are distributed to specific areas of the state. Allocations are not always consistent with the time-frame of the development of the STIP. Annual allocations to individual projects or categories of funding that add up to less than $1 million are routinely added to the STIP but due to the timing of project identification may require amendments to be processed. Federal-Aid Highway Earmarked Funding: SAFETEA-LU saw an unprecedented amount of federal funds earmarked by Congress. About $9 million in Earmarked funding was made available each year under SAFETEA-LU, up from about $3 million each year under previous transportation acts. Earmarked funding is subject to obligation limitation but is available until spent. Due to project delivery schedules and the rules pertaining to the spending of these funds, the actual level of funding committed each year is variable. Earmark funding has not occurred under the continuing resolutions since the end of SAFETEA-LU at the end of FFY 29. MAP-21 does not include Earmark funding. Federal Transit Funding: Federal transit funding is appropriated annually. Programs include: Urbanized Area Formula Program, Rural Area Formula Program (includes rural, small urban, intercity bus, and job access and reverse commute), Enhanced Mobility of Seniors and Individuals with Disabilities Formula Program (includes New Freedom), Metropolitan and Statewide Non-metropolitan Transportation Planning Formula Program, State of Good Repair Grants and Bus and Bus Facilities Formula Grants. The passage of MAP-

21 and its provisions to guarantee funding for transit programs keep federal transit funds predictable; however, federal funds make up only a small percentage of total operating costs for the transit programs. MAP-21 consolidated certain transit programs to improve efficiency, targeted funding increases particularly for improving the state of good repair, added new reporting requirements and required performance measures for state of good repair, planning and safety programs. State Highway and Transit Funding. The State of Minnesota has a biennial budget. State agency programs and operating budgets are based on a balanced budget. The 214-217 STIP is based on one year of approved funding and three years of estimated funding. The funding level for the STIP is estimated to be approximately the same for all 4 years of the STIP. State Highway Funding: Funding for construction from this source is expected to be about $29 million per year based on the current revenue forecast. The State Highway cash flow also permits advance construction of projects prior to actual federal dollars being available. State Transit Funding: Transit assistance comes from three sources, the General Fund, Motor Vehicle Sales Tax (MVST) and Motor Vehicle Leased Sales Tax (MVLST). The transit appropriation from the State General Fund is expected to be about $16.3 million in each year of the STIP for Greater Minnesota and $17.9 million in 214 (of which $37 million is for the Southwest Corridor LRT project), $77. million in 215, and $76.7 million in the final two years of the STIP for the Metropolitan Area. Minnesota s 27 Legislature statutorily dedicated 4 percent of the annual MVST collections for transit: 4 percent is dedicated for Greater Minnesota transit operations and 36 percent for Twin Cities Metropolitan Area transit operations. The February 213 Forecast estimates total revenue for the Transit Assistance portion of revenues to be about $248.7 million in 214, $262.9 million in 215, $278.9 million in 216 and $294.3 million in 217. Greater Minnesota transit receives 5 percent of MVLST revenues after the fund reaches a threshold of $32 million. As of the February 213 Forecast, estimates for Greater Minnesota transit assistance are $13.5 million in 214. In addition, Minnesota s 213 Legislature modified the allocation of MVLST revenue for fiscal years 214 and 215 by capping the County/State Aid Highway (CSAH) fund s allocation at $9 million. Therefore $1.8 million of forecasted revenue over the 214-15 Biennium that would have gone to CSAH under the old formula will go to the Greater Minnesota transit account in the Transit Assistance Fund instead. No capital bonding funds were provided for transit projects in 213. II-6

Local Highway and Transit Funding. Local funding is assumed to be available to match, or overmatch, the federal-aid for highways and transit. The state and local funding is also expected to be sufficient to maintain and operate the highway and transit systems. Local Highway Funding: The State has a dedicated fund for state aid roads and bridges for counties and cities of 5, and over in population. The funding is available for maintenance and construction and is used in part to maintain the federal-aid highways and to match federal-aid. The local highway funding committed to match the federal highway aid is expected to average about $172 million per year. Local Transit Funding: The majority of the funding for the Minneapolis-St. Paul large urbanized area transit system is provided through local and state revenues. Since transit is substantially a local program, estimates of urbanized transit system funding are based on the MPO TIPs. Small urban and rural transit systems have a portion of their funding provided by assistance from the State General Fund, MVST and MVLST. The local share may be from a large variety of sources. Advance Construction. Federal law allows states to request and receive approval to construct Federal-aid projects prior to receiving apportionment or obligation authority for the Federal-aid funds through the use of Advance Construction (AC). This means that Minnesota may commit future federal funds to a project as long as it goes through the normal FHWA approval and authorization process. An AC project is treated the same as any other federal project and must be authorized II-7 prior to advertising for letting or expending any funds on the project. Projects using AC must be fully encumbered in the state MnDOT budget for the amount of state funds and the federal AC amount. AC is available to local governments as well as MnDOT. The agency that uses the AC procedure must front end the project with their own funds. These may be state aid funds, local tax funds, State Road Construction funds or some other appropriate funding sources. Local projects utilizing AC funds require a special agreement approved by MnDOT s Division of State Aid. Federal regulations require that AC be shown in the year incurred and that the conversion of AC be shown in each year in which conversion takes place. Conversion is the process of converting AC to the obligation of actual federal funds. In the project listings in this STIP, AC funding is shown in a separate column and the dollar amounts are not included in the column. However, the AC conversion dollar amounts are included in the FHWA column and the column in the year in which a project is converted. See Appendix C for the detailed financial plan. Project Selection The project selection process is the identification of the projects to be implemented in the first year of the 214-217 STIP. The projects in the remaining years of the STIP are deemed to be eligible for selection for implementation without a formal amendment to the STIP. MnDOT reserves the right to

select projects for the first year of the STIP from the projects in the last three years of the STIP. Project selection includes two iterative processes. The first iterative process is determining the program from the list of projects within the draft ATIPs. This includes the analysis of the preferred sources of funding for the projects and the directions included in the 2 Year Highway Investment Plan. It also is the step where the fiscal constraint is maintained. The second iterative process is the review of the STIP. The draft STIP is circulated back to the District/ATP for review and comment. Changes are made in the draft STIP as a result of the review and comment period. The STIP is forwarded to the Commissioner s staff for review and approval before being sent to the U.S. DOT. Figure 3 is a summary of the proposed expenditures in the STIP by fiscal year and the proposed source of federal highway or transit funding, state trunk highway funding or other source of state or local funding. Figure 4 is a summary of the proposed expenditures in the STIP fiscal year and ATP. II-8

Figure 3 is a summary of the proposed expenditures in the STIP by fiscal year and the proposed source of federal highway or transit funding, state trunk highway funding or other source of state or local funding. Figure 4 is a summary of the proposed expenditures in the STIP by fiscal year and ATP. Figure 3 STATE TRANSPORTATION PROGRAM FUNDING BY SOURCE AND YEAR ($ MILLIONS) SOURCE 214 215 216 217 TOTAL* Figure 4 STATE TRANSPORTATION PROGRAM FUNDING BY DISTRICT/ATP AND YEAR ($ MILLIONS) DISTRICT/ATP 214 215 216 217 TOTAL* Transit Programs Federal Transit 1 93 17 113 114 491 Administration 217 319 181 26 923 2 55 49 73 31 27 Other 91 169 163 17 594 3 119 93 16 83 41 SUBTOTAL* 38 488 344 376 1,517 4 59 62 71 6 252 Highway Programs 6 132 193 122 97 544 Federal aid Highway 541 461 445 53 1,95 Federal AC Conversion 46 73 14 58 282 State Trunk Highway 314 34 325 276 1,256 II-9 7 98 66 78 111 353 8 62 53 43 36 195 SUBTOTAL* 617 687 66 533 2,444 METRO 1,53 768 64 696 3,158 Bond 21 12 46 84 442 MISC 1 15 114 123 442 Other 35 95 98 55 598 SUBTOTAL* 1,462 1,71 1,18 976 4,528 TOTAL 1,77 1,56 1,361 1,353 6,44 TOTAL* 1,771 1,56 1,36 1,353 6,44 *may not total correctly due to rounding *may not total correctly due to rounding

III. PROGRAM LISTING The following section contains the FY 214-217 STIP project listing sorted by District/ATP. The first page of each District/ATP shows the District/ATP location within the state and the counties included within each District/ATP. The name of the District Transportation Engineer, phone number, and address are shown as well as a general information telephone number. The second page begins the listing of projects in that District/ATP sorted by Fiscal Year. Within each Fiscal Year, projects are sorted by System with transit projects first followed by rail, local roadway, and then state projects. The following information is provided for each project System BB CITY CR CSAH FH I IRR LOCAL MSAS MUN PED/BIKE RECTRAIL RR MN or US TWN Figure 5 System Categories Description Transit (buses) City Project County Road County State Aid Highway Forest Highway Interstate Highway Indian Reservation Roads and Bridges Local project not associated with a road Municipal State Aid Street Municipal Street Pedestrian or Bike Path/Trail (not assigned to a specific road) DNR Recreational Trail Railroad Trunk Highway Township Road - The sequence number is a unique number assigned to each project in this project listing. - The route name and number on which System the project is located. See Figure 5. III-1

Proj Num - Project identifier. Most trunk highway projects start with the control section numbers. Local projects start with either the county number or the city number. Agency - The jurisdiction responsible for implementing projects or for opening bids. Description - The location and/or type of project. Smart Code See Figure 7 Miles - The length of the project. Program - The program category. See Figure 6. Type of Work - The intent of the project. - Preliminary fund assignment with exact determination of funding determined upon authorization. See Figure 8. FHWA - The total estimated cost of the project relative to federal funding to be used in year of letting. This includes advance construction (AC) conversion funding. It does not include the original advance construction funding. - The total estimated federal aid highway funding to be used for the project. This includes advance construction conversion funding. Program Description Figure 6 Program Categories AM Municipal Agreement BI Bridge Improvement BR Bridge Replacement BT Bike Trail (not an Enhancement) CA Consultant Agreement DA Detour Agreement DR Drainage EN Enhancement (STP) IR Indian Reservation Roads MA Miscellaneous Agreements MC Major Construction NA Not Applicable (Uncommitted) NO Noise Walls PL Planning PM Preventive Maintenance RB Rest Area/Beautification RC Reconstruction RD Recondition RS Resurfacing RT Recreational Trail (DNR only) RW Right of Way Acquisition RX Road Repair (Bridge and Road Construction) (BARC) SA Supplemental Agreement/Cost Overruns SC Safety Capacity SH Highway Safety Improvement Program (HSIP) SR Safety Railroads ST Striping and Signing TM Transportation Management TR Transit (FHWA) B9 FTA Urbanized Area Formula Section 537 CF Clean Fuels Section 538 B3 FTA Capital Program - Section 539 GR State of Good Repair NB FTA Elderly and Persons with Disabilities Section 531 OB FTA Non-urbanized Areas - Section 5311 & Section 5311(f) JA FTA Job Access and Reverse Commute Section 5316 NF New Freedom Section 5317 III-2

Fund **AB** **AC** **ADA** **BP8** **BR4M** **CIMS** **DI** **ELLA** **FMP** **HB** **HRRR** **HSR** **IDIQ** **ITS** **LGA** **MNXXX** **NCIP** **PNRS** **BP8** **SAM** **SB** **SRTS** **TCSP** **TED1** **TED12** **TED14** **TRLF** Figure 7 Smart Code Description Alternate Bid Advance Construction/Advance Construction Payback Americans with Disabilities Act (Funding) 28 Chapter 152 Bonds Better Roads for a Better Minnesota Corridor Investment Management Strategy Destination Innovation Early Let Late Award Flood Mitigation Program Historic Bridges High Risk Rural Road High Speed Rail Indefinite Delivery Indefinite Quantity Intelligent Transportation System Local Government Advance / Local Government Advance Payback Demo National Corridor Improvement Program (only if project is fully funded) Projects of National and Regional Significance (only if project is fully funded) Safety and Mobility Scenic Byway (only if project is fully funded) Safe to School (Infrastructure and Non-Infrastructure) Transportation, Community, Systems Preservation Program (only is project is fully funded) 21 Trunk Highway Bonds for Transportation Economic Development 212 Trunk Highway Economic Development Account 214 Trunk Highway Additional Spending Authority Transportation Revolving Loan Fund / Transportation Revolving Loan Payback Fund BF BR BROS CBI CMAQ DEMO DPS FTA FFM HSIP IM LF NCIP NHPP PLHD PUB RRS RT SB SF SRTS STP TAP TCSP TRLF Figure 8 Fund Categories Description Bond Bridge Replacement Off System Bridge Coordinated Border Infrastructure Congestion Mitigation and Air Quality HPP, Earmark, National Corridor Improvement Program, Projects of National & Regional Significance and all projects that have a Demo ID Department of Public Safety Federal Transit Administration Federal Miscellaneous Highway Safety Improvement Program Interstate Maintenance Local or Other National Corridor Infrastructure National Highway Performance Program (Interstates, NHS, and Principal Arterials) Public Lands Highway Discretionary Public Lands Highway Rail Grade Crossings & Rail Safety Recreational Trail Scenic Byways State Safe s to School Surface Transportation Program Transportation Alternative Program Special Allocations for Transportation, Community, and System Preservation projects Transportation Revolving Loan Fund III-3

AC - The total estimated amount of future federal funds (AC) being committed to a project, frontended by local/state funds. FTA - The total estimated federal aid transit funding to be used for the project. TH - The total estimated state trunk highway funding to be used for the project. Other - Estimate of funding other than FHWA, FTA or State TH to be used for the project. This includes local match, local funds, private contributions and special legislative appropriations. III-4

Clearwater Kittson Roseau Lake of the Woods Areawide Transportation Partnership (ATP) Boundaries Marshall 2 Koochiching Polk Pennington Red Lake Beltrami 1 Lake Cook Itasca St. Louis Norman Mahnomen Clay Cass Becker Wilkin 4 Hubbard Wadena 3 Crow Wing Aitkin Carlton Traverse Big Stone Lac qui Parle Yellow Medicine Lincoln Grant Stevens Lyon Murray Otter Tail Swift Chippewa Douglas Pope 8 Redwood Pipestone Cottonwood Renville Todd Kandiyohi Brown Stearns Meeker Watonwan Morrison McLeod Sibley Nicollet Benton Wright Carver Mille Lacs Hennepin Scott Kanabec Isanti Anoka Chisago Ramsey Washington Dakota Pine Rice 7 6 Blue Earth Sherburne Le Sueur Waseca Metro Steele Goodhue Dodge Wabasha Olmsted Winona DISTRICT 1 Duane Hill Transportation District Engineer (218) 725-274 1123 Mesaba Avenue Duluth, Minnesota 55811 General Information: (218) 725-27 FAX: (218) 725-28 Rock Nobles Jackson Martin Faribault Freeborn Mower Fillmore Houston

ATP: 1 Fiscal Year: 214 STIP for FY 214-217 1 BB TRF-16-14A DULUTH TRANSIT SECT 537: DULUTH DIAL-A-RIDE TRANSIT OPERATING. B9 OPERATE BUS LF 594,14 594,14 AUTHORITY ASSISTANCE 2 BB TRF-16-14B DULUTH TRANSIT SECT 537: OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,7,51 1,4, 5,67,51 AUTHORITY 3 BB TRF-16-14C DULUTH TRANSIT SECT 537: FACILITY MAINTENANCE, UPGRADES AND. B9 BUS GRANT FTA 699,856 55, 149,856 AUTHORITY REHAB 4 BB TRF-16-14D DULUTH TRANSIT SECT 537: PASSENGER AMENITIES. B9 OPERATE BUS FTA 3,965,29 15, 3,815,29 AUTHORITY 5 BB TRF-5-14-JA MNDOT SECT 5316: ARROWHEAD ECONOMIC OPPORTUNITY. JA OPERATE BUS FTA 24, 12, 12, AGENCY INC,- RURAL RIDES OPERATING 6 BB TRF-5-14-JB MNDOT SECT 5316: ARROWHEAD ECONOMIC OPPORTUNITY. JA OPERATE BUS FTA 225, 18, 45, AGENCY INC,- RURAL RIDES-MOBILITY MANAGEMENT 7 BB TRF-16-14-JA DULUTH TRANSIT SECT 5316: JARS URBAN OPERATING FUNDS FOR. JA OPERATE BUS FTA 383, 191,5 191,5 AUTHORITY DULUTH TRANSIT AUTHORITY 8 BB TRS-5-14 MNDOT ARROWHEAD TRANSIT-PURCHASE 9 BUSES - (CLASS 5). TR PURCHASE BUS STP 1,134, 97,2 226,8 9 BB TRS-16-14 DULUTH TRANSIT DTA-PURCHASE 1 BUSES TOTAL, 5 WILL BE HYBRID. TR PURCHASE BUS STP 5,616, 1,5, 4,116, AUTHORITY (CLASS 7) 1 RR 31-125AC GRAND RAPIDS **AC** BNSF, CLOSE ONE CROSSING AT 12TH AVENUE, GRAND RAPIDS AND INSTALL GATES AND FLASHING LIGHTS AT 19TH AVE NW, M 29, GRAND RAPIDS, ITASCA COUNTY (PHASE 2) (AC PAYBACK 1 OF 1). SR SAFETY TARGET RRS 877,5 877,5 11 CSAH 1 1-61-22 AITKIN COUNTY **MN14** JCT TH 169 TO JCT TH 232, GRADING & BASE 7. RC GRADING DEMO 1,6, 799,951 8,49 12 CSAH 1 1-61-25 AITKIN COUNTY **MN14** JCT TH 169 TO JCT TH 232, BITUMINOUS 7. RC BITUMINOUS DEMO 2,595, 2,76, 519, SURFACING PAVEMENT SB 13 PED/BIKE 9-9-4 CARLTON COUNTY FOND DU LAC TO CLOQUET TRAIL CONNECTION, 2. EN PED./BIKE TAP 4, 297,357 12,643 PED/BIKE TRAIL 14 LOCAL 9-596-5 CARLTON COUNTY **MN21** CONST PFEIFER RD, REMOVE 1 FT RAISED 1. RC RAILROAD DEMO 543,464 181,217 362,247 RR XING, TWIN LAKES TOWNSHIP SURFACING 15 CSAH 7 9-67-21 CARLTON COUNTY JCT OF DODDRIDGE AVE & TH 33,CLOQUET, TRAFFIC 2. SC TRAFFIC SIGNAL NHPP 49, 392, 98, SIGNAL& TURN LANES (ASSOC 95-53) REVISION 16 CSAH 7 9-67-23 CARLTON COUNTY INTERSECTION S ON THE BIG LAKE ROAD. SC TURN LANES STP 4, 32, 8, AT THE JCT OF CARLTON CSAH 5 & CARLTON CR 114 September 213 Project Listing Page III - 5 of 175

ATP: 1 Fiscal Year: 214 STIP for FY 214-217 17 CSAH 9 9-69-4 CARLTON COUNTY REHABILITATE CSAH 9 FROM CSAH 7 TO NORTH COUNTY 3. RS BITUMINOUS STP 1,25, 1,, 25, LINE PAVEMENT 18 CSAH 12 16-7-5 COOK COUNTY CSAH 12 MARKING UPGRADE, PHASE I. SH STRIPING HSIP 153,33 137,997 15,333 19 CSAH 12 16-7-6 COOK COUNTY CSAH 12 MARKING UPGRADE, PHASE II WITH CSAH 2. SH STRIPING HSIP 124,5 111,645 12,45 CENTERLINE 2 CSAH 4 16-7-7 COOK COUNTY CSAH 4 MARKING UPGRADE. SH STRIPING HSIP 35,5 31,95 3,55 21 CSAH 5 16-7-8 COOK COUNTY CSAH 5 & CSAH 8 MARKING UPGRADES. SH STRIPING HSIP 39,55 35,595 3,955 22 CSAH 14 31-614-14 ITASCA COUNTY FROM THE JCT OF ITASCA CSAH 29 TO JCT TH 38, 16. RD BITUMINOUS STP 3,, 1,8, 1,2, PAVEMENT RECLAMATION PAVEMENT 23 PED/BIKE 36-9-2 KOOCHICHING **AC** SECOND CREEK TO RANIER, WIDEN TRAIL TO 2. EN PED./BIKE TAP 51,93 27,72 51,93 COUNTY MEET STANDARDS (AC PROJECT, PAYBACK IN 215) 24 CSAH 17 36-77-1 KOOCHICHING **MN141** RECONSTRUCTION OF 1 MI OF CR 17 FROM. RC GRADE AND DEMO 1,356, 359,96 996,4 COUNTY CSAH 2 TO HWY 11 & 71 IN KOOCHICHING COUNTY SURFACE 25 Local 999 38-9-7 BEAVER BAY BEAVER BAY TRAILHEAD FACILITY. EN BUILDINGS TAP 5, 4, 1, 26 CSAH 4 38-64-17 LAKE COUNTY JCT LAKE CSAH 15 TO LAKE CSAH 5, BITUMINOUS 2. RS BITUMINOUS STP 25, 2, 5, SURFACING PAVEMENT 27 CSAH 5 38-65-13 LAKE COUNTY JCT LAKE CSAH 4 TO JCT TH 61, PAVEMENT 2. RD BITUMINOUS STP 1,, 8, 2, RECLAMATION, MILL & RECLAMATION 28 PED/BIKE 58-9-2 PINE COUNTY CONSTRUCTION OF A BIKE TRAIL IN PINE COUNTY FROM. BT PED./BIKE TCSP 587,414 469,931 117,483 THE SOUTH TO THE NORTH CITY LIMITS 29 CSAH 21 58-621-17 PINE COUNTY FROM THE JCT OF TH 48 TO JCT OF PINE CSAH 3, 8. RS BITUMINOUS STP 2,25, 1,8, 45, BITUMINOUS MILL &, TURN LANES RECLAMATION 3 CSAH 69-7-1 ST LOUIS COUNTY 6 INCH EDGE LINE. SH STRIPING HSIP 36, 32,4 3,6 31 CSAH 69-7-11 ST LOUIS COUNTY GROUND IN WET REFLECTIVE EDGELINE. SH STRIPING HSIP 343, 38,7 34,3 32 CSAH 69-7-12 ST LOUIS COUNTY NON-CRSP GROUND IN WET REFLECTIVE EDGELINE. SH STRIPING HSIP 33, 272,7 3,3 33 PED/BIKE 69-9-21 REGIONAL RAIL **MN175** MESABI TRAIL SEGMENT FROM INTERSECTION 2. BT PED./BIKE DEMO 7, 4, 3, AUTHORITY OF MURRAY ROAD AND TH 169 TO THE INTERSECTION OF OLD TH 16 AND TH 169 September 213 Project Listing Page III - 6 of 175

ATP: 1 Fiscal Year: 214 STIP for FY 214-217 34 PED/BIKE 69-9-28 ELY ELY TREZONA (MESABI) TRAIL CONNECTION, PED/BIKE. EN PED./BIKE TAP 186,3 149,4 37,26 TRAIL 35 CSAH 133 69-733-24 ST LOUIS COUNTY JCT TH 73 TO JCT ST LOUIS CR 496, PAVEMENT 12. RD BITUMINOUS STP 3,, 1,, 2,, RECLAMATION RECLAMATION 36 LOCAL 999 89-595-1 GRAND PORTAGE **AC** GRAND PORTAGE-ISLE ROYALE. MA FERRY BOAT STP 235,958 157,35 157,35 78,653 BAND TRANSPORTATION LINE INC, FUNDED BY THE FERRY FACILITIES BOAT PROGRAM (AC PAYBACK IN 215) 37 LOCAL 999 89-595-1AC GRAND PORTAGE **AC** GRAND PORTAGE-ISLE ROYALE. MA FERRY BOAT STP 157,35 157,35 BAND TRANSPORTATION LINE INC, FUNDED BY THE FERRY FACILITIES BOAT PROGRAM (AC PAYBACK 1 OF 1) 38 Local 999 91-7-21 ARDC HELMET HERO BICYCLE EDUCATION. EN PED./BIKE TAP 71,868 57,494 14,374 39 MSAS 12 112-12-5 CLOQUET JCT OF DODDRIDGE AVE & TH 33,CLOQUET, TRAFFIC 2. SC TRAFFIC SIGNAL NHPP 26, 28, 52, SIGNAL & TURN LANES (ASSOC 95-53) REVISION 4 LOCAL 999 118-8-42 DULUTH **MN134** SECONDARY ACCESS ROADWAY TO DULUTH 1. MC GRADE AND DEMO 1,25, 1,, 25, AIR NATIONAL GUARD BASE SURFACE 41 PED/BIKE 118-9-19 DULUTH CROSS CITY TRAIL DULUTH, RECYCLE WAY TO 59TH AVE 1. EN PED./BIKE TAP 7, 5, 2, WEST 42 MSAS 148 118-148-8 DULUTH 1TH AVENUE E RECONSTRUCTION: E SUPERIOR. RC GRADE AND STP 3,34, 95, 2,39, STREET TO E 5TH STREET SURFACE 43 PED/BIKE 129-591-3 GRAND RAPIDS **SRTS** INFRA GRAND RAPIDS CONSTRUCTION OF. BT PED./BIKE SRTS 157,968 157,968 SIDEWALKS ON 8TH AVE NW AND NE 7TH AVE 44 Local 999 134-9-1 INTERNATIONAL INTERNATIONAL FALLS AREA GATEWAY CORRIDOR. EN PED./BIKE TAP 625, 5, 125, FALLS PROJECT, LIGHTING, LANDSCAPING, WAY- FINDING SIGNS 45 I 35 98-143 MNDOT 2 MILES SOUTH TO MIDWAY RD, CABLE MEDIAN BARRIER 2. SH SAFETY TARGET HSIP 579,956 521,96 57,996 INSTALLATION (ASSOC SP 6982-299) 46 I 35 98-148 MNDOT **AC** 1 MI N JCT TH 27 TO ST LOUIS RIVER, SCANLON,. BI BRIDGE REPAIR NHPP 1,671,218 1,354,96 1,5, 317,122 PAINT BR #S 987, 988, 9837, 9838, DECK BR #S 9819, 9832 (AC PROJECT, PAYBACK IN 215) 47 I 35 8821-227 MNDOT **ITS** RURAL I35 TRAFFIC/WEATHER CMS SYSTEM, 3 74. SC TRAFFIC NHPP 525, 42, 15, CHANGEABLE MESSAGE SIGNS BOTH NB & SB ON I35 MANAGEMENT FROM CLOQUET TO ROCK CREEK SYSTEM 48 US 2 6937-691D MNDOT BONG BRIDGE & RAMP REPAIRS, DECK,. BI BRIDGE REPAIR NHPP 8,25, 6,6, 1,65, PAINTING, JOINT REPAIR/REPLACEMENT, BR #'S 691D September 213 Project Listing Page III - 7 of 175

ATP: 1 Fiscal Year: 214 STIP for FY 214-217 49 MN 1 381-18 MNDOT **TRLF** US FOREST ROUTE 553 TO US FOREST ROUTE 5. RC GRADE AND SF 169, 169, 424, RECONSTRUCTION (TRLF PAYBACK 2 OF 1) SURFACE 5 US 2 6937-11 MNDOT BONG BRIDGE & RAMP REPAIRS, DECK,. BI BRIDGE REPAIR NHPP 2,, 1,6, 4, PAINTING, JOINT REPAIR/REPLACEMENT, BR #S 6911, 6912, 6919 51 MN 33 95-53 MNDOT JCT I 35 TO 1.4MI NORTH IN CLOQUET, PAVEMENT 2. RC TRAFFIC SIGNAL NHPP 6,, 4,8, 1,2, REMOVAL & REPLACEMENT, SIGNAL REPLACEMENT AT REVISION DODRIDGE AVE (ASSOC 9-67-21, 112-12-5) 52 I 35 8821-239 MNDOT CABLE MEDIAN BARRIER, 12 LOCACTIONS FROM TH 7. SH MEDIAN BARRIER HSIP 2,46,676 2,366,8 4,668 TO CARLTON CO CSAH 4 53 MN 61 384-59 TWO HARBORS **TED1** TH 61/TWO HARBORS TED GRANT AT CR 26. RC TRAFFIC SIGNAL BF LF 1,742,4 1,742,4 (75, TED1 BOND) REVISION 54 MN 61 6925-134 MNDOT **ADA** PED RAMP FROM 32ND AVE E TO 3. EN PED./BIKE TAP 262,5 21, 52,5 59TH AVE E 55 MN 61 162-49 MNDOT ON TH 61, 1.15 MI S CSAH 5 TO 1.23 MI N CSAH 7, MILL & 14. RS BRIDGE REPAIR NHPP 6,598,956 5,279,165 1,319,791, CULVERTS & BRIDGE REPAIR# 8291, 8292, 5132, (ASSOC SPS 161- (8291), 162-(5132), 162-(8292), 56 MN 999 8821-241 MNDOT DISTRICTWIDE CULVERT REPAIR/REPLACE. RS CULVERT STP 1,8, 323,566 1,476,434 REPLACEMENT 57 MN 999 8821-218 MNDOT ON TH 2, TH 18, AND TH 21, SIGN REPLACEMENT. SC MISCELLANEOUS SF 6, 6, 58 MN 999 881-AM-14 MNDOT DISTRICTWIDE SETASIDES - MUNICIPAL AGREEMENTS-. AM MISCELLANEOUS SF 1, 1, 214 59 MN 999 881-CA-14 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,4, 1,4, AGREEMENTS-214 6 MN 999 881-RB-14 MNDOT DISTRICTWIDE SETASIDES - LANDSCAPE. RB LANDSCAPING SF 1, 1, PARTNERSHIPS-214 61 MN 999 881-RW-14 MNDOT DISTRICTWIDE SETASIDES - R/W ACQUISITION/ACC. RW RIGHT OF WAY SF 3,75, 3,75, MGMT - 214 62 MN 999 881-RX-14 MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR-214. RX ROAD REPAIR SF 1,5, 1,5, 63 MN 999 881-SA-14 MNDOT DISTRICTWIDE SETASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 4,, 4,, AGREEMENTS-214 COST OVERRUNS 64 MN 999 881-SE-14 MNDOT DISTRICTWIDE SETASIDES - SAFETY ENHANCEMENTS-. SC MISCELLANEOUS SF 5, 5, 214 September 213 Project Listing Page III - 8 of 175

ATP: 1 Fiscal Year: 214 STIP for FY 214-217 65 MN 999 881-SG-14 MNDOT DISTRICTWIDE SETASIDES - SIGNING, STRIPING,. SC MISCELLANEOUS SF 4, 4, LIGHTING-214 $93,152,883 $43,824,1 $1,865,25 $2,591,5 $19,138,511 $27,598,862 September 213 Project Listing Page III - 9 of 175

ATP: 1 Fiscal Year: 215 STIP for FY 214-217 66 BB TRF-16-15A DULUTH TRANSIT SECT 537: DULUTH DIAL-A-RIDE TRANSIT OPERATING. B9 OPERATE BUS LF 611,927 611,927 AUTHORITY ASSISTANCE 67 BB TRF-16-15B DULUTH TRANSIT SECT 537: OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,7,51 1,4, 5,67,51 AUTHORITY 68 BB TRF-16-15C DULUTH TRANSIT SECT 537: DULUTH TRANSIT. B9 BUS GRANT FTA 875, 7, 175, AUTHORITY 69 BB TRF-16-15D DULUTH TRANSIT SECT 537: PREVENTATIVE MAINTENANCE. B9 OPERATE BUS LF 3,965,29 3,965,29 AUTHORITY 7 BB TRS-5-15 MNDOT ARROWHEAD TRANSIT-PURCHASE 6 BUSES - (CLASS 5). TR PURCHASE BUS STP 852, 681,6 17,4 71 RR 69-191 MNDOT BNSF, INSTALL GATES AND FLASHING LIGHTS, SAVANNA. SR RR X-ING RRS 275, 275, RD, CO RD 186, FLOODWOOD (2.25 MI NW) S 72 RR 69-193 MNDOT DMIR, UPGRADE FROM CANTILEVERS TO 4-GATE/3. SR RR X-ING RRS 35, 35, CANTILEVER SYSTEM, VOSS RD, CSAH 7, MOUNTAIN IRON S 73 RR 69-194 MNDOT DMIR, INSTALL GATES AND FLASHING LIGHTS, CSAH 6,. SR RR X-ING RRS 275, 275, MAPLE GROVE RD, SOLWAY TWP S 74 CSAH 28 1-628-12 AITKIN COUNTY JCT TH 169 TO JCT TH 21, MILL &, TURN LANES 8. RS MILL AND STP 1,2, 84, 36, 75 CSAH 6 9-66-28 CARLTON COUNTY 1. MILES NORTH OF KETTLE RIVER TO JCT I 35 IN 1. RS MILL AND STP 1,25, 25, 1,, BARNUM, MILL & 76 CSAH 16-7-9 COOK COUNTY CURVE SIGNAGE S. SH SIGNING HSIP 237,6 213,84 23,76 77 CSAH 16-7-1 COOK COUNTY INTERSECTION SIGNING S PHASE I. SH SIGNING HSIP 2,15 18,135 2,15 78 CSAH 16-7-11 COOK COUNTY INTERSECTION SIGNING S PHASE II. SH SIGNING HSIP 23,85 21,465 2,385 79 CSAH 12 16-7-12 COOK COUNTY CSAH 12 SHOULDER S. SH SHOULDER HSIP 1, 9, 1, REPAIR 8 CSAH 16-7-13 COOK COUNTY INTERSECTION LIGHTING S. SH LIGHTING HSIP 24, 21,6 2,4 81 CSAH 12 16-612-73 COOK COUNTY 48.4 MILES N TO 49.9 MILES NORTH OF JCT TH 61, 2. RC GRADE AND STP 1,5, 5, 1,, RECONSTRUCTION SURFACE 82 PED/BIKE 31-9-7 ITASCA COUNTY MESABI AND ITASCA TRAIL SYSTEM, PED/BIKE TRAIL 6. EN PED./BIKE TAP 3, 15, 15, CONSTRUCTION September 213 Project Listing Page III - 1 of 175

ATP: 1 Fiscal Year: 215 STIP for FY 214-217 83 CSAH 7 31-67-28 ITASCA COUNTY FROM THE JCT OF ITASCA CSAH 8 TO JCT ITASCA CR 339, 6. RS MILL AND STP 95, 25, 7, MILL & 84 PED/BIKE 36-9-2AC KOOCHICHING **AC** SECOND CREEK TO RANIER, WIDEN TRAIL TO 2. EN PED./BIKE TAP 27,72 27,72 COUNTY MEET STANDARDS (AC PAYBACK 1 OF 1) 85 CSAH 46 58-646-29 PINE COUNTY FROM THE JCT OF PINE CSAH 49 TO JCT TH 23 AT 4. RS MILL AND STP 1,, 8, 2, KERRICK, MILL &, GUARDRAIL ON BR # 58533 86 CSAH 69-7-13 ST LOUIS COUNTY CHEVRON SIGNING. SH SIGNING HSIP 234, 21,6 23,4 87 CSAH 69-7-14 ST LOUIS COUNTY EDGELINE RUMBLE STRIPS. SH MISCELLANEOUS HSIP 15, 94,5 1,5 88 CSAH 69-7-15 ST LOUIS COUNTY INTERSECTION LIGHTING. SH LIGHTING HSIP 13, 117, 13, 89 CSAH 69-7-16 ST LOUIS COUNTY INTERSECTION PAVEMENT MARKING. SH STRIPING HSIP 116, 14,4 11,6 9 CSAH 69-7-17 ST LOUIS COUNTY MAINLINE DYNAMIC WARNING SYSTEM. SH MISCELLANEOUS HSIP 135, 121,5 13,5 91 PED/BIKE 69-9-18 ST LOUIS COUNTY **MN175** GRADE AND BIT SURFACE 5.47 MI OF THE 6. BT PED./BIKE DEMO 1,256,22 1,4,976 251,244 MCKINLEY-BIWABIK SEGMENT OF THE MESABI MULTI- USE TRAIL 92 PED/BIKE 69-9-29 ST LOUIS COUNTY MOUNTAIN IRON BICYCLE AND PEDESTRIAN 2. EN PED./BIKE TAP 343,2 274,56 68,64 CONNECTION 93 PED/BIKE 69-9-3 REGIONAL RAIL MESABI TRAIL, SOUDAN TO ELY, BIKE/PED TRAIL 4. EN PED./BIKE TAP 492, 393,6 98,4 AUTHORITY 94 CSAH 9 69-69-38 ST LOUIS COUNTY FROM JCT CSAH 13 (MIDWAY RD) TO JCT CSAH 4 (RICE 6. RD BITUMINOUS STP 3,125, 2,5, 625, LAKE RD), PAVEMENT RECLAMATION RECLAMATION 95 PED/BIKE 91-7-24 ARDC HELMET HERO BICYCLE EDUCATION PROGRAM. EN PED./BIKE TAP 71,868 57,494 14,374 96 PED/BIKE 92-9-32 MNDNR **MN12** CONSTRUCTION OF GITCHI-GAMI STATE TRAIL, 8. BT PED./BIKE DEMO 1,827,911 89,911 1,18, CASCADE RIVER TO GRAND MARAIS 97 PED/BIKE 92-9-34 MNDNR **MN187** CONSTRUCTION OF GITCHI-GAMI TRAIL, 7. BT PED./BIKE DEMO 2,649,851 739,851 1,91, SILVER BAY TO TETTEGOUCHE STATE PARK 98 PED/BIKE 92-9-38 MNDNR GITCHI GAMI TRAIL-BEAVER RIVER BRIDGE & W RD 1. EN PEDESTRIAN TAP 1,644,5 5, 1,144,5 SEGMENT, PED/BIKE BRIDGE & TRAIL BIKE BRIDGE 99 PED/BIKE 118-9-18 DULUTH **MN146** CROSS CITY TRAIL, DULUTH, 3TH AVE WEST 2. BT PED./BIKE DEMO 1,912,189 1,449,751 462,438 TO RECYCLE WAY September 213 Project Listing Page III - 11 of 175

ATP: 1 Fiscal Year: 215 STIP for FY 214-217 1 PED/BIKE 118-9-21 DULUTH CROSS CITY TRAIL DULUTH, 59TH AVE WEST TO PULASKI 1. EN PED./BIKE TAP 7, 5, 2, ST 11 MSAS 173 118-173-7 DULUTH WEST FIRST STREET RECONSTRUCTION FROM MESABA 1. RC GRADE AND STP 4,42, 92, 3,5, AVE TO PIEDMONT AVE SURFACE 12 MSAS 23 131-23-3 HIBBING SOUTH SALMI ROAD IN THE CITY OF HIBBING, 2. RC GRADE AND STP 1,4, 7, 7, RECONSTRUCTION SURFACE 13 MN 1 381-92 MNDOT.2 MI S KAWISHIWI RIVER TO.17 MI W T-273 &.63 MI SE 18. RS MILL AND STP 6,6, 5,28, 1,32, JCT CSAH 2 TO JCT NFD-172 (ASSOC SP 382-21), MILL AND 14 MN 1 381-18 MNDOT **TRLF** US FOREST ROUTE 553 TO US FOREST ROUTE 5. RC GRADE AND SF 169, 169, 424, RECONSTRUCTION (TRLF PAYBACK 3 OF 1) SURFACE 15 MN 11 364-73M MNDOT **ELLA** DISTRICT 2 PROJECT -.7 MI W OF LOMAN TO W JCT TH 71 (PELLAND) DESIGNED BY DIST 2 SP 364-73 AND FUNDED BY ATP 1 UNDER 364-73M $2,143, CBI FUNDS (TIED TO SP 364-73) 11. RD MILL AND STP CBI 6,636, 5,38,8 1,327,2 16 MN 11 366-57 MNDOT IN INTERNATIONAL FALLS,.25 MI E CSAH 332 TO E 11. RS STORM SEWER STP 5,, 4,, 1,, SHORE DOVE ISLAND, MILL & (ASSOC SP 366- REPAIR 364) 17 MN 23 91-67 MNDOT 15.9 MI NE OF SOUTH CARLTON CO LINE, REPLACE BR # 1. BR BRIDGE STP 3,8, 3,4, 76, 547 (NEW BR # 915) AND APPROACHES REPLACEMENT 18 MN 23 91-7 MNDOT 9.5 MI NE OF SOUTH CARLTON CO LINE, REPLACE BR #. BR BRIDGE STP 1,2, 96, 24, 851 (BOX CULVERT) (ASSOC 91-(851)) REPLACEMENT 19 MN 23 91-75 MNDOT 9. MI NE OF SOUTH CARLTON CO LINE, REPLACE BR #. BR BRIDGE STP 1,8, 1,44, 36, 5554 AND APPROACHES REPLACEMENT 11 MN 23 583-35 MNDOT.1 MI NE OF DUQUETTE, REPLACE BR # 5549 AND. BR BRIDGE STP 1,3, 1,4, 26, APPROACHES REPLACEMENT 111 MN 23 691-95 DULUTH **CIMS** FROM I 35 TO BECKS ROAD. NA MISCELLANEOUS SF 3,531,572 3,35, 496,572 112 MN 23 691-92 MNDOT TH 23 IN DULUTH, MISSION CREEK BRIDGE# 5757 WORK. BR GRADE AND SF 2,5, 2,5, AND GRADING BRIDGE 113 I 35 98-148AC MNDOT **AC** 1 MI N JCT TH 27 TO ST LOUIS RIVER, SCANLON,. BI BRIDGE REPAIR NHPP 1,5, 1,5, PAINT BR #S 987, 988, 9837, 9838, DECK BR #S 9819, 9832 (AC PAYBACK 1 OF 1) September 213 Project Listing Page III - 12 of 175

ATP: 1 Fiscal Year: 215 STIP for FY 214-217 114 I 35 6982-29AC4 MNDOT **AC** BOUNDARY AVE TO 26TH AVE E, PAVEMENT REPL & REPAIRS, BR REPL BR #S 69831, 69832, 6988 & REPAIRS BR #S 69851, 69852, 69879 + SPOT REPAIRS AT 21ST AVE W INTERCHANGE, REMOVE BR #S 69835 & 69828 NEAR 27TH AVE W, SAFETY S (AC PAYBACK 4 OF 4) 1. BR BRIDGE REPLACEMENT NHPP 2,454,611 2,454,611 115 US 53 6918-8 MNDOT **AB**CHAP152** BETWEEN EVELETH AND VIRGINIA, 5. MC GRADE AND BF 6,, 6,, RELOCATE TH 53 AWAY FROM UNITED TACONITE BRIDGE OPERATIONS 116 US 53 368-48 MNDOT **ADA** IN INTERNATIONAL FALLS, ON TH 53 FR JCT TH 53/CRESCENT DR TO JCT TH53/4TH ST AND TH 11 FR 6TH AVE W TO 3RD AVE W AND TH 11 FR. 3RD AVE W TO.25 MI E CSAH 332, MILL/INLAY, ADA, SIGNALS (ASSOC SP 365-4, 366-56) 2. RS MILL AND NHPP 3,1, 2,48, 62, 117 MN 61 162-48 MNDOT **FMP** 6 MI SO GRAND MARAIS AT CUT FACE CREEK, REPLACE CULVERT WITH SINGLE SPAN BRIDGE ALONG WITH CHANNEL ADJUSTMENTS (FLOOD MITIGATION FUNDING FY 215). BR BRIDGE REPLACEMENT BF 2,, 2,, 118 MN 7 5811-12 MNDOT.1 MILES E OF JCT TH 361 TO MINNESOTA WISCONSIN 9. RS MILL AND STP 7,2, 5,76, 1,44, BORDER, MILL &, PROFILE CORRECTIONS, TURN LANES 119 MN 73 6929-18 MNDOT **ELLA** REPLACE BRIDGE #926, 1 MILES SOUTH OF. BR BRIDGE STP 98, 784, 196, JCT TH 169 (ASSOC 6972) REPLACEMENT 12 MN 999 881-ADA-15 MNDOT **ADA** DISTRICTWIDE SETASIDE - ACCESSIBILITY. EN PED./BIKE STP 262,5 21, 52,5 S - 215 121 MN 999 881-AM-15 MNDOT DISTRICTWIDE SETASIDES - MUNICIPAL AGREEMENTS-. AM MISCELLANEOUS SF 1, 1, 215 122 MN 999 881-CA-15 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,4, 1,4, AGREEMENTS-215 123 MN 999 881-CL-15 MNDOT DISTRICTWIDE SETASIDES - HYDRAULICS-215. RS CULVERT SF 2,, 2,, REPLACEMENT 124 MN 999 881-PM-15 MNDOT DISTRICTWIDE SETASIDES - PREVENTATIVE. PM JOINT SEALING SF 1,8, 1,8, MAINTENANCE-215 125 MN 999 881-RB-15 MNDOT DISTRICTWIDE SETASIDES - LANDSCAPE. RB LANDSCAPING SF 1, 1, PARTNERSHIPS-215 126 MN 999 881-RW-15 MNDOT DISTRICTWIDE SETASIDES - R/W ACQUISITION/ACC. RW RIGHT OF WAY SF 2,, 2,, MGMT - 215 September 213 Project Listing Page III - 13 of 175

ATP: 1 Fiscal Year: 215 STIP for FY 214-217 127 MN 999 881-RX-15 MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR-215. RX ROAD REPAIR SF 4,, 4,, 128 MN 999 881-SA-15 MNDOT DISTRICTWIDE SETASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 4,5, 4,5, AGREEMENTS-215 COST OVERRUNS 129 MN 999 881-SE-15 MNDOT DISTRICTWIDE SETASIDES - SAFETY ENHANCEMENTS-. SC MISCELLANEOUS SF 9, 9, 215 13 MN 999 881-SG-15 MNDOT DISTRICTWIDE SETASIDES - SIGNING, STRIPING,. SC MISCELLANEOUS SF 1,, 1,, LIGHTING-215 131 MN 999 881-SHS-15 MNDOT DISTRICTWIDE SETASIDE - MNDOT HSIP PROJECTS. SH SAFETY TARGET HSIP 768, 691,2 76,8 $17,251,749 $5,391,114 $ $2,1, $31,156,5 $86,64,135 September 213 Project Listing Page III - 14 of 175

ATP: 1 Fiscal Year: 216 STIP for FY 214-217 132 BB TRF-16-16A DULUTH TRANSIT SECT 537: DULUTH DIAL-A-RIDE TRANSIT OPERATING. B9 OPERATE BUS LF 63,285 63,285 AUTHORITY ASSISTANCE 133 BB TRF-16-16B DULUTH TRANSIT SECT 537: DULUTH OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,7,51 1,45, 5,62,51 AUTHORITY 134 BB TRF-16-16C DULUTH TRANSIT SECT 537: DULUTH TRANSIT. B9 BUS GRANT FTA 875, 7, 175, AUTHORITY 135 BB TRF-16-16D DULUTH TRANSIT SECT 537: DULUTH PREVENTATIVE MAINTENANCE. B9 OPERATE BUS LF 3,965,29 3,965,29 AUTHORITY 136 BB TRS-5-16 MNDOT ARROWHEAD TRANSIT-PURCHASE 9 BUSES - (CLASS 5). TR PURCHASE BUS STP 1,242, 993,6 248,4 137 BB TRS-16-16 DULUTH TRANSIT DTA-PURCHASE 1 BUSES TOTAL, 5 BUSES WILL BE. TR PURCHASE BUS STP 4,78,5 1,5, 3,28,5 AUTHORITY HYBRID (CLASS 7) 138 BB TRS-22-16 HIBBING CITY OF HIBBING - PURCHASE 2 BUSES (CLASS 5). TR PURCHASE BUS STP 268, 214,4 53,6 139 RR 38-11 MNDOT DMIR/CN, INSTALL GATES, FLASHING LIGHTS AND. SR RR X-ING RRS 25, 25, UPDATED CIRCUITRY, CR 124, BIG ROCK ROAD, TWO S HARBORS (3 MI N) 14 RR 69-195 MNDOT DWP/CN, INSTALL GATES, FLASHING LIGHTS AND. SR RR X-ING RRS 25, 25, UPDATED CIRUITRY, CR 776, OLD MISSABE TRUNK, S FAYAL TWP 141 RR 69-196 MNDOT DMIR, INSTALL GATES, FLASHING LIGHTS AND UPDATED. SR RR X-ING RRS 25, 25, CIRCUITRY, CR 894, STARK RD, MIDWAY TWP S 142 CSAH 21 9-621-3 CARLTON COUNTY GRADING & AGG SURFACE FROM CR 123 TO TH 21 4. RC GRADE AND STP 1,25, 1,, 25, SURFACE 143 PED/BIKE 31-9-8 BIGFORK BIGFORK RIVERWALK TRAIL 2. EN PED./BIKE TAP 55, 275, 275, 144 CSAH 69-7-18 ST LOUIS COUNTY 216 GROUND IN WET REFLECTIVE EDGELINE. SH STRIPING HSIP 42, 37,8 4,2 145 PED/BIKE 69-9-3 ST LOUIS COUNTY MESABI TRAIL-SOUDAN TO ELY. EN PED./BIKE TAP 494, 394, 1, 146 CSAH 23 69-623-32 ST LOUIS COUNTY AGG BASE & BIT RECLAIM FROM TH 53 TO AUTIO ROAD 6. RD BITUMINOUS STP 3,, 2,4, 6, RECLAMATION 147 CSAH 9 69-69-13 ST LOUIS COUNTY ARLINGTON AVE FROM TRINITY ROAD TO ARROWHEAD 3. RD BITUMINOUS STP 2,, 1,6, 4, ROAD RECLAIM, MILL & RECLAMATION September 213 Project Listing Page III - 15 of 175

ATP: 1 Fiscal Year: 216 STIP for FY 214-217 148 PED/BIKE 92-9-51 MNDNR GITCHI GAMI TRAIL-BEAVER RIVER BRIDGE & W RD 1. EN PED./BIKE TAP 84,3 5, 34,3 SEGMENT 149 MSAS 22 118-22-2 DULUTH DULUTH HEIGHTS CONECTOR (JOSHUA AVE) FROM. MC GRADE AND STP 4,6, 2,9, 1,7, MAPLE GROVE TO ARROWHEAD ROAD SURFACE 15 PED/BIKE 129-9-7 GRAND RAPIDS GRAND RAPIDS MISSISSIPPI RIVERFRONT PEDESTRIAN. EN PED./BIKE TAP 988,985 296,696 692,289 BRIDGE 151 MSAS 112 129-112-1 GRAND RAPIDS 5TH STREET NORTH FROM 6TH AVENUE NE TO 17TH AVE 2. RS MILL AND STP 1,35, 5, 85, NW 152 MSAS 13 22-13-9 HERMANTOWN STEBNER ROAD BETWEEN MAPLE GROVE ROAD AND TH 1. RC GRADE AND STP 2,5, 1,6, 9, 53 RECONSTRUCTION SURFACE 153 MN 1 381-18 MNDOT **TRLF** US FOREST ROUTE 553 TO US FOREST ROUTE 5. RC GRADE AND SF 169, 169, 424, RECONSTRUCTION (TRLF PAYBACK 4 OF 1) SURFACE 154 MN 23 691-89 MNDOT **ELLA**.28 MI E BECKS RD TO POLK STREET IN WEST 5. BR BRIDGE STP 11,4, 8,12, 3,28, DULUTH, MILL & (ASSOC 691-88544A REPLACEMENT (KINGBURY CR) 155 I 35 588-186 MNDOT APPROACH WORK AND BRIDGE REPLACEMENT FOR I 35. BR BRIDGE NHPP 5,7, 5,13, 57, NB BR# 9784 AND SB BR# 9783 OVER BNSF RR 2 MI SO REPLACEMENT JCT TH 48 156 MN 46 319-4M MNDOT 5. MI MI N OF SQUAW LAKE, REPLACE BR# 883, OVER POPPLE RIVER (DESIGNED BY DISTRICT 2 SP 319-4 AND FUNDED BY ATP 1 UNDER SP 319-4M FOR $852,382 TIED TO 319-4). BR BRIDGE REPLACEMENT SF 852,382 852,382 157 US 53 368-49 MNDOT **ELLA** TH 53, 1.3MI S KEYES RD TO CRESCENT DR IN 34. RS MILL AND NHPP 14,2, 11,36, 2,84, INTERNATIONAL FALLS, M&O, CULVERTS (ASSOC 6922-53), MILL AND 158 US 53 6922-54 MNDOT **ELLA**MN239** TH 53 S VAR LOCATIONS, FR THE JCT CR 54 TO JCT CSAH 122-TURN LANES, BYPASS LANES, ADA S IN THE CITY OF ORR ( ASSOC SP 6921-21) 42. RS TURN LANES DEMO 5,, 4,, 1,, 159 US 53 6915-133 MNDOT IN DULUTH, US 53 (TRINITY RD).422 MI N JCT ANDERSON 1. RS MILL AND NHPP 1,, 8, 2, RD TO E JCT MN TH 194 EB (ASSOC 6933-9), MILL AND 16 US 53 6917-14 MNDOT NB US 53 ONLY 1.275 MI N JCT CSAH 47 SWAN LAKE RD 4. RS MILL AND NHPP 1,5, 1,2, 3, TO.28 MI S JCT CR 737-HARRIS RD, MILL AND 161 US 53 6918-81 MNDOT IN EVELETH, FROM N JCT TH 37 TO.4 MI N JCT 2. RS CULVERT NHPP 1,3, 1,4, 26, VERMILLION DR, MILL AND September 213 Project Listing Page III - 16 of 175

ATP: 1 Fiscal Year: 216 STIP for FY 214-217 162 MN 61 163-48 MNDOT APPROACH WORK AND REPLACEMENT FOR TH 61 BR#. BR BRIDGE NHPP 1,34, 1,43,2 26,8 891 OVER DEVIL TRACK RIVER, 4. MI NE OF GUNFLINT REPLACEMENT TRAIL 163 MN 61 6925-135 MNDOT IN DULUTH, 61ST AVE E TO.12 MI N SUPERIOR ST, MILL 1. RS MILL AND NHPP 56, 448, 112, AND 164 US 169 3115-71 MNDOT **ELLA** IN GRAND RAPIDS FROM WOODLAND PARK 4. RS MILL AND NHPP 3,4, 2,432, 68, ROAD TO 13TH ST & IN COLERIANE JCT CURLEY AVE TO ELIZABETH AVE( ASSOC 3116-141), MILL AND 165 MN 194 6933-92 MNDOT IN DULUTH N MESABA AVE CROSSING TO JCT I 35 CPR & 1. RD CONCRETE NHPP 2,7, 2,16, 54, BRIDGE REPAIR # 69839 & 6984 (TIED TO 698-59) PAVEMENT (ASSOC SP 6933-(69839B) & 6933-(6984B) REHAB 166 MN 21 119-26M MNDOT REPLACE BR# 6296 TH 21 OVER SISSABAGAMAH RIVER. BR BRIDGE SF 45,27 45,27 (DESIGNED BY DISTRICT 3 SP 19-26 AND FUNDED BY REPLACEMENT ATP 1 UNDER 119-26M FOR $45,27, TIED TO 119-26) 167 MN 217 3614-2 MNDOT E LIMIT LITTLE FORK TO JCT TH 53 (ASSOC 3614-928A) 17. RS BRIDGE REPAIR STP 6,8, 5,44, 1,36, 168 I 535 698-59 MNDOT IN DULUTH, CPR WORK ON I 535 FR JCT BLATNIK BRIDGE 1. RD CONCRETE NHPP 1,4, 1,26, 14, TO JCT I 35 (TIED TO SP 6933-92) PAVEMENT REHAB 169 MN 999 881-ADA-16 MNDOT **ADA** DISTRICTWIDE SETASIDE - ACCESSIBILITY. EN PED./BIKE STP 26, 28, 52, S - 216 17 MN 999 881-AM-16 MNDOT DISTRICTWIDE SETASIDES - MUNICIPAL AGREEMENTS-. AM MISCELLANEOUS SF 1, 1, 216 171 MN 999 881-CA-16 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,5, 1,5, AGREEMENTS-216 172 MN 999 881-CL-16 MNDOT DISTRICTWIDE SETASIDES - HYDRAULICS-216. RS CULVERT SF 2,, 2,, REPLACEMENT 173 MN 999 881-PM-16 MNDOT DISTRICTWIDE SETASIDES - PREVENTATIVE. PM JOINT SEALING SF 1,8, 1,8, MAINTENANCE-216 174 MN 999 881-RB-16 MNDOT DISTRICTWIDE SETASIDES - LANDSCAPE. RB LANDSCAPING SF 1, 1, PARTNERSHIPS-216 175 MN 999 881-RW-16 MNDOT DISTRICTWIDE SETASIDES - R/W ACQUISITION/ACC. RW RIGHT OF WAY SF 1,5, 1,5, MGMT - 216 176 MN 999 881-RX-16 MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR-216. RX ROAD REPAIR SF 3,, 3,, September 213 Project Listing Page III - 17 of 175

ATP: 1 Fiscal Year: 216 STIP for FY 214-217 177 MN 999 881-SA-16 MNDOT DISTRICTWIDE SETASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 5,7, 5,7, AGREEMENTS-216 COST OVERRUNS 178 MN 999 881-SE-16 MNDOT DISTRICTWIDE SETASIDES - SAFETY ENHANCEMENTS-. SC MISCELLANEOUS SF 6, 6, 216 179 MN 999 881-SG-16 MNDOT DISTRICTWIDE SETASIDES - SIGNING, STRIPING,. SC MISCELLANEOUS SF 7, 7, LIGHTING-216 18 LOCAL 999 881-SHL-16 LOCAL DISTRICTWIDE SETASIDE - LOCAL HSIP/HRRR PROJECTS. SH SAFETY TARGET HSIP 748, 673,2 74,8 181 MN 999 881-SHS-16 MNDOT DISTRICTWIDE SETASIDE - MNDOT HSIP PROJECTS. SH SAFETY TARGET HSIP 79, 711, 79, $113,297,82 $6,986,896 $ $2,15, $3,73,452 $2,87,454 September 213 Project Listing Page III - 18 of 175

ATP: 1 Fiscal Year: 217 STIP for FY 214-217 182 BB TRF-16-17A DULUTH TRANSIT SECT 537: DULUTH DIAL-A-RIDE TRANSIT OPERATING. B9 OPERATE BUS LF 649,19 649,19 AUTHORITY ASSISTANCE 183 BB TRF-16-17B DULUTH TRANSIT SECT 537: OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,282,15 1,493,5 5,788,65 AUTHORITY 184 BB TRF-16-17D DULUTH TRANSIT SECT 537: PREVENTATIVE MAINTENANCE. B9 OPERATE BUS LF 4,84, 4,84, AUTHORITY 185 BB TRF-16-17C DULUTH TRANSIT SECT 537: DULUTH TRANSIT. B9 BUS GRANT FTA 9, 72, 18, AUTHORITY 186 BB TRS-5-17 MNDOT ARROWHEAD TRANSIT-PURCHASE 9 BUSES - (CLASS 5). TR PURCHASE BUS STP 1,242, 993,6 248,4 187 BB TRS-16-17 DULUTH TRANSIT DTA - STRIDE-PURCHASE 3 BUSES (CLASS 4). TR PURCHASE BUS STP 246, 196,8 49,2 AUTHORITY 188 CSAH 49 31-649-11 ITASCA COUNTY FROM TH 38 TO 7.1 MI NORTH OF INTERSECTION WITH 13. RD BITUMINOUS STP 1,5, 1,2, 3, CSAH 59, BITUMINOUS 189 CSAH 2 38-62-26 LAKE COUNTY.3 MI NORTH OF FOREST HIGHWAY 11 TO 2.6 MI NORTH, 2. RD SHOULDER STP 9, 72, 18, GRADING AND AGGREGATE BASE WIDENING 19 CSAH 9 69-69-4 DULUTH, ST LOUIS IN DULUTH ON 4TH STREET FROM 6TH AVE E TO 2. RD MILL AND STP 3,4, 1,9, 1,5, COUNTY WALLACE RD, MILL AND, CURB AND GUTTER AND STORM SEWER 191 MN 1 694-46 MNDOT **MN22**AB**.1 MI W OF THE SIX MILE LAKE RD TO 6. RC GRADE AND DEMO 19,17,921 15,336,737 3,834,184.1MI E OF BRADACH ROAD (EAGLES NEST LAKE AREA) SURFACE RECONSTRUCTION 192 MN 1 381-18 MNDOT **TRLF** US FOREST ROUTE 553 TO US FOREST ROUTE 5. RC GRADE AND SF 169, 169, 424, RECONSTRUCTION (TRLF PAYBACK 5 OF 1) SURFACE 193 MN 27 92-12 MNDOT FR. AITKIN/CARLTON CO LINE TO W JCT TH 73, MILL AND 9. RS CULVERT SF 2,4, 2,4, 194 I 35 588-18 MNDOT NB I 35, FROM NORTH OF PINE CO CSAH 33 TO SOUTH OF 9. RS CULVERT REPAIR NHPP 5,, 4,5, 5, CARLTON CO LINE, MILL AN 195 I 35 98-15 MNDOT I 35 BRIDGE # 9824 OVER CSAH 61 3.5 MI S OF JCT TH 21. BI REDECK NHPP 1,39, 1,178,1 13,9 REPAIR, RE-DECK (ASSOC 98-9824) 196 MN 37 6947-5 MNDOT IN HIBBING,.29 MI E JCT TH 169 TO.7 MI W JCT CR 25 & 15. RS CULVERT STP 4,6, 3,68, 92, ON TH 37 FR JCT CR788/CSAH 62 TO JCT CSAH 7, MILL & September 213 Project Listing Page III - 19 of 175

ATP: 1 Fiscal Year: 217 STIP for FY 214-217 197 MN 38 318-7 MNDOT RECLAIM - TH 38 PUGHOLE LAKE TO MARCELL & ON TH 14. RS CULVERT STP 12,2, 8,76, 3,44, 286 FR JCT TH 6 TO JCT TH 38 (ASSOC SP 3117-4) 198 MN 38 318-76 MNDOT TH 38 M&O.17 MI S JCT HORSESHOE LAKE RD TO S 6. RS CULVERT SF 2,3, 2,3, LIMITS BIG FORK 199 MN 48 584-57 MNDOT 4.5 MI E JCT TH 35, TH 48 BR 585 BR, APPROACH PANEL. RS BRIDGE SF 35, 35, REPAIRS APPROACHES 2 US 53 6916-14 MNDOT S OF HAINES RD TO S OF MIDWAY RD, MILL AND 6. RS MILL AND NHPP 3,1, 2,48, 62, 21 US 53 6917-141 MNDOT SB PALE FACE RIVER TO RR 682/CR 691 6. RS MILL AND NHPP 2,4, 1,92, 48, 22 US 53 6917-142 MNDOT NB US 53 SOUTH OF JCT TH 37, LYON SPRING AREA 6. RD MILL AND NHPP 6,5, 5,2, 1,3, 23 MN 61 386-7 MNDOT **ELLA** APPROACH GRADING FOR BR#9395, BEAVER. BI BRIDGE REPAIR NHPP 3,, 2,4, 6, RIVER TH 61 BR # 9395 SUPERSTRUCTURE 24 MN 73 912-32 MNDOT TH 73 APPROACH GRADING AND BRIDGE REPLACEMENT. BR BRIDGE SF 6, 6, #36 OVER KETTLE RIVER REPLACEMENT 25 US 169 6934-116 MNDOT JCT US 169/S JCT TH 73 IN HIBBING TO (ASSOC SP 6935-4. RS MILL AND NHPP 4,4, 3,52, 88, 91,TIED TO SP 6934-117) 26 US 169 6934-117 MNDOT IN HIBBING JCT TH 169/TH 37 INTERSECTION. SH SIGNAL REVISION HSIP 1,333,333 1,2, 133,333 MODIFICATION (TIED TO 6934-116) 27 US 169 6935-89 MNDOT IN VIRGINIA,.7 MI W CR-19 TO JCT 53 (HOOVER RD), 2. BI BITUMINOUS NHPP 3,6, 2,88, 72,, REPAIR BRIDGE#6934 & 6935 28 MN 286 3117-4 MNDOT JCT TH 6 TO JCT TH 38, MILL AND OVELAY( ASSOC SP 4. RS CULVERT SF 1,6, 1,6, 318-7) 29 MN 999 8821-2 MNDOT MILL & RESURFACING AND ADA WORK, MOOSE. RS STORM SEWER STP 3,, 2,4, 6, LAKE AREA, TH 27, 73 &289 21 MN 999 881-ADA-17 MNDOT **ADA** DISTRICTWIDE SETASIDE - ACCESSIBILITY. EN PED./BIKE STP 26, 28, 52, S - 217 211 MN 999 881-AM-17 MNDOT DISTRICTWIDE SETASIDES - MUNICIPAL AGREEMENTS-. AM MISCELLANEOUS SF 1, 1, 217 212 MN 999 881-CA-17 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT AGREEMENTS-217. CA MISCELLANEOUS SF 1,5, 1,5, September 213 Project Listing Page III - 2 of 175

ATP: 1 Fiscal Year: 217 STIP for FY 214-217 213 MN 999 881-PM-17 MNDOT DISTRICTWIDE SETASIDES - PREVENTATIVE. PM JOINT SEALING SF 2,, 2,, MAINTENANCE-217 214 MN 999 881-RB-17 MNDOT DISTRICTWIDE SETASIDES - LANDSCAPE. RB LANDSCAPING SF 1, 1, PARTNERSHIPS-217 215 MN 999 881-RW-17 MNDOT DISTRICTWIDE SETASIDES - R/W ACQUISITION/ACC. RW RIGHT OF WAY SF 1,, 1,, MGMT - 217 216 MN 999 881-RX-17 MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR-217. RX ROAD REPAIR SF 3,, 3,, 217 MN 999 881-SA-17 MNDOT DISTRICTWIDE SETASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 6,1, 6,1, AGREEMENTS-217 COST OVERRUNS 218 MN 999 881-SG-17 MNDOT DISTRICTWIDE SETASIDES - SIGNING, STRIPING,. SC MISCELLANEOUS SF 5, 5, LIGHTING-217 219 LOCAL 999 881-SHL-17 LOCAL DISTRICTWIDE SETASIDE - LOCAL HSIP/HRRR PROJECTS. SH SAFETY TARGET HSIP 1,444,444 1,3, 144,444 22 LOCAL 999 881-TAP-R-17 LOCAL DISTRICTWIDE SETASIDE - LOCAL TAP RURAL. EN MISCELLANEOUS TAP 375, 3, 75, 221 LOCAL 999 881-TAP-SU-17 LOCAL DISTRICTWIDE SETASIDE - LOCAL TAP SMALL URBAN. EN MISCELLANEOUS TAP 25, 2, 5, 222 LOCAL 999 881-TAP-SW-17 LOCAL DISTRICTWIDE SETASIDE - LOCAL TAP STATEWIDE. EN MISCELLANEOUS TAP 5, 4, 1, $114,365,38 $62,873,237 $ $2,213,5 $35,929,417 $13,348,884 September 213 Project Listing Page III - 21 of 175

Clearwater Kittson Roseau Lake of the Woods Areawide Transportation Partnership (ATP) Boundaries Marshall 2 Koochiching Polk Pennington Red Lake Beltrami 1 Lake Cook Itasca St. Louis Norman Mahnomen Hubbard Clay Cass Becker Wilkin 4 Wadena 3 Crow Wing Aitkin Carlton Traverse Big Stone Lac qui Parle Yellow Medicine Lincoln Grant Stevens Lyon Murray Otter Tail Swift Chippewa Douglas Pope 8 Redwood Pipestone Cottonwood Renville Todd Kandiyohi Brown Stearns Meeker Watonwan Morrison McLeod Sibley Nicollet Benton Wright Mille Lacs Carver Hennepin Scott Kanabec Isanti Anoka Chisago Ramsey Washington Dakota Pine Rice 7 6 Blue Earth Sherburne Rock Nobles Jackson Martin Faribault Le Sueur Waseca Metro Steele Goodhue Dodge Wabasha Olmsted Freeborn Mower Fillmore Winona Houston DISTRICT 2 Craig Collison Acting Transportation District Engineer (218) 755-6549 392 Hwy 2 West Bemidji, Minnesota 5661 General Information: (218) 755-65 FAX: (218) 755-6512

ATP: 2 Fiscal Year: 214 STIP for FY 214-217 223 BB TRF-18-14A EAST GRAND SECT 537: EAST GRAND FORKS DAR TRANSIT. B9 OPERATE BUS LF 63, 63, FORKS OPERATING ASSISTANCE 224 BB TRF-18-14B EAST GRAND SECT 537: EAST GRAND FORKS FIXED ROUTE TRANSIT. B9 OPERATE BUS FTA 248, 77, 171, FORKS OPERATING ASSISTANCE 225 BB TRF-18-14C EAST GRAND SECT 537: EAST GRAND FORKS INSTALLATION OF. B9 BUS GRANT FTA 2, 16, 4, FORKS DESIGNATED BUS STOPS 226 BB TRF-58-14-JA MNDOT SECT 5316: JARC RURAL FUNDS - TRI-VALLEY. JA MISCELLANEOUS FTA 15, 75, 75, OPPORTUNITY COUNCIL, INC - 3 RURAL BUS ROUTES 227 BB TRF-58-14-NA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - TRI-VALLEY. NF MISCELLANEOUS FTA 13, 14, 26, OPPORTUNITY COUNCIL, INC - TRAVEL TRAINING 228 BB TRS-6-14 MNDOT PAUL BUNYAN TRANSIT - PURCHASE 1 BUS (4-G) AND. TR PURCHASE BUS STP 76, 6,8 15,2 BUS RELATED EQUIPMENT 229 BB TRS-58-14 MNDOT TRI-VALLEY TRANSIT - PURCHASE 2 BUSES (4-G) AND. TR PURCHASE BUS STP 152, 121,6 3,4 BUS RELATED EQUIPMENT 23 BB TRS-11-14 MNDOT HUBBARD CO - PURCHASE 1 BUS (4-G) AND BUS. TR PURCHASE BUS STP 76, 6,8 15,2 RELATED EQUIPMENT 231 BB TRS-384-14 MNDOT ROSEAU CO TRANSIT - PURCHASE 1 BUS (4-G) AND. TR PURCHASE BUS STP 76, 6,8 15,2 BUS RELATED EQUIPMENT 232 RR 45-17 MARSHALL BNSF, INSTALL GATES AND FLASHING LIGHTS/CLOSE. SR RAILROAD RRS 25, 25, COUNTY DOT #81538R, 23TH ST NW, CR 149, WARRENTON TWP SIGNALS (.5 MI N) 233 LOCAL 4-7-5AC BELTRAMI COUNTY **AC** COUNTY WIDE SHOULDER PAVING AND RUMBLE. SH PAVE SHOULDER HSIP 35, 35, STRIPS (AC PAYBACK 1 OF 1) 234 CSAH 8 35-68-4 KITTSON COUNTY IN KITTSON CO: ON CSAH 8 FROM CSAH 1 TO US59 & ON 7. RS BITUMINOUS STP 87, 49, 38, CSAH 1 FROM CSAH 6 TO CSAH 8, BITUMINOUS (ASSOCIATED SP 35-61-32) 235 LOCAL 39-7-5 LAKE OF THE COUNTY WIDE SHOULDER PAVING AND SAFETY WEDGE. SH PAVE SHOULDER HSIP 532,62 479,358 53,262 WOODS 236 CSAH 17 39-617-8 LAKE OF THE FROM 2.4 MI S OF LAKE OF THE WOODS CSAH 11, NORTH 9. RC GRADE AND STP 3,677,76 2,75, 927,76 WOODS COUNTY TO ROCKY POINT RESORT ON LAKE OF THE WOODS, SURFACE RECONSTRUCT RURAL HIGHWAY (TIED WITH 68-617-6) 237 PED/BIKE 45-591-2 MARSHALL **SRTS** INFRA ARGYLE, CE & CONSTRUCTION OF. BT PED./BIKE SRTS 386,62 386,62 SIDEWALK AND S ON 2ND ST, 3RD ST, AND GARFIELD AVE September 213 Project Listing Page III - 22 of 175

ATP: 2 Fiscal Year: 214 STIP for FY 214-217 238 LOCAL 6-7-5 POLK COUNTY COUNTY WIDE SHOULDER PAVING AND CENTERLINE. SH PAVE SHOULDER HSIP 219,3 197,37 21,93 RUMBLE STRIPS 239 PED/BIKE 6-9-2 POLK COUNTY IN FOSSTON, CONSTRUCT NEW MULTI USE PED/BIKE 2. EN PEDESTRIAN TAP 344,755 275,84 68,951 TRAIL, PHASE I BIKE TRAIL 24 CSAH 17 68-617-6 ROSEAU COUNTY FROM CITY OF ROOSEVELT, NORTH TO 2.4 MI S OF LAKE 4. RC GRADE AND STP 1,43,24 1,7, 36,24 OF THE WOODS CSAH 11, RECONSTRUCT RURAL SURFACE HIGHWAY (TIED WITH 39-617-8) 241 LOCAL 88-7-38 LOCAL DISTRICT WIDE CHEVRON INSTALLATION PROJECT. SH MISCELLANEOUS HSIP 1,81,66 1,621,494 18,166 242 CITY 119-8-11 EAST GRAND IN EAST GRAND FORKS - ON 17TH ST NE FROM MN22 TO. RC CONCRETE STP 1,246,87 737,84 59,3 FORKS 5TH AVE NE, CONCRETE REPAIR PAVEMENT REHAB 243 PED/BIKE 119-117-2 EAST GRAND FORKS IN EAST GRAND FORKS - ALONG 2TH ST NE FROM MN22 TO 5TH AVE NE & ALONG 5TH AVE NE FROM 23RD ST NE TO 15TH ST NE, CONSTRUCT NEW PED/BIKE SIDEWALK. EN PEDESTRIAN BIKE TRAIL TAP 289,6 177,88 111,18 244 MN 1 459-5 MNDOT **BP8** OSLO, REPAIR BR #91, (MN LEAD AGENCY) (CH. BI BRIDGE REPAIR BF 7,, 7,, 152) 245 US 2 62-72 MNDOT IN CROOKSTON - SLOPE PROTECTION (DESIGN BUILD). SC SLIDE REPAIR NHPP 7,, 5,6, 1,4, 246 US 2 46-62 MNDOT FROM WILTON TO BEMIDJI - WB & EB - INSTALL/EXTEND 6. SH TURN LANES HSIP 25, 225, 25, LEFT TURN LANES 247 US 59 355-17 MNDOT NORTH OF LANCASTER, REPL BR #6877 WITH BR #3517 &. BR BRIDGE STP 1,25, 1,, 25, APPROACHES REPLACEMENT 248 US 59 575-58 MNDOT **FMP** IN THIEF RIVER FALLS, REPAIR BR #5327. BI BRIDGE REPAIR BF 1,6, 1,6, 249 MN 92 634-13 MNDOT FROM MN32 TO US59, BITUMINOUS MILL AND & 13. RS MILL AND STP SF 4,15, 2,954,4 1,195,6 W OF BROOKS, REPL BR #683 WITH BR #633 & APPROACHES 25 MN 175 3516-19 MNDOT 3.4 MI E OF JCT US75 & 3.7 MI E OF JCT US75, REPL BR. BR BRIDGE SF 1,5, 1,5, #3559 WITH BR #353 & BR #3551 WITH BR #354 & REPLACEMENT APPROACHES 251 MN 2 298-27AC MNDOT **AC**.52 MI E OF MN64 TO HUBBARD CSAH 39, 1. RC GRADE AND STP 1,333,6 1,333,6 RECONSTRUCT RURAL HIGHWAY & NEW BRIDGE 29X1 SURFACE (AC PAYBACK 1 OF 1) September 213 Project Listing Page III - 23 of 175

ATP: 2 Fiscal Year: 214 STIP for FY 214-217 252 MN 2 547-31 MNDOT **FMP**AB** FROM US75 TO ADA, CONCRETE CRACKING 13. RD CRACK AND STP BF 5,9, 3,92, 98, 1,, AND BITUMINOUS & REPL BR #268 WITH CULV #54X9 (TIED WITH 547-28) 253 MN 2 547-28 MNDOT **BP8** S OF TH 2 (TWP RD OVER MARSH RIVER) REPL. BR BRIDGE SF BF 5, 25, 25, BR #6522 WITH BR #5411 (TIED WITH 547-31) REPLACEMENT 254 MN 22 616-41 MNDOT BNSF, INSTALL GATES AND FLASHING LIGHTS, MN TH 22,. SR RAILROAD RRS 25, 25, 42TH AVE SW, (SOUTHEAST OF EAST GRAND FORKS) SIGNALS 255 MN 31 689-16AC MNDOT **FMP**AC** MN11 TO THE CANADIAN BORDER, 1. RS MILL AND INLAY STP 2,19,95 2,19,95 BITUMINOUS MILL AND INLAY (AC PAYBACK 1 OF 1) 256 MN 999 8822-164 MNDOT ON US2 FROM CASS LAKE TO DEER RIVER AND ON MN34 45. SH CENTERLINE HSIP 125, 112,5 12,5 FROM AKELEY TO WALKER, INSTALL CENTERLINE RUMBLE STRIPS RUMBLE STRIPS 257 MN 999 882-AM-14 MNDOT DISTRICTWIDE SETASIDE - COOPERATIVE AGREEMENT -. AM COOP. CONST. SF 5, 5, 214 AGREEMENT 258 MN 999 882-CA-14 MNDOT DISTRICTWIDE - CONSULTANT AGREEMENTS - 214. CA PLANNING SF 1,, 1,, 259 MN 999 882-MA-14 MNDOT DISTRICTWIDE - MISC AGREEMENTS - 214. MA MISCELLANEOUS SF 2, 2, 26 MN 999 882-PM-14 MNDOT DISTRICTWIDE SETASIDE - PAVEMENT MANAGEMENT -. PM PREVENTIVE SF 3,, 3,, 214 MAINTENANCE 261 MN 999 882-RW-14 MNDOT DISTRICTWIDE SETASIDE - RIGHT OF WAY - 214. RW RIGHT OF WAY SF 1,2, 1,2, 262 MN 999 882-RX-14 MNDOT DISTRICTWIDE SETASIDE - BARC - 214. RX ROAD REPAIR SF 2,, 2,, 263 MN 999 882-SA-14 MNDOT DISTRICTWIDE SETASIDE - SA/OVERRUN - 214. SA SUPP. AGREE. & SF 1,4, 1,4, COST OVERRUNS $54,568,372 $26,55,753 $ $272, $14,913,1 $12,877,519 September 213 Project Listing Page III - 24 of 175

ATP: 2 Fiscal Year: 215 STIP for FY 214-217 264 BB TRF-58-15-JA MNDOT SECT 5316: JARC RURAL FUNDS - TRI-VALLEY. JA MISCELLANEOUS FTA 15, 75, 75, OPPORTUNITY COUNCIL, INC - 3 RURAL BUS ROUTES 265 BB TRF-58-15-NA MNDOT SECT 531: NEW FREEDOM RURAL FUNDS - TRI-VALLEY. NB MISCELLANEOUS FTA 13, 14, 26, OPPORTUNITY COUNCIL, INC - TRAVEL TRAINING 266 BB TRS-58-15 MNDOT TRI-VALLEY TRANSIT - PURCHASE 2 BUSES (4-G) AND. TR PURCHASE BUS STP 156, 124,8 31,2 BUS RELATED EQUIPMENT 267 BB TRS-11-15 MNDOT HUBBARD CO - PURCHASE 1 BUS (4-G) AND BUS. TR PURCHASE BUS STP 78, 62,4 15,6 RELATED EQUIPMENT 268 BB TRS-2487-15 MNDOT CITY OF FOSSTON - PURCHASE 1 BUS (4-G) AND BUS. TR PURCHASE BUS STP 78, 62,4 15,6 RELATED EQUIPMENT 269 BB TRS-384-15 MNDOT ROSEAU CO - PURCHASE 1 BUS (4-G) AND BUS. TR PURCHASE BUS STP 78, 62,4 15,6 RELATED EQUIPMENT 27 RR 6-127 POLK COUNTY SOO, INSTALL GATES AND FLASHING LIGHTS, POLK CSAH. SR RAILROAD RRS 25, 25, 41, 37TH ST SE, KNUTE TWP (2 MI S ERSKINE) SIGNALS 271 RR 6-128 POLK COUNTY BNSF, INSTALL GATES AND FLASHING LIGHTS, CSAH 71,. SR RAILROAD RRS 25, 25, 25TH AVE SW, CROOKSTON (.3 MI NE) SIGNALS 272 RR 68-112 ROSEAU COUNTY CN, INSTALL GATES AND FLASHING LIGHTS, 69TH AVE,. SR RAILROAD RRS 225, 225, M 17, ROOSEVELT (WEST CORP LIMITS) SIGNALS 273 LOCAL 4-7-6AC BELTRAMI COUNTY **AC** COUNTY WIDE SHOULDER PAVING & RUMBLE. SH PAVE SHOULDER HSIP 35, 35, STRIPS (AC PAYBACK 1 OF 1) 274 LOCAL 4-7-7 BELTRAMI COUNTY COUNTY WIDE RUMBLE STRIPE. SH EDGELINE HSIP 229,578 26,62 22,958 RUMBLE STRIPS 275 LOCAL 4-7-8 BELTRAMI COUNTY COUNTY WIDE SHOULDER PAVING & RUMBLE STRIPS. SH PAVE SHOULDER HSIP 25,496 225,446 25,5 276 CSAH 23 4-623-27 BELTRAMI COUNTY FROM US71 TO BELTRAMI CSAH 29, BITUMINOUS 7. RS BITUMINOUS STP 1,7, 1,275, 425, 277 LOCAL 15-7-5 CLEARWATER COUNTY WIDE SHOULDER PAVING, RUMBLE STRIPE &. SH PAVE SHOULDER HSIP 388,889 35, 38,889 COUNTY SAFETY WEDGE 278 CSAH 7 15-67-23 CLEARWATER FROM US2 TO MN92 IN GONVICK, BITUMINOUS 16. RS BITUMINOUS STP 2,5, 1,875, 625, COUNTY 279 CSAH 1 54-61-12 NORMAN COUNTY FROM CSAH 39 TO CSAH 25, NORMAN CO, 7. RC GRADE AND STP 1,77, 1,172, 598, RECONSTRUCT RURAL HIGHWAY SURFACE 28 LOCAL 6-7-6 POLK COUNTY COUNTY WIDE SHOULDER PAVING AND SAFETY WEDGE. SH PAVE SHOULDER HSIP 18, 162, 18, September 213 Project Listing Page III - 25 of 175

ATP: 2 Fiscal Year: 215 STIP for FY 214-217 281 LOCAL 6-7-7 POLK COUNTY COUNTY WIDE SHOULDER PAVING AND SAFETY WEDGE. SH PAVE SHOULDER HSIP 2, 18, 2, 282 LOCAL 88-7-39 LOCAL DISTRICT WIDE RUMBLE STRIPS. SH EDGELINE HSIP 466,667 42, 46,667 RUMBLE STRIPS 283 LOCAL 88-7-43AC LOCAL **AC** DISTRICT WIDE SIGNS AND MARKINGS (AC. SH SIGNING HSIP 214,435 214,435 PAYBACK 1 OF 1) 284 LOCAL 88-7-44 LOCAL DISTRICT WIDE GROUND IN WET REFLECTIVE EDGE. SH STRIPING HSIP 683,4 615,6 68,34 STRIPING 285 PED/BIKE 15-9-7 BELTRAMI COUNTY ALONG THE ABANDONED SOO LINE CORRIDOR FROM 2. EN PEDESTRIAN TAP 51, 48, 12, 5TH ST TO CR 11 IN BEMIDJI, CONSTRUCT NEW MULTI- BIKE TRAIL USE PED/BIKE TRAIL (EAST-WEST TRAIL) 286 CITY 15-18-11 BEMIDJI IN BEMIDJI, ON IRVINE AVE NW FROM MN197 TO 3TH ST NW, RECONSTRUCT URBAN STREET & ON 3TH ST NW FROM RIDGEWAY AVE NW TO IRVINE AVE NW, BITUMINOUS MILL AND 1. RC GRADE AND SURFACE STP 1,55, 737, 318, 287 MN 1 41-8 MNDOT **BP8** 12.5 MI W OF TH 89, REPL BR #41 WITH NEW. BR BRIDGE BF 1,4, 1,4, BR #429 (CH 152) OVER OVERFLOW CHANNEL REPLACEMENT 288 MN 1 572-45 MNDOT 11. MI E OF N JCT MN32, REPL BR #369 & APPROACHES. BR BRIDGE STP 98, 784, 196, REPLACEMENT 289 US 2 65-61 MNDOT EBL - FROM.7 MI E OF FOSSTON TO 3.4 MI E OF 3. RD BITUMINOUS NHPP 2,3, 1,84, 46, FOSSTON, BITUMINOUS RECLAIM AND RECLAMATION 29 MN 9 541-22 MNDOT FROM BORUP TO THE CITY OF BELTRAMI - LOW SLUMP. BI BRIDGE SF 1,2, 1,2, ON BR #68, BR #543, BR #542, BR #545 & BR #454 291 MN 11 682-27 MNDOT FROM ROSEAU CSAH 15 TO E MN89 IN ROSEAU, 3. RD BITUMINOUS NHPP 2,3, 1,84, 46, BITUMINOUS RECLAIM AND & EXTEND ONE RECLAMATION END OF BR 58X6 292 MN 11 351-14 MNDOT **ELLA** FROM THE E END BR #3511 (OVER THE RED RIVER) TO KARLSTAD, BITUMINOUS MILL AND INLAY & EAST OF DONALDSON, REPL BR #8513 & BR #8514 & APPROACHES 28. RS MILL AND INLAY NHPP 6,, 4,8, 1,2, 293 MN 11 364-73 MNDOT **ELLA** FROM LOMAN TO PELLAND, BITUMINOUS MILL 11. RD MILL AND NA AND & GRADE WIDENING (DESIGNED BY DIST 2, FUNDED BY ATP 1 UNDER SP 364-73M, $6,636,) 294 MN 11 683-4 MNDOT AT INTERSECTION OF TH 11 & LAKE ST IN WARROAD -. SC TRAFFIC SIGNAL SF LF 25, 167,5 82,5 SIGNAL REPLACEMENT REVISION September 213 Project Listing Page III - 26 of 175

ATP: 2 Fiscal Year: 215 STIP for FY 214-217 295 MN 32 453-14 MNDOT **AB** N LIMITS OF THIEF RIVER FALLS TO MIDDLE RIVER, 22. RD BITUMINOUS NHPP 9,6, 7,68, 1,92, BITUMINOUS RECLAIM AND & REPL BR #8581, RECLAMATION BR #8582, BR #8583 & BR #685 & APPROACHES 296 US 59 633-38 MNDOT 5. MI S OF PLUMMER, REPL BR #5819 & APPROACHES. BR BRIDGE NHPP 1,, 1,, REPLACEMENT 297 US 75 549-3 MNDOT **FMP** ON US75 FROM N END OF C&G IN HALSTAD TO N END OF C&G IN SHELLY, PLUS INSLOPE REPAIR FROM RP 272. TO 292. (FMP $6,), AND ON MN2 FROM E END BR #544 TO W LIMITS OF HALSTAD, BITUMINOUS MILL AND INLAY 8. RS MILL AND INLAY SF BF 2,8, 2,2, 6, 298 MN 172 394-22 MNDOT 5.7 MI N OF MN11, INSLOPE REPAIR AT WABANICA CREEK. RS INSLOPE REPAIR STP 6, 48, 12, 299 MN 371 112-55 MNDOT FROM WALKER TO RAILROAD CROSSING S OF CASS 2. RS MILL AND NA LAKE, MILL &, (DESIGNED BY DIST 2, FUNDED BY ATP 3 UNDER SP 112-55M, $4,588,935) 3 MN 999 8822-126 MNDOT DISTRICTWIDE CULVERT REPAIR - 215. DR CULVERT REPAIR SF 5, 5, 31 MN 999 882-AM-15 MNDOT DISTRICTWIDE SETASIDE - COOPERATIVE AGREEMENT -. AM COOP. CONST. SF 5, 5, 215 AGREEMENT 32 MN 999 882-CA-15 MNDOT DISTRICTWIDE - CONSULTANT AGREEMENTS - 215. CA PLANNING SF 1,, 1,, 33 MN 999 882-MA-15 MNDOT DISTRICTWIDE - MISC AGREEMENTS - 215. MA MISCELLANEOUS SF 2, 2, 34 MN 999 882-PM-15 MNDOT DISTRICTWIDE SETASIDE - PAVEMENT MANAGEMENT -. PM PREVENTIVE SF 2,2, 2,2, 215 MAINTENANCE 35 MN 999 882-RW-15 MNDOT DISTRICTWIDE SETASIDE - RIGHT OF WAY - 215. RW RIGHT OF WAY SF 5, 5, 36 MN 999 882-RX-15 MNDOT DISTRICTWIDE SETASIDE - BARC - 215. RX ROAD REPAIR SF 1,5, 1,5, 37 MN 999 882-SA-15 MNDOT DISTRICTWIDE SETASIDE - SA/OVERRUN - 215. SA SUPP. AGREE. & SF 1,4, 1,4, COST OVERRUNS 38 BB 882-SETASIDE- 15 EAST GRAND FORKS SECT 537: TRANSIT OPERATING ASSISTANCE AND. B9 OPERATE BUS/BUS GRANT FTA LF 384, 13, 254, 39 MN 999 882-SHS-15 MNDOT DISTRICTWIDE SETASIDE - MNDOT HSIP - 215. SH SAFETY TARGET HSIP 352,941 317,647 35,294 $48,86,46 $26,969,28 $ $39, $16,758,794 $4,823,44 September 213 Project Listing Page III - 27 of 175

ATP: 2 Fiscal Year: 216 STIP for FY 214-217 31 BB TRS-6-16 MNDOT PAUL BUNYAN TRANSIT - PURCHASE 2 BUSES (4-G). TR PURCHASE BUS STP 16, 128, 32, AND BUS RELATED EQUIPMENT 311 BB TRS-58-16 MNDOT TRI-VALLEY TRANSIT - PURCHASE 1 BUS (5-G) AND BUS. TR PURCHASE BUS STP 146, 116,8 29,2 RELATED EQUIPMENT 312 BB TRS-11-16 MNDOT HUBBARD CO TRANSIT - PURCHASE 1 BUS (4-G) AND. TR PURCHASE BUS STP 8, 64, 16, BUS RELATED EQUIPMENT 313 RR 45-18 MNDOT BNSF, INSTALL GATES AND FLASHING LIGHTS, BRIDGE. SR RAILROAD RRS 25, 25, AVE, CSAH 4, ARGYLE SIGNALS 314 LOCAL 4-7-1 BELTRAMI COUNTY COUNTY WIDE MAINLINE DYNAMIC WARNING SYSTEM. SH TRAFFIC MGMT. HSIP 66,667 6, 6,667 SYSTEM 315 LOCAL 4-7-11 BELTRAMI COUNTY COUNTY WIDE SHOULDER PAVING, RESURFACING AND. SH PAVE SHOULDER HSIP 24, 183,6 2,4 SAFETY WEDGE 316 LOCAL 4-7-12 BELTRAMI COUNTY COUNTY WIDE SHOULDER PAVING & RUMBLE STRIPS. SH PAVE SHOULDER HSIP 18,712 97,841 1,871 317 LOCAL 4-7-13 BELTRAMI COUNTY COUNTY WIDE INSTALL STREET LIGHTS. SH LIGHTING HSIP 84, 75,6 8,4 318 CSAH 28 29-628-2 HUBBARD COUNTY FROM MN34 TO US71, PARK RAPIDS ALTERNATE TRUCK 4. RC GRADE AND STP 2,24, 1,792, 448, ROUTE, RECONSTRUCT RURAL HIGHWAY SURFACE 319 LOCAL 45-7-3 MARSHALL COUNTY WIDE SHOULDER PAVING & RUMBLE STRIPS. SH PAVE SHOULDER HSIP 388,889 35, 38,889 COUNTY 32 CSAH 28 45-628-9 MARSHALL FROM MARSHALL CSAH 4 TO US59, BITUMINOUS 15. RS BITUMINOUS STP 1,6, 977, 623, COUNTY 321 LOCAL 57-7-4 PENNINGTON COUNTY WIDE SHOULDER PAVING, RUMBLE STRIPE &. SH PAVE SHOULDER HSIP 388,889 35, 38,889 COUNTY SAFETY WEDGE 322 LOCAL 57-7-5 PENNINGTON COUNTY WIDE INTERSECTION LIGHTING. SH LIGHTING HSIP 18, 16,2 1,8 COUNTY 323 LOCAL 57-7-6 PENNINGTON COUNTY WIDE RUMBLE STRIPE. SH EDGELINE HSIP 12, 1,8 1,2 COUNTY RUMBLE STRIPS 324 CSAH 3 57-63-35 PENNINGTON FROM POLK CO LINE TO MN32, BITUMINOUS MILL AND 13. RS MILL AND STP 1,5, 977, 523, COUNTY 325 CSAH 2 6-62-19 POLK COUNTY FROM POLK CSAH 3 TO MN92, BITUMINOUS 6. RS BITUMINOUS STP 66, 3, 36, 326 CSAH 8 6-68-13 POLK COUNTY FROM POLK CSAH 1 TO US2, BITUMINOUS 6. RS BITUMINOUS STP 715, 3, 415, September 213 Project Listing Page III - 28 of 175

ATP: 2 Fiscal Year: 216 STIP for FY 214-217 327 CSAH 45 6-645-23 POLK COUNTY FROM US75 TO MN9, BITUMINOUS 9. RS BITUMINOUS STP 1,25, 7, 325, 328 LOCAL 63-7-2 RED LAKE COUNTY COUNTY WIDE RURAL INTERSECTION ADVISORY. SH TRAFFIC MGMT. HSIP 38,5 34,65 3,85 LIGHTING AT VARIOUS LOCATIONS SYSTEM 329 LOCAL 68-7-2 ROSEAU COUNTY COUNTY WIDE INTERSECTION PROJECTS. SH SAFETY TARGET HSIP 161,45 145,35 16,145 33 CSAH 4 68-64-28 ROSEAU COUNTY FROM KITTSON CO LINE TO MN11, BITUMINOUS 1. RS BITUMINOUS STP 1,1, 7, 4, 331 MSAS 115 17-115-17 THIEF RIVER FALLS IN THIEF RIVER FALLS, REALIGN GREENWOOD ST FROM HANSON DR TO US59 & BITUMINOUS MILL AND ON ATLANTIC AVE, DAVIS AVE, & OAKLAND PARK RD (TIED WITH 575-59). RC GRADE AND SURFACE STP 1,25, 675,163 349,837 332 MN 1 572-44 MNDOT IN THIEF RIVER FALLS, ON MN1 FROM N JCT MN32 TO 2. RC MILL AND INLAY NHPP LF 2,8, 2,176, 544, 8, CSAH 18/15 AVE NE & ON US59 FROM 1ST ST TO ATLANTIC AVE, RECONSTRUCT URBAN STREET 333 US 2 46-59 MNDOT **ELLA** INTERSECTION REVISION AT US2 & MN89, W OF 1. SC GRADE AND NHPP 5,, 4,, 1,, BEMIDJI & NEW BR #43 BRIDGE 334 MN 9 541-24 MNDOT **FMP** SOUTH OF ADA, RAISE HIGHWAY GRADE & REPL. BR GRADE AND BF 1,4, 1,4, BR #541 & APPROACHES BRIDGE 335 MN 11 391-41 MNDOT FROM W OF MN172 (W OF BAUDETTE) TO E MN72, 1. RS MILL AND NHPP 3,2, 2,56, 64, BAUDETTE, BITUMINOUS MILL AND 336 MN 32 544-27 MNDOT.8 MI S OF THE S JCT MN2 (N OF TWIN VALLEY), REPL. BR BRIDGE SF 85, 85, BR #92 & APPROACHES REPLACEMENT 337 MN 46 319-4 MNDOT 5.9 MI NW OF SQUAW LAKE, REPL BR #883 &. BR BRIDGE NA APPROACHES, (DESIGNED BY DIST 2, FUNDED BY ATP 1 REPLACEMENT UNDER SP 319-4M, $852,382) 338 US 59 575-59 MNDOT IN THIEF RIVER FALLS, REALIGN GREENWOOD ST FROM HANSON DR TO US59 & BITUMINOUS MILL AND ON ATLANTIC AVE, DAVIS AVE, & OAKLAND PARK RD (TIED WITH 17-115-17). AM GRADE AND SURFACE SF 125, 125, 339 US 75 611-24 MNDOT ON US75 FROM N OF US2 TO S OF MN1 IN WARREN, BITUMINOUS RESURFACING & REPL 7 BRIDGES: BR #8392, BR #3958, BR #8393, BR #8394, BR #3959, BR #4463 & BR #6361 AND ON MN1 FROM E END OF BR #91 TO E LIMITS OF OSLO, BITUMINOUS MILL AND 16. RS MILL AND STP 5,8, 4,64, 1,16, September 213 Project Listing Page III - 29 of 175

ATP: 2 Fiscal Year: 216 STIP for FY 214-217 34 US 75 612-49 MNDOT IN NIELSVILLE & IN CLIMAX - RECONSTRUCT URBAN 1. RC CONCRETE SF 1,54, 1,54, STREET PAVEMENT REHAB 341 US 75 359-24 MNDOT **FMP** NORTH OF HUMBOLT - RAISE HIGHWAY GRADE &. RD GRADE AND BF 75, 75, REPL BR #1727 & APPROACHES BRIDGE 342 MN 175 3516-17 MNDOT FROM HALLOCK TO LAKE BRONSON, REPL BR #3556. BR BRIDGE STP 3,, 2,4, 6, WITH BR #3514, BR #3557 WITH BR #3515 AND BR REPLACEMENT #3558 WITH BR #3516 & APPROCAHES 343 MN 197 416-5 MNDOT **ELLA**ADA** IN BEMIDJI, FROM DELTON AVE TO HANNAH AVE, REPLACE & INSTALL PED CURB RAMPS & APS SIGNAL ENHANCEMENTS & UPGRADE SIGNAL AT IRVINE AVE 1. SC PEDESTRIAN RAMPS STP SF 925, 12, 68, 125, 344 RR 359-25 MNDOT BNSF, INSTALL GATES AND FLASHING LIGHTS, US75, ST.. SR RAILROAD RRS 25, 25, VINCENT (1 MI E) SIGNALS 345 MN 999 882-AM-16 MNDOT DISTRICTWIDE SETASIDE - COOPERATIVE AGREEMENT -. AM COOP. CONST. SF 5, 5, 216 AGREEMENT 346 MN 999 882-BR-16 MNDOT BRIDGE REHABILITATION SETASIDE - 216. BI BRIDGE NHPP LF 25,, 1,, 15,, REHABILITATION BF 347 MN 999 882-CA-16 MNDOT DISTRICTWIDE - CONSULTANT AGREEMENTS - 216. CA PLANNING SF 1,, 1,, 348 LOCAL 999 882-EN-16 LOCAL DISTRICTWIDE - ENHANCEMENT PROGRAM - LOCAL - 216. EN ENHANCEMENT TAP 625, 5, 125, 349 MN 999 882-MA-16 MNDOT DISTRICTWIDE - MISC AGREEMENTS - 216. MA MISCELLANEOUS SF 5, 5, 35 MN 999 882-PM-16 MNDOT DISTRICTWIDE SETASIDE - PAVEMENT MANAGEMENT -. PM PREVENTIVE SF 3,1, 3,1, 216 MAINTENANCE 351 MN 999 882-RW-16 MNDOT DISTRICTWIDE SETASIDE - RIGHT OF WAY - 216. RW RIGHT OF WAY SF 8, 8, 352 MN 999 882-RX-16 MNDOT DISTRICTWIDE SETASIDE - BARC - 216. RX ROAD REPAIR SF 1,7, 1,7, 353 MN 999 882-SA-16 MNDOT DISTRICTWIDE SETASIDE - SA/OVERRUN - 216. SA SUPP. AGREE. & SF 1,4, 1,4, COST OVERRUNS 354 BB 882-SETASIDE- 16 EAST GRAND FORKS SECT 537: TRANSIT OPERATING ASSISTANCE AND - 216. B9 OPERATE BUS/BUS GRANT FTA LF 372, 116, 256, 355 MN 999 882-SHS-16 MNDOT DISTRICTWIDE SETASIDE - MNDOT HSIP - 216. SH SAFETY TARGET HSIP 352,941 317,647 35,294 September 213 Project Listing Page III - 3 of 175

ATP: 2 Fiscal Year: 216 STIP for FY 214-217 $72,962,48 $35,267,66 $ $116, $16,174,294 $21,44,148 September 213 Project Listing Page III - 31 of 175

ATP: 2 Fiscal Year: 217 STIP for FY 214-217 356 BB TRS-6-17 MNDOT PAUL BUNYAN TRANSIT - PURCHASE 1 BUS (4-G) AND. TR PURCHASE BUS STP 82, 65,6 16,4 BUS RELATED EQUIPMENT 357 BB TRS-58-17 MNDOT TRI-VALLEY TRANSIT - PURCHASE 1 BUS (4-G) AND BUS. TR PURCHASE BUS STP 82, 65,6 16,4 RELATED EQUIPMENT 358 BB TRS-384-17 MNDOT ROSEAU CO - PURCHASE 1 BUS (4-G) AND BUS. TR PURCHASE BUS STP 82, 65,6 16,4 RELATED EQUIPMENT 359 CSAH 27 35-627-4 KITTSON COUNTY IN LANCASTER ON KITTSON CSAH 27 FROM JCT OF 2ND ST TO US59 AND IN HALLOCK ON KITTSON CSAH 4 FROM US75 TO JCT KITTSON CSAH 37 (SP 35-64-1), RECONSTRUCT URBAN STREET 1. RC GRADE AND SURFACE STP 625, 225, 4, 36 CSAH 2 6-62-17 POLK COUNTY FROM POLK CASAH 21 TO THE POLK/MARSHALL CO LINE, 11. RS BITUMINOUS STP 825,6 625,6 2, BITUMINOUS 361 CSAH 2 63-62-1 RED LAKE COUNTY FROM RED LAKE CO CSAH 1, (NE OF RED LAKE FALLS) TO 7. RS BITUMINOUS STP 98, 6, 38, THE RED LAKE/PENNINGTON CO LINE, BITUMINOUS 362 CITY 115-115-1 CROOKSTON IN CROOKSTON, ON S MAIN ST FROM THIRD AVE SW TO S 1. RD BITUMINOUS STP 81,663 552, 258,663 BROADWAY ST, BITUMINOUS RECLAIM AND RECLAMATION 363 US 2 46-6 MNDOT BEMIDJI BYPASS - EB & WB LANES, REPAIR 7 BRIDGES: BR #45, BR #46, BR #47, BR #48, BR #49, BR #41 & BR #423 AND LOWER GRADES UNDER BR #419 & BR #423 2. BI BRIDGE REPAIR NHPP 3,4, 2,72, 68, 364 US 59 355-19 MNDOT FROM MN175 TO CANADIAN BORDER, BITUMINOUS MILL 17. RS MILL AND STP 4,34, 3,472, 868, AND 365 US 75 546-18 MNDOT IN HENDRUM, RECONSTRUCT URBAN STREET 1. RC CONCRETE STP 3,8, 2,6, 65, 55, PAVEMENT 366 MN 197 416-51 MNDOT IN BEMIDJI, NB & SB - FROM 7TH ST SW TO 3RD ST NW, 2. RS MILL AND NHPP 2,, 1,6, 4, MILL AND & PED RAMPS 367 MN 219 451-17 MNDOT N OF GOODRIDGE AT VARIOUS LOCATIONS, REPL 4. BR BRIDGE SF 1,9, 1,9, BRIDGES: BR #691, BR #6911, BR #6912, & BR #6913 & REPLACEMENT APPROACHES 368 MN 22 617-41 MNDOT 8.2 MI N OF EAST GRAND FORKS & 5.6 MI S OF. BR BRIDGE STP 1,6, 1,28, 32, ALVARADO, REPL BR #697 & BR #6915 & APPROACHES REPLACEMENT 369 MN 999 882-AM-17 MNDOT DISTRICTWIDE SETASIDE - COOPERATIVE AGREEMENT -. AM COOP. CONST. SF 4, 4, 217 AGREEMENT 37 MN 999 882-CA-17 MNDOT DISTRICTWIDE - CONSULTANT AGREEMENTS - 217. CA PLANNING SF 1,, 1,, September 213 Project Listing Page III - 32 of 175

ATP: 2 Fiscal Year: 217 STIP for FY 214-217 371 LOCAL 999 882-EN-17 LOCAL DISTRICTWIDE - ENHANCEMENT PROGRAM - LOCAL - 217. EN ENHANCEMENT STP 5, 4, 1, 372 MN 999 882-MA-17 MNDOT DISTRICTWIDE - MISC AGREEMENTS - 217. MA MISCELLANEOUS SF 2, 2, 373 MN 999 882-PM-17 MNDOT DISTRICTWIDE SETASIDE - PAVEMENT MANAGEMENT -. PM PREVENTIVE SF 2,2, 2,2, 217 MAINTENANCE 374 MN 999 882-RW-17 MNDOT DISTRICTWIDE SETASIDE - RIGHT OF WAY - 217. RW RIGHT OF WAY SF 5, 5, 375 MN 999 882-RX-17 MNDOT DISTRICTWIDE SETASIDE - BARC - 217. RX ROAD REPAIR SF 2,, 2,, 376 MN 999 882-SA-17 MNDOT DISTRICTWIDE SETASIDE - SA/OVERRUN - 217. SA SUPP. AGREE. & SF 1,2, 1,2, COST OVERRUNS 377 BB 882-SETASIDE- EAST GRAND SECT: 537 TRANSIT OPERATING ASSISTANCE AND. B9 BUS GRANT FTA LF 412, 148, 264, 17 FORKS - 217 378 LOCAL 999 882-SHL-17 LOCAL DISTRICTWIDE - LOCAL HSIP - 217. SH SAFETY TARGET HSIP 888,889 8, 88,889 379 MN 999 882-SHS-17 MNDOT DISTRICTWIDE SETASIDE - MNDOT HSIP - 217. SH SAFETY TARGET HSIP 777,778 7, 77,778 $3,65,93 $15,771,4 $ $148, $12,395,778 $2,29,752 September 213 Project Listing Page III - 33 of 175

Clearwater Kittson Roseau Lake of the Woods Areawide Transportation Partnership (ATP) Boundaries Marshall 2 Koochiching Polk Pennington Red Lake Beltrami 1 Lake Cook Itasca St. Louis Norman Mahnomen Hubbard Clay Cass Becker Wilkin 4 Wadena 3 Crow Wing Aitkin Carlton Traverse Big Stone Lac qui Parle Yellow Medicine Lincoln Grant Stevens Lyon Murray Otter Tail Swift Chippewa Douglas Pope 8 Redwood Pipestone Cottonwood Renville Todd Kandiyohi Brown Stearns Meeker Watonwan Morrison McLeod Sibley Nicollet Benton Wright Mille Lacs Carver Hennepin Scott Kanabec Isanti Anoka Chisago Ramsey Washington Dakota Pine Rice 7 6 Blue Earth Sherburne Rock Nobles Jackson Martin Faribault Le Sueur Waseca Metro Steele Goodhue Dodge Wabasha Olmsted Freeborn Mower Fillmore Winona Houston DISTRICT 3 Dan D. Anderson Transportation District Engineer (218) 828-573 7694 Industrial Park Road Baxter, Minnesota 56425-896 General Information: (218) 828-57 8-657-3971 FAX: (218) 828-5814

