Atlantic Ocean Random Routing RNAV Area (AORRA)

Similar documents
AGENCE POUR LA SÉCURITÉ DE LA NAVIGATION AÉRIENNE EN AFRIQUE ET A MADAGASCAR

Briefing Leaflet. Recommended Procedures in the AFI Region 1. EXCERPT FROM THE IATA IN-FLIGHT BROADCAST PROCEDURE (IFBP): 17ATSBL07 07 July 2017

AGENCE POUR LA SÉCURITÉ DE LA NAVIGATION AÉRIENNE EN AFRIQUE ET A MADAGASCAR

AGENCE POUR LA SÉCURITÉ DE LA NAVIGATION AÉRIENNE EN AFRIQUE ET A MADAGASCAR

AGENCE POUR LA SÉCURITÉ DE LA NAVIGATION AÉRIENNE EN AFRIQUE ET A MADAGASCAR

AGENCE POUR LA SÉCURITÉ DE LA NAVIGATION AÉRIENNE EN AFRIQUE ET A MADAGASCAR

REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES

AGENCE POUR LA SÉCURITÉ DE LA NAVIGATION AÉRIENNE EN AFRIQUE ET A MADAGASCAR

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

Pilot RVSM Training Guidance Material

REPUBLIC OF KAZAKHSTAN

Regulations & Obligations

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

AIP PORTUGAL ENR NOV-2007

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE. Lisbon, Portugal, 19 to 20 May 2010

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

AGENCE POUR LA SÉCURITÉ DELA NAVIGATION AÉRIENNE EN AFRIQUE ET A MADAGASCAR

1.2. Follow up of the AORRA airspace implementation (Presented by Secretariat) Summary

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

ENR 1.7 ALTIMETER SETTING PROCEDURES

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

International Civil Aviation Organization Western and Central African Office. Agenda Item 2: Air Traffic Management (ATM)

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR

AIR GROUND DATA LINK IN SOUTH ATLANTIC REGION. NAM/ CAR/ SAM ATS DATALINK IMPLEMENTATION WORKSHOP (Philisburg, Sint Maarten, April 2016)

FRENCH GUIANA ATM CONTINGENCY PLAN FOR ROCHAMBEAU FIR

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D

ALTIMETER SETTING PROCEDURES

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima

ENR 1.1 GEN. RULES (Insert para 13 in ENR 1.1 of AIP India as follows)

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA

EUR/SAM corridor airspace concept

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

Subject: Application of Data Link services within Kolkata FIR

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Agenda Item 6-ATM Coordination (ATM Contingency Plan- Level 1 and Level 2)

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

SERA AND CAP694 (THE UK FLIGHT PLANNING GUIDE) - GUIDANCE. Correct to 1 May This document is for guidance only and is subject to change.

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

AREA NAVIGATION RNAV- MANAGEMENT

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) IMPLEMENTATION IN INDONESIA

REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE

CONTROLLED AIRSPACE CONTAINMENT POLICY

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Advisory Circular. File No.: Z U Issue No.: 01

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance

USE OF RADAR IN THE APPROACH CONTROL SERVICE

CHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Traffic flow in oceanic airspace of Mumbai FIR, evaluation of FLAS and its Review

Appendix A REQUEST FOR AUTHORIZATION FORM

IRELAND SAFETY REGULATION DIVISION

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

RNAV - RNP. July 2010

Reporting Instructions FILING REQUIREMENTS

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

SPECIAL PROCEDURES FOR IN-FLIGHT CONTINGENCIES IN OCEANIC AIRSPACE OF SEYCHELLES FIR

Proposal for the updating of the FASID ATM Evolution Tables

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

Subject : Correct application of the strategic lateral offset procedures

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

Proposed restricted area Mahia Peninsula airspace user consultation

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

Safety Brief. 21st March Operations in Somali Airspace

Contents. Subpart A General 91.1 Purpose... 7

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

AIRAC AIP SUPPLEMENT 02/16 26 th MAY 2016

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs.

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING

FAA RNP 10 JOB AID With FAA Order B References (20 May 2010)

Figure 3.1. Foreign Airport Assessment Aid

AFI Regional Air Navigation Planning and Implementation Issues IMPLEMENTATION OF RNAV/RNP10 ROUTES AND RVSM IN THE AFI REGION. (Presented by IATA)

NORTH ATLANTIC (NAT) REGIONAL SUPPLEMENTARY PROCEDURES

APIRG17-WP/16 12/7/10 AVIATION SUMMARY. by APIRG. 1.1 traffic. 19 to of SAT/15. meeting system called for.

