Development of Road Infrastructure in India

Similar documents
Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

ROADS April Contents. Advantage India. Market overview. Investments. Regulatory framework. Opportunities. Industry associations

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

ROAD DEVELOPMENT IN INDIA 2015

PPP Days 2010 PPPs Lessons from the Last 18 Months

Domestic Tourism Statistics in India


Helicopter Connectivity in North East

ORDER. Subject : Constitution of the Working Group on Tourism for the Twelfth Plan ( ).

ROADS For updated information, please visit March 2019

Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~

Road Development in India Weekly Newsletter June 24 June 30,

Afghanistan. Supply, Installation, Rehabilitation, Construction Testing and Commissioning of Gardez To Khost Road in Afghanistan, Funded by USAID

BY NHIDCL. 25 t h MAY, 2018

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

the total length of railway lines in the country and the length out of that electrified in terms of kilometre and percentage, State-wise;

Karnataka Evaluation Policy and Karnataka Evaluation Authority

Sources of Information

Ministry of Development of North Eastern Region

Table-1.1 SEASONS, SOWING & HARVESTING PERIOD AND PRODUCTION. Five year Average Production ( to Harvesting Period.

PART I Issue 2 Rev. 3 Chapter 4 January 2017 Page 1 of 12

PRESENTATION ON INDIA JAPAN BILATERAL RELATION

Alternatives Study of Alignment

COMMISSION IMPLEMENTING REGULATION (EU)

Corridor of growth. Corridor Description and Rating NEW GURGAON. Areas Included:

Third scorpene submarine 'Karanj' was launched from Mazgaon Badargaon

Network Size and Growth

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement

Japan India Cooperation on Railway Sector

11 th Annual Conference Road Development in India Telangana State Initiatives

MINISTRY OF URBAN DEVELOPMENT DEMAND NO. 95 Ministry of Urban Development

G.O.Ms.No.142 Dated:

One Under-rated achievement of the Delhi Master Plan MPD 2021 wins the ISOCARP award 2008 for Urban planning.

The winning states in each of the three award categories were as follows:

Business Case Approved. Under Construction. Business Case Approved. Under Construction

SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

15-18 May 2018 Proposal for Government of Bihar to participate in GES 2018

Credit No IN. National Project Director 9,Institutional Area, Lodhi Road, New Delhi Tel:

STATE NATIONAL ANDHRA PRADESH KERALA. CRI Pumps bags Rs.150 cr. pump order from EESL

DESPITE GLOBAL ISSUES, TOURISM IS ON A GROWTH PATH

QUALITY OF SERVICE OF CELLULAR MOBILE IN LUTYENS AND NDMC AREAS OF DELHI A STUDY

Indian Aviation Industry

Multimodal Logistics Professionals

PROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period)

PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders. February 18 th, Presented To:

Aero Expo 2016 Civil Aviation Convention & Exhibition Enhancing Regional & Remote Connectivity. November 18 th, 2016.

SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

An Overview of Airport Infrastructure in India. By V.P.Agrawal, Chairman, Airports Authority of India

A14 SCHEME - LAST CHANCE TO OBJECT

16. COMMITTEE SECTION (T&T)

2001/02 Financial review of the Ministry of Transport. Report of the Transport and Industrial Relations Committee

TAMIL NADU EVERYDAY CURRENT AFFAIRS APRIL 9, Chennai s Presidency college ranked third in the NIRF 2019 rankings

Railways in India 2012

GMR Infrastructure Limited, Q1-FY 11 Performance Highlights. Financial Highlights for Q (Rs. Cr.)

Sub. Rev Eng. Ad. Rev Hin. Ad. Rev Ver. Ad. Rev.

