Human Technopole The Campus Establishment

Similar documents
21-23 Nov nd Saudi International Lab Expo 2016

Air Transportation & Aerospace Campus at The Ohio State University Airport. Strategic Plan and Facilities Development Program

BSc (Hons) Food Science and Technology (Minor: Food Entrepreneurship) (with 6-month internship) A307

Project Concept Note

Johan Montagnat Introduction GRADUATE SCHOOL

CURRICULUM VITAE R A S H A D. Z. A L L A H V E R D I E V

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

SALISBURY NHS FOUNDATION TRUST

Answers to the most frequently asked questions (FAQs)

A I P H International Horticultural Expo Conference 2015

Surgical Services and Observation Unit Project Given by Highland Hospital to the Highland Park Community.

Carta di Pescara : a new instrument to promote sustainable industry in Abruzzo

Registration for exhibitors January 2017 Messe Luzern Innovation starts here. swissplastics-expo.ch. Patronage.

Sarajevo, Bosnia and Herzegovina 1 December 2011

ASSEMBLY 39TH SESSION

BSc (Hons) Food Science and Technology (Minor: Food Microbiology) (Full-Time)

The campus as living lab for sustainable solutions

Update on STX France. October, 2017

Bavarian Research Alliance GmbH Networking and support. Albrecht Friess Scientific Officer

1.6 M Manhours per year. 9 Heavy wide-body bays incl 3 A380 bays with paint facilities. More than 200,000 m 2 of apron & hangars

Bolton Council Invest in Bolton. Welcome INVEST IN

EU Strategy for the Danube Region

For personal use only

Preliminary Analysis to Aid Public Comment on TSA s Proposed Nude Body Scanner Rule (Version 0.9 March 29, 2013)

About this consultation

Financial Benchmarking and Market Trends for Government Contractors: How Does Your Company Compare?

Real-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance.

replacement SONNE status report

Passenger Traffic Achieves Strong Growth of 4.8% for the Month of August

The Design, Engineering and Innovation team is the primary provider of engineering services to Etihad Airways and the focal point of technical

DATA MANAGEMENT & CONNECTED SOLUTIONS

ANNUAL REPORT Three Countries, One Landscape! GREATER VIRUNGA TRANSBOUNDARY COLLABORATION. Intergovernmental Organization : DRC- Rwanda - Uganda

GCSE Legacy and Revised Wales Results, June 2017.

Tullibody Action Group Vision for New Civic Centre

Public Sector Grade II Listed Building Case Study

Theme Prediction & Prevention of Cardiovascular systems for better clinical practice

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

UCONN 2000 Preliminary Phasing Outline by Fiscal Year Draft Phasing Plan for Informational Purposes Only - Revised 9/25/13 Adjusted 4/13 Adjusted 9/13

Annual General Meeting May 3 rd FULL YEAR RESULTS DELIVERING OUR PROMISE

2015 Summer Experience Taiwan-- Duale Hochschule Baden-Württemberg Mannheim &Stuttgart

AIRBUS Generic Flight Test Installation

Link Union Station (LINK US)

OPPORTUNITIES TO JOIN THE SILVERSTONE PARK COMMUNITY ENTER

Fife Sports and Leisure Trust

WAREHOUSE/INDUSTRIAL UNIT TO LET. Worldwide Heathrow Regional M4, M25, M3 Local A40, West London

AIM Altitude PRESS PACK AIX 2017 Stand 5B60

FACILITY MASTER PLAN educating for the future: forging a path for tomorrow s innovative, global thinkers. Outreach Meeting #4 December 17, 2013

Expo 2017: Good Intentions

Application of Queueing Theory to Airport Related Problems

NMEA International Conference and Expo Annual Business Meeting. September 29, 2011 Sanibel Island, Ft. Myers, Florida

Pro Line Fusion integrated avionics system. Pro Line Fusion on Embraer Legacy 450 and 500: Business-jet technology designed with tomorrow in mind.