ATP: 3 Fiscal Year: 214 STIP for FY 214-217 38 BB TRF-48-14B METRO BUS SECT 537: FIXED ROUTE TRANSIT SERVICE OPERATING. B9 OPERATE BUS FTA 6,837,659 1,162,659 5,675, ASSISTANCE 381 BB TRF-48-14D METRO BUS SECT 537: TRANSIT PURCHASES, OFFICE. B9 BUS GRANT FTA 25, 2, 5, EQUIPMENT & COMPUTERS 382 BB TRF-48-14E METRO BUS SECT 537: TRANSIT PURCHASES,. B9 BUS GRANT FTA 1, 8, 2, MAINTENANCE TOOLS & EQUIPMENT 383 BB TRF-48-14F METRO BUS SECT 537: TRANSIT IZED PREVENTIVE. B9 BUS GRANT FTA 1,343,211 1,74,569 268,642 MAINTENANCE 384 BB TRF-48-14O METRO BUS SECT 537: TRANSIT PURCHASES, 2 SMALL. B9 BUS GRANT FTA 36, 288, 72, BUSES 385 BB TRF-48-14V METRO BUS SECT 537: TRANSIT PURCHASES, BUS. B9 BUS GRANT FTA 25, 2, 5, SHELTER AMENITY PROGRAM 386 BB TRF-48-14W METRO BUS SECT 537: TRANSIT PURCHASE, ITS PROJECTS. B9 BUS GRANT FTA 5, 4, 1, 387 BB TRS-42-14 MNDOT CITY OF PINE RIVER, PURCHASE ONE BUS (CLASS 3). TR PURCHASE BUS STP 62, 49,6 12,4 388 BB TRS-55-14 MNDOT RIVER RIDER, PURCHASE THREE BUSES (CLASS 4). TR PURCHASE BUS STP 228, 182,4 45,6 389 BB TRS-57-14 MNDOT TRI-CAP, PURCHASE ONE BUS. TR PURCHASE BUS STP 76, 6,8 15,2 39 BB TRF-57-14-NA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - TRI-COUNTY. NF BUS GRANT FTA 87,5 7, 17,5 ACTIONS PROGRAMS, INC - MOBILITY MANAGEMENT 391 BB TRF-57-14-NB MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - TRI-COUNTY. NF BUS GRANT FTA 19, 95, 95, ACTIONS PROGRAMS, INC - MOBILITY MANAGEMENT 392 BB TRS-3449-14 MNDOT CITY OF BRAINERD, PURCHASE ONE BUS. TR PURCHASE BUS STP 76, 6,8 15,2 393 BB TRS-768-14 MNDOT ISANTI CO, PURCHASE ONE BUS. TR PURCHASE BUS STP 76, 6,8 15,2 394 BB TRS-958-14 MNDOT KANABEC COUNTY, PURCHASE ONE BUS. TR PURCHASE BUS STP 76, 6,8 15,2 395 RR 11-111 MNDOT BNSF RR, INSTALL GATES AT MULTIPLE TRACKS. SR RR X-ING RRS 425, 425, CROSSING, OAK AVE, M52, CASS LAKE S September 213 Project Listing Page III - 34 of 175

ATP: 3 Fiscal Year: 214 STIP for FY 214-217 396 RR 73-125 MNDOT CP/SOO RR, INSTALL GATES AND FLASHING LIGHTS,. SR RR X-ING RRS 275, 275, 15TH ST, T 299, EDEN LAKE TWP (2.5 MI NW EDEN S VALLEY) 397 PED/BIKE 18-9-7 CROW WING **MN132** CONSTRUCT CUYUNA LAKE TRAIL, CROW. BT PED./BIKE DEMO 5, 34, 16, COUNTY WING CSAH 31 TO TH 6/CROW WING CSAH 1 IN DEERWOOD 398 CSAH 3 5-63-27AC BENTON COUNTY **AC** BENTON COUNTY CSAH 3: BENTON DRIVE TO TH. PL PLANNING STP 13,137 13,137 1, CONDUCT EVIRONMENTAL STUDY (AC PAYBACK 1 OF 1) 399 CSAH 3 5-63-28 BENTON COUNTY **MN162** BENTON COUNTY CSAH 3: BENTON DRIVE TO. RW RIGHT OF WAY DEMO 4,5, 658,242 3,841,758 TH 1, RIGHT OF WAY ACQUISITION (SAFETEA-LU) 4 LOCAL 999 18-7-9 CROW WING CURVE CHEVRON SIGNING. SH SIGNING HSIP 315, 283,5 31,5 COUNTY 41 CSAH 8 18-68-1 CROW WING TH 18 TO 7.7 MI NORTH, RESURFACING, SHOULDER 8. RS MILL AND STP 1,4, 791,2 68,8 COUNTY PAVING, TURN LANES (INCLUDES LOCAL PROJECT ON CR 12 FROM STIMAC RD TO CSAH 12) 42 CSAH 28 18-628-2 CROW WING CROW WING CSAH 12 TO TH 21, RESURFACING, 2. RS MILL AND STP 35, 28, 7, COUNTY SHOULDER PAVING, TURN LANES, CURB AND GUTTER REHAB 43 LOCAL 999 3-7-4 ISANTI COUNTY CHEVRON INSTALLATION AT VARIOUS LOCATIONS IN. SH SIGNING HSIP 277,2 249,48 27,72 ISANTI COUNTY 44 LOCAL 999 3-7-5 ISANTI COUNTY GROUND IN WET REFLECTIVE MARKINGS. SH STRIPING HSIP 33,45 273,15 3,345 45 LOCAL 999 33-7-4 KANABEC COUNTY RURAL INTERSECTION LIGHTING AND DYNAMIC. SH SIGNING HSIP 277,778 25, 27,778 WARNING SIGNS AT VARIOUS LOCATIONS IN KANABEC COUNTY 46 LOCAL 999 33-7-5 KANABEC COUNTY **MN231** KANABEC COUNTY - TOWNSHIP SIGN. SC SIGNING DEMO 71, 56,8 14,2 PROGRAM - PRELIMINARY ENGINEERING (PHASE I) 47 LOCAL 999 33-7-6 KANABEC COUNTY **MN231** KANABEC COUNTY - TOWNSHIP SIGN. SC SIGNING DEMO 513, 41,4 12,6 PROGRAM - CONSTRUCTION (PHASE II) 48 CSAH 4 33-64-18AC KANABEC COUNTY **AC** KANABEC CSAH 1 TO TH 47, MILL AND 2. RS MILL AND STP 328,259 328,259 (PAYBACK 1 OF 1) 49 CSAH 12 33-612-13AC1 KANABEC COUNTY **AC** FROM TH 23 TO KANABEC CSAH 6, MILL AND 5. RS MILL AND STP 493,6 493,6 (AC PAYBACK 1 OF 2) September 213 Project Listing Page III - 35 of 175

ATP: 3 Fiscal Year: 214 STIP for FY 214-217 41 CR 117 48-7-7 MILLE LACS MILLE LACS CR 117 FROM CSAH 1 TO EAST COUNTY 3. SH SHOULDER HSIP 12, 18, 12, COUNTY LINESHOULDER PAVING, RUMBLE STRIPS WITH SAFETY REPAIR EDGE 411 CR 122 48-7-8 MILLE LACS ON MILLE LACS CR 122, SHOULDER PAVING, RUMBLE 2. SH SHOULDER HSIP 68, 61,2 6,8 COUNTY STRIPS, AND SAFETY EDGE REPAIR 412 LOCAL 999 48-7-9 MILLE LACS COUNTY ROAD 152 AND 155, LANE DEPARTURE SAFETY. SH STRIPING HSIP 12, 18, 12, COUNTY PROJECT INCLUDING 2' SHOULDER PAVEMENT WITH RUMBLE STRIP AND SAFETY WEDGE 413 PED/BIKE 48-591-4 MILLE LACS **SRTS** INFRA PRINCETON, CE & CONSTRUCTION FOR. BT PED./BIKE SRTS 269,117 269,117 PATHS ALONG 12TH STREET N AND 5TH STREET N 414 CSAH 4 48-64-17 MILLE LACS **AC**.5 MI S OF MILLE LACS CSAH 13 TO CSAH 12, 4. RC GRADE AND STP 1,694, 415,7 9, 1,278,3 COUNTY RECONSTRUCT INCLUDING WIDENING (AC PROJECT - SURFACE PAYBACK IN 215) 415 CSAH 2 49-62-5 MORRISON FROM TH 1 TO MORRISON CSAH 3, MILL AND 4. RS MILL AND STP 63,686 391,286 239,4 COUNTY 416 LOCAL 999 71-7-22 SHERBURNE CSAH 4 AND CR 39 INTERSECTION S. SH TURN LANES HSIP 65, 544,5 6,5 COUNTY 417 LOCAL 999 71-7-23 SHERBURNE COUNTYWIDE 6" EDGELINE STRIPING. SH STRIPING HSIP 141, 126,9 14,1 COUNTY 418 LOCAL 999 71-7-24 SHERBURNE **AC** CSAH 43 AND CSAH 5 INTERSECTION. SH TURN LANES HSIP 288,6 243, 167,4 45,6 COUNTY S (AC PROJECT - PAYBACK IN 215) 419 CSAH 15 71-615-1 SHERBURNE COUNTY FROM 2' NORTH OF TH 1 TO BIG LAKE TOWNSHIP 211TH AVENUE, GRADING, BASE, & BITUMINOUS, INCLUDING REALIGNMENT OF SHERBURNE CR 79 INTERSECTION AND REALIGNMENT OF BIG LAKE TOWNSHIP 156TH STREET INTERSECTION 2. RC GRADE AND SURFACE STP 2,841, 1,67,5 1,233,5 42 LOCAL 999 73-7-9 STEARNS COUNTY STEARNS COUNTY INTERSECTION STREET LIGHTING. SH STRIPING HSIP 91, 81,9 9,1 421 CSAH 133 73-7-1 STEARNS COUNTY CSAH 133/19TH AVENUE, CONSTRUCT ROUNDABOUT. SH MISCELLANEOUS HSIP 45, 45, 45, 422 CSAH 2 73-62-45 STEARNS COUNTY **AC** STEARNS CSAH 4 TO CSAH 75, ROADWAY. RS MILL AND STP 198, 792, 198, RESURFACING (AC PROJECT - PAYBACK IN 217) 423 CSAH 9 73-69-37 STEARNS COUNTY **AC** STEARNS CSAH 4 TO I 94 IN AVON, BITUMINOUS 1. RC BITUMINOUS STP 4, 6, 4, RECLAMATION (AC PROJECT - PAYBACK IN 216) RECLAMATION September 213 Project Listing Page III - 36 of 175

ATP: 3 Fiscal Year: 214 STIP for FY 214-217 424 CSAH 34 73-634-7 STEARNS COUNTY **AC** STEARNS CSAH 66 IN PAYNESVILLE TO TH 22 1. RD BITUMINOUS STP 913,3 1,436,7 913,3 NORTH OF EDEN VALLEY, RECLAIM AND RESURFACE, RECLAMATION INCL. SHOULDERS (AC PROJECT - PAYBACK IN 215) 425 LOCAL 999 77-595-1 TODD COUNTY RESTORATION OF THE EXISTING DEPOT STRUCTURE IN. EN HISTORIC TAP 55,15 44,12 11,3 STAPLES PRESERVATION 426 PED/BIKE 8-591-2 WADENA **SRTS** INFRA WADENA, CE AND CONSTRUCTION FOR. BT PED./BIKE SRTS 267,418 267,418 SIDEWALKS, CROSSING S, AND SIGNING 427 PED/BIKE 86-9-4AC WRIGHT COUNTY **AC** CONSTRUCT BIKE/PED TRAIL ALONG WRIGHT CSAH 34 FROM BEEBE LAKE REGIONAL PARK IN ST MICHAEL TO INTERSECTION OF CSAH 19 & 34 IN HANOVER (AC PAYBACK 1 OF 1) 4. EN PED./BIKE TAP 164,35 164,35 428 CSAH 33 86-633-2 WRIGHT COUNTY TH 55 TO WRIGHT CSAH 2 IN ROCKFORD, RECLAIM & RESURFACE, INCL. INSTALLING SAFETY EDGE ALONG SHOULDER, CONSTRUCTING RIGHT-TURN & BYPASS LANES, UPDATING SIGNING & INSTALLING STREET LIGHTING AT VARIOUS RURAL INTERSECTIONS 9. RD BITUMINOUS RECLAMATION STP 1,6, 72, 88, 429 PED/BIKE 18-591-4 BRAINERD **SRTS** INFRA BRAINERD, CE & CONSTRUCTION OF. BT PED./BIKE SRTS 282, 282, SIDEWALKS ALONG 1TH AVE NE, 11TH AVE NE, J ST NE, AND L ST NE 43 PED/BIKE 162-9-5 ST CLOUD **AC** EXTEND BEAVER ISLAND BIKE/PED TRAIL, ST CLOUD CIVIC CENTER NORTH TO 5TH AVENUE ALONG MISSISSIPPI RIVER IN ST CLOUD (AC PROJECT, PAYBACK IN 215). EN PEDESTRIAN BIKE TRAIL TAP 2,448,561 493,465 61,439 1,955,96 431 LOCAL 999 162-151-1 ST. CLOUD 33RD STREET SOUTH PHASE 1: 4' E OF CSAH 75 TO 5' W OF SOUTHWAY DRIVE, EXPAND TO 4-LANE, INCL ROUNDABOUT AT SOUTHWAY DR AND ASSOCIATED FRONTAGE ROAD REVISIONS. MC GRADE AND SURFACE STP 3,5, 1,9, 1,6, 432 PED/BIKE 191-591-2 SAUK RAPIDS **SRTS** INFRA SAUK RAPIDS CONSTRUCTION. BT PED./BIKE SRTS 276,6 276,6 ENGINEERING & CONSTRUCTION FOR SIDEWALKS ALONG 11TH STREET NORTH AND 6TH AVENUE NORTH 433 LOCAL 999 213-126-1 BUFFALO **AC** ON NEW ALIGNMENT TH 25 TO TH 55, CONSTRUCT 1. MC GRADE AND STP 879, 1,81, 879, SETTLERS PARKWAY ON THE SOUTH SIDE OF BUFFALO SURFACE (AC PROJECT, PAYBACK IN 215) 434 LOCAL 999 217-112-2 OTSEGO **AC** LAMBERT AVE TO ODEAN AVE IN OTSEGO, GRADE 3. RC GRADE AND STP 2,715, 8, 2,715, & SURFACE, INCL BIKE/PED TRAIL (AC PROJECT - SURFACE PAYBACK IN 216) September 213 Project Listing Page III - 37 of 175

ATP: 3 Fiscal Year: 214 STIP for FY 214-217 435 LOCAL 999 22-117-2AC1 SARTELL **AC** GRADING, AGG BASE, BITUMINOUS SURFACING, CONCRETE CURB & GUTTER, ROUNDABOUTS, STORM SEWER & WATER MAIN FOR 5TH AVENUE FROM JCT CR 12 & 5TH AVE TO.429 MI N OF 5TH AVE (AC PAYBACK 1 OF 2). MC GRADE AND SURFACE STP 172, 172, 436 MSAS 117 22-117-3 SARTELL **MN162** ROW ACQUISITION FROM 23RD ST SOUTH TO HERITAGE DR AND FROM HERITAGE DR NORTH TO 4TH AVE CONNECTION AT 2ND ST SOUTH, 1.8 MILES (SAFETEA-LU) 2. RW RIGHT OF WAY DEMO 59, 47,1 119,999 437 PED/BIKE 247-591-1 DELANO **SRTS** INFRA DELANO CONSTRUCTION ENGINEERING. BT PED./BIKE SRTS 292,11 292,11 AND CONSTRUCTION FOR SIDEWALK/TRAIL CONNECTION ON DELANO SCHOOL CAMPUS 438 MN 15 733-48 SAINT CLOUD **TED1** CONSTRUCT NEW INTERCHANGE AT TH 15. AM GRADE AND BF 12,4, 12,4, AND 33RD STREET IN ST CLOUD AND WAITE PARK, NEW BRIDGE BRIDGE #7346 439 MN 1 52-17 MNDOT **TED12** INTERCHANGE S AT TH 1 AND BENTON CSAH 3 IN SAUK RAPIDS, INCLUDES REHAB BR 56 (RAILS AND SIDEWALKS) (BENTON COUNTY IS THE LEAD AGENCY) (OTHER FUNDS = 1,463,65 TED 12 & 794,35 LOCAL). AM GRADE AND SURFACE LF 2,258, 2,258, 44 US 1 51-29 MNDOT TH 1 AND TH 23 INTERCHANGE AREA, RESURFACING 1. RS BITUMINOUS NHPP 1,6, 1,28, 32, 441 US 1 493-71 MNDOT S OF LONG PRAIRIE RIVER TO CUSHING, MICROMILL, 16. RS MILL AND NHPP 4,1, 3,28, 82, ULTRA THIN BONDED WEARING COURSE 442 MN 12 862-51 MNDOT **TED12** CONSTRUCT DELANO NW BUSINESS PARK. AM GRADE AND LF 4,918,5 4,918,5 SURFACE 443 MN 15 7321-48 MNDOT INSTALL TRAFFIC QUEUE DETECTION SYSTEM BETWEEN. SC TRAFFIC SIGNAL SF 2, 2, 3RD ST AND 8TH ST IN ST. CLOUD REVISION 444 MN 15 7321-5 MNDOT LANDSCAPING AT TH 15/STEARNS CO CSAH 12. RB LANDSCAPING SF 1, 1, INTERCHANGE AREA IN ST CLOUD AND SARTELL 445 MN 23 331-32 MNDOT END OF BR #337 OVER GROUNDHOUSE RIVER E OF 6. RS MILL AND SF 2,431,562 2,431,562 OGILVIE TO S JCT TH 65 S OF MORA; BITUMINOUS 446 MN 23 735-119 MNDOT **ADA** 214 ADA PROJECT TH 23 IN ST. CLOUD AND 2. SC SPOT SF 46, 46, WAITE PARK, INCLUDE FIBER OPTIC September 213 Project Listing Page III - 38 of 175

ATP: 3 Fiscal Year: 214 STIP for FY 214-217 447 MN 65 33-46 MNDOT ON NBL, FM ANOKA/ISANTI CO LINE TO 1.1 MI S ISANTI CO CSAH 5 IN ISANTI; AND ON SBL, FM.7 MI S ISANTI CO CSAH 5 IN ISANTI TO 2.4 MI S TH 95 IN CAMBRIDGE, BITUMINOUS 8. RS BITUMINOUS NHPP 3,52,873 2,442,298 61,575 448 MN 65 3313-16 MNDOT 4.7 MI N OF TH 17 TO TH 7 IN BRUNSWICK, MILL AND 3. RS CULVERT REPAIR SF 2,2, 2,2, 449 US 71 778-39 MNDOT IN BROWERVILLE FROM BR #6227 TO BR #6228, RECONSTRUCTION, INCLUDING CURB & GUTTER, SIDEWALK, STORM SEWER, CITY WORK INCLUDES WATER MAIN AND SANITARY SEWER 1. RS MILL AND NHPP LF 3,425, 2,16, 54, 725, 45 MN 84 1111-13 MNDOT REPLACE BRIDGE (OLD BR#984) WITH NEW BR 11X3. BR BRIDGE SF 8, 8, OVER BOY RIVER.2 MI S OF LONGVILLE REPLACEMENT 451 I 94 868-158 MNDOT **AC**.75 M W OF TH 25 TO WRIGHT CO CSAH 18 IN MONTICELLO, RECONSTRUCTION, INCLUDING EB & WB AUXILIARY LANES, REPLACE PAVEMENT (AC PROJECT - PAYBACK IN 215) 2. RC GRADE AND SURFACE NHPP 13,7, 12,274,444 555,556 1,425,556 452 I 94 868-158S MNDOT.8 M W OF TH 25 TO WRIGHT CO CSAH 18 IN 2. SH GRADE AND HSIP 1,244,444 1,12, 124,444 MONTICELLO, RECONSTRUCTION INCL EB & WB SURFACE AUXILIARY LANES, REPLACE PAVEMENT (HSIP PROJECT) 453 MN 95 36-36 MNDOT REPLACE BR #9173 (WITH NEW BR. #31) OVER RUM 1. BR BRIDGE NHPP 5,8, 4,64, 1,16, RIVER.6 W OF CAMBRIDGE REPLACEMENT 454 MN 371 1117-23 MNDOT N END OF PINE RIVER TO BACKUS, MILL AND, 17. RS MILL AND NHPP 2,138,486 1,71,789 427,697 PAVE SHOULDERS 455 MN 371 181-1 MNDOT LANDSCAPING ALONG TH 371 THROUGH NISSWA 1. RB LANDSCAPING SF 4, 4, 456 MN 999 8823-277 MNDOT DISTRICTWIDE RR CIRCUITRY PROJECT. SR RR X-ING SF 225, 225, S 457 MN 999 883-AM-14 MNDOT DISTRICTWIDE SET ASIDES - COOPERATIVE. AM COOP. CONST. SF 1,5, 1,5, AGREEMENTS - 214 AGREEMENT 458 MN 999 883-CA-14 MNDOT DISTRICTWIDE SET ASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,2, 1,2, AGREEMENTS - 214 459 MN 999 883-MA-14 MNDOT DISTRICTWIDE SET ASIDES - MISC AGREEMENTS - 214. MA UTILITY SF 8, 8, AGREEMENT 46 MN 999 883-RB-14 MNDOT DISTRICTWIDE SET ASIDES - LANDSCAPING - 214. RB LANDSCAPE SF 3, 3, PARTNERSHIP September 213 Project Listing Page III - 39 of 175

ATP: 3 Fiscal Year: 214 STIP for FY 214-217 461 MN 999 883-RW-14 MNDOT DISTRICTWIDE SET ASIDES - RIGHT-OF-WAY - 214. RW RIGHT OF WAY SF 3,36, 3,36, 462 MN 999 883-RX-14 MNDOT DISTRICTWIDE SET ASIDES - MISC ROAD & BRIDGE. RX ROAD REPAIR SF 4,675, 4,675, REPAIR (BARC) - 214 463 MN 999 883-SA-14 MNDOT DISTRICTWIDE SET ASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 3,5, 3,5, AGREEMENTS/OVERRUNS - 214 COST OVERRUNS 464 MN 999 883-SC-14 MNDOT DISTRICTWIDE SET ASIDES - SAFETY S -. SC TRAFFIC MGMT. SF 3, 3, 214 SYSTEM $118,662,236 $44,431,36 $6,934,95 $2,778,228 $27,249,834 $44,22,868 September 213 Project Listing Page III - 4 of 175

ATP: 3 Fiscal Year: 215 STIP for FY 214-217 465 BB TRF-48-15B METRO BUS SECT 537:ST. CLOUD FR TRANSIT OPERATING. B9 OPERATE BUS FTA 7,174,286 1,174,286 6,, ASSISTANCE 466 BB TRF-48-15D METRO BUS SECT 537: TRANSIT PURCHASES OFFICE. B9 BUS GRANT FTA 25, 2, 5, EQUIPMENT AND COMPUTERS 467 BB TRF-48-15E METRO BUS SECT 537: TRANSIT PURCHASES. B9 BUS GRANT FTA 1, 8, 2, MAINTENANCE TOOLS AND EQUIPMENT 468 BB TRF-48-15F METRO BUS SECT 537: IZED PREVENTIVE MAINTENANCE. B9 BUS GRANT FTA 1,237,858 988,286 249,572 469 BB TRF-48-15V METRO BUS SECT 537: TRANSIT PURCHASE, BUS SHELTER. B9 BUS GRANT FTA 2, 16, 4, TRANSIT AMENITY 47 BB TRF-48-15W METRO BUS SECT 537: TRANSIT PURCHASE, ITS PROJECTS. B9 BUS GRANT FTA 25, 2, 5, 471 BB TRS-48-15 METRO BUS ST CLOUD METRO BUS PURCHASE 3 SMALL BUSES. TR PURCHASE BUS STP 48, 32, 16, 472 BB TRS-55-15 MNDOT RIVER RIDER TRANSIT, PURCHASE ONE BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 473 BB TRS-57-15 MNDOT TRI-CAP TRANSIT, PURCHASE OF ONE BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 474 BB TRS-3449-15 MNDOT BRAINERD/CROW WING COUNTY PUBLIC TRANSIT,. TR PURCHASE BUS STP 78, 62,4 15,6 PURCHASE ONE BUS (CLASS 4) 475 BB TRS-767-15 MNDOT RAINBOW RIDER PUBLIC TRANSIT, PURCHASE ONE BUS. TR PURCHASE BUS STP 78, 62,4 15,6 (CLASS 4) 476 BB TRS-768-15 MNDOT ISANTI HEARTLAND EXPRESS, PURCHASE ONE BUS. TR PURCHASE BUS STP 78, 62,4 15,6 (CLASS 4) 477 RR 18-112 MNDOT BNSF RR, INSTALL GATES AND FLASHING LIGHTS, CR. SR RR X-ING RRS 275, 275, 111, RABBIT LAKE TWP (3 MI NE OF DEERWOOD) S 478 RR 86-129 MNDOT CP/SOO RR, INSTALL GATES AND FLASHING LIGHTS, S. SR RR X-ING RRS 275, 275, MYRTLE DR, M 12, ANNANDALE S 479 LOCAL 999 18-7-1 CROW WING INTERSECTION CONFLICT WARNING SYSTEM. SH MISCELLANEOUS HSIP 12, 18, 12, COUNTY September 213 Project Listing Page III - 41 of 175

ATP: 3 Fiscal Year: 215 STIP for FY 214-217 48 CSAH 36 18-636-8 CROW WING RECONSTRUCT FROM CROW WING CSAH 37 IN CROSS 5. RC GRADE AND STP 2,585, 2,68, 517, COUNTY LAKE TO CR 114 SURFACE 481 LOCAL 999 3-7-6 ISANTI COUNTY GROUND IN WET REFLECTIVE MARKINGS. SH STRIPING HSIP 295,711 266,14 29,571 482 CSAH 12 33-612-13AC2 KANABEC COUNTY **AC** FROM TH 23 TO KANABEC CSAH 6, MILL & 5. RS MILL AND STP 22,8 22,8 (AC PAYBACK 2 OF 2) 483 LOCAL 999 48-7-1 MILLE LACS COUNTYWIDE 6" EDGELINE STRIPING. SH STRIPING HSIP 67,75 6,975 6,775 COUNTY 484 CSAH 4 48-64-17AC MILLE LACS **AC** MILLE LACS CSAH 13 TO MILLE LACS CSAH 12, 4. RC GRADE AND STP 9, 9, COUNTY RECONSTRUCTION INCLUDING WIDENING (AC PAYBACK SURFACE 1 OF 1) 485 LOCAL 999 49-7-14 MORRISON GROUND-IN PAVEMENT MESSAGES. SH MISCELLANEOUS HSIP 233, 29,7 23,3 COUNTY 486 CSAH 19 49-619-9 MORRISON RECONSTRUCT FROM TODD CO CSAH 2 TO TH 238, IN 3. RC GRADE AND STP 95, 582,9 367,1 COUNTY THE CITY OF UPSALA SURFACE 487 LOCAL 999 71-7-24AC SHERBURNE **AC** CSAH 43 AND CSAH 5 INTERSECTION. SH TURN LANES HSIP 167,4 167,4 COUNTY S (AC PAYBACK 1 OF 1) 488 LOCAL 999 71-7-25 SHERBURNE VARIOUS COUNTY ROADS - 8" RUMBLE STRIP, 6". SH STRIPING HSIP 1, 9, 1, COUNTY EDGELINE STRIPE 489 CR 42 71-7-26 SHERBURNE 2' SHOULDER PAVING, SAFETY EDGE, 8" RUMBLE STRIP,. SH STRIPING HSIP 94, 84,6 9,4 COUNTY 6" EDGELINE STRIPE 49 CR 83 71-7-27 SHERBURNE 2' SHOULDER PAVING, SAFETY EDGE, 8" RUMBLE STRIP,. SH STRIPING HSIP 95, 85,5 9,5 COUNTY 6" EDGELINE STRIPE 491 CR 93 71-7-28 SHERBURNE 2' SHOULDER PAVING, SAFETY EDGE, 8" RUMBLE STRIP,. SH STRIPING HSIP 91, 81,9 9,1 COUNTY 6" EDGELINE STRIPE 492 CR 51 71-7-29 SHERBURNE 2' SHOULDER PAVING, SAFETY EDGE, 8" RUMBLE STRIP,. SH STRIPING HSIP 117, 15,3 11,7 COUNTY 6" EDGELINE STRIPE 493 CSAH 1 71-7-3 SHERBURNE 2' SHOULDER PAVING, SAFETY EDGE, 8" RUMBLE STRIP,. SH STRIPING HSIP 16, 95,4 1,6 COUNTY 6" EDGELINE STRIPE 494 CSAH 34 73-634-7AC STEARNS COUNTY **AC** STEARNS CSAH 66 IN PAYNESVILLE TO TH 22 1. RD BITUMINOUS STP 1,436,7 1,436,7 NORTH OF EDEN VALLEY, RECLAIM AND RESURFACE, RECLAMATION INCL. SHOULDERS (AC PAYBACK 1 OF 1) September 213 Project Listing Page III - 42 of 175

ATP: 3 Fiscal Year: 215 STIP for FY 214-217 495 CSAH 12 73-72-2AC STEARNS COUNTY **AC** SAFETY S FROM 5 FEET WEST. SC MEDIAN BARRIER STP 372,92 372,92 OF 5TH AVENUE TO CONNECTICUT AVENUE IN SARTELL (AC PAYBACK 1 OF 1) 496 LOCAL 999 77-7-6 TODD COUNTY GROUND IN WET REFLECTIVE PAVEMENT MARKING. SH STRIPING HSIP 296,667 267, 29,667 PROJECT 497 LOCAL 999 8-7-4 WADENA COUNTY INTERSECTION LIGHTING. SH LIGHTING HSIP 29,2 26,28 2,92 498 PED/BIKE 162-9-5AC ST CLOUD **AC** EXTEND BEAVER ISLAND BIKE/PED TRAIL, ST. EN PEDESTRIAN TAP 61,439 61,439 CLOUD CIVIC CENTER NORTH TO 5TH AVENUE ALONG BIKE TRAIL MISSISSIPPI RIVER IN ST CLOUD (AC PAYBACK 1 OF 1) 499 PED/BIKE 162-9-6AC ST. CLOUD **AC** BEAVER ISLAND TRAIL EXTENSION FROM 33RD STREET SOUTH TO MISSISSIPPI RIVER BLUFFS REGIONAL PARK IN THE CITY OF ST CLOUD (AC PAYBACK 1 OF 1) 1. EN PEDESTRIAN BIKE TRAIL TAP 278, 278, 5 PED/BIKE 24-9-3 ELK RIVER CONSTRUCT MISSING SEGMENTS OF BIKE/PED TRAIL ALONG TWIN LAKES ROAD FROM EXISTING HOUSING DEVELOPMENTS IN ELK RIVER TO THE ELK RIVER NORTHSTAR COMMUTER RAIL STATION AND UPGRADE PED RAMPS TO ADA GUIDELINES 1. EN PED./BIKE TAP 222,5 16, 62,5 51 LOCAL 999 213-126-1AC BUFFALO **AC** ON NEW ALIGNMENT TH 25 TO TH 55, CONSTRUCT 1. MC GRADE AND STP 1,81, 1,81, SETTLERS PARKWAY ON THE SOUTH SIDE OF BUFFALO SURFACE (AC PAYBACK 1 OF 1) 52 LOCAL 999 22-117-2AC2 SARTELL **AC** GRADING, AGG BASE, BITUMINOUS SURFACING, CONCRETE CURB AND GUTTER, ROUNDABOUTS, STORM SEWER AND WATER MAIN FOR 5TH AVE FROM JCT CR 12 AND 5TH AVE TO.429 MI N OF 5TH AVE (AC PAYBACK, 2 OF 2). MC GRADE AND SURFACE STP 192, 192, 53 CSAH 75 222-1-3 CITY OF MONTICELLO **AC** JCT TH 25 AND CSAH 75 (BROADWAY) IN MONTICELLO, SAFETY AND OPERATIONAL S INCLUDING ACCESS MODIFICATIONS, TURN LANES, CONCRETE MEDIAN AND SIGNAL SYSTEM REVISIONS (AC PROJECT - PAYBACK IN 217) (ASSOCIATED W/SP 865-52). RC CHANNELIZATION STP 1,394, 1,2, 1,394, 54 PED/BIKE 233-9-1 SAINT JOSEPH MINNESOTA ST W PEDESTRIAN TRAIL FROM 4TH AVE. EN PEDESTRIAN TAP 425, 11, 315, NW TO.25 MI WEST & MINNESOTA ST W LIGHTING BIKE TRAIL S 55 MN 4 731-35 MNDOT REPLACE BRIDGE #5917 OVER SAUK RIVER, 1.1 MI S OF I. BR BRIDGE SF 1,481,971 1,481,971 94, NEW BR NO. 7347 REPLACEMENT September 213 Project Listing Page III - 43 of 175

ATP: 3 Fiscal Year: 215 STIP for FY 214-217 56 US 1 52-13 MNDOT **ELLA** BENTON CO CSAH 4 TO.2 MI W OF RAILROAD CROSSING NEAR ST. GERMAIN IN ST CLOUD, UNBONDED CONCRETE, EB & WB AND ON TH 15 FROM JCT TH 1 TO 1. MI S, RECONSTRUCTION (ASSOCIATED TO SP 59-34) 8. RC UNBONDED CONCRETE NHPP 14,425, 11,54, 2,885, 57 US 1 713-58 MNDOT 1.2 MI E OF TH 23 IN ST CLOUD TO 475 FT. W OF 52ND ST, 5. RS MILL AND STP 2,4, 1,632, 48, MILL & 58 US 12 862-5 MNDOT INSTALL CONTINUOUS T-SIGNAL SYSTEM AT E JCT TH 25. SH TURN LANES HSIP 1,1, 99, 11, S OF BUFFALO (HSIP PROJECT) 59 MN 15 732-22 MNDOT MEEKER/STEARNS CO LINE TO KIMBALL, MILL AND 2. SC MILL AND NHPP 838,41 67,433 167,68 51 MN 23 735-117 MNDOT RURAL INTERSECTION WARNING SYSTEM AT STEARNS. SC TURN LANES SF 145, 145, CR 158 COLD SPRING GRANITE 511 MN 25 865-5 MNDOT.3 MI S OF WRIGHT CO CR 16 TO.1 MI S OF SCHOOL BLVD IN MONTICELLO, RECONSTRUCTION, INSTALL TRAFFIC SIGNAL AT CR 16; AND FROM.1 MI S OF SCHOOL BLVD TO JCT I 94, MILL AND 2. RC GRADE AND SURFACE NHPP 6,1, 4,88, 1,22, 512 MN 25 864-36 CITY OF BUFFALO **CIMS** 1ST ST S TO 8TH ST NW IN BUFFALO, RECONSTRUCTION, INCL. ROAUNDABOUT, PED/BIKE FACILITIES, UTILITIES AND DRAINAGE S (CIMS AMOUNT IS $2,1,) (CITY IS LEAD AGENCY). AM CHANNELIZATION SF LF 3,8, 2,1, 1,7, 513 CSAH 75 865-52 CITY OF MONTICELLO **CIMS** JCT TH 25 AND CSAH 75 (BROADWAY) IN MONTICELLO, SAFETY AND OPERATIONAL S INCLUDING ACCESS MODIFICATIONS, TURN LANES, CONCRETE MEDIAN AND SIGNAL SYSTEM REVISIONS (CIMS AMOUNT IS $56,) (CITY IS LEAD AGENCY) (ASSOCIATED W/SP 222-1-3). AM CHANNELIZATION SF 56, 56, 514 MN 84 111-11 MNDOT REPLACE BRIDGE #6499 OVER NORWAY BROOK DAM IN. BR BRIDGE STP 3,43,334 2,434,667 68,667 PINE RIVER REPLACEMENT 515 MN 84 111-12 MNDOT REPLACE BRIDGE #6974 OVER ADA BROOK, 7.3 MI N OF. BR BRIDGE SF 575,933 575,933 PINE RIVER, NEW BR NO. 112 REPLACEMENT 516 I 94 868-16 MNDOT REPAIR RAILING, APPROACH PANEL, MILL AND. BI BRIDGE REPAIR NHPP 49,5 368,55 4,95 BRIDGE #8681 UNDER WRIGHT CO CR 111, 7 MI W OF JCT TH 25 517 I 94 868-158AC MNDOT **AC**.75 M W OF TH 25 TO WRIGHT CO CSAH 18 IN MONTICELLO, RECONSTRUCTION, INCLUDING EB & WB AUXILIARY LANES, REPLACE PAVEMENT (AC PAYBACK 1 OF 1) 2. RC GRADE AND SURFACE NHPP 555,556 555,556 September 213 Project Listing Page III - 44 of 175

ATP: 3 Fiscal Year: 215 STIP for FY 214-217 518 I 94 868-167 MNDOT WRIGHT CO. CSAH 75 AT MONTICELLO TO THE CROW 1. RS MILL AND INLAY NHPP 3,96, 3,564, 396, RIVER BRIDGE (EB ONLY), MILL AND 519 MN 115 498-4969A MNDOT PRESERVE BRIDGE #4969 OVER MISSISSIPPI RIVER AT. BI BRIDGE REPAIR SF 117, 117, CAMP RIPLEY 52 US 169 184-5265A MNDOT PRESERVE BRIDGE #5265 OVER DRY STREAM,.5 MI S. BI BRIDGE REPAIR NHPP 292,5 234, 58,5 OF JCT TH 18 521 US 169 4814-52 MNDOT REPLACE BRIDGE #6657 OVER RUM RIVER IN VINELAND. BR BRIDGE NHPP 1,575,762 1,26,61 315,152 REPLACEMENT 522 US 169 4814-3355A MNDOT PRESERVE BRIDGE #3355 OVER WHITE FISH CREEK, 2.2. BI BRIDGE REPAIR NHPP 175,5 14,4 35,1 MI S OF AITKIN/MILLE LACS CO LINE 523 MN 21 187-27 MNDOT TRAFFIC SIGNAL AND GEOMETRIC S AT. SC TRAFFIC SIGNAL SF 854,7 854,7 JCT TH 21 AND TH 6 IN DEERWOOD INST. 524 MN 21 187-28 MNDOT **ADA** 215 ADA PROJECT TH 21 AND TH 6 IN CROSBY 1. SC SPOT NHPP 25, 2, 5, 525 MN 371 112-55M MNDOT WALKER TO RR CROSSING S OF CASS LAKE, MILL AND 2. RS MILL AND NHPP 4,588,935 3,671,148 917,787 (DESIGNED BY DISTRICT 2, ATP-3 PORTION) 526 MN 999 8823-243 MNDOT DISTRICTWIDE SIGNING UPGRADE PROJECT. SC TRAFFIC SIGNAL SF 45, 45, REVISION 527 MN 999 883-AM-15 MNDOT DISTRICTWIDE SET ASIDES - COOPERATIVE. AM COOP. CONST. SF 1,, 1,, AGREEMENTS - 215 AGREEMENT 528 MN 999 883-CA-15 MNDOT DISTRICTWIDE SET ASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,2, 1,2, AGREEMENTS - 215 529 MN 999 883-MA-15 MNDOT DISTRICTWIDE SET ASIDES - MISC AGREEMENTS - 215. MA UTILITY SF 8, 8, AGREEMENT 53 MN 999 883-RB-15 MNDOT DISTRICTWIDE SET ASIDES - LANDSCAPING - 215. RB LANDSCAPE SF 3, 3, PARTNERSHIP 531 MN 999 883-RW-15 MNDOT DISTRICTWIDE SET ASIDES - RIGHT-OF-WAY - 215. RW RIGHT OF WAY SF 9,4, 9,4, 532 MN 999 883-RX-15 MNDOT DISTRICTWIDE SET ASIDES - MISC ROAD & BRIDGE. RX ROAD REPAIR SF 6,, 6,, REPAIR (BARC) - 215 533 MN 999 883-SA-15 MNDOT DISTRICTWIDE SET ASIDES - SUPPLEMENTAL AGREEMENTS/OVERRUNS - 215. SA SUPP. AGREE. & COST OVERRUNS SF 4,6, 4,6, September 213 Project Listing Page III - 45 of 175

ATP: 3 Fiscal Year: 215 STIP for FY 214-217 534 MN 999 883-SC-15 MNDOT DISTRICTWIDE SET ASIDES - SAFETY S -. SC TRAFFIC MGMT. SF 3, 3, 215 SYSTEM 535 LOCAL 999 883-SHL-15 MNDOT DISTRICTWIDE SETASIDES - HIGHWAY SAFETY. SH SAFETY TARGET HSIP 27, 243, 27, PROGRAM - 215 536 MN 999 883-SHS-15 MNDOT DISTRICTWIDE SETASIDES - DISTRICT 3 HSIP - 215. SH SAFETY TARGET HSIP 144,444 13, 14,444 $93,412,579 $43,347,49 $1,2, $2,226,572 $36,787,812 $11,5,75 September 213 Project Listing Page III - 46 of 175

ATP: 3 Fiscal Year: 216 STIP for FY 214-217 537 BB TRF-48-16B METRO BUS SECT 537: ST CLOUD RR OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,786,29 1,186,29 6,6, 538 BB TRF-48-16D METRO BUS SECT 537: TRANSIT PURCHASES OFFICE. B9 BUS GRANT FTA 25, 2, 5, EQUIPMENT AND COMPUTERS 539 BB TRF-48-16E METRO BUS SECT 537: TRANSIT PURCHASES. B9 BUS GRANT FTA 1, 8, 2, MAINTENANCE TOOLS AND EQUIPMENT 54 BB TRF-48-16F METRO BUS SECT 537: ST CLOUD METRO BUS IZED. B9 BUS GRANT FTA 1,382,36 1,15,629 276,47 PREVENTIVE MAINTENANCE 541 BB TRF-48-16V METRO BUS SECT 537: TRANSIT PURCHASE, BUS SHELTER. B9 BUS GRANT FTA 2, 16, 4, TRANSIT AMENITY 542 BB TRS-48-16 METRO BUS ST CLOUD METRO BUS PURCHASE 2 SMALL CNG BUSES. TR PURCHASE BUS STP 34, 267,6 72,4 543 BB TRS-55-16 MNDOT RIVER RIDER TRANSIT, PURCHASE ONE BUS (CLASS 5). TR PURCHASE BUS STP 146, 116,8 29,2 544 BB TRS-57-16 MNDOT TRI-CAP TRANSIT, PURCHASE OF 2 BUSES (CLASS 4). TR PURCHASE BUS STP 16, 128, 32, 545 BB TRS-3449-16 MNDOT BRAINERD/CROW WING COUNTY PUBLIC TRANSIT,. TR PURCHASE BUS STP 8, 64, 16, PURCHASE ONE BUS (CLASS 4) 546 BB TRS-768-16 MNDOT ISANTI HEARTLAND EXPRESS, PURCHASE ONE BUS. TR PURCHASE BUS STP 146, 115, 31, (CLASS 5) 547 BB TRS-918-16 MNDOT WADENA CO, FRIENDLY RIDER PUBLIC TRANSIT,. TR PURCHASE BUS STP 8, 64, 16, PURCHASE ONE BUS (CLASS 4) 548 BB TRS-958-16 MNDOT KANABEC COUNTY, PURCHASE ONE BUS (CLASS 4). TR PURCHASE BUS STP 8, 64, 16, 549 RR 49-135 MNDOT BNSF RR, INSTALL GATES AND FLASHING LIGHTS, CSAH. SR RR X-ING RRS 275, 275, 5, BEAR RD, CUSHING TWP S 55 RR 73-127 MNDOT CP/SOO RR, INSTALL GATES AND FLASHING LIGHTS,. SR RR X-ING RRS 275, 275, EDEN LAKE TWP (3. MI NW EDEN VALLEY) S 551 CSAH 3 5-63-29 BENTON COUNTY CSAH 3 FROM BENTON DR TO TH 1 - ROADWAY. RS GRADE AND STP 2,4,5 1,632,4 48,1 EXPANSION SURFACE 552 CSAH 1 11-61-23 CASS COUNTY CR 17 TO CSAH 29 IN CASS CO, RECONSTRUCTION AND 3. RC GRADE AND STP 1,5, 745,5 34,5 SHOULDER WIDENING SURFACE September 213 Project Listing Page III - 47 of 175

ATP: 3 Fiscal Year: 216 STIP for FY 214-217 553 CSAH 45 18-645-6 CROW WING CROW WING CSAH 2 TO CR 117 IN BRAINERD, MILL AND 9. RC MILL AND STP 95, 713,1 236,9 COUNTY, SHOULDER PAVING 554 CSAH 5 33-65-19 KANABEC COUNTY **AC** CSAH 17 TO CSAH 1 IN KANABEC CO, MILL AND 6. RS MILL AND STP 549,3 352, 35,7 197,3 (AC PROJECT, PAYBACK IN 217) 555 CSAH 4 71-64-34 SHERBURNE CSAH 4 FROM US 169 IN ZIMMERMAN TO E COUNTY LINE. RD BITUMINOUS STP 2,42, 1,, 1,42, COUNTY (ISANTI CSAH 8), RECLAIM AND BITUMINOUS PAVEMENT RECLAMATION 556 CSAH 9 73-69-37AC STEARNS COUNTY **AC** STEARNS CSAH 4 TO I 94 IN AVON, BITUMINOUS 1. RC BITUMINOUS STP 6, 6, RECLAMATION (AC PAYBACK 1 OF 1) RECLAMATION 557 LOCAL 999 77-7-7 TODD COUNTY TODD COUNTY SIX INCH EDGE LINE PAVEMENT. SH STRIPING HSIP 166,667 15, 16,667 MARKING PROJECT 558 CSAH 1 77-61-1 TODD COUNTY CSAH 37 TO CSAH 11 IN TODD CO, MILL AND 8. RC MILL AND STP 1,29, 864,3 425,7 559 CSAH 4 8-64-12 WADENA COUNTY TH 1 TO WADENA CSAH 54, RECONSTRUCTION 1. RC GRADE AND STP 42, 321,6 8,4 SURFACE 56 LOCAL 999 217-112-2AC OTSEGO **AC** LAMBERT AVE TO ODEAN AVE IN OTSEGO, GRADE. RC GRADE AND STP 8, 8, & SURFACE, INCL BIKE/PED TRAIL (AC PAYBACK 1 OF 1) SURFACE 561 LOCAL 999 218-8-2 CAMBRIDGE ON ALABAMA STREET, FROM TH 95 TO CR 45 IN. RC GRADE AND STP 2,292,5 1,, 1,292,5 CAMBRIDGE, RECONSTRUCTION SURFACE 562 US 1 493-69 MNDOT BNSF RR, INSTALL GATES, FLASHING LIGHTS,. SR RR X-ING RRS 275, 275, CIRCUITRY AND CANTILEVERS, US 1, 2ND AVE, MOTLEY S 563 MN 15 7321-51 MNDOT.1 MI N OF JCT TH 23 TO S END OF BRIDGE #511 OVER MISSISSIPPI RIVER, MILL AND, INCLUDE CONSTRUCT DUAL SB LEFT TURN LANES AT 12TH ST N IN ST. CLOUD. SC TURN LANES NHPP 1,922,82 1,538,256 384,564 564 MN 15 7321-51S MNDOT.1 MI N OF JCT TH 23 TO S END OF BRIDGE #511 OVER MISSISSIPPI RIVER, MILL AND, INCLUDE CONSTRUCT DUAL SB LEFT TURN LANES AT 12TH ST N IN ST. CLOUD (HSIP PROJECT). SH TURN LANES HSIP 36, 324, 36, 565 MN 24 718-23 MNDOT **ELLA**AC** REPLACE BR #6557 OVER MISSISSIPPI 1. BR BRIDGE NHPP 15,, 1,2, 9,, 4,8, RIVER AT CLEARWATER (AC PROJECT, PAYBACK IN 217) REPLACEMENT 566 MN 25 865-49 MNDOT 7TH ST TO CATLIN ST IN BUFFALO, RECONSTRUCTION, 2. RC GRADE AND NHPP 5,, 4,, 1,, UPGRADE TRAFFIC SIGNAL SURFACE 567 MN 27 484-22 MNDOT JCT TH 169 TO HENNEPIN AVE IN ISLE, MILL AND 7. RS MILL AND SF 2,29, 2,29,, INCL. LEFT TURN LANES AT TH 47 IN ISLE September 213 Project Listing Page III - 48 of 175

ATP: 3 Fiscal Year: 216 STIP for FY 214-217 568 MN 55 867-59 MNDOT AT WRIGHT CO CSAH 14 (EBL), CONSTRUCT LEFT TURN. SH TURN LANES HSIP 45, 45, 45, LANE AND DETACHED RIGHT TURN LANE (HSIP PROJECT) 569 US 71 7318-38 MNDOT E JCT TH 55 IN BELGRADE TO I94 IN SAUK CENTRE, MILL 3. RS MILL AND NHPP 6,214,549 4,971,639 1,242,91 AND 57 I 94 738-223 MNDOT STEARNS CO CR 159 AT COLLEGEVILLE E TO CSAH 75 2. RC UNBONDED NHPP 6,72, 6,48, 672, (EB & WB), UNBONDED CONCRETE CONCRETE 571 I 94 738-239 MNDOT STEARNS CSAH 75 W OF ST. JOSEPH TO W END OF BR.S 5. RS UNBONDED NHPP 12,96, 11,664, 1,296, #73865 & #73866 OVER SAUK RIVER (EB & WB) CONCRETE UNBONDED CONCRETE 572 MN 115 498-21 MNDOT BNSF RR, INSTALL GATES, FLASHING LIGHTS AND. SR RR X-ING RRS 275, 275, CIRCUITRY, MN TH 115, RANDALL S 573 US 169 4812-84 MNDOT S OF BR #4833 OVER RUM RIVER TO BEGINNING 4 LANE 15. RS MILL AND NHPP 4,117, 3,293,6 823,4 IN VINELAND, MILL & 574 US 169 4812-86 MNDOT **ELLA** MILLE LACS CO CSAH 11/19TH ST N OF MILACA 6. RS MILL AND NHPP 7,165, 5,732, 1,433, TO RUM RIVER REST AREA (NB), MILL &, INCL. TURN LANE EXTENSIONS 575 US 169 4812-86S MNDOT **ELLA** MILLE LACS CO CSAH 11/19TH ST N OF MILACA 6. SH MILL AND HSIP 133, 119,7 13,3 TO RUM RIVER REST AREA (NB), MILL &, INCL. TURN LANE EXTENSIONS 576 US 169 716-83 MNDOT JCT SHERBURNE CSAH 4 IN ZIMMERMAN, GEOMETRIC S, CONSTRUCT SB ACCEL LANE, RESURFACING AND SIGNAL REPLACEMENT, IN CONJUNCTION WITH SHERBURNE COUNTY PROJECT. AM CHANNELIZATION SF 3, 3, 577 MN 999 883-ADA-16 MNDOT **ADA** 216 ADA PROJECT. SC SPOT STP 25, 2, 5, 578 MN 999 883-AM-16 MNDOT DISTRICTWIDE SET ASIDES - COOPERATIVE. AM COOP. CONST. SF 1,, 1,, AGREEMENTS - 216 AGREEMENT 579 MN 999 883-CA-16 MNDOT DISTRICTWIDE SET ASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,2, 1,2, AGREEMENTS - 216 58 MN 999 883-MA-16 MNDOT DISTRICTWIDE SET ASIDES - MISC AGREEMENTS - 216. MA UTILITY SF 8, 8, AGREEMENT 581 MN 999 883-RB-16 MNDOT DISTRICTWIDE SET ASIDES - LANDSCAPING - 216. RB LANDSCAPE SF 3, 3, PARTNERSHIP 582 MN 999 883-RW-16 MNDOT DISTRICTWIDE SET ASIDES - RIGHT-OF-WAY - 216. RW RIGHT OF WAY SF 3,1, 3,1, September 213 Project Listing Page III - 49 of 175

ATP: 3 Fiscal Year: 216 STIP for FY 214-217 583 MN 999 883-RX-16 MNDOT DISTRICTWIDE SET ASIDES - MISC ROAD & BRIDGE. RX ROAD REPAIR SF 6,, 6,, REPAIR (BARC) - 216 584 MN 999 883-SA-16 MNDOT DISTRICTWIDE SET ASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 4,87, 4,87, AGREEMENTS/OVERRUNS - 216 COST OVERRUNS 585 MN 999 883-SC-16 MNDOT DISTRICTWIDE SET ASIDES - SAFETY S -. SC TRAFFIC MGMT. SF 3, 3, 216 SYSTEM 586 LOCAL 999 883-SHL-16 MNDOT DISTRICTWIDE SETASIDES - HIGHWAY SAFETY. SH SAFETY TARGET HSIP 1,911,764 1,72,588 191,176 PROGRAM - 216 587 MN 999 883-SHS-16 MNDOT DISTRICTWIDE SETASIDES - DISTRICT 3 HSIP - 216. SH SAFETY TARGET HSIP 31,444 271,3 3,144 $16,311,69 $6,586,383 $9,35,7 $2,335,658 $31,716,318 $11,673,25 September 213 Project Listing Page III - 5 of 175

ATP: 3 Fiscal Year: 217 STIP for FY 214-217 588 BB TRF-48-17B METRO BUS SECT 537: ST CLOUD RR OPERATING ASSISTANCE. B9 OPERATE BUS FTA 8,597,889 1,197,889 7,4, 589 BB TRF-48-17D METRO BUS SECT 537: TRANSIT PURCHASES OFFICE. B9 BUS GRANT FTA 25, 2, 5, EQUIPMENT AND COMPUTERS 59 BB TRF-48-17E METRO BUS SECT 537: TRANSIT PURCHASES. B9 BUS GRANT FTA 1, 8, 2, MAINTENANCE TOOLS AND EQUIPMENT 591 BB TRF-48-17F METRO BUS SECT 537: ST CLOUD METRO BUS IZED. B9 BUS GRANT FTA 1,417,361 1,133,889 283,472 PREVENTIVE MAINTENANCE 592 BB TRF-48-17V METRO BUS SECT 537: TRANSIT PURCHASE, BUS SHELTER. B9 BUS GRANT FTA 2, 16, 4, TRANSIT AMENITY 593 BB TRF-48-17W METRO BUS SECT 537: TRANSIT PURCHASE, ITS PROJECTS. B9 BUS GRANT FTA 25, 2, 5, 594 BB TRS-55-17 MNDOT RIVER RIDER TRANSIT, PURCHASE ONE BUS (CLASS 5). TR PURCHASE BUS STP 15, 12, 3, 595 BB TRS-57-17 MNDOT TRI-CAP TRANSIT, PURCHASE ONE BUS (CLASS 5). TR PURCHASE BUS STP 15, 12, 3, 596 BB TRS-3449-17 MNDOT BRAINERD/CROW WING COUNTY PUBLIC TRANSIT,. TR PURCHASE BUS STP 82, 65,6 16,4 PURCHASE ONE BUS (CLASS 4) 597 BB TRS-768-17 MNDOT ISANTI HEARTLAND EXPRESS, PURCHASE ONE BUS. TR PURCHASE BUS STP 82, 62,9 19,1 (CLASS 4) 598 BB TRS-958-17 MNDOT TIMBER TRAILS PUBLIC TRANSIT, PURCHASE ONE BUS. TR PURCHASE BUS STP 82, 62,9 19,1 (CLASS 4) 599 RR 71-124 MNDOT BNSF RR, INSTALL GATES AND FLASHING LIGHTS, T5,. SR RR X-ING RRS 35, 35, 32ND ST SE, HAVEN TOWNSHIP (1.5 MI SE ST CLOUD) S 6 RR 71-125 MNDOT BNSF RR, INSTALL GATES AND FLASHING LIGHTS, T14,. SR RR X-ING RRS 35, 35, 52ND ST SE, HAVEN TOWNSHIP (4 MI NW CLEAR LAKE) S 61 CSAH 1 5-61-1 BENTON COUNTY TH 23 TO BENTON CSAH 3 (GOLDEN SPIKE ROAD),. RS MILL AND STP 638, 51,4 127,6 ROADWAY RESURFACING 62 CSAH 75 11-675-2 CASS COUNTY TH 2 TO NORTH COUNTY LINE, MILL AND. RC MILL AND STP 6, 456, 144, September 213 Project Listing Page III - 51 of 175

ATP: 3 Fiscal Year: 217 STIP for FY 214-217 63 CSAH 16 18-616-19 CROW WING CROW WING CSAH 39 TO CSAH 66, MILL AND. RS MILL AND STP 625, 472,8 152,2 COUNTY 64 CSAH 25 18-625-5 CROW WING TH 18 TO TH 21, ROADWAY RESURFACING INCLUDING. RS MILL AND STP 52, 395,2 124,8 COUNTY SHOULDER PAVING 65 CSAH 9 3-69-9 ISANTI COUNTY TH 65 TO CR 45, RECONSTRUCTION. RS GRADE AND STP LF 2,797,3 763,5 2,33,8 SURFACE 66 CSAH 5 33-65-19AC KANABEC COUNTY **AC** CSAH 17 TO CSAH 1 IN KANABEC CO, MILL AND. RS MILL AND STP 35,7 35,7 (AC PROJECT - (AC PAYBACK 1 OF 1) 67 CR 213 49-596-9 MORRISON MORRISON CSAH 13 TO MN 115, ROADWAY. RS MILL AND STP 56, 425,6 134,4 COUNTY RESURFACING 68 CSAH 52 49-652-8 MORRISON MORRISON CSAH 26 TO GREENWOOD ROAD, ROADWAY. RS MILL AND STP 48, 364,8 115,2 COUNTY RESURFACING 69 CSAH 2 73-62-45AC STEARNS COUNTY **AC** STEARNS CSAH 4 TO CSAH 75, ROADWAY. RS MILL AND STP 792, 792, RESURFACING (AC PAYBACK 1 OF 1) 61 CSAH 1 77-61-11 TODD COUNTY WEST COUNTY LINE TO TODD CSAH 37, MILL AND. RS MILL AND STP 7, 532, 168, INCLUDING AGGREGATE SHOULDER AND SAFETY S 611 CSAH 17 8-617-8 WADENA COUNTY FERN AVENUE TO IRONWOOD AVENUE,. RS GRADE AND STP 3, 228, 72, RECONSTRUCTION AND REALIGNMENT OF S-CURVE SURFACE 612 CSAH 37 86-637-32 WRIGHT COUNTY TH 11 TO ODEAN AVE, GRADE AND SURFACE. RC GRADE AND STP 3,1, 1,53, 1,57, SURFACE 613 MSAS 117 22-117-4 SARTELL ON MSAS 117 (5TH AVE), FROM HERITAGE DR TO. RS GRADE AND STP 1,555, 547,6 1,7,4 NORTH.5 MILES IN SARTELL, GRADE AND SURFACE, SURFACE INCL. STORM SEWER AND DRAINAGE S 614 CSAH 75 222-1-3AC CITY OF MONTICELLO **AC** JCT TH 25 AND CSAH 75 (BROADWAY) IN MONTICELLO, SAFETY AND OPERATIONAL S INCLUDING ACCESS MODIFICATIONS, TURN LANES, CONCRETE MEDIAN AND SIGNAL SYSTEM REVISIONS (AC PAYBACK 1 OF 1). RC CHANNELIZATION STP 1,2, 1,2, 615 MN 6 182-5 MNDOT IN EMILY, RECONSTRUCTION INCLUDING SAFETY 1. RC GRADE AND SF 2,15, 2,15, INTERSECTION S AT CSAH 1 SURFACE INTERSECTION 616 MN 6 182-51 MNDOT SOUTH END OF MISSISSIPPI BRIDGE (BRIDGE #181) TO 6. RC MILL AND SF 2,, 2,, NORTH 5.7 MI, MILL AND September 213 Project Listing Page III - 52 of 175

ATP: 3 Fiscal Year: 217 STIP for FY 214-217 617 MN 24 718-23AC MNDOT **ELLA**AC** REPLACE BR #6557 OVER MISSISSIPPI 1. BR BRIDGE NHPP 9,, 9,, RIVER AT CLEARWATER (AC PAYBACK 1 OF 1) REPLACEMENT 618 MN 25 57-14 MNDOT TH 95 TO FOLEY, MILL AND INCLUDING SIX 5. RS MILL AND STP 2,, 1,6, 4, FOOT PAVED SHOULDER 619 MN 25 491-29 MNDOT LITTLE ROCK TO SOUTH OF GENOLA, MILL AND 9. RS MILL AND STP 3,1, 2,48, 62, 62 MN 27 774-14 MNDOT N JCT TH 71 TO 9TH ST NE IN LONG PRAIRIE, MILL AND 1. RS MILL AND SF 5, 5, 621 MN 27 495-35 MNDOT REPLACE BRIDGE #799 OVER RICE CREEK. BR BRIDGE SF 9, 9, REPLACEMENT 622 MN 27 496-23 MNDOT REPLACE BRIDGE #6711 OVER SKUNK RIVER 6. MILES. BR BRIDGE SF 5, 5, EAST OF LASTRUP REPLACEMENT 623 US 71 777-24 MNDOT N OF SOUTH LIMITS IN LONG PRAIRIE N TO S END OF 1. RS MILL AND NHPP 5, 4, 1, LONG PRAIRIE RIVER BRIDGE (BRIDGE #6852), MILL AND 624 US 71 779-16 MNDOT BERTHA TO WADENA/TODD CO LINE, MILL AND 8. RS MILL AND NHPP 3,, 2,4, 6, 625 MN 238 7323-11 MNDOT ALBANY TO UPSALA, RECLAIM INCLUDING.25 MILE 14. RS BITUMINOUS STP 7,11, 5,688, 1,422, URBAN SECTION IN ALBANY RECLAMATION 626 MN 371B 1814-6 MNDOT TH 21 (WASHINGTON ST) TO WILLOW ST IN BRAINERD, 1. RS GRADE AND NHPP 7,5, 5,6, 1,4, 5, RECONSTRUCTION, INCLUDING SIDEWALKS, CURB AND SURFACE GUTTER 627 MN 999 883-AM-17 MNDOT DISTRICTWIDE SET ASIDES - COOPERATIVE. AM COOP. CONST. SF 1,, 1,, AGREEMENTS - 217 AGREEMENT 628 MN 999 883-CA-17 MNDOT DISTRICTWIDE SET ASIDES - CONSULTANT. CA MISCELLANEOUS SF 8, 8, AGREEMENTS - 217 629 MN 999 883-MA-17 MNDOT DISTRICTWIDE SET ASIDES - MISC AGREEMENTS - 217. MA UTILITY SF 4, 4, AGREEMENT 63 MN 999 883-RB-17 MNDOT DISTRICTWIDE SET ASIDES - LANDSCAPING - 217. RB LANDSCAPE SF 3, 3, PARTNERSHIP 631 MN 999 883-RW-17 MNDOT DISTRICTWIDE SET ASIDES - RIGHT-OF-WAY - 217. RW RIGHT OF WAY SF 1,, 1,, 632 MN 999 883-RX-17 MNDOT DISTRICTWIDE SET ASIDES - MISC ROAD & BRIDGE. RX ROAD REPAIR SF 5,3, 5,3, REPAIR (BARC) - 217 September 213 Project Listing Page III - 53 of 175

ATP: 3 Fiscal Year: 217 STIP for FY 214-217 633 MN 999 883-SA-17 MNDOT DISTRICTWIDE SET ASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 3,4, 3,4, AGREEMENTS/OVERRUNS - 217 COST OVERRUNS 634 MN 999 883-SC-17 MNDOT DISTRICTWIDE SET ASIDES - SAFETY S -. SC TRAFFIC MGMT. SF 3, 3, 217 SYSTEM 635 LOCAL 999 883-SHL-17 MNDOT DISTRICTWIDE SETASIDES - HIGHWAY SAFETY. SH SAFETY TARGET HSIP 2,888,889 2,6, 288,889 PROGRAM - 217 636 MN 999 883-SHS-17 MNDOT DISTRICTWIDE SET ASIDES - DISTRICT 3 HSIP - 217. SH SAFETY TARGET HSIP 2,111,111 1,9, 211,111 637 LOCAL 999 883-TAP-17 MNDOT ATP-3 FY 217 LOCAL TRANSPORTATION ALTERNATIVES. EN PED./BIKE TAP 2,, 1,6, 4, PROGRAM SETASIDE $83,49,25 $42,968, $ $2,395,778 $23,33,111 $14,652,361 September 213 Project Listing Page III - 54 of 175

Clearwater Kittson Roseau Lake of the Woods Areawide Transportation Partnership (ATP) Boundaries Marshall 2 Koochiching Polk Pennington Red Lake Beltrami 1 Lake Cook Itasca St. Louis Norman Mahnomen Hubbard Clay Cass Becker Wilkin 4 Wadena 3 Crow Wing Aitkin Carlton Traverse Big Stone Lac qui Parle Yellow Medicine Lincoln Grant Stevens Lyon Murray Otter Tail Swift Chippewa Douglas Pope 8 Redwood Pipestone Cottonwood Renville Todd Kandiyohi Brown Stearns Meeker Watonwan Morrison McLeod Sibley Nicollet Benton Wright Mille Lacs Carver Hennepin Scott Kanabec Isanti Anoka Chisago Ramsey Washington Dakota Pine Rice 7 6 Blue Earth Sherburne Rock Nobles Jackson Martin Faribault Le Sueur Waseca Metro Steele Goodhue Dodge Wabasha Olmsted Freeborn Mower Fillmore Winona Houston DISTRICT 4 Jody Martinson Transportation District Engineer (218) 846-363 1 Hwy 1 West Detroit Lakes, Minnesota 5651 General Information: (218) 846-36 8-657-3984 FAX: (218) 847-1583

ATP: 4 Fiscal Year: 214 STIP for FY 214-217 638 BB TRF-34-14A MOORHEAD SECT 537: PARATRANSIT AND METRO SENIOR RIDE. B9 OPERATE BUS FTA 394, 87, 37, OPERATING ASSISTANCE 639 BB TRF-34-14B MOORHEAD SECT 537: CITY OF MOORHEAD TRANSIT OPERATING. B9 OPERATE BUS FTA 1,72, 449, 1,271, ASSISTANCE 64 BB TRF-34-14C MOORHEAD SECT 537: MOORHEAD TRANSIT PLANNING ASSISTANCE. B9 PLANNING FTA 22, 18, 4, 641 BB TRF-34-14D MOORHEAD SECT 537: MOORHEAD TRANSIT PREVENTIVE. B9 PREVENTIVE FTA 2, 16, 4, MAINTENANCE MAINTENANCE 642 BB TRF-34-14E MOORHEAD SECT 537: CITY OF MOORHEAD, REPLACEMENT OF ONE. B9 PURCHASE BUS FTA 7, 59,5 1,5 PARATRANSIT VEHICLE WITH CLASS 4 AND BUS RELATED EQUIPMENT 643 BB TRF-34-14F MOORHEAD SECT 537: CITY OF MOORHEAD, REPLACEMENT OF ONE. B9 PURCHASE BUS FTA 25, 2, 5, VAN FOR METRO SENIOR RIDE AND BUS RELATED EQUIPMENT 644 BB TRF-34-14G MNDOT SECT 537: CITY OF MOORHEAD PURCHASE BUS. B9 PURCHASE BUS FTA 5, 4, 1, RELATED EQUIPMENT 645 BB TRF-34-14N MNDOT SECT 531: CITY OF MOORHEAD MOBILITY MANAGER. NF OPERATE BUS FTA 3, 24, 6, 646 BB TRS-34-14 MOORHEAD SECT 537: CITY OF MOORHEAD, PURCHASE ONE BUS. B9 PURCHASE BUS STP 7, 56, 14, (CLASS 4) AND BUS RELATED EQUIPMENT 647 BB TRS-1131-14 MNDOT PRODUCTIVE ALTERNATIVES, PURCHASE 3 BUSES. TR PURCHASE BUS STP 21, 168, 42, (CLASS 4) AND BUS RELATED EQUIPMENT 648 BB TRS-767-14 MNDOT RAINBOW RIDER, PURCHASE 3 BUSES (CLASS 4) AND. TR PURCHASE BUS STP 21, 168, 42, BUS RELATED EQUIPMENT 649 BB TRS-7318-14 MNDOT BECKER COUNTY, PURCHASE 1 BUS (CLASS 4) AND. TR PURCHASE BUS STP 7, 56, 14, BUS RELATED EQUIPMENT 65 RR 21-12 MNDOT CP/SOO RR, INSTALL SIGNALS, GATES AND FLASHING. SR RAILROAD RRS 275, 275, LIGHTS, MUN 352, BIRCH AVE, ALEXANDRIA SIGNALS 651 RR 21-121 MNDOT CP/SOO RR, INSTALL SIGNALS, GATES AND FLASHING. SR RAILROAD RRS 275, 275, LIGHTS, CSAH 36, MILTONA (2 MI N) SIGNALS 652 PED/BIKE 14-591-5AC CLAY COUNTY **SRTS**AC** INFRA IN DILWORTH ALONG 7TH ST. NE,. EN PED./BIKE SRTS 3, 3, BIKE AND PED TRAIL (AC PROJECT, AC PAYBACK 1 OF 1) 653 PED/BIKE 14-591-6 CLAY **SRTS** INFRA BARNESVILLE, CE AND CONSTRUCTION. BT PEDESTRIAN SRTS 3, 3, FOR A PATH ALONG 5TH AVE AND ADDITIONAL BIKE TRAIL S AROUND THE SCHOOL September 213 Project Listing Page III - 55 of 175

ATP: 4 Fiscal Year: 214 STIP for FY 214-217 654 CSAH 1 21-61-32 DOUGLAS COUNTY EVANSVILLE TO 3.1 MI SO, AGGREGATE BASE & BIT 3. RD GRADE AND STP 1,156,25 925, 231,25 SURFACING SURFACE 655 CSAH 3 44-7-4 MAHNOMEN COUNTY 214 HSIP, VARIOUS LOCATIONS IN MAHNOMEN COUNTY, CSAH 3, 4, 5, 1 AND 13 - CHEVRON CURVE SIGNING, ASSOCIATED S.P. 44-7-5, S.P. 44-7-6, S.P. 44-7-7, S.P. 44-7-8. SH SIGNING HSIP 91,476 83,16 8,316 656 CSAH 6 44-66-12 MAHNOMEN **AC** BITUMINOUS FROM TH 59 TO CSAH 4 (AC 13. RS BITUMINOUS STP 2,234,682 1,46,682 141,318 1,188, COUNTY PROJECT, AC PAYBACK IN 217) 657 LOCAL 999 56-7-8 OTTER TAIL 214 HSIP LANE DEPARTURE - ENHANCED LINE. SH STRIPING HSIP 698,416 628,574 69,842 COUNTY MARKINGS - PHASE I AND II, ASSOCIATED S.P. 56-7-9 658 LOCAL 999 56-7-1 OTTER TAIL COUNTY 214 HSIP INTERSECTION S (ENHANCED SIGNAGE AND MARKING) AND LANE DEPARTURE (CHEVRON CURVE SIGNING) IN OTTER TAIL COUNTY, ASSOCIATED S.P. 56-7-11. SH SIGNING HSIP 185,378 168,525 16,853 659 LOCAL 999 56-7-12 OTTER TAIL 214 HSIP LANE DEPARTURE - SHOULDER PAVING AND. SH PAVE SHOULDER HSIP 627,116 564,44 62,712 COUNTY RUMBLE STRIPS ON CURVES - PHASE 1A AND 1B, ASSOCIATED S.P. 56-7-13 66 LOCAL 999 56-7-14 OTTER TAIL 214 HSIP VARIOUS LOCATIONS IN OTTER TAIL COUNTY,. SH LIGHTING HSIP 23, 182,7 2,3 COUNTY INTERSECTION S - LIGHTING 661 PED/BIKE 56-9-9AC OTTER TAIL **AC** HALVORSON PARK TRAIL IN BATTLE LAKE (AC. EN PEDESTRIAN TAP 29,498 29,498 COUNTY PROJECT, AC PAYBACK 1 OF 1) BIKE TRAIL 662 CSAH 1 56-61-57 OTTER TAIL BITUMINOUS FROM CSAH 35 TO CSAH 45 - NE 2. RS BITUMINOUS STP 85, 68, 17, COUNTY OF UNDERWOOD PAVEMENT 663 CSAH 22 75-622-3 STEVENS COUNTY BITUMINOUS MILL AND, FROM TH 59 TO TH 9 IN 2. RD MILL AND STP 375, 3, 75, MORRIS 664 CSAH 6 78-66-25 TRAVERSE REPLACE OLD BR# 7851 WITH NEW BR# 7853 OVER 12. BR BRIDGE STP 5, 4, 1, COUNTY MILE CREEK REPLACEMENT 665 PED/BIKE 84-9-2 WILKIN COUNTY LAKE BRECKENRIDGE TRAIL ON WILKIN CSAH 1 FROM 1. EN PEDESTRIAN TAP 46,25 125, 281,25 BRECKENRIDGE TO LAKE BRECKENRIDGE, MULTI-USE BIKE TRAIL BITUMINOUS TRAIL 666 LOCAL 999 88-7-4 LOCAL DISTRICTWIDE - LOCAL HSIP 6" EDGELINES. SH STRIPING HSIP 632,267 569,41 63,226 667 LOCAL 999 88-7-41 LOCAL DISTRICTWIDE - LOCAL HSIP 6" GROUND-IN WET. SH STRIPING HSIP 897,656 87,89 89,766 REFLECTIVE PAVEMENT MARKINGS AND RUMBLE STRIPES September 213 Project Listing Page III - 56 of 175

ATP: 4 Fiscal Year: 214 STIP for FY 214-217 668 PED/BIKE 12-9-4 ALEXANDRIA PEDESTRIAN/BIKE TRAIL ON 3RD AVE IN ALEXANDRIA,. EN PEDESTRIAN TAP 97, 62,8 34,92 MULTI-USE BITUMINOUS TRAIL BIKE TRAIL 669 MSAS 135 12-135-2 ALEXANDRIA **AC** URBAN GRADING AND SURFACING ON 5TH AVE 1. MC GRADING STP 76, 2,42,68 76, FROM TH 29 (BROADWAY AVE) TO PIONEER ROAD IN ALEXANDRIA (AC PROJECT, PAYBACK IN 215 & 216) 67 MSAS 125 126-125-3AC3 FERGUS FALLS **AC** LINCOLN AVENUE & TOWER ROAD REVISION WITH 1. BR GRADE,SURFACE STP 622,5 622,5 NEW BRIDGE #56539 OVER OTTER TAIL RIVER (AC & BRIDGE PAYBACK 3 OF 3) 671 MSAS 136 144-136-11 MOORHEAD FROM OAK WAY TO I 94 ON SE MAIN, BITUMINOUS MILL & 2. RD MILL AND STP 3,362,4 894,7 2,467,7 SURFACING OF ROAD AND SHARED USE PATH 672 PED/BIKE SRS-972-14 WEST CENTRAL **SRTS** NON-INFRA, GRANT TO COMPLETE SRTS PLANS. PL PLANNING SRTS 41,8 41,8 INITIATIVE IN FRAZEE, GLENWOOD, LAKE PARK, AND PARKERS PRAIRIE 673 PED/BIKE SRS-988-14 UMVRDC **SRTS** NON-INFRA, UMVRDC; GRANT TO HIRE A 2 YEAR REGIONAL COORDINATOR TO PROVIDE SUPPORT FOR EDUCATION, ENCOURAGEMENT, AND SCHOOL PATROL SAFETY CAMPAIGNS. PL PLANNING SRTS 71, 71, 674 US 1 141-152 MNDOT TH 1 EB FROM E. OF TH 9 TO 15TH ST N - GRADING,BITUMINOUS SURFACING AND REPLACE OLD BR 143 WITH NEW BR# 148 OVER THE BUFFALO RIVER (EB) 1. BR GRADE AND BRIDGE SF 993,188 993,188 675 MN 27 211-21 MNDOT EAST OF TH 55 TO WEST OF TH 94 - GRADING, 18. RD MILL AND STP 7,639,247 6,111,398 1,527,849 BITUMINOUS MILL, COLD IN-PLACE RECYCLE, AND 676 MN 27 782-32 MNDOT TH 27 FROM TH 28 TO S. OF CSAH 6, AND TH 117 FROM 13. RD MILL AND STP 2,339,384 1,871,57 467,877 SOUTH DAKOTA BORDER TO TH 27 - GRADING, BITUMINOUS MILLING AND SURFACING 677 MN 29 213-35 MNDOT **AC** MCKAY AVE N OF ALEXANDRIA TO TH 21-3. RD MILL AND STP 5,853,1 4,82,48 3,, 1,77,62 GRADING, BITUMINOUS MILLING & SURFACING (AC PROJECT, PAYBACK IN 215) 678 US 59 35-31 MNDOT **ADA**.1 MILES N OF JCT OF TH 34 TO.4 MILES SOUTH 14. RD MILL AND NHPP 5,116,3 4,93, 1,23,3 OF BUFFALO RIVER - GRADING, BITUMINOUS MILLING AND SURFACING, ADA S 679 US 75 147-25 MNDOT **AC** TH 1 TO N CLAY CO LINE - GRADING, BITUMINOUS 19. RS MILL AND NHPP 2,936,5 1,99,2 2,2, 1,27,3 MILLING & SURFACING (AC PROJECT, PAYBACK IN 215) 68 I 94 218-13 MNDOT CABLE MEDIAN GUARDRAIL, 1.32 MILES WEST OF TH 9 TO 22. SH GUARD RAIL HSIP 3,349, 3,349, 1.34 MILES EAST OF CSAH 8 (3,349, SECTION 164) September 213 Project Listing Page III - 57 of 175

ATP: 4 Fiscal Year: 214 STIP for FY 214-217 681 MN 18 5625-18 MNDOT **FMP** ANNIE LAKE OUTLET WEST OF PELICAN RAPIDS 1. DR STORM SEWER BF SF 433,7 151,2 282,5 682 MN 999 884-ADA-14 MNDOT DISTRICTWIDE SETASIDES - ADA - 214. SC PEDESTRIAN SF 936, 936, RAMPS 683 MN 999 884-AM-14 MNDOT DISTRICTWIDE SETASIDES - MUNICIPAL AGREEMENTS -. AM COOP. CONST. SF 2,1, 2,1, 214 AGREEMENT 684 MN 999 884-BI-14 MNDOT DISTRICTWIDE SETASIDES - BRIDGE MAINTENANCE - 214. BI PAINT BRIDGE SF 33, 33, 685 MN 999 884-CA-14 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,5, 1,5, AGREEMENTS - 214 686 MN 999 884-DR-14 MNDOT DISTRICTWIDE SETASIDES - DRAINAGE - 214. DR CULVERT SF 1,, 1,, REPLACEMENT 687 MN 999 884-MA-14 MNDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS. MA MISCELLANEOUS SF 75, 75, AGREEMENTS - 214 688 MN 999 884-RB-14 MNDOT DISTRICTWIDE SETASIDES - LANDSCAPING - 214. RB LANDSCAPING SF 3, 3, 689 MN 999 884-RW-14 MNDOT DISTRICTWIDE SETASIDES - RIGHT-OF-WAY - 214. RW RIGHT OF WAY SF 1,, 1,, 69 MN 999 884-RX-14 MNDOT DISTRICTWIDE SETASIDES - BARC - 214. RX BITUMINOUS SF 1,, 1,, 691 MN 999 884-SA-14 MNDOT DISTRICTWIDE SETASIDES - SUPP AGREE/COST. SA SUPP. AGREE. & SF 1,85, 1,85, OVERRUNS - 214 COST OVERRUNS 692 MN 999 884-SC-14 MNDOT DISTRICTWIDE SETASIDES - SAFETY S -. SC STRIPING SF 2,61,893 2,61,893 214 $58,66,1 $31,217,139 $7,383,386 $857,5 $18,844,227 $7,687,135 September 213 Project Listing Page III - 58 of 175

ATP: 4 Fiscal Year: 215 STIP for FY 214-217 693 BB TRF-34-15A MOORHEAD SECT 537: PARATRANSIT AND METRO SENIOR RIDE. B9 OPERATE BUS FTA 429, 94, 335, OPERATING ASSISTANCE 694 BB TRF-34-15D MOORHEAD SECT 537: MOORHEAD TRANSIT PREVENTIVE. B9 PREVENTIVE FTA 2, 16, 4, MAINTENANCE MAINTENANCE 695 BB TRF-34-15B MOORHEAD SECT 537: CITY OF MOORHEAD TRANSIT OPERATING. B9 OPERATE BUS FTA 2,4, 592, 1,448, ASSISTANCE 696 BB TRF-34-15C MOORHEAD SECT 537: MOORHEAD PLANNING ASSISTANCE. B9 PLANNING FTA 22, 18, 4, 697 BB TRF-34-15E MOORHEAD SECT 537: CITY OF MOORHEAD, PURCHASE 1 BUS. B9 PURCHASE BUS FTA 44, 352, 88, (CLASS 7) AND BUS RELATED EQUIPMENT 698 BB TRF-34-15N MNDOT SECT 531: CITY OF MOORHEAD MOBILITY MANAGER. NB OPERATE BUS FTA 3, 24, 6, 699 BB TRS-7-15 MNDOT CITY OF BENSON, PURCHASE BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 72, 57,6 14,4 RELATED EQUIPMENT 7 BB TRS-27-15 MNDOT CITY OF MORRIS, PURCHASE BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 72, 57,6 14,4 RELATED EQUIPMENT 71 BB TRS-1131-15 MNDOT PRODUCTIVE ALTERNATIVES, PURCHASE 2 BUSES. TR PURCHASE BUS STP 144, 115,2 28,8 (CLASS 4) AND BUS RELATED EQUIPMENT 72 BB TRS-767-15 MNDOT RAINBOW RIDER, PURCHASE 5 BUSES (CLASS 4) AND. TR PURCHASE BUS STP 36, 288, 72, BUS RELATED EQUIPMENT 73 RR 3-124 MNDOT CP/SOO RR, INSTALL GATES AND FLASHING LIGHTS,. SR RAILROAD RRS 3, 3, LEGION ROAD, MSAS 126, DETROIT LAKES SIGNALS 74 RR 56-131 MNDOT CP/SOO RR, INSTALL GATES AND FLASHING LIGHTS,. SR RAILROAD RRS 3, 3, CSAH 4, ELMO TWP SIGNALS 75 CSAH 7 3-67-22 BECKER COUNTY **AC** REPLACE BRIDGE #7175 OVER THE BNSF RR IN. BR BRIDGE STP 1,4, 4, 4, 1,, LAKE PARK (AC PROJECT, PAYBACK IN 216) REPLACEMENT 76 CSAH 43 3-643-9 BECKER COUNTY MILL AND FROM THE SOUTH COUNTY LINE TO 3. RD MILL AND STP 456,175 364,94 91,235 TH 87 77 CSAH 45 3-645-3 BECKER COUNTY BITUMINOUS FROM TH 87 TO CSAH 4 3. RS BITUMINOUS STP 425,763 34,61 85,153 78 CSAH 13 21-613-9 DOUGLAS COUNTY BITUMINOUS FROM TH 29 IN CARLOS TO CP 1. RS BITUMINOUS STP 22,744 162,195 4,549 RAILROAD 79 CSAH 42 21-642-12 DOUGLAS COUNTY BITMINOUS FROM CARLOS/LAKE LEHOMMEDIEU BRIDGE TO TH 29 3. RS BITUMINOUS STP 68,231 486,585 121,646 September 213 Project Listing Page III - 59 of 175

ATP: 4 Fiscal Year: 215 STIP for FY 214-217 71 CSAH 46 21-646-5 DOUGLAS COUNTY BITMINOUS FROM CP RAILROAD TO 1.5 MILES 2. RS BITUMINOUS STP 45,488 324,39 81,98 NORTH OF CSAH 23 711 LOCAL 999 56-7-15 OTTER TAIL COUNTY 215 HSIP LANE DEPARTURE - SHOULDER PAVING AND RUMBLE STRIPS ON CURVES - PHASE IIA, IIB, IIC, IID, ASSOCIATED S.P. 56-7-16, S.P. 56-7-17, S.P. 56-7-18. SH PAVE SHOULDER HSIP 1,234,14 1,11,726 123,414 712 PED/BIKE 56-9-1 OTTER TAIL LAKE ADLEY PARK TRAIL - PARKERS PRAIRIE, MULTI-USE. EN PEDESTRIAN TAP 231,25 185, 46,25 COUNTY BITUMINOUS TRAIL BIKE TRAIL 713 CSAH 28 61-628-27 POPE COUNTY BITUMINOUS RECLAMATION AND RESURFACING FROM 3. RD BITUMINOUS STP 81,975 648,78 162,195 TH 55 IN LOWRY TO CSAH 15 RECLAMATION 714 PED/BIKE 12-9-5 ALEXANDRIA FROM BIRCH AVE TO CR 73 ON GENEVA ROAD. EN PEDESTRIAN TAP 98, 414,593 565,47 PEDESTRIAN/BIKE LANES - PHASE II, MULTI-USE BIKE TRAIL BITUMINOUS TRAIL 715 MSAS 135 12-135-2AC1 ALEXANDRIA **AC** URBAN GRADING AND SURFACING ON 5TH AVE 1. MC GRADING STP 342,5 342,5 FROM TH 29 (BROADWAY AVE) TO PIONEER ROAD IN ALEXANDRIA (AC PROJECT, AC PAYBACK 1 OF 2) 716 MSAS 18 117-18-3 DETROIT LAKES US 59 UNDERPASS AT MORROW AVE & THOMAS ST EXTENSION IN DETROIT LAKES - GRADING, UNBONDED CONCRETE, BITUMINOUS SURFACING, ADA IMPROV, SIGNALS, LIGHTING & NEW BRIDGE #31 (TH 59 OVER NEW THOMAS AVE) (TIED WITH SP 31-6). MC NEW BRIDGE STP 1,862,5 1,49, 372,5 717 MN 9 842-17 MNDOT JCT MN 55 TO JCT US 75 IN DORAN & SOUTH STREET IN 31. RS MILL AND STP 9,325,7 7,46,6 1,865,1 MORRIS TO MN 27 IN HERMAN, & ON MN 55 FROM WENDELL TO US 59 MILL AND BIT 718 US 1 31-6 MNDOT **AC** US 1 FROM AIRPORT RD TO US 59, & US 59 FROM US 1 TO HOLMES STREET - GRADING, UNBONDED CONCRETE, BITUMINOUS SURFACING, ADA IMPROV, SIGNALS, LIGHTING & BRIDGE 31 (TH 59 OVER NEW THOMAS AVE) (TIED TO SP 117-18-3) (AC PROJECT, PAYBACK IN 216) 2. RC GRADE AND SURFACE NHPP 6,149,538 1,74, 5,3, 1,76, 2,649,538 719 MN 12 765-38 MNDOT KERKHOVEN TO PENNOCK - BITUMINOUS (DESIGNED BY DISTRICT 8, FUNDED BY DIST 4 & DIST 8) DIST 8 SP 343-66 $1,9,, DIST 4 SP 765-38 $1,548,6 (TIED TO 343-66) 8. RS BITUMINOUS NHPP 1,548,6 1,238,88 39,72 72 MN 29 213-35AC MNDOT **AC** MCKAY AVE N OF ALEXANDRIA TO TH 21 - MILL 3. RD MILL AND STP 3,, 3,, AND BITUMINOUS SURFACING (AC PROJECT, PAYBACK 1 OF 1) September 213 Project Listing Page III - 6 of 175

ATP: 4 Fiscal Year: 215 STIP for FY 214-217 721 MN 29 767-29 MNDOT **BP8** **ELLA** THORTON AVE IN BENSON TO JCT OF MN 4 - MILL & BITUMINOUS & REPLACE BRIDGE #655, 6551, 6552 (BRIDGE #6652 CHAPTER 152 FUNDS)(DESIGNED BY DIST 4, FUNDED BY DIST 4 & DIST 8, DIST 4 $6,437,4 DIST 8 SP 128-9$78,, TIED TO 128-9) 14. RS BRIDGE REPLACEMENT SF BF 6,437,4 3,545,4 2,892, 722 MN 34 144-17 MNDOT **AB** JCT TH 9 TO DUNVILLA - PAVEMENT 19. RS MILL AND STP 7,15,1 5,684,1 1,421, REHABILITATION 723 MN 75 141-173 MOORHEAD **CIMS** GEOMETRIC S AT JCT. OF 11TH ST. AND MAIN AVE/TH75 AND 11TH ST. FROM CENTER AVE TO MAIN AVE, M/O, RECONSTRUCT, AND SIGNAL WORK, ASSOCIATED S.A.P. 144-121-6 AND S.A.P. 144-136-14(CIMS GRANT=$3,44,) 1. RC MILL AND SF 3,44, 3,44, 724 US 75 147-25AC MNDOT **AC** TH 1 TO N CLAY CO LINE - GRADING, BITUMINOUS 19. RS MILL AND NHPP 2,2, 2,2, MILLING & SURFACING (AC PROJECT, PAYBACK 1 OF 1) 725 I 94 568-13 MNDOT DECK REPLACEMENT ON BRIDGE #56813 (WB) AND 56814. BI GRADE AND SF 1,79,1 1,79,1 (EB) OVER CSAH 1 BRIDGE 726 MN 999 884-AM-15 MNDOT DISTRICTWIDE SETASIDES - MUNICIPAL AGREEMENTS -. AM COOP. CONST. SF 275, 275, 215 AGREEMENT 727 MN 999 884-CA-15 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 75, 75, AGREEMENTS - 215 728 MN 999 884-DR-15 MNDOT DISTRICTWIDE SETASIDES - DRAINAGE - 215. DR CULVERT SF 1,, 1,, REPLACEMENT 729 MN 999 884-MA-15 MNDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS. MA MISCELLANEOUS SF 75, 75, AGREEMENTS - 215 73 MN 999 884-RB-15 MNDOT DISTRICTWIDE SETASIDES - LANDSCAPING - 215. RB LANDSCAPING SF 3, 3, 731 MN 999 884-RW-15 MNDOT DISTRICTWIDE SETASIDES - RIGHT-OF-WAY - 215. RW RIGHT OF WAY SF 1,5, 1,5, 732 MN 999 884-RX-15 MNDOT DISTRICTWIDE SETASIDES - BARC - 215. RX BITUMINOUS SF 1,, 1,, 733 MN 999 884-SA-15 MNDOT DISTRICTWIDE SETASIDES - SUPP AGREE/COST. SA SUPP. AGREE. & SF 2,, 2,, OVERRUNS - 215 COST OVERRUNS 734 MN 999 884-SC-15 MNDOT DISTRICTWIDE SETASIDES - SAFETY S -. SC SHOULDER SF 1,15, 1,15, 215 REPAIR September 213 Project Listing Page III - 61 of 175

ATP: 4 Fiscal Year: 215 STIP for FY 214-217 735 MN 999 884-SHS-15 MNDOT DISTRICTWIDE SAFETY S (STATE HSIP) -. SH MISCELLANEOUS HSIP 539,2 485,28 53,92 215 $61,937,44 $29,197,579 $5,7, $1,24, $21,218,24 $1,281,585 September 213 Project Listing Page III - 62 of 175

ATP: 4 Fiscal Year: 216 STIP for FY 214-217 736 BB TRF-34-16A MOORHEAD SECT 537: PARATRANSIT AND METRO SENIOR RIDE. B9 OPERATE BUS FTA 446, 98, 348, OPERATING ASSISTANCE 737 BB TRF-34-16B MOORHEAD SECT 537: CITY OF MOORHEAD TRANSIT OPERATING. B9 OPERATE BUS FTA 2,12, 615, 1,55, ASSISTANCE 738 BB TRF-34-16C MOORHEAD SECT 537: MOORHEAD PLANNING ASSISTANCE. B9 PLANNING FTA 22, 18, 4, 739 BB TRF-34-16D MOORHEAD SECT 537: MOORHEAD TRANSIT PREVENTIVE. B9 PREVENTIVE FTA 2, 16, 4, MAINTENANCE MAINTENANCE 74 BB TRF-34-16N MNDOT SECT 531: CITY OF MOORHEAD MOBILITY MANAGER. NB OPERATE BUS FTA 32, 26, 6, 741 BB TRS-7-16 MNDOT CITY OF BENSON, PURCHASE BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 74, 59,2 14,8 RELATED EQUIPMENT 742 BB TRS-1738-16 MNDOT CITY OF APPLETON/PRAIRIE 5 - PURCHASE BUS (CLASS. TR PURCHASE BUS STP 74, 59,2 14,8 4) AND BUS RELATED EQUIPMENT 743 BB TRS-34-16 MNDOT CITY OF MOORHEAD, PURCHASE BUS (CLASS 4) AND. TR PURCHASE BUS STP 74, 59,2 14,8 BUS RELATED EQUIPMENT 744 BB TRS-1131-16 MNDOT PRODUCTIVE ALTERNATIVES, PURCHASE BUS (CLASS. TR PURCHASE BUS STP 74, 59,2 14,8 4) AND BUS RELATED EQUIPMENT 745 BB TRS-249-16 MNDOT MAHNOMAN COUNTY, PURCHASE BUS (CLASS 4) AND. TR PURCHASE BUS STP 74, 59,2 14,8 BUS RELATED EQUIPMENT 746 BB TRS-767-16 MNDOT RAINBOW RIDER, PURCHASE 2 BUSES (CLASS 4) AND. TR PURCHASE BUS STP 148, 118,4 29,6 BUS RELATED EQUIPMENT 747 BB TRS-7318-16 MNDOT BECKER COUNTY, PURCHASE BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 118,4 59,2 59,2 RELATED EQUIPMENT 748 RR 3-125 MNDOT SOO RR, INSTALL GATES, FLASHING LIGHTS AND. SR RAILROAD RRS 275, 275, UPDATED CIRCUITRY, 13TH ST, T564, LAKE VIEW TWP (1 SIGNALS MI S DETROIT LAKES) 749 RR 44-14 MNDOT SOO RR, INSTALL GATES, FLASHING LIGHTS AND. SR RAILROAD RRS 275, 275, UPDATED CIRCUITRY, 28TH ST, CSAH 6, POPPLE GROVE SIGNALS TWP (3 MI N WAUBUN) 75 CSAH 7 3-67-22AC BECKER COUNTY **AC** REPLACE BNSF RR BRIDGE #7175 IN LAKE PARK. BR BRIDGE STP 4, 4, (AC PROJECT, AC PAYBACK 1 OF 1) REPLACEMENT 751 PED/BIKE 26-9-3 GRANT COUNTY HOFFMAN PEDESTRIAN BIKE TRAIL ALONG TH 27 FROM. EN PEDESTRIAN TAP 386,25 39, 77,25 1ST STREET TO ELK LAKE, BITUMINOUS SURFACING BIKE TRAIL September 213 Project Listing Page III - 63 of 175

ATP: 4 Fiscal Year: 216 STIP for FY 214-217 752 CSAH 1 26-61-22 GRANT COUNTY TH 79 TO TH 78, 6 MILES EAST OF ELBOW LAKE, 3. RD BITUMINOUS STP 665, 532, 133, BITUMINOUS RECLAMATION & SURFACING RECLAMATION 753 CSAH 8 56-68-24 OTTER TAIL **AC**CSAH 53 TO.1 WEST OF CSAH 67, BITUMINOUS 5. RS BITUMINOUS STP 1,51,552 824,773 82,341 226,779 COUNTY & PAVED SHOULDERS (AC PROJECT, AC PAYBACK IN 217) 754 CSAH 1 75-61-31 STEVENS COUNTY **AC** TH 9 IN HANCOCK TO CSAH 1, AGGREGATE BASE 5. RC GRADE AND STP 1,417,659 1,117,659 82,341 3, & BITUMINOUS SURFACING (AC PROJECT, AC PAYBACK SURFACE IN 217) 755 MSAS 135 12-135-2AC2 ALEXANDRIA **AC** URBAN GRADING AND SURFACING ON 5TH AVE 1. MC GRADING STP 1,699,568 1,699,568 FROM TH 29 (BROADWAY AVE) TO PIONEER ROAD IN ALEXANDRIA (AC PAYBACK 2 OF 2) 756 US 1 31-6AC MNDOT **AC** US 1 FROM AIRPORT RD TO US 59, & US 59 FROM US 1 TO HOLMES - US 1 FROM AIRPORT RD TO US 59, & US 59 FROM US 1 TO HOLMES STREET - GRADING, UNBONDED CONCRETE, BITUMINOUS SURFACING, ADA IMPROV, SIGNALS, LIGHTING & BRIDGE 31 (TH 59 OVER NEW THOMAS AVE) (TIED TO SP 117-18-3) (AC PROJECT, PAYBACK 1 OF 1) 2. RC GRADE AND SURFACE NHPP 5,3, 5,3, 757 MN 29 212-58 MNDOT **BP8**ELLA** ALEXANDRIA 4-LANE EXPANSION FROM I 94 TO CSAH 28, INCLUDING REPLACING BRIDGE OLD BR 21814 WITH NEW BR 21828 & OLD BR 21813 WITH NEW BR 21827 & I 94 WITH INTERCHANGE MODIFICATION (CHAPTER 152 FUNDS) 2. BR GRADE AND BRIDGE BF SF 16,34,8 1,934,8 14,1, 758 US 75 848-44 MNDOT **FMP**ELLA** KENT FLOOD MITIGATION, REPLACE 3. BR GRADE AND BF SF 9,471, 3,471, 6,, BRIDGE #5186 (NEW BR 844) (WHISKEY CREEK), ROAD BRIDGE REALIGNMENT, RR OVERPASS 759 US 75 846-2 MNDOT REPLACE OLD BRIDGE #9314 WITH NEW BRIDGE #846,. BR BRIDGE STP 788,5 63,8 157,7 OVER DORAN SLOUGH REPLACEMENT 76 MN 79 2613-18 MNDOT JCT TH 59/ELBOW LAKE TO JCT I 94, MILL AND BIT. 12. RS MILL AND STP 4,243,3 3,394,64 848,66 761 I 94 146-66 MNDOT **AC** I 94/TH 75 INTERCHANGE MODIFICATION (AC. MC BRIDGE NHPP 7,59, 5,9,6 4,99, 1,158,4 PROJECT, PAYBACK IN 217) APPROACHES 762 MN 2 442-19 MNDOT **AB** JCT TH 59 TO MAHNOMEN-CLEARWATER COUNTY 2. RD MILL AND STP 7,574, 6,59,2 1,514,8 LINE - PAVEMENT REHABILITATION 763 MN 999 884-CA-16 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 5, 5, AGREEMENTS - 216 September 213 Project Listing Page III - 64 of 175

ATP: 4 Fiscal Year: 216 STIP for FY 214-217 764 MN 999 884-DR-16 MNDOT DISTRICTWIDE SETASIDES - DRAINAGE - 216. DR CULVERT SF 75, 75, REPLACEMENT 765 MN 999 884-MA-16 MNDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS. MA MISCELLANEOUS SF 75, 75, AGREEMENTS - 216 766 MN 999 884-RW-16 MNDOT DISTRICTWIDE SETASIDES - RIGHT-OF-WAY - 216. RW RIGHT OF WAY SF 1,5, 1,5, 767 MN 999 884-RX-16 MNDOT DISTRICTWIDE SETASIDES - BARC - 216. RX BITUMINOUS SF 2,9, 2,9, 768 MN 999 884-SA-16 MNDOT DISTRICTWIDE SETASIDES - SUPP AGREE/COST. SA SUPP. AGREE. & SF 2,5, 2,5, OVERRUNS - 216 COST OVERRUNS 769 MN 999 884-SC-16 MNDOT DISTRICTWIDE SETASIDES - SAFETY S -. SC SHOULDER SF 1,15, 1,15, 216 REPAIR 77 LOCAL 999 884-SHL-16 LOCAL DISTRICTWIDE SETASIDES - SAFETY (LOCAL HSIP) - 216. SH STRIPING HSIP 666, 599,4 66,6 771 MN 999 884-SHS-16 MNDOT DISTRICTWIDE SAFETY S (STATE HSIP) -. SH MISCELLANEOUS HSIP 539,2 485,28 53,92 216 772 PED/BIKE 884-TAP-16 LOCAL DISTRICTWIDE SETASIDES - TRANSPORTATION. EN PEDESTRIAN TAP 323,333 258,666 64,667 ALTERNATIVE - 216 BIKE TRAIL $71,,562 $28,535,186 $5,154,682 $917, $18,514,28 $23,34,96 September 213 Project Listing Page III - 65 of 175

ATP: 4 Fiscal Year: 217 STIP for FY 214-217 773 BB TRF-34-17A MOORHEAD SECT 537: PARATRANSIT AND METRO SENIOR RIDE. B9 OPERATE BUS FTA 464, 12, 362, OPERATING ASSISTANCE 774 BB TRF-34-17B MOORHEAD SECT 537: CITY OF MOORHEAD TRANSIT OPERATING. B9 OPERATE BUS FTA 2,21, 1,57, 64, ASSISTANCE 775 BB TRF-34-17C MOORHEAD SECT 537: MOORHEAD PLANNING ASSISTANCE. B9 PLANNING FTA 22, 18, 4, 776 BB TRF-34-17D MOORHEAD SECT 537: MOORHEAD TRANSIT PREVENTIVE. B9 PREVENTIVE FTA 2, 16, 4, MAINTENANCE MAINTENANCE 777 BB TRF-34-17N MNDOT SECT 531: CITY OF MOORHEAD MOBILITY MANAGER. NB OPERATE BUS FTA 32, 25,6 6,4 778 BB TRS-27-17 MNDOT CITY OF MORRIS, PURCHASE BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 76, 53,2 22,8 RELATED EQUIPMENT 779 BB TRS-1131-17A MNDOT PRODUCTIVE ALTERNATIVES, PURCHASE BUS (1 CLASS. TR PURCHASE BUS STP 76, 53,2 22,8 4) AND BUS RELATED EQUIPMENT 78 BB TRS-1131-17B MNDOT PRODUCTIVE ALTERNATIVES, PURCHASE BUS (1 CLASS. TR PURCHASE BUS STP 15, 15, 45, 5) AND BUS RELATED EQUIPMENT 781 BB TRS-767-17 MNDOT RAINBOW RIDER, PURCHASE BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 76, 53,2 22,8 RELATED EQUIPMENT 782 CSAH 22 3-622-34 BECKER COUNTY **AC** ROUNDABOUT ON TH 59 AT CSAH 22, SOUTH OF 1. SC GRADING STP 1,374, 374, 36, 1,, DETROIT LAKES (TIED TO SP 34-34)(AC PROJECT, PAYBACK IN 218) 783 CSAH 6 44-66-12AC MAHNOMEN **AC** BITUMINOUS FROM TH 59 TO CSAH 4 (AC 13. RS BITUMINOUS STP 141,318 141,318 COUNTY PROJECT,AC PAYBACK 1 OF 1) 784 CSAH 8 56-68-24AC OTTER TAIL **AC**CSAH 53 TO.1 WEST OF CSAH 67, BITUMINOUS 5. RS BITUMINOUS STP 82,341 82,341 COUNTY & PAVED SHOULDERS (AC PROJECT, AC PAYBACK 1 OF 1) 785 CSAH 1 75-61-31AC STEVENS COUNTY **AC** TH 9 IN HANCOCK TO CSAH 1, AGGREGATE BASE 5. RC GRADE AND STP 82,341 82,341 & BITUMINOUS SURFACING (AC PROJECT, AC PAYBACK 1 SURFACE OF 1) 786 CSAH 6 76-66-45 SWIFT COUNTY CSAH 31 TO CSAH 35 IN KERKHOVEN, BITUMINOUS MILL 7. RD MILL AND STP 1,9, 1,52, 38, AND 787 MSAS 11 19-11-6 MORRIS PACIFIC AVE FROM WEST 5TH ST (TH 28)TO WEST 6TH ST 1. RC GRADE AND STP 1,379, 927, 452, IN MORRIS, URBAN GRADING (ALSO SP 19-115-2) SURFACE 788 MN 9 849-23 MNDOT REPLACE OLD BRIDGE #6783 WITH NEW BRIDGE #847,. BR GRADE AND STP 956, 764,8 191,2 OVER DEERHORN CREEK BRIDGE September 213 Project Listing Page III - 66 of 175

ATP: 4 Fiscal Year: 217 STIP for FY 214-217 789 MN 9 261-19 MNDOT JCT TH 27 IN HERMAN TO JCT OF TH 55, MILL AND 18. RS MILL AND STP 4,212,1 3,369,68 842,42 79 US 1 31-63 MNDOT BRIDGE MAINTENANCE (REDECK ON BRIDGE #33. BR GRADE AND NHPP 911, 728,8 182,2 OVER CP RAILROAD, EB) IN DETROIT LAKES BRIDGE 791 US 12 765-89 MNDOT JCT CSAH 25 (E OF BENSON) TO KERKHOVEN, MILL AND 16. RS MILL AND NHPP 5,33,5 4,242,8 1,6,7 792 MN 28 65-16 MNDOT EAST OF BEARDSLEY TO WEST OF GRACEVILLE, MILL 12. RS MILL AND STP 2,734,3 2,187,4 546,9 AND BIT 793 MN 29 768-19 MNDOT **ADA** IN BENSON ON MN 9, MN 12, AND 29, MILL AND 3. RS MILL AND NHPP 2,814, 2,251,2 562,8, SIGNAL ENHANCEMENTS, ADA 794 MN 32 142-19 MNDOT JCT OF TH 34 TO JCT TH 1, MILL AND 16. RS MILL AND STP 3,943,4 3,154,7 788,7 795 US 59 35-34 MNDOT.4 MILES S OF BUFFALO RIVER TO JCT TH 2, MILL AND 22. RS MILL AND NHPP 8,81,8 7,48,6 1,762,2 796 US 59 769-1 MNDOT TH 119 TO JCT TH 12, MILL AND 8. RS MILL AND NHPP 3,4, 2,72, 68, 797 US 59 34-34 MNDOT ROUNDABOUT ON TH 59 AT CSAH 22, SOUTH OF DETROIT 1. SC GRADE AND NHPP 1,17,8 936,6 234,2 LAKES SURFACE 798 I 94 1481-966B MNDOT BRIDGE PAINTING ON I 94 OVER THE RED RIVER (BRIDGE. BI PAINT BRIDGE NHPP 357, 321,3 35,7 # 966, 967) 799 I 94 146-66AC MNDOT **AC** I 94/TH 75 INTERCHANGE MODIFICATION (AC. MC BRIDGE NHPP 4,99, 4,99, PROJECT, PAYBACK 1 OF 1) APPROACHES 8 MN 999 884-BI-17 MNDOT DISTRICTWIDE SETASIDES - BRIDGE MAINTENANCE - 217. BI PAINT BRIDGE SF 4, 4, 81 MN 999 884-CA-17 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 75, 75, AGREEMENTS - 217 82 MN 999 884-DR-17 MNDOT DISTRICTWIDE SETASIDES - DRAINAGE - 217. DR CULVERT SF 1,, 1,, REPLACEMENT 83 MN 999 884-MA-17 MNDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS. MA MISCELLANEOUS SF 75, 75, AGREEMENTS - 217 84 MN 999 884-RW-17 MNDOT DISTRICTWIDE SETASIDES - RIGHT-OF-WAY - 217. RW RIGHT OF WAY SF 75, 75, 85 MN 999 884-RX-17 MNDOT DISTRICTWIDE SETASIDES - BARC - 217. RX BITUMINOUS SF 3,1, 3,1, September 213 Project Listing Page III - 67 of 175

ATP: 4 Fiscal Year: 217 STIP for FY 214-217 86 MN 999 884-SA-17 MNDOT DISTRICTWIDE SETASIDES - SUPP AGREE/COST. SA SUPP. AGREE. & SF 2,, 2,, OVERRUNS - 217 COST OVERRUNS 87 MN 999 884-SC-17 MNDOT DISTRICTWIDE SETASIDES - SAFETY S -. SC STRIPING SF 1,5, 1,5, 217 88 LOCAL 999 884-SHL-17 LOCAL DISTRICTWIDE SETASIDES - SAFETY (LOCAL HSIP) - 217. SH STRIPING HSIP 1,222,222 1,1, 122,222 89 MN 999 884-SHS-17 MNDOT DISTRICTWIDE SAFETY S (STATE HSIP) -. SH MISCELLANEOUS HSIP 1,, 9, 1, 217 81 PED/BIKE 884-TAP-17A LOCAL DISTRICTWIDE SETASIDES - TRANSPORTATION. EN PEDESTRIAN TAP 111,111 1, 11,111 ALTERNATIVE - 217 BIKE TRAIL 811 PED/BIKE 884-TAP-17B LOCAL DISTRICTWIDE SETASIDES - TRANSPORTATION. EN PEDESTRIAN TAP 222,222 2, 22,222 ALTERNATIVE - 217 BIKE TRAIL 812 PED/BIKE 884-TAP-17C LOCAL DISTRICTWIDE SETASIDES - TRANSPORTATION. EN PEDESTRIAN TAP 333,333 3, 33,333 ALTERNATIVE - 217 BIKE TRAIL $6,331,788 $38,77,48 $36, $1,875,6 $16,562,2 $3,186,688 September 213 Project Listing Page III - 68 of 175