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

Bandra Worli Sea Link

DLF Ltd. Q1 Analyst Presentation

National Conference on

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

JAIPUR METRO. One of the world s fastest project completions. A presentation by. Nihal Chand Goel Chairman & MD Jaipur Metro Rail Corporation

We Shine Study Circle TNPSC. elg;g epfo;tfs; (CURRENT AFFAIRS) nrg;lk;gh;

ROAD ACCIDENTS IN INDIA 2012

IAT Annual Conference 'Driving Forward

Indiabulls Real Estate Limited (CIN : L45101DL2006PLC148314)

General Awareness (GA)

March 06 Current Affairs

Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra

Government of India Ministry of Road Transport & Highways Transport Research Wing New Delhi

REVIEW OF THE PERFORMANCE OF STATE ROAD TRANSPORT UNDERTAKINGS (PASSENGER SERVICES) FOR APRIL, 2014 MARCH, 2015

Sagarmala Development Company (SDC)

SITREP NO-110/ hours 32-20/2007-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 18 TH September, 2007

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

Australian Journal of Basic and Applied Sciences. Why to Introduce Flat Fare System in Janmarg, Ahmedabad, Gujarat A Case Study

Accelerated Road Development Programme (SARDP-NE) and Border Highways under Border Area Development Programme (BADP) in Arunachal Pradesh

1.1 To qualify for an Air Service Licence, an applicant (Company) has to fulfil a number of conditions and requirements which include, among others;

Progress Report on the Gautrain Rapid Rail Link Portfolio Committee on Transport

Nanaji Deshmukh Scheme of Construction of Hostels for DNTs Boys and Girls. (Centrally Sponsored Scheme)

The presentation has been prepared for information purpose, it is not a solicitation of any offer to buy or sell any security or instruments.

Investment Opportunities DMIC UP Region

Connectivity continues to remain one of the biggest concerns for north Chennai residents with thousands of commuters struggling every day

Intercontinental Consultants and Technocrats Private Limited

Rangitīkei District Council

TO BE INTRODUCED IN LOK SABHA. Bill No. 93 of 2006

Maha Metro comes into existence

Now Available. Urban Rail Transport. in India Urban Bus Transport. in India India Infrastructure Research.

MEMORANDUM OF UNDERSTANDING. Government of India and the Government of the United Kingdom of Great Britain and Northern Ireland.

MINISTRY OF TOURISM CUSTOMER CHARTER

Presentation on Indian Tourism Industry

Adequate infrastructure facilities are a pre requisite for industrial development. The infrastructure facilities available in Assam are as follows:

SmartCity (Kochi) Infrastructure Private Limited SEZ

AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited

Presentation on City Gas Distribution (CGD) Pipeline Network Projects in Smart Cities

From: OECD Tourism Trends and Policies Access the complete publication at: Japan

ROADS. JUNE 2017 (As of 9 June 2017) For updated information, please visit

S. No. State Name of the Field Office Nodal Office I. Uttar Pradesh 1) Agra Kanpur. II. Uttarakhand 9) Dehradun Dehradun

Rail Budget 2013: Highlights

Belt and Road Initiative (BRI) in Belarus - assessment from an economic perspective

Transcription:

Development of Road Infrastructure in India By Nirmal Jit Singh Director General (Road Development & Special Secretary) Ministry of Road Transport & Highways

Road Network in India Total Road Length about 33 lakh km National Highways 70,548 km State Highways 1,28,000 km Major District Roads 4,70,000 km Other District / Village Roads 26,50,000 km The NHs comprises only 2% of the total length of roads, but carries over 40% of the total traffic. 2

National Highways Network Present Length of NATIONAL HIGHWAYS 70, 548 km The distribution of NHs: NHAI State PWDs B R O Roads declared as NHs but not yet entrusted 20,193 km 42,019 km 3,992 km 4,344 km 3

Lane wise distribution of National Highways 4-Lane 2-Lane Intermediate/Single Lane 17% (12,053 km) 53% (37,646 km) 30% (20,849 km) Normal distance traveled by trucks in India is 250-300 km per day where as the international norm is 600-800 km per day Require immediate capacity augmentation and up gradation with enhanced safety features State Govt. are being persuaded to have integrated check posts on Highways. NHAI is modernizing the Toll Collection System to cut down waiting time at Toll Plazas. 4