1 st Circular with Draft Program

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

National Accounts Workshop for SADC countries

Cycling as part of the NZ transport system

PIRG and RASG Global Coordination Meeting Setting the Stage. Nancy Graham. Director, Air Navigation Bureau

Expo Milan Dott. Filippo Ciantia International Projects Manager Centre for Sustainable Development

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

ICAO Initiatives on Global Tracking

Border Security for Air Transport in the Pacific

Lake Myra County Park. Wake County, North Carolina Community Forum #2 June 12, 2008

Air navigation deficiencies in the CAR/SAM Regions with high risk ( U priority) (Presented by the Secretariat)

Generating Business Value from Information Technology

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

SciTech Poland at Hannover Messe 2017

Overview. Wilderness Act of Statement of Need. What is Wilderness Character. Monitoring Wilderness Character

WASH ASSESSMENT REPORT LATRINE FACILITIES KUTUPALONG AND BALUKHALI MAKESHIFTS & SPONTANEOUS SETTLEMENTS IOM WASH UNIT, DECEMBER 2017

Analysts and Investors conference call. Q results. 15 May 2013

KnowledgeFOrResilient society

Update on the development of the Regional Real Time Passenger Information (RTPI) System

TWELFTH AIR NAVIGATION CONFERENCE

Polo Sant Anna Valdera (PSV) V.le R. Piaggio, Pontedera, Pisa

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

Transportation Impact Assessment Paradise Shores RV Resort Development Stettler County, Alberta Progress Update February 2018 PO#

Catchment and Lake Research

Gogo Connected Aircraft Services

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

The Case of the Stolen CD Players

Project Data Sheet BASIC PROJECT DATA

2018 AUSTRALIAN BREWERS CONFERENCE

MARKET SHARE ANALYSIS

AI in a SMART AIrport

Evidence Based Training For Airline Pilots

Welcome remarks IAEA

insouthglos Economy .co.uk Our economy

Study Visit in Nouvelle-Aquitaine. Bordeaux. 7th-9th November

F 3 U 2 TU RE 4 NE 3 TW O 4 AL 2 B 2 GL 0 3 INFORMATION FOR EXHIBITORS AND VISITORS

International Expos & Fairs to be held in Bangladesh in

Exhibition and Sponsorship brochure. 28 th International Population Conference 29 October 4 November 2017 Cape Town International Conference Centre

The University Campus. Campus Masterplan: Staff update

Agenda Item 3: Review Conclusions from the E/CAR/DCA/24, RASG-PA/6 and GREPECAS PPRC/2 Meetings

Will it Fit? Preliminary Findings

Intelligence Investment guidance. Managing aircraft. Delivering value Analysis. Member of ISTAT UK CAA Approval No. UK.MG.

PHOTONICS CONGRESS CHINA

Coordination Center German Research Vessels

GCSE -Full Courses Summer 2008

Asia Pacific Regional Aviation Safety Team

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

Nature conservation, protected areas & ecological connectivity

Transcription:

Human Technopole The Campus Establishment With the contribution of the project structure Press Conference

2 Human Technopole Programme The Human Technopole campus will be composed of 7 centres and 3+1 facilities Research Centres C1 Onco Genomics Centre C2 Neuro Genomics Centre C3 Agri-Food and Nutrition Genomic Centre C4 Data Science Center C5 Computational Life Sciences Centre C6 Centre for Analysis, Decision and Society C7 Center for Smart Materials and Devices Facilities F1 Central Genomics Facility F2 Imaging Facility F3 Data Storage and High- Performance Computing Facility F4 Common Shared Services Facility Common Technology- Development Platform high-throughtput Next Generation Sequencing infractructure for large population screening Electron Diffraction Tomography Electron Cryo- Tomography Partly located in CINECA headquarters The human capital resources of the Human Technopole scientific project consist of 1,500 researchers. Human Technopole Establishment Project

3 The location choice Key factors In order to identify the best location for the Human Technopole project within the Expo 2015 area, the following factors have been considered: Centrality and priorities of the scientific project Strategic positioning within the site Human Technopole as a focal point/hub Compactness of HT structures so as to avoid fragmentation across the campus A balanced mix between refurbishing of existing buildings (ready to be used), thus enhancing the legacy of Expo public investment, and the realisation of new bespoke buildings where specialised functions can be developed. Observance of the establishment timescales as planned in the scientific project. Human Technopole Establishment Project