Clearwater Kittson Roseau Lake of the Woods Areawide Transportation Partnership (ATP) Boundaries Marshall 2 Koochiching Polk Pennington Red Lake Beltrami 1 Lake Cook Itasca St. Louis Norman Mahnomen Hubbard Clay Cass Becker Wilkin 4 Wadena 3 Crow Wing Aitkin Carlton Traverse Big Stone Lac qui Parle Yellow Medicine Lincoln Grant Stevens Lyon Murray Otter Tail Swift Chippewa Douglas Pope 8 Redwood Pipestone Cottonwood Renville Todd Kandiyohi Brown Stearns Meeker Watonwan Morrison McLeod Sibley Nicollet Benton Wright Mille Lacs Carver Hennepin Scott Kanabec Isanti Anoka Chisago Ramsey Washington Dakota Pine Rice 7 6 Blue Earth Sherburne Le Sueur Waseca Metro Steele Goodhue Dodge Wabasha Olmsted Winona DISTRICT 6 Jeff Vlaminck Transportation District Engineer (57) 286-751 29 48th Street NW Rochester, Minnesota 5591-5848 General Information: (57) 286-75 FAX: (57) 285-7355 Rock Nobles Jackson Martin Faribault Freeborn Mower Fillmore Houston

ATP: 6 Fiscal Year: 214 STIP for FY 214-217 813 BB TRF-47-14A ROCHESTER SECT 537: ROCHESTER DAR TRANSIT OPERATING. B9 OPERATE BUS LF 676,785 676,785 ASSISTANCE 814 BB TRF-47-14B ROCHESTER SECT 537: ROCHESTER RR TRANSIT OPERATING. B9 OPERATE BUS FTA 6,644,54 1,735,856 4,98,198 ASSISTANCE 815 BB TRF-47-14C ROCHESTER SECT 537: ELECTRONIC FAREBOXES/OTHER ITS. B9 BUS GRANT FTA 1,5, 1,2, 3, 816 BB TRF-47-14D ROCHESTER SECT 537: DOWNTOWN BUS STOP S. B9 BUS GRANT FTA 5, 4, 1, 817 BB TRF-47-14E ROCHESTER SECT 537: ROCHESTER RR - PURCHASE 3 BUSES. B9 PURCHASE BUS FTA 1,236, 988,8 247,2 (CLASS 7) 818 BB TRF-378-14 LA CRESCENT SECT 537: LA CRESCENT TRANSIT OPERATING. B9 OPERATE BUS FTA 187,779 44, 143,779 ASSISTANCE 819 BB TRS-1-14 MNDOT CVS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 82 BB TRS-1-14A STEELE COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 821 BB TRS-47-14 ROCHESTER ROCHESTER RR - PURCHASE 1 BUS (CLASS 7). TR PURCHASE BUS STP 412, 297, 115, 822 BB TRS-65-14 MNDOT CITY OF WINONA - PURCHASE 2 BUSES (CLASS 6). TR PURCHASE BUS STP 416, 332,8 83,2 823 BB TRS-1977-14 MNDOT SEMCAC - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 824 BB TRS-7284-14A THREE RIVERS THREE RIVERS - PURCHASE 1 BUS (CLASS 4) - CITY OF. TR PURCHASE BUS STP 76, 6,8 15,2 NORTHFIELD 825 BB TRS-7284-14 THREE RIVERS THREE RIVERS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 826 RR 24-131 FREEBORN IC&E - INSTALL GATES - CSAH 14, FREEBORN COUNTY. SR RR X-ING RRS 275, 275, COUNTY S 827 RR 24-132AC ALBERT LEA **AC** UP - UPGRADE TO GATES - MYERS ROAD, ALBERT. SR RR X-ING RRS 189,577 189,577 LEA, FREEBORN COUNTY (AC PAYBACK 1 OF 1) S 828 RR 74-133 STEELE COUNTY DM&E - INSTALL GATES - CSAH 17, SW 52ND AVE,. SR RR X-ING RRS 275, 275, STEELE COUNTY S 829 CSAH 17 24-7-15 FREEBORN SHOULDER PAVING + RS + SAFETY WEDGE ON CSAH 17. SH PAVE SHOULDER HSIP 125,8 113,22 12,58 COUNTY (SEGMENT 17.3) September 213 Project Listing Page III - 69 of 175

ATP: 6 Fiscal Year: 214 STIP for FY 214-217 83 CSAH 17 24-7-16 FREEBORN SHOULDER PAVING + RS + SAFETY WEDGE ON CSAH 17. SH PAVE SHOULDER HSIP 47, 366,3 4,7 COUNTY (SEGMENT 17.2) 831 CSAH 17 24-617-18 FREEBORN RECONSTRUCTION - CSAH 17 - CR 69 TO CSAH 18 7. RC GRADE AND STP 3,7, 1,962,49 1,737,51 COUNTY SURFACE 832 LOCAL 999 25-7-7 GOODHUE SIX-INCH LATEX EDGELINE AND GROUND IN SIX-INCH. SH SAFETY TARGET HSIP 12,517 92,265 1,252 COUNTY EPOXY WET-REFLECTIVE MARKINGS AT VARIOUS LOCATIONS IN GOODHUE COUNTY 833 TWN 117 25-599-12 GOODHUE REPLACE BRIDGE 2624 - T-117 (TERRITORIAL RD.) - 1.5. BR BRIDGE BROS 56, 448, 112, COUNTY MI S OF THE INTERSECTION OF CSAH 2 ON TERRITORIAL REPLACEMENT ROAD 834 CSAH 6 25-66-16 GOODHUE GRADE & AGGREGATE SURFACE - CSAH 6 - JCT CSAH 9 6. RC GRADE AND STP 5,5, 3,237,874 2,262,126 COUNTY TO JCT CSAH 1 SURFACE 835 CSAH 37 66-7-11 RICE COUNTY CSAH 37 SHOULDER PAVING WITH RUMBLE STRIPES AND SAFETY EDGE IN CONJUNCTION WITH ASSOCIATED SAP 66-637-1, MILLING, RECLAMATION AND BITUMINOUS SURFACING. SH PAVE SHOULDER HSIP 2,77,778 25, 1,827,778 836 LOCAL 999 74-7-3 STEELE COUNTY 214 HSIP STRIPING PROJECT ON VARIOUS CSAHS. SH STRIPING HSIP 151,71 136,539 15,171 THROUGHOUT THE COUNTY 837 LOCAL 999 79-7-5 WABASHA COUNTY WABASHA COUNTY CHEVRONS ON VARIOUS CSAHS. SH SAFETY TARGET HSIP 388,889 35, 38,889 AND CRS THROUGHOUT THE COUNTY 838 LOCAL 999 79-7-6 WABASHA COUNTY WABASHA COUNTY EDGELINE STRIPING ON VARIOUS. SH SAFETY TARGET HSIP 388,889 35, 38,889 CSAHS AND CRS THROUGHOUT THE COUNTY 839 CSAH 26 85-626-21 WINONA COUNTY BIT. RECLAMATION & - CSAH 26 - WEST 5. RD BITUMINOUS STP 1,125, 882,418 242,582 COUNTY LINE TO 2.4 MILES EAST &.1 MILE EAST OF TH RECLAMATION 74 TO CR 114 84 PED/BIKE 97-8-4 WINONA STATE UNIVERSITY **MN139**MN222** CONSTRUCTION OF GRADE SEPARATED RAILROAD CROSSINGS ADJACENT TO WINONA STATE UNIVERSITY - APPROACH CONSTRUCTION. EN PEDESTRIAN BIKE TRAIL DEMO 4,5,741 584,231 3,421,51 841 MUN 11 14-11-5 AUSTIN 8TH AVE NE - 8TH ST TO IC&E RR - GRADE & SURFACE. RC GRADE AND STP 518,75 415, 13,75 SURFACE 842 MUN 123 14-123-7 AUSTIN 8TH STREET NE - 8TH AVE TO 1TH AVE - GRADE &. RC GRADE AND STP 231,25 185, 46,25 SURFACE SURFACE 843 MUN 135 125-135-5 FARIBAULT RECONSTRUCTION - 3TH ST NW - TH 21 (LYNDALE AVE). RC CONCRETE STP 575, 46, 115, TO CARDINAL AVE PAVEMENT September 213 Project Listing Page III - 7 of 175

ATP: 6 Fiscal Year: 214 STIP for FY 214-217 844 MUN 135 125-135-6 FARIBAULT RECONSTRUCTION - 3TH ST NW - TWIN LAKES CT TO. RC GRADE AND STP 71, 495, 215, TH 3 (2ND AVE NW) SURFACE 845 MUN 127 156-127-3 RED WING RECONSTRUCTION - WEST AVENUE - 7TH STREET TO 1. RC GRADE AND STP 1,83, 1,96, 734, MAPLE STREET SURFACE 846 PED/BIKE 159-9-18 ROCHESTER EAST CIRCLE DRIVE PATH FROM CSAH 2 TO TH 14-3. EN PEDESTRIAN TAP 1,249,49 8, 449,49 PEDESTRIAN/BIKE TRAIL BIKE TRAIL 847 MUN 132 159-132-6 ROCHESTER TH 52 INTERCHANGE S: 55TH ST NW - W. MC GRADE AND STP 3,675, 1,28, 2,395, TO E FRONTAGE RD SURFACE 848 PED/BIKE 249-591-2 BYRON **SRTS** INFRA BYRON, CE & CONSTRUCTION FOR. BT PED./BIKE SRTS 268,37 268,37 SIDEWALK/PATH CONNECTION ON CSAH 5, 4TH ST NE, AND COUNTY ROAD 134 849 PED/BIKE SRS-913-14 CITY OF RED WING **SRTS** NON-INFRA, RED WING; GRANT TO FUND A. PL PEDESTRIAN SRTS 27,7 27,7 PART-TIME 2 YEAR SRTS COORDINATOR TO IMPLEMENT BIKE TRAIL EDUCATION AND ENCOURAGEMENT ACTIVITIES 85 PED/BIKE SRS-918-14 OLMSTED COUNTY **SRTS** NON-INFRA, ROCHESTER; GRANT FOR. PL PEDESTRIAN SRTS 12, 12, EDUCATION AND ENCOURAGEMENT MATERIALS AND A 2 BIKE TRAIL YEAR COORDINATOR 851 MN 3 6612-97AC MNDOT **AC** FROM FARIBAULT TO NORTHFIELD, MEDIUM 13. RS MILL AND STP 3,147,24 3,147,24 BITUMINOUS (AC PAYBACK 1 OF 1) 852 US 14 748-46 MNDOT FROM I 35 EAST TO TH 218 - CABLE MEDIAN BARRIER 3. SH GUARD RAIL HSIP 314, 282,6 31,4 853 US 14 21-37 MNDOT FINAL HYDRAULIC DESIGN ON NEW ALIGNMENT FROM 19. PL PLANNING NHPP 6, 18, 42, CR 8 TO CR H - CONSULTANT CONTRACT 854 MN 16 234-45 MNDOT ON TH 16 NEAR LANESBORO, REPLACE BRIDGES. BR BRIDGE STP 1,378, 1,12,4 275,6 3686/2326 AND 3687/23X15 REPLACEMENT 855 I 35 741-38 MNDOT VARIOUS LOCATIONS BETWEEN WASECA STEELE. RB LANDSCAPING SF 25, 25, COUNTY LINE AND I 35, LANDSCAPING FOR COMPLETED PROJECT - SP 741-34 856 I 35 748-113 MNDOT **AC** NB AND SB FROM.5 MI N OF S LIMITS OF OWATONNA (4.787) TO.25 MI N OF N JCT US 14 (42.856), RECONSTRUCT PAVEMENT AND NB AND SB FROM BRIDGE STREET TO N JCT US 14, OWATONNA, CONSTRUCT AUXILIARY LANE AND REPLACE BRIDGES 74815/74835, 74816/74836, 74817/74837 AND 74818/74838 (AC PROJECT - PAYBACK IN 215 AND 216) 2. RC GRADE, SURFACE & BRIDGE NHPP 6,, 3,587, 18,13, 2,413, 857 I 35 748-12 MNDOT MEDFORD, RECONSTRUCTION OF ROUND-A-BOUTS. SC GRADE AND SF 261,468 261,468 SURFACE September 213 Project Listing Page III - 71 of 175

ATP: 6 Fiscal Year: 214 STIP for FY 214-217 858 I 35 748-123 MNDOT INSTALL HIGH TENSION CABLE MEDIAN BARRIER ALONG 9. SH GUARD RAIL HSIP 1,28,186 1,87,367 12,819 I 35 FROM 1.8 MI SOUTH OF CSAH 4 TO EXIT 4 (TH 14) 859 MN 43 237-21 MNDOT MN 16 FROM S JCT MN 43 TO N JCT MN 43 AND MN 43 FROM N JCT MN 16 TO THE ROOT RIVER BRIDGE IN RUSHFORD, RECONSTRUCT - MUNICIPAL AGREEMENTS PROGRAM - F.Y. 214 1. AM COOP. CONST. AGREEMENT SF LF 3,138, 1,5, 1,638, 86 MN 44 238-26AC MNDOT **AC** FROM JCT TH 52 TO E CITY LIMITS OF SPRING 13. RS MILL AND STP 2,4, 2,4, GROVE - BITUMINOUS MILL & (AC PAYBACK 1 OF 1) 861 US 52 255-48CE3 MNDOT DESIGN BUILD - ELK RUN INTERCHANGE - 214 COSTS 2. MC GRADE, SF 567,771 567,771 FOR CONSTRUCTION ENGINEERING SURFACE & BRIDGE 862 US 52 255-48RW3 MNDOT **BP8** DESIGN BUILD - ELK RUN INTERCHANGE - 214 2. MC GRADE, SF 545,175 545,175 COSTS FOR RIGHT OF WAY SURFACE & BRIDGE 863 US 52 239-29 MNDOT FROM IA/MN STATE LINE TO.1 MI N OF CSAH 22, 1. RS BITUMINOUS NHPP 2,987,1 2,389,68 597,42 MEDIUM BITUMINOUS MILL AND 864 US 52 256-72 MNDOT **CIMS** FROM 1.1 MILES S OF CSAH 9 TO.1 MILES N OF CSAH 1 RT, GRADING, BITUMINOUS SURFACING, DRAINAGE AND LIGHTING - ($.25M CIMS FUNDS, $1.27M SF AND $1.78M LOCAL FUNDS AND $5.6M SAM FUNDS) 3. SC GRADE AND SURFACE BF 8,9, 1,52, 7,38, 865 MN 6 792-21 MNDOT NEAR MAZEPPA, REPLACE BRIDGE 6532 WITH BRIDGE. BR BRIDGE STP 1,98, 1,584, 396, 7912 REPLACEMENT 866 MN 6 793-45 MNDOT **BP8** TH 6 OVER TROUT CREEK, REPLACE BRIDGE. BR BRIDGE BF 1,241, 1,241, 5397 WITH BRIDGE 7911 REPLACEMENT 867 US 61 2514-119 MNDOT NB AND SB FROM TH 19 TO TH 316, MEDIUM BITUMINOUS 8. RS MILL AND NHPP 4,386,512 3,59,21 877,32 MILL AND 868 US 61 2514-119S MNDOT CONSTRUCT AN OFFSET RIGHT TURN LANE AND EXTEND THE MEDIAN ACCELERATION LANE AT THE INTERSECTION OF TH 61 AND CSAH 18 (CASINO ROAD) AND CONSTRUCT OFFSET LEFT TURN LANES AT THE INTERSECTION OF TH 61 AND TH 19. SH TURN LANES HSIP 376, 338,4 37,6 869 US 61 794-791A MNDOT BRIDGE PAINTING IN GOODHUE AND WABASHA. BI BRIDGE REPAIR SF 569,825 569,825 COUNTIES (TH 19 AND TH 61) 87 US 63 2515-21CE MNDOT **BP8** RED WING BRIDGE - 214 COSTS FOR. BR BRIDGE SF 1,2, 1,2, CONSULTANT ENGINEERING REPLACEMENT September 213 Project Listing Page III - 72 of 175

ATP: 6 Fiscal Year: 214 STIP for FY 214-217 871 US 63 56-19 MNDOT FROM W JCT TH 16 TO S END ROOT RIVER BRIDGE (STEWARTVILLE), BITUMINOUS MILL &, CONSTRUCT LEFT TURN LANES IN RACINE, CSAH 1 & CSAH 2, REPLACE APPROACHES AND RAILINGS ON BRIDGE 51 OVER DEER CREEK AND BRIDGE 52 OVER BEAR CREEK 1. RS MILL AND NHPP 4,59, 3,292, 1,298, 872 US 63 56-19S MNDOT CSAH 1 IN RACINE, LEFT TURN LANES. SH SAFETY TARGET HSIP 36, 324, 36, 873 MN 74 857-26 MNDOT **TED1** ST. CHARLES INTERSTATE 9 BUSINESS PARK, TURN LANES WILL BE CONSTRUCTED ON TH 74 TO PROVIDE SAFER ACCESS TO THE NEW BUSINESS PARK (7, TED1 BONDS). AM GRADE AND SURFACE BF 7, 7, 874 I 9 858-149OV1 MNDOT **BP8** DRESBACH BRIDGE - 214 COSTS FOR. BR BRIDGE SF 2,222, 2,222, CONSTRUCTION OVERSIGHT REPLACEMENT 875 I 9 58-162 MNDOT **$1M** CONCRETE PAVEMENT REHABILITATION, EB 8. PM CONCRETE NHPP 2,52,75 1,847,475 25,275 FROM.24 MI E MN 16 TO 2.5 MI E CSAH 1 PAVEMENT REHAB 876 I 9 858-165 MNDOT **AC** EB FROM.8 MI W TH 76 TO O.69 W OF CSAH 12 8. RC MILL AND NHPP 6,682,9 5,754,61 2,6, 928,29 OVERPASS, UNBONDED CONCRETE (AC PROJECT, PAYBACK IN 215) 877 I 9 558-92 MNDOT I-9 EB FROM.9 MI E OF TH 63 TO 1.4 MI E OF CSAH 19, 12. PM CONCRETE NHPP 2,975,75 2,678,175 297,575 CONCRETE PAVEMENT REHABILITATION, PLANING AND PAVEMENT BITUMINOUS SHOULDER REPLACEMENT REHAB 878 MN 247 5512-8AC MNDOT **AC** FROM JCT TH 63 TO JCT TH 42, BITUMINOUS MILL 13. RS MILL AND STP 2,75,246 2,75,246 & (AC PAYBACK 1 OF 1) 879 MN 999 8826-135 MNDOT BRIDGE DECK CRACK SEALING ON 33 BRIDGES SPREAD OVER THE DISTRICT ON TH'S 35, 9,14, 61 AND 63 IN FREEBORN, GOODHUE, MOWER, RICE AND OLMSTED COUNTIES. BI BRIDGE REPAIR SF 359,683 359,683 88 MN 999 8826-141 MNDOT CRACK SEAL VARIOUS LOCATIONS ON TH'S 13, 14, 16, 19,. PM 1 - PM CRACK SF 996, 996, 3, 43, 44, 56, 6, 63, 76, 9, 218 AND 246 SEAL & CHIP 881 MN 999 8826-142 MNDOT SEAL COAT VARIOUS LOCATIONS ON TH'S 13, 19, 56, 6,. PM 1 - PM CRACK STP 2,156,267 1,488,995 667,272 61 AND 76 SEAL & CHIP 882 MN 999 8826-19 MNDOT **ADA** VARIOUS LOCATIONS DISTRICTWIDE,. SC PED./BIKE STP 287,5 23, 57,5 PEDESTRIAN RAMPS - ADA FUNDS - 214 883 PED/BIKE 8826-115 MNDOT ZUMBROTA HISTORICAL COVERED BRIDGE - SAFETY. MA BRIDGE REPAIR FFM 5, 4, 1, SYSTEM - NATIONAL HISTORIC COVERED BRIDGE PRESERVATION (NHCBP) PROGRAM GRANT September 213 Project Listing Page III - 73 of 175

ATP: 6 Fiscal Year: 214 STIP for FY 214-217 884 MN 999 886-CA-14 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 8,5, 8,5, AGREEMENTS - 214 885 MN 999 886-CL-14 MNDOT DISTRICTWIDE SETASIDES - CULVERTS - 214. DR CULVERT SF 5, 5, REPLACEMENT 886 MN 999 886-LT-14 MNDOT DISTRICTWIDE SETASIDES - LIGHTING - 214. SC LIGHTING SF 5, 5, 887 MN 999 886-MA-14 MNDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS. MA MISCELLANEOUS SF 1, 1, AGREEMENTS - 214 888 MN 999 886-RW-14 MNDOT DISTRICTWIDE SETASIDES - R/W - 214. RW RIGHT OF WAY SF 1,79,728 1,79,728 889 MN 999 886-SA-14 MNDOT DISTRICTWIDE SETASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 2,894, 2,894, AGREEMENTS AND COST OVERRUNS - 214 COST OVERRUNS 89 MN 999 886-SC-14 MNDOT DISTRICTWIDE SETASIDES - SAFETY PROJECTS - 214. SC SAFETY TARGET SF 1, 1, 891 MN 999 886-SG-14 MNDOT DISTRICTWIDE SETASIDES - SIGNAL REPLACEMENT -. SC TRAFFIC SIGNAL SF 434,468 434,468 214 INST. 892 MN 999 886-SN-14 MNDOT DISTRICTWIDE SETASIDES - SIGNING - 214. SC SIGNING SF 22, 22, 893 MN 999 886-ST-14 MNDOT DISTRICTWIDE SETASIDES - STRIPING - 214. SC STRIPING SF 74, 74, $131,655,648 $53,499,182 $2,73, $4,368,656 $42,98,171 $3,87,639 September 213 Project Listing Page III - 74 of 175

ATP: 6 Fiscal Year: 215 STIP for FY 214-217 894 BB TRF-47-15A ROCHESTER SECT 537: ROCHESTER DAR TRANSIT OPERATING. B9 OPERATE BUS LF 79,553 79,553 ASSISTANCE 895 BB TRF-47-15B ROCHESTER SECT 537: ROCHESTER RR TRANSIT OPERATING. B9 OPERATE BUS FTA 6,796,257 1,735,856 5,6,41 ASSISTANCE 896 BB TRF-47-15C ROCHESTER SECT 537: CONSTRUCT SMH BUS STOP. B9 OPERATE BUS FTA 3, 24, 6, S 897 BB TRF-47-15D ROCHESTER SECT 537: ROCHESTER RR - PURCHASE 5 BUSES. B9 PURCHASE BUS FTA 2,12, 1,696, 424, (CLASS 7) 898 BB TRF-378-15 LA CRESCENT SECT 537: LA CRESCENT TRANSIT OPERATING. B9 OPERATE BUS FTA 33,9 94, 236,9 ASSISTANCE 899 BB TRS- 1-15 MOWER COUNTY CVS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 9 BB TRS-1-15 MOWER COUNTY CVS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 91 BB TRS-47-15 ROCHESTER ROCHESTER RR - PURCHASE 2 BUSES (CLASS 7). TR PURCHASE BUS STP 848, 62, 228, 92 BB TRS-1977-15 MNDOT SEMCAC - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 93 BB TRS-7284-15 THREE RIVERS THREE RIVERS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 94 RR 5-114 MOWER COUNTY DM&E - INSTALL GATES - CSAH 6, 11TH ST, LYLE,. SR RR X-ING RRS 275, 275, MOWER COUNTY S 95 RR 5-115 MOWER COUNTY DM&E - INSTALL GATES - CSAH 4, 175TH ST, AUSTIN (3 MI. SR RR X-ING RRS 275, 275, S), MOWER COUNTY S 96 RR 74-136 STEELE COUNTY DM&E - INSTALL GATES - CSAH 18, SW 92ND AVE,. SR RR X-ING RRS 275, 275, MERIDEN, STEELE COUNTY S 97 CSAH 25 23-625-9 FILLMORE COUNTY REPLACE BRIDGE 9923 OVER PINE CREEK. BR BRIDGE BROS 57, 376, 194, REPLACEMENT 98 CR 249 28-598-11 HOUSTON COUNTY REPLACE BRIDGE 694-2.7 MILES WEST OF JCT TH 26. BR BRIDGE BROS 58, 35, 23, REPLACEMENT 99 CSAH 17 28-617-1 HOUSTON COUNTY REPLACE BRIDGE 88425-1.9 MI SOUTH OF JCT TH 44. BR BRIDGE STP 45, 245, 16, REPLACEMENT 91 CSAH 45 5-645-8 MOWER COUNTY GRADING, PAVEMENT, STORM SEWER, CURB AND GUTTER FROM TH 218 TO E LIMITS AUSTIN 1. RC GRADE AND SURFACE STP 2,, 1,4, 6, September 213 Project Listing Page III - 75 of 175

ATP: 6 Fiscal Year: 215 STIP for FY 214-217 911 CSAH 9 55-69-18 OLMSTED COUNTY GRADE AND SURFACE BETWEEN JCT OLMSTED CSAH 22 AND JCT OLMSTED CSAH 11 AND MILL AND SURFACE BETWEEN JCT OLMSTED CSAH 11 AND JCT OLMSTED CR 119 4. RC GRADE AND SURFACE STP 4,2, 3,225,1 974,9 912 LOCAL 999 66-7-12 RICE COUNTY RICE COUNTY ROADSIDE HAZARD ELIMINATION. SH SAFETY TARGET HSIP 3, 27, 3, 913 LOCAL 999 74-7-4 STEELE COUNTY 215 HSIP STRIPING PROJECT. SH STRIPING HSIP 57,46 51,714 5,746 914 CSAH 25 79-625-15 WABASHA COUNTY CONCRETE PAVEMENT AND SHOULDER WIDENING 4. RD CONCRETE STP 1,7, 1,34,9 395,1 FROM OLMSTED COUNTY LINE TO TH 42 PAVEMENT 915 MSAS 111 11-111-11 ALBERT LEA RECONSTRUCTION OF LAKEVIEW BLVD FROM ABBOTT 1. RC CONCRETE STP 1,7, 976,972 723,28 STREET TO WEDGE STREET PAVEMENT 916 PED/BIKE 14-9-7 AUSTIN SOUTHWEST TRAIL FROM 2 FEET EAST OF JCT 9TH 1. EN PEDESTRIAN TAP 252, 21,6 5,4 PLACE SW AND 2ND DRIVE SW TO JCT 4TH ST SW AND BIKE TRAIL 16TH AVE SW 917 MSAS 122 156-122-8 RED WING RECONSTRUCTION LEVEE ROAD FROM BROAD STREET 1. RC GRADE AND STP 1,894, 867,484 1,26,516 TO BAY POINT PARK SURFACE 918 PED/BIKE 159-9-19 ROCHESTER SOUTH BROADWAY PATH FROM 2TH ST SE TO THE 2. EN PEDESTRIAN TAP 1,1, 623,4 476,6 ZUMBRO RIVER BIKE TRAIL 919 MUN 158 159-158-2 ROCHESTER PAVEMENT WIDENING - 55TH ST NW - 5TH AVE NW TO 1. RC GRADE AND STP 2,75, 2,1, 65, CSAH 22 SURFACE 92 US 14 21-36 MNDOT I 35 TO DODGE CENTER, MEDIUM BITUMINOUS MILL AND 16. RS BITUMINOUS NHPP 5,99, 4,727,2 1,181,8 921 MN 19 664-15 MNDOT NEAR CARLTON COLLEGE IN NORTHFIELD, REHAB. BI BRIDGE REPAIR SF 5, 5, HISTORIC STONE ARCH BRIDGE 896 922 MN 26 282-65 MNDOT NEAR BROWNSVILLE, REPLACE BRIDGE 572. BR BRIDGE STP 1,25, 1,, 25, REPLACEMENT 923 I 35 248-14 MNDOT **AC** SB FROM.66 MI S CSAH 23 TO.5 MI N TH 3, 14. RS UNBONDED NHPP 13,65,757 11,88,681 4,5, 1,77,76 UNBONDED CONCRETE (AC PROJECT, CONCRETE PAYBACK IN 216) 924 I 35 748-113AC1 MNDOT **AC** NB AND SB FROM.5 MI N OF S LIMITS OF OWATONNA (4.787) TO.25 MI N OF N JCT US 14 (42.856), RECONSTRUCT PAVEMENT AND NB AND SB FROM BRIDGE STREET TO N JCT US 14, OWATONNA, CONSTRUCT AUXILIARY LANE AND REPLACE BRIDGES 74815/74835, 74816/74836, 74817/74837 AND 74818/74838 (AC PAYBACK - 1 OF 2) 2. RC GRADE, SURFACE & BRIDGE NHPP 1,, 1,, September 213 Project Listing Page III - 76 of 175

ATP: 6 Fiscal Year: 215 STIP for FY 214-217 925 I 35 668-112 MNDOT **ITS** I 35 PHASE III - NORTH SEGMENT FROM RICE 1. SC TRAFFIC MGMT. NHPP 775, 697,5 77,5 COUNTY CSAH 1 INTERCHANGE NORTH TO ELKO SYSTEM INTERCHANGE 926 MN 43 853-46 MNDOT **ELLA**BP8**AC** IN WINONA, REHAB BRIDGE 59 (AC 1. BI BRIDGE NHPP BF 47,28, 21,, 84,12, 26,28, PROJECT, PAYBACKS IN 216 ($36M) AND 217 (14M) REPLACEMENT WITH REMAINDER MANAGED TO THE FUTURE) 927 MN 44 284-35 MNDOT IN HOKAH, RECONSTRUCT RETAINING WALL FROM. RC MISCELLANEOUS SF 5, 5, APPROX..1 MI WEST OF 5TH STREET TO 3' EAST 928 MN 44 284-36 MNDOT IN CALEDONIA ON EAST SIDE MN 44 FROM FOLTZ DRIVE. AM COOP. CONST. SF 5, 5, TO NORTH PARK, TRAIL CONSTRUCTION - MUNICIPAL AGREEMENT AGREEMENT PROGRAM - F.Y. 215 929 MN 56 55-58 MNDOT FARM ENTRANCE OVER NORTH BRANCH UPPER IOWA. BR BRIDGE STP 49,5 392,4 98,1 RIVER - NEAR TAOPI, REPLACE BRIDGE 595 REPLACEMENT 93 MN 6 792-23 MNDOT NEAR MAZEPPA, REPLACE BRIDGE 6832. BR BRIDGE STP 1,39, 1,47,2 261,8 REPLACEMENT 931 US 61 2513-92 MNDOT **CIMS** IN RED WING FROM POTTER STREET TO OLD WEST MAIN STREET, MILL AND, MEDIAN CONSTRUCTION AND PEDESTRIAN SAFETY - MUNICIPAL AGREEMENT PROGRAM - F.Y. 215 - $2.445M CIMS FUNDS 1. AM COOP. CONST. AGREEMENT SF 5,39, 3,545, 1,845, 932 US 61 2513-93 MNDOT AT SEVASTOPOL ROAD AND WACOUTA ROAD - SOUTH 1. SC GRADE AND SF 1,193,323 1,193,323 OF RED WING, ADD LEFT TURN LANES AND REMOVE SURFACE ACCESSES 933 US 61 2514-12 MNDOT NB AND SB FROM READY MIX ENTRANCE IN RED WING 16. RS MILL AND NHPP 4,484,8 3,587,84 896,96 TO TH 19, MEDIUM BITUMINOUS MILL AND 934 US 63 559-8 MNDOT **TED14** CSAH 16 & TH 63 INTERCHANGE RECONSTRUCTION (BRIDGE 947) AND AIRPORT ACCESS PROJECT - $2.224 TED14 FUNDS, (OLMSTED COUNTY FUNDS ($5,5, LOCAL SALES TAX AND $1,295, COUNTY STATE AID). RC GRADE, SURFACE & BRIDGE SF 11,519, 4,724, 6,795, 935 US 63 559-78 MNDOT FROM CSAH 35 TO CR 12 (STEWARTVILLE), SHARED- 1. AM COOP. CONST. SF 5, 5, USE PATH - MUNICIPAL AGREEMENTS PROGRAM AGREEMENT 936 US 63 559-79 MNDOT NB & SB FROM.1 MI N N JCT TH 3 TO 28TH ST SE 6. RS MILL AND NHPP 4,765,88 3,812,7 953,18 (ROCHESTER), MEDIUM BITUMINOUS MILL AND 937 US 63 798-3 MNDOT OVER MILLER CREEK, REPLACE BRIDGES 9166 AND 9167. BR BRIDGE STP 2,446, 1,956,8 489,2 REPLACEMENT September 213 Project Listing Page III - 77 of 175

ATP: 6 Fiscal Year: 215 STIP for FY 214-217 938 US 65 244-41 MNDOT NB AND SB FROM.5 MI S I 35 (4-LANE) TO JCT TH 13, 7. RS MILL AND STP 3,2, 2,251,6 562,9 187,5 MEDIUM BITUMINOUS & MILL & FILL 939 I 9 858-149OV2 MNDOT **BP8** DRESBACH BRIDGE - 215 COSTS FOR. BR BRIDGE SF 2,221, 2,221, CONSTRUCTION OVERSIGHT REPLACEMENT 94 I 9 58-161 MNDOT UNDER 11TH DRIVE NE, AUSTIN, REPLACE BRIDGE 9177. BR BRIDGE NHPP 1,412,126 1,129,71 282,425 REPLACEMENT 941 I 9 558-9 MNDOT WB FROM 1.7 MI E CSAH 19 TO 2.3 MI E TH 74, 12. RS MILL AND NHPP 13,466,2 12,119,58 1,346,62 UNBONDED CONCRETE - MOVED FROM 22 942 I 9 858-165AC MNDOT **AC** EB FROM.8 MI W TH 76 TO O.69 W OF CSAH 12 8. RC MILL AND NHPP 2,6, 2,6, OVERPASS, UNBONDED CONCRETE (AC PAYBACK 1 OF 1) 943 MN 19 247-9 MNDOT BROADWAY, ALDEN, FREEBORN COUNTY, DM&E,. SR RR X-ING RRS 275, 275, UPGRADE TO GATES S 944 MN 999 8826-11 MNDOT **ADA** FUNDS - PEDESTRIAN RAMPS - VARIOUS. SC PED./BIKE STP 287,5 23, 57,5 LOCATIONS DISTRICTWIDE - 215 945 MN 999 886-AM-15 MNDOT DISTRICTWIDE SETASIDES - MUNICIPAL AGREEMENTS -. AM COOP. CONST. SF 3, 3, 215 AGREEMENT 946 MN 999 886-BI-15 MNDOT DISTRICTWIDE SETASIDES - BRIDGE REPAIR - 215. BI BRIDGE REPAIR SF 7, 7, 947 MN 999 886-CA-15 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 5,65, 5,65, AGREEMENTS - 215 948 MN 999 886-CL-15 MNDOT DISTRICTWIDE SETASIDES - CULVERTS - 215. DR CULVERT SF 5, 5, REPLACEMENT 949 MN 999 886-LT-15 MNDOT DISTRICTWIDE SETASIDES - LIGHTING - 215. SC LIGHTING SF 5, 5, 95 MN 999 886-LT-15S MNDOT DISTRICTWIDE SETASIDES - LIGHTING - 215. SH LIGHTING HSIP 5, 45, 5, 951 MN 999 886-MA-15 MNDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS. MA MISCELLANEOUS SF 1, 1, AGREEMENTS - 215 952 MN 999 886-PM-15 MNDOT DISTRICTWIDE SETASIDES - PREVENTIVE. PM PREVENTIVE STP 2,7, 2,16, 54, MAINTENANCE - 215 MAINTENANCE 953 MN 999 886-RS-15 MNDOT DISTRICTWIDE SETASIDES - THIN S - 215. RS BITUMINOUS SF 1,842,158 1,842,158 954 MN 999 886-RW-15 MNDOT DISTRICTWIDE SETASIDES - R/W - 215. RW RIGHT OF WAY SF 6,, 6,, September 213 Project Listing Page III - 78 of 175

ATP: 6 Fiscal Year: 215 STIP for FY 214-217 955 MN 999 886-RX-15 MNDOT DISTRICTWIDE SETASIDES - BARC - 215. RX ROAD REPAIR SF 1,567,5 1,567,5 956 MN 999 886-SA-15 MNDOT DISTRICTWIDE SETASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 3,6, 3,6, AGREEMENTS AND COST OVERRUNS - 215 COST OVERRUNS 957 MN 999 886-SC-15 MNDOT DISTRICTWIDE SETASIDES - SAFETY PROJECTS - 215 -. SC SAFETY TARGET SF 1,36,677 1,36,677 STIP AMOUNT $2,, - USED $693,323 FOR S.P. 2513-93 958 MN 999 886-SG-15 MNDOT DISTRICTWIDE SETASIDES - SIGNAL REPLACEMENT -. SC TRAFFIC SIGNAL SF 8, 8, 215 INST. 959 LOCAL 999 886-SHL-15 LOCAL HSIP/HRRR SETASIDE - LOCAL - 215. SH SAFETY TARGET HSIP 1,23,776 1,17,698 123,78 96 MN 999 886-SHS-15 MNDOT DISTRICTWIDE SETASIDES - HSIP - 215. SH SAFETY TARGET HSIP 989,216 89,294 98,922 961 MN 999 886-SN-15 MNDOT DISTRICTWIDE SETASIDES - SIGNING - 215. SC SIGNING SF 22, 22, 962 MN 999 886-ST-15 MNDOT DISTRICTWIDE SETASIDES - STRIPING - 215. SC STRIPING SF 85, 85, $193,32,791 $96,597,334 $88,17, $3,765,856 $45,141,479 $47,528,122 September 213 Project Listing Page III - 79 of 175

ATP: 6 Fiscal Year: 216 STIP for FY 214-217 963 BB TRF-47-16A ROCHESTER SECT 537: ROCHESTER DAR TRANSIT OPERATING. B9 OPERATE BUS LF 737,935 737,935 ASSISTANCE 964 BB TRF-47-16B ROCHESTER SECT 537: ROCHESTER RR TRANSIT OPERATING. B9 OPERATE BUS FTA 7,185,545 1,735,856 5,449,689 ASSISTANCE 965 BB TRF-47-16C ROCHESTER SECT 537: ROCHESTER RR - PURCHASE 3 BUSES. B9 PURCHASE BUS FTA 1,311, 1,48,8 262,2 (CLASS 7) 966 BB TRF-378-16 LA CRESCENT SECT 537: LACRESCENT TRANSIT OPERATING. B9 OPERATE BUS FTA 34,827 94, 246,827 ASSISTANCE 967 BB TRS-1-16 MOWER COUNTY CVS - PURCHASE 2 BUSES (CLASS 4). TR PURCHASE BUS STP 148, 118,4 29,6 968 BB TRS-47-16 ROCHESTER ROCHESTER RR - PURCHASE 1 BUS (CLASS 7). TR PURCHASE BUS STP 437, 211,5 225,5 969 BB TRS-65-16 WINONA CITY OF WINONA - PURCHASE 2 BUSES (CLASS 6). TR PURCHASE BUS STP 44, 352, 88, 97 BB TRS-7284-16 NORTHFIELD THREE RIVERS - PURCHASE 1 BUS (CLASS 5) - CITY OF. TR PURCHASE BUS STP 146, 116,8 29,2 NORTHFIELD 971 BB TRS-7284-16A THREE RIVERS THREE RIVERS - PURCHASE 1 BUS (CLASS 4) -. TR PURCHASE BUS STP 74, 59,2 14,8 FARIBAULT 972 BB TRS-7284-16B THREE RIVERS THREE RIVERS - PURCHASE 1 BUS (CLASS 4) -. TR PURCHASE BUS STP 74, 59,2 14,8 PLAINVIEW 973 BB TRS-7284-16C THREE RIVERS THREE RIVERS - PURCHASE 1 BUS (CLASS 5) - RED. TR PURCHASE BUS STP 146, 116,8 29,2 WING 974 RR 2-2 DODGE COUNTY DM&E - INSTALL GATES - 8TH AVE SW, CSAH 34, DODGE. SR RR X-ING RRS 25, 25, COUNTY S 975 RR 24-133 FREEBORN DM&E - INSTALL GATES - S 1ST AVE WEST, MSAS 112,. SR RR X-ING RRS 25, 25, COUNTY ALBERT LEA, FREEBORN COUNTY S 976 RR 55-129 OLMSTED COUNTY DM&E - INSTALL GATES - CSAH 22, EAST CIRCLE DRIVE,. SR RR X-ING RRS 3, 3, ROCHESTER, OLMSTED COUNTY S 977 RR 85-147 WINONA COUNTY DM&E - INSTALL GATES - CSAH 37, ST CHARLES (.5 MI E),. SR RR X-ING RRS 275, 275, WINONA COUNTY S 978 CSAH 23 23-623-26 FILLMORE COUNTY REPLACE BRIDGE 9922 OVER WEISEL CREEK. BR BRIDGE BROS 26, 28, 52, REPLACEMENT 979 TWP 237 28-599-77 HOUSTON COUNTY REPLACE BRIDGE L4556.3 MILES EAST OF JCT MN 76. BR BRIDGE REPLACEMENT BROS 42, 272, 148, September 213 Project Listing Page III - 8 of 175

ATP: 6 Fiscal Year: 216 STIP for FY 214-217 98 CSAH 25 55-625-23 OLMSTED COUNTY CONCRETE BETWEEN OLMSTED CSAH 22 6. RS CONCRETE STP 4,1, 2,838,2 1,261,8 (WEST CIRCLE DRIVE) AND OLMSTED CSAH 3 981 CSAH 46 66-646-5 RICE COUNTY PAVEMENT RESURFACING AND SHOULDER PAVING ON 7. RS SURFACING STP 4,, 2,98,2 1,91,8 RICE CSAH 46 BETWEEN MN 21 AND RICE CSAH 1 982 CSAH 23 14-2-14 AUSTIN RECONSTRUCT 4TH DRIVE SW FROM TURTLE CREEK 1. MC GRADE AND STP 1,3, 1,6,34 293,66 BRIDGE TO AUSTIN CITY LIMITS SURFACE 983 MSAS 158 159-158-3 ROCHESTER CONSTRUCT 41ST AVENUE NW FROM WEST CIRCLE. MC GRADE, STP 5,5, 2,821,26 2,678,74 DRIVE (CSAH 22) TO 55TH ST NW AND 55TH ST NW SURFACE AND FROM 41ST AVENUE TO CSAH 22 BRIDGE 984 I 35 248-14AC MNDOT **AC** SB FROM.66 MI S CSAH 23 TO.5 MI N TH 3, 14. RS UNBONDED NHPP 4,5, 4,5, UNBONDED CONCRETE (AC PAYBACK 1 OF 1) CONCRETE 985 I 35 748-113AC2 MNDOT **AC** NB AND SB FROM.5 MI N OF S LIMITS OF OWATONNA (4.787) TO.25 MI N OF N JCT US 14 (42.856), RECONSTRUCT PAVEMENT AND NB AND SB FROM BRIDGE STREET TO N JCT US 14, OWATONNA, CONSTRUCT AUXILIARY LANE AND REPLACE BRIDGES 74815/74835, 74816/74836, 74817/74837 AND 74818/74838 (AC PAYBACK - 2 OF 2) 2. RC MILL AND NHPP 8,13, 8,13, 986 MN 42 791-47 MNDOT ON TH 42 (ELGIN), REPLACE BRIDGE 5969. BR BRIDGE STP 652,746 522,197 13,549 REPLACEMENT 987 MN 43 853-46AC1 MNDOT **AC** IN WINONA, REHAB BRIDGE 59 - (AC PAYBACK 1 1. BI BRIDGE NHPP 36,, 36,, OF 2) REPLACEMENT 988 US 52 255-53 MNDOT SB LANES - FROM.4 MI S CSAH 11 TO 1' S MAIN ST RAMP (PINE ISLAND) AND FROM S JCT MN 6 (S OF ZUMBROTA) TO 1.2 MI N CSAH 7, MEDIUM BITUMINOUS MILL AND 8. RS MILL AND SF 2,5, 2,5, 989 US 52 558-121 MNDOT **ITS** EXTENSION OF FIBER OPTIC COMMUNICATION 7. SC TRAFFIC MGMT. NHPP 35, 28, 7, LINE NORTH FROM 75TH ST TO ELK RUN INTERCHANGE SYSTEM NORTH OF ORONOCO 99 MN 56 55-63 MNDOT OVER STREAM, REPLACE BRIDGE 647 AND OVER. BR BRIDGE STP 1,2, 96, 24, LITTLE CEDAR RIVER, REPLACE BRIDGE 6469 REPLACEMENT 991 US 61 855-39 MNDOT **ELLA** GILMORE AVENUE, WINONA, RECONSTRUCT. SC GRADE AND NHPP 2,, 1,6, 4, INTERSECTION AND INSTALL NEW SIGNAL SURFACE 992 US 61 854-75 MNDOT SB OVER TROUT CREEK, REPLACE BRIDGE 965. BR BRIDGE SF 1,1,952 1,1,952 REPLACEMENT September 213 Project Listing Page III - 81 of 175

ATP: 6 Fiscal Year: 216 STIP for FY 214-217 993 I 9 858-149OV3 MNDOT **BP8** DRESBACH BRIDGE - 216 COSTS FOR. BR BRIDGE SF 1,591, 1,591, CONSTRUCTION OVERSIGHT REPLACEMENT 994 MN 15 57-32 MNDOT FROM N END BR 5971 TO JCT W RAMPS I-9, MEDIUM 2. RS BITUMINOUS NHPP 1,1, 88, 22, MILL AND 995 MN 25 2319-16 MNDOT OVER S BRANCH ROOT RIVER, REPLACE BRIDGE 6975. BR BRIDGE STP 6,737,422 5,389,938 1,347,484 AND OVER N BRANCH ROOT RIVER REPLACE BRIDGE REPLACEMENT 6977 996 MN 999 886-ACC-16 MNDOT DISTRICTWIDE SETASIDES - ACCESS MANAGEMENT -. SC GRADE AND SF 245, 245, 216 SURFACE 997 MN 999 886-ADA-16 MNDOT **ADA** DISTRICTWIDE SETASIDES - ADA. SC APPU - SF 2, 2, S - 216 APPURTENANCES 998 MN 999 886-AM-16 MNDOT DISTRICTWIDE SETASIDES - MUNICIPAL AGREEMENTS -. AM COOP. CONST. SF 1,5, 1,5, 216 AGREEMENT 999 MN 999 886-BI-16 MNDOT DISTRICTWIDE SETASIDES - BRIDGE REPAIR - 216. BI BRIDGE REPAIR SF 1,, 1,, 1 MN 999 886-CA-16 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 2,5, 2,5, AGREEMENTS - 216 11 MN 999 886-CL-16 MNDOT DISTRICTWIDE SETASIDES - CULVERTS - 216. DR CULVERT SF 5, 5, REPLACEMENT 12 PED/BIKE 886-EN-16 DISTRICTWIDE F.Y. 216 ENHANCEMENT SETASIDE. EN PED./BIKE TAP 1,31,25 825, 26,25 13 MN 999 886-LT-16 MNDOT DISTRICTWIDE SETASIDES - LIGHTING - 216. SC LIGHTING SF 5, 5, 14 MN 999 886-LT-16S MNDOT DISTRICTWIDE SETASIDES - LIGHTING - 216. SH LIGHTING HSIP 5, 45, 5, 15 MN 999 886-MA-16 MNDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS. MA MISCELLANEOUS SF 1,53 1,53 AGREEMENTS - 216 16 MN 999 886-PM-16 MNDOT DISTRICTWIDE SETASIDES - PREVENTIVE. PM PREVENTIVE STP 3,1, 2,48, 62, MAINTENANCE - 216 MAINTENANCE 17 MN 999 886-RW-16 MNDOT DISTRICTWIDE SETASIDES - R/W - 216. RW RIGHT OF WAY SF 1,4, 1,4, 18 MN 999 886-RX-16 MNDOT DISTRICTWIDE SETASIDES - BARC - 216. RX ROAD REPAIR SF 1,569,134 1,569,134 19 MN 999 886-SA-16 MNDOT DISTRICTWIDE SETASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 2,54, 2,54, AGREEMENTS AND COST OVERRUNS - 216 COST OVERRUNS September 213 Project Listing Page III - 82 of 175

ATP: 6 Fiscal Year: 216 STIP for FY 214-217 11 MN 999 886-SG-16 MNDOT DISTRICTWIDE SETASIDES - SIGNAL REPLACEMENT -. SC TRAFFIC SIGNAL SF 8, 8, 216 INST. 111 LOCAL 999 886-SHL-16 LOCAL HSIP/HRRR SETASIDE - LOCAL - 216. SH SAFETY TARGET HSIP 1,588,236 1,429,412 158,824 112 MN 999 886-SHS-16 MNDOT DISTRICTWIDE SETASIDES - HSIP - 216. SH SAFETY TARGET HSIP 989,216 89,294 98,922 113 MN 999 886-SN-16 MNDOT DISTRICTWIDE SETASIDES - SIGNING - 216. SC SIGNING SF 22, 22, 114 MN 999 886-ST-16 MNDOT DISTRICTWIDE SETASIDES - STRIPING - 216. SC STRIPING SF 85, 85, $122,241,793 $75,644,741 $ $2,878,656 $3,699,571 $13,18,825 September 213 Project Listing Page III - 83 of 175

ATP: 6 Fiscal Year: 217 STIP for FY 214-217 115 BB TRF-47-17 ROCHESTER SECT 537: CONSTRUCT PARK & RIDE STRUCTURED. B9 OPERATE BUS FTA 5,, 4,, 1,, PARKING 116 BB TRF-47-17A ROCHESTER SECT 537: ROCHESTER DAR OPERATING ASSISTANCE. B9 OPERATE BUS LF 767,453 767,453 117 BB TRF-47-17B ROCHESTER SECT 537: ROCHESTER RR OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,472,967 1,735,856 5,737,111 118 BB TRF-378-17 LA CRESCENT SECT 537: LACRESCENT TRANSIT OPERATING. B9 OPERATE BUS FTA 351,52 94, 257,52 ASSISTANCE 119 BB TRF-47-17A ROCHESTER SECT 537: ROCHESTER RR, PURCHASE 3 BUSES. B9 PURCHASE BUS FTA 1,35, 1,8, 27, (CLASS 7) 12 BB TRS-1-17 MOWER COUNTY CVS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 82, 65,6 16,4 121 BB TRS-1-17A MOWER COUNTY CVS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 82, 65,6 16,4 122 BB TRS-1-17B ALBERT LEA ALBERT LEA - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 82, 65,6 16,4 123 BB TRS-47-17 ROCHESTER ROCHESTER RR, PURCHASE 1 BUS (CLASS 7). TR PURCHASE BUS STP 45, 343,2 16,8 124 CSAH 1 23-61-24 FILLMORE COUNTY FROM JCT FILLMORE CSAH 4 NORTH TO COUNTY LINE, 5. RC GRADE, STP 3,1,8 2,2, 9,8 GRADING AND BRIDGE REPLACEMENT SURFACE AND BRIDGE 125 CSAH 22 24-622-1 FREEBORN I-9 TO HAMMER ROAD, RESURFACING 1. RS BITUMINOUS STP 1,, 8, 2, COUNTY 126 CSAH 28 66-628-8 RICE COUNTY BETWEEN MN 246 AND PRAIRIE ST, RECONSTRUCTION 1. RC GRADE AND STP 95, 76, 19, SURFACE 127 CSAH 2 79-62-39 WABASHA COUNTY FROM WABASHA CSAH 25 TO TH 247, RECONDITIONING 2. RD BITUMINOUS STP 1,, 7, 3, RECLAMATION 128 MSAS 16 159-16-2 ROCHESTER 16TH AVE SW TO 11TH AVE SW, RECONSTRUCTION. RC GRADE AND STP 2,5, 2,, 5, SURFACE 129 MN 16 281-87 MNDOT FROM.56 MI W OF TH 26 TO.8 MI S OF TH 61 - MEDIUM 3. RS BITUMINOUS SF 1,128,648 1,128,648 BITUMINOUS MILL AND 13 MN 3 24-22 MNDOT OVER STREAM, OSLO, REPLACE BRIDGE 6746. BR BRIDGE SF 1,, 1,, REPLACEMENT 131 MN 42 556-22 MNDOT FROM TH 14 TO.35 MI N OF TH 247, MEDIUM 15. RS MILL AND STP 5,831, 4,664,8 1,166,2 BITUMINOUS MILL AND September 213 Project Listing Page III - 84 of 175

ATP: 6 Fiscal Year: 217 STIP for FY 214-217 132 MN 42 791-48 MNDOT NEAR KELLOGG, REPLACE BRIDGE 5787 OVER GORMAN. BR BRIDGE SF 1,1, 1,1, CREEK REPLACEMENT 133 MN 43 853-46AC2 MNDOT **AC** IN WINONA, REHAB BRIDGE 59 - (AC PAYBACK 1. BI BRIDGE NHPP 14,, 14,, 2 OF 2) - MANAGED TO THE FUTURE FOR REMAINING REPLACEMENT PAYBACKS 134 US 52 256-75 MNDOT NB LANES - ROCHESTER TO CANNON FALLS WITH 27. RS BITUMINOUS NHPP 1,3, 8,24, 2,6, EXCEPTIONS FROM R.P. 64.398 TO 66.632 AND R.P. 79.36 TO 82.26, MEDIUM BITUMINOUS 135 US 52 557-63 MNDOT OVER US 63, REPLACE DECKS NB BRIDGE 559 AND SB. BR BRIDGE NHPP 4,244,173 3,395,338 848,835 BRIDGE 551 REHABILITATION 136 MN 56 55-62 MNDOT FROM MAPLE STREET IN TAOPI TO CSAH 46, MEDIUM 16. RS BITUMINOUS STP 5,831, 4,664,8 1,166,2 BITUMINOUS MILL AND 137 MN 58 251-5 MNDOT OVER US 52 IN ZUMBROTA, REPLACE BRIDGE 9661. BR BRIDGE NHPP 4,, 3,2, 8, REPLACEMENT 138 US 61 2514-114 MNDOT NEAR SPRING CREEK AVE, INCLUDING CAROL LANE, 4. AM GRADE AND SF 5, 5, ACCESS MANAGEMENT AND INTERSECTION SAFETY SURFACE S 139 US 61 2514-121 MNDOT OVER HAY CREEK AND WITHERS HARBOR DRIVE,. BR BRIDGE NHPP 7,5, 6,, 1,5, REPLACE BRIDGE 6483 AND OVER ABANDONED C&NW REPLACEMENT RR, PLUG BRIDGE 6482 - IN RED WING 14 US 63 559-81 MNDOT **ITS** EXTENSION OF ROCHESTER TMS FROM 48TH ST 5. SC TRAFFIC MGMT. NHPP 35, 28, 7, ON TH 63 SOUTH TO I-9 INTERCHANGE SYSTEM 141 MN 139 2316-16 MNDOT IA/MN STATE LINE TO TH 52 (HARMONY), MEDIUM 4. RS BITUMINOUS SF 1,455,636 1,455,636 BITUMINOUS MILL AND 142 MN 999 886-ADA-17 MNDOT **ADA** DISTRICTWIDE SETASIDES - ADA. SC APPU - SF 2, 2, S - 217 APPURTENANCES 143 MN 999 886-AM-17 MNDOT DISTRICTWIDE SETASIDES - MUNICIPAL AGREEMENTS -. AM COOP. CONST. SF 4, 4, 217 AGREEMENT 144 MN 999 886-BI-17 MNDOT DISTRICTWIDE SETASIDES - BRIDGE REPAIR - 217. BI BRIDGE REPAIR SF 1,683,716 1,683,716 145 MN 999 886-CA-17 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,, 1,, AGREEMENTS - 217 146 MN 999 886-CL-17 MNDOT DISTRICTWIDE SETASIDES - CULVERTS - 217. DR CULVERT SF 3, 3, REPLACEMENT September 213 Project Listing Page III - 85 of 175

ATP: 6 Fiscal Year: 217 STIP for FY 214-217 147 MN 999 886-LT-17 MNDOT DISTRICTWIDE SETASIDES - LIGHTING - 217. SC LIGHTING SF 5, 5, 148 MN 999 886-MA-17 MNDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS. MA MISCELLANEOUS SF 1, 1, AGREEMENTS - 217 149 MN 999 886-PM-17 MNDOT DISTRICTWIDE SETASIDES - PREVENTIVE. PM PREVENTIVE SF 1,5, 1,5, MAINTENANCE - 217 MAINTENANCE 15 MN 999 886-RW-17 MNDOT DISTRICTWIDE SETASIDES - R/W - 217. RW RIGHT OF WAY SF 2,, 2,, 151 MN 999 886-RX-17 MNDOT DISTRICTWIDE SETASIDES - BARC - 217. RX ROAD REPAIR SF 7, 7, 152 MN 999 886-SA-17 MNDOT DISTRICTWIDE SETASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 2,5, 2,5, AGREEMENTS AND COST OVERRUNS - 217 COST OVERRUNS 153 MN 999 886-SG-17 MNDOT DISTRICTWIDE SETASIDES - SIGNAL REPLACEMENT -. SC TRAFFIC SIGNAL SF 25, 25, 217 INST. 154 LOCAL 999 886-SHL-17 LOCAL HSIP SETASIDE - LOCAL - 217. SH SAFETY TARGET HSIP 2,444,444 2,2, 244,444 155 MN 999 886-SHS-17 MNDOT DISTRICTWIDE SETASIDES - HSIP - 217. SH SAFETY TARGET HSIP 1,555,555 1,4, 155,555 156 MN 999 886-SN-17 MNDOT DISTRICTWIDE SETASIDES - SIGNING - 217. SC SIGNING SF 22, 22, 157 MN 999 886-ST-17 MNDOT DISTRICTWIDE SETASIDES - STRIPING - 217. SC STRIPING SF 85, 85, $97,182,444 $55,44,938 $ $6,99,856 $24,74,79 $1,522,86 September 213 Project Listing Page III - 86 of 175

Clearwater Kittson Roseau Lake of the Woods Areawide Transportation Partnership (ATP) Boundaries Marshall 2 Koochiching Polk Pennington Red Lake Beltrami 1 Lake Cook Itasca St. Louis Norman Mahnomen Hubbard Clay Cass Becker Wilkin 4 Wadena 3 Crow Wing Aitkin Carlton Traverse Big Stone Lac qui Parle Yellow Medicine Lincoln Grant Stevens Lyon Murray Otter Tail Swift Chippewa Douglas Pope 8 Redwood Pipestone Cottonwood Renville Todd Kandiyohi Brown Stearns Meeker Watonwan Morrison McLeod Sibley Nicollet Benton Wright Mille Lacs Carver Hennepin Scott Kanabec Isanti Anoka Chisago Ramsey Washington Dakota Pine Rice 7 6 Blue Earth Sherburne Le Sueur Waseca Metro Steele Goodhue Dodge Wabasha Olmsted Winona DISTRICT 7 Greg Ous Transportation District Engineer (57) 34-611 2151 Bassett Drive Mankato, Minnesota 561-6888 General Information: (57) 34-61 8-657-3747 FAX: (57) 34-6119 Rock Nobles Jackson Martin Faribault Freeborn Mower Fillmore Houston

ATP: 7 Fiscal Year: 214 STIP for FY 214-217 158 BB TRF-21-14-NA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH. NF OPERATE BUS FTA 57,5 46, 11,5 IN ACTION - MOBILITY MANAGEMENT 159 BB TRF-21-14-NB MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH. NF OPERATE BUS FTA 66, 33, 33, IN ACTION - RIDE COORDINATION 16 BB TRF-21-14-JA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH. NF OPERATE BUS FTA 1, 5, 5, IN ACTION - RIDES TO WORK PROGRAM 161 BB TRF-28-14 MNDOT SECT 537: CITY OF MANKATO RR TRANSIT OPERATING. B9 OPERATE BUS FTA 1,751, 435,755 1,315,245 ASSISTANCE 162 BB TRS-25-14 MNDOT CITY OF LE SUEUR PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 7, 56, 14, 163 BB TRS-46-14 MNDOT MARTIN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 7, 56, 14, 164 BB TRS-83-14 MNDOT WATONWAN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 7, 56, 14, 165 BB TRS-28-14 MNDOT BROWN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 7, 56, 14, 166 BB TRS-2496-14 MNDOT CITY OF ST PETER PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 7, 56, 14, 167 BB TRS-3331-14 MNDOT ROCK COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 168 RR 7-121 MNDOT INDUSTRIAL ROAD/CSAH 12 IN MANKATO, INSTALL GATES. SR RR X-ING RRS 375, 375, S 169 LOCAL 999 8-7-4 BROWN COUNTY EDGE LINE RUMBLE STRIPES. SH MISCELLANEOUS HSIP 87,5 78,75 8,75 17 CSAH 3 8-63-3 BROWN COUNTY FROM WEST COUNTY LINE TO TH 4, WIDENING AND 7. RD RECONDITION STP 2,37, 1,326, 981, BITUMINOUS SURFACING 171 PED/BIKE 32-9-9 JACKSON COUNTY OLD MILL TRAIL, FROM PLEASANTVIEW ELEMENTARY 2. EN PEDESTRIAN TAP 373,856 299,85 74,771 SCHOOL TO COLONIAL AVENUE BIKE TRAIL 172 TWN 183 32-599-89 JACKSON COUNTY.3 MI NORTH OF CSAH 18 (JACKSON CO), REPLACE BR. BR BRIDGE BROS 633, 348, 285, 2628 REPLACEMENT 173 CSAH 29 32-629-42 JACKSON COUNTY CSAH 8 TO CSAH 34 (JACKSON CO), & 6. RS BITUMINOUS STP 3,3, 1,326,5 1,676,5 SHOULDER WORK (FED $ CAPPED) 174 CSAH 38 46-7-1 MARTIN COUNTY CSAH 38, FROM CSAH 27 TO NORTHROP CL PROJECT 1. SH STRIPING HSIP 34,4 36,36 34,4 175 LOCAL 999 52-7-3 NICOLLET COUNTY COUNTY WIDE CHEVRON PROJECT. SH SIGNING HSIP 422,4 38,16 42,24 September 213 Project Listing Page III - 87 of 175

ATP: 7 Fiscal Year: 214 STIP for FY 214-217 176 PED/BIKE 72-9-2 SIBLEY BRIDGES FOR PRAIRIE LINE TRAIL, ALONG CO RD 166,. EN PEDESTRIAN TAP 68,497 4, 28,497 CONSTRUCT BR #R613 & #R614(PHASE 2A) BIKE BRIDGE 177 PED/BIKE 72-9-3 SIBLEY PRAIRIE LINE TRAIL ALONG CO RD 166 TO ARLINGTON 2. EN PEDESTRIAN TAP 68,497 4, 28,497 SPORTSMAN PARK & TO SOUTH OF HIGH ISLAND CREEK BIKE TRAIL CONSTRUCT PED/BIKE TRAIL AND SIDEWALK (PHASE 2B) 178 CSAH 5 83-7-6 WATONWAN CSAH 5, MARTIN COUNTY LINE TO BUTTERFIELD CITY. SH STRIPING HSIP 157,533 141,78 15,753 COUNTY LIMITS, 6" CL AND RUMBLE STIPES, SHOULDER PAVING, CHEVRONS 179 PED/BIKE 137-591-2 MANKATO **SRTS** INFRA MANKATO, CE & CONSTRUCTION OF. BT PED./BIKE SRTS 18,283 18,283 SIDEWALK & CURB EXTENSIONS ALONG HOFFMAN RD, KENNEDY ST, AND ELECTA BOULEVARD 18 MSAS 122 148-122-3 NEW ULM FROM TH 14 TO CSAH 29, CONSTRUCT NEW ROAD MSAS 1. MC GRADE AND STP 2,5, 576, 1,924, 122 SURFACE 181 US 14 72-116 MNDOT **LGA** CSAH 12 & TH 14 BRIDGE # 7587 & RAMPS (LGA. BR NEW BRIDGE NHPP 293,565 293,565 PAYBACK TO COUNTY 1 OF 3) TIED 7-612-11 182 US 14 72-116A MNDOT **LGA** NORTH AND SOUTH ABUTMENT FILL FOR PROPOSED BR # 7587 WITH TH 14 AND CSAH 12, 1 MI EAST OF MANKATO (LGA PAYBACK TO COUNTY 2 OF 2) TIED 7-612-19. BR NEW BRIDGE NHPP 76,435 76,435 183 MN 15 464-32 MNDOT FROM.6 MI NORTH OF I9 TO CSAH 54, MILL & 11. RS MILL AND NHPP 5,1, 4,8, 1,2, 184 MN 22 74-88 MNDOT FROM TH 83 TO CSAH 3, SIGNAL REVISIONS AND AT THE JCTS OF TH 22 WITH MADISON AVE, CSAH 17 AND ADAMS STREET IN MANKATO, CONSTRUCT ROUNDABOUTS AND CPR 2. MC GRADE AND SURFACE NHPP 6,6, 2,768, 692, 2,6, 185 MN 22 74-88S MNDOT FROM TH 83 TO CSAH 3, SIGNAL REVISIONS AND AT THE JCTS OF TH 22 WITH MADISON AVE, CSAH 17 AND ADAMS STREET IN MANKATO, CONSTRUCT ROUNDABOUTS AND CPR 2. SH GRADE AND SURFACE HSIP 98, 882, 98, 186 MN 22 727-2 MNDOT **AC** IN THE CITY OF GAYLORD, RECONSTRUCTION ON TH 5, TH19 & TH22 FROM THE SOUTH CITY LIMITS TO THE NORTH CITY LIMITS OF GAYLORD (AC PROJECT, PAYBACK IN 215) 2. RD GRADE AND SURFACE STP 2,84, 3,76, 94, 1,9, 187 MN 6 535-65 MNDOT **BP8** FINAL LANDSCAPING FOR 535-58 & 535-59 1. RB LANDSCAPING BF 4, 4, 188 MN 6 838-44AC1 MNDOT **AC**AB** FROM CSAH 5 IN BUTTERFIELD TO 7TH AVE 5. MC GRADE AND NHPP 7,, 7,, IN ST JAMES, CONSTRUCT 4 LANE ROADWAY AND NEW BRIDGE BRIDGE #834, ALTERNATE BID (AC PAYBACK 1 OF 2) September 213 Project Listing Page III - 88 of 175

ATP: 7 Fiscal Year: 214 STIP for FY 214-217 189 MN 6 8827-175 MNDOT **ITS** VARIOUS LOCATIONS ON TH 6, INSTALL. ST SIGNING NHPP 6, 48, 12, DYNAMIC MESSAGE SIGNS 19 MN 62 174-27 MNDOT **AB**BR4M** FROM TH 59 IN FULDA TO WEST LIMITS OF 23. RD SURFACING BF 14,, 14,, WINDOM, RECLAIM, ALT BID 191 MN 86 327-9 MNDOT FROM THE IOWA BORDER TO I9, MILL & 1. RS MILL AND STP 2,883, 2,36, 577, 192 I 9 328-116 MNDOT REPAIR BR 3287, 3288, 32811 & 32812 ON I 9 IN. BI BRIDGE REPAIR NHPP 2,4, 2,16, 24, JACKSON COUNTY 193 I 9 538-121 MNDOT FROM CSAH 35 TO 1.1 MI EAST OF CSAH 13, EB LANES 9. RS MILL AND NHPP 4,8, 4,32, 48, ONLY, MILL & 194 I 9 538-127 MNDOT REPAIR BR 5383, 5384, 5385 & 5386 ON I 9 IN. BI BRIDGE REPAIR NHPP 1,8, 1,62, 18, NOBLES COUNTY 195 I 9 8827-112 MNDOT REPAIR 7 BRIDGES IN FARIBAULT COUNTY ALONG I 9 21. BI BRIDGE REPAIR NHPP 2,, 1,8, 2, (BR#2283, 2284, 2286, 22815, 22816, 22825 & 22826) 196 I 9 8827-174 MNDOT **ITS** VARIOUS LOCATIONS ON I9, INSTALL DYNAMIC. ST SIGNING NHPP 5, 45, 5, MESSAGE SIGNS 197 MN 99 48-25 MNDOT RECONDITION INPLACE BRIDGE #493 OVER THE MN. BI BRIDGE REPAIR STP 2,5, 2,, 5, RIVER IN ST. PETER 198 MN 19 2212-29 MNDOT **AB** FROM EAST JCT OF CSAH 17 TO WEST LIMITS OF 1. RD SURFACING STP 9,, 7,2, 1,8, WELLS - RECLAIM, ALT BID 199 US 169 413-54 MNDOT **TED14** LE SEUER HILL ACCESS S,. AM GRADE AND SF 4,1, 2,8, 1,3, CSAH 28, $2,72,571 IS TED14 FUNDS, $727,429 IS STATE SURFACE FUNDS 11 US 169 529-66 MNDOT **AC**AB** ST PETER TO LE SUEUR, 1.8 MILES OF GRADE RAISE FOR FLOOD MITIGATION AND MILL AND SB LANES ONLY, ALTERNATE BID (AC PROJECT, PAYBACK IN 215) 11. RD MILL AND NHPP 1,94, 7,76, 1,94, 111 US 169 529-66F MNDOT **FMP**AB** ST PETER TO LE SUEUR, 1.8 MILES OF 11. RD MILL AND BF 2,, 2,, GRADE RAISE FOR FLOOD MITIGATION AND MILL AND SB LANES ONLY, ALTERNATE BID 112 US 169 529-66S MNDOT **AB** ST PETER TO LE SUEUR, 1.8 MILES OF GRADE 11. SH MILL AND HSIP 1,5, 1,35, 15, RAISE FOR FLOOD MITIGATION AND MILL AND SB LANES ONLY ALTERNATE BID 113 MN 999 887-BI-14 MNDOT DISTRICTWIDE SETASIDES - BRIDGE REPAIR -214. BI BRIDGE REPAIR SF 6, 6, September 213 Project Listing Page III - 89 of 175

ATP: 7 Fiscal Year: 214 STIP for FY 214-217 114 MN 999 887-CA-14 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 3,, 3,, AGREEMENTS - 214 115 MN 999 887-MA-14 MNDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS. MA COOP. CONST. SF 5, 5, AGREEMENTS - 214 AGREEMENT 116 MN 999 887-RW-14 MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY - 214. RW RIGHT OF WAY SF 1,5, 1,5, 117 MN 999 887-RX-14 MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR/ROUTE AND. RX ROAD REPAIR SF 2,, 2,, SEAL (BARC) - 214 118 MN 999 887-SA-14 MNDOT DISTRICTWIDE SETASIDES - CONSTRUCTION SA, CO. SA SUPP. AGREE. & SF 2,, 2,, AND INCENTIVES -214 COST OVERRUNS 119 MN 999 887-ST-14 MNDOT DISTRICTWIDE SETASIDES - STRIPING AND SIGNING. ST STRIPING SF 1,2, 1,2, (BARC) - 214 $98,2,466 $45,894,718 $11,52, $564,755 $22,587, $29,153,993 September 213 Project Listing Page III - 9 of 175

ATP: 7 Fiscal Year: 215 STIP for FY 214-217 111 BB TRF-21-15-NA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH. NF OPERATE BUS FTA 57,5 46, 11,5 IN ACTION - MOBILITY MANAGEMENT 1111 BB TRF-21-15-NB MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH. NF OPERATE BUS FTA 66, 33, 33, IN ACTION - RIDE COORDINATION 1112 BB TRF-21-15-JA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH. NF OPERATE BUS FTA 1, 5, 5, IN ACTION - RIDES TO WORK PROGRAM 1113 BB TRF-28-15 MNDOT SECT 537: CITY OF MANKATO RR TRANSIT OPERATING. B9 OPERATE BUS FTA 1,83,53 435,755 1,367,775 ASSISTANCE 1114 BB TRS-46-15 MNDOT MARTIN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 1115 BB TRS-28-15 MNDOT BROWN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 72, 57,6 14,4 1116 BB TRS-2496-15 MNDOT CITY OF ST PETER PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 72, 57,6 14,4 1117 RR 8-119 MNDOT CSAH 5 & E 2ND AVE IN SPRINGFIELD, DME, INSTALL. SR RR X-ING RRS 275, 275, GATES AND FLASHING LIGHTS S 1118 PED/BIKE 8-9-2 BROWN COUNTY ALONG TH 4 IN SLEEPY EYE, SLEEPY EYE LAKE TRAIL. EN PEDESTRIAN TAP 5, 4, 1, PHASE II, CONSTRUCT PED/BIKE TRAIL (FED$ CAPPED) BIKE TRAIL (TIED TO 82-42) 1119 CSAH 5 17-65-22 COTTONWOOD FROM TH 62 TO TH 3, MILL AND 12. RS MILL AND STP 2,163,575 1,326, 837,575 COUNTY 112 CSAH 41 46-641-7 MARTIN COUNTY FROM TH 15 TO CSAH 2, AND AGGREGATE 7. RS BITUMINOUS STP 2,46,625 1,326, 72,625 SHOULDERING 1121 CSAH 13 72-613-14 SIBLEY COUNTY ON CSAH 13 OVER NORTH BRANCH OF RUSH RIVER, 1.3. BR BRIDGE BROS 465,731 36,334 159,397 MI NORTH OF CO RD 62, REPLACE BR#L2645 REPLACEMENT 1122 PED/BIKE 83-9-4 WATONWAN WATLINE TRAIL - TH 4 OVER TH 6, MODIFY BR#8323 4. EN PEDESTRIAN TAP 5, 4, 1, COUNTY FOR TRAIL PURPOSES (FED $ CAPPED) (TIED TO 831- BIKE TRAIL 114) 1123 PED/BIKE 15-9-2 NORTH MANKATO US 14 TRAIL FROM LORAY DRIVE TO WEST LIND STREET, 1. EN PEDESTRIAN TAP 584,31 4, 184,31 CONSTRUCT PED/BIKE TRAIL BIKE TRAIL 1124 MSAS 126 165-126-5AC ST PETER **AC** DAVIS ST TO TH 22 REALIGNMENT OF N. MC GRADE AND STP 576, 576, WASHINGTON AVE IN ST PETER (NICOLLET CO) (FED $ SURFACE CAPPED) (AC PAYBACK 1 OF 1) 1125 MN 4 82-42 MNDOT ALONG TH 4 IN SLEEPY EYE, SLEEPY EYE LAKE TRAIL. AM PEDESTRIAN SF 236,391 236,391 PHASE II, CONSTRUCT PED/BIKE TRAIL (FED$ CAPPED) BIKE TRAIL (TIED TO 8-9-2) September 213 Project Listing Page III - 91 of 175

ATP: 7 Fiscal Year: 215 STIP for FY 214-217 1126 MN 4 461-3 MNDOT 6 MI NORTH OF IOWA STATE LINE, OVER STREAM AND. BR BRIDGE STP 1,245, 996, 249, EAST FORK DES MOINES RIVER, REPLACE BR 887 (WITH REPLACEMENT NEW BR 887A) AND REPLACE BR 6649 1127 MN 4 831-114 MNDOT WATLINE TRAIL - TH 4 OVER TH 6, MODIFY BR#8323 4. AM PEDESTRIAN SF 231,965 231,965 FOR TRAIL PURPOSES (FED $ CAPPED) (TIED TO 83-9- BIKE TRAIL 4) 1128 US 14 72-116 MNDOT **LGA** CSAH 12 & TH 14 BRIDGE #7587 & RAMPS (LGA. BR NEW BRIDGE NHPP 2,1, 2,1, PAYBACK TO COUNTY 2 OF 3) TIED 7-612-11 1129 MN 15 85-112 MNDOT FROM BROWN COUNTY LINE TO 11' SOUTH OF 17TH 7. RS MILL AND NHPP 3,3, 2,64, 66, ST, MILL & 113 MN 22 412-36 MNDOT NEAR ST PETER AT BR#42, RAISE ROAD ELEVATION. RD GRADE AND NHPP 2,5, 2,, 5, AND EXTEND BRIDGE BRIDGE 1131 MN 22 727-2AC MNDOT **AC** IN THE CITY OF GAYLORD, RECONSTRUCTION ON TH 5, TH19 & TH22 FROM THE SOUTH CITY LIMITS TO THE NORTH CITY LIMITS OF GAYLORD (AC PAYBACK 1 OF 1) 2. RD GRADE AND SURFACE STP 3,76, 3,76, 1132 MN 6 173-7 MNDOT **AC**AB** MOUNTAIN LAKE TO BUTTERFIELD, 5. MC GRADE AND NHPP 2,9, 11,6, 2,9, EXPANSION FROM 2 LANE TO 4 LANE, ALTERNATE BID, SURFACE (AC PROJECT, PAYBACK IN 216 & 217) 1133 MN 6 838-44AC2 MNDOT **AC**AB** FROM CSAH 5 IN BUTTERFIELD TO 7TH AVE 5. MC GRADE AND NHPP 4,161,472 4,161,472 IN ST JAMES, CONSTRUCT 4 LANE ROADWAY AND NEW BRIDGE BRIDGE #834, ALTERNATE BID (AC PAYBACK 2 OF 2) 1134 MN 6 8827-175 MNDOT **ELLA**ITS** VARIOUS LOCATIONS ON TH 6, INSTALL. ST SIGNING STP 6, 48, 12, DYNAMIC MESSAGE SIGNS 1135 US 71 325-29 MNDOT **CIMS** IN JACKSON, COMPLETE STREETS,. BR BRIDGE NHPP 4,46, 2,56, 1,9, ROUNABOUT AND REPLACE OLD BR 6741 WITH NEW BR REPLACEMENT CIMS 3211 (CIMS $1,26,) 1136 I 9 328-12 MNDOT FROM LAKEFIELD TO SHERBURN, WB LANES ONLY, MILL 23. RS MILL AND NHPP 6,697, 6,27,3 669,7 & 1137 US 169 529-66AC MNDOT **AC** ST PETER TO LE SUEUR, 1.8 MILES OF GRADE 1. RD MILL AND NHPP 7,76, 7,76, RAISE FOR FLOOD MITIGATION AND MILL AND SB LANES ONLY (AC PAYBACK 1 OF 1) 1138 MN 253 221-112 MNDOT 2.2 MI NORTH OF BRICELYN, OVER EAST FORK BLUE. BR BRIDGE STP 2,5, 2,, 5, EARTH RIVER, REPLACE BR 6876 (NEW BR) REPLACEMENT 1139 MN 86D 5212-27 MNDOT **ADA** VETERANS MEMORIAL BRIDGE, CONSTRUCT. SC PED./BIKE NHPP 1,1, 66, 165, 275, PED RAMPS AND BIKE TRAIL September 213 Project Listing Page III - 92 of 175

ATP: 7 Fiscal Year: 215 STIP for FY 214-217 114 MN 999 887-BI-15 MNDOT DISTRICTWIDE SETASIDES - BRIDGE REPAIR -215. BI BRIDGE REPAIR SF 6, 6, 1141 LOCAL 999 887-BROS-15 LOCAL SETASIDE FOR BRIDGE OFF SYSTEM - 215. BR BRIDGE BROS 54,583 43,666 1,917 REPLACEMENT 1142 MN 999 887-CA-15 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 3,5, 3,5, AGREEMENTS - 215 1143 MN 999 887-MA-15 MNDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS. MA COOP. CONST. SF 326, 326, AGREEMENTS - 215 AGREEMENT 1144 MN 999 887-RW-15 MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY - 215. RW RIGHT OF WAY SF 3,, 3,, 1145 MN 999 887-RX-15 MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR/ROUTE AND. RX ROAD REPAIR SF 1,9, 1,9, SEAL (BARC) - 215 1146 MN 999 887-SA-15 MNDOT DISTRICTWIDE SETASIDES - CONSTRUCTION SA, CO. SA SUPP. AGREE. & SF 2,, 2,, AND INCENTIVES -215 COST OVERRUNS 1147 LOCAL 999 887-SHL-15 LOCAL SETASIDE FOR LOCAL HSIP PROJECTS - 215. SH SAFETY TARGET HSIP 84,445 724, 8,445 1148 MN 999 887-ST-15 MNDOT DISTRICTWIDE SETASIDES - STRIPING AND SIGNING. ST STRIPING SF 1,2, 1,2, (BARC) - 215 $66,297,127 $41,99,372 $11,6, $564,755 $2,658,56 $3,974,944 September 213 Project Listing Page III - 93 of 175

ATP: 7 Fiscal Year: 216 STIP for FY 214-217 1149 BB TRF-28-16 MNDOT SECT 537: CITY OF MANKATO RR TRANSIT OPERATING. B9 OPERATE BUS FTA 1,857,636 435,755 1,421,881 ASSISTANCE 115 BB TRS-25-16 MNDOT CITY OF LE SUEUR PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1151 BB TRS-46-16 MNDOT MARTIN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1152 BB TRS-83-16 MNDOT WATONWAN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1153 BB TRS-28-16 MNDOT BROWN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1154 BB TRS-2494-16 MNDOT SMOC/NOBLES COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1155 BB TRS-2496-16 MNDOT CITY OF ST PETER PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1156 BB TRS-3274-16 MNDOT FARIBAULT COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1157 BB TRS-3331-16 MNDOT ROCK COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 8, 64, 16, 1158 RR 7-124 BLUE EARTH **AC** UNION PACIFIC, INSTALL GATES AND FLASHING. SR RR X-ING RRS 198,596 198,596 COUNTY LIGHTS, 515 AVE (CR 112) IN LAKE CRYSTAL, (.1 MILE S NORTH), BLUE EARTH COUNTY (AC PAYBACK 1 OF 1) 1159 CSAH 6 22-66-17 FARIBAULT ON CSAH 6 OVER THE BLUE EARTH RIVER, REPLACE. BR BRIDGE STP 1,68, 1,326, 354, COUNTY BRIDGE #4453 REPLACEMENT 116 CSAH 13 53-613-15 NOBLES COUNTY FROM IOWA STATE LINE TO CSAH 35, PAVE SHOULDERS 9. RS BITUMINOUS STP 1,998, 1,326, 672, AND BITUMINOUS 1161 CSAH 11 67-611-7 ROCK COUNTY.6 MILES NORTH OF CSAH 5, REPLACE BR#L213. BR BRIDGE BROS 336, 268,8 67,2 REPLACEMENT 1162 MSAS 117 137-117-1 MANKATO ON MAY STREET FROM RIVERFRONT DRIVE TO NORTH. RD GRADE AND STP 849, 576, 273, 6TH STREET, RECONSTRUCT ROADWAY SURFACE 1163 PED/BIKE 32-9-5 JACKSON COUNTY FORT BELMONT - BIKE TRAIL IN THE CITY OF JACKSON, 2. EN PEDESTRIAN TAP 322,186 257,749 64,437 CONSTRUCT PED/BIKE TRAIL (FED$CAPPED) BIKE TRAIL 1164 PED/BIKE 4-9-2 LE SUEUR COUNTY OXCART TRAIL, PHASE 1, FROM LE SUEUR MAYO PARK,. EN PEDESTRIAN TAP 5, 4, 1, NORTH, UNDER US169 TO DOPPY LANE, CONSTRUCT BIKE BRIDGE PED/BIKE TRAIL 1165 PED/BIKE 83-9-5 WATONWAN WATLINE TRAIL - ALONG TH 4 FROM TH 6 TO LONG 4. EN PEDESTRIAN TAP 5, 4, 1, COUNTY LAKE, CONSTRUCT PED/BIKE TRAIL (FED $ CAPPED) BIKE TRAIL September 213 Project Listing Page III - 94 of 175

ATP: 7 Fiscal Year: 216 STIP for FY 214-217 1166 MN 4 832-38 MNDOT FROM.2 MI S OF 1TH AVE S TO 11TH AVE N IN ST 1. MC GRADE AND STP 4,7, 3,76, 94, JAMES, RECONSTRUCT ROADWAY SURFACE 1167 US 14 72-116 MNDOT **LGA** CSAH 12 & TH 14 BRIDGE #7587 & RAMPS (LGA. BR NEW BRIDGE NHPP 2,225,962 2,225,962 PAYBACK TO COUNTY 3 OF 3) TIED 7-612-11 1168 MN 19 44-112 MNDOT OVER UNION PACIFIC RAILROAD, O.787 MI EAST OF. BR BRIDGE REPAIR STP 5,971, 4,776,8 1,194,2 SIBLEY/LESUEUR COUNTY LINE, REPLACE BR 5369 1169 US 59 539-1 MNDOT SOUTH OF THE JCT OF TH 6, REPLACE BR#853 &. BR BRIDGE STP 1,2, 96, 24, REPLACE CULVERT #395261 & 395394 REPLACEMENT 117 MN 6 173-7AC1 MNDOT **AC** MOUNTAIN LAKE TO BUTTERFIELD, EXPANSION 5. MC GRADE AND NHPP 7,6, 7,6, (AC PAYBACK 1 OF 2) SURFACE 1171 I 9 328-118 MNDOT **TED12** JCT OF I9 AND CO RD 34 IN CITY OF JACKSON, CONSTRUCT RAMPS, (TED FUNDING) COUNTY LET PROJECT & DESIGNED, $1.8 M TED12 FUNDS, $2.1 M LOCAL FUNDS FUNDED PROVIDED BY JACKSON COUNTY 7. AM GRADE AND SURFACE LF 3,9, 3,9, 1172 US 169 5211-59 MNDOT **FMP** FROM TH 14 TO ST PETER, GRADE, SURFACE 9. RD GRADE AND BF 14,, 14,, AND MEDIAN WORK, $8M ECONOMIC DEVELOPMENT SURFACE ADMINISTRATION FUNDS 1173 US 169 5211-61 MNDOT FROM TH 14 TO ST PETER, MILL AND 9. RD MILL AND NHPP 1,, 8,, 2,, 1174 MN 999 887-BI-16 MNDOT DISTRICTWIDE SETASIDES - BRIDGE REPAIR -216. BI BRIDGE REPAIR SF 6, 6, 1175 LOCAL 999 887-BROS-16 LOCAL SETASIDE FOR BRIDGE OFF SYSTEM - 216. BR BRIDGE BROS 11,5 81,2 2,3 REPLACEMENT 1176 MN 999 887-CA-16 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 5,, 5,, AGREEMENTS - 216 1177 MN 999 887-MA-16 MNDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS. MA COOP. CONST. SF 5, 5, AGREEMENTS - 216 AGREEMENT 1178 MN 999 887-PM-16 MNDOT SETASIDE FOR PREVENTATIVE MAINTENANCE - 216. PM SURFACING STP 2,5, 2,, 5, 1179 MN 999 887-RW-16 MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY - 216. RW RIGHT OF WAY SF 3,5, 3,5, 118 MN 999 887-RX-16 MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR/ROUTE AND. RX ROAD REPAIR SF 1,9, 1,9, SEAL (BARC) - 216 1181 MN 999 887-SA-16 MNDOT DISTRICTWIDE SETASIDES - CONSTRUCTION SA, CO. SA SUPP. AGREE. & SF 2,5, 2,5, AND INCENTIVES -216 COST OVERRUNS September 213 Project Listing Page III - 95 of 175

ATP: 7 Fiscal Year: 216 STIP for FY 214-217 1182 LOCAL 999 887-SHL-16 LOCAL SETASIDE FOR LOCAL HSIP PROJECTS - 216. SH SAFETY TARGET HSIP 84,445 724, 8,445 1183 MN 999 887-SHS-16 MNDOT DISTRICTWIDE SETASIDES - MNDOT HSIP PROJECTS -. SH SAFETY TARGET HSIP 49, 441, 49, 216 1184 MN 999 887-ST-16 MNDOT DISTRICTWIDE SETASIDES - STRIPING AND SIGNING. ST STRIPING SF 1,2, 1,2, (BARC) - 216 $77,532,325 $35,8,57 $ $435,755 $2,123,2 $21,172,863 September 213 Project Listing Page III - 96 of 175

ATP: 7 Fiscal Year: 217 STIP for FY 214-217 1185 BB TRF-28-17 MNDOT SECT 537: CITY OF MANKATO RR TRANSIT OPERATING. B9 OPERATE BUS FTA 1,913,365 435,755 1,477,61 ASSISTANCE 1186 BB TRS-46-17 MNDOT MARTIN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 1187 BB TRS-28-17 MNDOT BROWN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 1188 BB TRS-2387-17 MNDOT WESTERN COMMUNITY ACTION PURCHASE 1 BUS. TR PURCHASE BUS STP 76, 6,8 15,2 (CLASS 4) 1189 BB TRS-3274-17 MNDOT FARIBAULT COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 119 BB TRS-331-17 MNDOT TRAILBLAZER PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 82, 65,6 16,4 1191 CSAH 12 7-612-21 BLUE EARTH FROM CSAH 17 TO TH 83, CONSTRUCT NEW ROAD 2. MC GRADE AND STP 7,, 1,15, 5,85, COUNTY SURFACE 1192 CSAH 3 81-63-34 WASECA COUNTY ON CSAH 3 FROM OLD TH 14 TO TH 6 AND ON CSAH 7 11. RD CONCRETE STP 1,575,5 1,15, 425,5 FROM TH 13 TO STEELE CO LINE, CONCRETE PAVEMENT PRESERVATION (ASSOC 81-67-5) REHAB 1193 MSAS 112 123-112-1 FAIRMONT ON MARGARET STREET FROM NORTH AVE TO TH 15, 1. RD BITUMINOUS STP 1,189,657 951,725 237,932 PAVEMENT REHAB PAVEMENT 1194 CSAH 25 177-2-11 WORTHINGTON ON DIAGONAL STREET FROM OXFORD ROAD TO 1TH 1. RS MILL AND STP 563, 439,475 123,525 AVE, MILL AND 1195 MN 4 82-41 MNDOT FROM JCT TH 68 TO THE BROWN/NICOLLET COUNTY 8. RS MILL AND STP 3,94, 3,123,2 78,8 LINE, MILL & 1196 MN 13 811-48 MNDOT FROM JCT TH 3 AT NEW RICHLAND TO 1.5 MI SOUTH OF 11. RS MILL AND STP 4,8, 3,264, 816, WASECA, MILL & 1197 MN 13 811-55 MNDOT 6.1 MI S OF WASECA TO 3.8 MI N OF NEW RICHLAND,. BI BRIDGE REPAIR STP 8, 64, 16, REHAB BR#811 & 812 AND GUARDRAIL REPLACEMENT 1198 US 14 84-113 MNDOT FROM EAST LIMITS OF SLEEPY EYE TO THE WEST 1. RD MILL AND NHPP 4,3, 3,44, 86, LIMITS OF NEW ULM, MILL & AND CPR WITH DIAMOND GRINDING 1199 MN 15 463-45 MNDOT FROM JOHNSON STREET TO.5 MI S OF GOEMANN RD 3. RS BRIDGE REPAIR NHPP 6,1, 4,88,6 1,219,4 IN FAIRMONT, MILL & AND REHAB BR 462 12 MN 15 85-113 MNDOT FROM.2 MI S OF TWP RD 46 TO 12TH ST SOUTH, MILL & 8. RS MILL AND NHPP 7,18, 5,744, 1,436, September 213 Project Listing Page III - 97 of 175

ATP: 7 Fiscal Year: 217 STIP for FY 214-217 121 MN 22 74-1 MNDOT FROM.3 MI N OF TH 3 TO.3 MI N OF JCT CR 9, 13. RS UNBONDED STP 9,437, 7,549,6 1,887,4 UNBONDED CONCRETE 122 MN 22 74-11 MNDOT FROM.5 MI S OF CSAH 1 TO.8 MI N OF CSAH 15, 6. BR BRIDGE STP 2,2, 1,76, 44, REPLACE BR#5959 & 6497 REPLACEMENT 123 US 59 534-38 MNDOT FROM N JCT TH 6 TO I9 IN WORTHINGTON, MILL & 1. RS MILL AND NHPP 2,2, 1,76, 44, 124 MN 6 173-7AC2 MNDOT **AC** MOUNTAIN LAKE TO BUTTERFIELD, EXPANSION 5. MC GRADE AND NHPP 4,, 4,, (AC PAYBACK 2 OF 2) SURFACE 125 MN 6 173-69 MNDOT **AC** FROM WINDOM TO WEST OF MOUNTAIN LAKE, 8. MC GRADE AND NHPP 6,, 24,, 6,, RECONSTRUCT FROM TWO LANE TO FOUR LANE SURFACE DIVIDED HIGHWAY (AC PAYBACKS IN 218, 219 & 22) 126 I 9 328-122 MNDOT FROM.1 MI W OF CR 5 TO.74 MI E OF TH 86, MILL & 11. RS MILL AND NHPP 6,177, 5,559,3 617,7, WB LANES ONLY 127 I 9 328-121 MNDOT FROM.8 MI E OF TH 86 TO JACKSON/MARTIN COUNTY 22. RS MILL AND NHPP 12,585, 11,326,5 1,258,5 LINE, EB LANES, MILL & 128 I 9 678-15 MNDOT 2.9 MI E OF JCT TH 23, REPLACE BR#9689 & BR#969. BR BRIDGE NHPP 2,1, 1,89, 21, REPLACEMENT 129 I 9 468-124 MNDOT AT THE JCT OF TH 15, REHAB BR#46822, 46833 & 46834. BI BRIDGE REPAIR NHPP 1,8, 1,62, 18, 121 MN 19 226-13 MNDOT FROM TH 22 TO I9 IN ALDEN, MILL AND 1. RS MILL AND STP 5,293, 4,234,4 1,58,6 1211 MN 999 887-BI-17 MNDOT DISTRICTWIDE SETASIDES - BRIDGE REPAIR -217. BI BRIDGE REPAIR SF 4, 4, 1212 MN 999 887-CA-17 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 6,, 6,, AGREEMENTS - 217 1213 PED/BIKE 887-EN-17 LOCAL DISTRICTWIDE SETASIDE- LOCAL ENHANCEMENT. EN PEDESTRIAN TAP 875, 7, 175, PROJECTS - 217 BIKE TRAIL 1214 MN 999 887-NHS-17 MNDOT NHS BRIDGE SETASIDE. BR BRIDGE NHPP 2,442, 1,953,6 488,4 REPLACEMENT 1215 MN 999 887-RW-17 MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY - 217. RW RIGHT OF WAY SF 1,, 1,, 1216 MN 999 887-RX-17 MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR/ROUTE AND. RX ROAD REPAIR SF 1,6, 1,6, SEAL (BARC) - 217 September 213 Project Listing Page III - 98 of 175

ATP: 7 Fiscal Year: 217 STIP for FY 214-217 1217 MN 999 887-SA-17 MNDOT DISTRICTWIDE SETASIDES - CONSTRUCTION SA, CO. SA SUPP. AGREE. & SF 4,5, 4,5, AND INCENTIVES -217 COST OVERRUNS 1218 LOCAL 999 887-SHL-17 LOCAL SETASIDE FOR LOCAL HSIP PROJECTS - 217. SH SAFETY TARGET HSIP 1,556, 1,4, 156, 1219 MN 999 887-SHS-17 MNDOT DISTRICTWIDE SETASIDES - MNDOT HSIP PROJECTS -. SH SAFETY TARGET HSIP 1,111, 1,, 111, 217 122 MN 999 887-ST-17 MNDOT DISTRICTWIDE SETASIDES - STRIPING AND SIGNING. ST STRIPING SF 1,2, 1,2, (BARC) - 217 $111,467,522 $69,845,2 $24,, $435,755 $32,663,8 $8,522,767 September 213 Project Listing Page III - 99 of 175

Clearwater Kittson Roseau Lake of the Woods Areawide Transportation Partnership (ATP) Boundaries Marshall 2 Koochiching Polk Pennington Red Lake Beltrami 1 Lake Cook Itasca St. Louis Norman Mahnomen Hubbard Clay Cass Becker Wilkin 4 Wadena 3 Crow Wing Aitkin Carlton Traverse Big Stone Lac qui Parle Yellow Medicine Lincoln Grant Stevens Lyon Murray Otter Tail Swift Chippewa Douglas Pope 8 Redwood Pipestone Cottonwood Renville Todd Kandiyohi Brown Stearns Meeker Watonwan Morrison McLeod Sibley Nicollet Benton Wright Mille Lacs Carver Hennepin Scott Kanabec Isanti Anoka Chisago Ramsey Washington Dakota Pine Rice 7 6 Blue Earth Sherburne Rock Nobles Jackson Martin Faribault Le Sueur Waseca Metro Steele Goodhue Dodge Wabasha Olmsted Freeborn Mower Fillmore Winona Houston DISTRICT 8 Jon Huseby Transportation District Engineer (32) 231-5497 255 Transportation Road Willmar, Minnesota 5621 General Information: (32) 231-5195 8-657-3792 FAX: (32) 214-635

ATP: 8 Fiscal Year: 214 STIP for FY 214-217 1221 BB TRS-26-14 MNDOT LINCOLN CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 74, 59,2 14,8 RELATED EQUIPMENT 1222 BB TRS-1738-14 MNDOT PRAIRIE FIVE, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 74, 59,2 14,8 RELATED EQUIPMENT 1223 BB TRS-2387-14 MNDOT WESTERN COMMUNITY ACTION, PURCHASE 2 BUSES. TR PURCHASE BUS STP 148, 118,4 29,6 (CLASS 4) AND BUS RELATED EQUIPMENT 1224 BB TRS-331-14A MNDOT TRAILBLAZER, PURCHASE 4 BUSES (CLASS 4) AND. TR PURCHASE BUS STP 296, 236,8 59,2 BUS RELATED EQUIPMENT 1225 BB TRS-3312-14 MNDOT ECUMEN/AUGUSTANA LUTHERAN HOMES, INC,. TR PURCHASE BUS STP 74, 59,2 14,8 PURCHASE 1 BUS (CLASS 4) AND BUS RELATED EQUIPMENT 1226 BB TRS-3316-14 MNDOT PIPESTONE CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 74, 59,2 14,8 RELATED EQUIPMENT 1227 BB TRS-3339-14 MNDOT RENVILLE CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 74, 59,2 14,8 RELATED EQUIPMENT 1228 BB TRS-734-14 MNDOT KANDIYOHI CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 74, 59,2 14,8 RELATED EQUIPMENT 1229 RR 41-16 MNDOT LINCOLN CSAH 9 & 11TH STREET (VERDI), INSTALL. SR RR X-ING RRS 285, 285, GATES S 123 RR 64-19 MNDOT REDWOOD CR 8 (DUNCAN AVE) IN WALNUT GROVE,. SR RR X-ING RRS 3, 3, INSTALL FLASHING LIGHTS & GATES S 1231 RR 65-111 MNDOT RENVILLE CSAH 37 3 MI E OF GRANITE FALLS, INSTALL. SR RR X-ING RRS 285, 285, GATES (UPGRADE EXISTING FLASHERS) S 1232 LOCAL 999 34-7-6 KANDIYOHI VARIOUS LOCATIONS IN KANDIYOHI COUNTY,. SH SIGNING HSIP 29,25 26,123 2,92 COUNTY CHEVERON PLACEMENT 1233 CSAH 2 37-7-4 LAC QUI PARLE LAC QUI PARLE CSAH 48 TO E COUNTY LINE, NARROW 5. SH PAVE SHOULDER HSIP 218,52 196,668 21,852 SHOULDER PAVING 1234 CSAH 2 37-62-19 LAC QUI PARLE LAC QUI PARLE CR 31 TO E COUNTY LINE, SURFACING & 5. RS SURFACING STP 1,774, 1,419,2 354,8 AGG SHLD 1235 CSAH 1 42-7-5AC LYON COUNTY **AC** WEST COUNTY LINE TO MINNEOTA, NARROW 5. SH PAVE SHOULDER HSIP 229,169 229,169 SHLD. PAVING (AC PAYBACK1 OF 1) 1236 CSAH 24 42-7-6 LYON COUNTY LYON CSAH 1 TO LYON CSAH 5, NARROW SHLD. PAVING 3. SH PAVE SHOULDER HSIP 144,45 129,64 14,45 September 213 Project Listing Page III - 1 of 175

ATP: 8 Fiscal Year: 214 STIP for FY 214-217 1237 CSAH 24 42-7-7 LYON COUNTY LYON CSAH 5 TO US 59, NARROW SHLD. PAVING 4. SH PAVE SHOULDER HSIP 259,45 233,55 25,945 1238 LOCAL 999 43-7-8 MCLEOD COUNTY VARIOUS LOCATIONS IN MCLEOD COUNTY, GROUND-IN. SH STRIPING HSIP 35, 315, 35, WET REFLECTIVE EDGELINE 1239 LOCAL 999 47-7-7 MEEKER COUNTY VARIOUS LOCATIONS IN MEEKER COUNTY, GROUND-IN. SH STRIPING HSIP 268,92 242,28 26,892 REFLECTIVE MARKINGS 124 PED/BIKE 47-9-3 MEEKER COUNTY LAKE KORONIS OUTLET, CONSTRUCT PED/BIKE BRIDGE. EN PEDESTRIAN TAP 24, 119,516 12,484 BIKE TRAIL 1241 PED/BIKE 59-591-4 PIPESTONE **SRTS** INFRA PIPESTONE, CE AND CONSTRUCTION OF. BT PED./BIKE SRTS 215,719 215,719 A PATH ALONG 9TH ST SW AND 9TH AVE SW 1242 LOCAL 999 64-7-4 REDWOOD VARIOUS LOCATIONS IN REDWOOD COUNTY, 6". SH STRIPING HSIP 77,4 69,66 7,74 COUNTY GROUND-IN WET REFLECTIVE PAVEMENT MARKINGS 1243 CSAH 2 64-62-21 REDWOOD **AC** REDWOOD CSAH 24 TO 35TH ST, AGG BASE & 4. RC SURFACING STP 2,128, 1,379,5 272, 748,5 COUNTY SURFACING (AC PROJECT, PAYBACK IN 215) 1244 LOCAL 999 65-7-5 RENVILLE COUNTY VARIOUS LOCTIONS IN RENVILLE COUNTY, 6" WET. SH STRIPING HSIP 14,4 93,636 1,44 REFLECTIVE EPOXY EDGELINES 1245 LOCAL 999 65-7-6 RENVILLE COUNTY VARIOUS LOCATION IN RENVILLE COUNTY, 6" EDGELINES. SH STRIPING HSIP 74,997 67,497 7,5 1246 CSAH 3 87-7-5 YELLOW MEDICINE MN 68 TO YELLOW MEDICINE CSAH 11, MILLED IN 6" 11. SH STRIPING HSIP 88,74 79,866 8,874 COUNTY STRIPING 1247 CSAH 6 87-66-13AC YELLOW MEDICINE **AC** MILL, BIT SURFACING, & AGG. SHLD; MN 274 TO S 7. RS SURFACING STP 58,5 58,5 COUNTY COUNTY LINE (AC PAYBACK, 1 OF 1) 1248 MN 7 121-32 MNDOT **BP8** NW OF JCT MN 29 (MONTEVIDEO), REPLACE 1. BR BRIDGE BF 3,9, 3,9, BRIDGE 9114 (NEW BRIDGE #1215) (BOND FUNDS) REPLACEMENT 1249 MN 7 473-26 MNDOT JCT MN 4 (COSMOS) TO W JCT MN 22, MILL & 1. RS MILL AND STP 4,4, 3,52, 88, (TIED TO S.P.'S 438-3 & 438-32) 125 US 12 343-68 MNDOT W OF US 71 TO E OF US 71 (WILLMAR), REMOVE AND REPLACE CONCRETE PAVEMENT AND **ADA** 6TH STREET TO LAKELAND AVENUE AND JCT'S OF US 12 & 7TH STREET (WILLMAR), RIGHT TURN LANE & ADA 2. RD CONCRETE PAVEMENT REHAB NHPP 3,1, 2,48, 62, 1251 US 14 421-41 MNDOT W OF MN 23 (FLORENCE) TO TRACY, PLUS 1.5 23. RS SURFACING NHPP 5,2, 4,16, 1,4, MILES FULL DEPTH BIT. REPLACEMENT (TIED TO S.P. 421-9) 1252 US 14 421-9 MNDOT **FMP** 1.5 MILES W OF MN 23 TO 1. MILES W OF MN 23,. RC GRADE AND BF 94, 94, GRADE RAISE (TIED TO S.P. 421-41) SURFACE September 213 Project Listing Page III - 11 of 175

ATP: 8 Fiscal Year: 214 STIP for FY 214-217 1253 MN 22 437-41 MNDOT W EDGE OF GLENCOE TO S OF CSAH 115 (HUTCH BY- 1. RS SURFACING STP 1,4, 1,12, 28, PASS), 1254 MN 22 438-3 MNDOT JCT OF MN 7 & MN 22, MODIFY "Y" INTERSECTION (THIS. SC GRADE AND STP 2,3, 1,84, 46, PROJECT HAS WORK ON BOTH MN 22 AND MN 7) (TIED SURFACE TO S.P.'S 473-26 & 438-32) 1255 MN 22 438-32 MNDOT W JCT MN 7 TO SHADY RIDGE ROAD (HUTCHINSON), 7. RS BITUMINOUS STP 2,8, 2,24, 56, (TIED TO S.P.'S 473-26 & 438-3) 1256 MN 24 4711-19 MNDOT **DI** LITCHFIED TO MN 15, THIN CONCRETE 16. RS BITUMINOUS SF 5,7, 5,7, ($4 MILLION IS DI FUNDS) 1257 MN 3 512-24 MNDOT **TED14** SCHMITZ GRAIN ELEVATOR IN WEST SIDE OF. AM TURN LANES SF 15, 15, SLAYTON, RIGHT TURN LANE, $15, IS TED14 FUNDS 1258 MN 55 4712-18 MNDOT **AB** E OF E JCT MN 4 TO MN 22, 5. RS MILL AND SF 2,5, 2,5, 1259 US 59 377-8 MNDOT N LIMITS OF CLARKFIELD TO W JCT US 212, 1. RS SURFACING STP 1,3, 1,4, 26, (TIED TO S.P. 873-24) 126 US 59 429-25 MNDOT N OF MARSHALL (BY TITAN MACHINE), TURN LANE. SC TURN LANES SF 6, 6, 1261 US 59 873-24 MNDOT YELLOW MEDICINE CSAH 3 TO N LIMITS OF CLARKFIELD, 6. RS SURFACING STP 2,, 1,6, 4, MILL & (TIED TO S.P. 377-8) 1262 MN 67 877-52 MNDOT **AC** S OF YELLOW MEDICINE CO RD B1 TO ECHO, THIN 11. RS SURFACING STP 772, 512, 528, 26, (AC PROJECT, PAYBACK IN 215) 1263 US 212 376-41 MNDOT **AB** DAWSON TO W OF US 59, WHITETOPPING 9. RS MILL AND NHPP 7,, 5,6, 1,4, 1264 MN 999 8828-83 MNDOT DISTRICTWIDE CULVERT REPAIRS. DR CULVERT REPAIR STP 1,5, 1,2, 3, 1265 MN 999 8828-132 MNDOT HIRE CONTRACTOR TO INSTALL SIGNS FOR DISTRICT. RX SIGNING SF 5, 5, 8'S ANNUAL SIGN CHANGEOVER 1266 MN 999 8828-133 MNDOT DISTRICTWIDE, GROUND IN STRIPING. SH STRIPING HSIP 11, 99, 11, 1267 MN 999 8816-1765 MNDOT **IDIQ** STATEWIDE RURAL INTERSECTION CONFLICT WARNING SYSTEM (RICWS) DESIGN BUILD PROJECT (CONTRACT MIN $1,977,785, CONTRACT MAX $6,,, EXPIRATION DATE 12-15-215) (DISTRICTWIDE SETA FOR RICWS PROJECT LET IN SFY 213). SH WARNING FLASHERS HSIP 38, 342, 38, 1268 MN 999 8828-141 MNDOT **ADA** DISTRICTWIDE PEDESTRIAN RAMPS. SC PED./BIKE STP 23, 184, 46, September 213 Project Listing Page III - 12 of 175