Insert new Standards, including Appendix 6, applicable from 20 November 2008, and Attachment F as follows:

Letter of Agreement (LOA)

Overview of Worldwide Data Link Equipage Mandates

CHAPTER 5 SEPARATION METHODS AND MINIMA

PBN Airspace Concept. ATS requirements

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Federal Aviation Administration Operations in the New York Center Oceanic CTA/FIR

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

AIR LAW AND ATC PROCEDURES

AIP GEN SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 17 GEN 1.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

REGULATIONS OF THE CIVIL AVIATION BOARD NUMBER 75 ON PRIVILEGES OF HOLDERS OF PILOT, AIR TRAFFIC CONTROLLER

EXPERIMENTAL OPERATING LIMITATIONS EXHIBITION GROUP I1

ICAO Bay of Bengal ATS Coordination Group ATFM Task Force

NORTH ATLANTIC (NAT) REGIONAL SUPPLEMENTARY PROCEDURES

AERONAUTICAL INFORMATION CIRCULAR 33/17

AIP GEN SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 17 GEN 1.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT

Official Journal of the European Union L 186/27

Transcription:

AGENCE POUR LA SÉCURITÉ DE LA NAVIGATION AÉRIENNE EN AFRIQUE ET A MADAGASCAR Phone : 221.33869.23.32 221.33869.23.46 Fax : 221.33820.06.00 AFTN : GOOOYNYX E-mail : SENEGALBNI@asecna.org Web site : www.ais-asecna.org SUP AIP AIRAC NR 12/A/08GO 23 OCTOBER 2008 BUREAU NOTAM INTERNATIONAL DE L OUEST AFRICAIN B.P. 8155 Aéroport Léopold Sédar SENGHOR Dakar/Yoff- SENEGAL BÉNIN GUINEE BISSAU BURKINA FASO CÔTE D IVOIRE MALI MAURITANIE NIGER SENEGAL TOGO Atlantic Ocean Random Routing RNAV Area (AORRA) (Phase 2) EFFECTIVE DATE December 18th 2008 VALIDITY Permanent 1 DESCRIPTION OF AORRA AIRSPACE 1.1 The Atlantic Ocean Random Routing RNAV Area (AORRA) is the volume of airspace between FL290 and FL410 inclusive within the Atlantico, Dakar, Comodoro Rivadavia, Ezeiza, Johannesburg Oceanic, Luanda Oceanic and Montevideo FIRs limited by a line joining the following coordinates (See Attached Map): 04 10.0S 006 35.0E 05 30.0S 008 50.0E 05 20.0S 010 00.0E 07 48.0S 011 30.0E (OPAPO) then via a 120NM arc centred on Luanda to 09 40.0S 011 24.0E (ONTAR) 17 30.0S 011 13.0E 27 30.0S 015 00.0E 60 00.0S 015 00.0E 60 00.0S 053 00.0W 58 21.06S 053 00.0W 36 45.30S 053 11.47W 34 00.0S 051 33.20W 34 00.0S 050 00.0W 26 45.0S 043 45.0W 19 43.0S 034 55.0W 18 30.0S 038 45.0W SUP AIP NR 12/A/08GO Page 1/5

15 34.0S 036 18.0W 11 55.0S 032 53.0W 08 54.0S 031 56.0W 00 00.0 026 34.0W 00 00.0 006 35.0E 04 10.0S 006 35.0E Dakar Oceanic FIR airspace concerned is limited by following coordinates (see attached map): (0 00 00 ; 024 35 00 W); (06 21 46 S; 015 59 43 W); (06 21 46 S; 009 59 38 W); (11 59 53 S; 009 58 53 W); (09 31 51 S; 002 59 46 W); (0 00 00 ; 003 00 00 W). 1.2 Flights operating within the AORRA shall enter and exit AORRA via the following gates: Johannesburg Oceanic IBLOK S18 47 07 E 011 40 06 NIBEK S 22 58 05 E 013 12 09 NIGAM S 26 33 09 E 014 37 02 OKTEL S 28 07 09 E 015 00 05 UVGOD S 29 09 07 E 015 00 00 ALDOV S 30 37 02 E 015 00 00 BUXIR S 32 00 00 E 015 00 00 OKDOG S 33 05 00 E 015 00 00 ITMEK S 34 12 00 E 015 00 00 ITLIK S 35 16 00 E 015 00 00 Luanda URAPI S 09 49 07 W 003 48 07 OSUKO S 09 01 01 W 001 36 04 GAPEL S 08 17 06 E 000 19 00 TERBA S 04 47 09 E 000 35 00 OPAPO S 07 48 00 E 011 30 00 ONTAR S 09 40 00 E 011 24 00 Atlantico CIDER S 24 07 08 W 040 16 04 EKALO S 22 26 00 W 038 08 08 GARUP S18 51 48 W037 40 24 PORGA S18 40 48 W038 14 36 POLVO S18 35 24 W038 31 12 Montevideo BIVEN S 36 35 00 W 053 05 10 Ezeiza GUXOR S 37 22 30 W 053 00 00 BISUL S 43 31 22 W 053 00 00 Comodoro Rivadavia EGLAS S 48 00 00 W 053 00 00 IRIRO S 60 00 00 W 053 00 00 1.2.1 In case does not exist established AWY, standard instrument arrival (STAR) or standard instrument departure (SID), soon after the entrance in to/exit from AORRA, which attend origin/destination of a specific flight, ACFT may enter in to/exit from AORRA out of the gates established in item 1.2. 1.3 Aircraft may track via a flight plan preferred track between these gates. Prior to entering or after exiting the AORRA at a particular gate, aircraft are to comply with the fixed route Page 2/5 SUP AIP NR 12/A/08GO