S. No. Scheme Allocation and Expenditure 11 th Plan Outlays 2007-08 2008-09 2009-10 Alloc. Exp. Alloc Exp. Alloc 1. NH(Original) 16500 1908.64 1891.07 2154.79* (+50%) 2. NH works under BRO 2857.01 3234.55 (+13%) 2500 649.76 623.93 650 645.80 600 3. NHAI (Investment) 36238 6541.06 6541.06 6972.47 (+6%) 6972.47 8578.45 (+23%) 4. EAP (NHAI) 4454 2220 2220 1894 1894 340 5. Others 12138 1131.54 1063.86 1393.74 980.13 2445 Total 71830 12451 12339.92 13770 (+10%) 13349.41 15198 (+10%) IEBR 34829 2090 427.41 3700 1630.74 5000 Grand Total 106659 14541 12767.33 17470 (+20%) 14980.15 20198 (+15%) *- Enhanced to Rs. 2859.79 crore at R.E. which includes Rs. 500 crore additional outlay as a part of financial stimulus package and balance from re-appropriation from other heads 5

NATIONAL HIGHWAYS DEVELOPMENT PROJECT (NHDP) SEVEN PHASES Phase-I: Mainly the Golden Quadrilateral (GQ) connecting major cities of the country namely Delhi, Mumbai, Chennai and Kolkata Phase-II: Phase-III: North South and East West Corridors Connection of State Capitals and important places to GQ and Corridors Phase-IV: Improvement of National Highways to 2-lane with paved shoulders Phase-V: Six laning of National Highways (5,700 km GQ + 825 km other stretches) Phase-VI: Expressways Phase-VII: Bypasses, Ring Roads, Flyovers

QUALITATIVE CHANGE 8

9

10

11

Jaipur- Kishangarh Service Road 12

13

14

ATMS Control Room 15

Delhi - Gurgaon access controlled expressway- VIEW OF COMPLETED CORRIDOR

Naini Bridge 17

Nivedita Bridge

NHDP Status NHDP Phase Total Lengt h (km) Lengt h Awarded contracts under Fully Completed Projects under EPC BOT (Toll) BOT (Annuity) EPC BOT (Toll) BOT (Annuity) No.of Contra cts Lengt h No.of Contrac ts Leng th No.of Contra cts Leng th No.of Contra cts Lengt h No.of Contra cts Len gth No.of Contra cts I 7498 6572 182 454 9 476 8 5436 152 454 9 476 8 II 6647 4190 118 843 17 864 16 713 14 210 5 85 1 III 12109 14.38 1 3043 40 36 1 - - 187 5 - - V 6500 - - 1035 8 - - - - - - - - Total 32754 10806 302 4997 70 1376 25 6179 167 821 18 561 9

Steps taken to expedite projects Regular monitoring of Contracts at various levels Progress reviews at the level of Chairman, NHAI, Secretary (RT&H) and Minister (RT&H). Nodal Officers appointed by State Governments for resolving problems. Committee of Secretaries constituted under Cabinet Secretary to address inter-ministerial and Centre-State issues. The procedure of issue of land acquisition notifications simplified. To expedite the construction of ROBs, an officer of the Railways posted to NHAI to coordinate with Ministry of Railways. Action taken against non-performing contractors. Steps taken to improve cash flow problems of contractors by granting interest bearing discretionary advance at the request of contractor, release of retention money against bank guarantee of equal amount, deferment of recovery of advances (on interest basis) and relaxation in minimum Interim Payment Certificate (IPC) amount.

