MARINE INVESTIGATION REPORT M98C0066 GROUNDING

Similar documents
ATLANTIC / ARNGAST Collision in the DW route east of Langeland, Denmark, 4 August 2005

ECDIS Electronic Chart Display and Information Systems

AVIATION INVESTIGATION REPORT A00Q0116 RISK OF COLLISION

Marine Transportation Safety Investigation Report M17P0406

MARINE OCCURRENCE REPORT

AVIATION INVESTIGATION REPORT A04Q0041 CONTROL DIFFICULTY

ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED ORGANIZATIONS

MARINE ACCIDENT INVESTIGATION REPORT

MV Vemaoil XXIII (IMO ) into the anchored vessel MV Duzgit Integrity (IMO )

AVIATION INVESTIGATION REPORT A03O0213 LOSS OF SEPARATION

AVIATION OCCURRENCE REPORT A98W0216 LOSS OF SEPARATION

AVIATION INVESTIGATION REPORT A00Q0046 IN-FLIGHT BREAK-UP

The collision between BLUE BIRD and HAGLAND BONA on 1st December 2008 in Randers Fjord.

Consolidated version Of Lessons Learned For Presentation To Seafarers As requested by FSI 21

REPORT OF THE INVESTIGATION INTO THE GROUNDING OF MV HUELIN DISPATCH ON PIERRE AU VRAIC 21st SEPTEMBER 2012

Summary Report. Contact with Wharf General Villa. 5 March 2006

AVIATION OCCURRENCE REPORT A97Q0250 MID-AIR COLLISION BETWEEN CESSNA 172M C-GEYG OF CARGAIR LTD. AND CESSNA 150H C-FNLD MASCOUCHE AIRPORT, QUEBEC

Grounding of Maersk Garonne. Fremantle, Western Australia, 28 February 2015

AVIATION INVESTIGATION REPORT A09O0159 TREE STRIKE DURING CLIMB-OUT

REPORT OF THE INVESTIGATION INTO THE GROUNDING OF THE M.F.V. "ELSINOR" AT FOILNABOE, IRELAND ON THE 15TH SEPTEMBER, 2001.

AVIATION OCCURRENCE REPORT

Case Study. Korea Destiny and Pakistan Destiny

AVIATION INVESTIGATION REPORT A06Q0181 FLIGHT IN WEATHER CONDITIONS UNFAVOURABLE FOR VISUAL FLIGHT AND COLLISION WITH TERRAIN

CPP failure caused heavy contact with lock

REPORT General Cargo Vessel MEG - UBFH - Grounding on October 15th, 2002

AVIATION INVESTIGATION REPORT A02P0290 GEAR-UP LANDING

MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LITHUANIA MARINE ACCIDENTS AND INCIDENTS INVESTIGATION MANAGER

A Routine Inspection of the Fixed CO 2 Fire Extinguishing System that led to the Death of Four Officers!

AVIATION INVESTIGATION REPORT A01Q0165 LOSS OF CONTROL AND STALL

AVIATION OCCURRENCE REPORT VFR FLIGHT INTO ADVERSE WEATHER. RUSTY MYERS FLYING SERVICE BEECH D18S C-FBGO SIOUX LOOKOUT, ONTARIO 35 nm SE 06 JULY 1996

GENERAL INFORMATION Aircraft #1 Aircraft #2

The Polar Code and the Canadian Arctic

Maritime Rules. Part 21: Safe Ship Management Systems

REPORT. Dry Cargo Vessel OOSTERBRUG PJCQ - grounding in Malmö September 16, Swedish Maritime Safety Inspectorate

Allision between the MSC BENEDETTA and pier in Zeebrugge on 16 May 2014

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

DEPARTMENT OF TRANSPORT

National Transportation Safety Board

CIAIM-08/2017 REPORT. Grounding of the vessel TIDE NAVIGATOR at the Port of Vilanova i la Geltrú on 2 August 2016

AVIATION OCCURRENCE REPORT

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

TARIFF OF HARBOUR DUES

REPORT OF INVESTIGATION INTO THE GROUNDING OF MV "PANTANAL" AT CASHLA BAY, ROSSAVEAL ON 31st MARCH 2011

Navigation event 28 km north-west of Sydney Airport, NSW 11 January 2007

MARINE ACCIDENT INVESTIGATION REPORT

PILOT MASTER RELATIONSHIP IN ELECTRONIC WORLD

AVIATION OCCURRENCE REPORT

THE UNITED REPUBLIC OF TANZANIA MERCHANT SHIPPING NOTICE MSN 1613

R/V «Dr. Fridtjof Nansen» - Fishery and oceanographic research vessel

ACCIDENT REPORT. Grounding of the general cargo vessel Ruyter Rathlin Island, UK 10 October 2017 SUMMARY