structure associated with that particular entry or exit point or as instructed by ATC, and are required to flight plan accordingly. 1.3.1 Prior to entering or after exiting the AORRA from / to Luanda Oceanic airspace, operators are to plan a flight so as to cross the Luanda Oceanic FIR boundary at the significant point established on the FIR boundary and which is associated with the fixed route on which they intended operating while in that airspace. 2. Automatic Dependent Surveillance and Control Pilot Data Link Communications (ADS/CPDLC) 2.1 ADS/CPDLC will be utilized in AORRA airspace by suitably equipped service providers to provide this kind of communication and/or surveillance to aircraft equipped with FANS 1/A Functionalities. Operators are to note that in some sectors of the random routing airspace, ADS/CPDLC is the primary form of communication, with HF as secondary means of communication. 3. Required Navigation Performance (RNP) 10 procedures for aircraft operations within the AORRA 3.1. No aircraft shall flight plan to operate in the AORRA airspace unless it is RPN10 certified to operate in this airspace by the State of Registry or the State of operator, as the case may be, except in the following circumstances: 3.1.1. The aircraft is being initially delivered to the State of Registry or the State of the operator; 3.1.2. The aircraft is certified but experienced navigation degradation and is being flown back to base or to a maintenance facility for repairs; 3.1.3. The aircraft is engaged on a humanitarian or mercy flight; 3.1.4. State aircraft. 4. Approval of Airworthiness/Operations 4.1. RNP 10 Approval The operators operating or intending to operate in AORRA airspace shall obtain RNP 10 approval from the State s registry or State s Operator as appropriate, in accordance with the following conditions: a) The aircraft satisfies specifications of Minimum aircraft system performance specifications (MASPS) of the State s registry. b) The aircraft is operated under the conditions indicated in the RNP 10 operational approval issue by the user s State. 5. Flight Plans 5.1. When it is intended to operate an aircraft in AORRA airspace, RNP10 compliance shall be indicated placing an R in box 10 of the flight plan form. 5.2. Flight plans shall contain entry and exit point to AORRA and the estimated time for every 5 of longitude. SUP AIP NR 12/A/08GO Page 3/5

5.3. In the case of repetitive flight plans RNP10 compliance shall be indicated placing an R in box Q of the RPL, as follows: EQPT/R. 5.4. Those operators operating under the circumstances stipulated in paragraph 4.1 shall insert STS/ NON RNP10, in field 18 of the ICAO FPL. 6. Operational Procedures before entering to AORRA airspace 6.1. Before entering to AORRA airspace the RNP10 certified aircraft pilot-in-command shall verify that the required equipment to fly within AORRA airspace is normally operating and verify with the greatest possible accuracy the position of the aircraft through external air navigation aids. 6.2. If any equipment is not operating normally, the pilot should notify the ATC before entering the AORRA airspace. 6.3. Whilst operating within the defined area of the AORRA flight levels will comply with the table of cruising levels as reflected in Annex 2 Appendix 3(b). No RVSM operations are envisaged within the AORRA until further notice. 6.4. RVSM transition procedures should be taken into consideration from/to RVSM airspace in the FIRs where RVSM transition areas are defined. 7. Operational Procedures after Entering the AORRA Airspace 7.1. General Procedures 7.1.1. If an aircraft cannot continue the flight in compliance with the ATC clearance issued and/or cannot maintain the precision required for the specified navigation performance in the airspace, ATC will be advised immediately. 7.2. Position reporting shall be required at Entry/Exit gate. 05E 10E 15E 00 E/W 05W 10W 15W 20W 25W 30W 35W 40W 45W 50W As well as any other position required by ATC. Page 4/5 SUP AIP NR 12/A/08GO

END. SUP AIP NR 12/A/08GO Page 5/5