ATP: 8 Fiscal Year: 214 STIP for FY 214-217 1269 MN 999 8828-148 MNDOT PURCHASE SIGNS DISTRICTWIDE. RX SIGNING SF 25, 25, 127 MN 999 8828-149 MNDOT DISTRICTWIDE STRIPING. RX STRIPING SF 75, 75, 1271 MN 999 8828-158 MNDOT DISTRICTWIDE, GROUND IN STRIPING (SECTION 164. SH STRIPING HSIP 175, 175, FUNDS) 1272 MN 999 888-AM-14 MNDOT DISTRICTWIDE SETASIDES - MUNICIPAL AGREEMENTS -. AM COOP. CONST. SF 4, 4, 214 AGREEMENT 1273 MN 999 888-CA-14 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,3, 1,3, AGREEMENTS - 214 1274 MN 999 888-DA-14 MNDOT DISTRICTWIDE SETASIDES - DETOUR AGREEMENTS -. DA DETOUR SF 2, 2, 214 AGREEMENT 1275 MN 999 888-MA-14 MNDOT DISTRICTWIDE SETASIDES - MISC AGREEMENTS - 214. MA MISCELLANEOUS SF 5, 5, 1276 MN 999 888-PM-14 MNDOT DISTRICTWIDE SETASIDES - PREVENTIVE. PM PREVENTIVE SF 1,8, 1,8, MAINTENANCE - 214 MAINTENANCE 1277 MN 999 888-RB-14 MNDOT DISTRICTWIDE SETASIDES - LANDSCAPE PARTNERSHIP. RB LANDSCAPE SF 4, 4, PROGRAM - 214 PARTNERSHIP 1278 MN 999 888-RW-14 MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY - 214. RW RIGHT OF WAY SF 522,495 522,495 1279 MN 999 888-RX-14 MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR - 214. RX MISCELLANEOUS SF 1,25, 1,25, 128 MN 999 888-SA-14 MNDOT DISTRICTWIDE SETASIDES - CONSTRUCTION OVERRUNS. SA SUPP. AGREE. & SF 1,15, 1,15, & SUPP AGREE - 214 COST OVERRUNS $62,463,2 $32,945,627 $8, $ $23,114,495 $6,42,898 September 213 Project Listing Page III - 13 of 175

ATP: 8 Fiscal Year: 215 STIP for FY 214-217 1281 BB TRS-26-15 MNDOT LINCOLN CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 76, 6,8 15,2 RELATED EQUIPMENT 1282 BB TRS-1738-15 MNDOT PRAIRIE FIVE, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 76, 6,8 15,2 RELATED EQUIPMENT 1283 BB TRS-2387-15 MNDOT WESTERN COMMUNITY ACTION, PURCHASE 2 BUSES. TR PURCHASE BUS STP 152, 121,6 3,4 (CLASS 4) AND BUS RELATED EQUIPMENT 1284 BB TRS-331-15 MNDOT TRAILBLAZER, PURCHASE 4 BUSES (CLASS 4) AND. TR PURCHASE BUS STP 34, 243,2 6,8 BUS RELATED EQUIPMENT 1285 BB TRS-3325-15 MNDOT MURRAY CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 76, 6,8 15,2 RELATED EQUIPMENT 1286 BB TRS-734-15 MNDOT KANDIYOHI CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 76, 6,8 15,2 RELATED EQUIPMENT 1287 RR 65-112 MNDOT INSTALL GATES AND FLASHING LIGHTS AT 7TH ST. SR RR X-ING RRS 285, 285, NORTH, OLIVIA, MN S 1288 CSAH 15 12-7-4 CHIPPEWA CHIPPEWA CSAH 2 TO MN 7, NARROW SHLD. PAVING 4. SH PAVE SHOULDER HSIP 226,35 23,715 22,635 COUNTY 1289 CSAH 5 34-65-24 KANDIYOHI MN 7 TO N OF KANDIYOHI CSAH 3, GRADING, AGG. BASE, 5. RC GRADE AND STP STP 2,4, 1,68, 72, COUNTY & BRIDGE #9477 BRIDGE BROS 129 CSAH 28 47-628-9 MEEKER COUNTY MN 22 TO MEEKER CSAH 1, MILL & 6. RS MILL AND STP 1,15, 812, 23, 1291 LOCAL 999 51-7-3 MURRAY COUNTY VARIOUS LOCATIONS IN MURRAY COUNTY, GROUND-IN. SH STRIPING HSIP 246,24 221,422 24,62 WET REFLECTIVE STRIPING 1292 LOCAL 999 59-7-4 PIPESTONE VARIOUS LOCATIONS IN PIPESTONE COUNTY, GROUND-. SH STRIPING HSIP 111,767 1,59 11,177 COUNTY IN WET REFLECTIVE WHITE EDGE STRIPING 1293 CSAH 18 59-618-31 PIPESTONE COUNTY ON CSAH 18 - S OF PIPESTONE CSAH 11 TO LINCOLN COUNTY LINE AND PIPESTONE CSAH 8 TO MN 23, THEN ON CSAH 16 - MN 3 TO PIPESTONE CSAH 6, BIT 8. RS BITUMINOUS STP 66, 528, 132, 1294 CSAH 2 64-62-21AC REDWOOD **AC** REDWOOD CSAH 24 TO 35TH ST, AGG BASE & 4. RC SURFACING STP 272, 272, COUNTY SURFACING (AC PAYBACK, 1 OF 1) 1295 CSAH 11 65-611-46 RENVILLE COUNTY **AC** GRADING, BASE, & SURFACING; RENVILLE CSAH 5 6. RC GRADE AND STP 4,978, 1,198, 272, 3,78, TO RENVILLE CSAH 16 (AC PROJECT, PAYBACK IN 216) SURFACE 1296 CSAH 4 87-7-6 YELLOW MEDICINE US 75 TO SOUTH DAKOTA LINE, MILLED IN 6" STRIPING 13. SH STRIPING HSIP 96,39 86,751 9,639 COUNTY September 213 Project Listing Page III - 14 of 175

ATP: 8 Fiscal Year: 215 STIP for FY 214-217 1297 CSAH 1 87-7-7 YELLOW MEDICINE LYON COUNTY LINE TO REDWOOD COUNTY LINE, 12. SH STRIPING HSIP 94,95 84,685 9,41 COUNTY MILLED IN 6" STRIPING 1298 US 12 343-66 MNDOT **AB** KERKHOVEN TO PENNOCK, 8. RS BITUMINOUS NHPP 1,9, 1,52, 38, (ALTERNATE BID) (PRICE SHOWN IS FOR BITUMINOUS OPTION) (TIED TO 765-38 - 1,548,6, DIST 4) 1299 US 12 474-47 MNDOT **AB** W MEEKER COUNTY LINE TO MN 22, 11. RS BITUMINOUS NHPP 5,, 4,, 1,, RECLAMATION OR ALT. BID 13 US 12 343-5526 MNDOT E OF CSAH 5 (WILLMAR), SCARIFY & BRIDGE. BI BRIDGE SF 34, 34, #5526 131 MN 19 425-32 MNDOT BRUCE STREET TO JCT MN 23 (MARSHALL), MILL & 1. RS MILL AND NHPP 5, 4, 1, 132 MN 23 427-55 MNDOT **CIMS** JCT OF MN 23 & SARATOGA IN MARSHALL, RCI. AM TURN LANES SF 3,5, 3,5, (REDUCED CONFLICT INTERSECTION) & IMPROVED PEDESTRIAN FACILITIES 133 MN 29 126-54 MNDOT **AC** N JCT MN 7 TO W JCT MN 4 (MONTEVIDEO), 11. RS BITUMINOUS STP 884,4 584,4 615,6 3, (AC PROJECT, PAYBACK IN 216) 134 MN 29 128-9M MNDOT **ELLA** MN 4 TO CHIPPEWA/SWIFT COUNTY LINE, MILL 3. RS MILL AND STP 76, 68, 152, & (DISTRICT 4 IS THE LEAD AND THIS IS DISTRICT 8'S SHARE). TIED S.P. 767-29. 135 MN 3 511-15 MNDOT E JCT US 75 (PIPESTONE) TO LAKE WILSON, 17. RS BITUMINOUS STP 2,2, 1,76, 44, 136 MN 3 593-21 MNDOT 8TH AVE TO E JCT US 75 (PIPESTONE), MILL & 1. RS MILL AND STP 1,, 8, 2, (BOTH DIRECTIONS) 137 MN 4 129-22 MNDOT **BP8** W OF MILAN, REHAB BRIDGE 538 (BOND FUNDS). BR BRIDGE BF 2,6, 2,6, REPLACEMENT 138 US 59 428-58 MNDOT **ADA** MN 19 TO MN 23 (MARSHALL), MILL & 1. SC PED./BIKE NHPP 937,5 75, 187,5 PLUS PEDESTRIAN RAMPS 139 US 59 429-23 MNDOT N JCT MN 68 (MARSHALL) TO N OF LYON CSAH 33, MILL & 1. RS MILL AND SF 72, 72, 131 MN 67 875-18 MNDOT JCT. US 75 TO JCT US 59 (CLARKFIELD), 19. RS BITUMINOUS STP 2,7, 2,16, 54, 1311 MN 67 876-23 MNDOT **AC** CLARKFIELD TO JCT US 212, MILL & (AC 12. RS MILL AND STP 3,72, 2,352, 528, 72, PROJECT, PAYBACK IN 216) September 213 Project Listing Page III - 15 of 175

ATP: 8 Fiscal Year: 215 STIP for FY 214-217 1312 MN 67 877-52AC MNDOT **AC** S OF YELLOW MEDICINE CO RD B1 TO ECHO (AC 11. RS SURFACING STP 528, 528, PAYBACK, 1 OF 1) 1313 MN 68 421-51 MNDOT JCT OF MN 68 AND LYON CSAH 33 (MARSHALL), LEFT. SC TURN LANES SF 45, 45, TURN LANE 1314 MN 68 421-422A MNDOT N OF US 59, SCARIFY & LOW SLUMP ON. BI BRIDGE SF 29, 29, BRIDGE #422 1315 US 71 645-64 MNDOT US 14 TO S OF 11TH STREET (REDWOOD FALLS), MILL & 2. RS BITUMINOUS NHPP 3,9, 3,12, 78, 1316 US 75 595-25 MNDOT PIPESTONE CSAH 9 (OLD MN 268) TO E JCT MN 3 8. RS BITUMINOUS STP 1,2, 96, 24, (PIPESTONE), 1317 US 212 8712-31 MNDOT E END OF BRIDGE #8715 (GRANITE FALLS) TO JCT MN 1. RS MILL AND SF 7, 7, 23, MILL & 1318 MN 999 8828-134 MNDOT DISTRICTWIDE, GROUND IN STRIPING. SH STRIPING HSIP 1, 9, 1, 1319 MN 999 8816-1765 MNDOT **IDIQ** STATEWIDE RURAL INTERSECTION CONFLICT WARNING SYSTEM (RICWS) DESIGN BUILD PROJECT (CONTRACT MIN $1,977,785, CONTRACT MAX $6,,, EXPIRATION DATE 12-15-215) (DISTRICTWIDE SETA FOR RICWS PROJECT LET IN SFY 213). SH WARNING FLASHERS HSIP 39, 351, 39, 132 MN 999 8828-15 MNDOT PURCHASE SIGNS DISTRICTWIDE. RX SIGNING SF 25, 25, 1321 MN 999 8828-151 MNDOT DISTRICTWIDE STRIPING. RX STRIPING SF 75, 75, 1322 MN 999 888-AM-15 MNDOT DISTRICTWIDE SETASIDES - MUNICIPAL AGREEMENTS -. AM COOP. CONST. SF 4, 4, 215 AGREEMENT 1323 MN 999 888-CA-15 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,3, 1,3, AGREEMENTS - 215 1324 MN 999 888-DA-15 MNDOT DISTRICTWIDE SETASIDES - DETOUR AGREEMENTS -. DA DETOUR SF 2, 2, 215 AGREEMENT 1325 MN 999 888-MA-15 MNDOT DISTRICTWIDE SETASIDES - MISC AGREEMENTS - 215. MA MISCELLANEOUS SF 5, 5, 1326 MN 999 888-PM-15 MNDOT DISTRICTWIDE SETASIDES - PREVENTIVE. PM PREVENTIVE SF 1,, 1,, MAINTENANCE - 215 MAINTENANCE 1327 MN 999 888-RB-15 MNDOT DISTRICTWIDE SETASIDES - LANDSCAPE PARTNERSHIP. RB LANDSCAPE SF 4, 4, PROGRAM - 215 PARTNERSHIP September 213 Project Listing Page III - 16 of 175

ATP: 8 Fiscal Year: 215 STIP for FY 214-217 1328 MN 999 888-RW-15 MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY - 215. RW RIGHT OF WAY SF 1,131,611 1,131,611 1329 MN 999 888-RX-15 MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR - 215. RX ROAD REPAIR SF 66, 66, 133 MN 999 888-SA-15 MNDOT DISTRICTWIDE SETASIDES - CONSTRUCTION OVERRUNS. SA SUPP. AGREE. & SF 1,5, 1,5, & SUPP AGREE - 215 COST OVERRUNS 1331 MN 999 888-SAF-15 MNDOT DISTRICTWIDE SETASIDES - UNIDENTIFIED SAFETY. SC SAFETY TARGET SF 513,711 513,711 PROJECTS - 215 1332 MN 999 888-SHS-15 MNDOT DISTRICTWIDE SETASIDES - HSIP - 215. SH SAFETY TARGET HSIP 488,889 44, 48,889 $53,1,737 $26,53,563 $1,415,6 $ $18,932,711 $7,664,463 September 213 Project Listing Page III - 17 of 175

ATP: 8 Fiscal Year: 216 STIP for FY 214-217 1333 BB TRS-2387-16 MNDOT WESTERN COMMUNITY ACTION, PURCHASE 2 BUSES. TR PURCHASE BUS STP 156, 124,8 31,2 (CLASS 4) AND BUS RELATED EQUIPMENT 1334 BB TRS-3312-16 MNDOT ECUMEN/AUGUSTANA LUTHERAN HOMES, INC,. TR PURCHASE BUS STP 78, 62,4 15,6 PURCHASE 1 BUS (CLASS 4) AND BUS RELATED EQUIPMENT 1335 BB TRS-3316-16 MNDOT PIPESTONE CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 78, 62,4 15,6 RELATED EQUIPMENT 1336 BB TRS-734-16 MNDOT KANDIYOHI CO, PURCHASE 1 BUS (CLASS 5) AND BUS. TR PURCHASE BUS STP 133, 16,4 26,6 RELATED EQUIPMENT 1337 RR 43-113 MNDOT MCLEOD CSAH 15 AT MORNINGSIDE DRIVE IN GLENCOE,. SR RR X-ING RRS 3, 3, INSTALL CANTILEVERS & GATES S 1338 CSAH 6 12-7-5 CHIPPEWA MN 7 TO MN 4, NARROW SHLD PAVING 11. SH PAVE SHOULDER HSIP 54,54 486,486 54,54 COUNTY 1339 CSAH 6 12-66-12 CHIPPEWA MN 7 TO MN 29, AND 2' PAVED SHOULDERS 11. RS BITUMINOUS STP 2,11, 1,688, 422, COUNTY 134 LOCAL 999 34-7-7 KANDIYOHI VARIOUS LOCATIONS IN KANDIYOHI COUNTY, 6" EDGE. SH STRIPING HSIP 39,498 278,548 3,95 COUNTY STRIPE & HIGH BUILD SOLID LINE WHITE PAINT (WR) GROUND-IN 1341 CSAH 4 43-64-14 MCLEOD COUNTY **AC** MCLEOD CSAH 3 TO MN 7, REHAB. (AC PROJECT, 9. RS SURFACING STP 759,1 349,1 1,29,9 41, PAYBACK IN 217) 1342 CSAH 9 47-69-12 MEEKER COUNTY US 12 TO MEEKER CSAH 18, MILL & 8. RS MILL AND STP 1,87, 1,496, 374, 1343 PED/BIKE 43-9-2 MCLEOD COUNTY BUFFALO HIGHLANDS TRAIL ALONG US 212 FROM CSAH 2. EN PEDESTRIAN TAP 597,916 4, 197,916 1 (DAIRY AVE) TO BOONE ROAD BIKE TRAIL 1344 CSAH 11 65-611-46AC RENVILLE COUNTY **AC** GRADING, BASE, & SURFACING; RENVILLE CSAH 3 3. RC GRADE AND STP 272, 272, TO RENVILLE CSAH 16 (AC PAYBACK, 1 OF 1) SURFACE 1345 MN 9 346-17 MNDOT NEW LONDON TO SUNBURG, MILL & FROM 17. RS SURFACING STP 2,7, 2,16, 54, NEW LONDON TO US 71 AND FROM US 71 TO SUNBURG 1346 US 12 344-56 MNDOT E OF US 71 (WILLMAR) TO KANDIYOHI/MEEKER COUNTY 12. RS BITUMINOUS NHPP 1,8, 1,44, 36, LINE, 1347 MN 15 433-89 MNDOT **ELLA** WINTHROP TO BROWNTON, MILL & 12. RS MILL AND NHPP 4,2, 3,36, 84, September 213 Project Listing Page III - 18 of 175

ATP: 8 Fiscal Year: 216 STIP for FY 214-217 1348 MN 19 656-37 MNDOT E OF US 71 TO MN 4 (FAIRFAX), IN RURAL AND 14. RS SURFACING STP 2,6, 2,8, 52, MILL & IN URBANS 1349 MN 29 126-54AC MNDOT **AC** N JCT MN 7 TO W JCT MN 4 (MONTEVIDEO), 11. RS BITUMINOUS STP 615,6 615,6 (AC PAYBACK, 1 OF 1) 135 MN 4 121-1 MNDOT **AC** US 59 TO KANDIYOHI CSAH 5, (AC 4. RS BITUMINOUS STP 3,812, 2,812, 1,188, 1,, PROJECT, PAYBACK IN 217) 1351 US 59 514-39 MNDOT MN 62 (FULDA) TO S JCT MN 3, MILL & 13. RS MILL AND NHPP 4,, 3,2, 8, 1352 MN 67 876-23AC MNDOT **AC** CLARKFIELD TO JCT US 212, MILL & (AC 12. RS MILL AND STP 528, 528, PAYBACK, 1 OF 1) 1353 MN 68 647-31 MNDOT E JCT MN 19 TO S OF REDWOOD CSAH 32, 3. RS BITUMINOUS STP 6, 48, 12, 1354 MN 68 878-14 MNDOT **ADA** IN CANBY, PEDESTRIAN RAMPS 1. SC PED./BIKE STP 137,5 11, 27,5 1355 US 75 372-34 MNDOT S LIMITS OF CANBY TO YELLOW MEDICINE CSAH 3, MILL 11. RS SURFACING SF 2,4, 2,4, & ; MN 67 TO S OF JCT US 212, 1356 US 75 596-39 MNDOT PIPESTONE TO PIPESTONE CREEK, 5. RS BITUMINOUS SF 7, 7, 1357 MN 269 598-1 MNDOT SOUTH DAKOTA/MINNESOTA STATE LINE TO MN 23, 3. RS BITUMINOUS STP 78, 624, 156, 1358 MN 274 8714-12 MNDOT WOOD LAKE TO MN 23, 8. RS BITUMINOUS STP 1,8, 1,44, 36, 1359 MN 999 8828-152 MNDOT HIRE CONTRACTOR TO INSTALL SIGNS FOR DISTRICT. RX SIGNING SF 5, 5, 8'S ANNUAL SIGN CHANGEOVER 136 MN 999 8828-153 MNDOT PURCHASE SIGNS DISTRICTWIDE. RX SIGNING SF 25, 25, 1361 MN 999 8828-154 MNDOT DISTRICTWIDE STRIPING. RX STRIPING SF 75, 75, 1362 MN 999 888-AM-16 MNDOT DISTRICTWIDE SETASIDES - MUNICIPAL AGREEMENTS -. AM COOP. CONST. SF 4, 4, 216 AGREEMENT 1363 MN 999 888-CA-16 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,3, 1,3, AGREEMENTS - 216 1364 MN 999 888-DA-16 MNDOT DISTRICTWIDE SETASIDES - DETOUR AGREEMENTS - 216. DA DETOUR AGREEMENT SF 2, 2, September 213 Project Listing Page III - 19 of 175

ATP: 8 Fiscal Year: 216 STIP for FY 214-217 1365 MN 999 888-MA-16 MNDOT DISTRICTWIDE SETASIDES - MISC AGREEMENTS - 216. MA MISCELLANEOUS SF 5, 5, 1366 MN 999 888-PM-16 MNDOT DISTRICTWIDE SETASIDES - PREVENTIVE. PM PREVENTIVE SF 75, 75, MAINTENANCE - 216 MAINTENANCE 1367 MN 999 888-RB-16 MNDOT DISTRICTWIDE SETASIDES - LANDSCAPE PARTNERSHIP. RB LANDSCAPE SF 4, 4, PROGRAM - 216 PARTNERSHIP 1368 MN 999 888-RW-16 MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY - 216. RW RIGHT OF WAY SF 531,522 531,522 1369 MN 999 888-RX-16 MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR - 216. RX ROAD REPAIR SF 72, 72, 137 MN 999 888-SA-16 MNDOT DISTRICTWIDE SETASIDES - CONSTRUCTION OVERRUNS. SA SUPP. AGREE. & SF 1,5, 1,5, & SUPP AGREE - 216 COST OVERRUNS 1371 MN 999 888-SAF-16 MNDOT DISTRICTWIDE SETASIDES - UNIDENTIFIED SAFETY. SC SAFETY TARGET SF 1,4, 1,4, PROJECTS - 216 1372 MN 999 888-SHS-16 MNDOT DISTRICTWIDE SETASIDES - HSIP - 216. SH SAFETY TARGET HSIP 488,889 44, 48,889 $42,757,565 $24,915,734 $2,478,9 $ $16,263,911 $1,577,92 September 213 Project Listing Page III - 11 of 175

ATP: 8 Fiscal Year: 217 STIP for FY 214-217 1373 BB TRS-1738-17 MNDOT PRAIRIE FIVE, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 82, 65,6 16,4 RELATED EQUIPMENT 1374 BB TRS-2387-17 MNDOT WESTERN COMMUNITY ACTION, PURCHASE 1 BUS. TR PURCHASE BUS STP 82, 65,6 16,4 (CLASS 4) AND BUS RELATED EQUIPMENT 1375 BB TRS-331-17 MNDOT TRAILBLAZER, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 82, 65,6 16,4 RELATED EQUIPMENT 1376 BB TRS-3312-17 MNDOT ECUMEN/AUGUSTANA LUTHERAN HOMES, INC,. TR PURCHASE BUS STP 82, 65,6 16,4 PURCHASE 1 BUS (CLASS 4) AND BUS RELATED EQUIPMENT 1377 BB TRS-3339-17 MNDOT RENVILLE CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 82, 65,6 16,4 RELATED EQUIPMENT 1378 BB TRS-734-17 MNDOT KANDIYOHI CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 82, 65,6 16,4 RELATED EQUIPMENT 1379 CSAH 4 43-64-14AC MCLEOD COUNTY **AC** MCLEOD CSAH 3 TO MN 7, REHAB. (AC PAYBACK, 1 9. RS SURFACING STP 1,29,9 1,29,9 OF 1) 138 CSAH 2 59-62-25 PIPESTONE PIPESTONE CSAH 13 TO E OF PIPESTONE CSAH 13, 1. RC GRADE AND STP 35, 28, 7, COUNTY RECONSTRUCT SURFACE 1381 CSAH 16 59-616-32 PIPESTONE **AC** PIPESTONE CSAH 9 TO HATFIELD, WIDENING, 6. RD GRADE AND STP 493,1 93,1 1,56,9 4, COUNTY INSLOPE S, CULVERTS, AND SURFACE RESURFACING (AC PROJECT, PAYBACK IN 218) 1382 MSAS 15 27-15-6 REDWOOD FALLS E 2ND STREET TO NORMANDALE ROAD, 1. RC GRADE AND STP 1,3,4 942,4 358, RECONSTRUCTION SURFACE 1383 MN 4 471-29 MNDOT N OF COSMOS, REPLACE BRIDGES 9992 & 9993. BR NEW BRIDGE SF 91, 91, 1384 US 14 411-89 MNDOT STATE LINE TO LAKE BENTON, MILL & 8. RS BITUMINOUS NHPP 2,3, 1,84, 46, 1385 MN 19 424-38 MNDOT LYON CSAH 5 TO LYON CSAH 7 (MARSHALL), 4. RS BITUMINOUS STP 61, 488, 122, 1386 MN 19 643-34 MNDOT W JCT MN 67 TO REDWOOD FALLS, MILL & 15. RS MILL AND NHPP 5,, 4,, 1,, 1387 MN 22 438-34 MNDOT **AC**AB** W JCT MN 7 TO LITCHFIELD, 4" & 12. RD BITUMINOUS STP 2,628, 1,628, 2,372, 1,, RECLAIM SHLDS (AC PROJECT, PAYBACK IN 218) 1388 MN 23 345-89 MNDOT CLARA CITY TO KANDIYOHI CSAH 5 (WILLMAR), 15. RS BITUMINOUS NHPP 2,1, 1,68, 42, September 213 Project Listing Page III - 111 of 175

ATP: 8 Fiscal Year: 217 STIP for FY 214-217 1389 MN 29 126-9 MNDOT N OF US 212, REPLACE BRIDGE 9111 OVER TC&W. BR NEW BRIDGE NHPP 1,7, 1,36, 34, RAILROAD 139 MN 3 511-14 MNDOT LAKE WILSON TO US 59 (SLAYTON), 1. RS BITUMINOUS SF 2,2, 2,2, 1391 MN 4 121-1AC MNDOT **AC** US 59 TO KANDIYOHI CSAH 5, (AC 4. RS BITUMINOUS STP 1,188, 1,188, PAYBACK, 1 OF 1) 1392 MN 68 878-13 MNDOT STATE LINE TO CANBY, 8. RS BITUMINOUS STP 1,5, 1,2, 3, 1393 US 71 3411-89 MNDOT S JCT MN 23 (WILLMAR BY-PASS) TO MN 971A (BEG 4- LANE) - ALSO INCLUDES WORK ON MN 23 FROM.25 MI W CSAH 5 TO 2.6 MI E CSAH 5 R.P 141+.232 TO 144+.17, 8. RS BITUMINOUS NHPP 1,6, 1,28, 32, 1394 MN 277 1213-12 MNDOT S OF MN 4, REPLACE BRIDGE #6816 (CHPT. 152 BOND. BR NEW BRIDGE BF 1,1, 1,1, FUNDS) 1395 MN 999 8828-155 MNDOT HIRE CONTRACTOR TO INSTALL SIGNS FOR DISTRICT. RX SIGNING SF 5, 5, 8'S ANNUAL SIGN CHANGEOVER 1396 MN 999 8828-156 MNDOT PURCHASE SIGNS DISTRICTWIDE. RX SIGNING SF 25, 25, 1397 MN 999 8828-157 MNDOT DISTRICTWIDE STRIPING. RX STRIPING SF 649,215 649,215 1398 MN 999 888-AM-17 MNDOT DISTRICTWIDE SETASIDES - MUNICIPAL AGREEMENTS -. AM COOP. CONST. SF 4, 4, 217 AGREEMENT 1399 MN 999 888-CA-17 MNDOT DISTRICTWIDE SETASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,3, 1,3, AGREEMENTS - 217 14 MN 999 888-DA-17 MNDOT DISTRICTWIDE SETASIDES - DETOUR AGREEMENTS -. DA DETOUR SF 2, 2, 216 AGREEMENT 141 MN 999 888-MA-17 MNDOT DISTRICTWIDE SETASIDES - MISC. AGREEMENTS - 217. MA MISCELLANEOUS SF 5, 5, 142 MN 999 888-PM-17 MNDOT DISTRICTWIDE SETASIDES - PREVENTIVE. PM PREVENTIVE SF 1,, 1,, MAINTENANCE - 217 MAINTENANCE 143 MN 999 888-RB-17 MNDOT DISTRICTWIDE SETASIDES - LANDSCAPE PARTNERSHIP. RB LANDSCAPE SF 4, 4, PROGRAM - 217 PARTNERSHIP 144 MN 999 888-RW-17 MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY - 217. RW RIGHT OF WAY SF 121, 121, 145 MN 999 888-RX-17 MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR - 217. RX ROAD REPAIR SF 495,48 495,48 September 213 Project Listing Page III - 112 of 175

ATP: 8 Fiscal Year: 217 STIP for FY 214-217 146 MN 999 888-SA-17 MNDOT DISTRICTWIDE SETASIDES - CONSTRUCTION OVERRUNS. SA SUPP. AGREE. & SF 1,5, 1,5, & SUPP AGREE - 217 COST OVERRUNS 147 LOCAL 999 888-SHL-17 DISTRICTWIDE DISTRICTWIDE LOCAL SETASIDES - HSIP - 216. SH SAFETY TARGET HSIP 1,222,222 1,1, 122,222 148 MN 999 888-SHS-17 MNDOT DISTRICTWIDE SETASIDES - HSIP - 217. SH SAFETY TARGET HSIP 1,111,111 1,, 111,111 149 LOCAL 999 888-TAP-17 MNDOT TAP SETASIDE. EN PED./BIKE TAP 75, 6, 15, $36,351,356 $2,364, $3,878,9 $ $13,688,734 $2,298,622 September 213 Project Listing Page III - 113 of 175

Clearwater Kittson Roseau Lake of the Woods Areawide Transportation Partnership (ATP) Boundaries Marshall 2 Koochiching Polk Pennington Red Lake Beltrami 1 Lake Cook Itasca St. Louis Norman Mahnomen Hubbard Clay Cass Becker Wilkin 4 Wadena 3 Crow Wing Aitkin Carlton Traverse Big Stone Lac qui Parle Yellow Medicine Lincoln Grant Stevens Lyon Murray Otter Tail Swift Chippewa Douglas Pope 8 Redwood Pipestone Cottonwood Renville Todd Kandiyohi Brown Stearns Meeker Watonwan Morrison McLeod Sibley Nicollet Benton Wright Mille Lacs Carver Hennepin Scott Kanabec Isanti Anoka Chisago Ramsey Washington Dakota Pine Rice 7 6 Blue Earth Sherburne Rock Nobles Jackson Martin Faribault Le Sueur Waseca Metro Steele Goodhue Dodge Wabasha Olmsted Freeborn Mower Fillmore Winona Houston METRO DISTRICT Scott McBride Metro District Engineer (651) 234-773 Waters Edge Building 15 W. County Road B-2 Roseville, Minnesota 55113-3174 General Information: (651) 234-75 FAX: (651) 234-795

ATP: M Fiscal Year: 214 STIP for FY 214-217 141 BB TCP-CCLRT-14 METRO TRANSIT SECT 539: CENTRAL CORRIDOR LIGHT RAIL TRANSIT. B3 GRADE AND FTA 117,564,59 98,443,694 19,12,896 PROJECT-NEW START FFGA 214 APPROPRIATION SURFACE 1411 BB TRF-TCMT-14 MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ASSOCIATED. B9 BUS GRANT FTA 1,241,871 993,497 248,374 MAINTENANCE-BUS 1412 BB TRF-TCMT-14A MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 PURCHASE BUS FTA 2,769,241 2,215,393 553,848 LEASE-TIRES 1413 BB TRF-TCMT-14AA MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-OPERATIONS. B9 BUS GRANT FTA 1,1, 88, 22, COMMUNICATIONS & CONTROL EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1414 BB TRF-TCMT-14AC MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FARE. B9 BUS GRANT FTA 5, 4, 1, COLLECTION EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1415 BB TRF-TCMT-14AF MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-RENEWABLE. B9 BUS GRANT FTA 75, 6, 15, ENERGY INITIATIVES 1416 BB TRF-TCMT-14AJ MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-OVERHAUL. B9 BUS GRANT FTA 1,7, 1,36, 34, BASE RENOVATION AND MAINTENANCE SHOP 1417 BB TRF-TCMT-14AK MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ONBOARD. B9 BUS GRANT FTA 752, 61,6 15,4 PEDESTRIAN DETECTION SYSTEM TRANSIT TECHNOLOGY SYSTEMS 1418 BB TRF-TCMT-14AL MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-RTS TRANSIT. B9 BUS GRANT FTA 4,, 3,2, 8, TECHNOLOGY SYSTEMS 1419 BB TRF-TCMT-14AP MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-U OF M. B9 BUS GRANT FTA 6, 48, 12, LAYOVER 142 BB TRF-TCMT-14AS MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-LRV EQUIPMENT & TECHNOLOGY, WIRELESS VIDEO, TRAIN OPERATOR DISPLAYS, HOIST REPLACEMENT & LRT CORRIDOR CAMERAS. GR BUS GRANT FTA 1,, 8, 2, 1421 BB TRF-TCMT-14AT MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-SNELLING. B9 BUS GRANT FTA 1,7, 1,36, 34, AVENUE ARTERIAL BRT September 213 Project Listing Page III - 114 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 1422 BB TRF-TCMT-14AU MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-I35W. B9 BUS GRANT FTA 1,795,415 1,436,332 359,83 BRT/EXPRESS SERVICE 1423 BB TRF-TCMT-14AV MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-MAJOR. B9 BUS GRANT FTA 1,25, 1,, 25, TO SUPPORT FACILITIES 1424 BB TRF-TCMT-14AW MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PUBLIC. B9 BUS GRANT FTA 312,5 25, 62,5 SUPPORT FACILITIES REFURBISHMENT 1425 BB TRF-TCMT-14AX MET COUNCIL-MT SECT 5337: FIXED GUIDEWAY: TWIN CITIES MET COUNCIL. GR BUS GRANT FTA 1,5, 84, 21, MT-LRT ASSOCIATED MAINTENANCE & TRACK MODIFICATIONS 1426 BB TRF-TCMT-14AY MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ANISHINABE. B9 BUS GRANT FTA 2, 16, 4, PARK & RIDE 1427 BB TRF-TCMT-14AZ MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-DOWNTOWN. B9 BUS GRANT FTA 75, 6, 15, MINNEAPOLIS BUS LAYOVER 1428 BB TRF-TCMT-14B MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-BUS. B9 PURCHASE BUS FTA 38,66,225 32,356,291 5,79,934 ACQUISITION 1429 BB TRF-TCMT-14BA MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-CENTRAL. B9 BUS GRANT FTA 1,45, 1,16, 29, CORRIDOR BUS FACILITIES & COMO PARK FACILITY S 143 BB TRF-TCMT-14BC MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-DT MPLS. B9 BUS GRANT FTA 1,6, 1,28, 32, LIGHT RAIL NORTH PLATFORM AT NICOLLET MALL STATION 1431 BB TRF-TCMT-14C MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PREVENTIVE. B9 BUS GRANT FTA 5,, 4,, 1,, MAINTENANCE 1432 BB TRF-TCMT-14D MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 BUS GRANT FTA 1,125, 9, 225, SECURITY/SAFETY FOR 1% 1433 BB TRF-TCMT-14E MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 1,715, 1,372, 343, ENHANCEMENTS 1% September 213 Project Listing Page III - 115 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 1434 BB TRF-TCMT-14F MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 1,33, 938,16 364,84 BUSINESS COMPUTER HW & SW 1435 BB TRF-TCMT-14H MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-METRO. B9 BUS GRANT FTA 5,312,5 4,25, 1,62,5 MOBILITY COST OF CONTRACTING FOR SERVICES 1436 BB TRF-TCMT-14J MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-REGIONAL. B9 BUS GRANT FTA 3,75, 3,, 75, FLEET COST OF CONTRACTING 1437 BB TRF-TCMT-14K MET COUNCIL-U SECT 537: TWIN CITIES MET COUNCIL U OF M-U OF MN. B9 PURCHASE BUS FTA 343,75 275, 68,75 OFM BUS ACQUISITION 1438 BB TRF-TCMT-14L MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-MTS BUS. B9 PURCHASE BUS FTA 8,, 6,4, 1,6, ACQUISITION 1439 BB TRF-TCMT-14T MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-NEW POLICE. B9 BUS GRANT FTA 12,, 9,6, 2,4, FACILITY 144 BB TRF-TCMT-14X MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FORT. B9 BUS GRANT FTA 14, 112, 28, SNELLING P&R EXPANSION 1441 BB TRF-TCMT-14Z MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ENERGY. B9 BUS GRANT FTA 1,, 8, 2, 1442 BB TRS-768-14A MNDOT HEARTLAND EXPRESS-PURCHASE CLASS 4 BUS. TR PURCHASE BUS STP 72, 57,6 14,4 1443 BB TRS-TCMT-1B MET COUNCIL-MT CMAQ: PURCHASE 6 ARTIC BUSES & RELATED SPARE. TR BUS GRANT CMAQ 3,42,6 2,722,8 68,52 PARTS & EQUIPMENT FOR EXPANDED WEEKDAY SERVICE ON RTE 673, MINNETONKA & MPLS 1444 BB TRS-TCMT-11B SOUTHWEST CMAQ: PURCHASE 15 BUSES FOR EXPRESS SERVICE. TR BUS GRANT CMAQ 8,25, 6,6, 1,65, TRANSIT 1445 BB TRS-TCMT-13H CITY OF CARVER CMAQ:AT SW QUADRANT OF INTERSECTION OF TH 212 & CARVER CSAH 11-SERVICE BETWEEN CARVER & DOWNTOWN MPLS/U OF M & DEMONSTRATION EXPRESS BUS SERVICE FOR THREE YEARS. TR OPERATE BUS CMAQ 1,32,75 826,2 26,55 1446 BB TRS-TCMT-14 MVTA CMAQ: PURCHASE FIVE, 45-FOOT OVER-THE-ROAD COACH BUSES & FUND STARTUP SERVICE BETWEEN SOUTH METRO & DOWNTOWN ST. PAUL ALONG I-35E, TH 13 & OTHER ROADWAYS. TR PURCHASE BUS CMAQ 3,12, 2,496, 624, September 213 Project Listing Page III - 116 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 1447 LOCAL 999 TRS-TCMT-14A MET COUNCIL-MT CMAQ: CENTRAL CORRIDOR OPERATING COSTS ON. TR OPERATE BUS CMAQ 13,839,259 7,, 6,839,259 UNIVERSITY AVE BETWEEN DOWNTOWN MPLS & DOWNTOWN ST. PAUL 1448 LOCAL 999 TRS-TCMT-14C MET COUNCIL-MT CMAQ TDM: ACTIVITIES TO REDUCE SOV USE BY VAN POOLS, CAR POOL & RIDE MATCHING PROGRAMS, MARKETING, TRANSIT RIDERSHIP INCENTIVES BY SUPPORTING SEVERAL TRANSPORTATION MANAGEMENT ORGANIZATIONS.. TM PLANNING CMAQ 4,375, 3,5, 875, 1449 I 94 TRS-TCMT-14F MET COUNCIL-MT CMAQ: ON I 94 NEAR MANNING AVE IN LAKE ELMO-FOUR. TR PURCHASE BUS CMAQ 2,794,5 2,235,6 558,9 6 FT BUSES FOR EXPRESS SERVICE 145 I 94 TRS-TCMT-14G MET COUNCIL-MT CMAQ: ON I 94 NEAR MANNING AVE IN LAKE ELMO-. TR BUS GRANT CMAQ 958,117 766,494 191,623 EXPRESS SERVICE FOR 3 YEARS 1451 RR 2-134 MNDOT MNNR, 69TH AVE NE, MSAS 35 IN FRIDLEY-INSTALL. SR RR X-ING RRS 195, 195, GATES AND FLASHING LIGHTS S 1452 RR 1-119 MNDOT TCW ON TACOMA AVENUE, MUN 25 IN NORWOOD YOUNG. SR RR X-ING RRS 225, 225, AMERICA-INSTALL GATES AND FLASHING LIGHTS S 1453 RR 27-34 MNDOT PGR ON KELL AVE S, MUN 312 IN BLOOMINGTON-INSTALL. SR RR X-ING RRS 234, 234, GATES AND FLASHING LIGHTS S 1454 RR 62-23 MNDOT MNNR ON KNOLLWOOD DR, MUN 42 IN NEW BRIGHTON-. SR RR X-ING RRS 225, 225, INSTALL GATES AND FLASHING LIGHTS S 1455 RR 62-21 MNDOT CP ON S ERIE ST M636 IN ST PAUL-UPGRADE TO GATES. SR RR X-ING RRS 23, 23, AND FLASHING LIGHTS S 1456 RR 7-123 MNDOT UP ON CSAH 9 IN JORDAN-INSTALL CANTILEVERS, GATES. SR RR X-ING RRS 312, 312, AND FLASHING LIGHTS S 1457 RR 82-139 MNDOT UP ON CENTRAL AVE, MUN 46 IN BAYPORT-INSTALL. SR RR X-ING RRS 286, 286, GATES AND FLASHING LIGHTS S 1458 RR 82-14 MNDOT UP ON 1TH AVE N, MUN 4 IN BAYPORT-INSTALL GATES. SR RR X-ING RRS 338, 338, AND LIGHTS S 1459 CR 3 2-596-2 ANOKA COUNTY ON ANOKA CR 3 (COON RAPIDS BLVD) AT SPRINGBROOK. SH SPOT HSIP 52, 468, 52, DR IN COON RAPIDS-TRAFFIC SIGNAL REBUILD, LENGTHEN TURN LANES 146 CSAH 5 2-65-18 ANOKA COUNTY ON ANOKA CSAH 5 AT ALPINE DRIVE IN RAMSEY-TRAFFIC. SH GRADE AND HSIP 1,4, 936, 14, SIGNAL, CONSTRUCT LEFT & RIGHT TURN LANES SURFACE September 213 Project Listing Page III - 117 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 1461 CSAH 11 2-611-32 ANOKA COUNTY ON ANOKA CSAH 11 (FOLEY BLVD) FROM 11ST TO. RC GRADE AND STP 3,31,6 2,425,28 66,32 EGRET IN COON RAPIDS-RECONSTRUCT TO 4-LN RDWY, SURFACE NEW SIGNALS, TRAIL 1462 CSAH 51 2-651-7 ANOKA COUNTY FROM ANOKA CSAH 12 TO 121ST AVE IN COON RAPIDS & 2. RC GRADE AND STP 7,956, 6,364,8 1,591,2 BLAINE-RECONSTRUCT TO 4-LANE RDWY, PED/BIKE, SURFACE SIGNALS 1463 CSAH 78 2-678-2 ANOKA COUNTY ON ANOKA CSAH 78 (HANSON BLVD) AT ANOKA CSAH 2. SH SPOT HSIP 1,3, 842,4 457,6 (161ST AVE NW) IN ANDOVER-CONSTRUCT TRAFFIC SIGNAL, TURN LANES AT ALL LEGS 1464 CSAH 18 1-618-13 CARVER COUNTY ON CARVER CSAH 18 (LYMAN BLVD) FROM CARVER CSAH 1. RC GRADE AND STP 6,344, 5,75,2 1,268,8 15 (AUDUBON RD) TO CARVER CSAH 17(POWERS BLVD) SURFACE IN CHANHASSEN-RECONSTRUCT TO 4-LN RDWY 1465 PED/BIKE 19-9-11 DAKOTA COUNTY THROUGH THE WESTERN PORTION OF THE SPRING LK 3. EN PEDESTRIAN TAP 4,1, 1,2, 3,8, PARK RESERVE-CONSTRUCT MISS RIVER REG TRIAL BIKE TRAIL 1466 PED/BIKE 19-9-13 DAKOTA COUNTY **AC** MISS RIVER REG TR, SCHARRS BLUFF TO MISS RIVER, SPRING LK RARK RESERVE, NININGER TWP- CONSTRUCT PED/BIKE TR & TRAILHEAD FACILITY (WAS 91-9-57) (AC PROJECT, PAYBACK IN 217) 2. EN PED./BIKE TAP 4,74,892 273,84 759,18 4,467,88 1467 PED/BIKE 19-9-15 DAKOTA COUNTY TH 11 TO GARLOUGH ELEMENTARY, WEST ST PAUL- 1. EN PEDESTRIAN TAP 992,6 794,8 198,52 CONSTRUCT N URBAN REG TR INCLUDING UNDERPASS BIKE TRAIL 1468 CSAH 9 19-69-18 DAKOTA COUNTY **AC** FROM DAKOTA CSAH 46/2 IN NEW MARKET TWP TO DAKOTA CSAH 7 IN LAKEVILLE AND EUREKA TWP- RECONSTRUCT 2-LANE ROADWAY WITH PAVED SHOULDERS & TURN LANES (AC PROJECT, PAYBACK IN 217) 5. RC GRADE AND SURFACE STP 1,42,5 5,61, 1,42,5 1469 CSAH 32 19-632-28 DAKOTA COUNTY ON DAKOTA CSAH 32 AT NICOLLET AVE IN BURNSVILLE-. SH GRADE AND HSIP 364, 327,6 36,4 CONSTRUCT WB LEFT TURN LANE AND CHANNELIZATION SURFACE 147 CSAH 32 19-632-34AC DAKOTA COUNTY **AC** DAKOTA CSAH 32(CLIFF RD) AT JOHNNY CAKE. SH TRAFFIC SIGNAL HSIP 618,75 618,75 RIDGE RD IN EAGAN-SIGNAL REBUILD, LEFT AND RIGHT REVISION TURN LANES (AC PAYBACK 1 OF 1) 1471 CSAH 42 19-642-44 DAKOTA COUNTY **MN223** AT TH 52 INTERCHANGE IN ROSEMOUNT-RIGHT. RW RIGHT OF WAY DEMO 11,, 2,624,675 8,375,325 OF WAY FOR RECONSTRUCTION OF INTERCHANGE (SAFETEA-LU) 1472 CSAH 42 19-642-45 DAKOTA COUNTY **MN223** AT TH 52 INTERCHANGE IN ROSEMOUNT-. PL PLANNING DEMO 375, 3, 75, PRELIMINARY ENGINEERING FOR RECONSTRUCTION OF INTERCHANGE (SAFETEA-LU) September 213 Project Listing Page III - 118 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 1473 MN 55 27-3-14 HENNEPIN COUNTY **MN12** RIGHT OF WAY ACQUISITION AND CONSTRUCTION AT CSAH 115/CR 116 FOR TH 55 CORRIDOR PROTECTION PROJECT (I-494 TO CROW RIVER) (SAFETEA-LU) 21. RW RIGHT OF WAY DEMO 51, 48, 12, 1474 MN 55 27-596-5 HENNEPIN COUNTY **MN12** RIGHT OF WAY ACQUISITION AND CONSTRUCTION AT CSAH 115/CR 116 FOR TH 55 CORRIDOR PROTECTION PROJECT (I-494 TO CROW RIVER) (SAFETEA-LU) 21. RW RIGHT OF WAY DEMO 754,51 63,61 15,9 1475 CSAH 3 27-63-51 HENNEPIN COUNTY **MN237** LAKE ST ACCESS TO I 35W, MPLS-PURCHASE. MC GRADE,SURFACE DEMO 7,437,293 5,949,834 1,487,459 RIGHT OF WAY, PE & CONSTRUCTION, DESIGN BUILD & BRIDGE CONSTRUCTION PROJECT (SAFETEA-LU) 1476 CSAH 3 27-63-53 HENNEPIN COUNTY **MN61** LAKE ST ACCESS TO I 35W, MPLS-PURCHASE. MC GRADE,SURFACE DEMO 3,154,244 2,523,395 63,849 RIGHT OF WAY, PE & CONSTRUCTION, DESIGN BUILD & BRIDGE CONSTRUCTION PROJECT (21 APPROPRIATIONS ACT) 1477 CSAH 3 27-63-55 HENNEPIN COUNTY **MN151** LAKE ST ACCESS TO I 35W, MPLS-PURCHASE. MC GRADE,SURFACE DEMO 1,799,8 1,439,84 359,96 RIGHT OF WAY, PE & CONSTRUCTION, DESIGN BUILD & BRIDGE CONSTRUCTION PROJECT (SAFETEA-LU) 1478 CSAH 5 27-65-29 HENNEPIN COUNTY HENNEPIN CSAH 5(FRANKLIN AVE) OVER W RIVER RD &. BR BRIDGE REPAIR STP 23,653, 8,32, 15,333, MISSISSIPPI RIVER-RECONDITION BR 2441 OTHER 1479 PED/BIKE 27-619-23 HANOVER ALONG HENNEPIN CSAH 19 IN HANOVER-CONSTRUCT BIT 1. EN ENHANCEMENT TAP 618, 216,233 41,767 PED/BIKE TRAIL 148 CSAH 61 27-661-46 HENNEPIN COUNTY FROM CSAH 3(EXCELSIOR BLVD) TO NO OF TH 7 IN 1. RC GRADE AND STP 13,, 7,28, 5,72, HOPKINS & MINNETONKA-UPGRADE TO A 4-LANE RDWY, SURFACE INTERSECTION S (TIED TO 276-235) 1481 CSAH 31 62-631-9 RAMSEY COUNTY ON RAMSEY CSAH 31 (MARYLAND AVE) AT PAYNE AVE IN. SH SPOT HSIP 1,663,951 1,497,556 166,395 ST PAUL-TRAFFIC SIGNAL REBUILD, DEVELOP DEDICATED LEFT TURN LANES 1482 LOCAL 999 62-631-15 RAMSEY COUNTY **AC** ON MARYLAND AVE AND APPROACHES BETWEEN L'ORIENT ST AND JACKSON ST IN ST PAUL- RECONSTRUCT BRIDGE #62525 (AC PROJECT, PAYBACK IN 215). BI BRIDGE REPAIR STP 187, 748, 187, 1483 CSAH 2 7-62-2 SCOTT COUNTY **AC** AT SCOTT CSAH 46 IN NEW MARKET-. SH GRADE AND HSIP 148,5 1,336,5 148,5 ROUNDABOUT (AC PROJECT, PAYBACK IN FY15) SURFACE 1484 CSAH 46 7-646-5AC SCOTT COUNTY **AC** AT CR 29 IN NEW MARKET-ROUNDABOUT (AC. SH GRADE AND HSIP 369,283 369,283 PAYBACK 1 OF 1) SURFACE September 213 Project Listing Page III - 119 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 1485 PED/BIKE 7-71-8 SCOTT COUNTY ALONG CSAH 11 FROM RIVER RD/STAGECOACH RD TO 4. EN PEDESTRIAN TAP 1,3, 1,4, 26, SHENANDOAH DR IN SHAKOPEE-CONSTRUCT PED/BIKE BIKE TRAIL TRAIL 1486 PED/BIKE 82-9-4 WASHINGTON CONSTRUCT HARDWOOD CREEK REGIONAL TR. EN ENHANCEMENT TAP 135, 92, 43, COUNTY EXTENSION FROM 145TH ST TO 14TH ST IN HUGO 1487 PED/BIKE 82-9-6 WASHINGTON RIGHT OF WAY ACQUISITION FOR HARDWOOD CREEK. RW RIGHT OF WAY TAP 65, 52, 13, COUNTY REGIONAL TR EXTENSION FROM 145TH ST TO 14TH ST IN HUGO 1488 LOCAL 999 91-6-67 MPLS PARK/REC GRAND ROUNDS MISSISSIPPI GORGE-. PL PLANNING SB 17, 136, 34, BOARD PICNIC/OBSERVATION AREA (SCENIC BYWAYS 26 APPROPRIATION ACT) 1489 LOCAL 999 91-6-83 MPLS PARK/REC GRAND ROUNDS MISSISSIPPI GORGE-RESTROOMS. RB REST AREA SB 3, 2, 1, BOARD FACILITY (SCENIC BYWAYS 27 APPROPRIATION ACT) 149 LOCAL 999 91-6-97 MPLS PARK/REC GRAND ROUNDS MISSISSIPPI GORGE-. RB GRADE AND SB 187,5 15, 37,5 BOARD PARKING/OVERLOOK (SCENIC BYWAYS 29 SURFACE APPROPRIATIONS ACT) 1491 PED/BIKE 91-7-26 MPLS PARK/REC BOARD GRAND ROUNDS MISSING LINK-CONSTRUCTION OF RIDGEWAY PARKWAY SHARED-USE PATH AND OVERLOOK S (OTHER FHWA AMT IS PUBLIC LAND HIGHWAY DISCRETIONARY). BT PED./BIKE PLHD 65, 35, 3, 1492 PED/BIKE 91-9-68 MPLS PARK/REC FROM FRANKLIN AVE N TO CENTRAL RIVERFRONT PARK. EN PED./BIKE TAP 1,22,5 962, 24,5 BOARD IN MPLS-CONSTRUCT WEST RIVER PKWY TRAIL S 1493 PED/BIKE 91-9-71 MPLS PARK/REC ALONG THE WEST BANK OF MISS RIVER-JAMES I RICE. EN PED./BIKE TAP 1,4, 832, 28, BOARD PKWY TRAIL S & CONNECTIONS 1494 PED/BIKE 91-9-72 THREE RIVERS OVER HENNEPIN CSAH 19 IN SHOREWOOD & TONKA BAY-. EN PEDESTRIAN TAP 2,, 1,4, 96, PARK DISTRICT CONSTRUCT LAKE MINNETONKA LRT REGIONAL TR BIKE BRIDGE PED/BIKE BRIDGE 1495 PED/BIKE 91-9-74 THREE RIVERS CONSTRUCT INTERCITY TRAIL FROM NOKOMIS PKWY IN 4. BT PEDESTRIAN STP 7,15, 5,72, 1,43, PARK DISTRICT MPLS TO 86TH ST IN BLOOMINGTON BIKE TRAIL 1496 PED/BIKE 91-9-75 THREE RIVERS PARK DISTRICT CONSTRUCT CRYSTAL LAKE REGIONAL TRAIL FROM THE MPLS GRAND ROUNDS TRAIL NETWORK TO THE TWIN CITIES REGIONAL TRL NETWORK IN ROBBINSDALE, BRS, SHELTERS, KIOSKS 2. BT PEDESTRIAN BIKE TRAIL STP 2,74, 2,163,2 54,8 September 213 Project Listing Page III - 12 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 1497 CITY 17-3-5 CITY OF BLOOMINGTON AIRPORT SOUTH DISTRICT IN BLOOMINGTON- INSTALLATION & EXPANSION OF ITS WAYFINDING TECHNOLOGY TO RELIEVE CONGESTION ON 24TH AVE, LINDAU LANE AND KILLEBREW LANE ENTERING FROM I- 494, TH77 & TH5. TM CONGESTION RELIEF TECHNOLOGY CMAQ 1,3,5 1,4,4 26,1 1498 PED/BIKE 17-9-8 BLOOMINGTON MINNESOTA RIVER CROSSING AT THE OLD CEDAR AVE BRIDGE PROJECT IN BLOOMINGTON-MULTIMODAL CROSSING ($3M IN OTHER IS BONDS AND $9M IN OTHER IS TIF). BT PEDESTRIAN BIKE BRIDGE FFM 14,, 2,, 12,, 1499 PED/BIKE 17-425-8 BLOOMINGTON HYLAND TRL CORRIDOR FROM 15TH ST/MARYLAND RD 1. EN PEDESTRIAN TAP 1,197,3 539,76 657,54 TO THE BLOOMINGTON FERRY RD TRAILHEAD NEAR THE BIKE TRAIL MN RIVER IN BLOOMINGTON-CONSTRUCT TRAIL 15 PED/BIKE 11-2-31 BROOKLYN PARK **AC** FROM REGENT AVE AT SHINGLE CREEK TO NOBLE AVE AT SHINGLE CREEK IN BROOKLYN PARK- PEDESTRIAN/BICYCLE TRAIL WITH LIGHTING, PEDESTRIAN ROAD SAFETY S (AC PROJECT, PAYBACK IN 215). EN PEDESTRIAN BIKE TRAIL TAP 242, 968, 242, 151 PED/BIKE 127-591-2 FRIDLEY **SRTS** CE AND CONSTRUCT INFRASTRUCTURE. BT PED./BIKE SRTS 94,4 94,4 S AT THREE SCHOOLS IN FRIDLEY 152 PED/BIKE 141-9-38 MINNEAPOLIS OVER THE MISS RIVER FROM U OF M EAST TO WEST. EN BRIDGE REPAIR TAP 1,3, 1,4, 26, BANK IN MPLS-REHABILITATE & PAINT BR 9(MN BR 94246) 153 PED/BIKE 141-91-3 MINNEAPOLIS SECT 187: NON-MOTORIZED PILOT PROGRAM IN TWIN. BT GRADE AND FFM 1,3, 1,3, CITIES SURFACE 154 CITY 141-454-1 MINNEAPOLIS **AC** COLUMBIA AVE NE TO TH 47 ACCESS RAMP-. BR BRIDGE STP 14,4, 8,96, 14,4, REPLACE BR 9664 OVER BNSF NORTHTOWN YARD & REPLACEMENT APPROACHES (AC PROJECT, PAYBACK IN 217) 155 PED/BIKE 141-591-4 MINNEAPOLIS **SRTS** INFRA SAFE ROUTES TO SCHOOL - SIGNING,. BT GRADE AND SRTS 63, 63, BIKE RACKS, PAVEMENT MARKINGS IN MINNEAPOLIS SURFACE 156 PED/BIKE 141-591-8 MINNEAPOLIS **SRTS** INFRA MINNEAPOLIS, CE AND CONSTRUCTION. BT PED./BIKE SRTS 254,71 254,71 FOR BIKE STORAGE AND PED/BIKE S AROUND LUCY CRAFT LANEY SCHOOL 157 CITY 164-7-8 SAINT PAUL **MN219** RIGHT OF WAY FOR TWIN CITIES BIOSCIENCE. RW GRADE AND DEMO 1,337,25 1,69,8 267,45 CORRIDOR, ST PAUL (SAFETEA-LU) SURFACE 158 CITY 164-7-9 SAINT PAUL **MN219** CONSTRUCTION OF TWIN CITIES BIOSCIENCE. RC GRADE AND DEMO 1,395,771 1,116,617 279,154 CORRIDOR, ST PAUL (SAFETEA-LU) SURFACE September 213 Project Listing Page III - 121 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 159 CITY 164-158-2 SAINT PAUL **AC** 3 FT W OF TO 3 FT E OF MARKET ST, ST PAUL-. BR BRIDGE STP 1,347,2 3, 1,1, 1,47,2 REPLACE KELLOGG ST BR 92798 OVER RAVINE & REPLACEMENT APPROACHES (AC PROJECT, PAYBACK IN 217) 151 CITY 164-213-7 SAINT PAUL ON WESTERN AVE FROM ST ANTHONY TO UNIV & FROM 1. EN ENHANCEMENT TAP 1,425, 1,4, 385, CONCORDIA TO SELBY-STREETSCAPE, LIGHTING 1511 CSAH 17 166-2-14 SHAKOPEE ON SCOTT CSAH 17 FROM VIERLING DR TO TH 169 IN. SH SPOT HSIP 2,22, 1,11,6 1,118,4 SHAKOPEE-TRAFFIC SIGNAL REBUILD INCLUDING TURN LANES 1512 US 952A 173-1-7 WEST ST PAUL ON ROBERT ST FROM MENDOTA RD TO ANNAPOLIS ST IN 2. RB GRADE AND STP 11,72, 6,98, 4,74, W ST PAUL-WIDENING, MILL &, LANDSCAPING SURFACE (TIED TO 198-84) 1513 PED/BIKE 179-9-4 BURNSVILLE FROM I 35W TO TH 77 ALONG MN RIVER IN BURNSVILLE- 4. EN PEDESTRIAN TAP 1,3, 1,4, 26, CONSTRUCT BIG RIVERS REGIONAL TRAIL BIKE TRAIL 1514 CSAH 6 188-2-21 LAKEVILLE **AC** AT DAKOTA CSAH 6 (185TH ST) & DAKOTA CSAH. RC GRADE AND STP 48, 1,632, 48, 5 (KENWOOD TR) IN LAKEVILLE-CONSTRUCT SURFACE ROUNDABOUT (AC PROJECT, PAYBACK IN 217) 1515 MN 149 195-1-1 EAGAN **AC** FROM TH 55 TO JUST NORTH OF I-494 IN EAGAN- 1. RC GRADE AND STP 536,6 2,146,4 536,6 RECONSTRUCT FROM 4-LN RDWY TO 5-LN RDWY, TRAIL SURFACE (TIED TO 1917-44) (AC PROJECT, PAYBACK IN 217) 1516 MN 55 195-1-11 EAGAN **AC** FROM THE MN149 NORTH INTERSECTION THROUGH THE MN149 SOUTH INTERSECTION- EXPANSION TO A 6-LANE ROADWAY INCLUDING TRAFFIC SIGNALS, AND CONSTRUCTION OF A MULTI-USE TRAIL (AC PROJECT, PAYBACK IN FY15) (TIED TO 199-95). MC GRADE AND SURFACE STP 94,13 2,64, 94,13 1517 MN 11 238-1-3 ROGERS **AC** AT HENNEPIN CSAH 144 IN ROGERS- RECONSTRUCT INTERCHANGE, MULTI-USE TRAIL AND SIDEWALK, SIGNALS AND LIGHTING (AC PROJECT, PAYBACK IN 215) (REMAINDER OF MATCH TO FEDERAL FUNDS IS UNDER 2738-28) (TIED WITH 2738-28, 2738-29). MC GRADE AND BRIDGE STP 856, 7,7, 856, 1518 PED/BIKE 238-591-2 ROGERS **SRTS** INFRA SAFE ROUTES TO SCHOOL -. BT PED./BIKE SRTS 171,5 171,5 INFRASTRUCTURE (CONSTRUCT TRAIL) CO RD 144 TO ROGERS MIDDLE SCHOOL (28 PROGRAM) 1519 PED/BIKE SRS-964-13A MINNEAPOLIS PUBLIC SCHOOLS **SRTS** NON-INFRA, MPLS PUBLIC SCHOOLS; GRANT TO HIRE A SRTS COORDINATOR, PURCHASE A DISTRICT- WIDE BICYCLE FLEET, AND PROVIDE EDUCATION AND ENCOURAGEMENT ACTIVITIES IN THE SCHOOLS. PL PLANNING SRTS 96, 96, September 213 Project Listing Page III - 122 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 152 PED/BIKE SRS-986-13 SOUTH WASHINGTON COUNTY SCHOOLS **SRTS** NON-INFRA, SOUTH WASHINGTON COUNTY SCHOOLS; GRANT TO HIRE A SRTS COORDINATOR TO ASSIST THE SRTS SCHOOL TEAMS, PURCHASE SAFETY EQUIPMENT AND TRAINING FOR SCHOOL SAFETY PATROLS, PURCHASE INCENTIVES FOR STUDENTS, AND PAY FOR SRTS CAMPAIGN MATERIALS. PL PLANNING SRTS 62, 62, 1521 PED/BIKE SRS-987-13 COLUMBIA HEIGHTS PUBLIC SCHOOLS **SRTS** NON-INFRA, COLUMBIA HEIGHTS PUBLIC SCHOOLS; GRANT TO PROVIDE ACCESS TO BICYCLES AND BICYCLE EDUCATION THROUGH THE PURCHASE OF A BIKE FLEET, BIKE MAINTANCE TRAINING FOR STAFF AND STUDENTS, AND TOOLS FOR BICYCLE REPAIR. PL PLANNING SRTS 12, 12, 1522 MN 5 12-14 MNDOT FROM JUST W OF CARVER CSAH 11 W JCT IN VICTORIA 4. RB LANDSCAPING SF 15, 15, TO JUST E OF MN41 IN CHANHASSEN-LANDSCAPING 1523 MN 5 2732-99 MNDOT FROM I-494 IN BLOOMINGTON TO EDGCUMBE RD IN ST 4. SC SIGNING SF 15, 15, PAUL-SIGN REPLACEMENT 1524 MN 5 621-86 MNDOT FROM MN55 IN MPLS TO DAVERN AVE ST IN ST PAUL - REDECK BRIDGE 93, PAINT BRIDGES 93 AND 9491, MINOR REPAIRS TO BRIDGES 9489, 949 AND 9491, MINOR CONCRETE PAVEMENT REPAIR 1. BI REDECK BF 11,25, 11,25, 1525 MN 7 276-225 MNDOT AT OAK ST(HENNEPIN CSAH 19) IN. SC TRAFFIC SIGNAL SF LF 23, 17, 6, SHOREWOOD/EXCELSIOR-SIGNAL REPLACEMENT & REVISION TURN LANE EXTENSION 1526 MN 7 276-227 MNDOT AT 5TH AVE N/OAKRIDGE RD IN HOPKINS-SIGNAL. SC TRAFFIC SIGNAL SF LF 25, 125, 125, REPLACEMENT REVISION 1527 MN 7 276-235 MNDOT AT HENNEPIN CSAH 61 (SHADY OAK RD) IN MINNETONKA - UPGRADE TO A 4-LANE RDWY, INTERSECTION S (TIED TO 27-661-46) ($577K IS CO-OP AGMT FUNDS). AM GRADE AND SURFACE SF 72, 72, 1528 MN 13 71-18 MNDOT **ADA** AT SCOTT CSAH 44/16TH STREET SE IN PRIOR. AM TRAFFIC SIGNAL SF 674,763 674,763 LAKE-SIGNAL REPLACEMENT, FRONTAGE RELOCATION, REVISION UPGRADE TO PED/ADA FACILITIES 1529 MN 13 71-11 MNDOT FROM US 169 (ON MN 11) IN SHAKOPEE TO LOUISIANA 1. RB LANDSCAPING SF 5, 5, AVE IN SAVAGE - LANDSCAPING 153 MN 25 16-28 MNDOT AT 7TH ST (62ND ST) IN MAYER - ROUNDABOUT. AM SPOT SF 391, 391, 1531 MN 25 17-19 MNDOT **FMP** MN25 FLOOD MITIGATION ALONG S FORK OF 1. RC GRADE AND BF 35, 35, CROW RIVER-RAISING RDWY GRADE SOUTH OF SURFACE WATERTOWN September 213 Project Listing Page III - 123 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 1532 MN 25 73-13 MNDOT MN25/TH169 WEST RAMP TERMINAL AS IT INTERSECTS IN. SC TRAFFIC SIGNAL SF 25, 25, BELLE PLAINE - INSTALL SIGNAL SYSTEMS AND INST. NECESSARY EQUIPMENT 1533 I 35 198-87 MNDOT AT DAKOTA CSAH 46 (162ND ST W) AND 7 (21TH ST W) 5. RB LANDSCAPING SF 2, 2, IN LAKEVILLE - LANDSCAPING AND LIVING SNOW FENCE 1534 I 35 828-46 MNDOT AT CSAH 2 IN FOREST LAKE-REPLACE LIGHTING SYSTEM 1. SC LIGHTING SF 3, 3, 1535 I 35E 282-33 MNDOT **BP8** AT ANOKA CSAH 14 IN LINO LAKES-PARK AND. AM PARK AND RIDE BF 1,773,825 1,773,825 RIDE (CHP 152 TRANSIT ADVANTAGE BONDS) 1536 I 35E 628-367 MNDOT **BR4M**FMP** FROM I94 IN ST. PAUL TO JUST NORTH OF LITTLE CANADA RD IN LITTLE CANADA - CONSTRUCT MNPASS LANE, REHAB PAVEMENT, REPLACE BRIDGES 659, 651, 6511, 6512, 6514, 6579, 9117, 9118, 9119, 912 AND TMS 5. MC GRADE,SURFACE & BRIDGE NHPP BF 14,75, 33,, 15,964,5 55,785,5 1537 I 35E 628-367CE MNDOT FROM I94 IN ST PAUL TO JUST N OF LITTLE CANADA RD IN 5. CA GRADE,SURFACE BF 4,25, 4,25, LITTLE CANADA - MNPASS DESIGN AND CONSTRUCTION & BRIDGE OVERSIGHT 1538 I 35E 628-367STIP MNDOT FROM I94 IN ST PAUL TO JUST N OF LITTLE CANADA RD IN 5. MC GRADE,SURFACE SF 8, 8, LITTLE CANADA - MNPASS STIPENDS & BRIDGE 1539 I 35E 6281-43 MNDOT **BP8** AT RAMSEY COUNTY ROAD E IN VADNAIS. AM PARK AND RIDE BF 1,844,673 1,844,673 HEIGHTS-PARK AND RIDE (CHP 152 TRANSIT ADVANTAGE BONDS) 154 I 35W 28-68 MNDOT INTERCHANGES AT S JCT ANOKA CSAH 23 (LAKE DR) IN BLAINE, AT ANOKA CSAH 32 (85TH AVE) IN BLAINE/SHOREVIEW AND AT N JCT ANOKA CSAH 23 (LAKE DR) IN LINO LAKES - REPLACE INTERCHANGE LIGHTING 6. SC LIGHTING SF 28, 28, 1541 I 35W 2782-295 MNDOT FROM 42ND ST IN MPLS TO 66TH ST IN RICHFIELD - 4. RB LANDSCAPING SF 5, 5, GATEWAYS LANDSCAPING 1542 I 35W 2782-32 MNDOT AT W 94TH ST OVER I35W IN BLOOMINGTON-RE-DECK 2. BI REDECK NHPP 6,485,1 5,616,9 624,1 245, BRIDGE 953 AND APPROACH WORK 1543 I 35W 2783-136 MNDOT **TED1** FROM 3RD & 4TH ST RAMP TO JOHNSON ST IN 2. MC GRADE AND BF SF LF 13,475,51 3,5 13,472,1 MINNEAPOLIS- CONSTRUCT ENTRANCE RAMP AND ADD SURFACE AUXILIARY LANE (TED INTERCHANGE BONDS) 1544 MN 36 8214-114RW1 MNDOT ST CROIX RIVER X-ING AT STILLWATER-(MN)TH 36/(WI) TH 2. RW RIGHT OF WAY NHPP 1,4, 1,12, 28, 64-RIGHT OF WAY ACQUISITION 1545 MN 36 8214-165 MNDOT BETWEEN OSGOOD AVE AND MN95 IN OAK PARK 1. RB LANDSCAPING SF 56, 56, HEIGHTS - TYPE I STATE ENTRY SIGN September 213 Project Listing Page III - 124 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 1546 MN 36 8221-1 MNDOT **AC** OVER ST CROIX RIVER NEAR STILLWATER & OAK PARK HEIGHTS-NEW BRIDGE 8245 OVER ST. CROIX RIVER, INCLUDING RAMPS ON & OFF TH 95 & XCEL BARGE UNLOADER FACILITY REMOVAL (AC PROJECT, PAYBACK IN 215, $63.98M MANAGED INTO THE FUTURE). BR BRIDGE REPLACEMENT NHPP BF 199,657,166 45,, 72,348,663 154,657,166 1547 MN 36 8221-1A MNDOT **MN217** ST CROIX RIVER X-ING AT STILLWATER-(MN)TH 36/(WI) TH 64-DESIGN, MITIGATION IMPLEMENTATION, CONSTRUCT, & ACQUIRE RW (SAFETEA-LU) (BEING USED AS PART OF 8221-1 CONSTRUCTION) 2. RW RIGHT OF WAY DEMO BF 4,39,171 3,231,337 87,834 1548 MN 36 8221-1CE MNDOT CONSTRUCTION ENGINEERING BY CONSULTANTS FOR ST CROIX RIVER NEAR STILLWATER & OAK PARK HEIGHTS-NEW BRIDGE 8245 OVER ST. CROIX RIVER, INCLUDING RAMPS ON & OFF TH 95. BR PLANNING BF 1,96,749 1,96,749 1549 MN 36 8221-1RR MNDOT RR AGREEMENT FOR ST CROIX RIVER NEAR STILLWATER. BR RAILROAD SF 42, 21, 21, & OAK PARK HEIGHTS-NEW BRIDGE 8245 OVER ST. AGREEMENT CROIX RIVER, INCLUDING RAMPS ON & OFF TH 95 155 MN 36 8221-8245AAC MNDOT **AC** AT BRIDGE 8245 OVER ST. CROIX RIVER - CONSTRUCT SUBSTRUCTURE (COFFERDAMS, DRILLED SHAFTS, FOOTINGS, & STARTER COLUMN SEGMENTS) FOR 5 RIVER PIERS (AC PAYBACK 1 OF 1). BR BRIDGE REPLACEMENT NHPP 14,693,78 14,693,78 1551 MN 36 8221-8245PEAC MNDOT **AC** ST CROIX RIVER CROSSING - DESIGN & PREPARE 3 BRIDGE PLANS, SPECIAL PROVISIONS, ESTIMATES & CONDUCT REVIEW OF HYDRAULIC ANALYSIS FOR THE ENTIRE CONSTRUCTION PROJECT (AC PAYBACK 1 OF 1). CA BRIDGE REPLACEMENT NHPP 5,6, 5,6, 1552 MN 36 8221-8245PRAC MNDOT **AC** ST CROIX RIVER CROSSING - PEER REVIEW OF. CA BRIDGE NHPP 1,, 1,, FINAL BRIDGE DESIGN FOR 3 BRIDGES (8245, 8247, REPLACEMENT 8248) (AC PAYBACK 1 OF 1) 1553 MN 36 8221-8247A MNDOT AT MN RAMP BRIDGES 8247 AND 8248 - EARLY MATERIALS FOR HP PILING AND PILE TIPS (AS PART OF THE ST. CROIX RIVER CROSSING PROJECT) (CHAPTER 152 BRIDGE BONDS). BR BRIDGE REPLACEMENT BF 875, 875, 1554 US 52 195-33 MNDOT AT 28TH/CSAH 86 IN RANDOLPH TWP - CONVERT MEDIAN TO 3/4 INTERSECTION WITH U TURNS AND CONSTRUCT LEFT TURN LANE FOR U TURN MOVEMENTS WITH 3/4 INTERSECTION. SH GRADE AND SURFACE HSIP 985, 886,5 98,5 1555 US 52 196-57 MNDOT AT DAKOTA CSAH 66 IN VERMILLION TWP-CONSTRUCT 1. SH GRADE,SURFACE HSIP 1,, 9, 1, 3/4 INTERSECTION WITH MEDIAN U TURNS AND & BRIDGE CONSTRUCT LEFT TURN LANE September 213 Project Listing Page III - 125 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 1556 MN 55 199-95 MNDOT **ADA** FROM JUST W OF N JCT MN149 TO JUST E OF S JCT MN149 IN EAGAN- WIDEN FROM 4 TO 6 LANE EXPANSION, TRAIL, ADA, SIGNALS, DRAINAGE (TIED TO 195-1-11) 1. AM GRADE AND SURFACE SF 57, 57, 1557 MN 55 2723-12 MNDOT AT NIAGARA LANE/PLYMOUTH BLVD IN PLYMOUTH-. SC TRAFFIC SIGNAL SF LF 69, 56, 13, SIGNAL REBUILD, CONSTRUCT L-TURN LN WB & REVISION LENGTHEN EB L-TURN LANE 1558 US 61 6222-162 MNDOT **ADA** FROM JUST S WHITE BEAR AVE TO JUST N OF JCT MN96 IN WHITE BEAR LAKE-MILL &, SIGNALS, ADA, REPAIR/REPLACE DRAINAGE INFRASTRUCTURE & MEDIAN ISLAND 2. RS MILL AND SF LF 3,41, 3,2, 39, 1559 US 61 1913-64B MNDOT **MN261** HASTINGS BRIDGE 194 (21 1. BR BRIDGE DEMO 291,967 291,967 APPROPRIATIONS ACT-STP) REPLACEMENT 156 US 61 1913-64E MNDOT **MN261** HASTINGS BRIDGE 194 - NATIONAL PARK 1. BR BRIDGE DEMO 5, 5, SERVICE MITIGATION, BIRD STUDY PHASE I (21 REPLACEMENT APPROPRIATIONS ACT-STP) 1561 US 61 1913-75 MNDOT FROM 4TH ST IN HASTINGS TO I 94 IN ST PAUL-FREEWAY 18. TM TRAFFIC MGMT. CMAQ 3,744, 2,995,2 748,8 MANAGEMENT SYSTEM ON TH 61 SYSTEM 1562 MN 62 2775-15 MNDOT FROM PORTLAND AVE TO BLOOMINGTON AVE IN 1. SC LIGHTING SF 24, 24, RICHFIELD & MINNEAPOLIS - REPLACE LIGHTING SYSTEM 1563 MN 65 27-1 MNDOT **ADA**AB** FROM 53RD AVE NE IN FRIDLEY TO ANOKA CSAH 1 IN SPRING LAKE PARK-MILL AND, ALT BID (UNBONDED CONCRETE OR RUBBLIZE CONCRETE AND THICK BIT ), DRAINAGE, GUARDRAIL, ADA PED RAMPS & WALK, SIGNAL, STRIPING AND BUS STOP S 4. RD MILL AND NHPP 9,33, 7,464, 1,866, 1564 MN 65 28-136 MNDOT **ADA** AT VIKING BLVD IN EAST BETHEL-EXTEND NB &. SC TURN LANES SF 24, 24, SB LEFT TURN LANES, REPLACE CULVERT, ADA 1565 MN 65 271-42 MNDOT NORTH OF 14TH AVE IN MPLS-REPLACE RAILROAD. BR BRIDGE BF 11,55, 11,55, BRIDGE 9446 (NEW 27236) & RAISE CLEARANCE, REPLACEMENT DRAINAGE 1566 I 94 2781-438 MNDOT FROM I94/694 SPLIT IN BROOKLYN CENTER TO NICOLLET 8. SC SIGNING SF 7, 7, AVE IN MPLS - SIGN REPLACEMENT 1567 I 94 2781-456 MNDOT SOUTH SIDE OF I 94, FROM SE FRANKLIN AVE TO JUST E. NO NOISE SF 71, 71, OF SE CECIL ST IN MPLS-NOISE WALL ABSORPTION ABATEMENT PANELS September 213 Project Listing Page III - 126 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 1568 MN 96 8211-35 MNDOT AT WASHINGTON CSAH 15 (MANNING AVE) IN GRANT -. AM SPOT SF 72, 72, ROUNDABOUT 1569 MN 1 2733-87 MNDOT FROM I494 IN BLOOMINGTON TO 5TH ST IN EDINA - SIGN 4. SC SIGNING SF 35, 35, REPLACEMENT 157 MN 1 2734-27W17 MNDOT HCRRA BRIDGE 539 (NEW BRIDGE 27W17) IN ST. LOUIS. AM BRIDGE SF 1,9, 1,9, PARK - DESIGN AND CONSTRUCT NEW LRT BRIDGE REPLACEMENT 1571 MN 1 2734-33 MNDOT **AB**AC** FROM 36TH ST TO CEDAR LAKE RD IN ST. LOUIS PARK - REPLACE BRIDGES 538(2733), 539 (NEW PED BRIDGE 2734), 5462(2735), 5598(2736), AND JOINT REPLACEMENT BRIDGE 2719, RECONSTRUCT MAIN LINE PAVEMENT AND INTERCHANGES INCLUDING CONSTRUCTING AUXILLIARY LANES AND NOISE WALLS (AC PROJECT, PAYBACK IN 215) 2. MC GRADE AND SURFACE NHPP BF 43,, 3,, 3,8, 13,, 1572 MN 1 2734-33RR MNDOT FROM 36TH ST TO CEDAR LAKE RD IN ST. LOUIS PARK - 2. AM RAILROAD SF 3,125, 3,125, RAIL ROAD AGREEMENT AGREEMENT 1573 MN 1 2755-11 MNDOT AT BROOKLYN BLVD OVER MN1 IN BROOKLYN CENTER-. BI REDECK SF 2,21, 2,21, REDECK BRIDGE 2738 & PED BRIDGES 2738A, 2738B, REPLACE APPROACH PANELS, DRAINAGE & GUARDRAIL 1574 MN 11 19-24 MNDOT FROM CARVER CSAH 61 IN CHANHASSEN TO MINN RIVER BR APPROACH IN SHAKOPEE- GRADE, SURFACE, NEW FLOODPLAIN BR 14 (REP BR 17),PED/BIKE TRAIL, SIGNING, REMOVE BOX CULVERT #4528, DRAINAGE ($5M IN OTHER IS LOCAL FUNDS; $9M IN OTHER IS LRIP-GO BONDS) 1. AM GRADE AND BRIDGE SF 33,835,5 19,835,5 14,, 1575 MN 11 19-29 MNDOT NORTH OF SCOTT-CARVER COUNTY LINE TO SOUTH END. BR BRIDGE SF 2, 2, OF OLD US212-PILE LOAD TEST REPLACEMENT 1576 MN 11 2738-28 MNDOT **SAM** RECONSTRUCT INTERCHANGE AT MN11/CSAH144 IN ROGERS (BONDS ARE PART OF MATCH TO FEDERAL ON 238-1-3) (TIED WITH 2738-29, 238-1-3). MC GRADE AND BRIDGE BF 9,2, 9,2, 1577 MN 11 2738-29 MNDOT FROM S. DIAMOND LAKE RD IN ROGERS TO 2. RD MILL AND NHPP 1,85, 868, 217, HENNEPIN/WRIGHT COUNTY LINE - BITMUMINOUS MILL & (TIED WITH 2738-28, 238-1-3) 1578 MN 11 1918-18 MNDOT **ADA** AT DAKOTA CR 43 (LEXINGTON AVE) IN MENDOTA. SC TRAFFIC SIGNAL SF LF 25, 125, 125, HEIGHTS-REPLACE TRAFFIC SIGNAL, INSTALL APS & ADA REVISION RAMPS 1579 US 169 2772-12 MNDOT OVER US212/MN62 IN EDEN PRAIRIE/EDINA-REDECK. BI BRIDGE REPAIR NHPP 2,125, 1,7, 425, BRIDGES 2779 AND 278, NEW APPROACH PANELS (TIED TO 2772-91) September 213 Project Listing Page III - 127 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 158 US 169 2772-9 MNDOT FROM I-394 IN ST LOUIS PARK TO BROOKLYN BLVD IN 9. SC SIGNING SF 45, 45, BROOKLYN PARK-SIGN REPLACEMENT 1581 US 169 2772-91 MNDOT FROM JUST S OF VALLEY VIEW ROAD TO JUST N JCT MN 62 IN EDINA-MILL & UNBONDED CONCRETE, GUARDRAIL, DRAINAGE, PED RAMPS & SIGNING (TIED TO 2772-12) 1. RC UNBONDED CONCRETE NHPP 8,755, 7,4, 1,751, 1582 US 169 2776-3RW14 MNDOT I-494, BLOOMINGTON-RW FOR RECONSTRUCTION OF. RW RIGHT OF WAY NHPP 5,96, 4,768, 1,192, INTERCHANGE 1583 US 169 75-94 MNDOT FROM JUST N MN25 IN BELLE PLAINE TO SCOTT CSAH 83 19. TM SPOT SF 42, 42, IN SHAKOPEE-REMOVE MEDIAN CROSSOVERS, ACCESS MODIFICATIONS, ADD TURN LANES, DRAINAGE 1584 US 169 75-97 MNDOT **SAM** AT SCOTT COUNTY ROAD 69 - INTERCHANGE 1. AM BRIDGE BF 15,45, 15,45, CONSTRUCTION (SAM INTERCHANGE BONDS) REPLACEMENT 1585 US 212 117-11 MNDOT **ITS** AT DELL RD IN EDEN PRAIRIE AND AT MN11 & POWERS BLVD (CARVER CSAH17) IN CHANHASSEN - ATMS INSTALLATION (FEDERAL AMOUNT IS DISTRICT C ITS FUNDS) 3. SC TRAFFIC MGMT. SYSTEM NHPP 15, 12, 3, 1586 MN 284 114-15 MNDOT E 1TH ST IN WACONIA-ROUNDABOUT ($72K IS CO-OP. AM SPOT SF 1,12, 1,12, AGMT FUNDS) 1587 I 394 2789-141 MNDOT **TED12** FROM RIDGEDALE DRIVE TO WESTBOUND I394 IN MINNETONKA - NEW ENTRANCE RAMP/BRIDGE 27W9 (OTHER INCLUDES MULTIPLE FUNDING SOURCES) $1,63,965 TED FUNDS. AM GRADE AND BRIDGE LF 1,63,965 1,63,965 1588 I 494 1985-143 MNDOT AT SE QUADRANT OF I494 & BLAINE AVE E IN INVER. AM SPOT SF 65, 65, GROVE HEIGHTS - REPAIR & IMPROVE DRAINAGE TO POND T-23 1589 I 494 1985-146 MNDOT AT 7TH AVE IN S ST PAUL-LANDSCAPING, RETAINING. RB LANDSCAPING SF 125, 125, WALL 159 I 494 2785-372 MNDOT AT NB MN77 AND AT 12TH AVE OVER I494 IN 1. BI REDECK NHPP 1,37, 1,233, 137, BLOOMINGTON-REDECK BRIDGES 982 & 98 & REPLACE APPROACH PANELS 1591 MN 61 2771-11 MNDOT HENNEPIN CSAH 81 TO I94 IN MAPLE GROVE-POWERLINE 3. MC MISCELLANEOUS NHPP 1,982,341 1,585,873 396,468 RELOCATION INCLUDING INSTALLATION OF NEW STILL TOWER STRUCTURES AND REMOVAL OF LATICE TOWER 1592 MN 61 2771-12RW MNDOT **MN211** EXTENSION OF 15TH AVE TO W OF I94 IN 1. RW RIGHT OF WAY DEMO 2,17,164 1,685,731 421,433 MAPLE GROVE-RIGHT OF WAY (SAFETEA-LU) (REMAINING R/W AMOUNT INCLUDED IN R/W SETASIDE) September 213 Project Listing Page III - 128 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 1593 I 694 6285-149 MNDOT I694 EB RAMP TO SB I35E IN LITTLE CANADA - REPAIR. RS SHOULDER SF 1,55, 1,55, SHOULDER SETTLEMENT AREA AND SLOPE STABILITY REPAIR PROBLEM 1594 I 694 6285-154 MNDOT AT LEXINGTON AVENUE IN ARDEN HILLS/SHOREVIEW -. AM TURN LANES SF 252,212 252,212 RIGHT TURN LANES AND SIGNAL MODIFICATION 1595 US 952A 198-84 MNDOT **CIMS** ON ROBERT ST FROM MENDOTA RD TO ANNAPOLIS ST IN W ST PAUL-MEDIAN BARRIER, ACCESS CLOSURES, SIGNAL REPLACEMENTS (TIED TO 173-1- 7) ($72K IS CO-OP AGMT FUNDS; $3.5M IS CIMS FUNDS) 2. AM MEDIAN BARRIER SF 5,452, 5,452, 1596 MN 999 8825-355 MNDOT NE QUADRANT OF METRO DISTRICT - RELAMP LIGHTING. SC LIGHTING SF 46, 46, SYSTEM 1597 MN 999 8825-364 MNDOT METROWIDE-UPGRADE EXISTING COMMUNICATIONS. TM TRAFFIC MGMT. SF 925, 925, INFRASTRUCTURE & CONTROLLERS SYSTEM 1598 MN 999 8825-388 MNDOT TH55, TH13 & TH 149-COORDINATION & RETIMING OF SIGNALS INCLUDING CCTV CAMERAS, MESSAGE SIGNS AND UPGRADING SIGNAL CABINETS FOR FUTURE TRANSIT SIGNAL PRIORITY. TM SIGNALS & CAMERA INSTALLATION CMAQ 1,172,475 937,98 234,495 1599 MN 999 8825-389 MNDOT METROWIDE-INSTALL RURAL INTERSECTION LIGHTING. SH LIGHTING HSIP 28, 187,2 2,8 16 MN 999 8825-439 MNDOT METROWIDE - POND RESTORATION. DR MISCELLANEOUS SF 8, 8, 161 MN 999 8825-473 MNDOT **ADA** METROWIDE AT VARIOUS LOCATIONS - CURB. SC SPOT STP 63, 54, 126, RAMPS & APS INSTALLATION 162 MN 999 8825-476 MNDOT METROWIDE-LOOP REPLACEMENTS. TM TRAFFIC MGMT. SF 75, 75, SYSTEM 163 MN 999 88M-BI-14 MNDOT METRO SETASIDE FOR BRIDGE. BI BRIDGE REPAIR SF 7, 7, PROJECTS FOR FY 214 OTHER 164 MN 999 88M-CA-14 MNDOT METRO SETASIDE -CONSULTANT DESIGN -214. CA MISCELLANEOUS SF 8,7, 8,7, 165 MN 999 88M-PM-14 MNDOT METRO SETASIDE FOR PREVENTIVE MAINTENANCE. PM PREVENTIVE SF 5,, 5,, PROJECTS FOR FY 214 MAINTENANCE 166 MN 999 88M-RB-14 MNDOT METRO SETASIDE FOR LANDSCAPING & LANDSCAPE. RB LANDSCAPING SF 1, 1, PARTNERSHIPS FOR FY 214 167 MN 999 88M-RW-14 MNDOT METRO SETASIDE FOR RIGHT OF WAY FOR FY 214. RW RIGHT OF WAY SF 12,61, 12,61, 168 MN 999 88M-RX-14 MNDOT METRO SETASIDE FOR ROAD REPAIR FOR FY 214. RX ROAD REPAIR SF 4,6, 4,6, September 213 Project Listing Page III - 129 of 175