RULES of navigation in the water area of the Northern Sea Route. I. General

REPORT INTO THE FIRE AND SUBSEQUENT GROUNDING OF THE MV "PATRIARCH" ON 1ST SEPTEMBER, 2004

Ice Navigation MIWB Wibbo Hofman MIWB 28/09/2017

REPORT OF THE INVESTIGATION INTO THE BOTTOM CONTACT OF THE M.V. CIELO DI MONACO AT GREENORE PORT ON 28th SEPTEMBER 2015

Report on the investigation into the violation of the Dover Traffic Separation Scheme by. MV Musketier ( IMO )

Order for Greenland on the safe navigation, etc. of ships

AVIATION INVESTIGATION REPORT A01P0111 AIR PROXIMITY SAFETY NOT ASSURED

Sample Regulations for Water Aerodromes

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

Collision of MV FINNRUNNER with pier

Final Report AIC PAPUA NEW GUINEA ACCIDENT INVESTIGATION COMMISSION ACCIDENT INVESTIGATION REPORT. Bayswater Road Ltd VH-ATO

REPORT OF THE INVESTIGATION INTO THE GROUNDING OF THE MV "LOCATOR" OFF SAINT MACDARA S ISLAND, OFF THE COAST OF GALWAY ON 31st MARCH 2007

National Transportation Safety Board

Air Operator Certification

Flight Operations Briefing Notes

Airmen s Academic Examination

TABLE OF CONTENTS 1.0 INTRODUCTION...

INFORMATION AND GUIDANCE TRAINING REQUIREMENTS FOR PERSONNEL ON SHIPS OPERATING IN POLAR WATERS

THE ISPS CODE. International Ship & Port Facility Security Code and SOLAS Amendments 2002

Ratification of Conventions

helicopter? Fixed wing 4p58 HINDSIGHT SITUATIONAL EXAMPLE

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014

UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. GRANT OF EXEMPTION

USE OF RADAR IN THE APPROACH CONTROL SERVICE

Final Report. Marine inquiry MO Passenger ship, Azamara Quest, contact with Wheki Rock, Tory Channel 27 January 2016

All-Weather Operations Training Programme

IMO / ILO REQUIREMENTS FROM 2014

AVIATION RULES OF THE KYRGYZ REPUBLIC APKR-6 "OPERATION OF AIRCRAFT" Annex 6 Flight time limitations and flight duty time 01-Sep-2016

UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. GRANT OF EXEMPTION

FAR Part 117 Flight and Duty Limitations and Rest Requirements: Flightcrew Members (with FAA Corrections as of November 19, 2013)

To: Deputy Registrars, Owners, Managers, DPA, Masters

UNO Marine Accident Report. A c c i d e n t t o s e a f a r e r 2 2 M a r c h y w h i l e u s i n g g r i n d e r

APPLICATION FOR REVALIDATION OF A CERTIFICATE OF COMPETENCY

CAPTAIN NICHOLAS J. LEWIS Marine Expert

Government Decree on the Manning of Ships and Certification of Seafarers (1797/2009)

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007

AVIATION INVESTIGATION REPORT A05P0032 SETTLING WITH POWER ROLL-OVER

Dalian VTS Guide for Users

Sub-Standard vessels in German ports 2016

GUIDANCE ON DETENTION AND ACTION TAKEN

London City Airport. 43 years

MARINE ACCIDENT REPORT April 2012

Staff Instruction. Aerial Assessment Requirements Prior to Heliport Certification

Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish

COLLISION INVESTIGATIONS The new technologies and other interesting bits

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

Subject: How to Meet STCW Requirements for Masters, Deck Officers and Other Crew Members of Certain Canadian Ships Operating in Polar Waters

Craig Trans /IMO#

THE ZANZIBAR MARITIME TRANSPORT ACT, No. 5 OF SAFE MANNING REGULATIONS [Made under section 123] PART I PRELIMINARY PROVISIONS

1. Part. cishipping.com. (15 February 2012)

Transcription:

MARINE INVESTIGATION REPORT M98C0066 GROUNDING SELF-UNLOADING BULK CARRIER AALGOLAKE@ LONG POINT BAY, LAKE ERIE, ONTARIO 14 OCTOBER 1998

The Transportation Safety Board of Canada investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. Marine Investigation Report Grounding Self-unloading Bulk Carrier AALGOLAKE@ Long Point Bay, Lake Erie, Ontario 14 October 1998 Report Number M98C0066 Summary Before dawn, while proceeding across Long Point Bay, Lake Erie, Ontario, the AALGOLAKE@ experienced heavy vibration and came to a stop. The vessel had struck and grounded on shoals near the Nanticoke channel. The vessel was refloated the next day with the assistance of a lightering vessel and three tugs. Ce rapport est également disponible en français.