Objective To make visible difference in the Road Programme Plan to target completion of 35,000 km of NHs @ 7,000 km per year (20 km per day) during next five years (2009-14) Presently only 6,500 km is in progress To achieve the target, works of about 20,000 km should be in progress at any point of time Work Plan formulated by NHAI for awarding 12,000 km each during 2009-10 and 2010-11 This will provide connectivity to 400 districts in the country and 300 most populous cities in the country Projects worth Rs. 3 lakh crore to be taken up during 2009-14 60 to 70 % on BOT (Toll)

Strategy Road shows to attract Foreign Investments Widening to 6 / 4 / 2 lanes based on Traffic. Mode of implementation (e.g. BOT (Toll), BOT (Annuity) and EPC) be decided concurrently at one go based on feasibility as sequential system of bidding leads to delay

SPECIAL ACCELERATED ROAD DEVELOPMENT PROGRAMME FOR NORTH EAST REGION (SARDP NE) Major Initiative covering 9,940 km Programme in 2 Phases for completion by 2015-16 Presently Phase A for 2,796 km under implementation 2,039 km NHs 757 km State Roads Cost estimate for Phase A Rs. 19,827 crore 1,580 km of roads at an estimated cost of Rs. 5,565 crore approved for execution 724 km NH to be improved by NHAI Balance 492 km approved in-principle Arunachal Pradesh Package approved involving roads of 2,319 km length - 1,472 km is NHs & 847 km is State/GS/Strategic roads-estimated Cost Rs. 12,513 crore. Phase B involves 2 laning of 4,825 km of NHs and 2-laning/ improvements of State roads Phase B is approved only for DPR preparation and investment decision is yet to be taken by the Government 23

Special Programme for Development of Roads in the Left Wing Extremism (LWE) affected areas Approved in Feb 2009 Involves development of about 1,202 km of NHs and 4,363 km of state Roads in LWE affected areas as a special project. Estimated to cost - Rs. 7,300 crore. The projects covers 33 districts in 8 states namely in Andhra Pradesh, Bihar, Chhattisgarh, Jharkhand, Madhya Pradesh, Maharashtra, Orissa and Uttar Pradesh. Technical and financial sanction for all identified NHs & State Road Projects would be as per stipulated procedure for NHs works. Approved Outlay for 2009-10 Rs. 500 crore.

NHDP-Phase-IV and other Non-NHDP BOT projects for improvement of NH to 2-lane standards NHDP-IV-A approved in July, 2008 for up-gradation of 5,000 km of NHs to 2-lane with paved shoulders for a total estimated cost of Rs. 6,950 crore on BOT (Toll) and BOT (Annuity) basis. Target for completion of NHDP-IV A- Dec, 2013. Programme for award of about 7,000 km to 2-lane with paved shoulders put up on the Ministry s website. Feasibility studies proposals invited for 47 nos. of projects for a total of 6,157 km (35 nos. under NHDP-IV for 4,559 km & 12 nos. under Non-NHDP for 1,598 km). Feasibility studies awarded for 29 projects for a total length of 5,021 km. Programme being implemented through State PWDs / NHAI / State Govt. Undertakings / directly by the Ministry.

Maintenance and Repair of National Highways Available Allocation Year Requiremen t as per norms (Rs. Crore) Amount provided (Rs. Crore) Shortfall (Rs. Crore) % Shortfall Expenditur e (Rs. Crore) 2002 2003 2200.00 800.00 1400.00 63.64 629.54 2003 2004 2200.00 731.74 1468.26 66.74 731.62 2004 2005 2480.00 745.56 1734.44 69.94 679.03 2005 2006 2480.00 868.10 1611.90 65.00 838.31 2006 2007 2480.00 814.38 1665.62 67.16 784.30 2007 2008 2280.00 1001.70 1278.30 56.07 981.35 2008 2009 2500.00 973.97 1526.03 61.04 969.45 2009 2010 2500.00 1060.44 1439.56 57.58 221.72* * - Upto August, 2009 Issues for Concern Allocation is about 35 ~ 40 % of requirement. 26