ATP: M Fiscal Year: 214 STIP for FY 214-217 169 MN 999 88M-SA-14 MNDOT METRO SETASIDE FOR SUPPLEMENTAL. SA SUPP. AGREE. & SF 13,7, 13,7, AGREEMENTS/OVERRUNS FOR FY 214 COST OVERRUNS 161 MN 999 88M-SC-14 MNDOT METRO SETASIDE FOR SAFETY CAPACITY PROJECTS. SC SPOT SF 1,645, 1,645, FOR FY 214 1611 MN 999 88M-SHS-14 MNDOT METRO ATP SETASIDE FOR HSIP PROJECTS YET TO BE. SH SPOT HSIP 2,175,873 1,958,286 217,587 SELECTED FOR FY 214 1612 MN 999 88M-TE-14 MNDOT METRO SETASIDE FOR WATER RESOURCES ($5K),. SC MISCELLANEOUS SF 51, 51, TRAF ENG ($1K), TRAF MGMT($K) PRESERVATION PROJECTS FOR FY 214 1613 MN 999 88M-TM-14 MNDOT METRO SETASIDE-TRAFFIC MANAGEMENT STATE. TM TRAFFIC MGMT. SF 4, 4, FURNISHED MATERIALS FOR METRO PROJECTS IN FY SYSTEM 214 1614 MN 999 88M-TRLF-14 MNDOT **TRLF** REPAYMENT, FY 214, TRLF LOANS USED FOR. RW RIGHT OF WAY SF 2,244, 2,244, RIGHT OF WAY PURCHASE ON TH 212 & TH 65 $1,52,979,467 $285,854,156 $19,748,671 $181,991,967 $124,894,568 $46,238,776 September 213 Project Listing Page III - 13 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 1615 BB TCP-CCLRT-15 METRO TRANSIT SECT 539: CENTRAL CORRIDOR LIGHT RAIL TRANSIT. B3 GRADE AND FTA 13,743,388 13,743,388 PROJECT-NEW START FFGA 215 APPROPRIATION SURFACE 1616 BB TRF-TCMT-15 MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ASSOCIATED. B9 BUS GRANT FTA 1,33,965 1,43,172 26,793 MAINTENANCE-BUS 1617 BB TRF-TCMT-15A MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 PURCHASE BUS FTA 3,371,69 2,697,287 674,322 LEASE-TIRES 1618 BB TRF-TCMT-15AB MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-RTS TRANSIT. B9 BUS GRANT FTA 4,, 3,2, 8, TECHNOLOGY SYSTEMS 1619 BB TRF-TCMT-15AG MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FORT. B9 BUS GRANT FTA 7, 56, 14, SNELLING P&R EXPANSION 162 BB TRF-TCMT-15AH MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-OVERHAUL. GR BUS GRANT FTA 2,379,13 1,93,282 475,821 LIGHT RAIL VEHICLES & ASSOCIATED LRV EQUIPMENT 1621 BB TRF-TCMT-15AJ MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-LRV. GR BUS GRANT FTA 7, 56, 14, EQUIPMENT & TECHNOLOGY, WIRELESS VIDEO, TRAIN OPERATOR DISPLAYS, HOIST REPLACEMENT 1622 BB TRF-TCMT-15AK MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-SNELLING. B9 BUS GRANT FTA 1,7, 1,36, 34, AVENUE ARTERIAL BRT 1623 BB TRF-TCMT-15AL MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-I35W. B9 BUS GRANT FTA 2,322,818 1,858,254 464,564 BRT/EXPRESS SERVICE 1624 BB TRF-TCMT-15AM MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-MAJOR. B9 BUS GRANT FTA 1,25, 1,, 25, TO SUPPORT FACILITIES 1625 BB TRF-TCMT-15AN MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PUBLIC. B9 BUS GRANT FTA 312,5 25, 62,5 SUPPORT FACILITIES REFURBISHMENT 1626 BB TRF-TCMT-15AP MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-SUPPORT. B9 BUS GRANT FTA 2, 16, 4, FACILITY ROOF REFURBISHMENT 1627 BB TRF-TCMT-15AQ MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ONBOARD. B9 BUS GRANT FTA 1,777, 1,421,6 355,4 PEDESTRIAN DETECTION SYSTEM TRANSIT TECHNOLOGY SYSTEMS September 213 Project Listing Page III - 131 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 1628 BB TRF-TCMT-15AR MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-HWY 36 EAST. B9 BUS GRANT FTA 1, 8, 2, P&R (STILLWATER) 1629 BB TRF-TCMT-15AS METRO TRANSIT SECT 539: SOUTHWEST CORRIDOR LIGHT RAIL TRANSIT. B3 GRADE AND FTA 2,, 1,, 1,, PROJECT-NEW START FFGA 215 APPROPRIATION SURFACE 163 BB TRF-TCMT-15B MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-BUS. B9 PURCHASE BUS FTA 45,7,642 38,845,546 6,855,96 ACQUISITION 1631 BB TRF-TCMT-15C MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PREVENTIVE. B9 BUS GRANT FTA 5,, 4,, 1,, MAINTENANCE 1632 BB TRF-TCMT-15D MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 BUS GRANT FTA 1,75, 86, 215, SECURITY/SAFETY FOR 1% 1633 BB TRF-TCMT-15E MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 715, 572, 143, ENHANCEMENTS 1% 1634 BB TRF-TCMT-15F MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 1,382, 1,15,6 276,4 BUSINESS COMPUTER HW & SW 1635 BB TRF-TCMT-15M MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ENERGY. B9 BUS GRANT FTA 1,, 8, 2, 1636 BB TRF-TCMT-15N MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-OPERATIONS. B9 BUS GRANT FTA 1,25, 82, 25, COMMUNICATIONS & CONTROL EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1637 BB TRF-TCMT-15Q MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FARE. B9 BUS GRANT FTA 1,5, 84, 21, COLLECTION EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1638 BB TRF-TCMT-15S MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-METRO. B9 BUS GRANT FTA 5,312,5 4,25, 1,62,5 MOBILITY COST OF CONTRACTING FOR SERVICES 1639 BB TRF-TCMT-15T MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-REGIONAL. B9 BUS GRANT FTA 3,75, 3,, 75, FLEET COST OF CONTRACTING 164 BB TRF-TCMT-15U MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-MTS BUS. B9 PURCHASE BUS FTA 13,2, 1,56, 2,64, ACQUISITION September 213 Project Listing Page III - 132 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 1641 BB TRF-TCMT-15X MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL U OF M-U OF MN. B9 PURCHASE BUS FTA 343,75 275, 68,75 BUS ACQUISITION 1642 BB TRS-768-15A MNDOT HEARTLAND EXPRESS-PURCHASE CLASS 4 BUS. TR PURCHASE BUS STP 76, 6,8 15,2 1643 LOCAL 999 TRS-TCMT-15 MET COUNCIL-MT CMAQ TDM: ACTIVITIES TO REDUCE SOV USE BY VAN POOLS, CAR POOL & RIDE MATCHING PROGRAMS, MARKETING, TRANSIT RIDERSHIP INCENTIVES BY SUPPORTING SEVERAL TRANSPORTATION MANAGEMENT ORGANIZATIONS.. TM PLANNING CMAQ 4,375, 3,5, 875, 1644 BB TRS-TCMT-15A METRO TRANSIT CMAQ: PURCHASE FIVE BUSES AND TECHNOLOGY S FOR LIMITED STOP SERVICE ON SNELLING AVENUE IN ROSEVILLE AND ST PAUL, FORD PARKWAY IN ST PAUL, AND 46TH STREET IN MPLS. TR PURCHASE BUS CMAQ 3,79,15 2,967,32 741,83 1645 BB TRS-TCMT-15B METRO TRANSIT CMAQ: SERVICE DEMONSTRATION FOR LIMITED STOP. TR OPERATE BUS CMAQ 4,332,691 3,466,153 866,538 SERVICE ON SNELLING AVE IN ROSEVILLE AND ST PAUL, FORD PARKWAY IN ST PAUL, AND 46TH ST IN MPLS 1646 BB TRS-TCMT-15C SHAKOPEE CMAQ: PURCHASE 3 COACH BUSES FOR EXPRESS BUS. TR PURCHASE BUS CMAQ 1,8, 1,44, 36, SERVICE FROM MARSHALL ROAD TRANSIT STATION TO THE U OF M 1647 BB TRS-TCMT-15D SHAKOPEE CMAQ: THREE YEARS OF STARTUP OPERATING FUNDS. TR OPERATE BUS CMAQ 1,6,533 1,28,426 32,17 FOR EXPRESS BUS SERVICE FROM MARSHALL ROAD TRANSIT STATION TO THE U OF M 1648 BB TRS-TCMT-15E METRO TRANSIT CMAQ: PURCHASE SIX BUSES AND TECHNOLOGY S FOR LIMITED STOP SERVICE ON WEST 7TH STREET IN ST PAUL, BLOOMINGTON, AND MSP INTERNATIONAL AIRPORT. TR PURCHASE BUS CMAQ 3,51,98 2,88,784 72,196 1649 BB TRS-TCMT-15F METRO TRANSIT CMAQ: SERVICE DEMONSTRATION FOR LIMITED STOP. TR OPERATE BUS CMAQ 3,123,839 2,499,71 624,768 SERVICE ON WEST 7TH ST IN ST PAUL, BLOOMINGTON, AND MSP INTERNATIONAL AIRPORT 165 RR 1-12 MNDOT TCWR RR, CARVER CSAH 41 IN DAHLGREN TOWNSHIP. SR RR X-ING RRS 225, 225, (1/2 MILE E OF COLOGNE)-INSTALL GATES AND FLASHING S LIGHTS 1651 RR 27-38 MNDOT CP RR, 5TH AVE S (M22) IN HOPKINS-INSTALL. SR RR X-ING RRS 275, 275, CANTS UPGRADE TO GATES AND FLASHING LIGHTS S 1652 RR 27-39 MNDOT PGR RR, W 84TH ST, M123 IN BLOOMINGTON-INSTALL. SR RR X-ING RRS 225, 225, GATES AND FLASHING LIGHTS S 1653 RR 27-31 MNDOT PGR RR, W 9TH ST, MSAS 13 IN BLOOMINGTON-. SR RR X-ING RRS 225, 225, UPGRADE CANTILEVERS AND ADD LEDS S September 213 Project Listing Page III - 133 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 1654 RR 27-311 MNDOT UP RR, PENNSYLVANIA AVE, M72 IN GOLDEN VALLEY-. SR RR X-ING RRS 25, 25, INSTALL GATES AND FLASHING LIGHTS S 1655 CSAH 18 2-618-3 ANOKA COUNTY ANOKA CSAH 18 (BROADWAY AVE) AT CR 62 (KETTLE. SH GRADE AND HSIP 55, 495, 55, RIVER BLVD) IN COLUMBUS-ROUNDABOUT SURFACE 1656 PED/BIKE 1-9-5 CARVER COUNTY FROM 1ST ST BRIDGE OVER W CHASKA CREEK IN CHASKA TO MAIN ST IN CITY OF CARVER (SW OF INTERSECTION OF HICKORY ST)-PEDESTRIAN/BICYCLE TRAIL AND TRAILHEAD FACILITIES 2. EN PEDESTRIAN BIKE TRAIL TAP 757,9 66,32 151,58 1657 CSAH 1 1-61-46 CARVER COUNTY FROM JUST N OF CSAH 3 IN WACONIA TWP TO TH 7 IN WATERTOWN TWP-RECONSTRUCTION INCLUDING ADDITION OF TURN LANES AT INTERSECTIONS AND WIDENING SHOULDERS 3. RD GRADE AND SURFACE STP 4,867,5 3,894, 973,5 1658 PED/BIKE 19-9-16 DAKOTA COUNTY FROM DAKOTA CSAH 38 TO JOHNNY CAKE RIDGE ROAD 1. EN PEDESTRIAN TAP 1,818,135 1,1, 718,135 IN APPLE VALLEY-PEDESTRIAN/BICYCLE TRAIL BIKE TRAIL INCLUDING BRIDGE 1659 CSAH 23 19-623-29 DAKOTA COUNTY CMAQ: CSAH 23 & CSAH 42-FIBER OPTIC INSTALLATION, 6. TM TRAFFIC MGMT. CMAQ 1,153,9 923,12 23,78 TRAFFIC SIGNAL MGMT SYS, SIGNAL TIMING SYSTEM 166 CSAH 32 19-632-32 DAKOTA COUNTY CMAQ: INSTALL FIBER OPTIC CABLE FOR SIGNAL INTERCONNECTION ALONG CSAH 32 IN EAGAN INCLUDING TRAFFIC MONITORING EQUIPMENT, FLASHING YELLOW ARROWS AND RETIMING AND COORDINATION 3. TM TRAFFIC MGMT. SYSTEM CMAQ 519,2 415,36 13,84 1661 CSAH 42 19-642-51 DAKOTA COUNTY ALONG THE NORTH SIDE OF CSAH 42 FROM NICOLLET 2. EN PEDESTRIAN STP 3,692,233 2,953,786 738,447 AVE TO ELM DRIVE IN BURNSVILLE-PED/BICYCLE TRAIL BIKE TRAIL 1662 CSAH 19 27-619-22 HENNEPIN COUNTY AT HENNEPIN CSAH 3 IN CORCORAN-INTERSECTION. SH LIGHTING HSIP 27,5 24,75 2,75 LIGHTING 1663 CSAH 116 27-716-1 HENNEPIN COUNTY CR 116 AT CSAH 15 IN ROGERS-INTERSECTION LIGHTING. SH LIGHTING HSIP 27,5 24,75 2,75 1664 CSAH 135 27-735-3 HENNEPIN COUNTY ON CSAH 135 (TONKAWA RD) OVER THE MAXWELL. BR BRIDGE STP 1,72, 792, 28, CHANNEL OF LAKE MINNETONKA IN ORONO-REPLACE REPLACEMENT BRIDGE #9621 1665 PED/BIKE 62-9-2 RAMSEY COUNTY FROM LONG LAKE REGIONAL PARK IN NEW BRIGHTON 1. EN PEDESTRIAN TAP 1,442,32 1,1, 342,32 TO CR H IN MOUNDS VIEW-PEDESTRIAN/BICYCLE TRAIL BIKE TRAIL 1666 CSAH 1 62-61-4 RAMSEY COUNTY RAMSEY CSAH 1 & RAMSEY CO RD H, MOUNDS VIEW-. SH SPOT HSIP 1,2, 63, 57, INTERSECTION INCLUDING REPLACE TRAFFIC SIGNAL AND TURN LANES September 213 Project Listing Page III - 134 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 1667 LOCAL 999 62-631-15AC RAMSEY COUNTY **AC** ON MARYLAND AVE AND APPROACHES BETWEEN. BI BRIDGE REPAIR STP 748, 748, L'ORIENT ST AND JACKSON ST IN ST PAUL- RECONSTRUCT BRIDGE #62525 (AC PAYBACK 1 OF 1) 1668 CSAH 42 62-642-7 RAMSEY COUNTY CSAH 42 (FORD PKWY) FROM W OF HOWELL ST TO SNELLING AVE IN ST PAUL -RECONSTRUCT TO INCLUDE RAISED MEDIANS, BIKE AND TURN LANES AT INTERSECTIONS, NEW TRAFFIC SIGNALS AND SIDEWALK UPGRADES 1. RD GRADE AND SURFACE STP 3,33,896 2,664,717 666,179 1669 CSAH 2 7-62-2AC SCOTT COUNTY **AC** AT SCOTT CSAH 46 IN NEW MARKET-. SH GRADE AND HSIP 1,336,5 1,336,5 ROUNDABOUT (AC PAYBACK 1 OF 1) SURFACE 167 CSAH 8 7-68-22 SCOTT COUNTY FROM CSAH 91 TO THE DAKOTA COUNTY LINE- RECONSTRUCT INCLUDING ADDITION OF TURN LANES AT INTERSECTIONS AND A MULTI-USE TRAIL TO CONNECT TO AN EXISTING TRAIL IN DAKOTA COUNTY 2. RD TURN LANES STP 4,73, 3,784, 946, 1671 CSAH 17 7-617-24 SCOTT COUNTY FROM S OF CSAH 78 TO N OF CSAH 42-RECONSTRUCT AS 2. RC GRADE AND STP 8,47, 6,776, 1,694, A 4-LANE DIVIDED ROADWAY AND MULTI-USE TRAIL SURFACE 1672 PED/BIKE 82-9-5 WASHINGTON FROM US 61 TO US 1 IN DENMARK TOWNSHIP- 2. EN PEDESTRIAN TAP 1,683, 1,1, 583, COUNTY PEDESTRIAN/BICYCLE TRAIL BIKE TRAIL 1673 PED/BIKE 91-9-28 THREE RIVERS **AC** CMAQ:PEDESTRIAN/BICYCLE TRAIL BETWEEN 4. BT PEDESTRIAN CMAQ 7,664, 2,4, 3,76, 5,264, PARK DISTRICT TRACY AVE AND FRANCE AVE/EDINA PROMENADE IN BIKE TRAIL EDINA (AC PROJECT, PAYBACK IN FY16) 1674 PED/BIKE 92-9-52 DNR ON THE GATEWAY STATE TRAIL OVER HADLEY AVE. EN PEDESTRIAN TAP 1,65, 1,1, 55, NORTH IN OAKDALE-PEDESTRIAN/BICYCLE TRAIL BRIDGE BIKE BRIDGE 1675 PED/BIKE 98-9-8 CHISAGO COUNTY FROM TH95 (BENCH ST) TO CHISAGO COUNTY RD 2 IN TAYLORS FALLS - MULTI USE PAVED TRAIL (VALLEY VIEW TRAIL) TO PROVIDE CONNECTIVITY TO MN INTERSTATE PARK, SWEDISH IMMIGRANT TRAIL AND PROPOSED GATEWAY TRAIL. EN PEDESTRIAN BIKE TRAIL TAP 262,29 197,44 64,886 1676 LOCAL 999 17-444-7 BLOOMINGTON LINDAU LANE/IKEA WAY IN BLOOMINGTON-REMOVAL OF. SH MEDIAN BARRIER HSIP 1,232, 1,18,8 123,2 APPROXIMATELY 38FT OF MEDIAN 1677 PED/BIKE 11-2-31AC BROOKLYN PARK **AC** FROM REGENT AVE AT SHINGLE CREEK TO NOBLE AVE AT SHINGLE CREEK IN BROOKLYN PARK- PEDESTRIAN/BICYCLE TRAIL WITH LIGHTING, PEDESTRIAN ROAD SAFETY S (AC PAYBACK 1 OF 1). EN PEDESTRIAN BIKE TRAIL TAP 968, 968, September 213 Project Listing Page III - 135 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 1678 LOCAL 999 141-3-21 MINNEAPOLIS CMAQ: UPGRADE OF THE TRAFFIC SIGNAL CONTROL SYSTEM AT 262 LOCATIONS IN MPLS ENHANCING THE ITS AND SIGNAL COORDINATION CAPABILITIES THROUGH NEW CONTROLLERS, ADVANCED DETECTOR TECHNIQUES AND TMC UPGRADES. TM TRAFFIC MGMT. SYSTEM CMAQ 3,245, 2,596, 649, 1679 LOCAL 999 141-3-25 MINNEAPOLIS 17 INTERSECTIONS IN MPLS-INSTALL SPECIAL COLORED. SH SIGNING HSIP 187, 168,3 18,7 MARKING AND SIGNING TREATMENTS FOR BICYCLE CONFLICT ZONES 168 LOCAL 999 141-211-14 MINNEAPOLIS 4TH AVE S BETWEEN 3RD ST S AND 11TH ST S IN MPLS-. SH TRAFFIC SIGNAL HSIP 786,5 77,3 79,2 OVERHEAD SIGNAL INDICATIONS AT 9 INTERSECTIONS REVISION 1681 LOCAL 999 141-328-4 MINNEAPOLIS ON 1TH AVE SE OVER THE MISSISSIPPI RIVER IN MPLS-. BI BRIDGE REPAIR STP 7,5, 3,369,3 4,13,7 REHABILITATION OF CONCRETE ARCH STRUCTURE OF BRIDGE #2796 1682 LOCAL 999 141-425-6 MINNEAPOLIS SB HENNEPIN/LYNDALE AVE FROM DUNWOODY BLVD TO EB I94 ENTRANCE RAMP AND FRANKLIN AVE AND; NB HENNEPIN AVE FROM FRANKLIN AVE TO END OF HENNEPIN/LYNDALE COMMON SECTION ADJACENT TO LORING PARK-RECONSTRUCTION, SIGNAL TIMING WORK AND PED/BICYCLE FACILITIES 1. RC GRADE AND SURFACE STP 9,119, 7,295,2 1,823,8 1683 CSAH 35 157-2-26 RICHFIELD CSAH 35 (PORTLAND AVE) FROM 67TH ST TO 77TH ST IN RICHFIELD-RECONSTRUCT TO 2-LANE ROAD WITH A CENTER TURN LANE AND INCLUDING TRANSIT FACILITIES, BIKE LANES AND PEDESTRIAN FACILITIES 1. RD TURN LANES STP 5,183,545 4,146,836 1,36,79 1684 I 35W 16-2-25 ROSEVILLE AT I 35W AND CLEVELAND AVE IN ROSEVILLE-. RD GRADE AND STP 1,49,73 1,192,584 298,146 RECONSTRUCT RAMP TERMINALS INCLUDING DUAL LEFT SURFACE TURN LANES ON NB CLEVELAND AVE 1685 PED/BIKE 164-3-11 SAINT PAUL ON E 7TH ST FROM ARCADE ST TO BUSH; ON ARCADE ST FROM E 7TH ST TO BRIDGE OVER PHALEN BLVD; ON FOREST ST FROM WELLS ST TO REANEY AVE IN ST PAUL; AND ON REANEY AVE FROM FOREST ST TO JOHNSON PKWY-SIDEWALKS, LANDSCAPING, TREES, PEDESTRIAN LIGHTING, ON-STREET BICYCLE FACILITIES 1. EN PED./BIKE TAP 529,411 423,536 15,875 1686 LOCAL 999 164-158-21 SAINT PAUL ON KELLOGG BLVD OVER THE RAVINE BETWEEN. BI BRIDGE REPAIR STP 3,432, 2,745,6 686,4 WABASHA ST AND SAINT PETER ST IN ST PAUL- RECONSTRUCT BRIDGE #92797 1687 PED/BIKE 164-646-1 SAINT PAUL ON RAYMOND AVE FROM HAMPDEN AVE TO ENERGY PARK DR IN ST PAUL-STREET RECONSTRUCTION TO ADD CURB EXTENSIONS, BOULEVARD TREES, LANDSCAPING, PEDESTRIAN MEDIANS, SIDEWALK WIDENING, BIKE LANES, PEDESTRIAN LIGHTING. EN PED./BIKE TAP 1,826,33 1,1, 726,33 September 213 Project Listing Page III - 136 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 1688 PED/BIKE 188-9-2 LAKEVILLE FROM 173RD ST W TO FARMINGTON BORDER INCLUDING 1. EN PEDESTRIAN TAP 1,124,267 899,41 224,857 A BRIDGE ACROSS NORTH CREEK IN LAKEVILLE- BIKE TRAIL PEDESTRIAN/BICYCLE TRAIL 1689 LOCAL 999 189-2-23 MAPLE GROVE ON WEAVER LAKE RD AT DUNKIRK LANE, XENE LANE, 3. SC GRADE AND STP 2,62,35 2,96,244 524,61 AND NIAGARA LANE IN MAPLE GROVE-CONSTRUCT SURFACE ROUNDABOUTS 169 LOCAL 999 189-12-11 MAPLE GROVE WEAVER LAKE RD AT DUNKIRK LANE IN MAPLE GROVE-. SH GRADE AND HSIP 1,138,61 1,24,749 113,861 CONVERT SIGNALIZED INTERSECTION TO ROUNDABOUT SURFACE 1691 MN 55 195-1-11AC EAGAN **AC** FROM THE MN149 NORTH INTERSECTION THROUGH THE MN149 SOUTH INTERSECTION- EXPANSION TO A 6-LANE ROADWAY INCLUDING TRAFFIC SIGNALS, AND CONSTRUCTION OF A MULTI-USE TRAIL (AC PAYBACK 1 OF 1). MC GRADE AND SURFACE STP 2,64, 2,64, 1692 MN 11 238-1-3AC ROGERS **AC** AT HENNEPIN CSAH 144 IN ROGERS-. MC GRADE AND STP 7,7, 7,7, RECONSTRUCT INTERCHANGE, MULTI-USE TRAIL AND BRIDGE SIDEWALK, SIGNALS AND LIGHTING (AC PAYBACK 1 OF 1) 1693 MN 5 12-11 MNDOT FROM JUST E OF SCANDIA RD IN LAKETOWN TWP TO 6. RS MILL AND SF 5,49, 5,49, ROLLING ACRES RD/BAVARIA RD IN VICTORIA - MILL &, DRAINAGE, GUARDRAIL 1694 MN 5 12-12 MNDOT FROM JUST E OF JCT MN25 IN CAMDEN TWP TO JUST 6. RS MILL AND SF 3,325, 3,325, EAST OF BIRCH ST IN WACONIA- MILL &, GUARDRAIL, ACCESS MANAGEMENT, DRAINAGE 1695 US 1 22-93 MNDOT AT FELDSPAR AVE NW IN RAMSEY-RECONSTRUCT. SC GRADE AND SF 27, 27, INTERSECTION SURFACE 1696 US 12 2714-142 MNDOT FROM E JCT HENNEPIN CSAH 11 IN WAYZATA TO I494 CD 1. SC GRADE AND SF 1,265, 1,265, RD EXIT IN MINNETONKA-CONSTRUCT AUXILIARY LANE, SURFACE DRAINAGE, GUARDRAIL 1697 MN 13 192-55 MNDOT FROM 2ND ST IN MENDOTA TO I35E IN LILYDALE-MILL AND 1. RD STORM SEWER SF 1,345, 1,345,, SLOPE STABILIZATION, REPLACE CURB, GUTTER AND CATCH BASINS 1698 MN 13 71-14 MNDOT AT 15TH STREET IN PRIOR LAKE AND SAVAGE- CONSTRUCT REDUCED CONFLICT INTERSECTION AT 15TH & RESTRICT ACCESS TO RI/RO AT ZINRAN/OAKLAND BEACH AVE. AM SPOT SF 1,4, 1,4, 1699 MN 13 71-17 MNDOT AT SCOTT CSAH 42 (EGAN DR) IN PRIOR LAKE/SAVAGE -. SC TRAFFIC SIGNAL SF LF 3, 15, 15, SIGNAL REPLACEMENT REVISION September 213 Project Listing Page III - 137 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 17 MN 13 71-98 MNDOT **ADA** AT DULUTH AVE SE (SCOTT MSAS 11) IN PRIOR. SC TRAFFIC SIGNAL SF LF 275, 137,5 137,5 LAKE - SIGNAL REPLACEMENT INCLUDING REVISION ADA/PEDESTRIAN UPGRADES 171 I 35E 1982-171 MNDOT ON SOUTH SIDE FROM N OF DEERWOOD DR TO JUST NE. NO NOISE SF LF 715, 645, 7, OF FAWN WAY IN EAGAN - NOISE WALL ABATEMENT 172 I 35E 628-367B MNDOT FROM I94 IN ST PAUL TO JUST N OF LITTLE CANADA RD IN 5. CA GRADE,SURFACE SF 1,2, 1,2, LITTLE CANADA - MNPASS OPERATION/INTEGRATION & BRIDGE 173 I 35E 6281-19 MNDOT FROM RAMSEY CR E IN VADNAIS HTS TO JUST S OF RAMSEY CSAH 96 IN WHITE BEAR LAKE-MILL &, MILL & CONCRETE UNBONDED, DRAINAGE, LOOP DETECTORS, GUARDRAIL, CONSTRUCT SLOPE, CPR AT RAMPS, MILL &, CABLE MEDIAN BARRIER,TEMP BYPASS, & RR AGREEMENT (TIED WITH 6281-25) 2. RS MILL AND NHPP 4,94, 4,446, 494, 174 I 35E 6281-2 MNDOT **ADA** RAMSEY CSAH 96 OVER I35E IN WHITE BEAR LAKE-REDECK BRIDGE 62834, REPLACE APPROACH PANELS, DRAINAGE, REPLACE TRAFFIC SIGNALS, ADA PED FACILITIES. BI REDECK NHPP 1,825, 1,453,5 161,5 21, 175 I 35E 6281-25 MNDOT OVER GOOSE LAKE RD AND BNSF RR IN VADNAIS HEIGHTS-REPLACE BRIDGES 9567 (NEW 62729) AND 9568 (NEW 6273) INCLUDING REPLACEMENT AND PROFILE ADJUSTMENTS OF PAVEMENT ON BOTH SIDES OF BRIDGE, GUARDRAIL, DRAINAGE, TMS (TIED WITH 6281-19). BR BRIDGE REPLACEMENT NHPP 9,475, 8,527,5 947,5 176 I 35E 6281-44 MNDOT SB FROM RAMSEY CR J TO RAMSEY CSAH 96 N WHITE 3. TM TRAFFIC MGMT. SF 1, 1, BEAR LAKE-SIGNS AND SHOULDERING FOR BUS ONLY SYSTEM SHOULDER 177 I 35W 2782-315 MNDOT FROM 42ND ST IN MPLS TO 66TH ST IN RICHFIELD - 4. RB LANDSCAPING SF 2, 2, CORRIDOR LANDSCAPING 178 I 35W 6284-157 MNDOT AT RAMSEY CSAH 96 (CTY RD G) OVER I35W IN ARDEN 1. BI REDECK NHPP 925, 832,5 92,5 HILLS/NEW BRIGHTON-REDECK BRIDGE 9577, APPROACH PANEL WORK, GUARDRAIL 179 I 35W 6284-17 MNDOT FROM MN36 IN ROSEVILLE TO US1 IN MOUNDS VIEW- 6. TM TRAFFIC MGMT. SF 1,, 1,, INSTALL ITS, INCLUDING VEHICLE DETECTION, FIBER, SYSTEM REPLACE SHELTERS & ELIMINATE COPPER 171 I 35W 6284-171 MNDOT AT RAMSEY CSAH 12 (CR F) IN ARDEN HILLS/NEW. BR BRIDGE SF 3,155, 3,155, BRIGHTON - REPLACE BRIDGE 9599 AND APPROACHES, REPLACEMENT GUARDRAIL, PED/BIKE TRAIL 1711 MN 36 6211-12 MNDOT FROM US61 IN MAPLEWOOD TO MN12 IN N ST PAUL- 4. TM TRAFFIC MGMT. SF 1,2, 1,2, INSTALL TMS SYSTEM September 213 Project Listing Page III - 138 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 1712 MN 36 824-62 MNDOT FROM I-694 IN PINE SPRINGS TO JUST EAST OF 1. RB LANDSCAPING SF 5, 5, HIGHLANDS TRAIL N IN GRANT- LANDSCAPING 1713 MN 36 8214-114MIT15 MNDOT OVER ST CROIX RIVER NEAR STILLWATER-MITIGATION. BR BRIDGE SF LF 6, 3, 3, ITEMS FOR REPLACEMENT OF RIVER BRIDGE 4654 REPLACEMENT 1714 MN 36 8214-114RW2 MNDOT ST CROIX RIVER X-ING AT STILLWATER-(MN)TH 36/(WI) TH 2. RW RIGHT OF WAY NHPP 1,3, 1,4, 26, 64-RIGHT OF WAY ACQUISITION 1715 MN 36 8214-114Z MNDOT ST CROIX MIT ITEM - BLUFFLAND RESTORATION - REMOVAL OF BUCKHORN SIGN, PARTIAL RESTORATION OF WISCONSIN APPROACH (REMOVAL OF PAVEMENT FROM EAST END OF BRIDGE TO STH 35 AND PORTIONS OF CTH E) - WISCONSIN LET 2. RC GRADE AND SURFACE SF LF 9,651 45,326 45,325 1716 MN 36 8214-144 MNDOT **MN126** ST CROIX RIVER X-ING AT STILLWATER-(MN)TH 36/(WI) TH 64-PRE DESIGN AND STUDY OF LONG TERM RDWY APPROACH ALTERNATIVES TO TH 36/SH 64 FOR ST CROIX RIVER CROSSING (SAFETEA-LU) 4. PL PLANNING DEMO 339,95 271,96 67,99 1717 MN 36 8214-16 MNDOT FROM OSGOOD AVE TO WESTSIDE OF MN95-1. RB LANDSCAPING SF 45, 45, LANDSCAPING 1718 MN 36 8214-164 MNDOT FROM W OF GREELEY AVE/CSAH 66 (W LIMIT OF ST. 1. RB LANDSCAPING SF 35, 35, CROIX CROSSING PROJECT) TO E OF OSGOOD AVE - LANDSCAPING 1719 MN 36 8221-1AC MNDOT **AC** OVER ST CROIX RIVER NEAR STILLWATER & OAK PARK HEIGHTS-NEW BRIDGE 8245 OVER ST. CROIX RIVER, INCLUDING RAMPS ON & OFF TH 95 (AC PAYBACK 1 OF 1). BR BRIDGE REPLACEMENT NHPP 8,368,663 8,368,663 172 MN 41 71-1 MNDOT FROM RR X-ING #7225 IN LOUISVILLE TOWNSHIP TO 2. RS MILL AND SF 835, 835, JUST SOUTH OF CHASKA MN RIVER BRIDGE IN CHASKA - MILL &, SLOPE ARMORING 1721 MN 51 6215-1 MNDOT **BP8** FROM JUST S OF W FORD PKWY IN ST PAUL TO JUST N OF MN36 IN ROSEVILLE-BUS STOP BUMPOUTS FOR RAPID BUS SERVICE (CHP 152 TRANSIT ADVANTAGE BONDS) 7. AM GRADING BF 6,, 6,, 1722 MN 51 6216-13 MNDOT AT RAMSEY COUNTY ROAD E IN ARDEN HILLS-REPLACE. BR BRIDGE STP 2,68, 2,144, 536, BRIDGE 621(6238), ADD TURN LANES, CONSTRUCT REPLACEMENT TRAIL, SIGNAL 1723 MN 51 6216-133 MNDOT FROM DAN PATCH AVE/MIDWAY PKWY IN FALCON HEIGHTS/SAINT PAUL TO I694 IN ARDEN HILLS-SIGNAL COORDINATION, DEPLOY CC CAMERAS, AND DYNAMIC MESSAGE SIGNS 6. TM SIGNALS & CAMERA INSTALLATION CMAQ 78,225 566,58 141,645 September 213 Project Listing Page III - 139 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 1724 US 52 1928-6 MNDOT FROM SOUTHVIEW BLVD IN SOUTH ST PAUL TO PLATO 4. SC LIGHTING NHPP 1,265, 1,12, 253, BLVD IN ST PAUL - REPLACE LIGHTING SYSTEMS 1725 MN 55 191-44 MNDOT UP RR, COURTHOUSE BLVD IN HASTINGS-INSTALL. SR RR X-ING RRS 275, 275, CANTS, UPGRADE TO GATES AND FLASHING LIGHTS S 1726 MN 55 2722-82 MNDOT AT HENNEPIN CSAH 11/SIOUX TRAIL IN MEDINA -. SC TRAFFIC SIGNAL SF LF 3, 15, 15, REPLACE TEMPORARY WOOD POLE SIGNAL SYSTEM REVISION WITH PERMANENT SIGNAL SYSTEM 1727 MN 55 2723-123 MNDOT **ADA** WB FROM I494 NB EXIT RAMP TO PLYMOUTH 1. SC TURN LANES SF 1,446, 1,446, BLVD IN PLYMOUTH-CONSTRUCT A WB THIRD LANE, SIGNALS, DRAINAGE AND ADA 1728 US 61 6222-173 MNDOT CP RR, JUST S OF RAMSEY CSAH 9 (BUFFALO ST) IN. SR RR X-ING RRS 35, 35, WHITE BEAR LAKE-INSTALL CANTS, UPGRADE TO GATES S 1729 US 61 6222-166 MNDOT **ADA** AT BUERKLE ROAD IN VADNAIS HEIGHTS -. SC TRAFFIC SIGNAL SF LF 25, 125, 125, SIGNAL REPLACEMENT INCLUDING ADA/PEDESTRIAN REVISION UPGRADES 173 MN 65 27-99 MNDOT **ADA** AT 41ST AVE NE IN COLUMBIA HEIGHTS -. SC TRAFFIC SIGNAL SF LF 28, 14, 14, REPLACE TRAFFIC SIGNAL AND ADA S REVISION 1731 MN 65 28-142 MNDOT FROM 133RD AVE IN BLAINE TO BUNKER LAKE BLVD IN. AM FRONTAGE ROAD SF 25, 25, HAM LAKE-FRONTAGE ROAD AND CLOSE ACCESSES 1732 MN 65 28-143 MNDOT FROM 14TH AVE TO 145TH AVE IN HAM LAKE-FRONTAGE 1. AM FRONTAGE ROAD SF 25, 25, ROAD AND CLOSE ACCESSES 1733 MN 77 1925-52 MNDOT OVER MN RIVER IN BLOOMINGTON AND EAGAN-PAINT NB 1. BI PAINT BRIDGE NHPP 2,14, 1,712, 428, BRIDGE 96N, SB 96S AND PED BRIDGE 96F AND REPLACE GUARDRAIL 1734 I 94 2781-447 MNDOT WB RAMP OVER LRT AND CITY ST LOCATED JUST E OF JCT OF MN 55 IN MPLS AND ON I494 OVER 34TH ST IN BLOOMINGTON- PAINT BRIDGES 27859, 27861, 27V28 AND 27765, AND APPROPRIATE BEARING WORK. BI PAINT BRIDGE NHPP 1,195, 1,75,5 119,5 1735 I 94 2781-448 MNDOT NEAR JUNCTION OF I94 AND I394 IN MPLS - REMOVE AND. BI BRIDGE REPAIR NHPP 37, 333, 37, REPLACE LOW SLUMP AND O/L AND DECK REPAIRS ON BRIDGES 27793 AND 27799L, GUARDRAIL 1736 I 94 6282-19 MNDOT ON SOUTH SIDE FROM PRIOR AVE TO FAIRVIEW AVE IN. NO NOISE SF LF 97, 68, 29, ST PAUL-NOISE WALL ABATEMENT 1737 I 94 6282-2 MNDOT AT MACKUBIN STREET IN ST. PAUL-REPLACE. BR BRIDGE NHPP 1,68, 1,512, 168, PEDESTRIAN BRIDGE #9737, SIDEWALK, FENCING, REPLACEMENT GUARDRAIL, PED RAMPS, TMS September 213 Project Listing Page III - 14 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 1738 I 94 8282-19 MNDOT FROM I494/694 IN WOODBURY TO ST CROIX RIVER IN 5. TM TRAFFIC MGMT. SF 1,, 1,, LAKELAND-INCIDENT MGMT SYSTEM AND RAMP METERS SYSTEM AT RADIO DR, WOODBURY DR AND MANNING AVE 1739 I 94 8282-116 MNDOT MANNING AVE IN WOODBURY TO ST. CROIX RIVER IN 5. DR STORM SEWER SF 4,56, 4,56, LAKELAND TWP- REPAIR, REPLACE & LINE LARGE PIPES REPAIR 174 MN 1 2734-33AC MNDOT **AC** FROM 36TH ST TO CEDAR LAKE RD IN ST. LOUIS PARK - REPLACE BRIDGES 538(2733), 539(NEW PED BRIDGE 2734), 5462(2735), 5598(2736), AND JOINT REPLACEMENT BRIDGE 2719, RECONSTRUCT MAIN LINE PAVEMENT AND INTERCHANGES INCLUDING CONSTRUCTING AUXILLIARY LANES AND NOISE WALLS (AC PAYBACK 1 OF 1) 2. MC GRADE AND SURFACE NHPP 3,8, 3,8, 1741 MN 149 1917-44 MNDOT **ADA**ELLA** FROM N JCT MN55/149 TO S END OF BRIDGE 19857 OVER I494 IN EAGAN-4 TO 5 LANE EXPANSION, MILL &, TRAIL, ADA, SIGNALS, DRAINAGE (TIED TO 195-1-1) 1. AM GRADE AND SURFACE SF 845, 845, 1742 MN 149 1917-45 MNDOT **AB**ADA** FROM I494 IN MENDOTA HEIGHTS TO MN5 IN 6. RS MILL AND STP 6,94, 5,552, 1,388, ST. PAUL- PAVEMENT PRESERVATION, TURN LANE, SIGNAL, ADA AND DRAINAGE 1743 US 169 2772-97 MNDOT AT 36TH AVE N (EAST RAMP) IN PLYMOUTH - REPLACE. SC TRAFFIC SIGNAL SF LF 225, 112,5 112,5 SIGNAL SYSTEM REVISION 1744 US 169 2772-99 MNDOT ON EAST SIDE FROM 16TH ST W IN ST LOUIS PARK TO. NO NOISE SF LF 845, 77, 75, JUST N OF WAYZATA BLVD IN GOLDEN VALLEY - NOISE ABATEMENT WALL AND ACCESS CLOSURE 1745 US 169 78-1 MNDOT FROM MN 282 TO N OF MN 21 IN JORDAN - RECONST/ MAINLINE INCLUDING MEDIAN J- BARRIER AND REPLACE MEDIAN DRAINAGE STRUCTURES AND PIPES, REPLACE JOINTS, SPOT PAINT AND MILL AND PATCH OR BRIDGES 682, 683, 684, 885 2. SC MEDIAN BARRIER NHPP 7,79, 6,232, 1,558, 1746 US 212 2763-49 MNDOT **TED12** AT SHADY OAK ROAD IN EDEN PRAIRIE -. AM GRADE AND LF 7,, 7,, INTERCHANGE RECONSTRUCTION (OTHER INCLUDES BRIDGE MULTIPLE FUNDING SOURCES) $7,, TED FUNDS 1747 I 394 2789-136 MNDOT **ADA** JUST E OF MN1 IN GOLDEN VALLEY TO WEST END OF BRIDGE #2777D IN MPLS- MILL AND, MINOR CPR, DIAMOND GRINDING, SHOULDERS, DRAINAGE, ADA RAMPS, GUARDRAIL AND SIGNAL LOOPS 2. RS MILL AND NHPP 4,5, 4,5, 45, September 213 Project Listing Page III - 141 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 1748 I 494 2785-33 MNDOT **ELLA**AC** FROM N OF I394 IN MINNETONKA TO I94/I494/I694 INTERCHANGE IN MAPLE GROVE - UNBONDED CONCRETE, CPR, RIGHT SIDE DYNAMIC SHOULDER, SIGNING, STRIPING, DRAINAGE, TMS, NOISE WALLS, REDECK AND WIDEN BRIDGES 27973, 27974, 27975, 27976, 27977, 27978, AND REDECK BRIDGE 2795(AC PROJECT, PAYBACK IN 216) 8. RC GRADE AND BRIDGE NHPP 29,946, 17,626, 31,654, 12,32, 1749 I 494 2785-338 MNDOT FROM FLYING CLOUD DR TO W OF BUSH LAKE RD IN 2. RB LANDSCAPING SF 47, 47, BLOOMINGTON - LANDSCAPING 175 MN 61 2771-12 MNDOT **MN235** EXTENSION OF 15TH AVE TO W OF I94 IN 1. MC GRADE,SURFACE DEMO 4,64,68 3,363,254 1,24,814 MAPLE GROVE-ROADWAY REALIGNMENT (SAFETEA-LU) & BRIDGE 1751 MN 61 2771-12A MNDOT **MN226** EXTENSION OF 15TH AVE TO W OF I94 IN 1. MC GRADE,SURFACE DEMO 1,873,34 1,498,427 374,67 MAPLE GROVE-ROADWAY REALIGNMENT (SAFETEA-LU) & BRIDGE 1752 MN 61 2771-12B MNDOT **MN119** EXTENSION OF 15TH AVE TO W OF I94 IN 1. MC GRADE,SURFACE DEMO 936,518 749,214 187,34 MAPLE GROVE-ROADWAY REALIGNMENT (SAFETEA-LU) & BRIDGE 1753 MN 61 2771-12C MNDOT **MN249** EXTENSION OF 15TH AVE TO W OF I94 IN 1. MC GRADE,SURFACE DEMO 49, 49, MAPLE GROVE-ROADWAY REALIGNMENT (28 & BRIDGE APPROPRIATIONS ACT-STP) 1754 MN 61 2771-12D MNDOT **MN266** EXTENSION OF 15TH AVE TO W OF I94 IN 1. MC GRADE,SURFACE DEMO 399,932 399,932 MAPLE GROVE-ROADWAY REALIGNMENT (21 & BRIDGE APPROPRIATIONS ACT-STP) 1755 I 694 6285-148 MNDOT US1 SB TO EB LEFT ENTRANCE TO I694 AND MERGE TO 2. RB LANDSCAPING SF 2, 2, SNELLING AND SB HAMLINE TO EB I694 IN ARDEN HILLS - LANDSCAPING 1756 MN 999 8825-347 MNDOT METROWIDE - TMS UPGRADES. TM TRAFFIC MGMT. SF 1,2, 1,2, SYSTEM 1757 MN 999 8825-382 MNDOT METROWIDE - ELECTRICAL SERVICE UPGRADES/REFURBISH & NID ON I 94 N OF TUNNEL IN MPLS TO SHINGLE CREEK PKWY IN BROOKLYN CTR; SYSTEM REFURBISH, RAMP METERS AT MAPLE GROVE PKWY TO EB94 AND HANSEN BLVD TO WB 1; CAMERA FILL INS. TM TRAFFIC MGMT. SYSTEM SF 1,525, 1,525, 1758 MN 999 8825-383 MNDOT METROWIDE - REPAIR OR REPLACE CANTILEVER SIGN. SC SIGNING SF 5, 5, STRUCTURES 1759 MN 999 8825-391 MNDOT SW QUADRANT OF METRO DISTRICT - RELAMP LIGHTING. SC LIGHTING SF 55, 55, SYSTEM 176 MN 999 8825-462 MNDOT SW QUADRANT OF METRO-SIGN REPLACEMENT. SC SIGNING SF 8, 8, September 213 Project Listing Page III - 142 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 1761 MN 999 8825-477 MNDOT METROWIDE-LOOP REPLACEMENTS. TM TRAFFIC MGMT. SF 75, 75, SYSTEM 1762 MN 999 88M-ADA-15 MNDOT **ADA** METRO SETASIDE FOR ADA PROJECT FOR FY. SC CURB & GUTTER STP 1,8, 86, 22, 215 1763 MN 999 88M-AM-15 MNDOT METRO SETASIDE FOR MUNICIPAL AGREEMENT. AM MISCELLANEOUS SF 4,, 4,, PROJECTS FOR FY 215 1764 MN 999 88M-BI-15 MNDOT METRO SETASIDE FOR BRIDGE. BI BRIDGE REPAIR NHPP 6,325, 5,6, 1,265, PROJECTS FOR FY 215 OTHER 1765 MN 999 88M-CA-15 MNDOT METRO SETASIDE -CONSULTANT DESIGN -215. CA MISCELLANEOUS SF 8,, 8,, 1766 MN 999 88M-CM-15 MNDOT METRO SETASIDE FOR LOWER COST CONGESTION. SC MISCELLANEOUS NHPP 14,, 7,2, 6,8, MGMT PROJECT FOR FY 215 1767 MN 999 88M-NO-15 MNDOT METRO SETASIDE FOR NOISE ABATEMENT PROJECTS. NO NOISE SF 1,32, 1,32, FOR FY 215 ABATEMENT 1768 MN 999 88M-PM-15 MNDOT METRO SETASIDE FOR PREVENTIVE MAINTENANCE. PM PREVENTIVE SF 4,5, 4,5, PROJECTS FOR FY 215 MAINTENANCE 1769 MN 999 88M-RB-15 MNDOT METRO SETASIDE FOR LANDSCAPING & LANDSCAPE. RB LANDSCAPING SF 1, 1, PARTNERSHIPS FOR FY 215 177 MN 999 88M-RS-15 MNDOT METRO SETASIDE FOR RESURFACING &. RS MILL AND STP 1,565, 1,252, 313, RECONDITIONING PROJECTS FOR FY 215 1771 MN 999 88M-RW-15 MNDOT METRO SETASIDE FOR RIGHT OF WAY FOR FY 215. RW RIGHT OF WAY SF 22,615, 22,615, 1772 MN 999 88M-RX-15 MNDOT METRO SETASIDE FOR ROAD REPAIR FOR FY 215. RX ROAD REPAIR SF 4,6, 4,6, 1773 MN 999 88M-SA-15 MNDOT METRO SETASIDE FOR SUPPLEMENTAL. SA SUPP. AGREE. & SF 11,, 11,, AGREEMENTS/OVERRUNS FOR FY 215 COST OVERRUNS 1774 MN 999 88M-SC-15 MNDOT METRO SETASIDE FOR SAFETY CAPACITY PROJECTS. SC SPOT SF 1,46,85 1,46,85 FOR FY 215 1775 LOCAL 999 88M-SHL-15 MNDOT METRO ATP SETASIDE FOR HSIP PROJECTS YET TO BE. SH SPOT HSIP 7,21,946 6,489,851 721,95 SELECTED FOR FY 215 1776 MN 999 88M-TE-15 MNDOT METRO SETASIDE FOR WATER RESOURCES ($1.195M),. SC MISCELLANEOUS SF 1,21, 1,21, TRAF ENG ($15K), TRAF MGMT($) PRESERVATION PROJECTS FOR FY 215 September 213 Project Listing Page III - 143 of 175

ATP: M Fiscal Year: 215 STIP for FY 214-217 1777 MN 999 88M-TM-15 MNDOT METRO SETASIDE-TRAFFIC MANAGEMENT STATE. TM TRAFFIC MGMT. SF 4, 4, FURNISHED MATERIALS FOR METRO PROJECTS IN FY SYSTEM 215 1778 MN 999 88M-TRLF-15 MNDOT **TRLF** REPAYMENT, FY 215, TRLF LOANS USED FOR. RW RIGHT OF WAY SF 2,244, 2,244, RIGHT OF WAY PURCHASE ON TH 212 & TH 65 $768,141,112 $191,13,1 $35,414, $285,765,129 $129,473,771 $161,889,211 September 213 Project Listing Page III - 144 of 175

ATP: M Fiscal Year: 216 STIP for FY 214-217 1779 BB TRF-TCMT-16 MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ASSOCIATED. B9 BUS GRANT FTA 1,369,163 1,95,33 273,833 MAINTENANCE-BUS 178 BB TRF-TCMT-16A MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 PURCHASE BUS FTA 3,914,423 3,131,538 782,885 LEASE-TIRES 1781 BB TRF-TCMT-16AA MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PUBLIC. B9 BUS GRANT FTA 335,84 268,672 67,168 SUPPORT FACILITIES REFURBISHMENT 1782 BB TRF-TCMT-16AB MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-SUPPORT. B9 BUS GRANT FTA 5, 4, 1, FACILITY ROOF REFURBISHMENT 1783 BB TRF-TCMT-16AC MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-CCLRT. GR BUS GRANT FTA 25, 2, 5, FACILITY MODIFICATIONS 1784 BB TRF-TCMT-16AD MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ONBOARD. B9 BUS GRANT FTA 1,677, 1,341,6 335,4 PEDESTRIAN DETECTION SYSTEM TRANSIT TECHNOLOGY SYSTEMS 1785 BB TRF-TCMT-16AE MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ADVANCE. B9 BUS GRANT FTA 6, 48, 12, SCHEDULE PLANNING SOFTWARE 1786 BB TRF-TCMT-16AF METRO TRANSIT SECT 539: SOUTHWEST CORRIDOR LIGHT RAIL TRANSIT. B3 GRADE AND FTA 2,, 1,, 1,, PROJECT-NEW START FFGA 215 APPROPRIATION SURFACE 1787 BB TRF-TCMT-16B MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PREVENTIVE. B9 BUS GRANT FTA 5,, 4,, 1,, MAINTENANCE 1788 BB TRF-TCMT-16C MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 BUS GRANT FTA 825, 66, 165, SECURITY/SAFETY FOR 1% 1789 BB TRF-TCMT-16D MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 715, 572, 143, ENHANCEMENTS 1% 179 BB TRF-TCMT-16E MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 1,725, 1,38, 345, BUSINESS COMPUTER HW & SW 1791 BB TRF-TCMT-16H MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ENERGY. B9 BUS GRANT FTA 1,, 8, 2, September 213 Project Listing Page III - 145 of 175

ATP: M Fiscal Year: 216 STIP for FY 214-217 1792 BB TRF-TCMT-16J MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-OPERATIONS. B9 BUS GRANT FTA 76, 68, 152, COMMUNICATIONS & CONTROL EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1793 BB TRF-TCMT-16L MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FARE. B9 BUS GRANT FTA 1,8, 1,44, 36, COLLECTION EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1794 BB TRF-TCMT-16N MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-METRO. B9 BUS GRANT FTA 5,312,5 4,25, 1,62,5 MOBILITY COST OF CONTRACTING FOR SERVICES 1795 BB TRF-TCMT-16P MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-REGIONAL. B9 BUS GRANT FTA 3,75, 3,, 75, FLEET COST OF CONTRACTING 1796 BB TRF-TCMT-16Q MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-MTS BUS. B9 PURCHASE BUS FTA 12,9, 1,32, 2,58, ACQUISITION 1797 BB TRF-TCMT-16R MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL U OF M-U OF MN. B9 PURCHASE BUS FTA 343,75 275, 68,75 BUS ACQUISITION 1798 BB TRF-TCMT-16T MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-RTS TRANSIT. B9 BUS GRANT FTA 4,5, 3,6, 9, TECHNOLOGY SYSTEMS 1799 BB TRF-TCMT-16W MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FORT. B9 BUS GRANT FTA 5,25, 4,2, 1,5, SNELLING P&R EXPANSION 18 BB TRF-TCMT-16X MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-OVERHAUL. GR BUS GRANT FTA 7,45, 5,96, 1,49, LIGHT RAIL VEHICLES & ASSOCIATED LRV EQUIPMENT 181 BB TRF-TCMT-16Y MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-LRV. GR BUS GRANT FTA 55, 44, 11, EQUIPMENT & TECHNOLOGY, TRAIN OPERATOR DISPLAYS, HOIST REPLACEMENT 182 BB TRF-TCMT-16Z MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-MAJOR. B9 BUS GRANT FTA 1,25, 1,, 25, TO SUPPORT FACILITIES 183 BB TRS-768-16A MNDOT HEARTLAND EXPRESS-PURCHASE CLASS 5 BUS. TR PURCHASE BUS STP 146, 116,8 29,2 184 LOCAL 999 TRS-TCMT-16 MET COUNCIL-MT CMAQ TDM: ACTIVITIES TO REDUCE SOV USE BY VAN POOLS, CAR POOL & RIDE MATCHING PROGRAMS, MARKETING, TRANSIT RIDERSHIP INCENTIVES BY SUPPORTING SEVERAL TRANSPORTATION MANAGEMENT ORGANIZATIONS.. TM PLANNING CMAQ 4,375, 3,5, 875, September 213 Project Listing Page III - 146 of 175

ATP: M Fiscal Year: 216 STIP for FY 214-217 185 BB TRS-TCMT-16A METRO TRANSIT CMAQ: PURCHASE FOUR BUSES FOR LIMITED STOP. TR PURCHASE BUS CMAQ 1,67,32 1,72,82 535,238 SERVICE ON CHICAGO AND PORTLAND AVE IN MPLS AND RICHFIELD AND AMERICAN BLVD IN BLOOMINGTON 186 BB TRS-TCMT-16B METRO TRANSIT CMAQ: SERVICE DEMONSTRATION FOR LIMITED STOP. TR OPERATE BUS CMAQ 8,842,26 5,927,918 2,914,288 SERVICE ON CHICAGO AND PORTLAND AVE IN MPLS AND RICHFIELD AND AMERICAN BLVD IN BLOOMINGTON 187 BB TRS-TCMT-16C METRO TRANSIT CMAQ: PURCHASE FIVE BUSES FOR LIMITED STOP SERVICE ON E 7TH ST, ARCADE AVE, MARYLAND AVE AND WHITE BEAR AVE IN ST PAUL AND WHITE BEAR AVE IN MAPLEWOOD. TR PURCHASE BUS CMAQ 2,9,15 1,476,725 532,425 188 BB TRS-TCMT-16D METRO TRANSIT CMAQ: SERVICE DEMONSTRATION FOR LIMITED STOP SERVICE ON EAST 7TH ST, ARCADE AVE, MARYLAND AVE AND WHITE BEAR AVE IN ST PAUL AND WHITE BEAR AVE IN MAPLEWOOD. TR OPERATE BUS CMAQ 7,514,836 5,523,275 1,991,561 189 RR 2-136 MNDOT BNSF RR, EGRET BLVD, MSAS 14 IN COON RAPIDS-. SR RR X-ING RRS 275, 275, INSTALL GATES AND FLASHING LIGHTS S 181 RR 19-144 MNDOT PGR RR, 292ND ST E, DAKOTA CSAH 88 IN RANDOLPH. SR RR X-ING RRS 225, 225, TOWNSHIP-INSTALL GATES AND FLASHING LIGHTS S 1811 RR 27-33 MNDOT CP ON VICKSBURG LN, MSAS 156 IN PLYMOUTH-. SR RR X-ING RRS 26, 26, UPGRADE TO GATES OR CONTRIBUTE TO GRADE S SEPARATION 1812 RR 27-312 MNDOT CP, VALLEY LANE, MSAS 144, IN EDINA-UPGRADE TO. SR RR X-ING RRS 25, 25, GATES S 1813 RR 62-29 MNDOT MNNR RR, LONG LAKE ROAD, RAMSEY CSAH 45 IN NEW. SR RR X-ING RRS 25, 25, BRIGHTON-INSTALL GATES AND FLASHING LIGHTS S 1814 RR 7-124 MNDOT UP RR, DELAWARE AVE, T18 IN ST. LAWRENCE TWSP-. SR RR X-ING RRS 275, 275, INSTALL GATES AND FLASHING LIGHTS S 1815 CSAH 11 2-611-34 ANOKA COUNTY FROM N OF EGRET BLVD TO N OF NORTHDALE BLVD- RECONSTRUCT CSAH 11 (FOLEY BLVD) AS A 4-LANE DIVIDED ROADWAY AS WELL AS A TRAIL AND SIDEWALK, PONDS, TRAFFIC SIGNALS AND DEDICATED LEFT- AND RIGHT-TURN LANES 4. RC GRADE AND SURFACE STP 4,183,2 3,346,56 836,64 1816 CSAH 24 2-624-26 ANOKA COUNTY FROM CR 72 (RUM RIVER BLVD)/POPPY ST THROUGH KERRY ST IN ST FRANCIS-RECONSTRUCT INCLUDING SHOULDER CONSTRUCTION, ACCESS AND INTERSECTION CONTROL S AND MULTI- USE TRAIL. RC GRADE AND SURFACE STP 1,848, 1,478,4 369,6 September 213 Project Listing Page III - 147 of 175

ATP: M Fiscal Year: 216 STIP for FY 214-217 1817 CSAH 116 2-716-15 ANOKA COUNTY FROM JUST E OF CRANE ST THROUGH JEFFERSON ST IN ANDOVER AND HAM LAKE-RECONSTRUCT FROM 2-LANE UNDIVIDED TO A 4-LANE DIVIDED ROADWAY INCLUDING SEPARATED BIKE/PED FACILITY, SIGNALIZED INTERSCTNS AND IMPROVE AT-GRADE RAIL CROSSING 2. MC GRADE AND SURFACE STP 11,477,76 7,84, 3,637,76 1818 CSAH 24 13-624-7 CHISAGO **AC** ON CHISAGO CSAH 24 FROM CSAH 23(CHISAGO BLVD) TO STINSON AVE IN CHISAGO CITY-RDWY S(AC PROJECT-PAYBACK IN FY 217 AND 218) 2. RC MILL AND STP 1,44, 96, 96, 48, 1819 CSAH 8 19-68-1 DAKOTA COUNTY DAKOTA CSAH 8 (WENTWORTH AVE) AT DAKOTA CSAH 73. SH GRADE AND HSIP 896, 86,4 89,6 (OAKDALE AVE) IN W ST. PAUL-ROUNDABOUT SURFACE 182 CSAH 46 27-646-7 HENNEPIN COUNTY OVER GODFREY PKWY IN MPLS-REPLACE BRIDGE #9585. BR BRIDGE STP 2,24, 1,792, 448, REPLACEMENT 1821 CSAH 53 27-653-21 HENNEPIN COUNTY FROM JUST WEST OF WASHBURN AVE TO 16TH AVE IN RICHFIELD-RECONSTRUCT TO A SIMILAR ROADWAY TO THE EXISTING ON THE WEST END AND TO 3-LANES ON THE EAST 3. RD TURN LANES STP 19,7, 7,84, 11,86, 1822 CSAH 146 27-746-5 HENNEPIN COUNTY ON CSAH 146 (BROWN RD) OVER LONG LAKE CREEK IN. BR BRIDGE STP 56, 448, 112, ORONO-REPLACE BRIDGE #9622 REPLACEMENT 1823 PED/BIKE 91-9-28AC THREE RIVERS **AC** CMAQ:PEDESTRIAN/BICYCLE TRAIL BETWEEN 4. BT PEDESTRIAN CMAQ 3,76, 3,76, PARK DISTRICT TRACY AVE AND FRANCE AVE/EDINA PROMENADE IN BIKE TRAIL EDINA (AC PAYBACK 1 OF 1) 1824 PED/BIKE 91-9-76 THREE RIVERS FROM BOONE AVE N/36TH AVE N IN NEW HOPE TO 32ND 3. EN PEDESTRIAN TAP 1,153,6 922,88 23,72 PARK DISTRICT AVE N AND XENIA AVE N IN CRYSTAL- BIKE TRAIL PEDESTRIAN/BICYCLE TRAIL 1825 PED/BIKE 91-9-77 THREE RIVERS ALONG 57TH AVE N FROM E OF TH 1 TO N MISSISSIPPI 1. EN PEDESTRIAN TAP 1,435,84 1,12, 315,84 PARK DISTRICT REGIONAL PARK IN BROOKLYN CENTER- BIKE TRAIL PEDESTRAIN/BICYCLE TRAIL 1826 CSAH 34 17-2-65 BLOOMINGTON FROM W94TH ST TO T85 BLOCK OF NORMANDALE BLVD IN BLOOMINGTON-RECONSTRUCT OF CSAH 34 (NORMANDALE BLVD) AS A 4-LANE DIVIDED ROADWAY WITH LEFT-TURN LANES AND MULTI-USE TRAILS 1. RC GRADE AND SURFACE STP 8,12, 6,496, 1,624, 1827 LOCAL 999 17-3-6 BLOOMINGTON CMAQ:INSTALLATION OF INTERCONNECT INFRASTRUCTURE, COMMUNICATIONS EQUIPMENT AND MANAGEMENT SOFTWARE, IMPLEMENTATION OF PHASING MODIFICATIONS AND DEVELOPMENT AND INSTALLATION OF NEW COORDINATED TIMING PLANS THROUGH BLOOMINGTON 12. TM TRAFFIC MGMT. SYSTEM CMAQ 1,12, 896, 224, September 213 Project Listing Page III - 148 of 175

ATP: M Fiscal Year: 216 STIP for FY 214-217 1828 PED/BIKE 127-2-29 FRIDLEY FROM MAIN STREET (CR 12) AND 57TH AVE NE TO 44TH 2. EN PEDESTRIAN TAP 1,442,56 1,12, 322,56 AVE NE ACROSS I-694 IN FRIDLEY-PEDESTRIAN/BICYCLE BIKE BRIDGE BRIDGE AND TRAIL CONNECTION 1829 PED/BIKE 13-9-4 HASTINGS AT THREE POINTS ALONG THE VERMILLION RIVER BETWEEN THE INTERSECTION OF 3RD ST AND BAILY ST TO VERMILLION FALLS PARK IN HASTINGS- PEDESTRIAN/BICYCLE TRAIL 2. EN PEDESTRIAN BIKE TRAIL TAP 1,8, 86,4 21,6 183 PED/BIKE 141-3-22 MINNEAPOLIS ON 7TH AND 8TH ST S FROM 1ST AVE N TO CHICAGO AVE AND ON 6TH AND 9TH ST S FROM 1ST AVE N TO 2ND AVE S IN MPLS-LANDSCAPING, PEDESTRIAN LIGHTING, PEDESTRIAN SAFETY S 2. EN PED./BIKE TAP 2,16, 1,12, 896, 1831 LOCAL 999 141-3-23 MINNEAPOLIS 35TH AND 36TH ST BETWEEN PARK AVE AND BLAISDALE. SH TRAFFIC SIGNAL HSIP 1,344, 1,29,6 134,4 AVE IN MPLS-CONSTRUCT OVERHEAD SIGNAL REVISION INDICATIONS AT 16 INTERSECTIONS 1832 LOCAL 999 141-3-24 MINNEAPOLIS 38 SIGNALIZED INTERSECTIONS IN MPLS-INSTALL. SH TRAFFIC SIGNAL HSIP 341,6 36,88 34,72 PEDESTRIAN COUNTDOWN SIGNALS INST. 1833 PED/BIKE 141-22-5 MINNEAPOLIS RECONSTRUCTION OF 6TH AVE N WITH PRESERVATION OF HISTORIC PAVERS AND LOADING DOCKS, INSTALLATION OF SIDEWALKS FROM 5TH ST N TO THE END OF ST N OF WASHINGTON AVE. EN PED./BIKE TAP 2,799,14 1,12, 1,679,14 1834 LOCAL 999 164-2-123 SAINT PAUL FROM GROTTO ST TO ARUNDEL ST AT MINNEHAHA AVE- EXTENSION OF PIERCE BUTLER ROUTE ON A NEW ALIGNMENT AS A 4-LANE ROADWAY WITH BIKE LANES AND SIDEWALKS 1. RC GRADE AND SURFACE STP 1,26,296 7,84, 2,186,296 1835 LOCAL 999 164-8-12 SAINT PAUL ON WHEELOCK PKWY OVER THE TROUT BROOK STORM WATER STREAM, TROUT BROOK REGIONAL TRAIL AND CP RAILWAY BETWEEN ABLE ST AND PARK ST IN ST PAUL-RECONSTRUCT BRIDGE #9396. BI BRIDGE REPAIR STP 2,464, 1,96, 54, 1836 PED/BIKE 164-646-2 SAINT PAUL ON RAYMOND AVE FROM ENERGY PARK DR TO COMO AVE, STREET RECONSTRUCTION TO ADD CURB EXTENSIONS, BOULEVARD TREES, LANDSCAPING, PEDESTRIAN MEDIANS, SIDEWALK WIDENING. EN PED./BIKE TAP 1,472,24 1,12, 352,24 1837 PED/BIKE 199-9-1 RAMSEY FROM MISSISSIPPI W REGIONAL PARK TO CITY LIMITS 3/8 MI W OF MNDOT WAYSIDE REST AREA/DAYTONPORT ROADSIDE PARKING AREA IN CITY OF RAMSEY- PEDESTRIAN/BICYCLE TRAIL 3. EN PEDESTRIAN BIKE TRAIL TAP 1,631,739 1,12, 511,739 1838 MN 5 12-1 MNDOT E AND W JCT MN11 IN CHANHASSEN-ACCELERATION 1. SH GRADE AND HSIP 1,68, 1,512, 168, LANES SURFACE September 213 Project Listing Page III - 149 of 175

ATP: M Fiscal Year: 216 STIP for FY 214-217 1839 MN 5 621-87 MNDOT **BP8** FROM HENNEPIN/RAMSEY CO LINE TO W 6TH ST 5. AM GRADING BF 5,, 5,, IN ST PAUL-BUS STOP BUMPOUTS FOR RAPID BUS SERVICE (CHP 152 TRANSIT ADVANTAGE BONDS) 184 US 8 131-11 MNDOT **AB** FROM JCT MN95 (TERN AVE) IN FRANCONIA/SHAFER TO MIDDLE OF BRIDGE 6566 IN TAYLORS FALLS-RECONSTRUCT ROADWAY AND CORRECT SUBGRADE AND SLOPE FAILURE, TURN LANES, SIGNAL 3. RS GRADE AND SURFACE SF 8,2, 8,2, 1841 US 12 2713-17 MNDOT AT HENNEPIN CSAH 9 IN INDEPENDENCE - CONSTRUCT. SC TURN LANES SF 79, 79, LEFT TURN LANES 1842 MN 13 191-171 MNDOT AT CSAH 5 IN BURNSVILLE- LANDSCAPING 1. RB LANDSCAPING SF 5, 5, 1843 I 35E 1982-179 MNDOT NORTH SIDE FROM KETTLE PARK TO S OF KINGS ROAD. NO NOISE SF LF 845, 761, 84, IN EAGAN - NOISE BARRIER ABATEMENT 1844 I 35E 628-369 MNDOT FROM ST. CLAIR AVE TO RAMSEY ST/GRAND AVE IN ST. 1. BI REDECK SF 1,425, 1,425, PAUL - REDECK BRIDGES 9519, 6282 AND 6283 1845 I 35W 28-7 MNDOT SB ENTRANCE RAMP FROM LAKE DR (ANOKA CSAH 23). SC GRADE AND SF 365, 365, TO S OF 85TH AVE IN BLAINE - CONSTUCT SB PARALLEL SURFACE ACCELERATION LANE, DRAINAGE, CURB & GUTTER 1846 I 35W 2782-316 MNDOT FROM 42ND ST IN MINNEAPOLIS TO 66TH ST IN 4. RB LANDSCAPING SF 5, 5, RICHFIELD - CORRIDOR LANDSCAPING 1847 I 35W 2783-137 MNDOT FROM HENNEPIN AVE TO JOHNSON ST IN MINNEAPOLIS - 1. BI BRIDGE REPAIR SF 2,45, 2,45, REDECK BRIDGES 27885, 27886, 27985, 27989, 27994, GUARDRAIL 1848 I 35W 6284-162 MNDOT AT RAMSEY COUNTY RD H (T.C. ARSENAL ENTRANCE) IN 1. BR BRIDGE SF 6,47, 6,47, ARDEN HILLS - REPLACE BRIDGE #9582 AND RAMP REPLACEMENT RECONSTRUCTION 1849 I 35W 6284-163 MNDOT AT RAMSEY CR E2 IN ARDEN HILLS - REPLACE BRIDGE. BR BRIDGE SF 7,815, 7,815, 957 AND APPROACHES, GUARDRAIL, RETAINING WALL, REPLACEMENT PED/BIKE TRAIL AND PONDING 185 I 35W 6284-166 MNDOT FROM JCT MN36 IN ROSEVILLE TO JUST N I694 IN ARDEN 4. RS MILL AND NHPP 1,58, 9,522, 1,58, HILLS/NEW BRIGHTON- MILL AND, DRAINAGE, GUARDRAIL, SIGNING, AUXILLIARY LANES 1851 MN 36 6212-148 MNDOT **ADA** OVER LEXINGTON AVENUE IN ROSEVILLE- 1. BR BRIDGE SF BF LF 13,6, 2,68, 1,92, REPLACE BRIDGE 5723 AND APPROACHES, SIGNALS, REPLACEMENT TMS, ADA, GUARDRAIL, STORM SEWER AND PONDS September 213 Project Listing Page III - 15 of 175

ATP: M Fiscal Year: 216 STIP for FY 214-217 1852 MN 36 8214-114AH MNDOT ST CROIX MIT ITEM - KOLLINER PARK: REMOVAL OF 2. RC GRADE AND SF 9,518 4,759 4,759 NON-HISTORIC ELEMENTS TO ALLOW REVERSION TO SURFACE "NATURAL"-WISCONSIN LET 1853 MN 36 8214-114AK MNDOT FROM N SUNNYSIDE DR TO CHESTNUT ST IN 2. RC GRADE AND SF LF 2,6, 1,3, 1,3, STILLWATER - MULTI-USE LOOP TRAIL AS PART OF ST SURFACE CROIX MITIGATION PACKAGE 1854 MN 41 18-81 MNDOT HISTORIC CHASKA ATHLETIC PARK IN CHASKA-. RB LANDSCAPING SF 5, 5, LANDSCAPING 1855 MN 47 26-65 MNDOT AT 142ND AVENUE IN RAMSEY-RECONSTRUCT CENTER. SH SPOT HSIP 28, 252, 28, RAISED MEDIAN TO GAIN POSITIVE OFFSET FOR NB AND SB LEFT TURN LANES 1856 US 52 6244-11 MNDOT FROM PLATO BLVD TO I94 IN ST. PAUL - LANDSCAPING 1. RB LANDSCAPING SF 3, 3, 1857 MN 56 1911-24 MNDOT PGR RR, JUST S OF 292ND ST E IN RANDOLPH TOWNSHIP-. SR RR X-ING RRS 225, 225, INSTALL GATES AND FLASHING LIGHTS S 1858 US 61 825-137 MNDOT **ADA** FROM MAYCREST AVE TO US1 INTERSECTION IN DENMARK TOWNSHIP-CONSTRUCT TURN LANES, MAYCREST AVE CONNECTION, MILL AND, STORM SEWER, PONDS, GUARDRAIL, ADA CURB RAMPS 1. SC TURN LANES SF 5,37, 5,37, 1859 US 61 825-141 MNDOT WASHINGTON CSAH19 OVER US61 IN COTTAGE GROVE -. BI BRIDGE REPAIR SF 13, 13, CLEAN BEARINGS, REPLACE JOINTS & MINOR OTHER SUBSTRUCTURE REPAIRS ON BRIDGE #971 186 US 61 826-45 MNDOT NORTH AND SOUTH INTERSECTIONS OF TH 97 AND US61 IN FOREST LAKE-RECONSTRUCT, REMOVE SIGNALS AND CONSTRUCT ROUNDABOUTS, REVISE SCHOOL ENTRANCE TO FOREST LAKE HIGH SCHOOL, PROVIDE GRADE SEPARATED BIKE/PED FACILITIES 1. SC GRADE AND BRIDGE STP 6,72, 5,376, 1,344, 1861 MN 77 1925-56 MNDOT AT DAKOTA CSAH32 (CLIFF RD) OVER MN77 IN EAGAN -. BI BRIDGE SF 575, 575, MILL, LOW SLUMP, REPLACE JOINTS BRIDGE# 1967 1862 I 94 6282-21 MNDOT AT GROTTO ST N IN ST. PAUL-REPLACE PED BRIDGE 9773. BR BRIDGE SF 1,9, 1,9, REPLACEMENT 1863 I 94 6282-24 MNDOT FROM JUST E OF DALE ST TO JUST W OF PELHAM BLVD IN ST PAUL - REPAIR BRIDGES 9379, 9381, 9452, 9457, 9663, REDECK BRIDGES 9383, 62813, 62845 AND MILL AND BRIDGE 9387 4. BI BRIDGE REPAIR SF 6,685, 6,685, September 213 Project Listing Page III - 151 of 175

ATP: M Fiscal Year: 216 STIP for FY 214-217 1864 I 94 6283-175 MNDOT EB I94 FROM 7TH ST EXIT TO MOUNDS BLVD IN ST PAUL- 1. SC GRADE AND NHPP 3,46, 3,114, 346, ADD AUXILLIARY LANE, NOISEWALL, DRAINAGE, POND, SURFACE TMS, SIGNING, LIGHTING, GUARDRAIL 1865 I 94 6283-234 MNDOT **ADA** FROM JUST E MOUNDS BLVD IN ST PAUL TO E OF MN12 IN WOODBURY AND ON US61 FROM JUST N BURNS AVE TO W JCT MN5 IN ST PAUL- UNBONDED CONCRETE, BITUMINOUS M&O, CONCRETE WHITE TOPPING, REPAIR BRIDGES 6276, 62861, 62862, 62838 AND 6287, AND PIER STRUT WORK ON BRIDGES 9147, 9148, 62868, 62869, DRAINAGE, SIGNALS, LIGHTING, SIGNING, GUARDRAIL, TMS AND ADA 7. RC UNBONDED CONCRETE NHPP 32,61, 29,349, 3,261, 1866 MN 95 136-46 MNDOT AT GRAND AVE (CHISAGO CSAH 14) IN NORTH BRANCH-. SC SPOT SF 1,38, 1,38, CONSTRUCT ROUNDABOUT 1867 MN 95 199-94 MNDOT **ADA** AT ARGENTA TRAIL(DAKOTA CSAH 63) IN INVER GROVE HEIGHTS-CONVERT TEMPORARY SIGNAL TO PERMANENT SIGNAL WITH ADA CROSSING, DUAL LEFT TURN LANES. SC SPOT SF 47, 47, 1868 MN 1 2733-89 MNDOT FROM JCT I494 IN BLOOMINGTON TO JUST N OF W 36TH ST IN ST LOUIS PARK-BITUMINOUS, DRAINAGE, GUARDRAIL S, OF BRIDGES 9431, 95, 2713, 2714 AND MISC REPAIR OF BRIDGES 2721, 9432, 2729, 2712 5. RD BITUMINOUS STP 15,95, 12,724, 3,181, 1869 MN 1 2735-193 MNDOT SB ENTRANCE RAMP FROM DULUTH ST TO MN1 IN. TM GRADE AND SF 27, 27, GOLDEN VALLEY- CONSTRUCT HOV BYPASS, DRAINAGE, SURFACE TMS 187 US 169 275-82 MNDOT FROM MN61 IN BROOKLYN PARK TO US1 IN ANOKA- 5. TM SIGNALS & CMAQ 1,152,197 921,758 23,439 SIGNAL COORDINATION, DEPLOY CC CAMERAS, AND CAMERA DYNAMIC MESSAGE SIGNS INSTALLATION 1871 US 169 275-84 MNDOT AT 93RD AVE IN BROOKLYN PARK/OSSEO-LANDSCAPING. RB LANDSCAPING SF 5, 5, 1872 US 169 2772-13 MNDOT ON EAST SIDE FROM 42ND AVE N TO 49TH ST N IN NEW 1. NO NOISE SF LF 1,355, 1,22, 135, HOPE - NOISE WALL ABATEMENT 1873 US 169 75-16 MNDOT FROM CANTERBURY RD(SCOTT CSAH 83) TO CSAH 21 IN SHAKOPEE-RECONSTRUCT AND WIDEN RIGHT SHOULDER TO BUS SHOULDER AND ADD SIGNAGE, GUARDRAIL 3. TM GRADE AND SURFACE SF 1,, 1,, 1874 US 169 75-114 MNDOT AT CR 69 IN JACKSON TWP-LANDSCAPING 1. RB LANDSCAPING SF 5, 5, September 213 Project Listing Page III - 152 of 175

ATP: M Fiscal Year: 216 STIP for FY 214-217 1875 US 169 75-88 MNDOT FROM SOUTH OF HENNEPIN/SCOTT CO LINE IN 2. TM TRAFFIC MGMT. SF 5, 5, SHAKOPEE TO EAST OF US169 IN SAVAGE - TMS SYSTEM INSTALLATION 1876 MN 252 2748-62 MNDOT FROM MN61 IN BROOKLYN PARK TO I694 IN BROOKLYN 4. TM SIGNALS & CMAQ 839,39 671,232 167,87 CENTER-SIGNAL COORDINATION, DEPLOY CC CAMERAS, CAMERA AND DYNAMIC MESSAGE SIGNS INSTALLATION 1877 MN 28 6241-12 MNDOT FROM JUST S COMO IN LAUDERDALE TO I35W IN 2. RC MILL AND NHPP 2,432, 1,945,6 486,4 ROSEVILLE-MILL AND AND PARTIAL RECONSTRUCT 1878 I 494 2785-33AC MNDOT **AC** FROM N OF I394 IN MINNETONKA TO I94/I494/I694 INTERCHANGE IN MAPLE GROVE - UNBONDED CONCRETE, CPR, RIGHT SIDE DYNAMIC SHOULDER, SIGNING, STRIPING, DRAINAGE, TMS, NOISE WALLS, REDECK AND WIDEN BRIDGES 27973, 27974, 27975, 27976, 27977, 27978, AND REDECK BRIDGE 2795(AC PAYBACK 1 OF 1) 8. RC GRADE AND BRIDGE NHPP 31,654, 31,654, 1879 MN 999 8825-478 MNDOT METROWIDE-LOOP REPLACEMENTS. TM TRAFFIC MGMT. SF 75, 75, SYSTEM 188 MN 999 8825-48 MNDOT METROWIDE - DMS REPLACEMENT. TM TRAFFIC MGMT. SF 425, 425, SYSTEM 1881 MN 999 88M-ADA-16 MNDOT **ADA** METRO SETASIDE FOR ADA PROJECT FOR FY. SC CURB & GUTTER STP 1,8, 86, 22, 216 1882 MN 999 88M-AM-16 MNDOT METRO SETASIDE FOR MUNICIPAL AGREEMENT. AM MISCELLANEOUS SF 3,, 3,, PROJECTS FOR FY 216 1883 MN 999 88M-CA-16 MNDOT METRO SETASIDE -CONSULTANT DESIGN -216. CA MISCELLANEOUS SF 8,, 8,, 1884 MN 999 88M-CM-16 MNDOT METRO SETASIDE FOR LOWER COST CONGESTION. SC MISCELLANEOUS SF 2,1, 2,1, MGMT PROJECT FOR FY 216 1885 MN 999 88M-ML-16 MNDOT METRO SETASIDE FOR MANAGED LANE. RC MISCELLANEOUS NHPP 2,, 15,, 5,, IMPLEMENTATION PROJECT FOR FY 216 1886 MN 999 88M-NO-16 MNDOT METRO SETASIDE FOR NOISE ABATEMENT PROJECTS. NO NOISE SF 25, 25, FOR FY 216 ABATEMENT 1887 MN 999 88M-PM-16 MNDOT METRO SETASIDE FOR PREVENTIVE MAINTENANCE. PM PREVENTIVE SF 5,, 5,, PROJECTS FOR FY 216 MAINTENANCE 1888 MN 999 88M-RB-16 MNDOT METRO SETASIDE FOR LANDSCAPING & LANDSCAPE. RB LANDSCAPING SF 1, 1, PARTNERSHIPS FOR FY 216 September 213 Project Listing Page III - 153 of 175

ATP: M Fiscal Year: 216 STIP for FY 214-217 1889 MN 999 88M-RS-16 MNDOT METRO SETASIDE FOR RESURFACING &. RS MILL AND STP 1,795, 1,436, 359, RECONDITIONING PROJECTS FOR FY 216 189 MN 999 88M-RW-16 MNDOT METRO SETASIDE FOR RIGHT OF WAY FOR FY 216. RW RIGHT OF WAY SF 18,2, 18,2, 1891 MN 999 88M-RX-16 MNDOT METRO SETASIDE FOR ROAD REPAIR FOR FY 216. RX ROAD REPAIR SF 4,6, 4,6, 1892 MN 999 88M-SA-16 MNDOT METRO SETASIDE FOR SUPPLEMENTAL. SA SUPP. AGREE. & SF 1,, 1,, AGREEMENTS/OVERRUNS FOR FY 216 COST OVERRUNS 1893 MN 999 88M-SC-16 MNDOT METRO SETASIDE FOR SAFETY CAPACITY PROJECTS. SC SPOT SF 91, 91, FOR FY 216 1894 LOCAL 999 88M-SHL-16 MNDOT METRO ATP SETASIDE FOR HSIP PROJECTS YET TO BE. SH SPOT HSIP 9,2,244 8,118,22 92,24 SELECTED FOR FY 216 1895 MN 999 88M-TE-16 MNDOT METRO SETASIDE FOR TRAFFIC ENGINEERING ($5M),. SC MISCELLANEOUS SF 5,565, 5,565, ROADSIDE SAFETY($.215M), TMS($) & WRE ($.35M) FOR FY 216 1896 MN 999 88M-TM-16 MNDOT METRO SETASIDE-TRAFFIC MANAGEMENT STATE. TM TRAFFIC MGMT. SF 4, 4, FURNISHED MATERIALS FOR METRO PROJECTS IN FY SYSTEM 216 1897 MN 999 88M-TR-16 MNDOT METRO SETASIDE-TEAM TRANSIT FOR METRO. TM TRAFFIC MGMT. SF 73, 73, PROJECTS IN FY 216 SYSTEM 1898 MN 999 88M-TRLF-16 MNDOT **TRLF** REPAYMENT, FY 216, TRLF LOANS USED FOR. RW RIGHT OF WAY SF 2,244, 2,244, RIGHT OF WAY PURCHASE ON TH 212 & TH 65 $64,443,125 $197,261,73 $96, $149,62,14 $129,579,45 $164,539,85 September 213 Project Listing Page III - 154 of 175

ATP: M Fiscal Year: 217 STIP for FY 214-217 1899 BB TRF-TCMT-17 MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-SUPPORT. B9 BUS GRANT FTA 3, 24, 6, FACILITY ROOF REFURBISHMENT 19 BB TRF-TCMT-17A MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-RECAULK. B9 BUS GRANT FTA 3,1, 2,48, 62, WALLS OF SUPPORT FACILITIES 191 BB TRF-TCMT-17B MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-CCLRT. GR BUS GRANT FTA 25, 2, 5, FACILITY MODIFICATIONS 192 BB TRF-TCMT-17C MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ONBOARD. B9 BUS GRANT FTA 177, 141,6 35,4 PEDESTRIAN DETECTION SYSTEM TRANSIT TECHNOLOGY SYSTEMS 193 BB TRF-TCMT-17D MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ASSOCIATED. B9 BUS GRANT FTA 1,437,621 1,15,97 287,524 MAINTENANCE-BUS 194 BB TRF-TCMT-17E MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 PURCHASE BUS FTA 4,362,247 3,489,798 872,449 LEASE-TIRES 195 BB TRF-TCMT-17F MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PREVENTIVE. B9 BUS GRANT FTA 5,, 4,, 1,, MAINTENANCE 196 BB TRF-TCMT-17G MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 BUS GRANT FTA 825, 66, 165, SECURITY/SAFETY FOR 1% 197 BB TRF-TCMT-17H MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 715, 572, 143, ENHANCEMENTS 1% 198 BB TRF-TCMT-17J MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 1,664, 1,331,2 332,8 BUSINESS COMPUTER HW & SW 199 BB TRF-TCMT-17K MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ENERGY. B9 BUS GRANT FTA 1,, 8, 2, 191 BB TRF-TCMT-17L MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-OPERATIONS. B9 BUS GRANT FTA 785, 628, 157, COMMUNICATIONS & CONTROL EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION September 213 Project Listing Page III - 155 of 175

ATP: M Fiscal Year: 217 STIP for FY 214-217 1911 BB TRF-TCMT-17M MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FARE. B9 BUS GRANT FTA 3, 24, 6, COLLECTION EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1912 BB TRF-TCMT-17N MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-METRO. B9 BUS GRANT FTA 5,312,5 4,25, 1,62,5 MOBILITY COST OF CONTRACTING FOR SERVICES 1913 BB TRF-TCMT-17P MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-REGIONAL. B9 BUS GRANT FTA 3,75, 3,, 75, FLEET COST OF CONTRACTING 1914 BB TRF-TCMT-17Q MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-MTS BUS. B9 PURCHASE BUS FTA 16,6, 13,28, 3,32, ACQUISITION 1915 BB TRF-TCMT-17R MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL U OF M-U OF MN. B9 PURCHASE BUS FTA 343,75 275, 68,75 BUS ACQUISITION 1916 BB TRF-TCMT-17S MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-OVERHAUL. GR BUS GRANT FTA 7,63,979 6,14,783 1,526,196 LIGHT RAIL VEHICLES & ASSOCIATED LRV EQUIPMENT 1917 BB TRF-TCMT-17T MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-LRV. GR BUS GRANT FTA 25, 2, 5, EQUIPMENT & TECHNOLOGY, HOIST REPLACEMENT 1918 BB TRF-TCMT-17U MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-MAJOR. B9 BUS GRANT FTA 1,25, 1,, 25, TO SUPPORT FACILITIES 1919 BB TRF-TCMT-17V MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PUBLIC. B9 BUS GRANT FTA 335,84 268,672 67,168 SUPPORT FACILITIES REFURBISHMENT 192 BB TRF-TCMT-17W MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-I35W. B9 BUS GRANT FTA 15,69,14 13,336,619 2,353,521 BRT/EXPRESS SERVICE BUSES 1921 BB TRF-TCMT-17X MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-BUS. B9 PURCHASE BUS FTA 13,94,241 11,13,15 1,964,136 ACQUISITION 1922 BB TRF-TCMT-17Y METRO TRANSIT SECT 539: SOUTHWEST CORRIDOR LIGHT RAIL TRANSIT. B3 GRADE AND FTA 2,, 1,, 1,, PROJECT-NEW START FFGA 215 APPROPRIATION SURFACE 1923 CSAH 24 13-624-7AC1 CHISAGO **AC** ON CHISAGO CSAH 24 FROM CSAH 23(CHISAGO 2. RC MILL AND STP 6, 6, BLVD) TO STINSON AVE IN CHISAGO CITY-RDWY S(AC PAYBACK 1 OF 2) September 213 Project Listing Page III - 156 of 175

ATP: M Fiscal Year: 217 STIP for FY 214-217 1924 PED/BIKE 19-9-13AC DAKOTA COUNTY **AC** MISS RIVER REG TR, SCHARRS BLUFF TO MISS RIVER, SPRING LK RARK RESERVE, NININGER TWP- CONSTRUCT PED/BIKE TR & TRAILHEAD FACILITY (WAS 91-9-57) (AC PAYBACK 1 OF 1) 2. EN PED./BIKE TAP 759,18 759,18 1925 CSAH 9 19-69-18AC DAKOTA COUNTY **AC** FROM DAKOTA CSAH 46/2 IN NEW MARKET TWP TO DAKOTA CSAH 7 IN LAKEVILLE AND EUREKA TWP- RECONSTRUCT 2-LANE ROADWAY WITH PAVED SHOULDERS & TURN LANES (AC PAYBACK 1 OF 1) 5. RC GRADE AND SURFACE STP 5,61, 5,61, 1926 CSAH 81 27-681-34 HENNEPIN COUNTY FROM N OF 63RD AVE N TO N OF CSAH 8 IN BROOKILYN PARK-RECONSTRUCT TO A MULTI-LANE DIVIDED ROADWAY INCLUDING CONCRETE MEDIAN AND A MUTLI- USE TRAIL 1. RC GRADE AND SURFACE STP 13,35, 7,84, 5,51, 1927 CITY 141-454-1AC MINNEAPOLIS **AC** COLUMBIA AVE NE TO TH 47 ACCESS RAMP-. BR BRIDGE STP 8,96, 8,96, REPLACE BR 9664 OVER BNSF NORTHTOWN YARD & REPLACEMENT APPROACHES (AC PAYBACK 1 OF 1) 1928 LOCAL 999 164-9-14 SAINT PAUL FROM HARRIET ISLAND REGIONAL PARK IN ST PAUL TO 2. EN PEDESTRIAN STP 7,693,28 6,154,624 1,538,656 THE MISSISSIPPI RIVER REGIONAL TRAIL IN SOUTH ST BIKE TRAIL PAUL-PED/BICYCLE TRAIL 1929 CITY 164-158-2AC SAINT PAUL **AC** 3 FT W OF TO 3 FT E OF MARKET ST, ST PAUL-. BR BRIDGE STP 1,1, 1,1, REPLACE KELLOGG ST BR 92798 OVER RAVINE & REPLACEMENT APPROACHES (AC PAYBACK 1 OF 1) 193 CSAH 6 188-2-21AC LAKEVILLE **AC** AT DAKOTA CSAH 6 (185TH ST) & DAKOTA CSAH. RC GRADE AND STP 1,632, 1,632, 5 (KENWOOD TR) IN LAKEVILLE-CONSTRUCT SURFACE ROUNDABOUT (AC PAYBACK 1 OF 1) 1931 MN 149 195-1-1AC EAGAN **AC** FROM TH 55 TO JUST NORTH OF I-494 IN EAGAN- 1. RC GRADE AND STP 2,146,4 2,146,4 RECONSTRUCT FROM 4-LN RDWY TO 5-LN RDWY, TRAIL SURFACE (AC PAYBACK 1 OF 1) 1932 MN 3 192-41 MNDOT JUST S MN5 IN CASTLE ROCK TWP TO JUST N 17TH ST 5. RS MILL AND STP 3,5, 2,8, 7, IN EMPIRE TWP-MILL AND 1933 MN 5 271-49 MNDOT FROM CSAH 4 (EDEN PRAIRIE RD) TO FULLER 1. RS MILL AND STP 75, 6, 15, RD/VENTURE LANE IN EDEN PRAIRIE-MILL AND 1934 MN 13 71-112 MNDOT FROM E OF US 169 IN SAVAGE TO JUST E OF WASHBURN 4. RS MILL AND NHPP 5,, 4,, 1,, AVE IN BURNSVILLE-MILL AND 1935 I 35E 1982-178 MNDOT S OF I35E FROM S OF ASTON CIRCLE TO MCANDREWS. NO NOISE SF LF 645, 58, 65, RD E IN BURNSVILLE - NOISE WALL ABATEMENT 1936 I 35E 628-381 MNDOT S OF UNIVERSITY AVE TO JUST N OF MARYLAND AVE IN 1. RB LANDSCAPING SF 3, 3, ST PAUL-LANDSCAPING September 213 Project Listing Page III - 157 of 175

ATP: M Fiscal Year: 217 STIP for FY 214-217 1937 I 35E 628-382 MNDOT FROM I94 IN ST PAUL TO JUST N LITTLE CANADA RD IN 5. RB LANDSCAPING SF 3, 3, LITTLE CANADA-LANDSCAPING 1938 I 35W 2782-327 MNDOT FROM 46TH ST TO I94 IN MPLS - MANAGED LANE COMPLETION, PAVEMENT RECONSTRUCTION AND REPAIR, NOISEWALLS, TMS, DRAINAGE, LIGHTING, REPLACE BRIDGES 9731, 9733, 27842, 27843, 27867, 27868, 27869, 2787, 27871, 27872 4. MC GRADE AND BRIDGE NHPP BF 121,, 58,11, 62,89, 1939 MN 36 8214-161 MNDOT EASTSIDE OF MN95 TO ST CROIX RIVER FROM BAYPORT. RB LANDSCAPING SF 175, 175, TO LIFT BRIDGE - LANDSCAPING 194 MN 36 8217-4654D MNDOT **ELLA** OVER ST CROIX RIVER - LIFT BRIDGE MGMT. BR BRIDGE REPAIR BF 11,6, 11,6, PLAN AND REPAIR CONVERSION PROJECT FOR BRIDGE # 4654 AS PART OF ST CROIX MITIGATION PACKAGE 1941 MN 5 194-27 MNDOT FROM MN3 IN FARMINGTON TO US52 IN HAMPTON-MILL 8. RS MILL AND STP 4,, 3,2, 8, AND 1942 MN 51 6215-11 MNDOT FROM DAYTON AVE TO PIERCE BUTLER IN ST PAUL-MILL 2. RS MILL AND STP 1,5, 1,2, 3, AND 1943 MN 51 6216-127 MNDOT FROM COMO AVE IN ST PAUL TO MN36 IN ROSEVILLE- 2. RD CONCRETE STP 2,75, 2,2, 55, CPR AND DIAMOND GRINDING PAVEMENT REHAB 1944 I 94 2781-432 MNDOT FROM NICOLLET AVE IN MPLS TO W SHINGLE CREEK BRIDGE 2799 IN BROOKLYN CENTER-MAJOR CPR AND DIAMOND GRINDING, DRAINAGE AND MISC REPAIR ON 5 BRIDGES 9. RD CONCRETE PAVEMENT REHAB NHPP 31,615, 28,453,5 3,161,5 1945 I 94 2781-452 MNDOT BETWEEN I394 AND MN55 IN MPLS-REPAIR BRIDGES. BI BRIDGE REPAIR NHPP 1,7, 1,53, 17, 27726, 27726A, 27726B, 27727, 27727A, 27727B, 27728 1946 I 94 2781-453 MNDOT AT HENNEPIN/LYNDALE TUNNEL (BRIDGE 27832) AND EB 1. BI BRIDGE REPAIR NHPP 2,23, 2,7, 223, I94 UNDER I35W TUNNEL (BRIDGE 27834) IN MPLS-TILE REPAIR 1947 I 94 6282-23 MNDOT ON S SIDE OF I 94, FROM SNELLING AVE N TO PASCAL ST. NO NOISE SF LF 63, 565, 65, N IN ST PAUL-NOISE WALL ABATEMENT 1948 MN 1 2734-5 MNDOT FROM 36TH ST TO CEDAR LAKE RD IN ST LOUIS PARK- 2. RB LANDSCAPING SF 25, 25, LANDSCAPING 1949 MN 11 1918-11 MNDOT **AB** JUST E I35E IN MENDOTA HTS TO I494 IN INVER 4. RD GRADE AND STP 6,, 4,8, 1,2, GROVE HTS-RECLAMATION/WHITE TOPPING SURFACE 195 MN 149 6223-2 MNDOT OVER MISSISSIPPI RIVER IN ST PAUL - REDECK & 1. BI REDECK BF 14,18, 14,18, APPROACH WORK ON BRIDGE #629 September 213 Project Listing Page III - 158 of 175

ATP: M Fiscal Year: 217 STIP for FY 214-217 1951 US 169 2772-15 MNDOT JUST NORTH OF MN62 IN EDINA TO MN55 IN GOLDEN 6. RD CONCRETE NHPP 17,28, 13,824, 3,456, VALLEY -CPR WITH DIAMOND GRINDING AND MILL AND PAVEMENT, DRAINAGE REHAB 1952 US 169 2772-112 MNDOT FROM I394 IN GOLDEN VALLEY TO I94 IN BROOKLYN 8. TM TRAFFIC MGMT. SF 5, 5, PARK-INCIDENT MGMT, ITS REFURBISHMENT AND SYSTEM ENHANCEMENT 1953 MN 61 2771-43 MNDOT FROM US169 IN BROOKLYN PARK TO US1 IN COON 7. TM TRAFFIC MGMT. SF 425, 425, RAPIDS - INSTALL TRAFFIC MANAGEMENT SYSTEM SYSTEM 1954 MN 999 8825-479 MNDOT METROWIDE-LOOP REPLACEMENTS. TM TRAFFIC MGMT. SF 75, 75, SYSTEM 1955 MN 999 88M-ADA-17 MNDOT **ADA** METRO SETASIDE FOR ADA/BIKE PROJECT FOR. SC CURB & GUTTER STP 2,, 1,6, 4, FY 217 1956 MN 999 88M-AM-17 MNDOT METRO SETASIDE FOR MUNICIPAL AGREEMENT. AM MISCELLANEOUS SF 3,, 3,, PROJECTS FOR FY 217 1957 MN 999 88M-BI-17 MNDOT METRO SETASIDE FOR BRIDGE. BI BRIDGE REPAIR STP 2,62, 2,96, 524, PROJECTS ON NON-NHS FOR FY 217 OTHER 1958 MN 999 88M-CA-17 MNDOT METRO SETASIDE -CONSULTANT DESIGN -217. CA MISCELLANEOUS SF 6,35, 6,35, 1959 MN 999 88M-CM-17 MNDOT METRO SETASIDE FOR LOWER COST CONGESTION. SC MISCELLANEOUS SF 15,49, 15,49, MGMT PROJECT FOR FY 217 196 LOCAL 999 88M-CMAQ-17 MNDOT METRO ATP SETASIDE FOR CMAQ (INCLUDING TDM). TR MISCELLANEOUS CMAQ 34,213,455 27,37,764 6,842,691 PROJECTS YET TO BE SELECTED FOR FY 217 1961 MN 999 88M-NO-17 MNDOT METRO SETASIDE FOR NOISE ABATEMENT PROJECTS. NO NOISE SF 19, 19, FOR FY 217 ABATEMENT 1962 MN 999 88M-PM-17 MNDOT METRO SETASIDE FOR PREVENTIVE MAINTENANCE. PM PREVENTIVE SF 5,, 5,, PROJECTS FOR FY 217 MAINTENANCE 1963 MN 999 88M-RB-17 MNDOT METRO SETASIDE FOR LANDSCAPING & LANDSCAPE. RB LANDSCAPING SF 1, 1, PARTNERSHIPS FOR FY 217 1964 MN 999 88M-RS-17 MNDOT METRO SETASIDE FOR RESURFACING &. RS MILL AND NHPP 975, 78, 195, RECONDITIONING PROJECTS ON NHS FOR FY 217 1965 MN 999 88M-RW-17 MNDOT METRO SETASIDE FOR RIGHT OF WAY FOR FY 217. RW RIGHT OF WAY SF 11,1, 11,1, 1966 MN 999 88M-RX-17 MNDOT METRO SETASIDE FOR ROAD REPAIR FOR FY 217. RX ROAD REPAIR SF 5,, 5,, September 213 Project Listing Page III - 159 of 175

ATP: M Fiscal Year: 217 STIP for FY 214-217 1967 MN 999 88M-SA-17 MNDOT METRO SETASIDE FOR SUPPLEMENTAL. SA SUPP. AGREE. & SF 8,436, 8,436, AGREEMENTS/OVERRUNS FOR FY 217 COST OVERRUNS 1968 MN 999 88M-SC-17 MNDOT METRO SETASIDE FOR SAFETY CAPACITY PROJECTS ON. SC SPOT NHPP 6,, 4,8, 1,2, NHS FOR FY 217 1969 MN 999 88M-SCN-17 MNDOT METRO SETASIDE FOR SAFETY CAPACITY PROJECTS ON. SC SPOT STP 3,, 2,4, 6, NON-NHS FOR FY 217 197 LOCAL 999 88M-SHL-17 MNDOT METRO ATP SETASIDE FOR HSIP PROJECTS YET TO BE. SH SPOT HSIP 9,222,222 8,3, 922,222 SELECTED FOR FY 217 1971 MN 999 88M-SHS-17 MNDOT METRO SETASIDE FOR HSIP FOR FY 217. SH SPOT HSIP 4,111,111 3,7, 411,111 1972 LOCAL 999 88M-STP-17 MNDOT METRO ATP SETASIDE FOR STP PROJECTS YET TO BE. MC GRADE AND STP 8,446,22 6,756,976 1,689,244 SELECTED FOR FY 217 SURFACE 1973 LOCAL 999 88M-TAP-17 MNDOT METRO ATP SETASIDE FOR TRANSPORTATION. EN ENHANCEMENT TAP 7,562,66 6,5,128 1,512,532 ALTERNATIVE PROGRAM PROJECTS YET TO BE SELECTED FOR FY 217 1974 LOCAL 999 88M-TAP-17C MNDOT METRO ATP SETASIDE FOR TRANSPORTATION. EN ENHANCEMENT TAP 15, 12, 3, ALTERNATIVE PROGRAM PROJECTS YET TO BE SELECTED FOR FY 217 FOR CHISAGO COUNTY 1975 MN 999 88M-TE-17 MNDOT METRO SETASIDE FOR TRAFFIC ENGINEERING ($4M),. SC MISCELLANEOUS SF 8,23, 8,23, ROADSIDE SAFETY($), TMS($) & WRE ($4.23M) FOR FY 217 1976 MN 999 88M-TM-17 MNDOT METRO SETASIDE-TRAFFIC MANAGEMENT STATE. TM TRAFFIC MGMT. SF 4, 4, FURNISHED MATERIALS FOR METRO PROJECTS IN FY SYSTEM 217 1977 MN 999 88M-TR-17 MNDOT METRO SETASIDE-TEAM TRANSIT FOR METRO. TM TRAFFIC MGMT. SF 395, 395, PROJECTS IN FY 217 SYSTEM 1978 MN 999 88M-TRLF-17 MNDOT **TRLF** REPAYMENT, FY 217, TRLF LOANS USED FOR. RW RIGHT OF WAY SF 1,98, 1,98, RIGHT OF WAY PURCHASE ON TH 212 & TH 65 $696,4,774 $221,5,5 $ $168,777,874 $83,881,611 $222,24,789 September 213 Project Listing Page III - 16 of 175

Clearwater STATEWIDE RESERVES Kittson Roseau Lake of the Woods Marshall 2 Koochiching Polk Pennington Red Lake Beltrami 1 Lake Cook Itasca St. Louis Norman Mahnomen Hubbard Clay Cass Becker Wilkin 4 Wadena 3 Crow Wing Aitkin Carlton Traverse Big Stone Lac qui Parle Yellow Medicine Lincoln Grant Stevens Lyon Murray Otter Tail Swift Chippewa Douglas Pope 8 Redwood Pipestone Cottonwood Renville Todd Kandiyohi Brown Stearns Meeker Watonwan Morrison McLeod Sibley Nicollet Benton Wright Mille Lacs Carver Hennepin Scott Kanabec Isanti Anoka Chisago Ramsey Washington Dakota Pine Rice 7 6 Blue Earth Sherburne Le Sueur Waseca Metro Steele Goodhue Dodge Wabasha Olmsted Winona DISTRICT C Office of Transportation System Management 395 John Ireland Blvd MS 44 Saint Paul, MN 55155-1899 (651) 366-3798 FAX: (651) 366-379 Rock Nobles Jackson Martin Faribault Freeborn Mower Fillmore Houston

ATP: C Fiscal Year: 214 STIP for FY 214-217 1979 REC TRAIL 1-13-2F CROW WING TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 191,275 75, 116,275 COUNTY PURCHASE 198 REC TRAIL 2-13-2F CROW WING TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 14,14 1,578 3,526 COUNTY PURCHASE 1981 REC TRAIL 5-13-2C SAINT LOUIS TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 195, 75, 12, COUNTY PURCHASE 1982 REC TRAIL 6-13-3A MILLE LACS BRIDGE. RT INSTALL BRIDGE RT 117,768 88,326 29,442 COUNTY 1983 REC TRAIL 7-13-4B MURRAY COUNTY TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 198,965 63,961 135,4 PURCHASE 1984 REC TRAIL 8-13-3C FILLMORE COUNTY CANFIELD CREEK BRIDGE. RT INSTALL BRIDGE RT 28, 21, 7, 1985 REC TRAIL 1-13-S MINNESOTA TRAIL TRAIL & CAMPGROUND & MAINTENANCE. RT MAINTENANCE RT 4, 3, 1, RIDERS AND ASSOCIATION S 1986 REC TRAIL 11-13-4C WASECA COUNTY TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 3, 22,5 7,5 PURCHASE 1987 REC TRAIL 12-13-2C SUPERIOR HIKING REHABILITATING/ MAINTAINING THE SUPERIOR HIKING. RT REHABILITATION RT 76, 46, 3, TRAIL TRAIL AND ASSOCIATION MAINTENANCE 1988 REC TRAIL 13-13-1A BELTRAMI COUNTY MOVIL MAZE PARK MT. BIKE TRAIL 4. RT CONSTRUCT RT 2, 1, 1, MOUNTAIN BIKE TRAIL 1989 REC TRAIL 14-13-3A ISLE HARBOR SOO LINE - FATHER HENNEPIN STATE PARK LINK 1. RT PAVE TRAIL RT 84, 21, 63, TOWNSHIP 199 REC TRAIL 15-13-3C CITY OF PARKING LOT UPGRADE AND SHELTER. RT CONSTRUCT RT 5, 3,75 1,25 CHATFIELD PARKING LOT AND SHELTER 1991 REC TRAIL 17-13-2B U.S. FOREST SERVICE - SUPERIOR NATIONAL FOREST CLEARING THE 3 MILE POW WOW TRAIL. RT MAINTENANCE RT 37,5 28,125 9,375 1992 REC TRAIL 18-13-4A RENVILLE COUNTY MINNESOTA VALLEY OHV PARK 15. RT DESIGN AND RT 187,5 147,5 4, CONSTRUCT OHV PARK September 213 Project Listing Page III - 161 of 175

ATP: C Fiscal Year: 214 STIP for FY 214-217 1993 REC TRAIL 2-13-3A CITY OF SAINT SKI TRAIL GROOMER. RT EQUIPMENT RT 26,4 19,8 6,6 CLOUD PURCHASE 1994 REC TRAIL 22-13-3C GOODHUE COUNTY CANNON VALLEY TRAIL EXCAVATOR. RT EQUIPMENT RT 25,83 19,373 6,457 PURCHASE 1995 REC TRAIL 23-13-3A STEARNS COUNTY MULTI PURPOSE TRAIL MAINTENANCE AND GROOMING. RT EQUIPMENT RT 46,136 34,62 11,534 EQUIPMENT PURCHASE 1996 REC TRAIL 24-13-2B U.S. FOREST SERVICE, SUPERIOR NATIONAL FOREST BIG ASPEN ATV TRAIL MAINTENANCE AND REHABILITATION. RT REHABILITATION AND MAINTENANCE RT 6, 35, 25, 1997 REC TRAIL 25-13-4D CITY OF ADAMS TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 225, 75, 15, PURCHASE 1998 REC TRAIL 28-13-2A ITASCA COUNTY TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 182, 75, 17, PURCHASE 1999 REC TRAIL 3-13-1A BECKER COUNTY TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 117,563 58,781 58,782 PURCHASE 2 REC TRAIL 31-13-2B CITY OF ORR TRAIL GROOMER. RT EQUIPMENT RT 188,1 75, 113,1 PURCHASE 21 REC TRAIL 32-13-1B GRANT COUNTY GRANT COUNTY ATV TRAILS & SAFETY PARK 2. RT CONSTRUCT ATV RT 65, 48,75 16,25 TRAIL AND SAFETY PARK 22 REC TRAIL 34-13-3B ANOKA COUNTY RICE CREEK WEST REGIONAL TRAIL UNDERPASS. RT UNDERPASS RT 3, 34,74 265,296 RECONSTRUCTION RECONSTR 23 REC TRAIL 37-13-2C CITY OF DULUTH CROSS CITY TRAIL PHASE III 1. RT CONSTRUCT RT 7, 15, 55, TRAIL 24 REC TRAIL 41-13-2C COOK COUNTY KUBOTA L38 4WD TRACTOR. RT EQUIPMENT RT 24,464 18,347 6,117 PURCHASE 25 REC TRAIL 42-13-2C COOK COUNTY COOK COUNTY MOUNTAIN BIKE TRAIL EXTENSION 4. RT CONSTRUCT RT 61,354 46,4 15,35 MOUNTAIN BIKE TRAIL 26 REC TRAIL 43-13-2C CITY OF DULUTH MISSION CREEK TRAIL CENTER OF THE DULUTH 1. RT CONSTRUCT RT 2, 15, 5, TRAVERSE MOUNTAIN BIKE TRAIL 27 REC TRAIL D1-13-3C DNR PARKS AND ZUMBRO BOTTOMS HORSE CAMP VAULT TOILET. RT INSTALL VAULT RT 4, 3, 1, TRAILS TOILET September 213 Project Listing Page III - 162 of 175

ATP: C Fiscal Year: 214 STIP for FY 214-217 28 REC TRAIL D2-13-2D DNR PARKS AND WILLARD MUNGER STATE TRAIL PART 1. RT CULVERT AND RT 233,582 15, 83,582 TRAILS TRAIL RESTORATION 29 REC TRAIL D3-13-2D DNR PARKS AND WILLARD MUNGER STATE TRAIL PART 2. RT CULVERT AND RT 594,97 132,159 462,811 TRAILS TRAIL RESTORATION 21 REC TRAIL D4-13-2C DNR PARKS AND PIT TOILET REPLACEMENT. RT TOILET RT 9,4 67,8 22,6 TRAILS REPLACEMENT 211 REC TRAIL D5-13-3A DNR PARKS AND FATHER HENNEPIN STATE PARK TRAIL CONNECTION 1. RT CONSTRUCT RT 85, 63,75 21,25 TRAILS TRAIL 212 REC TRAIL D6-13-2 DNR PARKS AND SNOWMOBILE TRAIL GROOMER AND DRAG EQUIPMENT. RT EQUIPMENT RT 18, 75, 15, TRAILS PURCHASE PURCHASE 213 REC TRAIL D8-13-2D DNR PARKS AND SUTTER 5 TRAIL DOZER EQUIPMENT PURCHASE. RT EQUIPMENT RT 74, 55,5 18,5 TRAILS PURCHASE 214 REC TRAIL D9-13-2D DNR PARKS AND CIMLINE MAGMA 15. RT EQUIPMENT RT 49,515 37,136 12,379 TRAILS PURCHASE 215 REC TRAIL D1-13-2B DNR PARKS AND OHV RECREATION AREA ENTRANCE OVER DM&IR. RT BRIDGE REPAIR RT 124,96 93,72 31,24 TRAILS RAILROAD 216 BB TRF-911-14 MNDOT SECT 5311: GREATER MN TRANSIT OPERATING; PUBLIC. OB OPERATE BUS FTA 39,, 14,9, 24,1, TRANSIT OPERATING ASSISTANCE 217 BB TRF-981-14 MNDOT SECT 5311(F): INTER-CITY BUS PROGRAM; INVOLVES OPERATING (5%), VEHICLE PURCHASES (8%), VEHICLE REHAB (8%), MARKETING (8%) AND PILOT OPERATING (1%). OB OPERATE BUS FTA 5,, 2,6, 2,4, 218 BB TRF-916-14 MNDOT SECT 5339: GREATER MN TRANSIT, INCLUDING. BB FTA 2,375, 1,9, 475, TRANSIT BUSES AND BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS 219 BB TRF-917-14 MNDOT SECT 531: GREATER MN TRANSIT INCLUDING SMALL URBAN, RURAL TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND ITS PROJECTS. NB PURCHASE BUS FTA 2,3, 1,8, 5, 22 BB TRF-911-14 MNDOT SECT 531: MN TRANSIT INCLUDING LARGE. NB PURCHASE BUS FTA 2,4, 1,9, 5, URBAN TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND TRANSIT ITS September 213 Project Listing Page III - 163 of 175

ATP: C Fiscal Year: 214 STIP for FY 214-217 221 BB TRS-91-14T MNDOT STP-GREATER MN TRANSIT ; INCLUDING. TR PURCHASE BUS STP 1,25, 1,, 25, TRANSIT BUSES, AND BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS 222 PED/BIKE SRS-959-14 MNDOT **SRTS** NON-INFRA, HIRE PLANNING CONSULTANT TO. CA CONSULTING SRTS 99, 99, PROVIDE PLANNING ASSISTANCE TO SCHOOLS WHO ARE NOT WORKING WITH AN MPO OR AN RDC 223 MN 57 27-4 MNDOT REPAIR AND RESTORATION OF HISTORICAL RETAINING. EN MISCELLANEOUS STP 9, 5, 2, 2, WALLS ALONG BOTH SIDES OF TH 57 THROUGH MANTORVILLE 224 MN 999 8816-1972 MNDOT 5.5 TZD REGIONAL COORDINATORS (SECTION 164). SH TZD BEHAVIOR HSIP 485, 485, STRATEGIES 225 MN 999 8816-1989 MNDOT PROVIDE COMMERCIAL DRIVER'S LICENSE (CDL). PL TRAINING STP 2, 2, TRAINING TO WOMEN AND MINORITIES IN MNDOT DISTRICTS SERVING APPROXIMATELY 3 TRAINEES 226 MN 999 8816-199 MNDOT PROVIDE TRIBAL EMPLOYMENT SUPPORT SERVICES. PL TRAINING STP 12, 12, (TESS) PROGRAMMING FOR FOUR TRIBAL ORGANIZATIONS AT $3, EACH 227 MN 999 8816-1991 MNDOT PROVIDE HIGHWAY HEAVY CONSTRUCTION OJT. PL TRAINING STP 8, 8, TRAINING PROGRAM SERVICES THROUGHOUT MNDOT DISTRICTS 228 MN 999 8816-1992 MNDOT PROVIDE 5 DBE OWNERS REIMBURSEMENT FOR. PL TRAINING STP 5, 5, PROFESSIONAL EDUCATION/TRAINING AND BIDXPRESS SUBSCRIPTION SERVICES (3 MONTHS) 229 MN 999 8816-1993 MNDOT PROVIDE INTENSIVE, INDUSTRY-SPECIFIC BIDDING AND. PL TRAINING STP 13, 13, ESTIMATING TRAINING FOR 5 CERTIFIED DBE BUSINESS OWNERS 23 MN 999 8816-1994 MNDOT PROVIDE BUSINESS DEVELOPMENT SERVICES FOR 1. PL TRAINING STP 4, 4, DBE'S: TECHNICAL/BUSINESS ASSISTANCE, 1-1 CONSULTING AND OTHER SERVICES 231 MN 999 8816-23 MNDOT THE SECOND STRATEGIC HIGHWAY RESEARCH (SHRP2). NA RESEARCH & FFM 12, 12, NATIONAL WORKSHOP ON PAVEMENT PRESERVATION STUDIES FOR HIGH VOLUME ROADS 232 MN 999 8816-222 MNDOT ON THE JOB TRAINNING (OJT) SUPPORTIVE SERVICE PROGRAM TO PROVIDE OPPORTUNITIES FOR WOMEN AND MINORITIES ON FEDERALLY - FUNDED HIGHWAY PROJECTS. NA TRAINING FFM 185,455 185,455 September 213 Project Listing Page III - 164 of 175

ATP: C Fiscal Year: 214 STIP for FY 214-217 233 MN 999 8816-223 MNDOT PROVIDE BUSINESS DEVELOPMENT SERVICES STATEWIDE FOR APPROXIMATELY 4 DBE'S TECHNICAL ASSISTANCE, 1-1 CONSULTING AND OTHER BUSINESS SERVICES. NA TRAINING FFM 28,988 28,988 234 MN 999 8816-218 MNDOT IMPLEMENTATION OF STEP FREQUENCY GROUND. NA RESEARCH & FFM 2, 2, PENETRATING RADAR STUDIES 235 LOCAL 999 88C-BLRI-14 MNDOT BRIDGE LOAD RATING INSPECTION / SPECIALIZED. BI MISCELLANEOUS STP 45, 2, 25, HAULING VEHICLES (SHV) LOAD RATINGS ON LOCAL SYSTEM 236 MN 999 88C-CM-14 MNDOT CONTAMINATED MATERIAL CONTRACTS, ASBESTOS. RW WETLAND SF 435, 435, MATERIALS MITIGATION 237 MN 999 88C-COF-14 MNDOT COMMISSIONER'S OPPORTUNITY FUND. NA MISCELLANEOUS STP 2,21, 98, 1,23, 238 MN 999 88C-DI-14 MNDOT DESTINATION INNOVATION. NA INNOVATIVE SF 15,, 15,, SOLUTIONS 239 MN 999 88C-EAM-14 MNDOT ENTERPRISE ASSET MANAGEMENT SOFTWARE. CA PLANNING STP 1,5, 1,2, 3, 24 LOCAL 999 88C-FCBS-14 MNDOT FRACTURE CRITICAL BRIDGE INSPECTIONS ON LOCAL. BI MISCELLANEOUS STP 25, 2, 5, NON-FEDERAL ROUTES (SOFT MATCH) 241 LOCAL 999 88C-FCB-14 MNDOT FRACTURE CRITICAL BRIDGE INSPECTIONS ON LOCAL. BI MISCELLANEOUS STP 62,5 5, 12,5 FEDERAL ROUTES 242 LOCAL 999 88C-HBS-14 MNDOT LOCAL HISTORIC BRIDGE STUDY PHASE III. PL MISCELLANEOUS STP 1,125, 9, 225, 243 MN 999 88C-HSP-14 MNDOT STRATEGIC HIGHWAY SAFETY PLAN INFRASTRUCTURE. SH MEDIAN BARRIER HSIP 1,666,667 1,5, 166,667 (STATEWIDE) 244 MN 999 88C-ITS-14 MNDOT ITS DEPLOYMENT SETASIDE. TM MISCELLANEOUS STP 1,8, 1,5, 3, 245 MN 999 88C-LTA-14 MNDOT LOCAL TECHNICAL ASSISTANCE PROGRAM. PL PLANNING FFM 525, 15, 375, 246 MN 999 88C-PED-14 MNDOT STATEWIDE PED/BIKE COORDINATOR. PL PLANNING STP 15, 15, 247 MN 999 88C-PI-14 MNDOT PROGRAM INCIDENTALS SETASIDE. CA MISCELLANEOUS SF 2, 2, 248 RR 999 88C-RAIL-14 MNDOT RAIL GRADE CROSSING SETASIDE-UPGRADES. SR RR X-ING RRS 25, 25, S 249 RR 999 88C-RCD-14 MNDOT RAIL CROSSING DATABASE. SR RR X-ING RRS 11, 11, S September 213 Project Listing Page III - 165 of 175

ATP: C Fiscal Year: 214 STIP for FY 214-217 25 MN 999 88C-RDF-14 MNDOT RED DYED FUEL TAX EVASION ENFORCEMENT. TM PLANNING STP 2, 2, 251 MN 999 88C-RIDE-14 MNDOT MINNESOTA RIDESHARE COORDINATOR. PL PLANNING STP 15, 15, 252 MN 999 88C-RWI-14 MNDOT RIGHT OF WAY INCIDENTALS. RW RIGHT OF WAY SF 2, 2, 253 RR 999 88C-RXE-14 MNDOT RAIL GRADE CROSSING PRELIMINARY ENGINEERING. SR RR X-ING RRS 1, 1, S 254 MN 999 88C-SANC-14 MNDOT STRATEGIC HIGHWAY SAFETY PLAN INFRASTRUCTURE. SH PAVEMENT HSIP 5,415, 5,415, (STATEWIDE, SECTION 164) MARKING/CABLE BARRIER 255 MN 999 88C-SDS-14 MNDOT SEEDS/PHOENIX INTERNSHIPS. NA MISCELLANEOUS STP 7, 7, 256 MN 999 88C-SFM-14 MNDOT STATE FURNISHED MATERIALS. NA MISCELLANEOUS SF 2,, 2,, 257 MN 999 88C-SRS-14 MNDOT **SRTS** SAFE ROUTES TO SCHOOL - NON. PL PLANNING SRTS 112, 112, INFRASTRUCTURE COORDINATOR 258 RR 999 88C-THR-14 MNDOT REPLACING EQUIPMENT ON TRUNK HIGHWAY. SR RR X-ING RRS 1,, 15, 985, CROSSINGS S 259 MN 999 88C-TZCO-14 MNDOT TZD ENFORCEMENT, EMS & OTHER SHSP BEHAVIOR. SH TZD BEHAVIOR HSIP 1,, 1,, STRATEGIES (SECTION 164) STRATEGIES 26 MN 999 88C-WLB-14 MNDOT WETLAND BANKING AGREEMENTS. RW WETLAND SF 25, 25, MITIGATION 261 MN 999 88C-WS-14 MNDOT WEIGH STATION AND SCALE REHABILITATION. RB BUILDING REHAB STP 2,, 1,6, 4, $1,3,996 $23,168,69 $ $23,1, $21,2, $32,535,387 September 213 Project Listing Page III - 166 of 175

ATP: C Fiscal Year: 215 STIP for FY 214-217 262 BB TRS-91-15T MNDOT STP-GREATER MN TRANSIT ; INCLUDING. TR PURCHASE BUS STP 1,25, 1,, 25, TRANSIT BUSES AND BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS 263 BB TRF-981-15 MNDOT SECT 5311(F): INTER-CITY BUS PROGRAM; INVOLVES OPERATING (5%), VEHICLE PURCHASES (8%), VEHICLE REHAB (8%), MARKETING (8%) AND PILOT OPERATING (1%). OB OPERATE BUS FTA 5,, 2,6, 2,4, 264 BB TRF-911-15 MNDOT SECT 5311: GREATER MN TRANSIT OPERATING; PUBLIC. OB OPERATE BUS FTA 41,375,1 15,2, 26,175,1 TRANSIT OPERATING ASSISTANCE 265 BB TRF-916-15 MNDOT SECT 5339: GREATER MN TRANSIT, BUS. BB FTA 2,375, 1,9, 475, RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS 266 BB TRF-917-15 MNDOT SECT 531: GREATER MN TRANSIT INCLUDING. NB PURCHASE BUS FTA 2,3, 1,8, 5, SMALL URBAN, RURAL TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND ITS PROJECTS 267 BB TRF-911-15 MNDOT SECT 531: MN TRANSIT INCLUDING LARGE. NB PURCHASE BUS FTA 2,4, 1,9, 5, URBAN TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND TRANSIT ITS 268 LOCAL 999 88C-BLRI-15 MNDOT BRIDGE LOAD RATING INSPECTION / SPECIALIZED. BI MISCELLANEOUS STP 625, 5, 125, HAULING VEHICLES (SHV) LOAD RATINGS ON LOCAL SYSTEM 269 MN 999 88C-CM-15 MNDOT CONTAMINATED MATERIAL CONTRACTS, ASBESTOS. RW WETLAND SF 335, 335, MATERIALS MITIGATION 27 MN 999 88C-COF-15 MNDOT COMMISSIONER'S OPPORTUNITY FUND. NA MISCELLANEOUS STP 1,47, 1,14, 33, 271 MN 999 88C-DBE-15 MNDOT DBE WORKFORCE DEVELOPMENT (1% FEDERAL). PL MISCELLANEOUS STP 1,7, 1,7, 272 LOCAL 999 88C-FCBS-15 MNDOT FRACTURE CRITICAL BRIDGE INSPECTIONS ON LOCAL. BI MISCELLANEOUS STP 25, 2, 5, NON-FEDERAL ROUTES (SOFT MATCH) 273 LOCAL 999 88C-FCB-15 MNDOT FRACTURE CRITICAL BRIDGE INSPECTIONS ON LOCAL. BI MISCELLANEOUS STP 62,5 5, 12,5 FEDERAL ROUTES 274 LOCAL 999 88C-HBS-15 MNDOT LOCAL HISTORIC BRIDGE STUDY PHASE IV. PL MISCELLANEOUS TAP 75, 5, 125, 125, 275 MN 999 88C-HSIP-15 MNDOT ADDITIONAL MAP 21 GREATER MN STATE HSIP SET. SH SAFETY TARGET HSIP 2,666,666 2,4, 266,666 ASIDE FOR 215 276 MN 999 88C-HSP-15 MNDOT STRATEGIC HIGHWAY SAFETY PLAN INFRASTRUCTURE. SH MEDIAN BARRIER HSIP 1,666,667 1,5, 166,667 (STATEWIDE) September 213 Project Listing Page III - 167 of 175

ATP: C Fiscal Year: 215 STIP for FY 214-217 277 MN 999 88C-ITS-15 MNDOT ITS DEPLOYMENT SETASIDE. TM MISCELLANEOUS STP 1,875, 1,5, 375, 278 MN 999 88C-LTA-15 MNDOT LOCAL TECHNICAL ASSISTANCE PROGRAM. PL PLANNING FFM 525, 15, 375, 279 MN 999 88C-PED-15 MNDOT STATEWIDE PED/BIKE COORDINATOR. PL PLANNING TAP 15, 15, 28 MN 999 88C-PI-15 MNDOT PROGRAM INCIDENTALS SETASIDE. CA MISCELLANEOUS SF 2, 2, 281 RR 999 88C-RAIL-15 MNDOT RAIL GRADE CROSSING SETASIDE-UPGRADES. SR RR X-ING RRS 25, 25, S 282 RR 999 88C-RCD-15 MNDOT RAIL CROSSING DATABASE. SR RR X-ING RRS 11, 11, S 283 MN 999 88C-RDF-15 MNDOT RED DYED FUEL TAX EVASION ENFORCEMENT. TM PLANNING STP 14, 14, 284 MN 999 88C-RIDE-15 MNDOT MINNESOTA RIDESHARE COORDINATOR. PL PLANNING TAP 15, 15, 285 REC TRAIL 88C-RT-15 DNR PARKS AND STATEWIDE DNR PARKS & TRAILS. RT PARKS & TRAIL RT 2,5, 2,, 5, TRAILS 286 MN 999 88C-RWI-15 MNDOT RIGHT OF WAY INCIDENTALS. RW RIGHT OF WAY SF 2, 2, 287 RR 999 88C-RXE-15 MNDOT RAIL GRADE CROSSING PRELIMINARY ENGINEERING. SR RR X-ING RRS 1, 1, S 288 MN 999 88C-SANC-15 MNDOT STRATEGIC HIGHWAY SAFETY PLAN INFRASTRUCTURE. SH PAVEMENT HSIP 3,715, 3,715, (STATEWIDE, SECTION 164) MARKING/CABLE BARRIER 289 MN 999 88C-SDS-15 MNDOT SEEDS/PHOENIX INTERNSHIPS. PL MISCELLANEOUS STP 7, 7, 29 MN 999 88C-SFM-15 MNDOT STATE FURNISHED MATERIALS. NA MISCELLANEOUS SF 2,, 2,, 291 PED/BIKE 88C-SRS-15 MNDOT **SRTS** INFRA AND NON-INFRA STATEWIDE SRTS. PL PLANNING TAP 1,3, 1,4, 26, PROGRAM 292 MN 999 88C-TAPF-15 MNDOT TRANSPORTATION ALTERNATIVE PROGRAM FEDERAL. NA PLANNING TAP 5,, 5,, FUND SETASIDE 293 LOCAL 999 88C-TAPS-15 MNDOT TRANSPORTATION ALTERNATIVE PROGRAM STATE FUND. NA PLANNING TAP 5,, 5,, SETASIDE 294 MN 999 88C-TED-15 MNDOT TRANSPORTATION ECONOMIC DEVELOPMENT SET. PL MISCELLANEOUS SF 1,, 1,, ASIDE FOR 215 September 213 Project Listing Page III - 168 of 175