- 3 - Other Factual Information Port of Registry Flag "ALGOLAKE" Sault Ste. Marie, Ontario Canada Official Number 318430 Type Gross Tons 1 22 852 Length Draught Built Propulsion Crew 29 Passengers 0 Registered Owner Self-unloading bulk carrier 219 m Forward: 8.28 m Aft: 8.38 m 1977, Collingwood, Ontario Two 10-cylinder Pielstick diesel engines rated at 6620 kilowatts; single screw, controllable pitch propeller; bow thruster 3013286 Canada Inc. History of the Voyage On 10 October 1998, the AALGOLAKE@ departed Superior, Wisconsin, bound for Nanticoke, Ontario, with 32 340 short tons of coal. At 0534 Eastern daylight time on October 14, at Long Point Bay, Lake Erie, the AALGOLAKE@ altered course to 354 gyro (G) and proceeded at an average speed of 10.8 knots. It was dark, and winds were near gale from the west at 28 knots, gusting to 35 knots. The planned course on the navigation chart for the area showed a course of 355 true (T). The buoys marking the Nanticoke channel were laid over by wind, sea, and swell, which adversely affected their ability to be detected by radar. On the bridge were the first mate, a first-year navigation cadet, and a helmsman. The navigation cadet was instructed to keep a lookout and take position fixes every half hour. He stood at times at the chart table and occasionally glanced into the automatic radar plotting aid (ARPA) radar. The first mate had confidence in the cadet=s ability to assist in bridge watchkeeping tasks. A night order book instruction was that the master was to be called 30 minutes before the next course-alteration point, abeam of Nanticoke shoal buoy, about half the distance across Long Point Bay. At the alter-course point, which was a shortcut to enter the Nanticoke channel, the intention was to proceed on a course of 338 T for 2.5 nautical miles (M) and enter the Nanticoke channel, keeping buoy EN10 to starboard. 1 Units of measurement in this report conform to International Maritime Organization (IMO) standards or, where there is no such standard, are expressed in the International System of units.

- 4 - At 0615 the navigation cadet marked the position of the AALGOLAKE@ on the chart. The off-track error at this time was 0.42 M to the east. This was not entered in the bridge logbook. The first mate checked the cadet=s position fixes. No adjustment to the course to steer was made, but steering was changed from automatic to hand steering. No other position fix was made before running aground. At 0625 the master came up to the bridge, prior to being called, and engaged in a conversation, not related to navigation, with the first mate. Part of the conversation centred around the departure time of the ACANADIAN TRANSPORT@ from Nanticoke. The first mate indicated that the presence of the master increased his level of confidence. The master started up the electronic chart display (ECDIS) unit. In the start-up mode, the ambient light from the unit=s display screen Adaylight mode@ was significant. The master later indicated that he did not get his night vision established for a few minutes because of this bright light. For five or six minutes, the master attempted to get the ECDIS unit to operate properly but was not successful. The display screen was locked onto the area of western Lake Erie showing Pointe aux Pins and Southeast Shoal and vicinity and had been in this state since the previous day. The ECDIS unit was left in the Aon@ position, so that the service technician could see it in the locked state, and the monitor was turned to the Aoff@ position, which reduced ambient light. At 0646 the master adjusted the pitch controls to bring the vessel to half speed and marked the manoeuvre in the bridge logbook. The master did not specifically inform the first mate that he was briefly assuming responsibility for navigation, and this was not mutually understood or agreed upon. At the time of the investigation, both the first mate and the master indicated that the first mate maintained control of bridge operations. No one on the bridge confirmed the vessel=s position at the time of the speed reduction. Between the time that the master arrived on the bridge and the reduction in the ship=s speed, the AALGOLAKE@ passed but did not alter course at the course-alteration point abeam of Nanticoke shoal. At approximately 0648 the master went below to his cabin. Within one minute, he felt the vessel shudder and vibrate heavily. He quickly ran to the bridge to see that the helmsman had the wheel hard over to port and that the AALGOLAKE@ was slowing down. At 0650 the AALGOLAKE@ was hard aground in position latitude 42 45.8' N, longitude 080 01.96' W, and the gyrocompass showed 343 G. The vessel had overrun the course-alteration point by 2.1 M and was 0.8 M SE from the Nanticoke channel and three cables from gas well heads. Immediately after the grounding, the master instructed the crew to take soundings. It was discovered that the vessel was holed and taking on water in the forepeak and No. 5 port tank. The pumps were able to keep up with the influx of water. The holes were plugged with temporary cement boxes which were later strengthened in Port Colborne, Ontario. After transferring cargo from the No. 1 cargo hold to the No. 3 cargo hold, the crew tried to free the vessel with three tugs, but without success. The ACANADIAN TRANSPORT@, which previously had discharged its cargo in Nanticoke, was used to lighter the AALGOLAKE@of approximately 6000 tons. The vessel was scheduled for permanent repair work at Port Weller Drydock at the end of the shipping season. The master held a Canadian Ocean Navigator I certificate and was determined by company medical personnel to be medically fit, as of March 1998. He had taken bridge resource management (BRM) training in Newport, Rhode Island, two years earlier. The master joined the AALGOLAKE@ in July and since that time had piloted the vessel 10 times, inbound and outbound, to and from Nanticoke. He was to be relieved for his holidays by