Development of NHs which are not covered under any of the programmes Sl. Item Length No. (km) (i) Total length of NH Network 70,548 (ii) (iii) (iv) (v) (vi) Length of NH under various phases of NHDP as per mandate given by COI Length of NH under Special Accelerated Road Development Programme for North-East Region Development of road (NH) in Left Wing Extremism affected areas Length of NH covered for development under various programmes Balance length not covered under any of the programmes [(i)-(v)] 47,054 5,119 1,320 53,493 17,055

Development of NHs which are not covered under any of the programmes The 11 th Plan envisages accelerated efforts to bring NH Network to a minimum of 2-lane standard within the next 10 years and removing existing deficiencies, etc. The Ministry has formulated a proposal for taking up a specific programme to improve the remaining 17,055 km of NHs and complete it in 5 years in phased manner commencing from year 2009-10 to year 2013-14. Out of the balance length of 17,055 km of NHs -the total length of single / intermediate lane (SL / IL) is about 8,800 km. The balance 8,255 km length of NHs are having various types of deficiencies such as missing links, weak 2-lane pavements etc.

Development NHs which are not covered under any of the development programmes Contd.. Estimated fund requirement for the programme Rs. 40,900 crore. Proposed funding arrangement Rs. 10,000 ~ Rs. 15,000 crore by securing World Bank loan. Rs. 30,900 crore from budgetary allocation. Planning Commission has been requested to consider enhancing the outlay under NH(O) for year 2009-10 by Rs. 2,965 crore to enable taking up this programme.

Formulation of the Master Plan for the National Expressway Network The objective is to prepare a National Expressway Network for the horizon year 2022. Consultancy Services awarded in December, 2009. Draft Project Report recommending for a total Expressway Network of about 17,650 km received in July 2009 hoisted in the Ministry s Website. State Govts. were requested on 21.8.2009 to offer their views, if any, within 2 weeks. Final Report duly considering the States viewpoints to be widely deliberated before finalization. Report expected to be finalized by October, 2009. 30

Road Safety Issues Road Accidents during 2007 4,79,216 no. of road accidents 1,14,444 persons killed 80% of road accidents attributed to driver fault Awareness campaigns through electronic / print media as well as by involving NGOs being taken by the Ministry 2-day Refresher Training being imparted by Ministry to the drivers of heavy vehicles through reputed institutions/ngos; 1,92,218 drivers trained during 10 th Plan (2002-07) 11 th Plan (2007-12) target is to train about 3 lakh drivers

Road Safety Issues Contd.. Trauma Care Services Earlier, M/o RT&H was providing ambulances/cranes to States and NGOs for immediate transportation of road accident victims to nearest Trauma centres and evacuation of accident sites. M/o Health & Family Welfare formulated a new scheme for upgradation of Trauma Care facilities on NHs Envisages establishment of Integrated Network of Trauma Care Centres along GQ, NS-EW corridors of NHs by upgrading Trauma Care facilities in 140 State Govt. Hospitals 20 Hospitals to be upgraded to Level-I Trauma Centres equipped to provide highest level of Trauma Care having super specialty facilities 40 Hospitals to be upgraded to Level-II Trauma Centres which are primarily Medical Colleges where physicians, surgeons, orthopedics, anesthetists will be available on call; average distance of these trauma centres to be about 300 km 80 Hospitals to be upgraded to Level-III Trauma Centres which are primarily District Hospitals to provide initial evaluation and stabilization of Trauma patients; these centres to be available at every 100-150 km

Road Safety Issues Contd.. Setting up of a National Road Safety and Traffic Management Board M/o RT&H is in process setting up the Board through an Act of Parliament The Board to Act as a dedicated and independent Agency to oversee road safety activities in the country The Board to have powers to recommend standards for designing, construction and maintenance of NHs To recommend safety standards of Motor Vehicles Issue guidelines on various road safety issues such as Trauma Care Services To improve data collection system on road safety and other issues concerning road safety The proposed Act also provides enabling provisions for creation of similar Boards at the State level