ATP: C Fiscal Year: 215 STIP for FY 214-217 295 RR 999 88C-THR-15 MNDOT REPLACING EQUIPMENT ON TRUNK HIGHWAY. SR RR X-ING RRS 1,, 15, 985, CROSSINGS S 296 MN 999 88C-TZCE-15 MNDOT TZD SAFETY EDUCATION (PAID. SH TZD BEHAVIOR HSIP 95, 95, MEDIA/WORKSHOPS/CONFERENCES/OTHER, SECTION STRATEGIES 164) 297 MN 999 88C-TZDC-15 MNDOT TZD REGIONAL COORDINATOR POSITIONS (SECTION 164). SH TZD BEHAVIOR HSIP 485, 485, STRATEGIES 298 MN 999 88C-TZDO-15 MNDOT TZD ENFORCEMENT, EMS & OTHER SHSP BEHAVIOR. SH TZD BEHAVIOR HSIP 1,75, 1,75, STRATEGIES (SECTION 164) STRATEGIES 299 MN 999 88C-WLB-15 MNDOT WETLAND BANKING AGREEMENTS. RW WETLAND SF 25, 25, MITIGATION 21 MN 999 88C-WS-15 MNDOT WEIGH STATION AND SCALE REHABILITATION. RB BUILDING REHAB STP 2,, 1,6, 4, $14,575,933 $28,795, $ $23,4, $2,351,666 $32,29,267 September 213 Project Listing Page III - 169 of 175

ATP: C Fiscal Year: 216 STIP for FY 214-217 211 BB TRF-981-16 MNDOT SECT 5311(F): INTER-CITY BUS PROGRAM: INVOLVES OPERATING (5%), VEHICLE PURCHASES (8%), VEHICLE REHAB (8%), MARKETING (8%) AND PILOT OPERATING (1%). OB OPERATE BUS FTA 5,15, 2,6, 2,55, 212 BB TRF-911-16 MNDOT SECT 5311: GREATER MN TRANSIT OPERATING; AND. OB OPERATE BUS FTA 4,17, 15,2, 24,97, PUBLIC TRANSIT OPERATING ASSISTANCE 213 BB TRF-916-16 MNDOT SECT 5339: GREATER MN TRANSIT, INCLUDING. BB FTA 2,375, 1,9, 475, TRANSIT BUSES, BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS 214 BB TRF-917-16 MNDOT SECT 531: GREATER MN TRANSIT INCLUDING. NB PURCHASE BUS FTA 2,3, 1,8, 5, SMALL URBAN, RURAL TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND ITS PROJECTS 215 BB TRF-911-16 MNDOT SECT 531: MN TRANSIT ; INCLUDING LARGE. NB PURCHASE BUS FTA 2,4, 1,9, 5, URBAN TRANSIT BUSES, BUS RELATED EQUIPMENT AND TRANSIT ITS 216 BB TRS-91-16T MNDOT STP GREATER MN TRANSIT : INCLUDING. TR PURCHASE BUS STP 1,25, 1,, 25, TRANSIT BUSES, BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS 217 MN 999 88C-CM-16 MNDOT CONTAMINATED MATERIAL CONTRACTS, ASBESTOS. RW WETLAND SF 335, 335, MATERIALS MITIGATION 218 MN 999 88C-COF-16 MNDOT COMMISSIONER'S OPPORTUNITY FUND. NA MISCELLANEOUS STP 3,23, 2,76, 47, 219 MN 999 88C-DBE-16 MNDOT DBE WORKFORCE DEVELOPMENT (1% FEDERAL). PL MISCELLANEOUS STP 1,7, 1,7, 211 MN 999 88C-DI-16 MNDOT DESTINATION INNOVATION. NA INNOVATIVE SF 12,, 12,, SOLUTIONS 2111 LOCAL 999 88C-FCBS-16 MNDOT FRACTURE CRITICAL BRIDGE INSPECTIONS ON LOCAL. BI MISCELLANEOUS STP 25, 2, 5, NON-FEDERAL ROUTES (SOFT MATCH) 2112 LOCAL 999 88C-FCB-16 MNDOT FRACTURE CRITICAL BRIDGE INSPECTIONS ON LOCAL. BI MISCELLANEOUS STP 62,5 5, 12,5 FEDERAL ROUTES 2113 MN 999 88C-HSIP-16 MNDOT ADDITIONAL MAP-21 GREATER MN STATE HSIP SET. SH SAFETY TARGET HSIP 2,777,777 2,5, 277,777 ASIDE FOR 216 2114 MN 999 88C-HSP-16 MNDOT STRATEGIC HIGHWAY SAFETY PLAN INFRASTRUCTURE. SH MEDIAN BARRIER HSIP 1,666,667 1,5, 166,667 (STATEWIDE) 2115 MN 999 88C-ITS-16 MNDOT ITS DEPLOYMENT SETASIDE. TM MISCELLANEOUS STP 1,8, 1,5, 3, September 213 Project Listing Page III - 17 of 175

ATP: C Fiscal Year: 216 STIP for FY 214-217 2116 MN 999 88C-LTA-16 MNDOT LOCAL TECHNICAL ASSISTANCE PROGRAM. PL PLANNING FFM 525, 15, 375, 2117 MN 999 88C-MNR-16 MNDOT MNROAD RECONSTRUCTION. RW WETLAND STP 2,5, 1,25, 1,25, MITIGATION 2118 MN 999 88C-OJT-16 MNDOT ON THE JOB TRAINING. NA MISCELLANEOUS STP 3, 3, 2119 MN 999 88C-PED-16 MNDOT STATEWIDE PED/BIKE COORDINATOR. PL PLANNING TAP 15, 15, 212 MN 999 88C-PI-16 MNDOT PROGRAM INCIDENTALS SETASIDE. CA MISCELLANEOUS SF 2, 2, 2121 RR 999 88C-RAIL-16 MNDOT RAIL GRADE CROSSING SETASIDE-UPGRADES. SR RR X-ING RRS 25, 25, S 2122 RR 999 88C-RCD-16 MNDOT RAIL CROSSING DATABASE. SR RR X-ING RRS 11, 11, S 2123 MN 999 88C-RDF-16 MNDOT RED DYED FUEL TAX EVASION ENFORCEMENT. TM PLANNING STP 14, 14, 2124 MN 999 88C-RIDE-16 MNDOT MINNESOTA RIDESHARE COORDINATOR. PL PLANNING TAP 15, 15, 2125 REC TRAIL 88C-RT-16 DNR PARKS AND STATEWIDE DNR PARKS & TRAILS. RT PARKS & TRAIL RT 2,5, 2,, 5, TRAILS 2126 MN 999 88C-RWI-16 MNDOT RIGHT OF WAY INCIDENTALS. RW RIGHT OF WAY SF 2, 2, 2127 RR 999 88C-RXE-16 MNDOT RAIL GRADE CROSSING PRELIMINARY ENGINEERING. SR RR X-ING RRS 1, 1, S 2128 MN 999 88C-SANC-16 MNDOT STRATEGIC HIGHWAY SAFETY PLAN INFRASTRUCTURE. SH PAVEMENT HSIP 3,715, 3,715, (STATEWIDE, SECTION 164) MARKING/CABLE BARRIER 2129 MN 999 88C-SDS-16 MNDOT SEEDS/PHOENIX INTERNSHIPS. NA MISCELLANEOUS STP 7, 7, 213 MN 999 88C-SFM-16 MNDOT STATE FURNISHED MATERIALS. NA MISCELLANEOUS SF 2,, 2,, 2131 MN 999 88C-TAPF-16 MNDOT TRANSPORTATION ALTERNATIVE PROGRAM FEDERAL. NA PLANNING TAP 5,, 5,, FUND SETASIDE 2132 LOCAL 999 88C-TAPS-16 MNDOT TRANSPORTATION ALTERNATIVE PROGRAM STATE FUND. NA PLANNING TAP 5,, 5,, SETASIDE 2133 MN 999 88C-TED-16 MNDOT TRANSPORTATION ECONOMIC DEVELOPMENT SET. PL MISCELLANEOUS SF 1,, 1,, ASIDE FOR 216 September 213 Project Listing Page III - 171 of 175

ATP: C Fiscal Year: 216 STIP for FY 214-217 2134 MN 999 88C-TZCE-16 MNDOT TZD SAFETY EDUCATION (PAID. SH TZD BEHAVIOR HSIP 95, 95, MEDIA/WORKSHOPS/CONFERENCES/OTHER, SECTION STRATEGIES 164) 2135 MN 999 88C-TZDC-16 MNDOT TZD REGIONAL COORDINATOR POSITIONS (SECTION 164). SH TZD BEHAVIOR HSIP 485, 485, STRATEGIES 2136 MN 999 88C-TZDO-16 MNDOT TZD ENFORCEMENT, EMS & OTHER SHSP BEHAVIOR. SH TZD BEHAVIOR HSIP 1,75, 1,75, STRATEGIES (SECTION 164) STRATEGIES 2137 MN 999 88C-WLB-16 MNDOT WETLAND BANKING AGREEMENTS. RW WETLAND SF 25, 25, MITIGATION $114,441,944 $28,41, $ $23,4, $31,982,777 $3,649,167 September 213 Project Listing Page III - 172 of 175

ATP: C Fiscal Year: 217 STIP for FY 214-217 2138 BB TRF-911-17 MNDOT SECT 5311: GREATER MN TRANSIT OPERATING; AND. OB OPERATE BUS FTA 42,616,353 15,2, 27,416,353 PUBLIC TRANSIT OPERATING ASSISTANCE 2139 BB TRF-916-17 MNDOT SECT 5339: GREATER MN TRANSIT, INCLUDING. BB FTA 2,375, 1,9, 475, TRANSIT BUSES, BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS 214 BB TRF-917-17 MNDOT SECT 531: GREATER MN TRANSIT ; INCLUDING. NB PURCHASE BUS FTA 2,3, 1,8, 5, SMALL URBAN, RURAL TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND ITS PROJECTS 2141 BB TRF-911-17 MNDOT SECT 531: MN TRANSIT INCLUDING LARGE. NB PURCHASE BUS FTA 2,4, 1,9, 5, URBAN TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND TRANSIT ITS 2142 BB TRF-981-17 MNDOT SECT 5311 (F): INTER-CITY BUS PROGRAM; INVOLVES OPERATING (5%), VEHICLE PURCHASES (8%), VEHICLE REHAB (8%), MARKETING (8%) AND PILOT OPERATING (1%). OB OPERATE BUS FTA 5,15, 2,6, 2,55, 2143 BB TRS-91-17T MNDOT STP-GREATER MN TRANSIT ; INCLUDING. TR PURCHASE BUS STP 1,25, 1,, 25, TRANSIT BUSES, BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS 2144 MN 999 88C-ADA-17 MNDOT AMERICAN WITH DISABILITITES ACT (ADA) SETASIDE FOR. PL PLANNING TAP 2,5, 2,, 5, 217 2145 LOCAL 999 88C-BUI-17 MNDOT BRIDGE UNDERWATER INSPECTION FOR LOCAL SYSTEM. BI MISCELLANEOUS BR 5, 4, 1, 2146 MN 999 88C-CM-17 MNDOT CONTAMINATED MATERIAL CONTRACTS, ASBESTOS. RW WETLAND SF 335, 335, MATERIALS MITIGATION 2147 MN 999 88C-COF-17 MNDOT COMMISSIONER'S OPPORTUNITY FUND. NA MISCELLANEOUS STP 1,7, 5,75, 4,32, 2148 MN 999 88C-DBE-17 MNDOT DBE WORKFORCE DEVELOPMENT (1% FEDERAL). PL MISCELLANEOUS STP 1,7, 1,7, 2149 MN 999 88C-DI-17 MNDOT DESTINATION INNOVATION. NA INNOVATIVE SF 1,, 1,, SOLUTIONS 215 LOCAL 999 88C-FCBS-17 MNDOT FRACTURE CRITICAL BRIDGE INSPECTIONS ON LOCAL. BI MISCELLANEOUS STP 25, 2, 5, NON-FEDERAL ROUTES (SOFT MATCH) 2151 LOCAL 999 88C-FCB-17 MNDOT FRACTURE CRITICAL BRIDGE INSPECTIONS ON LOCAL. BI MISCELLANEOUS STP 62,5 5, 12,5 FEDERAL ROUTES 2152 MN 999 88C-ITS-17 MNDOT ITS DEPLOYMENT SETASIDE. TM MISCELLANEOUS STP 1,5, 1,5, September 213 Project Listing Page III - 173 of 175

ATP: C Fiscal Year: 217 STIP for FY 214-217 2153 MN 999 88C-LTA-17 MNDOT LOCAL TECHNICAL ASSISTANCE PROGRAM. PL PLANNING FFM 525, 15, 375, 2154 MN 999 88C-OJT-17 MNDOT ON THE JOB TRAINING. NA MISCELLANEOUS STP 3, 3, 2155 MN 999 88C-PED-17 MNDOT STATEWIDE PED/BIKE COORDINATOR. PL PLANNING TAP 15, 15, 2156 MN 999 88C-PI-17 MNDOT PROGRAM INCIDENTALS SETASIDE. CA MISCELLANEOUS SF 2, 2, 2157 RR 999 88C-RAIL-17 MNDOT RAIL GRADE CROSSING SETASIDE-UPGRADES. SR RR X-ING RRS 25, 25, S 2158 RR 999 88C-RCD-17 MNDOT RAIL CROSSING DATABASE. SR RR X-ING RRS 11, 11, S 2159 MN 999 88C-RDF-17 MNDOT RED DYED FUEL TAX EVASION ENFORCEMENT. TM PLANNING STP 14, 14, 216 MN 999 88C-RIDE-17 MNDOT MINNESOTA RIDESHARE COORDINATOR. PL PLANNING TAP 15, 15, 2161 REC TRAIL 88C-RT-17 DNR PARKS AND STATEWIDE DNR PARKS & TRAILS. RT PARKS & TRAIL RT 2,5, 2,, 5, TRAILS 2162 MN 999 88C-RWI-17 MNDOT RIGHT OF WAY INCIDENTALS. RW RIGHT OF WAY SF 2, 2, 2163 RR 999 88C-RXE-17 MNDOT RAIL GRADE CROSSING PRELIMINARY ENGINEERING. SR RR X-ING RRS 1, 1, S 2164 RR 999 88C-RXS-17 MNDOT RAIL GRADE CROSSING SAFETY SETASIDE. SR RR X-ING RRS 4,9, 4,9, S 2165 MN 999 88C-SANC-17 MNDOT STRATEGIC HIGHWAY SAFETY PLAN INFRASTRUCTURE. SH PAVEMENT HSIP 3,715, 3,715, (STATEWIDE, SECTION 164) MARKING/CABLE BARRIER 2166 MN 999 88C-SDS-17 MNDOT SEEDS/PHOENIX INTERNSHIPS. NA MISCELLANEOUS STP 7, 7, 2167 MN 999 88C-SFM-117 MNDOT STATE FURNISHED MATERIALS. NA MISCELLANEOUS SF 2,, 2,, 2168 MN 999 88C-TAPF-17 MNDOT TRANSPORTATION ALTERNATIVE PROGRAM FEDERAL. NA PLANNING TAP 5,, 5,, FUND SETASIDE 2169 LOCAL 999 88C-TAPS-17 MNDOT TRANSPORTATION ALTERNATIVE PROGRAM STATE FUND. NA PLANNING TAP 5,, 5,, SETASIDE 217 MN 999 88C-TED-17 MNDOT TRANSPORTATION ECONOMIC DEVELOPMENT SET. PL MISCELLANEOUS SF 1,, 1,, ASIDE FOR 217 September 213 Project Listing Page III - 174 of 175

ATP: C Fiscal Year: 217 STIP for FY 214-217 2171 MN 999 88C-TZCE-17 MNDOT TZD SAFETY EDUCATION (PAID. SH TZD BEHAVIOR HSIP 95, 95, MEDIA/WORKSHOPS/CONFERENCES/OTHER, SECTION STRATEGIES 164) 2172 MN 999 88C-TZDC-17 MNDOT TZD REGIONAL COORDINATOR POSITIONS (SECTION 164). SH TZD BEHAVIOR HSIP 485, 485, STRATEGIES 2173 MN 999 88C-TZDO-17 MNDOT TZD ENFORCEMENT, EMS & OTHER SHSP BEHAVIOR. SH TZD BEHAVIOR HSIP 1,75, 1,75, STRATEGIES (SECTION 164) STRATEGIES 2174 MN 999 88C-WLB-17 MNDOT WETLAND BANKING AGREEMENTS. RW WETLAND SF 25, 25, MITIGATION 2175 MN 999 88C-WS-17 MNDOT WEIGH STATION AND SCALE REHABILITATION. RB BUILDING REHAB STP 1,, 8, 2, $123,383,853 $34,25, $ $23,4, $33,5, $32,728,853 September 213 Project Listing Page III - 175 of 175

Appendix A Select Highway and Transit Programs Greater Minnesota MPO Programs Transportation Alternatives Program (TAP) Highway Safety Improvement Program (HSIP) Transit Programs Tribal Transportation Program (TTP) Recreational Trails Program MnDOT State Road Construction Program (SRC)

Greater Minnesota MPO Programs Duluth-Superior Metropolitan Interstate Council Grand Forks-East Grand Forks Metropolitan Planning Organization St. Cloud Area Planning Organization Fargo-Moorhead Metropolitan Council of Governments LaCrosse Area Planning Committee Rochester-Olmsted Council of Governments Mankato/North Mankato Area Planning Organization A-1

A-1(1)

GREATER MINNESOTA MPO PROGRAMS In accordance with the joint FHWA/FTA Metropolitan Planning Rules, 23 CFR Section 45.324, each of the Metropolitan Planning Organizations in Greater Minnesota has developed and approved a four-year fiscally constrained Transportation Improvement Program (TIP). Each TIP provides a prioritized list of projects for which federal (FHWA and FTA), state (MnDOT) and in some cases, local funds are anticipated to be used. The federally funded projects have been selected through the Area Transportation Partnership (ATP) process and are included in the appropriate Area Transportation Improvement Program (ATIP). Also included in the MPO TIP is a financial plan which discusses the program s fiscal constraint as well as the MPO s certification that the MPO planning process is being carried out in compliance with all applicable federal requirements. In the case of Duluth-Superior and St. Cloud, which are air quality maintenance areas for carbon monoxide, a conformity determination analysis is also included. After adoption by the MPO, approval from MnDOT as the Governor s designee, and the completion of a joint planning finding and Air Quality Conformity Determination by FHWA and FTA (where needed), the MPO TIP is incorporated by reference, without modification, into the STIP. Additionally, the federal and MnDOT funded projects within the MPO area are listed in the STIP. The following table summarizes the federal funding for each MPO. A-1(2) Figure A-1 GREATER MINNESOTA MPO FUNDING BY SOURCE AND YEAR ($ THOUSANDS) SOURCE 214 215 216 217 TOTAL* FTA Duluth-Superior 2,291 2,1 2,15 2,214 8,755 Grand Forks-East Grand Forks 93 93 St. Cloud 2,613 2,226 2,336 2,396 9,571 Fargo-Moorhead 818 1,24 917 1,875 4,85 Rochester-Olmsted 4,325 3,672 2,785 6,816 17,597 Mankato/N. Mankato 565 565 435 436 2,1 LaCrosse 44 94 94 94 326 SUBTOTAL* 1,749 9,897 8,717 13,83 43,193 FHWA** Duluth-Superior 11,44 7,824 2,388 2,97 41,749 Grand Forks-East Grand Forks 1,166 1,166 St. Cloud 5,994 15,58 23,666 7,5 52,218 Fargo-Moorhead 6,89 7,884 5,96 5,311 25,964 Rochester-Olmsted 5,435 22,5 6,451 1,683 45,69 Mankato/N. Mankato 5,25 4 576 6,181 LaCrosse SUBTOTAL* 36,49 54,117 57,4 25,141 172,348 TOTAL* 46,798 64,14 65,757 38,972 215,542 *may not total correctly due to rounding **includes transit capital

MANKATO NORTH MANKATO AREA PLANNING ORGANIZATION On March 27, 212, the Census Bureau identified Mankato as an urbanized area with a population of 57,584. Under federal law ( 134(d)(1) of the Moving Ahead for Progress in the 21 st Century Act (MAP-21), all urbanized areas with a population of more than 5, individuals must have a designated metropolitan planning organization (MPO) that is responsible for long-range transportation planning, as well as a short-range investment program. In response to this, the Mankato/North Mankato Area Planning Organization (MAPO) was established with the guidance of MnDOT Office of Statewide Multimodal Planning (OSMP), the Federal Highway Administration, MnDOT District 7, local governments, transit operators and Region 9 Development Commission. A joint powers agreement between the local governments representing at least 75 percent of the affected population was enacted to establish MAPO as the designated metropolitan planning organization, and was approved by the Governor on January 11, 213. The city of Mankato serves as the administrative agency. Now that MAPO has been designated as the agency designated to be the MPO, MnDOT will continue to work with that agency and local governments to ensure all federal and state planning requirements are met. A-1(3)

ATP: DULUTH-SUPERIOR METROPOLITAN INTERSTATE COMMITTEE Fiscal Year: 214 STIP for FY 214-217 1 BB TRF-16-14A DULUTH TRANSIT SECT 537: DULUTH DIAL-A-RIDE TRANSIT OPERATING. B9 OPERATE BUS LF 594,14 594,14 AUTHORITY ASSISTANCE 2 BB TRF-16-14B DULUTH TRANSIT SECT 537: OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,7,51 1,4, 5,67,51 AUTHORITY 3 BB TRF-16-14C DULUTH TRANSIT SECT 537: FACILITY MAINTENANCE, UPGRADES AND. B9 BUS GRANT FTA 699,856 55, 149,856 AUTHORITY REHAB 4 BB TRF-16-14D DULUTH TRANSIT SECT 537: PASSENGER AMENITIES. B9 OPERATE BUS FTA 3,965,29 15, 3,815,29 AUTHORITY 7 BB TRF-16-14-JA DULUTH TRANSIT SECT 5316: JARS URBAN OPERATING FUNDS FOR DULUTH. JA OPERATE BUS FTA 383, 191,5 191,5 AUTHORITY TRANSIT AUTHORITY 9 BB TRS-16-14 DULUTH TRANSIT DTA-PURCHASE 1 BUSES TOTAL, 5 WILL BE HYBRID. TR PURCHASE BUS STP 5,616, 1,5, 4,116, AUTHORITY (CLASS 7) 4 LOCAL 999 118-8-42 DULUTH **MN134** SECONDARY ACCESS ROADWAY TO DULUTH 1. MC GRADE AND DEMO 1,25, 1,, 25, AIR NATIONAL GUARD BASE SURFACE 41 PED/BIKE 118-9-19 DULUTH CROSS CITY TRAIL DULUTH, RECYCLE WAY TO 59TH AVE 1. EN PED./BIKE TAP 7, 5, 2, WEST 42 MSAS 148 118-148-8 DULUTH 1TH AVENUE E RECONSTRUCTION: E SUPERIOR STREET. RC GRADE AND STP 3,34, 95, 2,39, TO E 5TH STREET SURFACE 43 PED/BIKE 129-591-3 GRAND RAPIDS **SRTS** INFRA GRAND RAPIDS CONSTRUCTION OF. BT PED./BIKE SRTS 157,968 157,968 SIDEWALKS ON 8TH AVE NW AND NE 7TH AVE 45 I 35 98-143 MNDOT 2 MILES SOUTH TO MIDWAY RD, CABLE MEDIAN BARRIER 2. SH SAFETY TARGET HSIP 579,956 521,96 57,996 INSTALLATION (ASSOC SP 6982-299) 48 US 2 6937-691D MNDOT BONG BRIDGE & RAMP REPAIRS, DECK,. BI BRIDGE REPAIR NHPP 8,25, 6,6, 1,65, PAINTING, JOINT REPAIR/REPLACEMENT, BR #'S 691D 54 MN 61 6925-134 MNDOT **ADA** PED RAMP FROM 32ND AVE E TO 3. EN PED./BIKE TAP 262,5 21, 52,5 59TH AVE E $32,868,464 $11,439,928 $ $2,291,5 $1,76,496 $17,376,54 September 213 MPO Project Listing A-1 Page 4 of 33

ATP: DULUTH-SUPERIOR METROPOLITAN INTERSTATE COMMITTEE Fiscal Year: 215 STIP for FY 214-217 66 BB TRF-16-15A DULUTH TRANSIT SECT 537: DULUTH DIAL-A-RIDE TRANSIT OPERATING. B9 OPERATE BUS LF 611,927 611,927 AUTHORITY ASSISTANCE 67 BB TRF-16-15B DULUTH TRANSIT SECT 537: OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,7,51 1,4, 5,67,51 AUTHORITY 68 BB TRF-16-15C DULUTH TRANSIT SECT 537: DULUTH TRANSIT. B9 BUS GRANT FTA 875, 7, 175, AUTHORITY 69 BB TRF-16-15D DULUTH TRANSIT SECT 537: PREVENTATIVE MAINTENANCE. B9 OPERATE BUS LF 3,965,29 3,965,29 AUTHORITY 94 CSAH 9 69-69-38 ST LOUIS COUNTY FROM JCT CSAH 13 (MIDWAY RD) TO JCT CSAH 4 (RICE 6. RD BITUMINOUS STP 3,125, 2,5, 625, LAKE RD), PAVEMENT RECLAMATION RECLAMATION 99 PED/BIKE 118-9-18 DULUTH **MN146** CROSS CITY TRAIL, DULUTH, 3TH AVE WEST 2. BT PED./BIKE DEMO 1,912,189 1,449,751 462,438 TO RECYCLE WAY 1 PED/BIKE 118-9-21 DULUTH CROSS CITY TRAIL DULUTH, 59TH AVE WEST TO PULASKI 1. EN PED./BIKE TAP 7, 5, 2, ST 11 MSAS 173 118-173-7 DULUTH WEST FIRST STREET RECONSTRUCTION FROM MESABA 1. RC GRADE AND STP 4,42, 92, 3,5, AVE TO PIEDMONT AVE SURFACE 112 MN 23 691-92 MNDOT TH 23 IN DULUTH, MISSION CREEK BRIDGE# 5757 WORK. BR GRADE AND SF 2,5, 2,5, AND GRADING BRIDGE 114 I 35 6982-29AC4 MNDOT **AC** BOUNDARY AVE TO 26TH AVE E, PAVEMENT REPL & 1. BR BRIDGE NHPP 2,454,611 2,454,611 REPAIRS, BR REPL BR #S 69831, 69832, 6988 & REPAIRS BR #S 69851, 69852, 69879 + SPOT REPAIRS AT 21ST AVE W INTERCHANGE, REMOVE BR #S 69835 & 69828 NEAR 27TH AVE W, SAFETY S (AC PAYBACK 4 OF 4) REPLACEMENT $27,633,87 $7,824,362 $ $2,1, $2,5, $15,29,445 September 213 MPO Project Listing A-1 Page 5 of 33

ATP: DULUTH-SUPERIOR METROPOLITAN INTERSTATE COMMITTEE Fiscal Year: 216 STIP for FY 214-217 132 BB TRF-16-16A DULUTH TRANSIT SECT 537: DULUTH DIAL-A-RIDE TRANSIT OPERATING. B9 OPERATE BUS LF 63,285 63,285 AUTHORITY ASSISTANCE 133 BB TRF-16-16B DULUTH TRANSIT SECT 537: DULUTH OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,7,51 1,45, 5,62,51 AUTHORITY 134 BB TRF-16-16C DULUTH TRANSIT SECT 537: DULUTH TRANSIT. B9 BUS GRANT FTA 875, 7, 175, AUTHORITY 135 BB TRF-16-16D DULUTH TRANSIT SECT 537: DULUTH PREVENTATIVE MAINTENANCE. B9 OPERATE BUS LF 3,965,29 3,965,29 AUTHORITY 137 BB TRS-16-16 DULUTH TRANSIT DTA-PURCHASE 1 BUSES TOTAL, 5 BUSES WILL BE. TR PURCHASE BUS STP 4,78,5 1,5, 3,28,5 AUTHORITY HYBRID (CLASS 7) 147 CSAH 9 69-69-13 ST LOUIS COUNTY ARLINGTON AVE FROM TRINITY ROAD TO ARROWHEAD 3. RD BITUMINOUS STP 2,, 1,6, 4, ROAD RECLAIM, MILL & RECLAMATION 149 MSAS 22 118-22-2 DULUTH DULUTH HEIGHTS CONECTOR (JOSHUA AVE) FROM. MC GRADE AND STP 4,6, 2,9, 1,7, MAPLE GROVE TO ARROWHEAD ROAD SURFACE 152 MSAS 13 22-13-9 HERMANTOWN STEBNER ROAD BETWEEN MAPLE GROVE ROAD AND TH 1. RC GRADE AND STP 2,5, 1,6, 9, 53 RECONSTRUCTION SURFACE 154 MN 23 691-89 MNDOT **ELLA**.28 MI E BECKS RD TO POLK STREET IN WEST 5. BR BRIDGE STP 11,4, 8,12, 3,28, DULUTH, MILL & (ASSOC 691-88544A REPLACEMENT (KINGBURY CR) 159 US 53 6915-133 MNDOT IN DULUTH, US 53 (TRINITY RD).422 MI N JCT ANDERSON 1. RS MILL AND NHPP 1,, 8, 2, RD TO E JCT MN TH 194 EB (ASSOC 6933-9), MILL AND 163 MN 61 6925-135 MNDOT IN DULUTH, 61ST AVE E TO.12 MI N SUPERIOR ST, MILL 1. RS MILL AND NHPP 56, 448, 112, AND 165 MN 194 6933-92 MNDOT IN DULUTH N MESABA AVE CROSSING TO JCT I 35 CPR & 1. RD CONCRETE NHPP 2,7, 2,16, 54, BRIDGE REPAIR # 69839 & 6984 (TIED TO 698-59) (ASSOC PAVEMENT SP 6933-(69839B) & 6933-(6984B) REHAB 168 I 535 698-59 MNDOT IN DULUTH, CPR WORK ON I 535 FR JCT BLATNIK BRIDGE 1. RD CONCRETE NHPP 1,4, 1,26, 14, TO JCT I 35 (TIED TO SP 6933-92) PAVEMENT REHAB $43,48,865 $2,388, $ $2,15, $4,272, $16,598,865 September 213 MPO Project Listing A-1 Page 6 of 33

ATP: DULUTH-SUPERIOR METROPOLITAN INTERSTATE COMMITTEE Fiscal Year: 217 STIP for FY 214-217 182 BB TRF-16-17A DULUTH TRANSIT SECT 537: DULUTH DIAL-A-RIDE TRANSIT OPERATING. B9 OPERATE BUS LF 649,19 649,19 AUTHORITY ASSISTANCE 183 BB TRF-16-17B DULUTH TRANSIT SECT 537: OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,282,15 1,493,5 5,788,65 AUTHORITY 184 BB TRF-16-17D DULUTH TRANSIT SECT 537: PREVENTATIVE MAINTENANCE. B9 OPERATE BUS LF 4,84, 4,84, AUTHORITY 185 BB TRF-16-17C DULUTH TRANSIT SECT 537: DULUTH TRANSIT. B9 BUS GRANT FTA 9, 72, 18, AUTHORITY 187 BB TRS-16-17 DULUTH TRANSIT DTA - STRIDE-PURCHASE 3 BUSES (CLASS 4). TR PURCHASE BUS STP 246, 196,8 49,2 AUTHORITY 19 CSAH 9 69-69-4 DULUTH, ST LOUIS IN DULUTH ON 4TH STREET FROM 6TH AVE E TO WALLACE 2. RD MILL AND STP 3,4, 1,9, 1,5, COUNTY RD, MILL AND, CURB AND GUTTER AND STORM SEWER $16,561,34 $2,96,8 $ $2,213,5 $ $12,251,4 September 213 MPO Project Listing A-1 Page 7 of 33

ATP: GRAND FORKS-EAST GRAND FORKS METROPOLITAN PLANNING ORGANIZATION Fiscal Year: 214 STIP for FY 214-217 223 BB TRF-18-14A EAST GRAND SECT 537: EAST GRAND FORKS DAR TRANSIT. B9 OPERATE BUS LF 63, 63, OPERATING ASSISTANCE 224 BB TRF-18-14B EAST GRAND SECT 537: EAST GRAND FORKS FIXED ROUTE TRANSIT. B9 OPERATE BUS FTA 248, 77, 171, OPERATING ASSISTANCE 225 BB TRF-18-14C EAST GRAND SECT 537: EAST GRAND FORKS INSTALLATION OF. B9 BUS GRANT FTA 2, 16, 4, DESIGNATED BUS STOPS 242 CITY 119-8-11 EAST GRAND IN EAST GRAND FORKS - ON 17TH ST NE FROM MN22 TO. RC CONCRETE STP 1,246,87 737,84 59,3 5TH AVE NE, CONCRETE REPAIR PAVEMENT REHAB 243 PED/BIKE 119-117-2 EAST GRAND IN EAST GRAND FORKS - ALONG 2TH ST NE FROM MN22. EN PEDESTRIAN TAP 289,6 177,88 111,18 TO 5TH AVE NE & ALONG 5TH AVE NE FROM 23RD ST NE BIKE TRAIL TO 15TH ST NE, CONSTRUCT NEW PED/BIKE SIDEWALK 254 MN 22 616-41 MNDOT BNSF, INSTALL GATES AND FLASHING LIGHTS, MN TH 22,. SR RAILROAD RRS 25, 25, 42TH AVE SW, (SOUTHEAST OF EAST GRAND FORKS) SIGNALS $2,116,93 $1,165,72 $ $93, $ $858,21 September 213 MPO Project Listing A-1 Page 8 of 33

ATP: ST CLOUD AREA PLANNING ORGANIZATION Fiscal Year: 214 STIP for FY 214-217 38 BB TRF-48-14B METRO BUS SECT 537: FIXED ROUTE TRANSIT SERVICE OPERATING. B9 OPERATE BUS FTA 6,837,659 1,162,659 5,675, ASSISTANCE 381 BB TRF-48-14D METRO BUS SECT 537: TRANSIT PURCHASES, OFFICE. B9 BUS GRANT FTA 25, 2, 5, EQUIPMENT & COMPUTERS 382 BB TRF-48-14E METRO BUS SECT 537: TRANSIT PURCHASES, MAINTENANCE. B9 BUS GRANT FTA 1, 8, 2, TOOLS & EQUIPMENT 383 BB TRF-48-14F METRO BUS SECT 537: TRANSIT IZED PREVENTIVE. B9 BUS GRANT FTA 1,343,211 1,74,569 268,642 MAINTENANCE 384 BB TRF-48-14O METRO BUS SECT 537: TRANSIT PURCHASES, 2 SMALL. B9 BUS GRANT FTA 36, 288, 72, BUSES 385 BB TRF-48-14V METRO BUS SECT 537: TRANSIT PURCHASES, BUS SHELTER. B9 BUS GRANT FTA 25, 2, 5, AMENITY PROGRAM 386 BB TRF-48-14W METRO BUS SECT 537: TRANSIT PURCHASE, ITS PROJECTS. B9 BUS GRANT FTA 5, 4, 1, 398 CSAH 3 5-63-27AC BENTON COUNTY **AC** BENTON COUNTY CSAH 3: BENTON DRIVE TO TH. PL PLANNING STP 13,137 13,137 1, CONDUCT EVIRONMENTAL STUDY (AC PAYBACK 1 OF 1) 399 CSAH 3 5-63-28 BENTON COUNTY **MN162** BENTON COUNTY CSAH 3: BENTON DRIVE TO. RW RIGHT OF WAY DEMO 4,5, 658,242 3,841,758 TH 1, RIGHT OF WAY ACQUISITION (SAFETEA-LU) 417 LOCAL 999 71-7-23 SHERBURNE COUNTYWIDE 6" EDGELINE STRIPING. SH STRIPING HSIP 141, 126,9 14,1 COUNTY 42 LOCAL 999 73-7-9 STEARNS COUNTY STEARNS COUNTY INTERSECTION STREET LIGHTING. SH STRIPING HSIP 91, 81,9 9,1 421 CSAH 133 73-7-1 STEARNS COUNTY CSAH 133/19TH AVENUE, CONSTRUCT ROUNDABOUT. SH MISCELLANEOUS HSIP 45, 45, 45, 422 CSAH 2 73-62-45 STEARNS COUNTY **AC** STEARNS CSAH 4 TO CSAH 75, ROADWAY. RS MILL AND STP 198, 792, 198, RESURFACING (AC PROJECT - PAYBACK IN 217) 43 PED/BIKE 162-9-5 ST CLOUD **AC** EXTEND BEAVER ISLAND BIKE/PED TRAIL, ST CLOUD CIVIC CENTER NORTH TO 5TH AVENUE ALONG MISSISSIPPI RIVER IN ST CLOUD (AC PROJECT, PAYBACK IN 215). EN PEDESTRIAN BIKE TRAIL TAP 2,448,561 493,465 61,439 1,955,96 431 LOCAL 999 162-151-1 ST. CLOUD 33RD STREET SOUTH PHASE 1: 4' E OF CSAH 75 TO 5' W OF SOUTHWAY DRIVE, EXPAND TO 4-LANE, INCL ROUNDABOUT AT SOUTHWAY DR AND ASSOCIATED FRONTAGE ROAD REVISIONS. MC GRADE AND SURFACE STP 3,5, 1,9, 1,6, September 213 MPO Project Listing A-1 Page 9 of 33

ATP: ST CLOUD AREA PLANNING ORGANIZATION Fiscal Year: 214 STIP for FY 214-217 432 PED/BIKE 191-591-2 SAUK RAPIDS **SRTS** INFRA SAUK RAPIDS CONSTRUCTION. BT PED./BIKE SRTS 276,6 276,6 ENGINEERING & CONSTRUCTION FOR SIDEWALKS ALONG 11TH STREET NORTH AND 6TH AVENUE NORTH 435 LOCAL 999 22-117-2AC1 SARTELL **AC** GRADING, AGG BASE, BITUMINOUS SURFACING, CONCRETE CURB & GUTTER, ROUNDABOUTS, STORM SEWER & WATER MAIN FOR 5TH AVENUE FROM JCT CR 12 & 5TH AVE TO.429 MI N OF 5TH AVE (AC PAYBACK 1 OF 2). MC GRADE AND SURFACE STP 172, 172, 436 MSAS 117 22-117-3 SARTELL **MN162** ROW ACQUISITION FROM 23RD ST SOUTH TO HERITAGE DR AND FROM HERITAGE DR NORTH TO 4TH AVE CONNECTION AT 2ND ST SOUTH, 1.8 MILES (SAFETEA- LU) 2. RW RIGHT OF WAY DEMO 59, 47,1 119,999 438 MN 15 733-48 SAINT CLOUD **TED1** CONSTRUCT NEW INTERCHANGE AT TH 15 AND. AM GRADE AND BF 12,4, 12,4, 33RD STREET IN ST CLOUD AND WAITE PARK, NEW BRIDGE BRIDGE #7346 439 MN 1 52-17 MNDOT **TED12** INTERCHANGE S AT TH 1 AND BENTON CSAH 3 IN SAUK RAPIDS, INCLUDES REHAB BR 56 (RAILS AND SIDEWALKS) (BENTON COUNTY IS THE LEAD AGENCY) (OTHER FUNDS = 1,463,65 TED 12 & 794,35 LOCAL). AM GRADE AND SURFACE LF 2,258, 2,258, 44 US 1 51-29 MNDOT TH 1 AND TH 23 INTERCHANGE AREA, RESURFACING 1. RS BITUMINOUS NHPP 1,6, 1,28, 32, 443 MN 15 7321-48 MNDOT INSTALL TRAFFIC QUEUE DETECTION SYSTEM BETWEEN. SC TRAFFIC SIGNAL SF 2, 2, 3RD ST AND 8TH ST IN ST. CLOUD REVISION 444 MN 15 7321-5 MNDOT LANDSCAPING AT TH 15/STEARNS CO CSAH 12. RB LANDSCAPING SF 1, 1, INTERCHANGE AREA IN ST CLOUD AND SARTELL 446 MN 23 735-119 MNDOT **ADA** 214 ADA PROJECT TH 23 IN ST. CLOUD AND 2. SC SPOT SF 46, 46, WAITE PARK, INCLUDE FIBER OPTIC 456 MN 999 8823-277 MNDOT DISTRICTWIDE RR CIRCUITRY PROJECT. SR RR X-ING SF 225, 225, S 457 MN 999 883-AM-14 MNDOT DISTRICTWIDE SET ASIDES - COOPERATIVE. AM COOP. CONST. SF 1,5, 1,5, AGREEMENTS - 214 AGREEMENT 458 MN 999 883-CA-14 MNDOT DISTRICTWIDE SET ASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,2, 1,2, AGREEMENTS - 214 459 MN 999 883-MA-14 MNDOT DISTRICTWIDE SET ASIDES - MISC AGREEMENTS - 214. MA UTILITY SF 8, 8, AGREEMENT 46 MN 999 883-RB-14 MNDOT DISTRICTWIDE SET ASIDES - LANDSCAPING - 214. RB LANDSCAPE SF 3, 3, PARTNERSHIP 461 MN 999 883-RW-14 MNDOT DISTRICTWIDE SET ASIDES - RIGHT-OF-WAY - 214. RW RIGHT OF WAY SF 3,36, 3,36, September 213 MPO Project Listing A-1 Page 1 of 33

ATP: ST CLOUD AREA PLANNING ORGANIZATION Fiscal Year: 214 STIP for FY 214-217 462 MN 999 883-RX-14 MNDOT DISTRICTWIDE SET ASIDES - MISC ROAD & BRIDGE. RX ROAD REPAIR SF 4,675, 4,675, REPAIR (BARC) - 214 463 MN 999 883-SA-14 MNDOT DISTRICTWIDE SET ASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 3,5, 3,5, AGREEMENTS/OVERRUNS - 214 COST OVERRUNS 464 MN 999 883-SC-14 MNDOT DISTRICTWIDE SET ASIDES - SAFETY S -. SC TRAFFIC MGMT. SF 3, 3, 214 SYSTEM $53,756,168 $5,994,245 $1,393,439 $2,613,228 $16,67, $28,478,695 September 213 MPO Project Listing A-1 Page 11 of 33

ATP: ST CLOUD AREA PLANNING ORGANIZATION Fiscal Year: 215 STIP for FY 214-217 465 BB TRF-48-15B METRO BUS SECT 537:ST. CLOUD FR TRANSIT OPERATING. B9 OPERATE BUS FTA 7,174,286 1,174,286 6,, ASSISTANCE 466 BB TRF-48-15D METRO BUS SECT 537: TRANSIT PURCHASES OFFICE. B9 BUS GRANT FTA 25, 2, 5, EQUIPMENT AND COMPUTERS 467 BB TRF-48-15E METRO BUS SECT 537: TRANSIT PURCHASES MAINTENANCE. B9 BUS GRANT FTA 1, 8, 2, TOOLS AND EQUIPMENT 468 BB TRF-48-15F METRO BUS SECT 537: IZED PREVENTIVE MAINTENANCE. B9 BUS GRANT FTA 1,237,858 988,286 249,572 469 BB TRF-48-15V METRO BUS SECT 537: TRANSIT PURCHASE, BUS SHELTER. B9 BUS GRANT FTA 2, 16, 4, TRANSIT AMENITY 47 BB TRF-48-15W METRO BUS SECT 537: TRANSIT PURCHASE, ITS PROJECTS. B9 BUS GRANT FTA 25, 2, 5, 471 BB TRS-48-15 METRO BUS ST CLOUD METRO BUS PURCHASE 3 SMALL BUSES. TR PURCHASE BUS STP 48, 32, 16, 488 LOCAL 999 71-7-25 SHERBURNE VARIOUS COUNTY ROADS - 8" RUMBLE STRIP, 6". SH STRIPING HSIP 1, 9, 1, COUNTY EDGELINE STRIPE 495 CSAH 12 73-72-2AC STEARNS COUNTY **AC** SAFETY S FROM 5 FEET WEST OF. SC MEDIAN BARRIER STP 372,92 372,92 5TH AVENUE TO CONNECTICUT AVENUE IN SARTELL (AC PAYBACK 1 OF 1) 498 PED/BIKE 162-9-5AC ST CLOUD **AC** EXTEND BEAVER ISLAND BIKE/PED TRAIL, ST. EN PEDESTRIAN TAP 61,439 61,439 CLOUD CIVIC CENTER NORTH TO 5TH AVENUE ALONG BIKE TRAIL MISSISSIPPI RIVER IN ST CLOUD (AC PAYBACK 1 OF 1) 499 PED/BIKE 162-9-6AC ST. CLOUD **AC** BEAVER ISLAND TRAIL EXTENSION FROM 33RD 1. EN PEDESTRIAN TAP 278, 278, STREET SOUTH TO MISSISSIPPI RIVER BLUFFS REGIONAL BIKE TRAIL PARK IN THE CITY OF ST CLOUD (AC PAYBACK 1 OF 1) 52 LOCAL 999 22-117-2AC2 SARTELL **AC** GRADING, AGG BASE, BITUMINOUS SURFACING, CONCRETE CURB AND GUTTER, ROUNDABOUTS, STORM SEWER AND WATER MAIN FOR 5TH AVE FROM JCT CR 12 AND 5TH AVE TO.429 MI N OF 5TH AVE (AC PAYBACK, 2 OF 2). MC GRADE AND SURFACE STP 192, 192, 54 PED/BIKE 233-9-1 SAINT JOSEPH MINNESOTA ST W PEDESTRIAN TRAIL FROM 4TH AVE NW. EN PEDESTRIAN TAP 425, 11, 315, TO.25 MI WEST & MINNESOTA ST W LIGHTING BIKE TRAIL S September 213 MPO Project Listing A-1 Page 12 of 33

ATP: ST CLOUD AREA PLANNING ORGANIZATION Fiscal Year: 215 STIP for FY 214-217 56 US 1 52-13 MNDOT **ELLA** BENTON CO CSAH 4 TO.2 MI W OF RAILROAD CROSSING NEAR ST. GERMAIN IN ST CLOUD, UNBONDED CONCRETE, EB & WB AND ON TH 15 FROM JCT TH 1 TO 1. MI S, RECONSTRUCTION (ASSOCIATED TO SP 59-34) 8. RC UNBONDED CONCRETE NHPP 14,425, 11,54, 2,885, 57 US 1 713-58 MNDOT 1.2 MI E OF TH 23 IN ST CLOUD TO 475 FT. W OF 52ND ST, 5. RS MILL AND STP 2,4, 1,632, 48, MILL & 526 MN 999 8823-243 MNDOT DISTRICTWIDE SIGNING UPGRADE PROJECT. SC TRAFFIC SIGNAL SF 45, 45, REVISION 527 MN 999 883-AM-15 MNDOT DISTRICTWIDE SET ASIDES - COOPERATIVE. AM COOP. CONST. SF 1,, 1,, AGREEMENTS - 215 AGREEMENT 528 MN 999 883-CA-15 MNDOT DISTRICTWIDE SET ASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,2, 1,2, AGREEMENTS - 215 529 MN 999 883-MA-15 MNDOT DISTRICTWIDE SET ASIDES - MISC AGREEMENTS - 215. MA UTILITY SF 8, 8, AGREEMENT 53 MN 999 883-RB-15 MNDOT DISTRICTWIDE SET ASIDES - LANDSCAPING - 215. RB LANDSCAPE SF 3, 3, PARTNERSHIP 531 MN 999 883-RW-15 MNDOT DISTRICTWIDE SET ASIDES - RIGHT-OF-WAY - 215. RW RIGHT OF WAY SF 9,4, 9,4, 532 MN 999 883-RX-15 MNDOT DISTRICTWIDE SET ASIDES - MISC ROAD & BRIDGE. RX ROAD REPAIR SF 6,, 6,, REPAIR (BARC) - 215 533 MN 999 883-SA-15 MNDOT DISTRICTWIDE SET ASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 4,6, 4,6, AGREEMENTS/OVERRUNS - 215 COST OVERRUNS 534 MN 999 883-SC-15 MNDOT DISTRICTWIDE SET ASIDES - SAFETY S -. SC TRAFFIC MGMT. SF 3, 3, 215 SYSTEM 535 LOCAL 999 883-SHL-15 MNDOT DISTRICTWIDE SETASIDES - HIGHWAY SAFETY. SH SAFETY TARGET HSIP 27, 243, 27, PROGRAM - 215 536 MN 999 883-SHS-15 MNDOT DISTRICTWIDE SETASIDES - DISTRICT 3 HSIP - 215. SH SAFETY TARGET HSIP 144,444 13, 14,444 $51,6,119 $15,58,531 $ $2,226,572 $27,87,444 $6,777,572 September 213 MPO Project Listing A-1 Page 13 of 33

ATP: ST CLOUD AREA PLANNING ORGANIZATION Fiscal Year: 216 STIP for FY 214-217 537 BB TRF-48-16B METRO BUS SECT 537: ST CLOUD RR OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,786,29 1,186,29 6,6, 538 BB TRF-48-16D METRO BUS SECT 537: TRANSIT PURCHASES OFFICE. B9 BUS GRANT FTA 25, 2, 5, EQUIPMENT AND COMPUTERS 539 BB TRF-48-16E METRO BUS SECT 537: TRANSIT PURCHASES MAINTENANCE. B9 BUS GRANT FTA 1, 8, 2, TOOLS AND EQUIPMENT 54 BB TRF-48-16F METRO BUS SECT 537: ST CLOUD METRO BUS IZED. B9 BUS GRANT FTA 1,382,36 1,15,629 276,47 PREVENTIVE MAINTENANCE 541 BB TRF-48-16V METRO BUS SECT 537: TRANSIT PURCHASE, BUS SHELTER. B9 BUS GRANT FTA 2, 16, 4, TRANSIT AMENITY 542 BB TRS-48-16 METRO BUS ST CLOUD METRO BUS PURCHASE 2 SMALL CNG BUSES. TR PURCHASE BUS STP 34, 267,6 72,4 551 CSAH 3 5-63-29 BENTON COUNTY CSAH 3 FROM BENTON DR TO TH 1 - ROADWAY. RS GRADE AND STP 2,4,5 1,632,4 48,1 EXPANSION SURFACE 563 MN 15 7321-51 MNDOT.1 MI N OF JCT TH 23 TO S END OF BRIDGE #511 OVER MISSISSIPPI RIVER, MILL AND, INCLUDE CONSTRUCT DUAL SB LEFT TURN LANES AT 12TH ST N IN ST. CLOUD. SC TURN LANES NHPP 1,922,82 1,538,256 384,564 564 MN 15 7321-51S MNDOT.1 MI N OF JCT TH 23 TO S END OF BRIDGE #511 OVER MISSISSIPPI RIVER, MILL AND, INCLUDE CONSTRUCT DUAL SB LEFT TURN LANES AT 12TH ST N IN ST. CLOUD (HSIP PROJECT). SH TURN LANES HSIP 36, 324, 36, 57 I 94 738-223 MNDOT STEARNS CO CR 159 AT COLLEGEVILLE E TO CSAH 75 (EB 2. RC UNBONDED NHPP 6,72, 6,48, 672, & WB), UNBONDED CONCRETE CONCRETE 571 I 94 738-239 MNDOT STEARNS CSAH 75 W OF ST. JOSEPH TO W END OF BR.S 5. RS UNBONDED NHPP 12,96, 11,664, 1,296, #73865 & #73866 OVER SAUK RIVER (EB & WB) UNBONDED CONCRETE CONCRETE 577 MN 999 883-ADA-16 MNDOT **ADA** 216 ADA PROJECT. SC SPOT STP 25, 2, 5, 578 MN 999 883-AM-16 MNDOT DISTRICTWIDE SET ASIDES - COOPERATIVE. AM COOP. CONST. SF 1,, 1,, AGREEMENTS - 216 AGREEMENT 579 MN 999 883-CA-16 MNDOT DISTRICTWIDE SET ASIDES - CONSULTANT. CA MISCELLANEOUS SF 1,2, 1,2, AGREEMENTS - 216 58 MN 999 883-MA-16 MNDOT DISTRICTWIDE SET ASIDES - MISC AGREEMENTS - 216. MA UTILITY SF 8, 8, AGREEMENT September 213 MPO Project Listing A-1 Page 14 of 33

ATP: ST CLOUD AREA PLANNING ORGANIZATION Fiscal Year: 216 STIP for FY 214-217 581 MN 999 883-RB-16 MNDOT DISTRICTWIDE SET ASIDES - LANDSCAPING - 216. RB LANDSCAPE SF 3, 3, PARTNERSHIP 582 MN 999 883-RW-16 MNDOT DISTRICTWIDE SET ASIDES - RIGHT-OF-WAY - 216. RW RIGHT OF WAY SF 3,1, 3,1, 583 MN 999 883-RX-16 MNDOT DISTRICTWIDE SET ASIDES - MISC ROAD & BRIDGE. RX ROAD REPAIR SF 6,, 6,, REPAIR (BARC) - 216 584 MN 999 883-SA-16 MNDOT DISTRICTWIDE SET ASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 4,87, 4,87, AGREEMENTS/OVERRUNS - 216 COST OVERRUNS 585 MN 999 883-SC-16 MNDOT DISTRICTWIDE SET ASIDES - SAFETY S -. SC TRAFFIC MGMT. SF 3, 3, 216 SYSTEM 586 LOCAL 999 883-SHL-16 MNDOT DISTRICTWIDE SETASIDES - HIGHWAY SAFETY. SH SAFETY TARGET HSIP 1,911,764 1,72,588 191,176 PROGRAM - 216 587 MN 999 883-SHS-16 MNDOT DISTRICTWIDE SETASIDES - DISTRICT 3 HSIP - 216. SH SAFETY TARGET HSIP 31,444 271,3 3,144 $53,329,593 $23,666,144 $ $2,335,658 $19,768,78 $7,559,83 September 213 MPO Project Listing A-1 Page 15 of 33

ATP: ST CLOUD AREA PLANNING ORGANIZATION Fiscal Year: 217 STIP for FY 214-217 588 BB TRF-48-17B METRO BUS SECT 537: ST CLOUD RR OPERATING ASSISTANCE. B9 OPERATE BUS FTA 8,597,889 1,197,889 7,4, 589 BB TRF-48-17D METRO BUS SECT 537: TRANSIT PURCHASES OFFICE. B9 BUS GRANT FTA 25, 2, 5, EQUIPMENT AND COMPUTERS 59 BB TRF-48-17E METRO BUS SECT 537: TRANSIT PURCHASES MAINTENANCE. B9 BUS GRANT FTA 1, 8, 2, TOOLS AND EQUIPMENT 591 BB TRF-48-17F METRO BUS SECT 537: ST CLOUD METRO BUS IZED. B9 BUS GRANT FTA 1,417,361 1,133,889 283,472 PREVENTIVE MAINTENANCE 592 BB TRF-48-17V METRO BUS SECT 537: TRANSIT PURCHASE, BUS SHELTER. B9 BUS GRANT FTA 2, 16, 4, TRANSIT AMENITY 593 BB TRF-48-17W METRO BUS SECT 537: TRANSIT PURCHASE, ITS PROJECTS. B9 BUS GRANT FTA 25, 2, 5, 599 RR 71-124 MNDOT BNSF RR, INSTALL GATES AND FLASHING LIGHTS, T5,. SR RR X-ING RRS 35, 35, 32ND ST SE, HAVEN TOWNSHIP (1.5 MI SE ST CLOUD) S 6 RR 71-125 MNDOT BNSF RR, INSTALL GATES AND FLASHING LIGHTS, T14,. SR RR X-ING RRS 35, 35, 52ND ST SE, HAVEN TOWNSHIP (4 MI NW CLEAR LAKE) S 61 CSAH 1 5-61-1 BENTON COUNTY TH 23 TO BENTON CSAH 3 (GOLDEN SPIKE ROAD),. RS MILL AND STP 638, 51,4 127,6 ROADWAY RESURFACING 69 CSAH 2 73-62-45AC STEARNS COUNTY **AC** STEARNS CSAH 4 TO CSAH 75, ROADWAY. RS MILL AND STP 792, 792, RESURFACING (AC PAYBACK 1 OF 1) 613 MSAS 117 22-117-4 SARTELL ON MSAS 117 (5TH AVE), FROM HERITAGE DR TO NORTH. RS GRADE AND STP 1,555, 547,6 1,7,4.5 MILES IN SARTELL, GRADE AND SURFACE, INCL. SURFACE STORM SEWER AND DRAINAGE S 627 MN 999 883-AM-17 MNDOT DISTRICTWIDE SET ASIDES - COOPERATIVE. AM COOP. CONST. SF 1,, 1,, AGREEMENTS - 217 AGREEMENT 628 MN 999 883-CA-17 MNDOT DISTRICTWIDE SET ASIDES - CONSULTANT. CA MISCELLANEOUS SF 8, 8, AGREEMENTS - 217 629 MN 999 883-MA-17 MNDOT DISTRICTWIDE SET ASIDES - MISC AGREEMENTS - 217. MA UTILITY SF 4, 4, AGREEMENT 63 MN 999 883-RB-17 MNDOT DISTRICTWIDE SET ASIDES - LANDSCAPING - 217. RB LANDSCAPE SF 3, 3, PARTNERSHIP 631 MN 999 883-RW-17 MNDOT DISTRICTWIDE SET ASIDES - RIGHT-OF-WAY - 217. RW RIGHT OF WAY SF 1,, 1,, September 213 MPO Project Listing A-1 Page 16 of 33

ATP: ST CLOUD AREA PLANNING ORGANIZATION Fiscal Year: 217 STIP for FY 214-217 632 MN 999 883-RX-17 MNDOT DISTRICTWIDE SET ASIDES - MISC ROAD & BRIDGE. RX ROAD REPAIR SF 5,3, 5,3, REPAIR (BARC) - 217 633 MN 999 883-SA-17 MNDOT DISTRICTWIDE SET ASIDES - SUPPLEMENTAL. SA SUPP. AGREE. & SF 3,4, 3,4, AGREEMENTS/OVERRUNS - 217 COST OVERRUNS 634 MN 999 883-SC-17 MNDOT DISTRICTWIDE SET ASIDES - SAFETY S -. SC TRAFFIC MGMT. SF 3, 3, 217 SYSTEM 635 LOCAL 999 883-SHL-17 MNDOT DISTRICTWIDE SETASIDES - HIGHWAY SAFETY. SH SAFETY TARGET HSIP 2,888,889 2,6, 288,889 PROGRAM - 217 636 MN 999 883-SHS-17 MNDOT DISTRICTWIDE SET ASIDES - DISTRICT 3 HSIP - 217. SH SAFETY TARGET HSIP 2,111,111 1,9, 211,111 $31,1,25 $7,5, $ $2,395,778 $12,441,111 $9,123,361 September 213 MPO Project Listing A-1 Page 17 of 33

ATP: FARGO-MOORHEAD COUNCIL OF GOVERNMENTS Fiscal Year: 214 STIP for FY 214-217 638 BB TRF-34-14A MOORHEAD SECT 537: PARATRANSIT AND METRO SENIOR RIDE. B9 OPERATE BUS FTA 394, 87, 37, OPERATING ASSISTANCE 639 BB TRF-34-14B MOORHEAD SECT 537: CITY OF MOORHEAD TRANSIT OPERATING. B9 OPERATE BUS FTA 1,72, 449, 1,271, ASSISTANCE 64 BB TRF-34-14C MOORHEAD SECT 537: MOORHEAD TRANSIT PLANNING ASSISTANCE. B9 PLANNING FTA 22, 18, 4, 641 BB TRF-34-14D MOORHEAD SECT 537: MOORHEAD TRANSIT PREVENTIVE. B9 PREVENTIVE FTA 2, 16, 4, MAINTENANCE MAINTENANCE 642 BB TRF-34-14E MOORHEAD SECT 537: CITY OF MOORHEAD, REPLACEMENT OF ONE. B9 PURCHASE BUS FTA 7, 59,5 1,5 PARATRANSIT VEHICLE WITH CLASS 4 AND BUS RELATED EQUIPMENT 643 BB TRF-34-14F MOORHEAD SECT 537: CITY OF MOORHEAD, REPLACEMENT OF ONE. B9 PURCHASE BUS FTA 25, 2, 5, VAN FOR METRO SENIOR RIDE AND BUS RELATED EQUIPMENT 645 BB TRF-34-14N MNDOT SECT 531: CITY OF MOORHEAD MOBILITY MANAGER. NF OPERATE BUS FTA 3, 24, 6, 646 BB TRS-34-14 MOORHEAD SECT 537: CITY OF MOORHEAD, PURCHASE ONE BUS. B9 PURCHASE BUS STP 7, 56, 14, (CLASS 4) AND BUS RELATED EQUIPMENT 652 PED/BIKE 14-591-5AC CLAY COUNTY **SRTS**AC** INFRA IN DILWORTH ALONG 7TH ST. NE,. EN PED./BIKE SRTS 3, 3, BIKE AND PED TRAIL (AC PROJECT, AC PAYBACK 1 OF 1) 653 PED/BIKE 14-591-6 CLAY **SRTS** INFRA BARNESVILLE, CE AND CONSTRUCTION. BT PEDESTRIAN SRTS 3, 3, FOR A PATH ALONG 5TH AVE AND ADDITIONAL BIKE TRAIL S AROUND THE SCHOOL 671 MSAS 136 144-136-11 MOORHEAD FROM OAK WAY TO I 94 ON SE MAIN, BITUMINOUS MILL & 2. RD MILL AND STP 3,362,4 894,7 2,467,7 SURFACING OF ROAD AND SHARED USE PATH 674 US 1 141-152 MNDOT TH 1 EB FROM E. OF TH 9 TO 15TH ST N - GRADING,BITUMINOUS SURFACING AND REPLACE OLD BR 143 WITH NEW BR# 148 OVER THE BUFFALO RIVER (EB) 1. BR GRADE AND BRIDGE SF 993,188 993,188 679 US 75 147-25 MNDOT **AC** TH 1 TO N CLAY CO LINE - GRADING, BITUMINOUS 19. RS MILL AND NHPP 2,936,5 1,99,2 2,2, 1,27,3 MILLING & SURFACING (AC PROJECT, PAYBACK IN 215) 68 I 94 218-13 MNDOT CABLE MEDIAN GUARDRAIL, 1.32 MILES WEST OF TH 9 TO 22. SH GUARD RAIL HSIP 3,349, 3,349, 1.34 MILES EAST OF CSAH 8 (3,349, SECTION 164) $13,772,88 $6,88,9 $2,2, $817,5 $2,2,488 $4,125,2 September 213 MPO Project Listing A-1 Page 18 of 33

ATP: FARGO-MOORHEAD COUNCIL OF GOVERNMENTS Fiscal Year: 215 STIP for FY 214-217 693 BB TRF-34-15A MOORHEAD SECT 537: PARATRANSIT AND METRO SENIOR RIDE. B9 OPERATE BUS FTA 429, 94, 335, OPERATING ASSISTANCE 694 BB TRF-34-15D MOORHEAD SECT 537: MOORHEAD TRANSIT PREVENTIVE. B9 PREVENTIVE FTA 2, 16, 4, MAINTENANCE MAINTENANCE 695 BB TRF-34-15B MOORHEAD SECT 537: CITY OF MOORHEAD TRANSIT OPERATING. B9 OPERATE BUS FTA 2,4, 592, 1,448, ASSISTANCE 696 BB TRF-34-15C MOORHEAD SECT 537: MOORHEAD PLANNING ASSISTANCE. B9 PLANNING FTA 22, 18, 4, 697 BB TRF-34-15E MOORHEAD SECT 537: CITY OF MOORHEAD, PURCHASE 1 BUS. B9 PURCHASE BUS FTA 44, 352, 88, (CLASS 7) AND BUS RELATED EQUIPMENT 698 BB TRF-34-15N MNDOT SECT 531: CITY OF MOORHEAD MOBILITY MANAGER. NB OPERATE BUS FTA 3, 24, 6, 722 MN 34 144-17 MNDOT **AB** JCT TH 9 TO DUNVILLA - PAVEMENT 19. RS MILL AND STP 7,15,1 5,684,1 1,421, REHABILITATION 723 MN 75 141-173 MOORHEAD **CIMS** GEOMETRIC S AT JCT. OF 11TH ST. AND MAIN AVE/TH75 AND 11TH ST. FROM CENTER AVE TO MAIN AVE, M/O, RECONSTRUCT, AND SIGNAL WORK, ASSOCIATED S.A.P. 144-121-6 AND S.A.P. 144-136- 14(CIMS GRANT=$3,44,) 1. RC MILL AND SF 3,44, 3,44, 724 US 75 147-25AC MNDOT **AC** TH 1 TO N CLAY CO LINE - GRADING, BITUMINOUS 19. RS MILL AND NHPP 2,2, 2,2, MILLING & SURFACING (AC PROJECT, PAYBACK 1 OF 1) $15,87,1 $7,884,1 $ $1,24, $4,825, $1,921, September 213 MPO Project Listing A-1 Page 19 of 33

ATP: FARGO-MOORHEAD COUNCIL OF GOVERNMENTS Fiscal Year: 216 STIP for FY 214-217 736 BB TRF-34-16A MOORHEAD SECT 537: PARATRANSIT AND METRO SENIOR RIDE. B9 OPERATE BUS FTA 446, 98, 348, OPERATING ASSISTANCE 737 BB TRF-34-16B MOORHEAD SECT 537: CITY OF MOORHEAD TRANSIT OPERATING. B9 OPERATE BUS FTA 2,12, 615, 1,55, ASSISTANCE 738 BB TRF-34-16C MOORHEAD SECT 537: MOORHEAD PLANNING ASSISTANCE. B9 PLANNING FTA 22, 18, 4, 739 BB TRF-34-16D MOORHEAD SECT 537: MOORHEAD TRANSIT PREVENTIVE. B9 PREVENTIVE FTA 2, 16, 4, MAINTENANCE MAINTENANCE 74 BB TRF-34-16N MNDOT SECT 531: CITY OF MOORHEAD MOBILITY MANAGER. NB OPERATE BUS FTA 32, 26, 6, 743 BB TRS-34-16 MNDOT CITY OF MOORHEAD, PURCHASE BUS (CLASS 4) AND. TR PURCHASE BUS STP 74, 59,2 14,8 BUS RELATED EQUIPMENT 761 I 94 146-66 MNDOT **AC** I 94/TH 75 INTERCHANGE MODIFICATION (AC. MC BRIDGE NHPP 7,59, 5,9,6 4,99, 1,158,4 PROJECT, PAYBACK IN 217) APPROACHES $9,953, $5,959,8 $4,99, $917, $1,158,4 $1,917,8 September 213 MPO Project Listing A-1 Page 2 of 33

ATP: FARGO-MOORHEAD COUNCIL OF GOVERNMENTS Fiscal Year: 217 STIP for FY 214-217 773 BB TRF-34-17A MOORHEAD SECT 537: PARATRANSIT AND METRO SENIOR RIDE. B9 OPERATE BUS FTA 464, 12, 362, OPERATING ASSISTANCE 774 BB TRF-34-17B MOORHEAD SECT 537: CITY OF MOORHEAD TRANSIT OPERATING. B9 OPERATE BUS FTA 2,21, 1,57, 64, ASSISTANCE 775 BB TRF-34-17C MOORHEAD SECT 537: MOORHEAD PLANNING ASSISTANCE. B9 PLANNING FTA 22, 18, 4, 776 BB TRF-34-17D MOORHEAD SECT 537: MOORHEAD TRANSIT PREVENTIVE. B9 PREVENTIVE FTA 2, 16, 4, MAINTENANCE MAINTENANCE 777 BB TRF-34-17N MNDOT SECT 531: CITY OF MOORHEAD MOBILITY MANAGER. NB OPERATE BUS FTA 32, 25,6 6,4 798 I 94 1481-966B MNDOT BRIDGE PAINTING ON I 94 OVER THE RED RIVER (BRIDGE. BI PAINT BRIDGE NHPP 357, 321,3 35,7 # 966, 967) 799 I 94 146-66AC MNDOT **AC** I 94/TH 75 INTERCHANGE MODIFICATION (AC. MC BRIDGE NHPP 4,99, 4,99, PROJECT, PAYBACK 1 OF 1) APPROACHES $8,275, $5,311,3 $ $1,875,6 $35,7 $1,52,4 September 213 MPO Project Listing A-1 Page 21 of 33

ATP: LACROSSE AREA PLANNING COMMITTEE Fiscal Year: 214 STIP for FY 214-217 818 BB TRF-378-14 LA CRESCENT SECT 537: LA CRESCENT TRANSIT OPERATING. B9 OPERATE BUS FTA 187,779 44, 143,779 ASSISTANCE 874 I 9 858-149OV1 MNDOT **BP8** DRESBACH BRIDGE - 214 COSTS FOR. BR BRIDGE SF 2,222, 2,222, CONSTRUCTION OVERSIGHT REPLACEMENT $2,49,779 $ $ $44, $2,222, $143,779 September 213 MPO Project Listing A-1 Page 22 of 33

ATP: LACROSSE AREA PLANNING COMMITTEE Fiscal Year: 215 STIP for FY 214-217 898 BB TRF-378-15 LA CRESCENT SECT 537: LA CRESCENT TRANSIT OPERATING. B9 OPERATE BUS FTA 33,9 94, 236,9 ASSISTANCE 939 I 9 858-149OV2 MNDOT **BP8** DRESBACH BRIDGE - 215 COSTS FOR. BR BRIDGE SF 2,221, 2,221, CONSTRUCTION OVERSIGHT REPLACEMENT $2,551,9 $ $ $94, $2,221, $236,9 September 213 MPO Project Listing A-1 Page 23 of 33

ATP: LACROSSE AREA PLANNING COMMITTEE Fiscal Year: 216 STIP for FY 214-217 966 BB TRF-378-16 LA CRESCENT SECT 537: LACRESCENT TRANSIT OPERATING. B9 OPERATE BUS FTA 34,827 94, 246,827 ASSISTANCE 993 I 9 858-149OV3 MNDOT **BP8** DRESBACH BRIDGE - 216 COSTS FOR. BR BRIDGE SF 1,591, 1,591, CONSTRUCTION OVERSIGHT REPLACEMENT $1,931,827 $ $ $94, $1,591, $246,827 September 213 MPO Project Listing A-1 Page 24 of 33

ATP: LACROSSE AREA PLANNING COMMITTEE Fiscal Year: 217 STIP for FY 214-217 118 BB TRF-378-17 LA CRESCENT SECT 537: LACRESCENT TRANSIT OPERATING. B9 OPERATE BUS FTA 351,52 94, 257,52 ASSISTANCE $351,52 $ $ $94, $ $257,52 September 213 MPO Project Listing A-1 Page 25 of 33

ATP: ROCHESTER-OLMSTED COUNCIL OF GOVERNMENTS Fiscal Year: 214 STIP for FY 214-217 813 BB TRF-47-14A ROCHESTER SECT 537: ROCHESTER DAR TRANSIT OPERATING. B9 OPERATE BUS LF 676,785 676,785 ASSISTANCE 814 BB TRF-47-14B ROCHESTER SECT 537: ROCHESTER RR TRANSIT OPERATING. B9 OPERATE BUS FTA 6,644,54 1,735,856 4,98,198 ASSISTANCE 815 BB TRF-47-14C ROCHESTER SECT 537: ELECTRONIC FAREBOXES/OTHER ITS. B9 BUS GRANT FTA 1,5, 1,2, 3, 816 BB TRF-47-14D ROCHESTER SECT 537: DOWNTOWN BUS STOP S. B9 BUS GRANT FTA 5, 4, 1, 817 BB TRF-47-14E ROCHESTER SECT 537: ROCHESTER RR - PURCHASE 3 BUSES (CLASS. B9 PURCHASE BUS FTA 1,236, 988,8 247,2 7) 821 BB TRS-47-14 ROCHESTER ROCHESTER RR - PURCHASE 1 BUS (CLASS 7). TR PURCHASE BUS STP 412, 297, 115, 846 PED/BIKE 159-9-18 ROCHESTER EAST CIRCLE DRIVE PATH FROM CSAH 2 TO TH 14-3. EN PEDESTRIAN TAP 1,249,49 8, 449,49 PEDESTRIAN/BIKE TRAIL BIKE TRAIL 847 MUN 132 159-132-6 ROCHESTER TH 52 INTERCHANGE S: 55TH ST NW - W TO. MC GRADE AND STP 3,675, 1,28, 2,395, E FRONTAGE RD SURFACE 848 PED/BIKE 249-591-2 BYRON **SRTS** INFRA BYRON, CE & CONSTRUCTION FOR. BT PED./BIKE SRTS 268,37 268,37 SIDEWALK/PATH CONNECTION ON CSAH 5, 4TH ST NE, AND COUNTY ROAD 134 849 PED/BIKE SRS-913-14 CITY OF RED WING **SRTS** NON-INFRA, RED WING; GRANT TO FUND A PART-. PL PEDESTRIAN SRTS 27,7 27,7 TIME 2 YEAR SRTS COORDINATOR TO IMPLEMENT BIKE TRAIL EDUCATION AND ENCOURAGEMENT ACTIVITIES 85 PED/BIKE SRS-918-14 OLMSTED COUNTY **SRTS** NON-INFRA, ROCHESTER; GRANT FOR. PL PEDESTRIAN SRTS 12, 12, EDUCATION AND ENCOURAGEMENT MATERIALS AND A 2 BIKE TRAIL YEAR COORDINATOR 878 MN 247 5512-8AC MNDOT **AC** FROM JCT TH 63 TO JCT TH 42, BITUMINOUS MILL & 13. RS MILL AND STP 2,75,246 2,75,246 (AC PAYBACK 1 OF 1) $18,951,645 $5,435,316 $ $4,324,656 $ $9,191,673 September 213 MPO Project Listing A-1 Page 26 of 33

ATP: ROCHESTER-OLMSTED COUNCIL OF GOVERNMENTS Fiscal Year: 215 STIP for FY 214-217 894 BB TRF-47-15A ROCHESTER SECT 537: ROCHESTER DAR TRANSIT OPERATING. B9 OPERATE BUS LF 79,553 79,553 ASSISTANCE 895 BB TRF-47-15B ROCHESTER SECT 537: ROCHESTER RR TRANSIT OPERATING. B9 OPERATE BUS FTA 6,796,257 1,735,856 5,6,41 ASSISTANCE 896 BB TRF-47-15C ROCHESTER SECT 537: CONSTRUCT SMH BUS STOP S. B9 OPERATE BUS FTA 3, 24, 6, 897 BB TRF-47-15D ROCHESTER SECT 537: ROCHESTER RR - PURCHASE 5 BUSES (CLASS. B9 PURCHASE BUS FTA 2,12, 1,696, 424, 7) 91 BB TRS-47-15 ROCHESTER ROCHESTER RR - PURCHASE 2 BUSES (CLASS 7). TR PURCHASE BUS STP 848, 62, 228, 911 CSAH 9 55-69-18 OLMSTED COUNTY GRADE AND SURFACE BETWEEN JCT OLMSTED CSAH 22 AND JCT OLMSTED CSAH 11 AND MILL AND SURFACE BETWEEN JCT OLMSTED CSAH 11 AND JCT OLMSTED CR 119 4. RC GRADE AND SURFACE STP 4,2, 3,225,1 974,9 918 PED/BIKE 159-9-19 ROCHESTER SOUTH BROADWAY PATH FROM 2TH ST SE TO THE 2. EN PEDESTRIAN TAP 1,1, 623,4 476,6 ZUMBRO RIVER BIKE TRAIL 919 MUN 158 159-158-2 ROCHESTER PAVEMENT WIDENING - 55TH ST NW - 5TH AVE NW TO 1. RC GRADE AND STP 2,75, 2,1, 65, CSAH 22 SURFACE 934 US 63 559-8 MNDOT **TED14** CSAH 16 & TH 63 INTERCHANGE RECONSTRUCTION (BRIDGE 947) AND AIRPORT ACCESS PROJECT - $2.224 TED14 FUNDS, (OLMSTED COUNTY FUNDS ($5,5, LOCAL SALES TAX AND $1,295, COUNTY STATE AID). RC GRADE, SURFACE & BRIDGE SF 11,519, 4,724, 6,795, 935 US 63 559-78 MNDOT FROM CSAH 35 TO CR 12 (STEWARTVILLE), SHARED-USE 1. AM COOP. CONST. SF 5, 5, PATH - MUNICIPAL AGREEMENTS PROGRAM AGREEMENT 936 US 63 559-79 MNDOT NB & SB FROM.1 MI N N JCT TH 3 TO 28TH ST SE 6. RS MILL AND NHPP 4,765,88 3,812,7 953,18 (ROCHESTER), MEDIUM BITUMINOUS MILL AND 941 I 9 558-9 MNDOT WB FROM 1.7 MI E CSAH 19 TO 2.3 MI E TH 74, UNBONDED 12. RS MILL AND NHPP 13,466,2 12,119,58 1,346,62 CONCRETE - MOVED FROM 22 $48,624,98 $22,5,15 $ $3,671,856 $7,73,638 $15,378,454 September 213 MPO Project Listing A-1 Page 27 of 33

ATP: ROCHESTER-OLMSTED COUNCIL OF GOVERNMENTS Fiscal Year: 216 STIP for FY 214-217 963 BB TRF-47-16A ROCHESTER SECT 537: ROCHESTER DAR TRANSIT OPERATING. B9 OPERATE BUS LF 737,935 737,935 ASSISTANCE 964 BB TRF-47-16B ROCHESTER SECT 537: ROCHESTER RR TRANSIT OPERATING. B9 OPERATE BUS FTA 7,185,545 1,735,856 5,449,689 ASSISTANCE 965 BB TRF-47-16C ROCHESTER SECT 537: ROCHESTER RR - PURCHASE 3 BUSES (CLASS. B9 PURCHASE BUS FTA 1,311, 1,48,8 262,2 7) 968 BB TRS-47-16 ROCHESTER ROCHESTER RR - PURCHASE 1 BUS (CLASS 7). TR PURCHASE BUS STP 437, 211,5 225,5 976 RR 55-129 OLMSTED COUNTY DM&E - INSTALL GATES - CSAH 22, EAST CIRCLE DRIVE,. SR RR X-ING RRS 3, 3, ROCHESTER, OLMSTED COUNTY S 98 CSAH 25 55-625-23 OLMSTED COUNTY CONCRETE BETWEEN OLMSTED CSAH 22 6. RS CONCRETE STP 4,1, 2,838,2 1,261,8 (WEST CIRCLE DRIVE) AND OLMSTED CSAH 3 983 MSAS 158 159-158-3 ROCHESTER CONSTRUCT 41ST AVENUE NW FROM WEST CIRCLE. MC GRADE, STP 5,5, 2,821,26 2,678,74 DRIVE (CSAH 22) TO 55TH ST NW AND 55TH ST NW FROM SURFACE AND 41ST AVENUE TO CSAH 22 BRIDGE 989 US 52 558-121 MNDOT **ITS** EXTENSION OF FIBER OPTIC COMMUNICATION 7. SC TRAFFIC MGMT. NHPP 35, 28, 7, LINE NORTH FROM 75TH ST TO ELK RUN INTERCHANGE SYSTEM NORTH OF ORONOCO $19,921,48 $6,45,96 $ $2,784,656 $7, $1,615,864 September 213 MPO Project Listing A-1 Page 28 of 33

ATP: ROCHESTER-OLMSTED COUNCIL OF GOVERNMENTS Fiscal Year: 217 STIP for FY 214-217 115 BB TRF-47-17 ROCHESTER SECT 537: CONSTRUCT PARK & RIDE STRUCTURED. B9 OPERATE BUS FTA 5,, 4,, 1,, PARKING 116 BB TRF-47-17A ROCHESTER SECT 537: ROCHESTER DAR OPERATING ASSISTANCE. B9 OPERATE BUS LF 767,453 767,453 117 BB TRF-47-17B ROCHESTER SECT 537: ROCHESTER RR OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,472,967 1,735,856 5,737,111 119 BB TRF-47-17A ROCHESTER SECT 537: ROCHESTER RR, PURCHASE 3 BUSES (CLASS. B9 PURCHASE BUS FTA 1,35, 1,8, 27, 7) 123 BB TRS-47-17 ROCHESTER ROCHESTER RR, PURCHASE 1 BUS (CLASS 7). TR PURCHASE BUS STP 45, 343,2 16,8 128 MSAS 16 159-16-2 ROCHESTER 16TH AVE SW TO 11TH AVE SW, RECONSTRUCTION. RC GRADE AND STP 2,5, 2,, 5, SURFACE 131 MN 42 556-22 MNDOT FROM TH 14 TO.35 MI N OF TH 247, MEDIUM BITUMINOUS 15. RS MILL AND STP 5,831, 4,664,8 1,166,2 MILL AND 135 US 52 557-63 MNDOT OVER US 63, REPLACE DECKS NB BRIDGE 559 AND SB. BR BRIDGE NHPP 4,244,173 3,395,338 848,835 BRIDGE 551 REHABILITATION 14 US 63 559-81 MNDOT **ITS** EXTENSION OF ROCHESTER TMS FROM 48TH ST 5. SC TRAFFIC MGMT. NHPP 35, 28, 7, ON TH 63 SOUTH TO I-9 INTERCHANGE SYSTEM $27,965,593 $1,683,338 $ $6,815,856 $2,85,35 $8,381,364 September 213 MPO Project Listing A-1 Page 29 of 33

ATP: MANKATO-NORTH MANKATO AREA PLANNING ORGANIZATION (LIST OF PROJECTS) Fiscal Year: 214 STIP for FY 214-217 158 BB TRF-21-14-NA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH IN. NF OPERATE BUS FTA 57,5 46, 11,5 ACTION - MOBILITY MANAGEMENT 159 BB TRF-21-14-NB MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH IN. NF OPERATE BUS FTA 66, 33, 33, ACTION - RIDE COORDINATION 16 BB TRF-21-14-JA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH IN. NF OPERATE BUS FTA 1, 5, 5, ACTION - RIDES TO WORK PROGRAM 161 BB TRF-28-14 MNDOT SECT 537: CITY OF MANKATO RR TRANSIT OPERATING. B9 OPERATE BUS FTA 1,751, 435,755 1,315,245 ASSISTANCE 168 RR 7-121 MNDOT INDUSTRIAL ROAD/CSAH 12 IN MANKATO, INSTALL GATES. SR RR X-ING RRS 375, 375, S 179 PED/BIKE 137-591-2 MANKATO **SRTS** INFRA MANKATO, CE & CONSTRUCTION OF. BT PED./BIKE SRTS 18,283 18,283 SIDEWALK & CURB EXTENSIONS ALONG HOFFMAN RD, KENNEDY ST, AND ELECTA BOULEVARD 181 US 14 72-116 MNDOT **LGA** CSAH 12 & TH 14 BRIDGE # 7587 & RAMPS (LGA. BR NEW BRIDGE NHPP 293,565 293,565 PAYBACK TO COUNTY 1 OF 3) TIED 7-612-11 182 US 14 72-116A MNDOT **LGA** NORTH AND SOUTH ABUTMENT FILL FOR PROPOSED BR # 7587 WITH TH 14 AND CSAH 12, 1 MI EAST OF MANKATO (LGA PAYBACK TO COUNTY 2 OF 2) TIED 7-612-19. BR NEW BRIDGE NHPP 76,435 76,435 184 MN 22 74-88 MNDOT FROM TH 83 TO CSAH 3, SIGNAL REVISIONS AND AT THE JCTS OF TH 22 WITH MADISON AVE, CSAH 17 AND ADAMS STREET IN MANKATO, CONSTRUCT ROUNDABOUTS AND CPR 2. MC GRADE AND SURFACE NHPP 6,6, 2,768, 692, 2,6, 185 MN 22 74-88S MNDOT FROM TH 83 TO CSAH 3, SIGNAL REVISIONS AND AT THE JCTS OF TH 22 WITH MADISON AVE, CSAH 17 AND ADAMS STREET IN MANKATO, CONSTRUCT ROUNDABOUTS AND CPR 2. SH GRADE AND SURFACE HSIP 98, 882, 98, $1,569,783 $5,25,283 $ $564,755 $79, $4,9,745 September 213 MPO Project Listing A-1 Page 3 of 33

ATP: MANKATO-NORTH MANKATO AREA PLANNING ORGANIZATION (LIST OF PROJECTS) Fiscal Year: 215 STIP for FY 214-217 111 BB TRF-21-15-NA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH IN. NF OPERATE BUS FTA 57,5 46, 11,5 ACTION - MOBILITY MANAGEMENT 1111 BB TRF-21-15-NB MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH IN. NF OPERATE BUS FTA 66, 33, 33, ACTION - RIDE COORDINATION 1112 BB TRF-21-15-JA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH IN. NF OPERATE BUS FTA 1, 5, 5, ACTION - RIDES TO WORK PROGRAM 1113 BB TRF-28-15 MNDOT SECT 537: CITY OF MANKATO RR TRANSIT OPERATING. B9 OPERATE BUS FTA 1,83,53 435,755 1,367,775 ASSISTANCE 1123 PED/BIKE 15-9-2 NORTH MANKATO US 14 TRAIL FROM LORAY DRIVE TO WEST LIND STREET, 1. EN PEDESTRIAN TAP 584,31 4, 184,31 CONSTRUCT PED/BIKE TRAIL BIKE TRAIL $2,611,34 $4, $ $564,755 $ $1,646,585 September 213 MPO Project Listing A-1 Page 31 of 33

ATP: MANKATO-NORTH MANKATO AREA PLANNING ORGANIZATION (LIST OF PROJECTS) Fiscal Year: 216 STIP for FY 214-217 1149 BB TRF-28-16 MNDOT SECT 537: CITY OF MANKATO RR TRANSIT OPERATING. B9 OPERATE BUS FTA 1,857,636 435,755 1,421,881 ASSISTANCE 1162 MSAS 117 137-117-1 MANKATO ON MAY STREET FROM RIVERFRONT DRIVE TO NORTH. RD GRADE AND STP 849, 576, 273, 6TH STREET, RECONSTRUCT ROADWAY SURFACE $2,76,636 $576, $ $435,755 $ $1,694,881 September 213 MPO Project Listing A-1 Page 32 of 33

ATP: MANKATO-NORTH MANKATO AREA PLANNING ORGANIZATION (LIST OF PROJECTS) Fiscal Year: 217 STIP for FY 214-217 1185 BB TRF-28-17 MNDOT SECT 537: CITY OF MANKATO RR TRANSIT OPERATING. B9 OPERATE BUS FTA 1,913,365 435,755 1,477,61 ASSISTANCE $1,913,365 $ $ $435,755 $ $1,477,61 September 213 MPO Project Listing A-1 Page 33 of 33

Transportation Alternatives Program (TAP) A-2

TRANSPORTATION ALTERNATIVES PROGRAM (TAP) MAP-21 consolidated Transportation Enhancements, Historic Structures, Safe s to School and Scenic Byways programs along with a number of different eligible activity categories into a new program, called the Transportation Alternatives Program (TAP). For the duration of MAP-21 (July 6, 212 to end of September 214) it will receive about 2% of Minnesota s formula highway apportionment. For the 214-217 STIP, projects were solicited, ranked and selected within the ATP process. The projects were then incorporated into the ATIPs. A-2(1)

Transportation Alternatives Program Fiscal Year: 214 ATP STIP for FY 214-217 FHWA AC FTA State Other 13 1 PED/BIKE 9-9-4 CARLTON FOND DU LAC TO CLOQUET TRAIL CONNECTION, 2. EN PED./BIKE TAP 4, 297,357 12,643 COUNTY PED/BIKE TRAIL 23 1 PED/BIKE 36-9-2 KOOCHICHING **AC** SECOND CREEK TO RANIER, WIDEN TRAIL 2. EN PED./BIKE TAP 51,93 27,72 51,93 COUNTY TO MEET STANDARDS (AC PROJECT, PAYBACK IN 25 1 Local 999 38-9-7 BEAVER BAY BEAVER BAY TRAILHEAD FACILITY. EN BUILDINGS TAP 5, 4, 1, 34 1 PED/BIKE 69-9-28 ELY ELY TREZONA (MESABI) TRAIL CONNECTION,. EN PED./BIKE TAP 186,3 149,4 37,26 PED/BIKE TRAIL 38 1 Local 999 91-7-21 ARDC HELMET HERO BICYCLE EDUCATION. EN PED./BIKE TAP 71,868 57,494 14,374 41 1 PED/BIKE 118-9-19 DULUTH CROSS CITY TRAIL DULUTH, RECYCLE WAY TO 1. EN PED./BIKE TAP 7, 5, 2, 59TH AVE WEST 44 1 Local 999 134-9-1 INTERNATIONAL INTERNATIONAL FALLS AREA GATEWAY CORRIDOR. EN PED./BIKE TAP 625, 5, 125, FALLS PROJECT, LIGHTING, LANDSCAPING, WAY-FINDING SIGNS 54 1 MN 61 6925-134 MNDOT **ADA** PED RAMP FROM 32ND AVE 3. EN PED./BIKE TAP 262,5 21, 52,5 E TO 59TH AVE E 239 2 PED/BIKE 6-9-2 POLK COUNTY IN FOSSTON, CONSTRUCT NEW MULTI USE 2. EN PEDESTRIAN TAP 344,755 275,84 68,951 PED/BIKE TRAIL, PHASE I BIKE TRAIL 243 2 PED/BIKE 119-117-2 EAST GRAND FORKS IN EAST GRAND FORKS - ALONG 2TH ST NE FROM MN22 TO 5TH AVE NE & ALONG 5TH AVE NE FROM 23RD ST NE TO 15TH ST NE, CONSTRUCT NEW PED/BIKE SIDEWALK. EN PEDESTRIAN BIKE TRAIL TAP 289,6 177,88 111,18 425 3 LOCAL 999 77-595-1 TODD COUNTY RESTORATION OF THE EXISTING DEPOT. EN HISTORIC TAP 55,15 44,12 11,3 STRUCTURE IN STAPLES PRESERVATION 427 3 PED/BIKE 86-9-4AC WRIGHT COUNTY **AC** CONSTRUCT BIKE/PED TRAIL ALONG WRIGHT CSAH 34 FROM BEEBE LAKE REGIONAL PARK IN ST MICHAEL TO INTERSECTION OF CSAH 19 & 34 IN HANOVER (AC PAYBACK 1 OF 1) 4. EN PED./BIKE TAP 164,35 164,35 43 3 PED/BIKE 162-9-5 ST CLOUD **AC** EXTEND BEAVER ISLAND BIKE/PED TRAIL, ST CLOUD CIVIC CENTER NORTH TO 5TH AVENUE ALONG MISSISSIPPI RIVER IN ST CLOUD (AC PROJECT, PAYBACK IN 215). EN PEDESTRIAN BIKE TRAIL TAP 2,448,561 493,465 61,439 1,955,96 661 4 PED/BIKE 56-9-9AC OTTER TAIL **AC** HALVORSON PARK TRAIL IN BATTLE LAKE. EN PEDESTRIAN TAP 29,498 29,498 COUNTY (AC PROJECT, AC PAYBACK 1 OF 1) BIKE TRAIL September 213 Transportation Alternatives Program Listing A-2 Page 2 of 11

Transportation Alternatives Program Fiscal Year: 214 ATP STIP for FY 214-217 FHWA AC FTA State Other 665 4 PED/BIKE 84-9-2 WILKIN COUNTY LAKE BRECKENRIDGE TRAIL ON WILKIN CSAH 1 1. EN PEDESTRIAN TAP 46,25 125, 281,25 FROM BRECKENRIDGE TO LAKE BRECKENRIDGE, BIKE TRAIL MULTI-USE BITUMINOUS TRAIL 668 4 PED/BIKE 12-9-4 ALEXANDRIA PEDESTRIAN/BIKE TRAIL ON 3RD AVE IN. EN PEDESTRIAN TAP 97, 62,8 34,92 ALEXANDRIA, MULTI-USE BITUMINOUS TRAIL BIKE TRAIL 846 6 PED/BIKE 159-9-18 ROCHESTER EAST CIRCLE DRIVE PATH FROM CSAH 2 TO TH 14-3. EN PEDESTRIAN TAP 1,249,49 8, 449,49 PEDESTRIAN/BIKE TRAIL BIKE TRAIL 171 7 PED/BIKE 32-9-9 JACKSON OLD MILL TRAIL, FROM PLEASANTVIEW 2. EN PEDESTRIAN TAP 373,856 299,85 74,771 COUNTY ELEMENTARY SCHOOL TO COLONIAL AVENUE BIKE TRAIL 176 7 PED/BIKE 72-9-2 SIBLEY BRIDGES FOR PRAIRIE LINE TRAIL, ALONG CO RD. EN PEDESTRIAN TAP 68,497 4, 28,497 166, CONSTRUCT BR #R613 & #R614(PHASE 2A) BIKE BRIDGE 177 7 PED/BIKE 72-9-3 SIBLEY PRAIRIE LINE TRAIL ALONG CO RD 166 TO ARLINGTON SPORTSMAN PARK & TO SOUTH OF HIGH ISLAND CREEK CONSTRUCT PED/BIKE TRAIL AND SIDEWALK (PHASE 2B) 2. EN PEDESTRIAN BIKE TRAIL TAP 68,497 4, 28,497 124 8 PED/BIKE 47-9-3 MEEKER COUNTY LAKE KORONIS OUTLET, CONSTRUCT PED/BIKE. EN PEDESTRIAN TAP 24, 119,516 12,484 BRIDGE BIKE TRAIL 1465 M PED/BIKE 19-9-11 DAKOTA COUNTY THROUGH THE WESTERN PORTION OF THE SPRING 3. EN PEDESTRIAN TAP 4,1, 1,2, 3,8, LK PARK RESERVE-CONSTRUCT MISS RIVER REG BIKE TRAIL TRIAL 1466 M PED/BIKE 19-9-13 DAKOTA COUNTY **AC** MISS RIVER REG TR, SCHARRS BLUFF TO MISS RIVER, SPRING LK RARK RESERVE, NININGER TWP-CONSTRUCT PED/BIKE TR & TRAILHEAD FACILITY (WAS 91-9-57) (AC PROJECT, PAYBACK IN 217) 2. EN PED./BIKE TAP 4,74,892 273,84 759,18 4,467,88 1467 M PED/BIKE 19-9-15 DAKOTA COUNTY TH 11 TO GARLOUGH ELEMENTARY, WEST ST 1. EN PEDESTRIAN TAP 992,6 794,8 198,52 PAUL-CONSTRUCT N URBAN REG TR INCLUDING BIKE TRAIL UNDERPASS 1479 M PED/BIKE 27-619-23 HANOVER ALONG HENNEPIN CSAH 19 IN HANOVER- 1. EN ENHANCEMENT TAP 618, 216,233 41,767 CONSTRUCT BIT PED/BIKE TRAIL 1485 M PED/BIKE 7-71-8 SCOTT COUNTY ALONG CSAH 11 FROM RIVER RD/STAGECOACH 4. EN PEDESTRIAN TAP 1,3, 1,4, 26, RD TO SHENANDOAH DR IN SHAKOPEE- BIKE TRAIL CONSTRUCT PED/BIKE TRAIL 1486 M PED/BIKE 82-9-4 WASHINGTON CONSTRUCT HARDWOOD CREEK REGIONAL TR. EN ENHANCEMENT TAP 135, 92, 43, COUNTY EXTENSION FROM 145TH ST TO 14TH ST IN HUGO September 213 Transportation Alternatives Program Listing A-2 Page 3 of 11

Transportation Alternatives Program Fiscal Year: 214 ATP STIP for FY 214-217 FHWA AC FTA State Other 1487 M PED/BIKE 82-9-6 WASHINGTON RIGHT OF WAY ACQUISITION FOR HARDWOOD. RW RIGHT OF WAY TAP 65, 52, 13, COUNTY CREEK REGIONAL TR EXTENSION FROM 145TH ST TO 14TH ST IN HUGO 1492 M PED/BIKE 91-9-68 MPLS PARK/REC FROM FRANKLIN AVE N TO CENTRAL RIVERFRONT. EN PED./BIKE TAP 1,22,5 962, 24,5 BOARD PARK IN MPLS-CONSTRUCT WEST RIVER PKWY TRAIL S 1493 M PED/BIKE 91-9-71 MPLS PARK/REC ALONG THE WEST BANK OF MISS RIVER-JAMES I. EN PED./BIKE TAP 1,4, 832, 28, BOARD RICE PKWY TRAIL S & CONNECTIONS 1494 M PED/BIKE 91-9-72 THREE RIVERS OVER HENNEPIN CSAH 19 IN SHOREWOOD &. EN PEDESTRIAN TAP 2,, 1,4, 96, PARK DISTRICT TONKA BAY-CONSTRUCT LAKE MINNETONKA LRT BIKE BRIDGE REGIONAL TR PED/BIKE BRIDGE 1499 M PED/BIKE 17-425-8 BLOOMINGTON HYLAND TRL CORRIDOR FROM 15TH ST/MARYLAND RD TO THE BLOOMINGTON FERRY RD TRAILHEAD NEAR THE MN RIVER IN BLOOMINGTON-CONSTRUCT TRAIL 1. EN PEDESTRIAN BIKE TRAIL TAP 1,197,3 539,76 657,54 15 M PED/BIKE 11-2-31 BROOKLYN PARK **AC** FROM REGENT AVE AT SHINGLE CREEK TO NOBLE AVE AT SHINGLE CREEK IN BROOKLYN PARK-PEDESTRIAN/BICYCLE TRAIL WITH LIGHTING, PEDESTRIAN ROAD SAFETY S (AC PROJECT, PAYBACK IN 215). EN PEDESTRIAN BIKE TRAIL TAP 242, 968, 242, 152 M PED/BIKE 141-9-38 MINNEAPOLIS OVER THE MISS RIVER FROM U OF M EAST TO. EN BRIDGE REPAIR TAP 1,3, 1,4, 26, WEST BANK IN MPLS-REHABILITATE & PAINT BR 9(MN BR 94246) 151 M CITY 164-213-7 SAINT PAUL ON WESTERN AVE FROM ST ANTHONY TO UNIV & 1. EN ENHANCEMENT TAP 1,425, 1,4, 385, FROM CONCORDIA TO SELBY-STREETSCAPE, LIGHTING 1513 M PED/BIKE 179-9-4 BURNSVILLE FROM I 35W TO TH 77 ALONG MN RIVER IN 4. EN PEDESTRIAN TAP 1,3, 1,4, 26, BURNSVILLE-CONSTRUCT BIG RIVERS REGIONAL BIKE TRAIL TRAIL $32,45,539 $16,313,531 $2,536,267 $ $52,5 $16,39,58 September 213 Transportation Alternatives Program Listing A-2 Page 4 of 11

Transportation Alternatives Program Fiscal Year: 215 ATP STIP for FY 214-217 FHWA AC FTA State Other 82 1 PED/BIKE 31-9-7 ITASCA COUNTY MESABI AND ITASCA TRAIL SYSTEM, PED/BIKE 6. EN PED./BIKE TAP 3, 15, 15, TRAIL CONSTRUCTION 84 1 PED/BIKE 36-9-2AC KOOCHICHING **AC** SECOND CREEK TO RANIER, WIDEN TRAIL 2. EN PED./BIKE TAP 27,72 27,72 COUNTY TO MEET STANDARDS (AC PAYBACK 1 OF 1) 92 1 PED/BIKE 69-9-29 ST LOUIS COUNTY MOUNTAIN IRON BICYCLE AND PEDESTRIAN 2. EN PED./BIKE TAP 343,2 274,56 68,64 CONNECTION 93 1 PED/BIKE 69-9-3 REGIONAL RAIL MESABI TRAIL, SOUDAN TO ELY, BIKE/PED TRAIL 4. EN PED./BIKE TAP 492, 393,6 98,4 AUTHORITY 95 1 PED/BIKE 91-7-24 ARDC HELMET HERO BICYCLE EDUCATION PROGRAM. EN PED./BIKE TAP 71,868 57,494 14,374 98 1 PED/BIKE 92-9-38 MNDNR GITCHI GAMI TRAIL-BEAVER RIVER BRIDGE & W RD 1. EN PEDESTRIAN TAP 1,644,5 5, 1,144,5 SEGMENT, PED/BIKE BRIDGE & TRAIL BIKE BRIDGE 1 1 PED/BIKE 118-9-21 DULUTH CROSS CITY TRAIL DULUTH, 59TH AVE WEST TO 1. EN PED./BIKE TAP 7, 5, 2, PULASKI ST 285 2 PED/BIKE 15-9-7 BELTRAMI ALONG THE ABANDONED SOO LINE CORRIDOR 2. EN PEDESTRIAN TAP 51, 48, 12, COUNTY FROM 5TH ST TO CR 11 IN BEMIDJI, CONSTRUCT BIKE TRAIL NEW MULTI-USE PED/BIKE TRAIL (EAST-WEST 498 3 PED/BIKE 162-9-5AC ST CLOUD **AC** EXTEND BEAVER ISLAND BIKE/PED TRAIL, ST CLOUD CIVIC CENTER NORTH TO 5TH AVENUE ALONG MISSISSIPPI RIVER IN ST CLOUD (AC PAYBACK 1 OF 1). EN PEDESTRIAN BIKE TRAIL TAP 61,439 61,439 499 3 PED/BIKE 162-9-6AC ST. CLOUD **AC** BEAVER ISLAND TRAIL EXTENSION FROM 33RD STREET SOUTH TO MISSISSIPPI RIVER BLUFFS REGIONAL PARK IN THE CITY OF ST CLOUD (AC PAYBACK 1 OF 1) 1. EN PEDESTRIAN BIKE TRAIL TAP 278, 278, 5 3 PED/BIKE 24-9-3 ELK RIVER CONSTRUCT MISSING SEGMENTS OF BIKE/PED TRAIL ALONG TWIN LAKES ROAD FROM EXISTING HOUSING DEVELOPMENTS IN ELK RIVER TO THE ELK RIVER NORTHSTAR COMMUTER RAIL STATION AND UPGRADE PED RAMPS TO ADA GUIDELINES 1. EN PED./BIKE TAP 222,5 16, 62,5 54 3 PED/BIKE 233-9-1 SAINT JOSEPH MINNESOTA ST W PEDESTRIAN TRAIL FROM 4TH. EN PEDESTRIAN TAP 425, 11, 315, AVE NW TO.25 MI WEST & MINNESOTA ST W BIKE TRAIL LIGHTING S 712 4 PED/BIKE 56-9-1 OTTER TAIL LAKE ADLEY PARK TRAIL - PARKERS PRAIRIE,. EN PEDESTRIAN TAP 231,25 185, 46,25 COUNTY MULTI-USE BITUMINOUS TRAIL BIKE TRAIL September 213 Transportation Alternatives Program Listing A-2 Page 5 of 11

Transportation Alternatives Program Fiscal Year: 215 ATP STIP for FY 214-217 FHWA AC FTA State Other 714 4 PED/BIKE 12-9-5 ALEXANDRIA FROM BIRCH AVE TO CR 73 ON GENEVA ROAD. EN PEDESTRIAN TAP 98, 414,593 565,47 PEDESTRIAN/BIKE LANES - PHASE II, MULTI-USE BIKE TRAIL BITUMINOUS TRAIL 916 6 PED/BIKE 14-9-7 AUSTIN SOUTHWEST TRAIL FROM 2 FEET EAST OF JCT 1. EN PEDESTRIAN TAP 252, 21,6 5,4 9TH PLACE SW AND 2ND DRIVE SW TO JCT 4TH ST BIKE TRAIL SW AND 16TH AVE SW 918 6 PED/BIKE 159-9-19 ROCHESTER SOUTH BROADWAY PATH FROM 2TH ST SE TO 2. EN PEDESTRIAN TAP 1,1, 623,4 476,6 THE ZUMBRO RIVER BIKE TRAIL 1118 7 PED/BIKE 8-9-2 BROWN COUNTY ALONG TH 4 IN SLEEPY EYE, SLEEPY EYE LAKE. EN PEDESTRIAN TAP 5, 4, 1, TRAIL PHASE II, CONSTRUCT PED/BIKE TRAIL (FED$ BIKE TRAIL CAPPED) (TIED TO 82-42) 1122 7 PED/BIKE 83-9-4 WATONWAN WATLINE TRAIL - TH 4 OVER TH 6, MODIFY 4. EN PEDESTRIAN TAP 5, 4, 1, COUNTY BR#8323 FOR TRAIL PURPOSES (FED $ CAPPED) BIKE TRAIL (TIED TO 831-114) 1123 7 PED/BIKE 15-9-2 NORTH MANKATO US 14 TRAIL FROM LORAY DRIVE TO WEST LIND 1. EN PEDESTRIAN TAP 584,31 4, 184,31 STREET, CONSTRUCT PED/BIKE TRAIL BIKE TRAIL 1656 M PED/BIKE 1-9-5 CARVER COUNTY FROM 1ST ST BRIDGE OVER W CHASKA CREEK IN CHASKA TO MAIN ST IN CITY OF CARVER (SW OF INTERSECTION OF HICKORY ST)- PEDESTRIAN/BICYCLE TRAIL AND TRAILHEAD FACILITIES 2. EN PEDESTRIAN BIKE TRAIL TAP 757,9 66,32 151,58 1658 M PED/BIKE 19-9-16 DAKOTA COUNTY FROM DAKOTA CSAH 38 TO JOHNNY CAKE RIDGE 1. EN PEDESTRIAN TAP 1,818,135 1,1, 718,135 ROAD IN APPLE VALLEY-PEDESTRIAN/BICYCLE BIKE TRAIL TRAIL INCLUDING BRIDGE 1665 M PED/BIKE 62-9-2 RAMSEY COUNTY FROM LONG LAKE REGIONAL PARK IN NEW 1. EN PEDESTRIAN TAP 1,442,32 1,1, 342,32 BRIGHTON TO CR H IN MOUNDS VIEW- BIKE TRAIL PEDESTRIAN/BICYCLE TRAIL 1672 M PED/BIKE 82-9-5 WASHINGTON FROM US 61 TO US 1 IN DENMARK TOWNSHIP- 2. EN PEDESTRIAN TAP 1,683, 1,1, 583, COUNTY PEDESTRIAN/BICYCLE TRAIL BIKE TRAIL 1674 M PED/BIKE 92-9-52 DNR ON THE GATEWAY STATE TRAIL OVER HADLEY AVE. EN PEDESTRIAN TAP 1,65, 1,1, 55, NORTH IN OAKDALE-PEDESTRIAN/BICYCLE TRAIL BIKE BRIDGE BRIDGE 1675 M PED/BIKE 98-9-8 CHISAGO COUNTY FROM TH95 (BENCH ST) TO CHISAGO COUNTY RD 2 IN TAYLORS FALLS - MULTI USE PAVED TRAIL (VALLEY VIEW TRAIL) TO PROVIDE CONNECTIVITY TO MN INTERSTATE PARK, SWEDISH IMMIGRANT TRAIL AND PROPOSED GATEWAY TRAIL. EN PEDESTRIAN BIKE TRAIL TAP 262,29 197,44 64,886 September 213 Transportation Alternatives Program Listing A-2 Page 6 of 11