4 Strategic Location Human Technopole Establishment Project

5 Location within the Expo 2015 Area ALBERO DELLA VITA PALAZZO ITALIA Human Technopole - Establishment Project

6 Human Technopole - The location Palazzo Italia is the focal point of the campus and the symbol of a virtuous reuse of the Expo 2015 legacy. NEW LAB. BUILDING NEW BUILDING US6 PALAZZO ITALIA CARDO NO The campus overlooks the Lake Arena and the Albero della Vita, hence it is located in a highly symbolic point of Expo. The compactness of the site allows to combine a progressive use of the existing buildings with the feature and the efficiency of new buildings. The realisation of new buildings allows to create customised solutions designed around the HT project while respecting the project timescales and functions. 22,000 m2 Territorial Surface 18,000 m2 Buildable area 4,000 m2 Usable green area Human Technopole - Establishment Project

7 DECEMBER 2017 83 83+F3 674 m2* available JUNE 2018 228+F3 11+F2 239 4.679 m2* available 1.300 m2* covered The area will host around 50% laboratories of C1, C2 and C3 centres PALAZZO ITALIA CARDO NO US6 NEW LAB. BUILDING NEW BUILDING *usable surface Human Technopole - Establishment Project

8 DECEMBER 2018 308+F3 47+F1+F4 11+F2 366 4,679 m2* available 2,000 m2* available 1,300 m2* available JUNE 2019 308+F3 47+F1+F4 11+F2 LABORATORIES 366 4,679 m2* available 2,000 m2* covered 1,300 m2* covered 2,000 m2* available PALAZZO ITALIA CARDO NO US6 NEW LAB. BUILDING NEW BUILDING *usable surface Human Technopole - Establishment Project

9 DECEMBER 2019 385+F3 47+F1+F4 11+F2 LABORATORIES 443 4,679 m2* covered 2,000 m2* covered 1,300 m2* covered 2,000 m2* available DECEMBER 2021 385+F3 47+F1+F4 11+F2 LABORATORIES 1.061 618 4,679 m2* covered 2,000 m2* covered 1,300 m2* covered 2,000 m2* available 11,000 m2* covered PALAZZO ITALIA CARDO NO US6 NEW LAB. BUILDING NEW BUILDING *usable surface Human Technopole - Establishment Project

10 Fully operational - 2024 385+F3 47+F1+F4 11+F2 LABORATORIES 1.057 1.500 4,679 m2* covered 2,000 m2* covered 1,300 m2* covered 2,000 m2* available 18,000 m2* covered PALAZZO ITALIA CARDO NO US6 NEW LAB. BUILDING NEW BUILDING *usable surface Human Technopole - Establishment Project

gen-17 mar-17 mag-17 lug-17 set-17 nov-17 gen-18 mar-18 mag-18 lug-18 set-18 nov-18 gen-19 mar-19 mag-19 lug-19 set-19 nov-19 gen-20 mar-20 mag-20 lug-20 set-20 nov-20 gen-21 mar-21 mag-21 lug-21 set-21 nov-21 gen-22 mar-22 mag-22 lug-22 set-22 nov-22 gen-23 mar-23 mag-23 lug-23 set-23 nov-23 gen-24 mar-24 mag-24 lug-24 set-24 nov-24 11 The Project Development: Human Resources and Spaces F3 F2 F1+F4 LAB. 1.600 30.000 1.400 25.000 1.200 1.000 20.000 800 15.000 600 10.000 400 200 5.000 0 0 Required Human Resources Headcounts Available Spaces Seats Areas Areas Activation F3 Activation F2 Laboratories Activation F1+F4 Human Technopole - Establishment Project

12 The establishment of HT Key features Establishment Tipology Permanent reuse of 3 existing buildings; Phase 2: construction of 2 new buildings Scattered/compact establishment Compact functions in a single compartment Existing buildings involved Palazzo Italia, US6, Cardo N-O New buildings planned Construction of 2 new buildings in phase 2 (2,000 m2+18,000 m2) Territorial surface covered 22,000 m2 Usable surface* 28,000 m2 *given the distribution area and the technical rooms, a total gross area of 35,000 m2 can be estimated. The costs related to specific estimates will be produced after the drafting of preliminary project plans following a comparison with benchmarks at international level. Human Technopole - Establishment Project

NEW BUILDING NEW LAB. BUILDING US6 13 HORTUS CARDO NO PALAZZO ITALIA Human Technopole - Establishment Project

Human Technopole - Establishment Project 14