Transportation Alternatives Program Fiscal Year: 215 ATP STIP for FY 214-217 FHWA AC FTA State Other 1677 M PED/BIKE 11-2-31AC BROOKLYN PARK **AC** FROM REGENT AVE AT SHINGLE CREEK TO NOBLE AVE AT SHINGLE CREEK IN BROOKLYN PARK-PEDESTRIAN/BICYCLE TRAIL WITH LIGHTING, PEDESTRIAN ROAD SAFETY S (AC PAYBACK 1 OF 1). EN PEDESTRIAN BIKE TRAIL TAP 968, 968, 1685 M PED/BIKE 164-3-11 SAINT PAUL ON E 7TH ST FROM ARCADE ST TO BUSH; ON ARCADE ST FROM E 7TH ST TO BRIDGE OVER PHALEN BLVD; ON FOREST ST FROM WELLS ST TO REANEY AVE IN ST PAUL; AND ON REANEY AVE FROM FOREST ST TO JOHNSON PKWY-SIDEWALKS, LANDSCAPING, TREES, PEDESTRIAN LIGHTING, ON- STREET BICYCLE FACILITIES 1. EN PED./BIKE TAP 529,411 423,536 15,875 1687 M PED/BIKE 164-646-1 SAINT PAUL ON RAYMOND AVE FROM HAMPDEN AVE TO ENERGY PARK DR IN ST PAUL-STREET RECONSTRUCTION TO ADD CURB EXTENSIONS, BOULEVARD TREES, LANDSCAPING, PEDESTRIAN MEDIANS, SIDEWALK WIDENING, BIKE LANES, PEDESTRIAN LIGHTING. EN PED./BIKE TAP 1,826,33 1,1, 726,33 1688 M PED/BIKE 188-9-2 LAKEVILLE FROM 173RD ST W TO FARMINGTON BORDER 1. EN PEDESTRIAN TAP 1,124,267 899,41 224,857 INCLUDING A BRIDGE ACROSS NORTH CREEK IN BIKE TRAIL LAKEVILLE-PEDESTRIAN/BICYCLE TRAIL 274 C LOCAL 999 88C-HBS-15 MNDOT LOCAL HISTORIC BRIDGE STUDY PHASE IV. PL MISCELLANEOUS TAP 75, 5, 125, 125, 279 C MN 999 88C-PED-15 MNDOT STATEWIDE PED/BIKE COORDINATOR. PL PLANNING TAP 15, 15, 284 C MN 999 88C-RIDE-15 MNDOT MINNESOTA RIDESHARE COORDINATOR. PL PLANNING TAP 15, 15, 291 C PED/BIKE 88C-SRS-15 MNDOT **SRTS** INFRA AND NON-INFRA STATEWIDE SRTS. PL PLANNING TAP 1,3, 1,4, 26, PROGRAM 292 C MN 999 88C-TAPF-15 MNDOT TRANSPORTATION ALTERNATIVE PROGRAM. NA PLANNING TAP 5,, 5,, FEDERAL FUND SETASIDE 293 C LOCAL 999 88C-TAPS-15 MNDOT TRANSPORTATION ALTERNATIVE PROGRAM STATE. NA PLANNING TAP 5,, 5,, FUND SETASIDE $34,355,44 $21,7,76 $ $ $5,385, $7,27,364 September 213 Transportation Alternatives Program Listing A-2 Page 7 of 11

Transportation Alternatives Program Fiscal Year: 216 ATP STIP for FY 214-217 FHWA AC FTA State Other 143 1 PED/BIKE 31-9-8 BIGFORK BIGFORK RIVERWALK TRAIL 2. EN PED./BIKE TAP 55, 275, 275, 145 1 PED/BIKE 69-9-3 ST LOUIS COUNTY MESABI TRAIL-SOUDAN TO ELY. EN PED./BIKE TAP 494, 394, 1, 148 1 PED/BIKE 92-9-51 MNDNR GITCHI GAMI TRAIL-BEAVER RIVER BRIDGE & W RD 1. EN PED./BIKE TAP 84,3 5, 34,3 SEGMENT 15 1 PED/BIKE 129-9-7 GRAND RAPIDS GRAND RAPIDS MISSISSIPPI RIVERFRONT. EN PED./BIKE TAP 988,985 296,696 692,289 PEDESTRIAN BRIDGE 348 2 LOCAL 999 882-EN-16 LOCAL DISTRICTWIDE - ENHANCEMENT PROGRAM -. EN ENHANCEMENT TAP 625, 5, 125, LOCAL - 216 751 4 PED/BIKE 26-9-3 GRANT COUNTY HOFFMAN PEDESTRIAN BIKE TRAIL ALONG TH 27. EN PEDESTRIAN TAP 386,25 39, 77,25 FROM 1ST STREET TO ELK LAKE, BITUMINOUS BIKE TRAIL SURFACING 772 4 PED/BIKE 884-TAP-16 LOCAL DISTRICTWIDE SETASIDES - TRANSPORTATION. EN PEDESTRIAN TAP 323,333 258,666 64,667 ALTERNATIVE - 216 BIKE TRAIL 12 6 PED/BIKE 886-EN-16 DISTRICTWIDE F.Y. 216 ENHANCEMENT SETASIDE. EN PED./BIKE TAP 1,31,25 825, 26,25 1163 7 PED/BIKE 32-9-5 JACKSON FORT BELMONT - BIKE TRAIL IN THE CITY OF 2. EN PEDESTRIAN TAP 322,186 257,749 64,437 COUNTY JACKSON, CONSTRUCT PED/BIKE TRAIL BIKE TRAIL (FED$CAPPED) 1164 7 PED/BIKE 4-9-2 LE SUEUR OXCART TRAIL, PHASE 1, FROM LE SUEUR MAYO. EN PEDESTRIAN TAP 5, 4, 1, COUNTY PARK, NORTH, UNDER US169 TO DOPPY LANE, BIKE BRIDGE CONSTRUCT PED/BIKE TRAIL 1165 7 PED/BIKE 83-9-5 WATONWAN WATLINE TRAIL - ALONG TH 4 FROM TH 6 TO LONG 4. EN PEDESTRIAN TAP 5, 4, 1, COUNTY LAKE, CONSTRUCT PED/BIKE TRAIL (FED $ CAPPED) BIKE TRAIL 1343 8 PED/BIKE 43-9-2 MCLEOD COUNTY BUFFALO HIGHLANDS TRAIL ALONG US 212 FROM 2. EN PEDESTRIAN TAP 597,916 4, 197,916 CSAH 1 (DAIRY AVE) TO BOONE ROAD BIKE TRAIL 1824 M PED/BIKE 91-9-76 THREE RIVERS FROM BOONE AVE N/36TH AVE N IN NEW HOPE TO 3. EN PEDESTRIAN TAP 1,153,6 922,88 23,72 PARK DISTRICT 32ND AVE N AND XENIA AVE N IN CRYSTAL- BIKE TRAIL PEDESTRIAN/BICYCLE TRAIL 1825 M PED/BIKE 91-9-77 THREE RIVERS ALONG 57TH AVE N FROM E OF TH 1 TO N 1. EN PEDESTRIAN TAP 1,435,84 1,12, 315,84 PARK DISTRICT MISSISSIPPI REGIONAL PARK IN BROOKLYN BIKE TRAIL CENTER-PEDESTRAIN/BICYCLE TRAIL September 213 Transportation Alternatives Program Listing A-2 Page 8 of 11

Transportation Alternatives Program Fiscal Year: 216 ATP STIP for FY 214-217 FHWA AC FTA State Other 1828 M PED/BIKE 127-2-29 FRIDLEY FROM MAIN STREET (CR 12) AND 57TH AVE NE TO 44TH AVE NE ACROSS I-694 IN FRIDLEY- PEDESTRIAN/BICYCLE BRIDGE AND TRAIL CONNECTION 2. EN PEDESTRIAN BIKE BRIDGE TAP 1,442,56 1,12, 322,56 1829 M PED/BIKE 13-9-4 HASTINGS AT THREE POINTS ALONG THE VERMILLION RIVER BETWEEN THE INTERSECTION OF 3RD ST AND BAILY ST TO VERMILLION FALLS PARK IN HASTINGS- PEDESTRIAN/BICYCLE TRAIL 2. EN PEDESTRIAN BIKE TRAIL TAP 1,8, 86,4 21,6 183 M PED/BIKE 141-3-22 MINNEAPOLIS ON 7TH AND 8TH ST S FROM 1ST AVE N TO CHICAGO AVE AND ON 6TH AND 9TH ST S FROM 1ST AVE N TO 2ND AVE S IN MPLS-LANDSCAPING, PEDESTRIAN LIGHTING, PEDESTRIAN SAFETY S 2. EN PED./BIKE TAP 2,16, 1,12, 896, 1833 M PED/BIKE 141-22-5 MINNEAPOLIS RECONSTRUCTION OF 6TH AVE N WITH PRESERVATION OF HISTORIC PAVERS AND LOADING DOCKS, INSTALLATION OF SIDEWALKS FROM 5TH ST N TO THE END OF ST N OF WASHINGTON AVE. EN PED./BIKE TAP 2,799,14 1,12, 1,679,14 1836 M PED/BIKE 164-646-2 SAINT PAUL ON RAYMOND AVE FROM ENERGY PARK DR TO COMO AVE, STREET RECONSTRUCTION TO ADD CURB EXTENSIONS, BOULEVARD TREES, LANDSCAPING, PEDESTRIAN MEDIANS, SIDEWALK WIDENING. EN PED./BIKE TAP 1,472,24 1,12, 352,24 1837 M PED/BIKE 199-9-1 RAMSEY FROM MISSISSIPPI W REGIONAL PARK TO CITY LIMITS 3/8 MI W OF MNDOT WAYSIDE REST AREA/DAYTONPORT ROADSIDE PARKING AREA IN CITY OF RAMSEY-PEDESTRIAN/BICYCLE TRAIL 3. EN PEDESTRIAN BIKE TRAIL TAP 1,631,739 1,12, 511,739 2119 C MN 999 88C-PED-16 MNDOT STATEWIDE PED/BIKE COORDINATOR. PL PLANNING TAP 15, 15, 2124 C MN 999 88C-RIDE-16 MNDOT MINNESOTA RIDESHARE COORDINATOR. PL PLANNING TAP 15, 15, 2131 C MN 999 88C-TAPF-16 MNDOT TRANSPORTATION ALTERNATIVE PROGRAM. NA PLANNING TAP 5,, 5,, FEDERAL FUND SETASIDE 2132 C LOCAL 999 88C-TAPS-16 MNDOT TRANSPORTATION ALTERNATIVE PROGRAM STATE. NA PLANNING TAP 5,, 5,, FUND SETASIDE $3,418,33 $18,565,391 $ $ $5,, $6,852,912 September 213 Transportation Alternatives Program Listing A-2 Page 9 of 11

Transportation Alternatives Program Fiscal Year: 217 ATP STIP for FY 214-217 FHWA AC FTA State Other 22 1 LOCAL 999 881-TAP-R-17 LOCAL DISTRICTWIDE SETASIDE - LOCAL TAP RURAL. EN MISCELLANEOUS TAP 375, 3, 75, 221 1 LOCAL 999 881-TAP-SU-17 LOCAL DISTRICTWIDE SETASIDE - LOCAL TAP SMALL. EN MISCELLANEOUS TAP 25, 2, 5, URBAN 222 1 LOCAL 999 881-TAP-SW-17 LOCAL DISTRICTWIDE SETASIDE - LOCAL TAP STATEWIDE. EN MISCELLANEOUS TAP 5, 4, 1, 637 3 LOCAL 999 883-TAP-17 MNDOT ATP-3 FY 217 LOCAL TRANSPORTATION. EN PED./BIKE TAP 2,, 1,6, 4, ALTERNATIVES PROGRAM SETASIDE 81 4 PED/BIKE 884-TAP-17A LOCAL DISTRICTWIDE SETASIDES - TRANSPORTATION. EN PEDESTRIAN TAP 111,111 1, 11,111 ALTERNATIVE - 217 BIKE TRAIL 811 4 PED/BIKE 884-TAP-17B LOCAL DISTRICTWIDE SETASIDES - TRANSPORTATION. EN PEDESTRIAN TAP 222,222 2, 22,222 ALTERNATIVE - 217 BIKE TRAIL 812 4 PED/BIKE 884-TAP-17C LOCAL DISTRICTWIDE SETASIDES - TRANSPORTATION. EN PEDESTRIAN TAP 333,333 3, 33,333 ALTERNATIVE - 217 BIKE TRAIL 1213 7 PED/BIKE 887-EN-17 LOCAL DISTRICTWIDE SETASIDE- LOCAL ENHANCEMENT. EN PEDESTRIAN TAP 875, 7, 175, PROJECTS - 217 BIKE TRAIL 149 8 LOCAL 999 888-TAP-17 MNDOT TAP SETASIDE. EN PED./BIKE TAP 75, 6, 15, 1924 M PED/BIKE 19-9-13AC DAKOTA COUNTY **AC** MISS RIVER REG TR, SCHARRS BLUFF TO MISS RIVER, SPRING LK RARK RESERVE, NININGER TWP-CONSTRUCT PED/BIKE TR & TRAILHEAD FACILITY (WAS 91-9-57) (AC PAYBACK 1 OF 1) 2. EN PED./BIKE TAP 759,18 759,18 1973 M LOCAL 999 88M-TAP-17 MNDOT METRO ATP SETASIDE FOR TRANSPORTATION. EN ENHANCEMENT TAP 7,562,66 6,5,128 1,512,532 ALTERNATIVE PROGRAM PROJECTS YET TO BE SELECTED FOR FY 217 1974 M LOCAL 999 88M-TAP-17C MNDOT METRO ATP SETASIDE FOR TRANSPORTATION. EN ENHANCEMENT TAP 15, 12, 3, ALTERNATIVE PROGRAM PROJECTS YET TO BE SELECTED FOR FY 217 FOR CHISAGO COUNTY 2144 C MN 999 88C-ADA-17 MNDOT AMERICAN WITH DISABILITITES ACT (ADA). PL PLANNING TAP 2,5, 2,, 5, SETASIDE FOR 217 2155 C MN 999 88C-PED-17 MNDOT STATEWIDE PED/BIKE COORDINATOR. PL PLANNING TAP 15, 15, 216 C MN 999 88C-RIDE-17 MNDOT MINNESOTA RIDESHARE COORDINATOR. PL PLANNING TAP 15, 15, 2168 C MN 999 88C-TAPF-17 MNDOT TRANSPORTATION ALTERNATIVE PROGRAM. NA PLANNING TAP 5,, 5,, FEDERAL FUND SETASIDE September 213 Transportation Alternatives Program Listing A-2 Page 1 of 11

Transportation Alternatives Program Fiscal Year: 217 ATP STIP for FY 214-217 FHWA AC FTA State Other 2169 C LOCAL 999 88C-TAPS-17 MNDOT TRANSPORTATION ALTERNATIVE PROGRAM STATE. NA PLANNING TAP 5,, 5,, FUND SETASIDE $26,688,434 $18,629,236 $ $ $5,5, $2,559,198 September 213 Transportation Alternatives Program Listing A-2 Page 11 of 11

Highway Safety Improvement Program (HSIP) A-3

HIGHWAY SAFETY PROGRAM (HSIP) With the passage of SAFETEA-LU and the development of the Minnesota Strategic Highway Safety Plan (SHSP), the types of safety projects funded with HSIP dollars has transitioned from a purely reactive safety program, addressing spot locations, to a more proactive safety program where low-cost systematic strategies are emphasized. Minnesota has completed individual safety plans for all 87 counties and 8 MnDOT districts that can leverage HSIP funds. Projects were selected for the 214-217 STIP through a centralized process. A solicitation process was used for the local project selection. Low cost, systematic, proactive projects were prioritized over reactive single location improvements. Projects funded include: systematic intersection lighting, enhanced edge lines, rumble strips, chevrons on curves and cable median barrier. The Office of Traffic, Safety and Technology approves all state and local HSIP projects before they are included in the STIP. For Greater Minnesota ATP s the selection committee was comprised of individuals from the following offices: MnDOT Office of Traffic, Safety and Technology District Traffic Engineer FHWA (Advisory) MnDOT Office of State Aid for Local Transportation (local solicitation only) For the Metro District ATP the selection committee was comprised of individuals representing: MnDOT Metro Traffic (2) Metro County Engineering (2) Metro City Engineering (2) The Highway Safety Improvement Program funding included in the 214-217 STIP is shown in Figure A-2. Projects were selected using the following criteria: Road Safety Plan developed project Ability to meet the intent of the SHSP Fatal and A injury crashes per intersection or per mile SHSP (critical emphasis areas) Cost per intersection and/or cost per mile ADT Inclusion on the High Risk Rural Roads list or Top 5% list A-3(1)

Figure A-2 HIGHWAY SAFETY PROGRAM BY YEAR ($ MILLIONS) 214 215 216 217 TOTAL Federal Highway 44.6 36.8 35. 37.5 153.9 A-3(2)

Highway Safety Improvement Projects Fiscal Year: 214 STIP for FY 214-217 ATP 18 1 CSAH 12 16-7-5 COOK COUNTY CSAH 12 MARKING UPGRADE, PHASE I. SH STRIPING HSIP 153,33 137,997 15,333 19 1 CSAH 12 16-7-6 COOK COUNTY CSAH 12 MARKING UPGRADE, PHASE II WITH CSAH. SH STRIPING HSIP 124,5 111,645 12,45 2 CENTERLINE 2 1 CSAH 4 16-7-7 COOK COUNTY CSAH 4 MARKING UPGRADE. SH STRIPING HSIP 35,5 31,95 3,55 21 1 CSAH 5 16-7-8 COOK COUNTY CSAH 5 & CSAH 8 MARKING UPGRADES. SH STRIPING HSIP 39,55 35,595 3,955 3 1 CSAH 69-7-1 ST LOUIS COUNTY 6 INCH EDGE LINE. SH STRIPING HSIP 36, 32,4 3,6 31 1 CSAH 69-7-11 ST LOUIS COUNTY GROUND IN WET REFLECTIVE EDGELINE. SH STRIPING HSIP 343, 38,7 34,3 32 1 CSAH 69-7-12 ST LOUIS COUNTY NON-CRSP GROUND IN WET REFLECTIVE. SH STRIPING HSIP 33, 272,7 3,3 EDGELINE 45 1 I 35 98-143 MNDOT 2 MILES SOUTH TO MIDWAY RD, CABLE MEDIAN 2. SH SAFETY TARGET HSIP 579,956 521,96 57,996 BARRIER INSTALLATION (ASSOC SP 6982-299) 52 1 I 35 8821-239 MNDOT CABLE MEDIAN BARRIER, 12 LOCACTIONS FROM. SH MEDIAN BARRIER HSIP 2,46,676 2,366,8 4,668 TH 7 TO CARLTON CO CSAH 4 233 2 LOCAL 4-7-5AC BELTRAMI COUNTY **AC** COUNTY WIDE SHOULDER PAVING AND. SH PAVE SHOULDER HSIP 35, 35, RUMBLE STRIPS (AC PAYBACK 1 OF 1) 235 2 LOCAL 39-7-5 LAKE OF THE COUNTY WIDE SHOULDER PAVING AND SAFETY. SH PAVE SHOULDER HSIP 532,62 479,358 53,262 WOODS WEDGE 238 2 LOCAL 6-7-5 POLK COUNTY COUNTY WIDE SHOULDER PAVING AND. SH PAVE SHOULDER HSIP 219,3 197,37 21,93 CENTERLINE RUMBLE STRIPS 241 2 LOCAL 88-7-38 LOCAL DISTRICT WIDE CHEVRON INSTALLATION PROJECT. SH MISCELLANEOUS HSIP 1,81,66 1,621,494 18,166 246 2 US 2 46-62 MNDOT FROM WILTON TO BEMIDJI - WB & EB - 6. SH TURN LANES HSIP 25, 225, 25, INSTALL/EXTEND LEFT TURN LANES 256 2 MN 999 8822-164 MNDOT ON US2 FROM CASS LAKE TO DEER RIVER AND ON 45. SH CENTERLINE HSIP 125, 112,5 12,5 MN34 FROM AKELEY TO WALKER, INSTALL RUMBLE STRIPS CENTERLINE RUMBLE STRIPS 4 3 LOCAL 999 18-7-9 CROW WING CURVE CHEVRON SIGNING. SH SIGNING HSIP 315, 283,5 31,5 COUNTY 43 3 LOCAL 999 3-7-4 ISANTI COUNTY CHEVRON INSTALLATION AT VARIOUS LOCATIONS. SH SIGNING HSIP 277,2 249,48 27,72 IN ISANTI COUNTY 44 3 LOCAL 999 3-7-5 ISANTI COUNTY GROUND IN WET REFLECTIVE MARKINGS. SH STRIPING HSIP 33,45 273,15 3,345 45 3 LOCAL 999 33-7-4 KANABEC COUNTY RURAL INTERSECTION LIGHTING AND DYNAMIC. SH SIGNING HSIP 277,778 25, 27,778 WARNING SIGNS AT VARIOUS LOCATIONS IN KANABEC COUNTY September 213 HSIP Project Listing A-3 Page 3 of 17

Highway Safety Improvement Projects Fiscal Year: 214 STIP for FY 214-217 ATP 41 3 CR 117 48-7-7 MILLE LACS MILLE LACS CR 117 FROM CSAH 1 TO EAST 3. SH SHOULDER HSIP 12, 18, 12, COUNTY LINESHOULDER PAVING, RUMBLE STRIPS REPAIR WITH SAFETY EDGE 411 3 CR 122 48-7-8 MILLE LACS ON MILLE LACS CR 122, SHOULDER PAVING, 2. SH SHOULDER HSIP 68, 61,2 6,8 RUMBLE STRIPS, AND SAFETY EDGE REPAIR 412 3 LOCAL 999 48-7-9 MILLE LACS COUNTY ROAD 152 AND 155, LANE DEPARTURE SAFETY PROJECT INCLUDING 2' SHOULDER PAVEMENT WITH RUMBLE STRIP AND SAFETY WEDGE. SH STRIPING HSIP 12, 18, 12, 416 3 LOCAL 999 71-7-22 SHERBURNE CSAH 4 AND CR 39 INTERSECTION S. SH TURN LANES HSIP 65, 544,5 6,5 COUNTY 417 3 LOCAL 999 71-7-23 SHERBURNE COUNTYWIDE 6" EDGELINE STRIPING. SH STRIPING HSIP 141, 126,9 14,1 COUNTY 418 3 LOCAL 999 71-7-24 SHERBURNE **AC** CSAH 43 AND CSAH 5 INTERSECTION. SH TURN LANES HSIP 288,6 243, 167,4 45,6 COUNTY S (AC PROJECT - PAYBACK IN 215) 42 3 LOCAL 999 73-7-9 STEARNS COUNTY STEARNS COUNTY INTERSECTION STREET. SH STRIPING HSIP 91, 81,9 9,1 LIGHTING 421 3 CSAH 133 73-7-1 STEARNS COUNTY CSAH 133/19TH AVENUE, CONSTRUCT. SH MISCELLANEOUS HSIP 45, 45, 45, ROUNDABOUT 452 3 I 94 868-158S MNDOT.8 M W OF TH 25 TO WRIGHT CO CSAH 18 IN MONTICELLO, RECONSTRUCTION INCL EB & WB AUXILIARY LANES, REPLACE PAVEMENT (HSIP PROJECT) 2. SH GRADE AND SURFACE HSIP 1,244,444 1,12, 124,444 655 4 CSAH 3 44-7-4 MAHNOMEN COUNTY 214 HSIP, VARIOUS LOCATIONS IN MAHNOMEN COUNTY, CSAH 3, 4, 5, 1 AND 13 - CHEVRON CURVE SIGNING, ASSOCIATED S.P. 44-7-5, S.P. 44-7-6, S.P. 44-7-7, S.P. 44-7-8. SH SIGNING HSIP 91,476 83,16 8,316 657 4 LOCAL 999 56-7-8 OTTER TAIL 214 HSIP LANE DEPARTURE - ENHANCED LINE. SH STRIPING HSIP 698,416 628,574 69,842 COUNTY MARKINGS - PHASE I AND II, ASSOCIATED S.P. 56-7-9 658 4 LOCAL 999 56-7-1 OTTER TAIL COUNTY 214 HSIP INTERSECTION S (ENHANCED SIGNAGE AND MARKING) AND LANE DEPARTURE (CHEVRON CURVE SIGNING) IN OTTER TAIL COUNTY, ASSOCIATED S.P. 56-7-11. SH SIGNING HSIP 185,378 168,525 16,853 659 4 LOCAL 999 56-7-12 OTTER TAIL 214 HSIP LANE DEPARTURE - SHOULDER PAVING. SH PAVE SHOULDER HSIP 627,116 564,44 62,712 COUNTY AND RUMBLE STRIPS ON CURVES - PHASE 1A AND 1B, ASSOCIATED S.P. 56-7-13 66 4 LOCAL 999 56-7-14 OTTER TAIL 214 HSIP VARIOUS LOCATIONS IN OTTER TAIL. SH LIGHTING HSIP 23, 182,7 2,3 COUNTY COUNTY, INTERSECTION S - LIGHTING September 213 HSIP Project Listing A-3 Page 4 of 17

Highway Safety Improvement Projects Fiscal Year: 214 STIP for FY 214-217 ATP 666 4 LOCAL 999 88-7-4 LOCAL DISTRICTWIDE - LOCAL HSIP 6" EDGELINES. SH STRIPING HSIP 632,267 569,41 63,226 667 4 LOCAL 999 88-7-41 LOCAL DISTRICTWIDE - LOCAL HSIP 6" GROUND-IN WET. SH STRIPING HSIP 897,656 87,89 89,766 REFLECTIVE PAVEMENT MARKINGS AND RUMBLE STRIPES 68 4 I 94 218-13 MNDOT CABLE MEDIAN GUARDRAIL, 1.32 MILES WEST OF 22. SH GUARD RAIL HSIP 3,349, 3,349, TH 9 TO 1.34 MILES EAST OF CSAH 8 (3,349, SECTION 164) 829 6 CSAH 17 24-7-15 FREEBORN COUNTY SHOULDER PAVING + RS + SAFETY WEDGE ON. SH PAVE SHOULDER HSIP 125,8 113,22 12,58 CSAH 17 (SEGMENT 17.3) 83 6 CSAH 17 24-7-16 FREEBORN COUNTY SHOULDER PAVING + RS + SAFETY WEDGE ON. SH PAVE SHOULDER HSIP 47, 366,3 4,7 CSAH 17 (SEGMENT 17.2) 832 6 LOCAL 999 25-7-7 GOODHUE COUNTY SIX-INCH LATEX EDGELINE AND GROUND IN SIX-. SH SAFETY TARGET HSIP 12,517 92,265 1,252 INCH EPOXY WET-REFLECTIVE MARKINGS AT VARIOUS LOCATIONS IN GOODHUE COUNTY 835 6 CSAH 37 66-7-11 RICE COUNTY CSAH 37 SHOULDER PAVING WITH RUMBLE STRIPES AND SAFETY EDGE IN CONJUNCTION WITH ASSOCIATED SAP 66-637-1, MILLING, RECLAMATION AND BITUMINOUS SURFACING. SH PAVE SHOULDER HSIP 2,77,778 25, 1,827,778 836 6 LOCAL 999 74-7-3 STEELE COUNTY 214 HSIP STRIPING PROJECT ON VARIOUS CSAHS. SH STRIPING HSIP 151,71 136,539 15,171 THROUGHOUT THE COUNTY 837 6 LOCAL 999 79-7-5 WABASHA COUNTY WABASHA COUNTY CHEVRONS ON VARIOUS. SH SAFETY TARGET HSIP 388,889 35, 38,889 CSAHS AND CRS THROUGHOUT THE COUNTY 838 6 LOCAL 999 79-7-6 WABASHA COUNTY WABASHA COUNTY EDGELINE STRIPING ON. SH SAFETY TARGET HSIP 388,889 35, 38,889 VARIOUS CSAHS AND CRS THROUGHOUT THE COUNTY 852 6 US 14 748-46 MNDOT FROM I 35 EAST TO TH 218 - CABLE MEDIAN 3. SH GUARD RAIL HSIP 314, 282,6 31,4 BARRIER 858 6 I 35 748-123 MNDOT INSTALL HIGH TENSION CABLE MEDIAN BARRIER 9. SH GUARD RAIL HSIP 1,28,186 1,87,367 12,819 ALONG I 35 FROM 1.8 MI SOUTH OF CSAH 4 TO EXIT 4 (TH 14) 868 6 US 61 2514-119S MNDOT CONSTRUCT AN OFFSET RIGHT TURN LANE AND EXTEND THE MEDIAN ACCELERATION LANE AT THE INTERSECTION OF TH 61 AND CSAH 18 (CASINO ROAD) AND CONSTRUCT OFFSET LEFT TURN LANES AT THE INTERSECTION OF TH 61 AND TH 19. SH TURN LANES HSIP 376, 338,4 37,6 872 6 US 63 56-19S MNDOT CSAH 1 IN RACINE, LEFT TURN LANES. SH SAFETY TARGET HSIP 36, 324, 36, 169 7 LOCAL 999 8-7-4 BROWN COUNTY EDGE LINE RUMBLE STRIPES. SH MISCELLANEOUS HSIP 87,5 78,75 8,75 September 213 HSIP Project Listing A-3 Page 5 of 17

Highway Safety Improvement Projects Fiscal Year: 214 STIP for FY 214-217 ATP 174 7 CSAH 38 46-7-1 MARTIN COUNTY CSAH 38, FROM CSAH 27 TO NORTHROP CL 1. SH STRIPING HSIP 34,4 36,36 34,4 PROJECT 175 7 LOCAL 999 52-7-3 NICOLLET COUNTY COUNTY WIDE CHEVRON PROJECT. SH SIGNING HSIP 422,4 38,16 42,24 178 7 CSAH 5 83-7-6 WATONWAN CSAH 5, MARTIN COUNTY LINE TO BUTTERFIELD. SH STRIPING HSIP 157,533 141,78 15,753 COUNTY CITY LIMITS, 6" CL AND RUMBLE STIPES, SHOULDER PAVING, CHEVRONS 185 7 MN 22 74-88S MNDOT FROM TH 83 TO CSAH 3, SIGNAL REVISIONS AND AT THE JCTS OF TH 22 WITH MADISON AVE, CSAH 17 AND ADAMS STREET IN MANKATO, CONSTRUCT ROUNDABOUTS AND CPR 2. SH GRADE AND SURFACE HSIP 98, 882, 98, 112 7 US 169 529-66S MNDOT **AB** ST PETER TO LE SUEUR, 1.8 MILES OF 11. SH MILL AND HSIP 1,5, 1,35, 15, GRADE RAISE FOR FLOOD MITIGATION AND MILL AND SB LANES ONLY ALTERNATE BID 1232 8 LOCAL 999 34-7-6 KANDIYOHI COUNTY VARIOUS LOCATIONS IN KANDIYOHI COUNTY,. SH SIGNING HSIP 29,25 26,123 2,92 CHEVERON PLACEMENT 1233 8 CSAH 2 37-7-4 LAC QUI PARLE LAC QUI PARLE CSAH 48 TO E COUNTY LINE, 5. SH PAVE SHOULDER HSIP 218,52 196,668 21,852 NARROW SHOULDER PAVING 1235 8 CSAH 1 42-7-5AC LYON COUNTY **AC** WEST COUNTY LINE TO MINNEOTA, 5. SH PAVE SHOULDER HSIP 229,169 229,169 NARROW SHLD. PAVING (AC PAYBACK1 OF 1) 1236 8 CSAH 24 42-7-6 LYON COUNTY LYON CSAH 1 TO LYON CSAH 5, NARROW SHLD. 3. SH PAVE SHOULDER HSIP 144,45 129,64 14,45 PAVING 1237 8 CSAH 24 42-7-7 LYON COUNTY LYON CSAH 5 TO US 59, NARROW SHLD. PAVING 4. SH PAVE SHOULDER HSIP 259,45 233,55 25,945 1238 8 LOCAL 999 43-7-8 MCLEOD COUNTY VARIOUS LOCATIONS IN MCLEOD COUNTY,. SH STRIPING HSIP 35, 315, 35, GROUND-IN WET REFLECTIVE EDGELINE 1239 8 LOCAL 999 47-7-7 MEEKER COUNTY VARIOUS LOCATIONS IN MEEKER COUNTY,. SH STRIPING HSIP 268,92 242,28 26,892 GROUND-IN REFLECTIVE MARKINGS 1242 8 LOCAL 999 64-7-4 REDWOOD COUNTY VARIOUS LOCATIONS IN REDWOOD COUNTY, 6". SH STRIPING HSIP 77,4 69,66 7,74 GROUND-IN WET REFLECTIVE PAVEMENT MARKINGS 1244 8 LOCAL 999 65-7-5 RENVILLE COUNTY VARIOUS LOCTIONS IN RENVILLE COUNTY, 6" WET. SH STRIPING HSIP 14,4 93,636 1,44 REFLECTIVE EPOXY EDGELINES 1245 8 LOCAL 999 65-7-6 RENVILLE COUNTY VARIOUS LOCATION IN RENVILLE COUNTY, 6". SH STRIPING HSIP 74,997 67,497 7,5 EDGELINES 1246 8 CSAH 3 87-7-5 YELLOW MEDICINE MN 68 TO YELLOW MEDICINE CSAH 11, MILLED IN 11. SH STRIPING HSIP 88,74 79,866 8,874 COUNTY 6" STRIPING 1266 8 MN 999 8828-133 MNDOT DISTRICTWIDE, GROUND IN STRIPING. SH STRIPING HSIP 11, 99, 11, September 213 HSIP Project Listing A-3 Page 6 of 17

Highway Safety Improvement Projects Fiscal Year: 214 STIP for FY 214-217 ATP 1267 8 MN 999 8816-1765 MNDOT **IDIQ** STATEWIDE RURAL INTERSECTION CONFLICT WARNING SYSTEM (RICWS) DESIGN BUILD PROJECT (CONTRACT MIN $1,977,785, CONTRACT MAX $6,,, EXPIRATION DATE 12-15-215) (DISTRICTWIDE SETA FOR RICWS PROJECT LET IN SFY 213). SH WARNING FLASHERS HSIP 38, 342, 38, 1271 8 MN 999 8828-158 MNDOT DISTRICTWIDE, GROUND IN STRIPING (SECTION. SH STRIPING HSIP 175, 175, 164 FUNDS) 1459 M CR 3 2-596-2 ANOKA COUNTY ON ANOKA CR 3 (COON RAPIDS BLVD) AT. SH SPOT HSIP 52, 468, 52, SPRINGBROOK DR IN COON RAPIDS-TRAFFIC SIGNAL REBUILD, LENGTHEN TURN LANES 146 M CSAH 5 2-65-18 ANOKA COUNTY ON ANOKA CSAH 5 AT ALPINE DRIVE IN RAMSEY-. SH GRADE AND HSIP 1,4, 936, 14, TRAFFIC SIGNAL, CONSTRUCT LEFT & RIGHT TURN SURFACE LANES 1463 M CSAH 78 2-678-2 ANOKA COUNTY ON ANOKA CSAH 78 (HANSON BLVD) AT ANOKA CSAH 2 (161ST AVE NW) IN ANDOVER- CONSTRUCT TRAFFIC SIGNAL, TURN LANES AT ALL LEGS. SH SPOT HSIP 1,3, 842,4 457,6 1469 M CSAH 32 19-632-28 DAKOTA COUNTY ON DAKOTA CSAH 32 AT NICOLLET AVE IN. SH GRADE AND HSIP 364, 327,6 36,4 BURNSVILLE-CONSTRUCT WB LEFT TURN LANE SURFACE AND CHANNELIZATION 147 M CSAH 32 19-632-34AC DAKOTA COUNTY **AC** DAKOTA CSAH 32(CLIFF RD) AT JOHNNY. SH TRAFFIC SIGNAL HSIP 618,75 618,75 CAKE RIDGE RD IN EAGAN-SIGNAL REBUILD, LEFT REVISION AND RIGHT TURN LANES (AC PAYBACK 1 OF 1) 1481 M CSAH 31 62-631-9 RAMSEY COUNTY ON RAMSEY CSAH 31 (MARYLAND AVE) AT PAYNE. SH SPOT HSIP 1,663,951 1,497,556 166,395 AVE IN ST PAUL-TRAFFIC SIGNAL REBUILD, DEVELOP DEDICATED LEFT TURN LANES 1483 M CSAH 2 7-62-2 SCOTT COUNTY **AC** AT SCOTT CSAH 46 IN NEW MARKET-. SH GRADE AND HSIP 148,5 1,336,5 148,5 ROUNDABOUT (AC PROJECT, PAYBACK IN FY15) SURFACE 1484 M CSAH 46 7-646-5AC SCOTT COUNTY **AC** AT CR 29 IN NEW MARKET-ROUNDABOUT. SH GRADE AND HSIP 369,283 369,283 (AC PAYBACK 1 OF 1) SURFACE 1511 M CSAH 17 166-2-14 SHAKOPEE ON SCOTT CSAH 17 FROM VIERLING DR TO TH 169. SH SPOT HSIP 2,22, 1,11,6 1,118,4 IN SHAKOPEE-TRAFFIC SIGNAL REBUILD INCLUDING TURN LANES 1554 M US 52 195-33 MNDOT AT 28TH/CSAH 86 IN RANDOLPH TWP - CONVERT MEDIAN TO 3/4 INTERSECTION WITH U TURNS AND CONSTRUCT LEFT TURN LANE FOR U TURN MOVEMENTS WITH 3/4 INTERSECTION. SH GRADE AND SURFACE HSIP 985, 886,5 98,5 1555 M US 52 196-57 MNDOT AT DAKOTA CSAH 66 IN VERMILLION TWP- 1. SH GRADE,SURFACE HSIP 1,, 9, 1, CONSTRUCT 3/4 INTERSECTION WITH MEDIAN U & BRIDGE TURNS AND CONSTRUCT LEFT TURN LANE September 213 HSIP Project Listing A-3 Page 7 of 17

Highway Safety Improvement Projects Fiscal Year: 214 STIP for FY 214-217 ATP 1599 M MN 999 8825-389 MNDOT METROWIDE-INSTALL RURAL INTERSECTION. SH LIGHTING HSIP 28, 187,2 2,8 LIGHTING 1611 M MN 999 88M-SHS-14 MNDOT METRO ATP SETASIDE FOR HSIP PROJECTS YET. SH SPOT HSIP 2,175,873 1,958,286 217,587 TO BE SELECTED FOR FY 214 224 C MN 999 8816-1972 MNDOT 5.5 TZD REGIONAL COORDINATORS (SECTION 164). SH TZD BEHAVIOR HSIP 485, 485, STRATEGIES 243 C MN 999 88C-HSP-14 MNDOT STRATEGIC HIGHWAY SAFETY PLAN. SH MEDIAN BARRIER HSIP 1,666,667 1,5, 166,667 INFRASTRUCTURE (STATEWIDE) 254 C MN 999 88C-SANC-14 MNDOT STRATEGIC HIGHWAY SAFETY PLAN. SH PAVEMENT HSIP 5,415, 5,415, INFRASTRUCTURE (STATEWIDE, SECTION 164) MARKING/CABLE BARRIER 259 C MN 999 88C-TZCO-14 MNDOT TZD ENFORCEMENT, EMS & OTHER SHSP. SH TZD BEHAVIOR HSIP 1,, 1,, BEHAVIOR STRATEGIES (SECTION 164) STRATEGIES $51,363,355 $44,634,264 $1,53,9 $ $1,22,314 $5,58,777 September 213 HSIP Project Listing A-3 Page 8 of 17

Highway Safety Improvement Projects Fiscal Year: 215 STIP for FY 214-217 ATP 76 1 CSAH 16-7-9 COOK COUNTY CURVE SIGNAGE S. SH SIGNING HSIP 237,6 213,84 23,76 77 1 CSAH 16-7-1 COOK COUNTY INTERSECTION SIGNING S PHASE I. SH SIGNING HSIP 2,15 18,135 2,15 78 1 CSAH 16-7-11 COOK COUNTY INTERSECTION SIGNING S PHASE II. SH SIGNING HSIP 23,85 21,465 2,385 79 1 CSAH 12 16-7-12 COOK COUNTY CSAH 12 SHOULDER S. SH SHOULDER HSIP 1, 9, 1, REPAIR 8 1 CSAH 16-7-13 COOK COUNTY INTERSECTION LIGHTING S. SH LIGHTING HSIP 24, 21,6 2,4 86 1 CSAH 69-7-13 ST LOUIS COUNTY CHEVRON SIGNING. SH SIGNING HSIP 234, 21,6 23,4 87 1 CSAH 69-7-14 ST LOUIS COUNTY EDGELINE RUMBLE STRIPS. SH MISCELLANEOUS HSIP 15, 94,5 1,5 88 1 CSAH 69-7-15 ST LOUIS COUNTY INTERSECTION LIGHTING. SH LIGHTING HSIP 13, 117, 13, 89 1 CSAH 69-7-16 ST LOUIS COUNTY INTERSECTION PAVEMENT MARKING. SH STRIPING HSIP 116, 14,4 11,6 9 1 CSAH 69-7-17 ST LOUIS COUNTY MAINLINE DYNAMIC WARNING SYSTEM. SH MISCELLANEOUS HSIP 135, 121,5 13,5 131 1 MN 999 881-SHS-15 MNDOT DISTRICTWIDE SETASIDE - MNDOT HSIP PROJECTS. SH SAFETY TARGET HSIP 768, 691,2 76,8 273 2 LOCAL 4-7-6AC BELTRAMI COUNTY **AC** COUNTY WIDE SHOULDER PAVING &. SH PAVE SHOULDER HSIP 35, 35, RUMBLE STRIPS (AC PAYBACK 1 OF 1) 274 2 LOCAL 4-7-7 BELTRAMI COUNTY COUNTY WIDE RUMBLE STRIPE. SH EDGELINE HSIP 229,578 26,62 22,958 RUMBLE STRIPS 275 2 LOCAL 4-7-8 BELTRAMI COUNTY COUNTY WIDE SHOULDER PAVING & RUMBLE. SH PAVE SHOULDER HSIP 25,496 225,446 25,5 STRIPS 277 2 LOCAL 15-7-5 CLEARWATER COUNTY WIDE SHOULDER PAVING, RUMBLE. SH PAVE SHOULDER HSIP 388,889 35, 38,889 COUNTY STRIPE & SAFETY WEDGE 28 2 LOCAL 6-7-6 POLK COUNTY COUNTY WIDE SHOULDER PAVING AND SAFETY. SH PAVE SHOULDER HSIP 18, 162, 18, WEDGE 281 2 LOCAL 6-7-7 POLK COUNTY COUNTY WIDE SHOULDER PAVING AND SAFETY. SH PAVE SHOULDER HSIP 2, 18, 2, WEDGE 282 2 LOCAL 88-7-39 LOCAL DISTRICT WIDE RUMBLE STRIPS. SH EDGELINE HSIP 466,667 42, 46,667 RUMBLE STRIPS 283 2 LOCAL 88-7-43AC LOCAL **AC** DISTRICT WIDE SIGNS AND MARKINGS (AC. SH SIGNING HSIP 214,435 214,435 PAYBACK 1 OF 1) 284 2 LOCAL 88-7-44 LOCAL DISTRICT WIDE GROUND IN WET REFLECTIVE EDGE STRIPING. SH STRIPING HSIP 683,4 615,6 68,34 September 213 HSIP Project Listing A-3 Page 9 of 17

Highway Safety Improvement Projects Fiscal Year: 215 STIP for FY 214-217 ATP 39 2 MN 999 882-SHS-15 MNDOT DISTRICTWIDE SETASIDE - MNDOT HSIP - 215. SH SAFETY TARGET HSIP 352,941 317,647 35,294 479 3 LOCAL 999 18-7-1 CROW WING INTERSECTION CONFLICT WARNING SYSTEM. SH MISCELLANEOUS HSIP 12, 18, 12, COUNTY 481 3 LOCAL 999 3-7-6 ISANTI COUNTY GROUND IN WET REFLECTIVE MARKINGS. SH STRIPING HSIP 295,711 266,14 29,571 483 3 LOCAL 999 48-7-1 MILLE LACS COUNTYWIDE 6" EDGELINE STRIPING. SH STRIPING HSIP 67,75 6,975 6,775 485 3 LOCAL 999 49-7-14 MORRISON COUNTY GROUND-IN PAVEMENT MESSAGES. SH MISCELLANEOUS HSIP 233, 29,7 23,3 487 3 LOCAL 999 71-7-24AC SHERBURNE **AC** CSAH 43 AND CSAH 5 INTERSECTION. SH TURN LANES HSIP 167,4 167,4 COUNTY S (AC PAYBACK 1 OF 1) 488 3 LOCAL 999 71-7-25 SHERBURNE VARIOUS COUNTY ROADS - 8" RUMBLE STRIP, 6". SH STRIPING HSIP 1, 9, 1, COUNTY EDGELINE STRIPE 489 3 CR 42 71-7-26 SHERBURNE 2' SHOULDER PAVING, SAFETY EDGE, 8" RUMBLE. SH STRIPING HSIP 94, 84,6 9,4 COUNTY STRIP, 6" EDGELINE STRIPE 49 3 CR 83 71-7-27 SHERBURNE 2' SHOULDER PAVING, SAFETY EDGE, 8" RUMBLE. SH STRIPING HSIP 95, 85,5 9,5 COUNTY STRIP, 6" EDGELINE STRIPE 491 3 CR 93 71-7-28 SHERBURNE 2' SHOULDER PAVING, SAFETY EDGE, 8" RUMBLE. SH STRIPING HSIP 91, 81,9 9,1 COUNTY STRIP, 6" EDGELINE STRIPE 492 3 CR 51 71-7-29 SHERBURNE 2' SHOULDER PAVING, SAFETY EDGE, 8" RUMBLE. SH STRIPING HSIP 117, 15,3 11,7 COUNTY STRIP, 6" EDGELINE STRIPE 493 3 CSAH 1 71-7-3 SHERBURNE 2' SHOULDER PAVING, SAFETY EDGE, 8" RUMBLE. SH STRIPING HSIP 16, 95,4 1,6 COUNTY STRIP, 6" EDGELINE STRIPE 496 3 LOCAL 999 77-7-6 TODD COUNTY GROUND IN WET REFLECTIVE PAVEMENT. SH STRIPING HSIP 296,667 267, 29,667 MARKING PROJECT 497 3 LOCAL 999 8-7-4 WADENA COUNTY INTERSECTION LIGHTING. SH LIGHTING HSIP 29,2 26,28 2,92 58 3 US 12 862-5 MNDOT INSTALL CONTINUOUS T-SIGNAL SYSTEM AT E JCT. SH TURN LANES HSIP 1,1, 99, 11, TH 25 S OF BUFFALO (HSIP PROJECT) 535 3 LOCAL 999 883-SHL-15 MNDOT DISTRICTWIDE SETASIDES - HIGHWAY SAFETY. SH SAFETY TARGET HSIP 27, 243, 27, PROGRAM - 215 536 3 MN 999 883-SHS-15 MNDOT DISTRICTWIDE SETASIDES - DISTRICT 3 HSIP - 215. SH SAFETY TARGET HSIP 144,444 13, 14,444 711 4 LOCAL 999 56-7-15 OTTER TAIL COUNTY 215 HSIP LANE DEPARTURE - SHOULDER PAVING AND RUMBLE STRIPS ON CURVES - PHASE IIA, IIB, IIC, IID, ASSOCIATED S.P. 56-7-16, S.P. 56-7- 17, S.P. 56-7-18. SH PAVE SHOULDER HSIP 1,234,14 1,11,726 123,414 September 213 HSIP Project Listing A-3 Page 1 of 17

Highway Safety Improvement Projects Fiscal Year: 215 STIP for FY 214-217 ATP 735 4 MN 999 884-SHS-15 MNDOT DISTRICTWIDE SAFETY S (STATE. SH MISCELLANEOUS HSIP 539,2 485,28 53,92 HSIP) - 215 912 6 LOCAL 999 66-7-12 RICE COUNTY RICE COUNTY ROADSIDE HAZARD ELIMINATION. SH SAFETY TARGET HSIP 3, 27, 3, 913 6 LOCAL 999 74-7-4 STEELE COUNTY 215 HSIP STRIPING PROJECT. SH STRIPING HSIP 57,46 51,714 5,746 95 6 MN 999 886-LT-15S MNDOT DISTRICTWIDE SETASIDES - LIGHTING - 215. SH LIGHTING HSIP 5, 45, 5, 959 6 LOCAL 999 886-SHL-15 LOCAL HSIP/HRRR SETASIDE - LOCAL - 215. SH SAFETY TARGET HSIP 1,23,776 1,17,698 123,78 96 6 MN 999 886-SHS-15 MNDOT DISTRICTWIDE SETASIDES - HSIP - 215. SH SAFETY TARGET HSIP 989,216 89,294 98,922 1147 7 LOCAL 999 887-SHL-15 LOCAL SETASIDE FOR LOCAL HSIP PROJECTS - 215. SH SAFETY TARGET HSIP 84,445 724, 8,445 1288 8 CSAH 15 12-7-4 CHIPPEWA COUNTY CHIPPEWA CSAH 2 TO MN 7, NARROW SHLD. 4. SH PAVE SHOULDER HSIP 226,35 23,715 22,635 PAVING 1291 8 LOCAL 999 51-7-3 MURRAY COUNTY VARIOUS LOCATIONS IN MURRAY COUNTY,. SH STRIPING HSIP 246,24 221,422 24,62 GROUND-IN WET REFLECTIVE STRIPING 1292 8 LOCAL 999 59-7-4 PIPESTONE VARIOUS LOCATIONS IN PIPESTONE COUNTY,. SH STRIPING HSIP 111,767 1,59 11,177 GROUND-IN WET REFLECTIVE WHITE EDGE STRIPING 1296 8 CSAH 4 87-7-6 YELLOW MEDICINE US 75 TO SOUTH DAKOTA LINE, MILLED IN 6" 13. SH STRIPING HSIP 96,39 86,751 9,639 COUNTY STRIPING 1297 8 CSAH 1 87-7-7 YELLOW MEDICINE LYON COUNTY LINE TO REDWOOD COUNTY LINE, 12. SH STRIPING HSIP 94,95 84,685 9,41 COUNTY MILLED IN 6" STRIPING 1318 8 MN 999 8828-134 MNDOT DISTRICTWIDE, GROUND IN STRIPING. SH STRIPING HSIP 1, 9, 1, 1319 8 MN 999 8816-1765 MNDOT **IDIQ** STATEWIDE RURAL INTERSECTION CONFLICT WARNING SYSTEM (RICWS) DESIGN BUILD PROJECT (CONTRACT MIN $1,977,785, CONTRACT MAX $6,,, EXPIRATION DATE 12-15-215) (DISTRICTWIDE SETA FOR RICWS PROJECT LET IN SFY 213). SH WARNING FLASHERS HSIP 39, 351, 39, 1332 8 MN 999 888-SHS-15 MNDOT DISTRICTWIDE SETASIDES - HSIP - 215. SH SAFETY TARGET HSIP 488,889 44, 48,889 1655 M CSAH 18 2-618-3 ANOKA COUNTY ANOKA CSAH 18 (BROADWAY AVE) AT CR 62. SH GRADE AND HSIP 55, 495, 55, (KETTLE RIVER BLVD) IN COLUMBUS-ROUNDABOUT SURFACE 1662 M CSAH 19 27-619-22 HENNEPIN COUNTY AT HENNEPIN CSAH 3 IN CORCORAN-. SH LIGHTING HSIP 27,5 24,75 2,75 INTERSECTION LIGHTING 1663 M CSAH 116 27-716-1 HENNEPIN COUNTY CR 116 AT CSAH 15 IN ROGERS-INTERSECTION. SH LIGHTING HSIP 27,5 24,75 2,75 LIGHTING September 213 HSIP Project Listing A-3 Page 11 of 17

Highway Safety Improvement Projects Fiscal Year: 215 STIP for FY 214-217 ATP 1666 M CSAH 1 62-61-4 RAMSEY COUNTY RAMSEY CSAH 1 & RAMSEY CO RD H, MOUNDS. SH SPOT HSIP 1,2, 63, 57, VIEW-INTERSECTION INCLUDING REPLACE TRAFFIC SIGNAL AND TURN LANES 1669 M CSAH 2 7-62-2AC SCOTT COUNTY **AC** AT SCOTT CSAH 46 IN NEW MARKET-. SH GRADE AND HSIP 1,336,5 1,336,5 ROUNDABOUT (AC PAYBACK 1 OF 1) SURFACE 1676 M LOCAL 999 17-444-7 BLOOMINGTON LINDAU LANE/IKEA WAY IN BLOOMINGTON-. SH MEDIAN BARRIER HSIP 1,232, 1,18,8 123,2 REMOVAL OF APPROXIMATELY 38FT OF MEDIAN 1679 M LOCAL 999 141-3-25 MINNEAPOLIS 17 INTERSECTIONS IN MPLS-INSTALL SPECIAL. SH SIGNING HSIP 187, 168,3 18,7 COLORED MARKING AND SIGNING TREATMENTS FOR BICYCLE CONFLICT ZONES 168 M LOCAL 999 141-211-14 MINNEAPOLIS 4TH AVE S BETWEEN 3RD ST S AND 11TH ST S IN. SH TRAFFIC SIGNAL HSIP 786,5 77,3 79,2 MPLS-OVERHEAD SIGNAL INDICATIONS AT 9 REVISION INTERSECTIONS 169 M LOCAL 999 189-12-11 MAPLE GROVE WEAVER LAKE RD AT DUNKIRK LANE IN MAPLE. SH GRADE AND HSIP 1,138,61 1,24,749 113,861 GROVE-CONVERT SIGNALIZED INTERSECTION TO SURFACE ROUNDABOUT 1775 M LOCAL 999 88M-SHL-15 MNDOT METRO ATP SETASIDE FOR HSIP PROJECTS YET. SH SPOT HSIP 7,21,946 6,489,851 721,95 TO BE SELECTED FOR FY 215 275 C MN 999 88C-HSIP-15 MNDOT ADDITIONAL MAP 21 GREATER MN STATE HSIP. SH SAFETY TARGET HSIP 2,666,666 2,4, 266,666 SET ASIDE FOR 215 276 C MN 999 88C-HSP-15 MNDOT STRATEGIC HIGHWAY SAFETY PLAN. SH MEDIAN BARRIER HSIP 1,666,667 1,5, 166,667 INFRASTRUCTURE (STATEWIDE) 288 C MN 999 88C-SANC-15 MNDOT STRATEGIC HIGHWAY SAFETY PLAN. SH PAVEMENT HSIP 3,715, 3,715, INFRASTRUCTURE (STATEWIDE, SECTION 164) MARKING/CABLE BARRIER 296 C MN 999 88C-TZCE-15 MNDOT TZD SAFETY EDUCATION (PAID. SH TZD BEHAVIOR HSIP 95, 95, MEDIA/WORKSHOPS/CONFERENCES/OTHER, STRATEGIES SECTION 164) 297 C MN 999 88C-TZDC-15 MNDOT TZD REGIONAL COORDINATOR POSITIONS. SH TZD BEHAVIOR HSIP 485, 485, (SECTION 164) STRATEGIES 298 C MN 999 88C-TZDO-15 MNDOT TZD ENFORCEMENT, EMS & OTHER SHSP. SH TZD BEHAVIOR HSIP 1,75, 1,75, BEHAVIOR STRATEGIES (SECTION 164) STRATEGIES $4,425,819 $36,829,518 $ $ $758,935 $2,837,366 September 213 HSIP Project Listing A-3 Page 12 of 17

Highway Safety Improvement Projects Fiscal Year: 216 STIP for FY 214-217 ATP 144 1 CSAH 69-7-18 ST LOUIS COUNTY 216 GROUND IN WET REFLECTIVE EDGELINE. SH STRIPING HSIP 42, 37,8 4,2 18 1 LOCAL 999 881-SHL-16 LOCAL DISTRICTWIDE SETASIDE - LOCAL HSIP/HRRR. SH SAFETY TARGET HSIP 748, 673,2 74,8 PROJECTS 181 1 MN 999 881-SHS-16 MNDOT DISTRICTWIDE SETASIDE - MNDOT HSIP PROJECTS. SH SAFETY TARGET HSIP 79, 711, 79, 314 2 LOCAL 4-7-1 BELTRAMI COUNTY COUNTY WIDE MAINLINE DYNAMIC WARNING. SH TRAFFIC MGMT. HSIP 66,667 6, 6,667 SYSTEM SYSTEM 315 2 LOCAL 4-7-11 BELTRAMI COUNTY COUNTY WIDE SHOULDER PAVING, RESURFACING. SH PAVE SHOULDER HSIP 24, 183,6 2,4 AND SAFETY WEDGE 316 2 LOCAL 4-7-12 BELTRAMI COUNTY COUNTY WIDE SHOULDER PAVING & RUMBLE. SH PAVE SHOULDER HSIP 18,712 97,841 1,871 STRIPS 317 2 LOCAL 4-7-13 BELTRAMI COUNTY COUNTY WIDE INSTALL STREET LIGHTS. SH LIGHTING HSIP 84, 75,6 8,4 319 2 LOCAL 45-7-3 MARSHALL COUNTY COUNTY WIDE SHOULDER PAVING & RUMBLE. SH PAVE SHOULDER HSIP 388,889 35, 38,889 STRIPS 321 2 LOCAL 57-7-4 PENNINGTON COUNTY WIDE SHOULDER PAVING, RUMBLE. SH PAVE SHOULDER HSIP 388,889 35, 38,889 COUNTY STRIPE & SAFETY WEDGE 322 2 LOCAL 57-7-5 PENNINGTON COUNTY WIDE INTERSECTION LIGHTING. SH LIGHTING HSIP 18, 16,2 1,8 COUNTY 323 2 LOCAL 57-7-6 PENNINGTON COUNTY WIDE RUMBLE STRIPE. SH EDGELINE HSIP 12, 1,8 1,2 COUNTY RUMBLE STRIPS 328 2 LOCAL 63-7-2 RED LAKE COUNTY COUNTY WIDE RURAL INTERSECTION ADVISORY. SH TRAFFIC MGMT. HSIP 38,5 34,65 3,85 LIGHTING AT VARIOUS LOCATIONS SYSTEM 329 2 LOCAL 68-7-2 ROSEAU COUNTY COUNTY WIDE INTERSECTION PROJECTS. SH SAFETY TARGET HSIP 161,45 145,35 16,145 355 2 MN 999 882-SHS-16 MNDOT DISTRICTWIDE SETASIDE - MNDOT HSIP - 216. SH SAFETY TARGET HSIP 352,941 317,647 35,294 557 3 LOCAL 999 77-7-7 TODD COUNTY TODD COUNTY SIX INCH EDGE LINE PAVEMENT. SH STRIPING HSIP 166,667 15, 16,667 MARKING PROJECT 564 3 MN 15 7321-51S MNDOT.1 MI N OF JCT TH 23 TO S END OF BRIDGE #511 OVER MISSISSIPPI RIVER, MILL AND, INCLUDE CONSTRUCT DUAL SB LEFT TURN LANES AT 12TH ST N IN ST. CLOUD (HSIP PROJECT). SH TURN LANES HSIP 36, 324, 36, 568 3 MN 55 867-59 MNDOT AT WRIGHT CO CSAH 14 (EBL), CONSTRUCT LEFT. SH TURN LANES HSIP 45, 45, 45, TURN LANE AND DETACHED RIGHT TURN LANE (HSIP PROJECT) 575 3 US 169 4812-86S MNDOT **ELLA** MILLE LACS CO CSAH 11/19TH ST N OF 6. SH MILL AND HSIP 133, 119,7 13,3 MILACA TO RUM RIVER REST AREA (NB), MILL &, INCL. TURN LANE EXTENSIONS September 213 HSIP Project Listing A-3 Page 13 of 17

Highway Safety Improvement Projects Fiscal Year: 216 STIP for FY 214-217 ATP 586 3 LOCAL 999 883-SHL-16 MNDOT DISTRICTWIDE SETASIDES - HIGHWAY SAFETY. SH SAFETY TARGET HSIP 1,911,764 1,72,588 191,176 PROGRAM - 216 587 3 MN 999 883-SHS-16 MNDOT DISTRICTWIDE SETASIDES - DISTRICT 3 HSIP - 216. SH SAFETY TARGET HSIP 31,444 271,3 3,144 77 4 LOCAL 999 884-SHL-16 LOCAL DISTRICTWIDE SETASIDES - SAFETY (LOCAL. SH STRIPING HSIP 666, 599,4 66,6 HSIP) - 216 771 4 MN 999 884-SHS-16 MNDOT DISTRICTWIDE SAFETY S (STATE. SH MISCELLANEOUS HSIP 539,2 485,28 53,92 HSIP) - 216 14 6 MN 999 886-LT-16S MNDOT DISTRICTWIDE SETASIDES - LIGHTING - 216. SH LIGHTING HSIP 5, 45, 5, 111 6 LOCAL 999 886-SHL-16 LOCAL HSIP/HRRR SETASIDE - LOCAL - 216. SH SAFETY TARGET HSIP 1,588,236 1,429,412 158,824 112 6 MN 999 886-SHS-16 MNDOT DISTRICTWIDE SETASIDES - HSIP - 216. SH SAFETY TARGET HSIP 989,216 89,294 98,922 1182 7 LOCAL 999 887-SHL-16 LOCAL SETASIDE FOR LOCAL HSIP PROJECTS - 216. SH SAFETY TARGET HSIP 84,445 724, 8,445 1183 7 MN 999 887-SHS-16 MNDOT DISTRICTWIDE SETASIDES - MNDOT HSIP. SH SAFETY TARGET HSIP 49, 441, 49, PROJECTS - 216 1338 8 CSAH 6 12-7-5 CHIPPEWA COUNTY MN 7 TO MN 4, NARROW SHLD PAVING 11. SH PAVE SHOULDER HSIP 54,54 486,486 54,54 134 8 LOCAL 999 34-7-7 KANDIYOHI COUNTY VARIOUS LOCATIONS IN KANDIYOHI COUNTY, 6". SH STRIPING HSIP 39,498 278,548 3,95 EDGE STRIPE & HIGH BUILD SOLID LINE WHITE PAINT (WR) GROUND-IN 1372 8 MN 999 888-SHS-16 MNDOT DISTRICTWIDE SETASIDES - HSIP - 216. SH SAFETY TARGET HSIP 488,889 44, 48,889 1819 M CSAH 8 19-68-1 DAKOTA COUNTY DAKOTA CSAH 8 (WENTWORTH AVE) AT DAKOTA. SH GRADE AND HSIP 896, 86,4 89,6 CSAH 73 (OAKDALE AVE) IN W ST. PAUL- SURFACE ROUNDABOUT 1831 M LOCAL 999 141-3-23 MINNEAPOLIS 35TH AND 36TH ST BETWEEN PARK AVE AND. SH TRAFFIC SIGNAL HSIP 1,344, 1,29,6 134,4 BLAISDALE AVE IN MPLS-CONSTRUCT OVERHEAD REVISION SIGNAL INDICATIONS AT 16 INTERSECTIONS 1832 M LOCAL 999 141-3-24 MINNEAPOLIS 38 SIGNALIZED INTERSECTIONS IN MPLS-INSTALL. SH TRAFFIC SIGNAL HSIP 341,6 36,88 34,72 PEDESTRIAN COUNTDOWN SIGNALS INST. 1838 M MN 5 12-1 MNDOT E AND W JCT MN11 IN CHANHASSEN- 1. SH GRADE AND HSIP 1,68, 1,512, 168, ACCELERATION LANES SURFACE 1855 M MN 47 26-65 MNDOT AT 142ND AVENUE IN RAMSEY-RECONSTRUCT. SH SPOT HSIP 28, 252, 28, CENTER RAISED MEDIAN TO GAIN POSITIVE OFFSET FOR NB AND SB LEFT TURN LANES 1894 M LOCAL 999 88M-SHL-16 MNDOT METRO ATP SETASIDE FOR HSIP PROJECTS YET. SH SPOT HSIP 9,2,244 8,118,22 92,24 TO BE SELECTED FOR FY 216 September 213 HSIP Project Listing A-3 Page 14 of 17

Highway Safety Improvement Projects Fiscal Year: 216 STIP for FY 214-217 ATP 2113 C MN 999 88C-HSIP-16 MNDOT ADDITIONAL MAP-21 GREATER MN STATE HSIP. SH SAFETY TARGET HSIP 2,777,777 2,5, 277,777 SET ASIDE FOR 216 2114 C MN 999 88C-HSP-16 MNDOT STRATEGIC HIGHWAY SAFETY PLAN. SH MEDIAN BARRIER HSIP 1,666,667 1,5, 166,667 INFRASTRUCTURE (STATEWIDE) 2128 C MN 999 88C-SANC-16 MNDOT STRATEGIC HIGHWAY SAFETY PLAN. SH PAVEMENT HSIP 3,715, 3,715, INFRASTRUCTURE (STATEWIDE, SECTION 164) MARKING/CABLE BARRIER 2134 C MN 999 88C-TZCE-16 MNDOT TZD SAFETY EDUCATION (PAID. SH TZD BEHAVIOR HSIP 95, 95, MEDIA/WORKSHOPS/CONFERENCES/OTHER, STRATEGIES SECTION 164) 2135 C MN 999 88C-TZDC-16 MNDOT TZD REGIONAL COORDINATOR POSITIONS. SH TZD BEHAVIOR HSIP 485, 485, (SECTION 164) STRATEGIES 2136 C MN 999 88C-TZDO-16 MNDOT TZD ENFORCEMENT, EMS & OTHER SHSP. SH TZD BEHAVIOR HSIP 1,75, 1,75, BEHAVIOR STRATEGIES (SECTION 164) STRATEGIES $38,99,235 $34,978,751 $ $ $968,246 $2,152,238 September 213 HSIP Project Listing A-3 Page 15 of 17

Highway Safety Improvement Projects Fiscal Year: 217 STIP for FY 214-217 ATP 26 1 US 169 6934-117 MNDOT IN HIBBING JCT TH 169/TH 37 INTERSECTION. SH SIGNAL REVISION HSIP 1,333,333 1,2, 133,333 MODIFICATION (TIED TO 6934-116) 219 1 LOCAL 999 881-SHL-17 LOCAL DISTRICTWIDE SETASIDE - LOCAL HSIP/HRRR. SH SAFETY TARGET HSIP 1,444,444 1,3, 144,444 PROJECTS 378 2 LOCAL 999 882-SHL-17 LOCAL DISTRICTWIDE - LOCAL HSIP - 217. SH SAFETY TARGET HSIP 888,889 8, 88,889 379 2 MN 999 882-SHS-17 MNDOT DISTRICTWIDE SETASIDE - MNDOT HSIP - 217. SH SAFETY TARGET HSIP 777,778 7, 77,778 635 3 LOCAL 999 883-SHL-17 MNDOT DISTRICTWIDE SETASIDES - HIGHWAY SAFETY. SH SAFETY TARGET HSIP 2,888,889 2,6, 288,889 PROGRAM - 217 636 3 MN 999 883-SHS-17 MNDOT DISTRICTWIDE SET ASIDES - DISTRICT 3 HSIP - 217. SH SAFETY TARGET HSIP 2,111,111 1,9, 211,111 88 4 LOCAL 999 884-SHL-17 LOCAL DISTRICTWIDE SETASIDES - SAFETY (LOCAL. SH STRIPING HSIP 1,222,222 1,1, 122,222 HSIP) - 217 89 4 MN 999 884-SHS-17 MNDOT DISTRICTWIDE SAFETY S (STATE. SH MISCELLANEOUS HSIP 1,, 9, 1, HSIP) - 217 154 6 LOCAL 999 886-SHL-17 LOCAL HSIP SETASIDE - LOCAL - 217. SH SAFETY TARGET HSIP 2,444,444 2,2, 244,444 155 6 MN 999 886-SHS-17 MNDOT DISTRICTWIDE SETASIDES - HSIP - 217. SH SAFETY TARGET HSIP 1,555,555 1,4, 155,555 1218 7 LOCAL 999 887-SHL-17 LOCAL SETASIDE FOR LOCAL HSIP PROJECTS - 217. SH SAFETY TARGET HSIP 1,556, 1,4, 156, 1219 7 MN 999 887-SHS-17 MNDOT DISTRICTWIDE SETASIDES - MNDOT HSIP. SH SAFETY TARGET HSIP 1,111, 1,, 111, PROJECTS - 217 147 8 LOCAL 999 888-SHL-17 DISTRICTWIDE DISTRICTWIDE LOCAL SETASIDES - HSIP - 216. SH SAFETY TARGET HSIP 1,222,222 1,1, 122,222 148 8 MN 999 888-SHS-17 MNDOT DISTRICTWIDE SETASIDES - HSIP - 217. SH SAFETY TARGET HSIP 1,111,111 1,, 111,111 197 M LOCAL 999 88M-SHL-17 MNDOT METRO ATP SETASIDE FOR HSIP PROJECTS YET. SH SPOT HSIP 9,222,222 8,3, 922,222 TO BE SELECTED FOR FY 217 1971 M MN 999 88M-SHS-17 MNDOT METRO SETASIDE FOR HSIP FOR FY 217. SH SPOT HSIP 4,111,111 3,7, 411,111 2165 C MN 999 88C-SANC-17 MNDOT STRATEGIC HIGHWAY SAFETY PLAN. SH PAVEMENT HSIP 3,715, 3,715, INFRASTRUCTURE (STATEWIDE, SECTION 164) MARKING/CABLE BARRIER 2171 C MN 999 88C-TZCE-17 MNDOT TZD SAFETY EDUCATION (PAID. SH TZD BEHAVIOR HSIP 95, 95, MEDIA/WORKSHOPS/CONFERENCES/OTHER, STRATEGIES SECTION 164) 2172 C MN 999 88C-TZDC-17 MNDOT TZD REGIONAL COORDINATOR POSITIONS. SH TZD BEHAVIOR HSIP 485, 485, (SECTION 164) STRATEGIES September 213 HSIP Project Listing A-3 Page 16 of 17

Highway Safety Improvement Projects Fiscal Year: 217 STIP for FY 214-217 ATP 2173 C MN 999 88C-TZDO-17 MNDOT TZD ENFORCEMENT, EMS & OTHER SHSP. SH TZD BEHAVIOR HSIP 1,75, 1,75, BEHAVIOR STRATEGIES (SECTION 164) STRATEGIES $4,9,331 $37,5, $ $ $1,31,999 $2,89,332 September 213 HSIP Project Listing A-3 Page 17 of 17

Transit Programs FTA Public Transit Urbanized Area Formula Program (Section 537) Capital Program (Section 539) Elderly and Persons with Disabilities Program (Section 531) Public Transit Non - Urbanized Area Formula Program (Section 5311) Inner - City Bus Program (Section 5311(f)) Job Access - Reverse Commute Program (Section 5316) New Freedom Program (Section 5317) Bus and Bus Facilities (Section 5339) State of Good Repair (Section 5337) FHWA Surface Transportation Program -Transit Capital Congestion Mitigation & Air Quality (CMAQ) FHWA Earmarks A-4

TRANSIT PROGRAMS Federal Transit Administration (FTA) A portion of the federal gas tax is placed in the Mass Transit Account of the Federal Highway Trust Fund. These funds are reserved for transit purposes and are managed by the FTA. Transit funding authorized by MAP-21 is managed in several different ways. Some transit funding is distributed by formula or grant applications and some is allocated to the states and/or transit authorities by FTA. and Air Quality (CMAQ). STP and CMAQ transit projects are prioritized by the ATP. Transit funding from FTA and FHWA is estimated in Figure A-3. Each of these programs is displayed in the Program Listing section of this document. In Minnesota, FTA transit allocations for rural and small urban transit capital and operating assistance are managed by MnDOT s Office of Transit (OT). These formula programs include the Enhanced Mobility of Seniors and Individuals with Disabilities Program (capital assistance) and the Rural Area Formula Program (capital and operating assistance). The Urbanized Area Formula Program (capital and operating assistance for urbanized areas with populations over 5,) is provided directly to the urbanized area transit agency by FTA. In addition, FTA directly allocates Bus and Bus Facilities Formula Program funds to the states and/or transit agencies in urbanized areas for major capital needs such as fleet replacement and construction of transit facilities. Federal Highway Administration (FHWA) An investment in transit capital is eligible for federal highway funding under MAP-21 through the Surface Transportation Program (STP) or Congestion Mitigation A-4(1)

Figure A-3 TRANSIT FUNDING BY SOURCE AND YEAR ($ MILLIONS) SOURCE PROGRAM 214 215 216 217 TOTAL* FTA Public Transit Urbanized Area Formula Program (Section 537) Capital Program (Section 539) Elderly and Persons with Disabilities Program (Sect 531) Non-Urbanized Area & Inner City Bus (Section 5311 & 5311(f)) Job Access & Reverse Commute Program (Section 5316) New Freedom Program (Section 5317) State of Good Repair (Section 5337) Bus and Bus Facilities (Section 5339) *may not total correctly due to rounding B9 92.3 89.4 51.3 76.2 39.3 B3 98.4 23.7 1. 1. 52.2 NB 3.7 3.8 3.7 3.7 14.9 OB 17.5 17.8 17.8 17.8 7.9 JA.5.5...6 NF.4.1...5 GR 1.6 2.5 6.6 6.5 17.2 BB 1.9 1.9 1.9 1.9 7.6 SUBTOTAL FTA 216.5 319.4 181.3 26.1 923.3 FHWA Transit Capital (STP) TR 6.6 4.9 7.3 4.3 23.1 Congestion Mitigation & Air Quality (CMAQ) TM, TR A-4(2) 26.1 18. 17.5 27.4 89. SUBTOTAL FHWA 32.7 22.9 24.8 31.7 112.1 TOTAL* 249.3 342.1 26.1 237.9 1,35.4

FTA SECTION 537 Fiscal Year: 214 STIP for FY 214-217 1 BB TRF-16-14A DULUTH TRANSIT SECT 537: DULUTH DIAL-A-RIDE TRANSIT OPERATING. B9 OPERATE BUS LF 594,14 594,14 AUTHORITY ASSISTANCE 2 BB TRF-16-14B DULUTH TRANSIT SECT 537: OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,7,51 1,4, 5,67,51 AUTHORITY 3 BB TRF-16-14C DULUTH TRANSIT SECT 537: FACILITY MAINTENANCE, UPGRADES AND. B9 BUS GRANT FTA 699,856 55, 149,856 AUTHORITY REHAB 4 BB TRF-16-14D DULUTH TRANSIT SECT 537: PASSENGER AMENITIES. B9 OPERATE BUS FTA 3,965,29 15, 3,815,29 AUTHORITY 223 BB TRF-18-14A EAST GRAND SECT 537: EAST GRAND FORKS DAR TRANSIT. B9 OPERATE BUS LF 63, 63, FORKS OPERATING ASSISTANCE 224 BB TRF-18-14B EAST GRAND SECT 537: EAST GRAND FORKS FIXED ROUTE TRANSIT. B9 OPERATE BUS FTA 248, 77, 171, FORKS OPERATING ASSISTANCE 225 BB TRF-18-14C EAST GRAND SECT 537: EAST GRAND FORKS INSTALLATION OF. B9 BUS GRANT FTA 2, 16, 4, FORKS DESIGNATED BUS STOPS 38 BB TRF-48-14B METRO BUS SECT 537: FIXED ROUTE TRANSIT SERVICE OPERATING. B9 OPERATE BUS FTA 6,837,659 1,162,659 5,675, ASSISTANCE 381 BB TRF-48-14D METRO BUS SECT 537: TRANSIT PURCHASES, OFFICE. B9 BUS GRANT FTA 25, 2, 5, EQUIPMENT & COMPUTERS 382 BB TRF-48-14E METRO BUS SECT 537: TRANSIT PURCHASES,. B9 BUS GRANT FTA 1, 8, 2, MAINTENANCE TOOLS & EQUIPMENT 383 BB TRF-48-14F METRO BUS SECT 537: TRANSIT IZED PREVENTIVE. B9 BUS GRANT FTA 1,343,211 1,74,569 268,642 MAINTENANCE 384 BB TRF-48-14O METRO BUS SECT 537: TRANSIT PURCHASES, 2 SMALL. B9 BUS GRANT FTA 36, 288, 72, BUSES 385 BB TRF-48-14V METRO BUS SECT 537: TRANSIT PURCHASES, BUS. B9 BUS GRANT FTA 25, 2, 5, SHELTER AMENITY PROGRAM 386 BB TRF-48-14W METRO BUS SECT 537: TRANSIT PURCHASE, ITS PROJECTS. B9 BUS GRANT FTA 5, 4, 1, September 213 Project Listing A-4 Page 3 of 52

FTA SECTION 537 Fiscal Year: 214 STIP for FY 214-217 638 BB TRF-34-14A MOORHEAD SECT 537: PARATRANSIT AND METRO SENIOR RIDE. B9 OPERATE BUS FTA 394, 87, 37, OPERATING ASSISTANCE 639 BB TRF-34-14B MOORHEAD SECT 537: CITY OF MOORHEAD TRANSIT OPERATING. B9 OPERATE BUS FTA 1,72, 449, 1,271, ASSISTANCE 64 BB TRF-34-14C MOORHEAD SECT 537: MOORHEAD TRANSIT PLANNING ASSISTANCE. B9 PLANNING FTA 22, 18, 4, 641 BB TRF-34-14D MOORHEAD SECT 537: MOORHEAD TRANSIT PREVENTIVE. B9 PREVENTIVE FTA 2, 16, 4, MAINTENANCE MAINTENANCE 642 BB TRF-34-14E MOORHEAD SECT 537: CITY OF MOORHEAD, REPLACEMENT OF ONE. B9 PURCHASE BUS FTA 7, 59,5 1,5 PARATRANSIT VEHICLE WITH CLASS 4 AND BUS RELATED EQUIPMENT 643 BB TRF-34-14F MOORHEAD SECT 537: CITY OF MOORHEAD, REPLACEMENT OF ONE. B9 PURCHASE BUS FTA 25, 2, 5, VAN FOR METRO SENIOR RIDE AND BUS RELATED EQUIPMENT 644 BB TRF-34-14G MNDOT SECT 537: CITY OF MOORHEAD PURCHASE BUS. B9 PURCHASE BUS FTA 5, 4, 1, RELATED EQUIPMENT 646 BB TRS-34-14 MOORHEAD SECT 537: CITY OF MOORHEAD, PURCHASE ONE BUS. B9 PURCHASE BUS STP 7, 56, 14, (CLASS 4) AND BUS RELATED EQUIPMENT 813 BB TRF-47-14A ROCHESTER SECT 537: ROCHESTER DAR TRANSIT OPERATING. B9 OPERATE BUS LF 676,785 676,785 ASSISTANCE 814 BB TRF-47-14B ROCHESTER SECT 537: ROCHESTER RR TRANSIT OPERATING. B9 OPERATE BUS FTA 6,644,54 1,735,856 4,98,198 ASSISTANCE 815 BB TRF-47-14C ROCHESTER SECT 537: ELECTRONIC FAREBOXES/OTHER ITS. B9 BUS GRANT FTA 1,5, 1,2, 3, 816 BB TRF-47-14D ROCHESTER SECT 537: DOWNTOWN BUS STOP S. B9 BUS GRANT FTA 5, 4, 1, 817 BB TRF-47-14E ROCHESTER SECT 537: ROCHESTER RR - PURCHASE 3 BUSES. B9 PURCHASE BUS FTA 1,236, 988,8 247,2 (CLASS 7) 818 BB TRF-378-14 LA CRESCENT SECT 537: LA CRESCENT TRANSIT OPERATING. B9 OPERATE BUS FTA 187,779 44, 143,779 ASSISTANCE 161 BB TRF-28-14 MNDOT SECT 537: CITY OF MANKATO RR TRANSIT OPERATING. B9 OPERATE BUS FTA 1,751, 435,755 1,315,245 ASSISTANCE September 213 Project Listing A-4 Page 4 of 52

FTA SECTION 537 Fiscal Year: 214 STIP for FY 214-217 1411 BB TRF-TCMT-14 MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ASSOCIATED. B9 BUS GRANT FTA 1,241,871 993,497 248,374 MAINTENANCE-BUS 1412 BB TRF-TCMT-14A MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 PURCHASE BUS FTA 2,769,241 2,215,393 553,848 LEASE-TIRES 1413 BB TRF-TCMT-14AA MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-OPERATIONS. B9 BUS GRANT FTA 1,1, 88, 22, COMMUNICATIONS & CONTROL EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1414 BB TRF-TCMT-14AC MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FARE. B9 BUS GRANT FTA 5, 4, 1, COLLECTION EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1415 BB TRF-TCMT-14AF MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-RENEWABLE. B9 BUS GRANT FTA 75, 6, 15, ENERGY INITIATIVES 1416 BB TRF-TCMT-14AJ MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-OVERHAUL. B9 BUS GRANT FTA 1,7, 1,36, 34, BASE RENOVATION AND MAINTENANCE SHOP 1417 BB TRF-TCMT-14AK MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ONBOARD. B9 BUS GRANT FTA 752, 61,6 15,4 PEDESTRIAN DETECTION SYSTEM TRANSIT TECHNOLOGY SYSTEMS 1418 BB TRF-TCMT-14AL MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-RTS TRANSIT. B9 BUS GRANT FTA 4,, 3,2, 8, TECHNOLOGY SYSTEMS 1419 BB TRF-TCMT-14AP MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-U OF M. B9 BUS GRANT FTA 6, 48, 12, LAYOVER 1421 BB TRF-TCMT-14AT MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-SNELLING. B9 BUS GRANT FTA 1,7, 1,36, 34, AVENUE ARTERIAL BRT 1422 BB TRF-TCMT-14AU MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-I35W. B9 BUS GRANT FTA 1,795,415 1,436,332 359,83 BRT/EXPRESS SERVICE 1423 BB TRF-TCMT-14AV MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-MAJOR. B9 BUS GRANT FTA 1,25, 1,, 25, TO SUPPORT FACILITIES 1424 BB TRF-TCMT-14AW MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PUBLIC. B9 BUS GRANT FTA 312,5 25, 62,5 SUPPORT FACILITIES REFURBISHMENT September 213 Project Listing A-4 Page 5 of 52

FTA SECTION 537 Fiscal Year: 214 STIP for FY 214-217 1426 BB TRF-TCMT-14AY MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ANISHINABE. B9 BUS GRANT FTA 2, 16, 4, PARK & RIDE 1427 BB TRF-TCMT-14AZ MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-DOWNTOWN. B9 BUS GRANT FTA 75, 6, 15, MINNEAPOLIS BUS LAYOVER 1428 BB TRF-TCMT-14B MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-BUS. B9 PURCHASE BUS FTA 38,66,225 32,356,291 5,79,934 ACQUISITION 1429 BB TRF-TCMT-14BA MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-CENTRAL. B9 BUS GRANT FTA 1,45, 1,16, 29, CORRIDOR BUS FACILITIES & COMO PARK FACILITY S 143 BB TRF-TCMT-14BC MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-DT MPLS. B9 BUS GRANT FTA 1,6, 1,28, 32, LIGHT RAIL NORTH PLATFORM AT NICOLLET MALL STATION 1431 BB TRF-TCMT-14C MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PREVENTIVE. B9 BUS GRANT FTA 5,, 4,, 1,, MAINTENANCE 1432 BB TRF-TCMT-14D MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 BUS GRANT FTA 1,125, 9, 225, SECURITY/SAFETY FOR 1% 1433 BB TRF-TCMT-14E MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 1,715, 1,372, 343, ENHANCEMENTS 1% 1434 BB TRF-TCMT-14F MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 1,33, 938,16 364,84 BUSINESS COMPUTER HW & SW 1435 BB TRF-TCMT-14H MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-METRO. B9 BUS GRANT FTA 5,312,5 4,25, 1,62,5 MOBILITY COST OF CONTRACTING FOR SERVICES 1436 BB TRF-TCMT-14J MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-REGIONAL. B9 BUS GRANT FTA 3,75, 3,, 75, FLEET COST OF CONTRACTING 1437 BB TRF-TCMT-14K MET COUNCIL-U SECT 537: TWIN CITIES MET COUNCIL U OF M-U OF MN. B9 PURCHASE BUS FTA 343,75 275, 68,75 OFM BUS ACQUISITION 1438 BB TRF-TCMT-14L MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-MTS BUS. B9 PURCHASE BUS FTA 8,, 6,4, 1,6, ACQUISITION September 213 Project Listing A-4 Page 6 of 52

FTA SECTION 537 Fiscal Year: 214 STIP for FY 214-217 1439 BB TRF-TCMT-14T MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-NEW POLICE. B9 BUS GRANT FTA 12,, 9,6, 2,4, FACILITY 144 BB TRF-TCMT-14X MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FORT. B9 BUS GRANT FTA 14, 112, 28, SNELLING P&R EXPANSION 1441 BB TRF-TCMT-14Z MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ENERGY. B9 BUS GRANT FTA 1,, 8, 2, $136,494,3 $56, $ $92,352,412 $ $44,85,618 September 213 Project Listing A-4 Page 7 of 52

FTA SECTION 537 Fiscal Year: 215 STIP for FY 214-217 66 BB TRF-16-15A DULUTH TRANSIT SECT 537: DULUTH DIAL-A-RIDE TRANSIT OPERATING. B9 OPERATE BUS LF 611,927 611,927 AUTHORITY ASSISTANCE 67 BB TRF-16-15B DULUTH TRANSIT SECT 537: OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,7,51 1,4, 5,67,51 AUTHORITY 68 BB TRF-16-15C DULUTH TRANSIT SECT 537: DULUTH TRANSIT. B9 BUS GRANT FTA 875, 7, 175, AUTHORITY 69 BB TRF-16-15D DULUTH TRANSIT SECT 537: PREVENTATIVE MAINTENANCE. B9 OPERATE BUS LF 3,965,29 3,965,29 AUTHORITY 38 BB 882-SETASIDE- 15 EAST GRAND FORKS SECT 537: TRANSIT OPERATING ASSISTANCE AND. B9 OPERATE BUS/BUS GRANT FTA LF 384, 13, 254, 465 BB TRF-48-15B METRO BUS SECT 537:ST. CLOUD FR TRANSIT OPERATING. B9 OPERATE BUS FTA 7,174,286 1,174,286 6,, ASSISTANCE 466 BB TRF-48-15D METRO BUS SECT 537: TRANSIT PURCHASES OFFICE. B9 BUS GRANT FTA 25, 2, 5, EQUIPMENT AND COMPUTERS 467 BB TRF-48-15E METRO BUS SECT 537: TRANSIT PURCHASES. B9 BUS GRANT FTA 1, 8, 2, MAINTENANCE TOOLS AND EQUIPMENT 468 BB TRF-48-15F METRO BUS SECT 537: IZED PREVENTIVE MAINTENANCE. B9 BUS GRANT FTA 1,237,858 988,286 249,572 469 BB TRF-48-15V METRO BUS SECT 537: TRANSIT PURCHASE, BUS SHELTER. B9 BUS GRANT FTA 2, 16, 4, TRANSIT AMENITY 47 BB TRF-48-15W METRO BUS SECT 537: TRANSIT PURCHASE, ITS PROJECTS. B9 BUS GRANT FTA 25, 2, 5, 693 BB TRF-34-15A MOORHEAD SECT 537: PARATRANSIT AND METRO SENIOR RIDE. B9 OPERATE BUS FTA 429, 94, 335, OPERATING ASSISTANCE 694 BB TRF-34-15D MOORHEAD SECT 537: MOORHEAD TRANSIT PREVENTIVE. B9 PREVENTIVE FTA 2, 16, 4, MAINTENANCE MAINTENANCE 695 BB TRF-34-15B MOORHEAD SECT 537: CITY OF MOORHEAD TRANSIT OPERATING. B9 OPERATE BUS FTA 2,4, 592, 1,448, ASSISTANCE September 213 Project Listing A-4 Page 8 of 52

FTA SECTION 537 Fiscal Year: 215 STIP for FY 214-217 696 BB TRF-34-15C MOORHEAD SECT 537: MOORHEAD PLANNING ASSISTANCE. B9 PLANNING FTA 22, 18, 4, 697 BB TRF-34-15E MOORHEAD SECT 537: CITY OF MOORHEAD, PURCHASE 1 BUS. B9 PURCHASE BUS FTA 44, 352, 88, (CLASS 7) AND BUS RELATED EQUIPMENT 894 BB TRF-47-15A ROCHESTER SECT 537: ROCHESTER DAR TRANSIT OPERATING. B9 OPERATE BUS LF 79,553 79,553 ASSISTANCE 895 BB TRF-47-15B ROCHESTER SECT 537: ROCHESTER RR TRANSIT OPERATING. B9 OPERATE BUS FTA 6,796,257 1,735,856 5,6,41 ASSISTANCE 896 BB TRF-47-15C ROCHESTER SECT 537: CONSTRUCT SMH BUS STOP S. B9 OPERATE BUS FTA 3, 24, 6, 897 BB TRF-47-15D ROCHESTER SECT 537: ROCHESTER RR - PURCHASE 5 BUSES. B9 PURCHASE BUS FTA 2,12, 1,696, 424, (CLASS 7) 898 BB TRF-378-15 LA CRESCENT SECT 537: LA CRESCENT TRANSIT OPERATING. B9 OPERATE BUS FTA 33,9 94, 236,9 ASSISTANCE 1113 BB TRF-28-15 MNDOT SECT 537: CITY OF MANKATO RR TRANSIT OPERATING. B9 OPERATE BUS FTA 1,83,53 435,755 1,367,775 ASSISTANCE 1616 BB TRF-TCMT-15 MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ASSOCIATED. B9 BUS GRANT FTA 1,33,965 1,43,172 26,793 MAINTENANCE-BUS 1617 BB TRF-TCMT-15A MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 PURCHASE BUS FTA 3,371,69 2,697,287 674,322 LEASE-TIRES 1618 BB TRF-TCMT-15AB MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-RTS TRANSIT. B9 BUS GRANT FTA 4,, 3,2, 8, TECHNOLOGY SYSTEMS 1619 BB TRF-TCMT-15AG MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FORT. B9 BUS GRANT FTA 7, 56, 14, SNELLING P&R EXPANSION 1622 BB TRF-TCMT-15AK MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-SNELLING. B9 BUS GRANT FTA 1,7, 1,36, 34, AVENUE ARTERIAL BRT 1623 BB TRF-TCMT-15AL MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-I35W. B9 BUS GRANT FTA 2,322,818 1,858,254 464,564 BRT/EXPRESS SERVICE 1624 BB TRF-TCMT-15AM MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-MAJOR. B9 BUS GRANT FTA 1,25, 1,, 25, TO SUPPORT FACILITIES September 213 Project Listing A-4 Page 9 of 52

FTA SECTION 537 Fiscal Year: 215 STIP for FY 214-217 1625 BB TRF-TCMT-15AN MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PUBLIC. B9 BUS GRANT FTA 312,5 25, 62,5 SUPPORT FACILITIES REFURBISHMENT 1626 BB TRF-TCMT-15AP MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-SUPPORT. B9 BUS GRANT FTA 2, 16, 4, FACILITY ROOF REFURBISHMENT 1627 BB TRF-TCMT-15AQ MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ONBOARD. B9 BUS GRANT FTA 1,777, 1,421,6 355,4 PEDESTRIAN DETECTION SYSTEM TRANSIT TECHNOLOGY SYSTEMS 1628 BB TRF-TCMT-15AR MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-HWY 36 EAST. B9 BUS GRANT FTA 1, 8, 2, P&R (STILLWATER) 163 BB TRF-TCMT-15B MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-BUS. B9 PURCHASE BUS FTA 45,7,642 38,845,546 6,855,96 ACQUISITION 1631 BB TRF-TCMT-15C MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PREVENTIVE. B9 BUS GRANT FTA 5,, 4,, 1,, MAINTENANCE 1632 BB TRF-TCMT-15D MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 BUS GRANT FTA 1,75, 86, 215, SECURITY/SAFETY FOR 1% 1633 BB TRF-TCMT-15E MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 715, 572, 143, ENHANCEMENTS 1% 1634 BB TRF-TCMT-15F MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 1,382, 1,15,6 276,4 BUSINESS COMPUTER HW & SW 1635 BB TRF-TCMT-15M MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ENERGY. B9 BUS GRANT FTA 1,, 8, 2, 1636 BB TRF-TCMT-15N MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-OPERATIONS. B9 BUS GRANT FTA 1,25, 82, 25, COMMUNICATIONS & CONTROL EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1637 BB TRF-TCMT-15Q MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FARE. B9 BUS GRANT FTA 1,5, 84, 21, COLLECTION EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1638 BB TRF-TCMT-15S MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-METRO. B9 BUS GRANT FTA 5,312,5 4,25, 1,62,5 MOBILITY COST OF CONTRACTING FOR SERVICES September 213 Project Listing A-4 Page 1 of 52

FTA SECTION 537 Fiscal Year: 215 STIP for FY 214-217 1639 BB TRF-TCMT-15T MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-REGIONAL. B9 BUS GRANT FTA 3,75, 3,, 75, FLEET COST OF CONTRACTING 164 BB TRF-TCMT-15U MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-MTS BUS. B9 PURCHASE BUS FTA 13,2, 1,56, 2,64, ACQUISITION 1641 BB TRF-TCMT-15X MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL U OF M-U OF MN. B9 PURCHASE BUS FTA 343,75 275, 68,75 BUS ACQUISITION $133,181,175 $ $ $89,432,642 $ $43,748,533 September 213 Project Listing A-4 Page 11 of 52

FTA SECTION 537 Fiscal Year: 216 STIP for FY 214-217 132 BB TRF-16-16A DULUTH TRANSIT SECT 537: DULUTH DIAL-A-RIDE TRANSIT OPERATING. B9 OPERATE BUS LF 63,285 63,285 AUTHORITY ASSISTANCE 133 BB TRF-16-16B DULUTH TRANSIT SECT 537: DULUTH OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,7,51 1,45, 5,62,51 AUTHORITY 134 BB TRF-16-16C DULUTH TRANSIT SECT 537: DULUTH TRANSIT. B9 BUS GRANT FTA 875, 7, 175, AUTHORITY 135 BB TRF-16-16D DULUTH TRANSIT SECT 537: DULUTH PREVENTATIVE MAINTENANCE. B9 OPERATE BUS LF 3,965,29 3,965,29 AUTHORITY 354 BB 882-SETASIDE- 16 EAST GRAND FORKS SECT 537: TRANSIT OPERATING ASSISTANCE AND - 216. B9 OPERATE BUS/BUS GRANT FTA LF 372, 116, 256, 537 BB TRF-48-16B METRO BUS SECT 537: ST CLOUD RR OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,786,29 1,186,29 6,6, 538 BB TRF-48-16D METRO BUS SECT 537: TRANSIT PURCHASES OFFICE. B9 BUS GRANT FTA 25, 2, 5, EQUIPMENT AND COMPUTERS 539 BB TRF-48-16E METRO BUS SECT 537: TRANSIT PURCHASES. B9 BUS GRANT FTA 1, 8, 2, MAINTENANCE TOOLS AND EQUIPMENT 54 BB TRF-48-16F METRO BUS SECT 537: ST CLOUD METRO BUS IZED. B9 BUS GRANT FTA 1,382,36 1,15,629 276,47 PREVENTIVE MAINTENANCE 541 BB TRF-48-16V METRO BUS SECT 537: TRANSIT PURCHASE, BUS SHELTER. B9 BUS GRANT FTA 2, 16, 4, TRANSIT AMENITY 736 BB TRF-34-16A MOORHEAD SECT 537: PARATRANSIT AND METRO SENIOR RIDE. B9 OPERATE BUS FTA 446, 98, 348, OPERATING ASSISTANCE 737 BB TRF-34-16B MOORHEAD SECT 537: CITY OF MOORHEAD TRANSIT OPERATING. B9 OPERATE BUS FTA 2,12, 615, 1,55, ASSISTANCE 738 BB TRF-34-16C MOORHEAD SECT 537: MOORHEAD PLANNING ASSISTANCE. B9 PLANNING FTA 22, 18, 4, 739 BB TRF-34-16D MOORHEAD SECT 537: MOORHEAD TRANSIT PREVENTIVE. B9 PREVENTIVE FTA 2, 16, 4, MAINTENANCE MAINTENANCE 963 BB TRF-47-16A ROCHESTER SECT 537: ROCHESTER DAR TRANSIT OPERATING. B9 OPERATE BUS LF 737,935 737,935 ASSISTANCE September 213 Project Listing A-4 Page 12 of 52

FTA SECTION 537 Fiscal Year: 216 STIP for FY 214-217 964 BB TRF-47-16B ROCHESTER SECT 537: ROCHESTER RR TRANSIT OPERATING. B9 OPERATE BUS FTA 7,185,545 1,735,856 5,449,689 ASSISTANCE 965 BB TRF-47-16C ROCHESTER SECT 537: ROCHESTER RR - PURCHASE 3 BUSES. B9 PURCHASE BUS FTA 1,311, 1,48,8 262,2 (CLASS 7) 966 BB TRF-378-16 LA CRESCENT SECT 537: LACRESCENT TRANSIT OPERATING. B9 OPERATE BUS FTA 34,827 94, 246,827 ASSISTANCE 1149 BB TRF-28-16 MNDOT SECT 537: CITY OF MANKATO RR TRANSIT OPERATING. B9 OPERATE BUS FTA 1,857,636 435,755 1,421,881 ASSISTANCE 1779 BB TRF-TCMT-16 MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ASSOCIATED. B9 BUS GRANT FTA 1,369,163 1,95,33 273,833 MAINTENANCE-BUS 178 BB TRF-TCMT-16A MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 PURCHASE BUS FTA 3,914,423 3,131,538 782,885 LEASE-TIRES 1781 BB TRF-TCMT-16AA MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PUBLIC. B9 BUS GRANT FTA 335,84 268,672 67,168 SUPPORT FACILITIES REFURBISHMENT 1782 BB TRF-TCMT-16AB MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-SUPPORT. B9 BUS GRANT FTA 5, 4, 1, FACILITY ROOF REFURBISHMENT 1784 BB TRF-TCMT-16AD MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ONBOARD. B9 BUS GRANT FTA 1,677, 1,341,6 335,4 PEDESTRIAN DETECTION SYSTEM TRANSIT TECHNOLOGY SYSTEMS 1785 BB TRF-TCMT-16AE MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ADVANCE. B9 BUS GRANT FTA 6, 48, 12, SCHEDULE PLANNING SOFTWARE 1787 BB TRF-TCMT-16B MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PREVENTIVE. B9 BUS GRANT FTA 5,, 4,, 1,, MAINTENANCE 1788 BB TRF-TCMT-16C MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 BUS GRANT FTA 825, 66, 165, SECURITY/SAFETY FOR 1% 1789 BB TRF-TCMT-16D MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 715, 572, 143, ENHANCEMENTS 1% 179 BB TRF-TCMT-16E MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 1,725, 1,38, 345, BUSINESS COMPUTER HW & SW September 213 Project Listing A-4 Page 13 of 52

FTA SECTION 537 Fiscal Year: 216 STIP for FY 214-217 1791 BB TRF-TCMT-16H MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ENERGY. B9 BUS GRANT FTA 1,, 8, 2, 1792 BB TRF-TCMT-16J MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-OPERATIONS. B9 BUS GRANT FTA 76, 68, 152, COMMUNICATIONS & CONTROL EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1793 BB TRF-TCMT-16L MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FARE. B9 BUS GRANT FTA 1,8, 1,44, 36, COLLECTION EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1794 BB TRF-TCMT-16N MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-METRO. B9 BUS GRANT FTA 5,312,5 4,25, 1,62,5 MOBILITY COST OF CONTRACTING FOR SERVICES 1795 BB TRF-TCMT-16P MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-REGIONAL. B9 BUS GRANT FTA 3,75, 3,, 75, FLEET COST OF CONTRACTING 1796 BB TRF-TCMT-16Q MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-MTS BUS. B9 PURCHASE BUS FTA 12,9, 1,32, 2,58, ACQUISITION 1797 BB TRF-TCMT-16R MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL U OF M-U OF MN. B9 PURCHASE BUS FTA 343,75 275, 68,75 BUS ACQUISITION 1798 BB TRF-TCMT-16T MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-RTS TRANSIT. B9 BUS GRANT FTA 4,5, 3,6, 9, TECHNOLOGY SYSTEMS 1799 BB TRF-TCMT-16W MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FORT. B9 BUS GRANT FTA 5,25, 4,2, 1,5, SNELLING P&R EXPANSION 182 BB TRF-TCMT-16Z MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-MAJOR. B9 BUS GRANT FTA 1,25, 1,, 25, TO SUPPORT FACILITIES $89,434,49 $ $ $51,269,29 $ $38,164,84 September 213 Project Listing A-4 Page 14 of 52

FTA SECTION 537 Fiscal Year: 217 STIP for FY 214-217 182 BB TRF-16-17A DULUTH TRANSIT SECT 537: DULUTH DIAL-A-RIDE TRANSIT OPERATING. B9 OPERATE BUS LF 649,19 649,19 AUTHORITY ASSISTANCE 183 BB TRF-16-17B DULUTH TRANSIT SECT 537: OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,282,15 1,493,5 5,788,65 AUTHORITY 184 BB TRF-16-17D DULUTH TRANSIT SECT 537: PREVENTATIVE MAINTENANCE. B9 OPERATE BUS LF 4,84, 4,84, AUTHORITY 185 BB TRF-16-17C DULUTH TRANSIT SECT 537: DULUTH TRANSIT. B9 BUS GRANT FTA 9, 72, 18, AUTHORITY 377 BB 882-SETASIDE- EAST GRAND SECT: 537 TRANSIT OPERATING ASSISTANCE AND. B9 BUS GRANT FTA LF 412, 148, 264, 17 FORKS - 217 588 BB TRF-48-17B METRO BUS SECT 537: ST CLOUD RR OPERATING ASSISTANCE. B9 OPERATE BUS FTA 8,597,889 1,197,889 7,4, 589 BB TRF-48-17D METRO BUS SECT 537: TRANSIT PURCHASES OFFICE. B9 BUS GRANT FTA 25, 2, 5, EQUIPMENT AND COMPUTERS 59 BB TRF-48-17E METRO BUS SECT 537: TRANSIT PURCHASES. B9 BUS GRANT FTA 1, 8, 2, MAINTENANCE TOOLS AND EQUIPMENT 591 BB TRF-48-17F METRO BUS SECT 537: ST CLOUD METRO BUS IZED. B9 BUS GRANT FTA 1,417,361 1,133,889 283,472 PREVENTIVE MAINTENANCE 592 BB TRF-48-17V METRO BUS SECT 537: TRANSIT PURCHASE, BUS SHELTER. B9 BUS GRANT FTA 2, 16, 4, TRANSIT AMENITY 593 BB TRF-48-17W METRO BUS SECT 537: TRANSIT PURCHASE, ITS PROJECTS. B9 BUS GRANT FTA 25, 2, 5, 773 BB TRF-34-17A MOORHEAD SECT 537: PARATRANSIT AND METRO SENIOR RIDE. B9 OPERATE BUS FTA 464, 12, 362, OPERATING ASSISTANCE 774 BB TRF-34-17B MOORHEAD SECT 537: CITY OF MOORHEAD TRANSIT OPERATING. B9 OPERATE BUS FTA 2,21, 1,57, 64, ASSISTANCE 775 BB TRF-34-17C MOORHEAD SECT 537: MOORHEAD PLANNING ASSISTANCE. B9 PLANNING FTA 22, 18, 4, 776 BB TRF-34-17D MOORHEAD SECT 537: MOORHEAD TRANSIT PREVENTIVE. B9 PREVENTIVE FTA 2, 16, 4, MAINTENANCE MAINTENANCE September 213 Project Listing A-4 Page 15 of 52

FTA SECTION 537 Fiscal Year: 217 STIP for FY 214-217 115 BB TRF-47-17 ROCHESTER SECT 537: CONSTRUCT PARK & RIDE STRUCTURED. B9 OPERATE BUS FTA 5,, 4,, 1,, PARKING 116 BB TRF-47-17A ROCHESTER SECT 537: ROCHESTER DAR OPERATING ASSISTANCE. B9 OPERATE BUS LF 767,453 767,453 117 BB TRF-47-17B ROCHESTER SECT 537: ROCHESTER RR OPERATING ASSISTANCE. B9 OPERATE BUS FTA 7,472,967 1,735,856 5,737,111 118 BB TRF-378-17 LA CRESCENT SECT 537: LACRESCENT TRANSIT OPERATING. B9 OPERATE BUS FTA 351,52 94, 257,52 ASSISTANCE 119 BB TRF-47-17A ROCHESTER SECT 537: ROCHESTER RR, PURCHASE 3 BUSES (CLASS. B9 PURCHASE BUS FTA 1,35, 1,8, 27, 7) 1185 BB TRF-28-17 MNDOT SECT 537: CITY OF MANKATO RR TRANSIT OPERATING. B9 OPERATE BUS FTA 1,913,365 435,755 1,477,61 ASSISTANCE 1899 BB TRF-TCMT-17 MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-SUPPORT. B9 BUS GRANT FTA 3, 24, 6, FACILITY ROOF REFURBISHMENT 19 BB TRF-TCMT-17A MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-RECAULK. B9 BUS GRANT FTA 3,1, 2,48, 62, WALLS OF SUPPORT FACILITIES 192 BB TRF-TCMT-17C MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ONBOARD. B9 BUS GRANT FTA 177, 141,6 35,4 PEDESTRIAN DETECTION SYSTEM TRANSIT TECHNOLOGY SYSTEMS 193 BB TRF-TCMT-17D MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ASSOCIATED. B9 BUS GRANT FTA 1,437,621 1,15,97 287,524 MAINTENANCE-BUS 194 BB TRF-TCMT-17E MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 PURCHASE BUS FTA 4,362,247 3,489,798 872,449 LEASE-TIRES 195 BB TRF-TCMT-17F MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PREVENTIVE. B9 BUS GRANT FTA 5,, 4,, 1,, MAINTENANCE 196 BB TRF-TCMT-17G MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-. B9 BUS GRANT FTA 825, 66, 165, SECURITY/SAFETY FOR 1% 197 BB TRF-TCMT-17H MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 715, 572, 143, ENHANCEMENTS 1% September 213 Project Listing A-4 Page 16 of 52

FTA SECTION 537 Fiscal Year: 217 STIP for FY 214-217 198 BB TRF-TCMT-17J MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-TRANSIT. B9 BUS GRANT FTA 1,664, 1,331,2 332,8 BUSINESS COMPUTER HW & SW 199 BB TRF-TCMT-17K MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-ENERGY. B9 BUS GRANT FTA 1,, 8, 2, 191 BB TRF-TCMT-17L MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-OPERATIONS. B9 BUS GRANT FTA 785, 628, 157, COMMUNICATIONS & CONTROL EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1911 BB TRF-TCMT-17M MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-FARE. B9 BUS GRANT FTA 3, 24, 6, COLLECTION EQUIPMENT, HARDWARE & SOFTWARE REPLACEMENT & EXPANSION 1912 BB TRF-TCMT-17N MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-METRO. B9 BUS GRANT FTA 5,312,5 4,25, 1,62,5 MOBILITY COST OF CONTRACTING FOR SERVICES 1913 BB TRF-TCMT-17P MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-REGIONAL. B9 BUS GRANT FTA 3,75, 3,, 75, FLEET COST OF CONTRACTING 1914 BB TRF-TCMT-17Q MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL MTS-MTS BUS. B9 PURCHASE BUS FTA 16,6, 13,28, 3,32, ACQUISITION 1915 BB TRF-TCMT-17R MET COUNCIL-MTS SECT 537: TWIN CITIES MET COUNCIL U OF M-U OF MN. B9 PURCHASE BUS FTA 343,75 275, 68,75 BUS ACQUISITION 1918 BB TRF-TCMT-17U MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-MAJOR. B9 BUS GRANT FTA 1,25, 1,, 25, TO SUPPORT FACILITIES 1919 BB TRF-TCMT-17V MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-PUBLIC. B9 BUS GRANT FTA 335,84 268,672 67,168 SUPPORT FACILITIES REFURBISHMENT 192 BB TRF-TCMT-17W MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-I35W. B9 BUS GRANT FTA 15,69,14 13,336,619 2,353,521 BRT/EXPRESS SERVICE BUSES 1921 BB TRF-TCMT-17X MET COUNCIL-MT SECT 537: TWIN CITIES MET COUNCIL MT-BUS. B9 PURCHASE BUS FTA 13,94,241 11,13,15 1,964,136 ACQUISITION $119,215,766 $ $ $76,225,98 $ $42,989,786 September 213 Project Listing A-4 Page 17 of 52

FTA SECTION 539 Fiscal Year: 214 STIP for FY 214-217 141 BB TCP-CCLRT-14 METRO TRANSIT SECT 539: CENTRAL CORRIDOR LIGHT RAIL TRANSIT. B3 GRADE AND FTA 117,564,59 98,443,694 19,12,896 PROJECT-NEW START FFGA 214 APPROPRIATION SURFACE $117,564,59 $ $ $98,443,694 $ $19,12,896 September 213 Project Listing A-4 Page 18 of 52

FTA SECTION 539 Fiscal Year: 215 STIP for FY 214-217 1615 BB TCP-CCLRT-15 METRO TRANSIT SECT 539: CENTRAL CORRIDOR LIGHT RAIL TRANSIT. B3 GRADE AND FTA 13,743,388 13,743,388 PROJECT-NEW START FFGA 215 APPROPRIATION SURFACE 1629 BB TRF-TCMT-15AS METRO TRANSIT SECT 539: SOUTHWEST CORRIDOR LIGHT RAIL TRANSIT. B3 GRADE AND FTA 2,, 1,, 1,, PROJECT-NEW START FFGA 215 APPROPRIATION SURFACE $33,743,388 $ $ $23,743,388 $ $1,, September 213 Project Listing A-4 Page 19 of 52

FTA SECTION 539 Fiscal Year: 216 STIP for FY 214-217 1786 BB TRF-TCMT-16AF METRO TRANSIT SECT 539: SOUTHWEST CORRIDOR LIGHT RAIL TRANSIT. B3 GRADE AND FTA 2,, 1,, 1,, PROJECT-NEW START FFGA 215 APPROPRIATION SURFACE $2,, $ $ $1,, $ $1,, September 213 Project Listing A-4 Page 2 of 52

FTA SECTION 539 Fiscal Year: 217 STIP for FY 214-217 1922 BB TRF-TCMT-17Y METRO TRANSIT SECT 539: SOUTHWEST CORRIDOR LIGHT RAIL TRANSIT. B3 GRADE AND FTA 2,, 1,, 1,, PROJECT-NEW START FFGA 215 APPROPRIATION SURFACE $2,, $ $ $1,, $ $1,, September 213 Project Listing A-4 Page 21 of 52

FTA SECTION 531 Fiscal Year: 214 STIP for FY 214-217 219 BB TRF-917-14 MNDOT SECT 531: GREATER MN TRANSIT INCLUDING SMALL URBAN, RURAL TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND ITS PROJECTS. NB PURCHASE BUS FTA 2,3, 1,8, 5, 22 BB TRF-911-14 MNDOT SECT 531: MN TRANSIT INCLUDING LARGE. NB PURCHASE BUS FTA 2,4, 1,9, 5, URBAN TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND TRANSIT ITS $4,7, $ $ $3,7, $ $1,, September 213 Project Listing A-4 Page 22 of 52

FTA SECTION 531 Fiscal Year: 215 STIP for FY 214-217 265 BB TRF-58-15-NA MNDOT SECT 531: NEW FREEDOM RURAL FUNDS - TRI-VALLEY. NB MISCELLANEOUS FTA 13, 14, 26, OPPORTUNITY COUNCIL, INC - TRAVEL TRAINING 698 BB TRF-34-15N MNDOT SECT 531: CITY OF MOORHEAD MOBILITY MANAGER. NB OPERATE BUS FTA 3, 24, 6, 266 BB TRF-917-15 MNDOT SECT 531: GREATER MN TRANSIT INCLUDING. NB PURCHASE BUS FTA 2,3, 1,8, 5, SMALL URBAN, RURAL TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND ITS PROJECTS 267 BB TRF-911-15 MNDOT SECT 531: MN TRANSIT INCLUDING LARGE. NB PURCHASE BUS FTA 2,4, 1,9, 5, URBAN TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND TRANSIT ITS $4,86, $ $ $3,828, $ $1,32, September 213 Project Listing A-4 Page 23 of 52

FTA SECTION 531 Fiscal Year: 216 STIP for FY 214-217 74 BB TRF-34-16N MNDOT SECT 531: CITY OF MOORHEAD MOBILITY MANAGER. NB OPERATE BUS FTA 32, 26, 6, 214 BB TRF-917-16 MNDOT SECT 531: GREATER MN TRANSIT INCLUDING. NB PURCHASE BUS FTA 2,3, 1,8, 5, SMALL URBAN, RURAL TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND ITS PROJECTS 215 BB TRF-911-16 MNDOT SECT 531: MN TRANSIT ; INCLUDING LARGE. NB PURCHASE BUS FTA 2,4, 1,9, 5, URBAN TRANSIT BUSES, BUS RELATED EQUIPMENT AND TRANSIT ITS $4,732, $ $ $3,726, $ $1,6, September 213 Project Listing A-4 Page 24 of 52

FTA SECTION 531 Fiscal Year: 217 STIP for FY 214-217 777 BB TRF-34-17N MNDOT SECT 531: CITY OF MOORHEAD MOBILITY MANAGER. NB OPERATE BUS FTA 32, 25,6 6,4 214 BB TRF-917-17 MNDOT SECT 531: GREATER MN TRANSIT ; INCLUDING. NB PURCHASE BUS FTA 2,3, 1,8, 5, SMALL URBAN, RURAL TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND ITS PROJECTS 2141 BB TRF-911-17 MNDOT SECT 531: MN TRANSIT INCLUDING LARGE. NB PURCHASE BUS FTA 2,4, 1,9, 5, URBAN TRANSIT BUSES, BUS RELATED EQUIPMENT, MOBILITY MANAGEMENT AND TRANSIT ITS $4,732, $ $ $3,725,6 $ $1,6,4 September 213 Project Listing A-4 Page 25 of 52

FTA SECTION 5311 Fiscal Year: 214 STIP for FY 214-217 216 BB TRF-911-14 MNDOT SECT 5311: GREATER MN TRANSIT OPERATING; PUBLIC. OB OPERATE BUS FTA 39,, 14,9, 24,1, TRANSIT OPERATING ASSISTANCE 217 BB TRF-981-14 MNDOT SECT 5311(F): INTER-CITY BUS PROGRAM; INVOLVES OPERATING (5%), VEHICLE PURCHASES (8%), VEHICLE REHAB (8%), MARKETING (8%) AND PILOT OPERATING (1%). OB OPERATE BUS FTA 5,, 2,6, 2,4, $44,, $ $ $17,5, $ $26,5, September 213 Project Listing A-4 Page 26 of 52

FTA SECTION 5311 Fiscal Year: 215 STIP for FY 214-217 263 BB TRF-981-15 MNDOT SECT 5311(F): INTER-CITY BUS PROGRAM; INVOLVES OPERATING (5%), VEHICLE PURCHASES (8%), VEHICLE REHAB (8%), MARKETING (8%) AND PILOT OPERATING (1%). OB OPERATE BUS FTA 5,, 2,6, 2,4, 264 BB TRF-911-15 MNDOT SECT 5311: GREATER MN TRANSIT OPERATING; PUBLIC. OB OPERATE BUS FTA 41,375,1 15,2, 26,175,1 TRANSIT OPERATING ASSISTANCE $46,375,1 $ $ $17,8, $ $28,575,1 September 213 Project Listing A-4 Page 27 of 52

FTA SECTION 5311 Fiscal Year: 216 STIP for FY 214-217 211 BB TRF-981-16 MNDOT SECT 5311(F): INTER-CITY BUS PROGRAM: INVOLVES OPERATING (5%), VEHICLE PURCHASES (8%), VEHICLE REHAB (8%), MARKETING (8%) AND PILOT OPERATING (1%). OB OPERATE BUS FTA 5,15, 2,6, 2,55, 212 BB TRF-911-16 MNDOT SECT 5311: GREATER MN TRANSIT OPERATING; AND. OB OPERATE BUS FTA 4,17, 15,2, 24,97, PUBLIC TRANSIT OPERATING ASSISTANCE $45,32, $ $ $17,8, $ $27,52, September 213 Project Listing A-4 Page 28 of 52

FTA SECTION 5311 Fiscal Year: 217 STIP for FY 214-217 2138 BB TRF-911-17 MNDOT SECT 5311: GREATER MN TRANSIT OPERATING; AND. OB OPERATE BUS FTA 42,616,353 15,2, 27,416,353 PUBLIC TRANSIT OPERATING ASSISTANCE 2142 BB TRF-981-17 MNDOT SECT 5311 (F): INTER-CITY BUS PROGRAM; INVOLVES OPERATING (5%), VEHICLE PURCHASES (8%), VEHICLE REHAB (8%), MARKETING (8%) AND PILOT OPERATING (1%). OB OPERATE BUS FTA 5,15, 2,6, 2,55, $47,766,353 $ $ $17,8, $ $29,966,353 September 213 Project Listing A-4 Page 29 of 52

FTA SECTION 5316 Fiscal Year: 214 STIP for FY 214-217 5 BB TRF-5-14-JA MNDOT SECT 5316: ARROWHEAD ECONOMIC OPPORTUNITY. JA OPERATE BUS FTA 24, 12, 12, AGENCY INC,- RURAL RIDES OPERATING 6 BB TRF-5-14-JB MNDOT SECT 5316: ARROWHEAD ECONOMIC OPPORTUNITY. JA OPERATE BUS FTA 225, 18, 45, AGENCY INC,- RURAL RIDES-MOBILITY MANAGEMENT 7 BB TRF-16-14-JA DULUTH TRANSIT SECT 5316: JARS URBAN OPERATING FUNDS FOR. JA OPERATE BUS FTA 383, 191,5 191,5 AUTHORITY DULUTH TRANSIT AUTHORITY 226 BB TRF-58-14-JA MNDOT SECT 5316: JARC RURAL FUNDS - TRI-VALLEY. JA MISCELLANEOUS FTA 15, 75, 75, OPPORTUNITY COUNCIL, INC - 3 RURAL BUS ROUTES $998, $ $ $566,5 $ $431,5 September 213 Project Listing A-4 Page 3 of 52

FTA SECTION 5316 Fiscal Year: 215 STIP for FY 214-217 264 BB TRF-58-15-JA MNDOT SECT 5316: JARC RURAL FUNDS - TRI-VALLEY. JA MISCELLANEOUS FTA 15, 75, 75, OPPORTUNITY COUNCIL, INC - 3 RURAL BUS ROUTES $15, $ $ $75, $ $75, September 213 Project Listing A-4 Page 31 of 52

FTA SECTION 5317 Fiscal Year: 214 STIP for FY 214-217 227 BB TRF-58-14-NA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - TRI-VALLEY. NF MISCELLANEOUS FTA 13, 14, 26, OPPORTUNITY COUNCIL, INC - TRAVEL TRAINING 39 BB TRF-57-14-NA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - TRI-COUNTY. NF BUS GRANT FTA 87,5 7, 17,5 ACTIONS PROGRAMS, INC - MOBILITY MANAGEMENT 391 BB TRF-57-14-NB MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - TRI-COUNTY. NF BUS GRANT FTA 19, 95, 95, ACTIONS PROGRAMS, INC - MOBILITY MANAGEMENT 645 BB TRF-34-14N MNDOT SECT 531: CITY OF MOORHEAD MOBILITY MANAGER. NF OPERATE BUS FTA 3, 24, 6, 158 BB TRF-21-14-NA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH IN. NF OPERATE BUS FTA 57,5 46, 11,5 ACTION - MOBILITY MANAGEMENT 159 BB TRF-21-14-NB MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH IN. NF OPERATE BUS FTA 66, 33, 33, ACTION - RIDE COORDINATION 16 BB TRF-21-14-JA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH IN. NF OPERATE BUS FTA 1, 5, 5, ACTION - RIDES TO WORK PROGRAM $661, $ $ $422, $ $239, September 213 Project Listing A-4 Page 32 of 52

FTA SECTION 5317 Fiscal Year: 215 STIP for FY 214-217 111 BB TRF-21-15-NA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH IN. NF OPERATE BUS FTA 57,5 46, 11,5 ACTION - MOBILITY MANAGEMENT 1111 BB TRF-21-15-NB MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH IN. NF OPERATE BUS FTA 66, 33, 33, ACTION - RIDE COORDINATION 1112 BB TRF-21-15-JA MNDOT SECT 5317: NEW FREEDOM RURAL FUNDS - VINE FAITH IN. NF OPERATE BUS FTA 1, 5, 5, ACTION - RIDES TO WORK PROGRAM $223,5 $ $ $129, $ $94,5 September 213 Project Listing A-4 Page 33 of 52

FTA SECTION 5337 Fiscal Year: 214 STIP for FY 214-217 142 BB TRF-TCMT-14AS MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-LRV EQUIPMENT & TECHNOLOGY, WIRELESS VIDEO, TRAIN OPERATOR DISPLAYS, HOIST REPLACEMENT & LRT CORRIDOR CAMERAS. GR BUS GRANT FTA 1,, 8, 2, 1425 BB TRF-TCMT-14AX MET COUNCIL-MT SECT 5337: FIXED GUIDEWAY: TWIN CITIES MET COUNCIL. GR BUS GRANT FTA 1,5, 84, 21, MT-LRT ASSOCIATED MAINTENANCE & TRACK MODIFICATIONS $2,5, $ $ $1,64, $ $41, September 213 Project Listing A-4 Page 34 of 52

FTA SECTION 5337 Fiscal Year: 215 STIP for FY 214-217 162 BB TRF-TCMT-15AH MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-OVERHAUL. GR BUS GRANT FTA 2,379,13 1,93,282 475,821 LIGHT RAIL VEHICLES & ASSOCIATED LRV EQUIPMENT 1621 BB TRF-TCMT-15AJ MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-LRV. GR BUS GRANT FTA 7, 56, 14, EQUIPMENT & TECHNOLOGY, WIRELESS VIDEO, TRAIN OPERATOR DISPLAYS, HOIST REPLACEMENT $3,79,13 $ $ $2,463,282 $ $615,821 September 213 Project Listing A-4 Page 35 of 52

FTA SECTION 5337 Fiscal Year: 216 STIP for FY 214-217 1783 BB TRF-TCMT-16AC MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-CCLRT. GR BUS GRANT FTA 25, 2, 5, FACILITY MODIFICATIONS 18 BB TRF-TCMT-16X MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-OVERHAUL. GR BUS GRANT FTA 7,45, 5,96, 1,49, LIGHT RAIL VEHICLES & ASSOCIATED LRV EQUIPMENT 181 BB TRF-TCMT-16Y MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-LRV. GR BUS GRANT FTA 55, 44, 11, EQUIPMENT & TECHNOLOGY, TRAIN OPERATOR DISPLAYS, HOIST REPLACEMENT $8,25, $ $ $6,6, $ $1,65, September 213 Project Listing A-4 Page 36 of 52

FTA SECTION 5337 Fiscal Year: 217 STIP for FY 214-217 191 BB TRF-TCMT-17B MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-CCLRT. GR BUS GRANT FTA 25, 2, 5, FACILITY MODIFICATIONS 1916 BB TRF-TCMT-17S MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-OVERHAUL. GR BUS GRANT FTA 7,63,979 6,14,783 1,526,196 LIGHT RAIL VEHICLES & ASSOCIATED LRV EQUIPMENT 1917 BB TRF-TCMT-17T MET COUNCIL-MT SECT 5337: TWIN CITIES MET COUNCIL MT-LRV. GR BUS GRANT FTA 25, 2, 5, EQUIPMENT & TECHNOLOGY, HOIST REPLACEMENT $8,13,979 $ $ $6,54,783 $ $1,626,196 September 213 Project Listing A-4 Page 37 of 52

FTA SECTION 5339 Fiscal Year: 214 STIP for FY 214-217 218 BB TRF-916-14 MNDOT SECT 5339: GREATER MN TRANSIT, INCLUDING. BB FTA 2,375, 1,9, 475, TRANSIT BUSES AND BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS $2,375, $ $ $1,9, $ $475, September 213 Project Listing A-4 Page 38 of 52

FTA SECTION 5339 Fiscal Year: 215 STIP for FY 214-217 265 BB TRF-916-15 MNDOT SECT 5339: GREATER MN TRANSIT, BUS. BB FTA 2,375, 1,9, 475, RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS $2,375, $ $ $1,9, $ $475, September 213 Project Listing A-4 Page 39 of 52

FTA SECTION 5339 Fiscal Year: 216 STIP for FY 214-217 213 BB TRF-916-16 MNDOT SECT 5339: GREATER MN TRANSIT, INCLUDING. BB FTA 2,375, 1,9, 475, TRANSIT BUSES, BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS $2,375, $ $ $1,9, $ $475, September 213 Project Listing A-4 Page 4 of 52

FTA SECTION 5339 Fiscal Year: 217 STIP for FY 214-217 2139 BB TRF-916-17 MNDOT SECT 5339: GREATER MN TRANSIT, INCLUDING. BB FTA 2,375, 1,9, 475, TRANSIT BUSES, BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS $2,375, $ $ $1,9, $ $475, September 213 Project Listing A-4 Page 41 of 52

FHWA TRANST Fiscal Year: 214 STIP for FY 214-217 8 BB TRS-5-14 MNDOT ARROWHEAD TRANSIT-PURCHASE 9 BUSES - (CLASS 5). TR PURCHASE BUS STP 1,134, 97,2 226,8 9 BB TRS-16-14 DULUTH TRANSIT DTA-PURCHASE 1 BUSES TOTAL, 5 WILL BE HYBRID. TR PURCHASE BUS STP 5,616, 1,5, 4,116, AUTHORITY (CLASS 7) 228 BB TRS-6-14 MNDOT PAUL BUNYAN TRANSIT - PURCHASE 1 BUS (4-G) AND. TR PURCHASE BUS STP 76, 6,8 15,2 BUS RELATED EQUIPMENT 229 BB TRS-58-14 MNDOT TRI-VALLEY TRANSIT - PURCHASE 2 BUSES (4-G) AND. TR PURCHASE BUS STP 152, 121,6 3,4 BUS RELATED EQUIPMENT 23 BB TRS-11-14 MNDOT HUBBARD CO - PURCHASE 1 BUS (4-G) AND BUS. TR PURCHASE BUS STP 76, 6,8 15,2 RELATED EQUIPMENT 231 BB TRS-384-14 MNDOT ROSEAU CO TRANSIT - PURCHASE 1 BUS (4-G) AND. TR PURCHASE BUS STP 76, 6,8 15,2 BUS RELATED EQUIPMENT 387 BB TRS-42-14 MNDOT CITY OF PINE RIVER, PURCHASE ONE BUS (CLASS 3). TR PURCHASE BUS STP 62, 49,6 12,4 388 BB TRS-55-14 MNDOT RIVER RIDER, PURCHASE THREE BUSES (CLASS 4). TR PURCHASE BUS STP 228, 182,4 45,6 389 BB TRS-57-14 MNDOT TRI-CAP, PURCHASE ONE BUS. TR PURCHASE BUS STP 76, 6,8 15,2 392 BB TRS-3449-14 MNDOT CITY OF BRAINERD, PURCHASE ONE BUS. TR PURCHASE BUS STP 76, 6,8 15,2 393 BB TRS-768-14 MNDOT ISANTI CO, PURCHASE ONE BUS. TR PURCHASE BUS STP 76, 6,8 15,2 394 BB TRS-958-14 MNDOT KANABEC COUNTY, PURCHASE ONE BUS. TR PURCHASE BUS STP 76, 6,8 15,2 647 BB TRS-1131-14 MNDOT PRODUCTIVE ALTERNATIVES, PURCHASE 3 BUSES. TR PURCHASE BUS STP 21, 168, 42, (CLASS 4) AND BUS RELATED EQUIPMENT 648 BB TRS-767-14 MNDOT RAINBOW RIDER, PURCHASE 3 BUSES (CLASS 4) AND. TR PURCHASE BUS STP 21, 168, 42, BUS RELATED EQUIPMENT 649 BB TRS-7318-14 MNDOT BECKER COUNTY, PURCHASE 1 BUS (CLASS 4) AND. TR PURCHASE BUS STP 7, 56, 14, BUS RELATED EQUIPMENT 819 BB TRS-1-14 MNDOT CVS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 82 BB TRS-1-14A STEELE COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 821 BB TRS-47-14 ROCHESTER ROCHESTER RR - PURCHASE 1 BUS (CLASS 7). TR PURCHASE BUS STP 412, 297, 115, 822 BB TRS-65-14 MNDOT CITY OF WINONA - PURCHASE 2 BUSES (CLASS 6). TR PURCHASE BUS STP 416, 332,8 83,2 September 213 Project Listing A-4 Page 42 of 52

FHWA TRANST Fiscal Year: 214 STIP for FY 214-217 823 BB TRS-1977-14 MNDOT SEMCAC - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 824 BB TRS-7284-14A THREE RIVERS THREE RIVERS - PURCHASE 1 BUS (CLASS 4) - CITY OF. TR PURCHASE BUS STP 76, 6,8 15,2 NORTHFIELD 825 BB TRS-7284-14 THREE RIVERS THREE RIVERS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 162 BB TRS-25-14 MNDOT CITY OF LE SUEUR PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 7, 56, 14, 163 BB TRS-46-14 MNDOT MARTIN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 7, 56, 14, 164 BB TRS-83-14 MNDOT WATONWAN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 7, 56, 14, 165 BB TRS-28-14 MNDOT BROWN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 7, 56, 14, 166 BB TRS-2496-14 MNDOT CITY OF ST PETER PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 7, 56, 14, 167 BB TRS-3331-14 MNDOT ROCK COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 1221 BB TRS-26-14 MNDOT LINCOLN CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 74, 59,2 14,8 RELATED EQUIPMENT 1222 BB TRS-1738-14 MNDOT PRAIRIE FIVE, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 74, 59,2 14,8 RELATED EQUIPMENT 1223 BB TRS-2387-14 MNDOT WESTERN COMMUNITY ACTION, PURCHASE 2 BUSES. TR PURCHASE BUS STP 148, 118,4 29,6 (CLASS 4) AND BUS RELATED EQUIPMENT 1224 BB TRS-331-14A MNDOT TRAILBLAZER, PURCHASE 4 BUSES (CLASS 4) AND BUS. TR PURCHASE BUS STP 296, 236,8 59,2 RELATED EQUIPMENT 1225 BB TRS-3312-14 MNDOT ECUMEN/AUGUSTANA LUTHERAN HOMES, INC,. TR PURCHASE BUS STP 74, 59,2 14,8 PURCHASE 1 BUS (CLASS 4) AND BUS RELATED EQUIPMENT 1226 BB TRS-3316-14 MNDOT PIPESTONE CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 74, 59,2 14,8 RELATED EQUIPMENT 1227 BB TRS-3339-14 MNDOT RENVILLE CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 74, 59,2 14,8 RELATED EQUIPMENT 1228 BB TRS-734-14 MNDOT KANDIYOHI CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 74, 59,2 14,8 RELATED EQUIPMENT 1442 BB TRS-768-14A MNDOT HEARTLAND EXPRESS-PURCHASE CLASS 4 BUS. TR PURCHASE BUS STP 72, 57,6 14,4 September 213 Project Listing A-4 Page 43 of 52

FHWA TRANST Fiscal Year: 214 STIP for FY 214-217 1443 BB TRS-TCMT-1B MET COUNCIL-MT CMAQ: PURCHASE 6 ARTIC BUSES & RELATED SPARE. TR BUS GRANT CMAQ 3,42,6 2,722,8 68,52 PARTS & EQUIPMENT FOR EXPANDED WEEKDAY SERVICE ON RTE 673, MINNETONKA & MPLS 1444 BB TRS-TCMT-11B SOUTHWEST CMAQ: PURCHASE 15 BUSES FOR EXPRESS SERVICE. TR BUS GRANT CMAQ 8,25, 6,6, 1,65, TRANSIT 1445 BB TRS-TCMT-13H CITY OF CARVER CMAQ:AT SW QUADRANT OF INTERSECTION OF TH 212 & CARVER CSAH 11-SERVICE BETWEEN CARVER & DOWNTOWN MPLS/U OF M & DEMONSTRATION EXPRESS BUS SERVICE FOR THREE YEARS. TR OPERATE BUS CMAQ 1,32,75 826,2 26,55 1446 BB TRS-TCMT-14 MVTA CMAQ: PURCHASE FIVE, 45-FOOT OVER-THE-ROAD COACH BUSES & FUND STARTUP SERVICE BETWEEN SOUTH METRO & DOWNTOWN ST. PAUL ALONG I-35E, TH 13 & OTHER ROADWAYS. TR PURCHASE BUS CMAQ 3,12, 2,496, 624, 1447 LOCAL 999 TRS-TCMT-14A MET COUNCIL-MT CMAQ: CENTRAL CORRIDOR OPERATING COSTS ON. TR OPERATE BUS CMAQ 13,839,259 7,, 6,839,259 UNIVERSITY AVE BETWEEN DOWNTOWN MPLS & DOWNTOWN ST. PAUL 1448 LOCAL 999 TRS-TCMT-14C MET COUNCIL-MT CMAQ TDM: ACTIVITIES TO REDUCE SOV USE BY VAN POOLS, CAR POOL & RIDE MATCHING PROGRAMS, MARKETING, TRANSIT RIDERSHIP INCENTIVES BY SUPPORTING SEVERAL TRANSPORTATION MANAGEMENT ORGANIZATIONS.. TM PLANNING CMAQ 4,375, 3,5, 875, 1449 I 94 TRS-TCMT-14F MET COUNCIL-MT CMAQ: ON I 94 NEAR MANNING AVE IN LAKE ELMO-FOUR. TR PURCHASE BUS CMAQ 2,794,5 2,235,6 558,9 6 FT BUSES FOR EXPRESS SERVICE 145 I 94 TRS-TCMT-14G MET COUNCIL-MT CMAQ: ON I 94 NEAR MANNING AVE IN LAKE ELMO-. TR BUS GRANT CMAQ 958,117 766,494 191,623 EXPRESS SERVICE FOR 3 YEARS 221 BB TRS-91-14T MNDOT STP-GREATER MN TRANSIT ; INCLUDING. TR PURCHASE BUS STP 1,25, 1,, 25, TRANSIT BUSES, AND BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS $49,83,226 $32,767,374 $ $ $ $17,62,852 September 213 Project Listing A-4 Page 44 of 52

FHWA TRANST Fiscal Year: 215 STIP for FY 214-217 7 BB TRS-5-15 MNDOT ARROWHEAD TRANSIT-PURCHASE 6 BUSES - (CLASS 5). TR PURCHASE BUS STP 852, 681,6 17,4 266 BB TRS-58-15 MNDOT TRI-VALLEY TRANSIT - PURCHASE 2 BUSES (4-G) AND. TR PURCHASE BUS STP 156, 124,8 31,2 BUS RELATED EQUIPMENT 267 BB TRS-11-15 MNDOT HUBBARD CO - PURCHASE 1 BUS (4-G) AND BUS. TR PURCHASE BUS STP 78, 62,4 15,6 RELATED EQUIPMENT 268 BB TRS-2487-15 MNDOT CITY OF FOSSTON - PURCHASE 1 BUS (4-G) AND BUS. TR PURCHASE BUS STP 78, 62,4 15,6 RELATED EQUIPMENT 269 BB TRS-384-15 MNDOT ROSEAU CO - PURCHASE 1 BUS (4-G) AND BUS. TR PURCHASE BUS STP 78, 62,4 15,6 RELATED EQUIPMENT 471 BB TRS-48-15 METRO BUS ST CLOUD METRO BUS PURCHASE 3 SMALL BUSES. TR PURCHASE BUS STP 48, 32, 16, 472 BB TRS-55-15 MNDOT RIVER RIDER TRANSIT, PURCHASE ONE BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 473 BB TRS-57-15 MNDOT TRI-CAP TRANSIT, PURCHASE OF ONE BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 474 BB TRS-3449-15 MNDOT BRAINERD/CROW WING COUNTY PUBLIC TRANSIT,. TR PURCHASE BUS STP 78, 62,4 15,6 PURCHASE ONE BUS (CLASS 4) 475 BB TRS-767-15 MNDOT RAINBOW RIDER PUBLIC TRANSIT, PURCHASE ONE BUS. TR PURCHASE BUS STP 78, 62,4 15,6 (CLASS 4) 476 BB TRS-768-15 MNDOT ISANTI HEARTLAND EXPRESS, PURCHASE ONE BUS. TR PURCHASE BUS STP 78, 62,4 15,6 (CLASS 4) 699 BB TRS-7-15 MNDOT CITY OF BENSON, PURCHASE BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 72, 57,6 14,4 RELATED EQUIPMENT 7 BB TRS-27-15 MNDOT CITY OF MORRIS, PURCHASE BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 72, 57,6 14,4 RELATED EQUIPMENT 71 BB TRS-1131-15 MNDOT PRODUCTIVE ALTERNATIVES, PURCHASE 2 BUSES. TR PURCHASE BUS STP 144, 115,2 28,8 (CLASS 4) AND BUS RELATED EQUIPMENT 72 BB TRS-767-15 MNDOT RAINBOW RIDER, PURCHASE 5 BUSES (CLASS 4) AND. TR PURCHASE BUS STP 36, 288, 72, BUS RELATED EQUIPMENT 899 BB TRS- 1-15 MOWER COUNTY CVS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 9 BB TRS-1-15 MOWER COUNTY CVS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 91 BB TRS-47-15 ROCHESTER ROCHESTER RR - PURCHASE 2 BUSES (CLASS 7). TR PURCHASE BUS STP 848, 62, 228, September 213 Project Listing A-4 Page 45 of 52

FHWA TRANST Fiscal Year: 215 STIP for FY 214-217 92 BB TRS-1977-15 MNDOT SEMCAC - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 93 BB TRS-7284-15 THREE RIVERS THREE RIVERS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 1114 BB TRS-46-15 MNDOT MARTIN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 78, 62,4 15,6 1115 BB TRS-28-15 MNDOT BROWN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 72, 57,6 14,4 1116 BB TRS-2496-15 MNDOT CITY OF ST PETER PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 72, 57,6 14,4 1281 BB TRS-26-15 MNDOT LINCOLN CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 76, 6,8 15,2 RELATED EQUIPMENT 1282 BB TRS-1738-15 MNDOT PRAIRIE FIVE, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 76, 6,8 15,2 RELATED EQUIPMENT 1283 BB TRS-2387-15 MNDOT WESTERN COMMUNITY ACTION, PURCHASE 2 BUSES. TR PURCHASE BUS STP 152, 121,6 3,4 (CLASS 4) AND BUS RELATED EQUIPMENT 1284 BB TRS-331-15 MNDOT TRAILBLAZER, PURCHASE 4 BUSES (CLASS 4) AND BUS. TR PURCHASE BUS STP 34, 243,2 6,8 RELATED EQUIPMENT 1285 BB TRS-3325-15 MNDOT MURRAY CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 76, 6,8 15,2 RELATED EQUIPMENT 1286 BB TRS-734-15 MNDOT KANDIYOHI CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 76, 6,8 15,2 RELATED EQUIPMENT 1642 BB TRS-768-15A MNDOT HEARTLAND EXPRESS-PURCHASE CLASS 4 BUS. TR PURCHASE BUS STP 76, 6,8 15,2 1643 LOCAL 999 TRS-TCMT-15 MET COUNCIL-MT CMAQ TDM: ACTIVITIES TO REDUCE SOV USE BY VAN POOLS, CAR POOL & RIDE MATCHING PROGRAMS, MARKETING, TRANSIT RIDERSHIP INCENTIVES BY SUPPORTING SEVERAL TRANSPORTATION MANAGEMENT ORGANIZATIONS.. TM PLANNING CMAQ 4,375, 3,5, 875, 1644 BB TRS-TCMT-15A METRO TRANSIT CMAQ: PURCHASE FIVE BUSES AND TECHNOLOGY S FOR LIMITED STOP SERVICE ON SNELLING AVENUE IN ROSEVILLE AND ST PAUL, FORD PARKWAY IN ST PAUL, AND 46TH STREET IN MPLS. TR PURCHASE BUS CMAQ 3,79,15 2,967,32 741,83 1645 BB TRS-TCMT-15B METRO TRANSIT CMAQ: SERVICE DEMONSTRATION FOR LIMITED STOP. TR OPERATE BUS CMAQ 4,332,691 3,466,153 866,538 SERVICE ON SNELLING AVE IN ROSEVILLE AND ST PAUL, FORD PARKWAY IN ST PAUL, AND 46TH ST IN MPLS September 213 Project Listing A-4 Page 46 of 52

FHWA TRANST Fiscal Year: 215 STIP for FY 214-217 1646 BB TRS-TCMT-15C SHAKOPEE CMAQ: PURCHASE 3 COACH BUSES FOR EXPRESS BUS. TR PURCHASE BUS CMAQ 1,8, 1,44, 36, SERVICE FROM MARSHALL ROAD TRANSIT STATION TO THE U OF M 1647 BB TRS-TCMT-15D SHAKOPEE CMAQ: THREE YEARS OF STARTUP OPERATING FUNDS. TR OPERATE BUS CMAQ 1,6,533 1,28,426 32,17 FOR EXPRESS BUS SERVICE FROM MARSHALL ROAD TRANSIT STATION TO THE U OF M 1648 BB TRS-TCMT-15E METRO TRANSIT CMAQ: PURCHASE SIX BUSES AND TECHNOLOGY S FOR LIMITED STOP SERVICE ON WEST 7TH STREET IN ST PAUL, BLOOMINGTON, AND MSP INTERNATIONAL AIRPORT. TR PURCHASE BUS CMAQ 3,51,98 2,88,784 72,196 1649 BB TRS-TCMT-15F METRO TRANSIT CMAQ: SERVICE DEMONSTRATION FOR LIMITED STOP. TR OPERATE BUS CMAQ 3,123,839 2,499,71 624,768 SERVICE ON WEST 7TH ST IN ST PAUL, BLOOMINGTON, AND MSP INTERNATIONAL AIRPORT 262 BB TRS-91-15T MNDOT STP-GREATER MN TRANSIT ; INCLUDING. TR PURCHASE BUS STP 1,25, 1,, 25, TRANSIT BUSES AND BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS $28,68,193 $22,821,754 $ $ $ $5,858,439 September 213 Project Listing A-4 Page 47 of 52

FHWA TRANST Fiscal Year: 216 STIP for FY 214-217 136 BB TRS-5-16 MNDOT ARROWHEAD TRANSIT-PURCHASE 9 BUSES - (CLASS 5). TR PURCHASE BUS STP 1,242, 993,6 248,4 137 BB TRS-16-16 DULUTH TRANSIT DTA-PURCHASE 1 BUSES TOTAL, 5 BUSES WILL BE. TR PURCHASE BUS STP 4,78,5 1,5, 3,28,5 AUTHORITY HYBRID (CLASS 7) 138 BB TRS-22-16 HIBBING CITY OF HIBBING - PURCHASE 2 BUSES (CLASS 5). TR PURCHASE BUS STP 268, 214,4 53,6 31 BB TRS-6-16 MNDOT PAUL BUNYAN TRANSIT - PURCHASE 2 BUSES (4-G). TR PURCHASE BUS STP 16, 128, 32, AND BUS RELATED EQUIPMENT 311 BB TRS-58-16 MNDOT TRI-VALLEY TRANSIT - PURCHASE 1 BUS (5-G) AND BUS. TR PURCHASE BUS STP 146, 116,8 29,2 RELATED EQUIPMENT 312 BB TRS-11-16 MNDOT HUBBARD CO TRANSIT - PURCHASE 1 BUS (4-G) AND. TR PURCHASE BUS STP 8, 64, 16, BUS RELATED EQUIPMENT 542 BB TRS-48-16 METRO BUS ST CLOUD METRO BUS PURCHASE 2 SMALL CNG BUSES. TR PURCHASE BUS STP 34, 267,6 72,4 543 BB TRS-55-16 MNDOT RIVER RIDER TRANSIT, PURCHASE ONE BUS (CLASS 5). TR PURCHASE BUS STP 146, 116,8 29,2 544 BB TRS-57-16 MNDOT TRI-CAP TRANSIT, PURCHASE OF 2 BUSES (CLASS 4). TR PURCHASE BUS STP 16, 128, 32, 545 BB TRS-3449-16 MNDOT BRAINERD/CROW WING COUNTY PUBLIC TRANSIT,. TR PURCHASE BUS STP 8, 64, 16, PURCHASE ONE BUS (CLASS 4) 546 BB TRS-768-16 MNDOT ISANTI HEARTLAND EXPRESS, PURCHASE ONE BUS. TR PURCHASE BUS STP 146, 115, 31, (CLASS 5) 547 BB TRS-918-16 MNDOT WADENA CO, FRIENDLY RIDER PUBLIC TRANSIT,. TR PURCHASE BUS STP 8, 64, 16, PURCHASE ONE BUS (CLASS 4) 548 BB TRS-958-16 MNDOT KANABEC COUNTY, PURCHASE ONE BUS (CLASS 4). TR PURCHASE BUS STP 8, 64, 16, 741 BB TRS-7-16 MNDOT CITY OF BENSON, PURCHASE BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 74, 59,2 14,8 RELATED EQUIPMENT 742 BB TRS-1738-16 MNDOT CITY OF APPLETON/PRAIRIE 5 - PURCHASE BUS (CLASS. TR PURCHASE BUS STP 74, 59,2 14,8 4) AND BUS RELATED EQUIPMENT 743 BB TRS-34-16 MNDOT CITY OF MOORHEAD, PURCHASE BUS (CLASS 4) AND. TR PURCHASE BUS STP 74, 59,2 14,8 BUS RELATED EQUIPMENT 744 BB TRS-1131-16 MNDOT PRODUCTIVE ALTERNATIVES, PURCHASE BUS (CLASS. TR PURCHASE BUS STP 74, 59,2 14,8 4) AND BUS RELATED EQUIPMENT 745 BB TRS-249-16 MNDOT MAHNOMAN COUNTY, PURCHASE BUS (CLASS 4) AND. TR PURCHASE BUS STP 74, 59,2 14,8 BUS RELATED EQUIPMENT September 213 Project Listing A-4 Page 48 of 52

FHWA TRANST Fiscal Year: 216 STIP for FY 214-217 746 BB TRS-767-16 MNDOT RAINBOW RIDER, PURCHASE 2 BUSES (CLASS 4) AND. TR PURCHASE BUS STP 148, 118,4 29,6 BUS RELATED EQUIPMENT 747 BB TRS-7318-16 MNDOT BECKER COUNTY, PURCHASE BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 118,4 59,2 59,2 RELATED EQUIPMENT 967 BB TRS-1-16 MOWER COUNTY CVS - PURCHASE 2 BUSES (CLASS 4). TR PURCHASE BUS STP 148, 118,4 29,6 968 BB TRS-47-16 ROCHESTER ROCHESTER RR - PURCHASE 1 BUS (CLASS 7). TR PURCHASE BUS STP 437, 211,5 225,5 969 BB TRS-65-16 WINONA CITY OF WINONA - PURCHASE 2 BUSES (CLASS 6). TR PURCHASE BUS STP 44, 352, 88, 97 BB TRS-7284-16 NORTHFIELD THREE RIVERS - PURCHASE 1 BUS (CLASS 5) - CITY OF. TR PURCHASE BUS STP 146, 116,8 29,2 NORTHFIELD 971 BB TRS-7284-16A THREE RIVERS THREE RIVERS - PURCHASE 1 BUS (CLASS 4) -. TR PURCHASE BUS STP 74, 59,2 14,8 FARIBAULT 972 BB TRS-7284-16B THREE RIVERS THREE RIVERS - PURCHASE 1 BUS (CLASS 4) -. TR PURCHASE BUS STP 74, 59,2 14,8 PLAINVIEW 973 BB TRS-7284-16C THREE RIVERS THREE RIVERS - PURCHASE 1 BUS (CLASS 5) - RED. TR PURCHASE BUS STP 146, 116,8 29,2 WING 115 BB TRS-25-16 MNDOT CITY OF LE SUEUR PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1151 BB TRS-46-16 MNDOT MARTIN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1152 BB TRS-83-16 MNDOT WATONWAN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1153 BB TRS-28-16 MNDOT BROWN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1154 BB TRS-2494-16 MNDOT SMOC/NOBLES COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1155 BB TRS-2496-16 MNDOT CITY OF ST PETER PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1156 BB TRS-3274-16 MNDOT FARIBAULT COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 74, 59,2 14,8 1157 BB TRS-3331-16 MNDOT ROCK COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 8, 64, 16, 1333 BB TRS-2387-16 MNDOT WESTERN COMMUNITY ACTION, PURCHASE 2 BUSES (CLASS 4) AND BUS RELATED EQUIPMENT. TR PURCHASE BUS STP 156, 124,8 31,2 September 213 Project Listing A-4 Page 49 of 52

FHWA TRANST Fiscal Year: 216 STIP for FY 214-217 1334 BB TRS-3312-16 MNDOT ECUMEN/AUGUSTANA LUTHERAN HOMES, INC,. TR PURCHASE BUS STP 78, 62,4 15,6 PURCHASE 1 BUS (CLASS 4) AND BUS RELATED EQUIPMENT 1335 BB TRS-3316-16 MNDOT PIPESTONE CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 78, 62,4 15,6 RELATED EQUIPMENT 1336 BB TRS-734-16 MNDOT KANDIYOHI CO, PURCHASE 1 BUS (CLASS 5) AND BUS. TR PURCHASE BUS STP 133, 16,4 26,6 RELATED EQUIPMENT 183 BB TRS-768-16A MNDOT HEARTLAND EXPRESS-PURCHASE CLASS 5 BUS. TR PURCHASE BUS STP 146, 116,8 29,2 184 LOCAL 999 TRS-TCMT-16 MET COUNCIL-MT CMAQ TDM: ACTIVITIES TO REDUCE SOV USE BY VAN POOLS, CAR POOL & RIDE MATCHING PROGRAMS, MARKETING, TRANSIT RIDERSHIP INCENTIVES BY SUPPORTING SEVERAL TRANSPORTATION MANAGEMENT ORGANIZATIONS.. TM PLANNING CMAQ 4,375, 3,5, 875, 185 BB TRS-TCMT-16A METRO TRANSIT CMAQ: PURCHASE FOUR BUSES FOR LIMITED STOP. TR PURCHASE BUS CMAQ 1,67,32 1,72,82 535,238 SERVICE ON CHICAGO AND PORTLAND AVE IN MPLS AND RICHFIELD AND AMERICAN BLVD IN BLOOMINGTON 186 BB TRS-TCMT-16B METRO TRANSIT CMAQ: SERVICE DEMONSTRATION FOR LIMITED STOP. TR OPERATE BUS CMAQ 8,842,26 5,927,918 2,914,288 SERVICE ON CHICAGO AND PORTLAND AVE IN MPLS AND RICHFIELD AND AMERICAN BLVD IN BLOOMINGTON 187 BB TRS-TCMT-16C METRO TRANSIT CMAQ: PURCHASE FIVE BUSES FOR LIMITED STOP SERVICE ON E 7TH ST, ARCADE AVE, MARYLAND AVE AND WHITE BEAR AVE IN ST PAUL AND WHITE BEAR AVE IN MAPLEWOOD. TR PURCHASE BUS CMAQ 2,9,15 1,476,725 532,425 188 BB TRS-TCMT-16D METRO TRANSIT CMAQ: SERVICE DEMONSTRATION FOR LIMITED STOP SERVICE ON EAST 7TH ST, ARCADE AVE, MARYLAND AVE AND WHITE BEAR AVE IN ST PAUL AND WHITE BEAR AVE IN MAPLEWOOD. TR OPERATE BUS CMAQ 7,514,836 5,523,275 1,991,561 216 BB TRS-91-16T MNDOT STP GREATER MN TRANSIT : INCLUDING. TR PURCHASE BUS STP 1,25, 1,, 25, TRANSIT BUSES, BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS $36,525,412 $24,794,9 $ $ $ $11,73,512 September 213 Project Listing A-4 Page 5 of 52

FHWA TRANST Fiscal Year: 217 STIP for FY 214-217 186 BB TRS-5-17 MNDOT ARROWHEAD TRANSIT-PURCHASE 9 BUSES - (CLASS 5). TR PURCHASE BUS STP 1,242, 993,6 248,4 187 BB TRS-16-17 DULUTH TRANSIT DTA - STRIDE-PURCHASE 3 BUSES (CLASS 4). TR PURCHASE BUS STP 246, 196,8 49,2 AUTHORITY 356 BB TRS-6-17 MNDOT PAUL BUNYAN TRANSIT - PURCHASE 1 BUS (4-G) AND. TR PURCHASE BUS STP 82, 65,6 16,4 BUS RELATED EQUIPMENT 357 BB TRS-58-17 MNDOT TRI-VALLEY TRANSIT - PURCHASE 1 BUS (4-G) AND BUS. TR PURCHASE BUS STP 82, 65,6 16,4 RELATED EQUIPMENT 358 BB TRS-384-17 MNDOT ROSEAU CO - PURCHASE 1 BUS (4-G) AND BUS. TR PURCHASE BUS STP 82, 65,6 16,4 RELATED EQUIPMENT 594 BB TRS-55-17 MNDOT RIVER RIDER TRANSIT, PURCHASE ONE BUS (CLASS 5). TR PURCHASE BUS STP 15, 12, 3, 595 BB TRS-57-17 MNDOT TRI-CAP TRANSIT, PURCHASE ONE BUS (CLASS 5). TR PURCHASE BUS STP 15, 12, 3, 596 BB TRS-3449-17 MNDOT BRAINERD/CROW WING COUNTY PUBLIC TRANSIT,. TR PURCHASE BUS STP 82, 65,6 16,4 PURCHASE ONE BUS (CLASS 4) 597 BB TRS-768-17 MNDOT ISANTI HEARTLAND EXPRESS, PURCHASE ONE BUS. TR PURCHASE BUS STP 82, 62,9 19,1 (CLASS 4) 598 BB TRS-958-17 MNDOT TIMBER TRAILS PUBLIC TRANSIT, PURCHASE ONE BUS. TR PURCHASE BUS STP 82, 62,9 19,1 (CLASS 4) 778 BB TRS-27-17 MNDOT CITY OF MORRIS, PURCHASE BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 76, 53,2 22,8 RELATED EQUIPMENT 779 BB TRS-1131-17A MNDOT PRODUCTIVE ALTERNATIVES, PURCHASE BUS (1 CLASS. TR PURCHASE BUS STP 76, 53,2 22,8 4) AND BUS RELATED EQUIPMENT 78 BB TRS-1131-17B MNDOT PRODUCTIVE ALTERNATIVES, PURCHASE BUS (1 CLASS. TR PURCHASE BUS STP 15, 15, 45, 5) AND BUS RELATED EQUIPMENT 781 BB TRS-767-17 MNDOT RAINBOW RIDER, PURCHASE BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 76, 53,2 22,8 RELATED EQUIPMENT 12 BB TRS-1-17 MOWER COUNTY CVS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 82, 65,6 16,4 121 BB TRS-1-17A MOWER COUNTY CVS - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 82, 65,6 16,4 122 BB TRS-1-17B ALBERT LEA ALBERT LEA - PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 82, 65,6 16,4 123 BB TRS-47-17 ROCHESTER ROCHESTER RR, PURCHASE 1 BUS (CLASS 7). TR PURCHASE BUS STP 45, 343,2 16,8 September 213 Project Listing A-4 Page 51 of 52

FHWA TRANST Fiscal Year: 217 STIP for FY 214-217 1186 BB TRS-46-17 MNDOT MARTIN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 1187 BB TRS-28-17 MNDOT BROWN COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 1188 BB TRS-2387-17 MNDOT WESTERN COMMUNITY ACTION PURCHASE 1 BUS. TR PURCHASE BUS STP 76, 6,8 15,2 (CLASS 4) 1189 BB TRS-3274-17 MNDOT FARIBAULT COUNTY PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 76, 6,8 15,2 119 BB TRS-331-17 MNDOT TRAILBLAZER PURCHASE 1 BUS (CLASS 4). TR PURCHASE BUS STP 82, 65,6 16,4 1373 BB TRS-1738-17 MNDOT PRAIRIE FIVE, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 82, 65,6 16,4 RELATED EQUIPMENT 1374 BB TRS-2387-17 MNDOT WESTERN COMMUNITY ACTION, PURCHASE 1 BUS. TR PURCHASE BUS STP 82, 65,6 16,4 (CLASS 4) AND BUS RELATED EQUIPMENT 1375 BB TRS-331-17 MNDOT TRAILBLAZER, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 82, 65,6 16,4 RELATED EQUIPMENT 1376 BB TRS-3312-17 MNDOT ECUMEN/AUGUSTANA LUTHERAN HOMES, INC,. TR PURCHASE BUS STP 82, 65,6 16,4 PURCHASE 1 BUS (CLASS 4) AND BUS RELATED EQUIPMENT 1377 BB TRS-3339-17 MNDOT RENVILLE CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 82, 65,6 16,4 RELATED EQUIPMENT 1378 BB TRS-734-17 MNDOT KANDIYOHI CO, PURCHASE 1 BUS (CLASS 4) AND BUS. TR PURCHASE BUS STP 82, 65,6 16,4 RELATED EQUIPMENT 196 LOCAL 999 88M-CMAQ-17 MNDOT METRO ATP SETASIDE FOR CMAQ (INCLUDING TDM). TR MISCELLANEOUS CMAQ 34,213,455 27,37,764 6,842,691 PROJECTS YET TO BE SELECTED FOR FY 217 2143 BB TRS-91-17T MNDOT STP-GREATER MN TRANSIT ; INCLUDING. TR PURCHASE BUS STP 1,25, 1,, 25, TRANSIT BUSES, BUS RELATED EQUIPMENT, TRANSIT FACILITIES AND TRANSIT ITS $39,695,455 $31,696,364 $ $ $ $7,999,91 September 213 Project Listing A-4 Page 52 of 52

Tribal Transportation Program (TTP) A-5

TRIBAL TRANSPORTATION PROGRAM The Tribal Transportation Program (TTP) is co-administered by the Federal Highway Administration s Office of Federal Lands Highway and the Department of the Interior s Bureau of Indian Affairs (BIA). The Indian tribal government, in cooperation with the BIA or FHWA, (and any state or local government, or metropolitan planning organization as may be appropriate), develops a Transportation Improvement Program (TIP) that includes all TTP eligible projects and activities on which the Tribe intends to expend its TTP funds. The TTP TIP is approved by the BIA and FHWA. After approval, the TTP TIP is forwarded by FHWA to MnDOT for incorporation into the State Transportation Improvement Program (STIP). A-5(1)

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5344 - Bois Forte 651 TIP Fiscal Year 213 19-MAR-13 Funding Amount 1,12,469 27 - Minnesota F5344 - Bois Forte Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F53449 R WHISKEY POINT ROAD 137 - St. Louis REHAB 7 F53442 R PALMQUIST ADDITION STREETS 137 - St. Louis REHAB 7 F534423 R EAST BOIS FORTE ROAD 137 - St. Louis REHAB 7 F534424 R SUGARBUSH ROAD 137 - St. Louis REHAB 7 F534425 R CEMETERY ROAD 137 - St. Louis RECONS 7 F534461 R BIG POINT DRIVE 137 - St. Louis RECONS 7 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 3, 488, 4, 522, FY 213 ($) FY 213 ($) 1, 5, 4, 64, FY 213 ($) FY 213 ($) 26, 15, 4, 18, FY 213 ($) FY 214 ($) FY 214 ($) FY 214 ($) 7,5 7,5 FY 214 ($) FY 214 ($) 25, 2, 225, FY 214 ($) FY 215 ($) FY 215 ($) FY 215 ($) 5, 425, 35, 51, FY 215 ($) FY 215 ($) FY 215 ($) FY 216 ($) FY 216 ($) 4, 3, 4, 38, FY 216 ($) FY 216 ($) 14, 22, 21, 255, FY 216 ($) FY 216 ($) 12, 13, 15, 157, FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 3, 488, 4, 522, 4, 3, 4, 38, 6, 482,5 39, 581,5 14, 22, 21, 255, 51, 35, 4, 45, 12, 13, 15, 157, Page 1 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5344 - Bois Forte 651 TIP Fiscal Year 213 19-MAR-13 Funding Amount 1,12,469 27 - Minnesota F5344 - Bois Forte Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F534462 R GOOFY'S ROAD 137 - St. Louis NEWCON 7 F534463 R NEW VERMILION STREETS 137 - St. Louis NEWCON 7 F534464 R EAGLE POINT ROAD 137 - St. Louis REHAB 7 F5344RM O IRR ROAD MAINTENANCE 137 - St. Louis SAFETY P1 F5344RP O IRR PLANNING PROJECT 137 - St. Louis PLANING P9 F5344RT O IRR TRANSIT 137 - St. Louis TRANSIT T2 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) FY 213 ($) 5, 16,5 21,5 FY 213 ($) 5, 4, 3, 48, FY 213 ($) 144, 144, FY 213 ($) 31,969 31,969 FY 213 ($) 1, 1, FY 214 ($) FY 214 ($) 4, 622, 1, 663, FY 214 ($) 5, 2, 3, 28, FY 214 ($) 15, 15, FY 214 ($) 35, 35, FY 214 ($) 1, 1, FY 215 ($) FY 215 ($) 5, 39, 16, 456, FY 215 ($) FY 215 ($) 1, 1, FY 215 ($) 34, 34, FY 215 ($) 1, 1, FY 216 ($) 19, 15, 11, 18, FY 216 ($) 4, 4, FY 216 ($) FY 216 ($) 1, 1, FY 216 ($) 35, 35, FY 216 ($) 1, 1, FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 19, 15, 11, 18, 95, 1,32,5 17, 1,144,5 1, 6, 6, 76, 494, 494, 135,969 135,969 4, 4, Location Subtotal State Subtotal CSTIP Subtotal 1,12,469 1,19,5 1,11, 1,112, 4,334,969 1,12,469 1,19,5 1,11, 1,112, 4,334,969 1,12,469 1,19,5 1,11, 1,112, 4,334,969 Page 2 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5345 - Fond Du Lac 651 TIP Fiscal Year 213 19-MAR-13 Funding Amount 1,168,761 27 - Minnesota F5345 - Fond Du Lac Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F5357 R FOND DU LAC STREETS 17 - Carlton RECONS 7 F5389 R BROOKSTON ROAD 17 - Carlton RECONS 7 F531119 R JOKELA ROAD 137 - St. Louis RECONS 7 F532277 R CARTWRIGHT ROAD 17 - Carlton RECONS 7 F53451 R BITUMINOUS PROJECTS (DA 17 - Carlton OVRLAY 7 F53452 R BLACKETTER, MAKWA, LV 1 & 2 PROJE 17 - Carlton RECONS 7 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 2, 1, 12, FY 213 ($) 2, 2, FY 213 ($) 12, 267,761 2, 281,761 FY 213 ($) 1, 1, 11, FY 213 ($) 1, 1, 1, 3, FY 213 ($) 32, 32, FY 214 ($) 2, 1, 12, FY 214 ($) 2, 2, 22, FY 214 ($) 1, 433, 443, FY 214 ($) 2, 1, 12, FY 214 ($) 1, 1, 1, 3, FY 214 ($) 25, 25, 12, 287, FY 215 ($) FY 215 ($) 23, 61, 633, FY 215 ($) 3, 1, 13, FY 215 ($) 2, 1, 12, FY 215 ($) 11, 18, 191, FY 215 ($) FY 216 ($) FY 216 ($) 36, 94, 976, FY 216 ($) 2, 1, 12, FY 216 ($) 2, 1, 12, FY 216 ($) FY 216 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 4, 2, 24, 61, 1,57, 2, 1,651, 27, 72,761 2, 749,761 7, 4, 47, 13, 182, 2, 197, 25, 25, 44, 319, Page 3 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5345 - Fond Du Lac 651 TIP Fiscal Year 213 19-MAR-13 Funding Amount 1,168,761 27 - Minnesota F5345 - Fond Du Lac Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F53453 R PFEFFER ROAD 17 - Carlton RECONS 7 F53454 R LOCKLING ROAD 17 - Carlton RECONS 7 F53455 R BITUMINOUS PROJECTS (MA 137 - St. Louis OVRLAY 7 F53456 O IRR PLANNING 17 - Carlton PLANING P9 F53457 R DAGWAAGI ROAD 17 - Carlton RECONS 7 F53458 R AGIDAAKI & BENESHI 17 - Carlton RECONS 7 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 2, 2, FY 213 ($) 4, 9, 1, 14, FY 213 ($) 1, 2, 1, 4, FY 213 ($) 5, 5, FY 213 ($) 2, 3, 8, 4, FY 213 ($) 2, 4, 1, 52, FY 214 ($) 1, 1, FY 214 ($) 1, 1, 2, FY 214 ($) 1, 1, 1, 3, FY 214 ($) 5, 5, FY 214 ($) 1, 1, 2, FY 214 ($) 1, 1, 2, FY 215 ($) FY 215 ($) FY 215 ($) 11, 14, 151, FY 215 ($) 5, 5, FY 215 ($) FY 215 ($) FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) 5, 5, FY 216 ($) FY 216 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 12, 12, 5, 91, 1, 16, 13, 143, 2, 158, 2, 2, 3, 31, 8, 42, 3, 41, 1, 54, Page 4 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5345 - Fond Du Lac 651 TIP Fiscal Year 213 19-MAR-13 Funding Amount 1,168,761 27 - Minnesota F5345 - Fond Du Lac Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F53459 R MEADOW 17 - Carlton RECONS 7 F53451 R GIKINOO TRAIL 17 - Carlton NEWCON 7 F534511 R WOULLET & COFFEY 17 - Carlton RECONS 7 F5345EF R ERFO PROJECT 137 - St. Louis RECONS 7 F5345RM O ROAD MAINTENANCE 17 - Carlton SAFETY P1 F5345RT O IRR TRANSIT 17 - Carlton TRANSIT T2 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 1, 2, 6, 27, FY 213 ($) 5, 9, 6, 155, FY 213 ($) 8, 18, 16, 24, FY 213 ($) 2, 1, 3, FY 213 ($) 1, 1, FY 213 ($) 5, 5, FY 214 ($) 1, 1, 2, FY 214 ($) 2, 12, 14, FY 214 ($) 1, 1, 1, 3, FY 214 ($) 2, 1, 3, FY 214 ($) 1, 1, FY 214 ($) 5, 5, FY 215 ($) FY 215 ($) FY 215 ($) FY 215 ($) FY 215 ($) 1, 1, FY 215 ($) 5, 5, FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) 1, 1, FY 216 ($) 5, 5, FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 2, 21, 6, 29, 7, 192, 6, 259, 9, 181, 17, 27, 4, 2, 6, 4, 4, 2, 2, Location Subtotal State Subtotal CSTIP Subtotal 1,168,761 1,2, 1,2, 1,2, 4,768,761 1,168,761 1,2, 1,2, 1,2, 4,768,761 1,168,761 1,2, 1,2, 1,2, 4,768,761 Page 5 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5346 - Grand Portage 651 TIP Fiscal Year 213 26-APR-13 Funding Amount 347,783 27 - Minnesota F5346 - Grand Portage Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F53466 O IRR PLANNING PROJECT 31 - Cook PLANING P9 F53467 R LODGE ROAD 31 - Cook RECONS 7 F53468 O LODGE PARKING 31 - Cook SAFETY 8 F534612 R UNNAMED PROPOSED ROAD (TRANSFE 31 - Cook NEWCON 7 F534614 R GRAND PORTAGE TRAILS 31 - Cook WALKWY 7 F5346RI O IRR ROAD INVENTORY PROJECT 31 - Cook PLANING P8 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 35, 35, FY 213 ($) 1, 5, 6, FY 213 ($) 1, 5, 6, FY 213 ($) 1, 5, 6, FY 213 ($) 5, 158, 25, 188, FY 213 ($) 1, 1, FY 214 ($) 35, 35, FY 214 ($) 3, 15, 1, 19, FY 214 ($) 3, 15, 1, 19, FY 214 ($) 3, 15, 1, 19, FY 214 ($) 7, 12, 25, 152, FY 214 ($) 1, 1, FY 215 ($) 35, 35, FY 215 ($) 3, 15, 1, 19, FY 215 ($) 3, 15, 1, 19, FY 215 ($) 3, 15, 1, 19, FY 215 ($) 7, 12, 25, 152, FY 215 ($) 1, 1, FY 216 ($) 35, 35, FY 216 ($) 5, 48, 1, 54, FY 216 ($) 4, 4, 1, 45, FY 216 ($) 4, 4, 1, 45, FY 216 ($) 5, 5, 1, 65, FY 216 ($) 1, 1, FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 14, 14, 11, 79, 8, 98, 1, 71, 8, 89, 1, 71, 8, 89, 24, 448, 85, 557, 4, 4, Page 6 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5346 - Grand Portage 651 TIP Fiscal Year 213 26-APR-13 Funding Amount 347,783 27 - Minnesota F5346 - Grand Portage Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F5346RM O GP ROAD MAINTENANCE 31 - Cook SAFETY P1 F5346RT O IRR TRANSIT 31 - Cook TRANSIT T2 Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 85, 85, FY 213 ($) 2,783 2,783 FY 214 ($) 85, 85, FY 214 ($) 2, 2, FY 215 ($) 85, 85, FY 215 ($) 2, 2, FY 216 ($) 85, 85, FY 216 ($) 2, 2, FY 217 ($) FY 217 ($) 34, 34, 8,783 8,783 Location Subtotal State Subtotal CSTIP Subtotal Report 347,783 35, 35, 35, 1,397,783 347,783 35, 35, 35, 1,397,783 347,783 35, 35, 35, 1,397,783 347,783 35, 35, 35, 1,397,783 Page 7 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type F55439 - Ho-Chunk Nation 651 TIP Fiscal Year 213 3-JUL-13 Funding Amount State Location 27 - Minnesota F55439 - Ho-Chunk Nation Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F5543912 R Whiterabbit Property 55 - Houston NEWCON 7 F5543913 R Littlejohn Property 55 - Houston REHAB 7 F554393 R Blackhawk Road 55 - Houston RECONS 7 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) FY 213 ($) FY 213 ($) FY 214 ($) FY 214 ($) FY 214 ($) FY 215 ($) 1, 1, FY 215 ($) 1, 1, FY 215 ($) 1, 1, FY 216 ($) 1, 1, FY 216 ($) 1, 1, FY 216 ($) 1, 1, FY 217 ($) FY 217 ($) FY 217 ($) 2, 2, 2, 2, 2, 2, Location Subtotal State Subtotal 3, 3, 6, 3, 3, 6, Page 8 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5347 - Leech Lake 651 TIP Fiscal Year 213 19-MAR-13 Funding Amount 3,573,18 27 - Minnesota F5347 - Leech Lake Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F53169 R RYAN'S VILLAGE ROAD 21 - Cass RECONS 7 F5334 R FINEDAY LOOP ROAD 7 - Beltrami RECONS 7 F53476 O PLANNING 21 - Cass PLANING P9 F53472 R NORWAY HEIGHTS (TRACT 33 NORTH) 21 - Cass RECONS 7 F534722 R 6 MILE LAKE ROAD 21 - Cass RECONS 7 F53473 R MISSION ROAD NE 7 - Beltrami RECONS 7 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 1, 1, 1, 3, FY 213 ($) FY 213 ($) 25, 25, FY 213 ($) 2, 1, 1, 13, FY 213 ($) 1, 1, 1, 3, FY 213 ($) 455,18 25, 48,18 FY 214 ($) 1, 1, 5, 115, FY 214 ($) 5, 5, 5, 6, FY 214 ($) 25, 25, FY 214 ($) FY 214 ($) 15, 3, 1, 325, FY 214 ($) 3, 4, 2, 45, FY 215 ($) 2, 25, 5, 275, FY 215 ($) 5, 5, 5, 555, FY 215 ($) 25, 25, FY 215 ($) FY 215 ($) 1, 3, 2, 33, FY 215 ($) 8, 45, 1, 54, FY 216 ($) 35, 4, 435, FY 216 ($) FY 216 ($) 25, 25, FY 216 ($) FY 216 ($) 5, 7, 75, FY 216 ($) 6, 85, 91, FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 66, 751, 11, 828, 55, 55, 1, 615, 1, 1, 2, 1, 1, 13, 76, 1,31, 31, 1,48, 17, 2,155,18 55, 2,38,18 Page 9 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5347 - Leech Lake 651 TIP Fiscal Year 213 19-MAR-13 Funding Amount 3,573,18 27 - Minnesota F5347 - Leech Lake Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F534732 R CSAH #8 (COOP PROJECT-APPROACH 21 - Cass BRIDGE B1 F534733 R PALACE CASINO NORTH 21 - Cass NEWCON 7 F534734 R TOWNLINE LAKE HOUSING 21 - Cass NEWCON 7 F534737 R CASS COUNTY ROAD 143 21 - Cass RECONS 7 F534738 R LOST LAKE ROAD (PLANTATION ROAD 7 - Beltrami RECONS 7 F534739 R SOUTH SAND LAKE ROAD 61 - Itasca RECONS 7 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 2, 2, FY 213 ($) 2, 1, 1, 13, FY 213 ($) 2, 5, 1, 53, FY 213 ($) 2, 5, 5, 57, FY 213 ($) 2, 1, 12, 114, FY 213 ($) 2, 1, 1, 13, FY 214 ($) FY 214 ($) FY 214 ($) FY 214 ($) 3, 3, 33, FY 214 ($) 3, 1, 2, 15, FY 214 ($) FY 215 ($) FY 215 ($) FY 215 ($) FY 215 ($) FY 215 ($) FY 215 ($) FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 2, 2, 2, 1, 1, 13, 2, 5, 1, 53, 32, 35, 5, 387, 5, 2, 14, 219, 2, 1, 1, 13, Page 1 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5347 - Leech Lake 651 TIP Fiscal Year 213 19-MAR-13 Funding Amount 3,573,18 27 - Minnesota F5347 - Leech Lake Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F534741 R EAST NATURE TRAIL 61 - Itasca RECONS 7 F534743 R CHIEF BOYD ROAD - BUCK LAKE 7 - Beltrami RECONS 7 F534744 R BENA STREETS 21 - Cass RECONS 7 F534745 R TRADERS BAY PLATS ROAD 21 - Cass RECONS 7 F534746 R WILKINSON STREETS 57 - Hubbard RECONS 7 F534747 R CR 75 TRAIL 21 - Cass WALKWY F1 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 2, 15, 1, 162, FY 213 ($) FY 213 ($) 2, 2, FY 213 ($) FY 213 ($) 3, 1, 12, 115, FY 213 ($) 225, 225, FY 214 ($) 5, 1, 5, 11, FY 214 ($) 7, 1, 3, 11, FY 214 ($) 25, 6, 2, 645, FY 214 ($) FY 214 ($) 5, 5, 5, 6, FY 214 ($) FY 215 ($) FY 215 ($) FY 215 ($) 1, 5, 3, 54, FY 215 ($) 1, 2, 2, 23, FY 215 ($) 5, 5, 55, FY 215 ($) FY 216 ($) FY 216 ($) FY 216 ($) 1, 1, 11, FY 216 ($) 2, 3, 32, FY 216 ($) FY 216 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 7, 25, 15, 272, 7, 1, 3, 11, 45, 1,2, 7, 1,315, 3, 5, 2, 55, 13, 2, 17, 23, 225, 225, Page 11 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5347 - Leech Lake 651 TIP Fiscal Year 213 19-MAR-13 Funding Amount 3,573,18 27 - Minnesota F5347 - Leech Lake Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F534748 R GOVERNMENT CENTER (WORK FORCE 21 - Cass NEWCON 7 F534749 R TRIBAL ROADS COMPOUND 21 - Cass RECONS 7 F53475 R PIKE BAY TOWNSHIP ROAD 21 - Cass RECONS 7 F534751 R BUG SCHOOL ROAD 21 - Cass RECONS 7 F534752 R NORTH SIDE ADDITION 21 - Cass RECONS 7 F534753 R BALL CLUB HOUSING 61 - Itasca RECONS 7 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 5, 3, 5, 31, FY 213 ($) 2, 1, 5, 17, FY 213 ($) 2, 1, 7, 19, FY 213 ($) 2, 1, 5, 17, FY 213 ($) 2, 1, 1, 112, FY 213 ($) 2, 1, 1, 112, FY 214 ($) FY 214 ($) FY 214 ($) FY 214 ($) FY 214 ($) 5, 1, 5, 11, FY 214 ($) 3, 1, 2, 15, FY 215 ($) FY 215 ($) FY 215 ($) FY 215 ($) FY 215 ($) FY 215 ($) FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 5, 3, 5, 31, 2, 1, 5, 17, 2, 1, 7, 19, 2, 1, 5, 17, 7, 2, 15, 222, 5, 2, 12, 217, Page 12 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5347 - Leech Lake 651 TIP Fiscal Year 213 19-MAR-13 Funding Amount 3,573,18 27 - Minnesota F5347 - Leech Lake Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F5347RT O TRANSIT 21 - Cass TRANSIT T2 F53RM47 O ROAD MAINTENANCE 21 - Cass PLANING P1 Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 15, 15, FY 213 ($) 8, 8, FY 214 ($) 15, 15, FY 214 ($) 9, 9, FY 215 ($) 15, 15, FY 215 ($) 9, 9, FY 216 ($) 15, 15, FY 216 ($) 9, 9, FY 217 ($) FY 217 ($) 6, 6, 3,5, 3,5, Location Subtotal State Subtotal CSTIP Subtotal Report 3,573,18 3,6, 3,6, 3,6, 14,373,18 3,573,18 3,6, 3,6, 3,6, 14,373,18 3,573,18 3,6, 3,6, 3,6, 14,373,18 3,573,18 3,6, 3,6, 3,6, 14,373,18 Page 13 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type F6474 - Grand Traverse 656 TIP Fiscal Year 213 19-MAR-13 Funding Amount 76,582 State Location 26 - Michigan F6474 - Grand Traverse Band Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type F6474TP O 2% Planning - GTB 55 - Grand Traverse PLANING P9 Phase CE CONS PE Z FY 213 ($) FY 214 ($) FY 215 ($) FY 216 ($) FY 217 ($) 76,582 76,582 76,582 76,582 36,328 76,582 76,582 76,582 76,582 36,328 Location Subtotal State Subtotal CSTIP Subtotal Report 76,582 76,582 76,582 76,582 36,328 76,582 76,582 76,582 76,582 36,328 76,582 76,582 76,582 76,582 36,328 76,582 76,582 76,582 76,582 36,328 Page 14 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5341 - Mille Lacs 651 TIP Fiscal Year 213 11-APR-13 Funding Amount 948,12 27 - Minnesota F5341 - Mille Lacs Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F5358 R AATAGE DRIVE EXTENSION 95 - Mille Lacs RECONS 7 F53416 O IRR PLANNING PROJECT 95 - Mille Lacs PLANING P9 F53411 R SHER HOUSING DEVELOPMENT 95 - Mille Lacs NEWCON 7 F534112 R ZHINGWAAK II HOUSING DEVELOPMENT 95 - Mille Lacs NEWCON 7 F534113 R TRIBAL GOVERNMENT PARKING LOTS R 95 - Mille Lacs REHAB 7 F534114 R DISTRICT 1 ROAD PAVING PROJECT 95 - Mille Lacs REHAB 7 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 1, 1, FY 213 ($) 37,12 37,12 FY 213 ($) 25,964 244,36 27, FY 213 ($) 1, 1, FY 213 ($) 5, 3, 1, 5, 32, FY 213 ($) 5, 1, 6, FY 214 ($) 1, 1, FY 214 ($) 37, 37, FY 214 ($) 6,5 4, 5, 411,5 FY 214 ($) FY 214 ($) FY 214 ($) FY 215 ($) 1, 1, FY 215 ($) 25, 25, FY 215 ($) 14,5 452, 1, 467,5 FY 215 ($) FY 215 ($) FY 215 ($) FY 216 ($) FY 216 ($) 37, 37, FY 216 ($) 5, 5, FY 216 ($) FY 216 ($) FY 216 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 3, 3, 136,12 136,12 46,964 1,146,36 6, 1,199, 1, 1, 5, 3, 1, 5, 32, 5, 1, 6, Page 15 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5341 - Mille Lacs 651 TIP Fiscal Year 213 11-APR-13 Funding Amount 948,12 27 - Minnesota F5341 - Mille Lacs Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F534115 O NEW FACILITIES BUILDING 95 - Mille Lacs SAFETY T3 F534116 R TRIBAL GOVERNMENT PARKING LOTS 115 - Pine REHAB 7 F534117 R Wagidaaki Safety Improvement 95 - Mille Lacs SAFETY P6 F5341RM O ROAD MAINTENANCE 95 - Mille Lacs SAFETY P1 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) FY 213 ($) 1, 1, 1, 3, FY 213 ($) 1, 5, 6, FY 213 ($) 25, 25, FY 214 ($) 1, 1, FY 214 ($) 195,5 5, 2,5 FY 214 ($) FY 214 ($) 25, 25, FY 215 ($) 256,5 256,5 FY 215 ($) FY 215 ($) FY 215 ($) 25, 25, FY 216 ($) 663, 663, FY 216 ($) FY 216 ($) FY 216 ($) 25, 25, FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 1,19,5 1,19,5 1, 196,5 6, 23,5 1, 5, 6, 1,, 1,, Location Subtotal State Subtotal CSTIP Subtotal Report 948,12 1,, 1,, 1,, 3,948,12 948,12 1,, 1,, 1,, 3,948,12 948,12 1,, 1,, 1,, 3,948,12 948,12 1,, 1,, 1,, 3,948,12 Page 16 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5743 - Prairie Island 31E TIP Fiscal Year 212 26-JUL-12 Funding Amount 66,7 27 - Minnesota F5743 - Prairie Island Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F57432 O Marina Road Boat Launch 49 - Goodhue RECONS 7 F57435 O PIIC Commuter/Passenger Rail Station 49 - Goodhue TRANSIT T2 F574311 R Sturgeon Lake Road Bridge Project 49 - Goodhue RECONS 7 F574313 R 63 Roads 49 - Goodhue NEWCON 7 F574314 R Buffalo Highlands Residential Developme 49 - Goodhue NEWCON 7 F574315 O PIIC Tribal Community Parking Lots 49 - Goodhue RECONS 7 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 212 ($) 8, 6, 1, 2, 8, FY 212 ($) FY 212 ($) FY 212 ($) 15, 75, 3, 17, 11, FY 212 ($) FY 212 ($) 4, 54, 1,5 5 6, FY 213 ($) 2, 12, 1, 15, FY 213 ($) 73,3 125, 4, 22,3 FY 213 ($) 5 5 15, 4, 2, FY 213 ($) 1, 5, 5, 65, FY 213 ($) FY 213 ($) 4, 45, 1,5 4,5 55, FY 214 ($) FY 214 ($) 175, 15, 7,6 197,6 FY 214 ($) 5 13,5 75, 4, 93, FY 214 ($) FY 214 ($) FY 214 ($) 4, 45, 1,5 4,5 55, FY 215 ($) FY 215 ($) 195, 5, 2, FY 215 ($) 1, 1, 5, 115, FY 215 ($) FY 215 ($) 5 25, 51, 1,5 78, FY 215 ($) 3,5 4, 1,5 1, 46, FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) 1, 72, 1, 3, 95, 443,3 14, 16,6 599,9 11, 114, 9, 13, 228, 25, 125, 3, 22, 175, 5 25, 51, 1,5 78, 15,5 184, 6, 1,5 216, Page 17 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5743 - Prairie Island 31E TIP Fiscal Year 212 26-JUL-12 Funding Amount 66,7 27 - Minnesota F5743 - Prairie Island Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F574316 O PIIC Tribal Enterprise Parking Lots 49 - Goodhue RECONS 7 F5743RM O IRR Road Maintenance 49 - Goodhue PLANING P1 F5743TP O Transportation Planning 49 - Goodhue PLANING P1 F5743TR O IRR Transit 49 - Goodhue TRANSIT T4 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 212 ($) 1, 255, 1,5 1, 267,5 FY 212 ($) 85, 85, FY 212 ($) 2,2 2,2 FY 212 ($) 2, 2, FY 213 ($) 4, 45, 1,5 4,5 55, FY 213 ($) 144, 144, FY 213 ($) 1, 1, FY 213 ($) 1, 1, FY 214 ($) 4, 45, 1,5 4,5 55, FY 214 ($) 136,8 136,8 FY 214 ($) 5, 5, FY 214 ($) 5, 5, FY 215 ($) 3,5 4, 1,5 1, 46, FY 215 ($) 75, 75, FY 215 ($) 5, 5, FY 215 ($) 5, 5, FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) 21,5 385, 6, 11, 423,5 44,8 44,8 22,2 22,2 22, 22, Location Subtotal State Subtotal CSTIP Subtotal Report 66,7 576,3 547,4 57, 2,3,4 66,7 576,3 547,4 57, 2,3,4 66,7 576,3 547,4 57, 2,3,4 66,7 576,3 547,4 57, 2,3,4 Page 18 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5249 - Red Lake 651 TIP Fiscal Year 213 19-MAR-13 Funding Amount 2,442,817 27 - Minnesota F5249 - Red Lake Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F522811 R NORTHEAST BOUNDARY ROAD 7 - Beltrami REHAB 7 F52511 R THUNDER LAKE ROAD EAST 7 - Beltrami NEWCON 7 F52495 R HIGHLANDS SECOND ADDITION STREET 7 - Beltrami NEWCON 7 F52496 R HEART LAKE ADDITION STREETS 7 - Beltrami NEWCON 7 F52497 R FISHERY ROAD (PHASE 1) 7 - Beltrami RECONS 3 F52498 R RED LAKE CATHOLIC CEMETERY ROAD 7 - Beltrami OVRLAY 7 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 9, 1, 1, FY 213 ($) 245, 1, 255, FY 213 ($) 67, 525, 15, 67, FY 213 ($) 12, 1,22,817 1, 1,35,817 FY 213 ($) 1, 3, 2, 33, FY 213 ($) 1, 1, FY 214 ($) 1, 5, 15, FY 214 ($) 25, 1, 35, FY 214 ($) FY 214 ($) 285, 2,, 15, 2,3, FY 214 ($) FY 214 ($) FY 215 ($) 2, 1, 3, FY 215 ($) 3, 2,, 282, 15, 2,597, FY 215 ($) FY 215 ($) FY 215 ($) FY 215 ($) FY 216 ($) 15, 1,2, 2, 1,37, FY 216 ($) 187,5 1,, 12, 1,199,5 FY 216 ($) FY 216 ($) FY 216 ($) FY 216 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 15, 1,2, 12, 36, 1,488, 487,5 3,, 552, 47, 4,86,5 67, 525, 15, 67, 45, 3,22,817 25, 3,65,817 1, 3, 2, 33, 1, 1, Page 19 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5249 - Red Lake 651 TIP Fiscal Year 213 19-MAR-13 Funding Amount 2,442,817 27 - Minnesota F5249 - Red Lake Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F52499 B MUDD RIVER BRIDGE (PHASE 1) 7 - Beltrami RECONS B1 F52491 R THUNDER LAKE CONNECTOR 7 - Beltrami RECONS 7 F5249A4 R NORTH SHORE ROAD 7 - Beltrami REHAB 7 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 1, 1, FY 213 ($) FY 213 ($) 9, 5, 95, FY 214 ($) FY 214 ($) FY 214 ($) 12, 6, 18, FY 215 ($) FY 215 ($) FY 215 ($) 2, 1, 3, FY 216 ($) FY 216 ($) 7,76 5, 75,76 FY 216 ($) 1, 1, FY 217 ($) FY 217 ($) FY 217 ($) 1, 1, 7,76 5, 75,76 15, 12, 117, Location Subtotal State Subtotal CSTIP Subtotal Report 2,442,817 2,368, 2,63, 2,645,576 1,59,393 2,442,817 2,368, 2,63, 2,645,576 1,59,393 2,442,817 2,368, 2,63, 2,645,576 1,59,393 2,442,817 2,368, 2,63, 2,645,576 1,59,393 Page 2 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F57411 - Shakopee (Prior Lake) 651 TIP Fiscal Year 213 26-APR-13 Funding Amount 324,389 27 - Minnesota F57411 - Shakopee (Prior Lake) Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F57411C2 R CR 83 - South 139 - Scott RECONS 7 F57411C3 R CR 42 139 - Scott REHAB 7 F57411C4 R Valley View Road 139 - Scott RECONS 7 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 324,389 324,389 FY 213 ($) FY 213 ($) FY 214 ($) 5, 5, 225, 325, FY 214 ($) FY 214 ($) FY 215 ($) 1, 9, 19, FY 215 ($) FY 215 ($) 135, 135, FY 216 ($) FY 216 ($) 21, 21, FY 216 ($) 6, 55, 115, FY 217 ($) FY 217 ($) FY 217 ($) 15, 5, 639,389 839,389 21, 21, 6, 19, 25, Location Subtotal State Subtotal CSTIP Subtotal Report 324,389 325, 325, 325, 1,299,389 324,389 325, 325, 325, 1,299,389 324,389 325, 325, 325, 1,299,389 324,389 325, 325, 325, 1,299,389 Page 21 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5741 - Upper Sioux 651 TIP Fiscal Year 213 12-FEB-13 Funding Amount 375,873 27 - Minnesota F5741 - Upper Sioux Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F57412 R Prairie's Edge Lane Project 173 - Yellow Medicine RECONS 7 F574115 R 56th Street Project 173 - Yellow Medicine RECONS 7 F5741RM O TTP Road Maintenance Project 173 - Yellow Medicine PLANING P1 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 1, 1, 3, 5, FY 213 ($) 1, 1, 3, 5, FY 213 ($) 365,873 365,873 FY 214 ($) 1, 1, 15, 125, FY 214 ($) 1, 1, 15, 125, FY 214 ($) 126,743 126,743 FY 215 ($) 1, 1, 15, 125, FY 215 ($) 1, 1, 15, 125, FY 215 ($) 126,743 126,743 FY 216 ($) 1, 1, 15, 125, FY 216 ($) 1, 1, 15, 125, FY 216 ($) 126,743 126,743 FY 217 ($) FY 217 ($) FY 217 ($) 31, 31, 48, 38, 31, 31, 48, 38, 746,12 746,12 Location Subtotal State Subtotal CSTIP Subtotal Report 375,873 376,743 376,743 376,743 1,56,12 375,873 376,743 376,743 376,743 1,56,12 375,873 376,743 376,743 376,743 1,56,12 375,873 376,743 376,743 376,743 1,56,12 Page 22 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5348 - White Earth 651 TIP Fiscal Year 213 29-MAY-13 Funding Amount 1,72,294 27 - Minnesota F5348 - White Earth Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F53144 R CLARK ROAD 87 - Mahnomen RECONS 3 F531828 R WAUBUN TRANSFER STATION ROAD 87 - Mahnomen RECONS 7 F5331 R WHITE EARTH SOUTH HOUSING 5 - Becker RECONS 7 F5388 R ELBOW LAKE STREETS 5 - Becker RECONS 7 F5398 R WILD RICE LOOP 29 - Clearwater RECONS 7 F5311711 R NAYTAHWAUSH FIRE HALL 87 - Mahnomen RECONS 7 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 1, 1, 2, FY 213 ($) 1, 1, 2, FY 213 ($) 5, 2, 5, 5, 35, FY 213 ($) 1, 1, 2, FY 213 ($) 1, 1, 2, FY 213 ($) 1, 6, 1, 1, 9, FY 214 ($) 1, 1, 2, FY 214 ($) 1, 1, 2, FY 214 ($) 1, 1, 5, 5, 12, FY 214 ($) 3, 1, 1, 5, FY 214 ($) 5, 5, 5, 5, 2, FY 214 ($) 1, 1, 5, 5, 12, FY 215 ($) 1, 1, 2, FY 215 ($) 1, 1, 2, FY 215 ($) 2, 13, 5, 5, 16, FY 215 ($) 4, 4, 1, 1, 46, FY 215 ($) 5, 45, 1, 1, 52, FY 215 ($) 1, 1, 1, 1, 4, FY 216 ($) 1, 1, 2, FY 216 ($) 1, 1, 2, FY 216 ($) 5, 125, 5, 5, 14, FY 216 ($) 4, 2, 2, 2, 28, FY 216 ($) 2, 2, 2, 2, 26, FY 216 ($) 1, 1, 2, FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 4, 4, 8, 4, 4, 8, 31, 276, 2, 2, 347, 11, 6, 41, 41, 792, 75, 655, 36, 36, 82, 12, 17, 8, 8, 135, Page 23 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5348 - White Earth 651 TIP Fiscal Year 213 29-MAY-13 Funding Amount 1,72,294 27 - Minnesota F5348 - White Earth Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type PCAS Class Name County Project Type Work Type F531335 R MISSION ROAD 5 - Becker RECONS 7 F531671 R WOMEN'S SHELTER ROAD 5 - Becker NEWCON 7 F5317811 R WORKFORCE TRAINING CENTER ROAD 87 - Mahnomen RECONS 7 F5322213 R NAYTAHWAUSH HEADSTART 87 - Mahnomen RECONS 7 F5348RM O TTP ROAD MAINTENANCE 87 - Mahnomen PLANING P1 F5348TP O TTP TRANSPORTATION PLANNING 87 - Mahnomen PLANING P9 Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z Phase CE CONS PE Z FY 213 ($) 1, 1, 5, 5, 21, FY 213 ($) 1, 1, 1, 1, 4, FY 213 ($) 8, 663,14 7, 1, 823,14 FY 213 ($) 2, 8, 2, 1, 13, FY 213 ($) 44, 44, FY 213 ($) 1,28 1,28 FY 214 ($) 4, 45, 1, 1, 51, FY 214 ($) 1, 1, 1, 1, 4, FY 214 ($) 2, 3, 1, 1, 34, FY 214 ($) 1, 2, 5, 5, 4, FY 214 ($) 4, 4, FY 214 ($) 17,28 17,28 FY 215 ($) 1, 1, 1, 1, 4, FY 215 ($) 1, 1, 1, 1, 4, FY 215 ($) 1, 1, 1, 1, 4, FY 215 ($) 1, 1, 1, 1, 4, FY 215 ($) 34, 34, FY 215 ($) 13,28 13,28 FY 216 ($) 1, 1, 1, 1, 4, FY 216 ($) 3, 3, 2, 2, 37, FY 216 ($) 2, 2, FY 216 ($) 1, 1, 2, FY 216 ($) 44, 44, FY 216 ($) 13,28 13,28 FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) FY 217 ($) 43, 462, 17, 17, 539, 33, 33, 23, 23, 382, 11, 964,14 81, 23, 1,169,14 31, 11, 27, 17, 176, 1,62, 1,62, 414,12 414,12 Page 24 of 25

Indian Reservation Roads Programs Federal Lands Highway MN TIP Report Entity Name Program Class Code CSTIP Type State Location F5348 - White Earth 651 TIP Fiscal Year 213 29-MAY-13 Funding Amount 1,72,294 27 - Minnesota F5348 - White Earth Projects on the CSTIP withn this state are listed and subtotaled in this section Covers that part of the reservation within the current state. PCAS Class Name County Project Type Work Type F5348TR O TTP TRANSIT 87 - Mahnomen TRANSIT T4 Phase CE CONS PE Z FY 213 ($) FY 214 ($) FY 215 ($) FY 216 ($) FY 217 ($) 15, 15, 15, 15, 6, 15, 15, 15, 15, 6, Location Subtotal 1,72,294 1,757,28 1,757,28 1,757,28 6,992,134 State Subtotal 1,72,294 1,757,28 1,757,28 1,757,28 6,992,134 CSTIP Subtotal 1,72,294 1,757,28 1,757,28 1,757,28 6,992,134 Report 1,72,294 1,757,28 1,757,28 1,757,28 6,992,134 Page 25 of 25

Recreational Trails Program A-6

RECREATIONAL TRAILS PROGRAM The Recreational Trails Program provides funds to develop, maintain, and enhance recreational trails for both motorized and non-motorized recreational trail users. are appropriated to the State by formula, 5 percent equally among all eligible states and 5 percent in proportion to the amount of off-road recreational fuel use. The maximum federal share in Minnesota is 75 percent for these projects, and a 25 percent cash or pre-approved in-kind match is required. Only state agencies, cities, counties, townships, tribal governments or private trail organizations sponsored by a local unit of government are eligible to apply. The Minnesota Department of Natural Resources (MNDNR) administers this program for Minnesota. The Minnesota Recreational Trail Users Advisory Board (MRTUA) assists the MNDNR in project selections. The committee is comprised of three representatives of the ten identified trail user groups (bike, mountain bike, hike, ski, horse, in-line skate, ATV, Off- Road Vehicles, snowmobiles, Off-Highway Motorcyling) in Minnesota. The Recreational Trails Program projects are listed in District C of the project list and on the following pages. Contact: Traci Vibo, Grant Coordinator, Minnesota Department of Natural Resources, Division of Parks and Trails, 5 Lafayette Road, Box 39, St. Paul, Minnesota 55155; phone at (651) 259-5619; or email at traci.vibo@state.mn.us. A-6(1)

Recreational Trail Projects Fiscal Year: 214 STIP for FY 214-217 ATP 1979 C REC TRAIL 1-13-2F CROW WING TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 191,275 75, 116,275 COUNTY PURCHASE 198 C REC TRAIL 2-13-2F CROW WING TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 14,14 1,578 3,526 COUNTY PURCHASE 1981 C REC TRAIL 5-13-2C SAINT LOUIS TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 195, 75, 12, COUNTY PURCHASE 1982 C REC TRAIL 6-13-3A MILLE LACS BRIDGE. RT INSTALL BRIDGE RT 117,768 88,326 29,442 1983 C REC TRAIL 7-13-4B MURRAY COUNTY TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 198,965 63,961 135,4 PURCHASE 1984 C REC TRAIL 8-13-3C FILLMORE COUNTY CANFIELD CREEK BRIDGE. RT INSTALL BRIDGE RT 28, 21, 7, 1985 C REC TRAIL 1-13-S MINNESOTA TRAIL TRAIL & CAMPGROUND &. RT MAINTENANCE RT 4, 3, 1, RIDERS MAINTENANCE AND ASSOCIATION S 1986 C REC TRAIL 11-13-4C WASECA COUNTY TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 3, 22,5 7,5 PURCHASE 1987 C REC TRAIL 12-13-2C SUPERIOR HIKING REHABILITATING/ MAINTAINING THE SUPERIOR. RT REHABILITATION RT 76, 46, 3, TRAIL ASSOCIATION HIKING TRAIL AND MAINTENANCE 1988 C REC TRAIL 13-13-1A BELTRAMI COUNTY MOVIL MAZE PARK MT. BIKE TRAIL 4. RT CONSTRUCT RT 2, 1, 1, MOUNTAIN BIKE TRAIL 1989 C REC TRAIL 14-13-3A ISLE HARBOR SOO LINE - FATHER HENNEPIN STATE PARK LINK 1. RT PAVE TRAIL RT 84, 21, 63, TOWNSHIP 199 C REC TRAIL 15-13-3C CITY OF CHATFIELD PARKING LOT UPGRADE AND SHELTER. RT CONSTRUCT RT 5, 3,75 1,25 PARKING LOT AND SHELTER 1991 C REC TRAIL 17-13-2B U.S. FOREST SERVICE - SUPERIOR NATIONAL FOREST CLEARING THE 3 MILE POW WOW TRAIL. RT MAINTENANCE RT 37,5 28,125 9,375 1992 C REC TRAIL 18-13-4A RENVILLE COUNTY MINNESOTA VALLEY OHV PARK 15. RT DESIGN AND RT 187,5 147,5 4, CONSTRUCT OHV PARK 1993 C REC TRAIL 2-13-3A CITY OF SAINT SKI TRAIL GROOMER. RT EQUIPMENT RT 26,4 19,8 6,6 CLOUD PURCHASE 1994 C REC TRAIL 22-13-3C GOODHUE COUNTY CANNON VALLEY TRAIL EXCAVATOR. RT EQUIPMENT RT 25,83 19,373 6,457 PURCHASE September 213 HSIP Project Listing A-6 Page 2 of 7

Recreational Trail Projects Fiscal Year: 214 STIP for FY 214-217 ATP 1995 C REC TRAIL 23-13-3A STEARNS COUNTY MULTI PURPOSE TRAIL MAINTENANCE AND. RT EQUIPMENT RT 46,136 34,62 11,534 GROOMING EQUIPMENT PURCHASE 1996 C REC TRAIL 24-13-2B U.S. FOREST SERVICE, SUPERIOR NATIONAL FOREST BIG ASPEN ATV TRAIL MAINTENANCE AND REHABILITATION. RT REHABILITATION AND MAINTENANCE RT 6, 35, 25, 1997 C REC TRAIL 25-13-4D CITY OF ADAMS TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 225, 75, 15, PURCHASE 1998 C REC TRAIL 28-13-2A ITASCA COUNTY TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 182, 75, 17, PURCHASE 1999 C REC TRAIL 3-13-1A BECKER COUNTY TRAIL GROOMER PURCHASE. RT EQUIPMENT RT 117,563 58,781 58,782 PURCHASE 2 C REC TRAIL 31-13-2B CITY OF ORR TRAIL GROOMER. RT EQUIPMENT RT 188,1 75, 113,1 PURCHASE 21 C REC TRAIL 32-13-1B GRANT COUNTY GRANT COUNTY ATV TRAILS & SAFETY PARK 2. RT CONSTRUCT ATV RT 65, 48,75 16,25 TRAIL AND SAFETY PARK 22 C REC TRAIL 34-13-3B ANOKA COUNTY RICE CREEK WEST REGIONAL TRAIL UNDERPASS. RT UNDERPASS RT 3, 34,74 265,296 RECONSTRUCTION RECONSTR 23 C REC TRAIL 37-13-2C CITY OF DULUTH CROSS CITY TRAIL PHASE III 1. RT CONSTRUCT RT 7, 15, 55, 24 C REC TRAIL 41-13-2C COOK COUNTY KUBOTA L38 4WD TRACTOR. RT EQUIPMENT RT 24,464 18,347 6,117 PURCHASE 25 C REC TRAIL 42-13-2C COOK COUNTY COOK COUNTY MOUNTAIN BIKE TRAIL EXTENSION 4. RT CONSTRUCT RT 61,354 46,4 15,35 MOUNTAIN BIKE TRAIL 26 C REC TRAIL 43-13-2C CITY OF DULUTH MISSION CREEK TRAIL CENTER OF THE DULUTH 1. RT CONSTRUCT RT 2, 15, 5, TRAVERSE MOUNTAIN BIKE TRAIL 27 C REC TRAIL D1-13-3C DNR PARKS AND ZUMBRO BOTTOMS HORSE CAMP VAULT TOILET. RT INSTALL VAULT RT 4, 3, 1, TRAILS TOILET 28 C REC TRAIL D2-13-2D DNR PARKS AND WILLARD MUNGER STATE TRAIL PART 1. RT CULVERT AND RT 233,582 15, 83,582 TRAILS TRAIL RESTORATION 29 C REC TRAIL D3-13-2D DNR PARKS AND WILLARD MUNGER STATE TRAIL PART 2. RT CULVERT AND RT 594,97 132,159 462,811 TRAILS TRAIL RESTORATION 21 C REC TRAIL D4-13-2C DNR PARKS AND PIT TOILET REPLACEMENT. RT TOILET RT 9,4 67,8 22,6 TRAILS REPLACEMENT September 213 HSIP Project Listing A-6 Page 3 of 7

Recreational Trail Projects Fiscal Year: 214 STIP for FY 214-217 ATP 211 C REC TRAIL D5-13-3A DNR PARKS AND FATHER HENNEPIN STATE PARK TRAIL 1. RT CONSTRUCT RT 85, 63,75 21,25 TRAILS CONNECTION TRAIL 212 C REC TRAIL D6-13-2 DNR PARKS AND SNOWMOBILE TRAIL GROOMER AND DRAG. RT EQUIPMENT RT 18, 75, 15, TRAILS EQUIPMENT PURCHASE PURCHASE 213 C REC TRAIL D8-13-2D DNR PARKS AND SUTTER 5 TRAIL DOZER EQUIPMENT PURCHASE. RT EQUIPMENT RT 74, 55,5 18,5 TRAILS PURCHASE 214 C REC TRAIL D9-13-2D DNR PARKS AND CIMLINE MAGMA 15. RT EQUIPMENT RT 49,515 37,136 12,379 TRAILS PURCHASE 215 C REC TRAIL D1-13-2B DNR PARKS AND OHV RECREATION AREA ENTRANCE OVER DM&IR. RT BRIDGE REPAIR RT 124,96 93,72 31,24 TRAILS RAILROAD $4,919,386 $2,188,166 $ $ $ $2,731,22 September 213 HSIP Project Listing A-6 Page 4 of 7

Recreational Trail Projects Fiscal Year: 215 STIP for FY 214-217 ATP 285 C REC TRAIL 88C-RT-15 DNR PARKS AND STATEWIDE DNR PARKS & TRAILS. RT PARKS & TRAIL RT 2,5, 2,, 5, TRAILS $2,5, $2,, $ $ $ $5, September 213 HSIP Project Listing A-6 Page 5 of 7

Recreational Trail Projects Fiscal Year: 216 STIP for FY 214-217 ATP 2125 C REC TRAIL 88C-RT-16 DNR PARKS AND STATEWIDE DNR PARKS & TRAILS. RT PARKS & TRAIL RT 2,5, 2,, 5, TRAILS $2,5, $2,, $ $ $ $5, September 213 HSIP Project Listing A-6 Page 6 of 7

Recreational Trail Projects Fiscal Year: 217 STIP for FY 214-217 ATP 2161 C REC TRAIL 88C-RT-17 DNR PARKS AND STATEWIDE DNR PARKS & TRAILS. RT PARKS & TRAIL RT 2,5, 2,, 5, TRAILS $2,5, $2,, $ $ $ $5, September 213 HSIP Project Listing A-6 Page 7 of 7

MnDOT State Road Construction Program (SRC) A-7

MnDOT STATE ROAD CONSTRUCTION PROGRAM In developing the 214-217 STIP, only federal-aid highway formula funds were subject to the ATP prioritization process. State funded projects are included in the formal STIP for informational purposes and were shared and discussed with the ATPs. MnDOT anticipates a high degree of flexibility in the use of federal or state funding sources for individual projects. The estimated average annual state funds available for trunk highway construction activities is $313 million. Actual amounts are slightly higher with a modest level of over programming. However, a portion of those state funds are reserved for statewide initiatives shown in District ATP C. State funds are available to each MnDOT District to cover the following items in priority order: 1. Match federal dollars received through the ATP process and Federal High Priority Project funding or Allocated funding. 2. Estimate necessary District set-asides to cover supplemental agreements and cost overruns. 4. A prioritized list of all other state funded projects or set-a-sides. This prioritized list will include all Municipal Agreement Projects, Bridge and Road Construction Projects and Landscape Partnerships. MnDOT s State Road Construction Program (SRC) is legislatively constrained by an annual budget level. The exact budget level can vary by biennium. The STIP program level may not coincide with the SRC budget level if MnDOT is more or less successful than anticipated during the ATP process. If the program level is significantly higher, legislative action would be required to raise the budget level. The STIP is fiscally constrained, but MnDOT s SRC budget includes a level of advance construction programming. Project totals (all four years of the STIP) for the MnDOT State Road Construction Program (SRC) are provided in Figure A-4. Figure A-5 gives the SRC program totals by District/ATP and year. s for the SRC include dollars funded by federal advance construction funds, which may exceed actual federal dollars available in any given year. This is due to the fact that AC can be converted over more than one year. 3. Estimate of right-of-way needs to cover all trunk highway projects, with appropriate lead time for expenditures. A single account will still be monitored by the MnDOT Office of Land Management. The MnDOT Districts must identify the expenditures for the correct State Fiscal Year (SFY). A-7(1)

Figure A-4 STATE ROAD CONSTRUCTION PROGRAM FUNDING ** BY SOURCE AND YEAR ( $ MILLIONS) SOURCE 214 215 216 217 TOTAL* FEDERAL FUNDS Formula 328.7 286.2 278.8 357.3 1,251.1 High Priority Projects (Demonstration) 5.3 6.8 4. 15.3 31.4 Other Federal..... Advance Construction *may not total correctly to rounding **includes bonds 116.2 137.9 15.2 26.4 295.7 SUBTOTAL* 45.2 43.9 298. 399. 1,578.1 Trunk Highway 312.2 337.7 322.7 273.7 1,246.3 BOND FUNDS 21.5 11.7 46. 84. 442.2 TOTAL* 972.9 87.3 666.7 756.7 3,266.7 DISTRICT/ ATP Figure A-5 STATE ROAD CONSTRUCTION PROGRAM FUNDING** BY DISTRICT/ATP AND YEAR ($ MILLIONS) *may not total correctly to rounding **includes bonds 214 215 216 217 TOTAL* 1 44.7 124. 75.3 91.4 335.4 2 35.3 36.5 47.3 24.8 143.9 3 65.1 68.5 9. 43.1 266.7 4 45.7 46. 59.6 45.2 196.4 6 1.3 228.8 43.7 56.6 429.4 7 81.9 49.6 46.1 116.4 294. 8 54.3 42.6 35.6 31.6 164.1 SUBTOTAL* 427.4 596. 397.6 49. 1,83. METRO 518.5 244.5 225.9 32.9 1,291.8 MISC 27. 29.8 43.2 44.8 144.8 TOTAL* 972.9 87.3 666.7 756.7 3,266.7 A-7(2)

Appendix B Other Modal Programs Minnesota Rail Service Improvement Program Port Development Assistance Program Minnesota Aeronautics Airport Capital Improvement Program

Minnesota Rail Service Improvement Program B-1

MINNESOTA RAIL SERVICE PROGRAM The Minnesota Rail Service Improvement Program (MRSI), established in 1976, helps prevent the loss of rail service on lines potentially subject to abandonment by railroads. Using state-developed eligibility rules, the state and rail users and/or railroads enter into contracts for rail line rehabilitation, capital improvements, purchase assistance to rail authorities, loan guarantees and state rail banking. Funding for these projects is in the form of a loan. When the project is completed, the recipient repays the state. These reimbursements are returned to the Minnesota Rail Service Improvement Program account to fund future rehabilitation projects. Projects fall within the program areas identified below. The MRSI Program has identified $27 million in railroad track project needs. Projects will move ahead if funding is available and project agreements can be completed and contracts executed. These loan projects are typically funded with state bond funds. Figure B-1 at the end of this section identifies the potential number of projects and funding. Rail Rehabilitation Program Provides low and no-interest loans to rehabilitate and preserve rail lines that are financially viable and have the potential to increase rail use. A shipper s survey, cost/benefit analysis, and a rehabilitation needs assessment are conducted to determine which lines are prospective rail projects. Repayment of loans is required. Capital Improvement Loan Program Provides rail users and railroads with loans for projects that improve rail service and/or strengthen the financial condition of the associated line. Eligible projects have typically included capital improvements such as building and expanding industrial spurs, upgrading bridges and building more efficient loading/un-loading facilities. Repayment of loans is on a quarterly basis. State Rail Bank Program Allows the state to acquire and preserve abandoned rail lines for future transportation use or for transmitting energy, fuel or other commodities. The following five programs are funded under the Minnesota Rail Service Improvement Program. Rail Purchase Assistance Program Assists Regional Railroad Authorities in acquiring rail lines that can be operated on a self-sustaining basis to provide local rail service. MnDOT may provide up to 5 percent of the value of the property. State funds are secured and require repayment if the line is sold or ceases to serve the purpose intended. B-1(1)

Rail User and Rail Carrier Loan Guarantee Program Assists rail users in obtaining loans for rail rehabilitation and capital improvements by guaranteeing up to 9 percent of the loan. The 1994 Legislature further amended the statute, recreating the program as the Rail User and Rail Carrier Loan Guarantee Program. Not only rail users but rail carriers are eligible for assistance under the program. In addition to rail line rehabilitation, rolling stock acquisition and installation are eligible. Additional information on the Minnesota Rail Service Improvement Program may be obtained from Peter Dahlberg, Program Manager, Office of Freight and Commercial Vehicle Operations, at (651) 366-3693. Figure B-1 MINNESOTA RAIL SERVICE PROGRAM ESTIMATED FUNDING SUMMARY AND NUMBER OF POTENTIAL PROJECTS BY PROGRAM AND YEAR PROGRAM 214 215 216 217 Rail Purchase Assistance Program Rail Rehabilitation Program Capital Improvement Loan Program $2,, (8) $1,5, (6) $1,5, (6) $1,5, (6) $6,5, (26) State Rail Bank Program Rail User/Rail Carrier Loan Guarantee Program TOTAL $2,, (8) $1,5, (6) $1,5, (6) $1,5, (6) $6,5, (26) ( ) = Number of Potential Project B-1(2)

Port Development Assistance Program B-2

PORT DEVELOPMENT ASSISTANCE PROGRAM The Port Development Assistance Program was developed by the state in response to the needs of the commercial navigation system. No federal funds are currently available for these types of projects. The program provides a funding source that facilitates compliance with tighter environmental standards; helps to ensure the continued commercial effectiveness of lake and river navigation terminals and helps to offset the increases in general cost of commercial shipping. There exist a number of conditions that warrant the port development assistance program in Minnesota. Many of the public terminals and docks in the state are in need of rehabilitation at costs beyond the means of local agencies. Local port authorities are having trouble keeping their infrastructures intact especially for our agricultural and mining industries because the transportation and disposal of dredge material restricted to fewer, temporary or permanent disposal locations due to environmental regulations. Project proposals are prioritized based on need, employment generated and overall economic benefit. Mn/DOT s Office of Freight and Commercial Vehicle Operations, working with the State s port authorities, had identified a list of potential harbor improvement projects for 213 and beyond. Past projects, besides dredging, include rehabilitating or improving rail and truck access, dock walls, building roofs, sprinklers and electrical systems, mobile handling equipment and adding warehouse capacity. The Minnesota Legislature has made the following appropriations to the Port Development Assistance Program: 1996 - $3 million (Bonds) 1998 - $3 million (Bonds) 1998 - $1.5 million (General ) 2 - $2 million (General ) 21 - $1 million (General ) 23 - $2 million (Bonds) 25 - $2 million (Bonds) 26 - $3 million (Bonds) 28 - $5, (General ) 29 - $3 million (Bonds) 211 - $3 million (Bonds) 212 - $1 million (Bonds) To date, total state appropriations for the Port Development Assistance Program amounts to $25 million. The Ports have identified nearly $45 million of port development needs. According to Minnesota law, Port Development Assistance funds cannot be added to other state sponsored port investments. Port Development funds can be used with federal and local dollars to complete projects that benefit a port. Additional information about the Port Development Assistance Program may be obtained from Dick Lambert, Ports and Waterways Section, Office of Freight and Commercial Vehicle Operations, at (651) 366-3683 or email: dick.lambert@state.mn.us. B-2(1)

Figure B-2 PORT DEVELOPMENT ASSISTANCE PROGRAM ANTICIPATED EXPENDITURES BY PORT AND YEAR PORT 214 215 216 217 TOTAL Duluth $ $1,3, $1,45, $ $2,75, Minneapolis $ $ $ $ $ St. Paul $ $5, $295, $ $795, Red Wing $ $2, $139,4 $ $339,4 Winona $31,24 $288,76 $ $ $32, TOTAL $31,24 $2,288,76 1,884,4 $ $4,24, Note : These anticipated expenditures are the result of the legislature s $3 million appropriation in 211 and $1 million appropriation in 212 and a small carryover from the 29 legislative appropriation. All appropriations are expected to be expended by 215. B-2

Minnesota Aeronautics Airport Capital Improvement Program B-3

MnDOT Office of Aeronautics AERONAUTICS Cassandra Isackson Transportation Operations Manager (651) 234-721 222 E Plato Blvd St. Paul, Minnesota 5517-1618 General Information: (651) 234-72 8-657-3922 FAX: (651) 296-989