- 5 - another master upon arrival at Nanticoke. He had sailed as master for the previous six years. He was well rested at the time of the occurrence. The first mate held a Canadian Inland Master certificate and was determined by company medical personnel to be medically fit, as of March 1998. He had taken BRM training two years earlier, in Newport, Rhode Island. Twenty years previously, he was employed as master for several years and as first mate since then with different shipping companies. He was well rested at the time of the occurrence. The navigation cadet was a first-year cadet with Georgian College and, before joining the vessel in May 1998, had eight months of marine training. The training did not include the use of radar or any other piece of bridge electronic equipment. Since joining the AALGOLAKE@, the cadet was instructed by the master to assist in the watchkeeping duties of each of the three officers, for approximately two-month periods, on each respective watch. He had not been familiarized with BRM concepts, either by Georgian College or by the first, second, or third mates during his first period of service on board a ship. He was well rested at the time of the occurrence. At the time of the occurrence, the company had an ISM Document of Compliance at its shore-based operations office and a Safety Management System Certificate aboard each of its vessels, including the AALGOLAKE@. The company has been pro-active to ensure that the masters and mates receive regular training which includes courses in pilotage and BRM. Refresher training is provided for personnel, whenever the company is informed that an individual=s human performance is an issue. The ARPA radar was operating and located beside the ECDIS unit at the forward starboard bridge window, and an ECDIS repeater was at the centre control console. The port radar was on stand-by. The vessel is also equipped with Loran C and a Differential Global Positioning System unit. The vessel=s paper graph depth sounder had not been operating effectively for several months when a request was made to have it serviced or replaced. Vessel and company personnel were concerned about the serviceability of the depth sounder. Service had been arranged for Nanticoke and pricing had been received for a replacement unit, if the technician could not get the unit fully functional. The service technician, however, was not aware of instructions to service the depth sounder. It is possible that there was some miscommunication between the company and the service technician=s Montreal office regarding the service call details.

- 6 - Analysis No Formal or Mutually Agreed Handover of the Watch The master had left instructions to be called 30 minutes before the next course-alteration point, abeam of Nanticoke shoal buoy. This would have been around 0610. The master arrived on the bridge at 0625, however, without having been called. At 0646 the master moved the engine controls to half speed and wrote the entry into the bridge logbook. This action most likely gave the first mate the impression that the master was taking command because the vessel was arriving at a port. Although the master=s action was not formal, it was implied; but the first mate did not question it. The IMO International Convention on Standards of Training, Certification and Watchkeeping for Seafarers, 1978, Section A-VIII/2 part 3-1 23.3 states: The officer in charge of a navigation watch shall: continue to be responsible for the safe navigation of the ship, despite the presence of the master on the bridge, until informed specifically that the master has assumed that responsibility and this is mutually understood. By being acquiescent, rather than questioning who was in charge, the first mate was distracted from carrying out his responsibilities. It was not until the master went below that the first mate realized that the master had not taken command. The master took unilateral action with regard to the operation of the ship, without a position check follow-up. Apparently, he made an assumption that the first mate or cadet would do so. If the master, officer, or cadet had checked the vessel=s position, it would have shown that the AALGOLAKE@ was standing into danger. Bridge Resource Management Despite company efforts, no formal BRM regime was in place on the bridge of the AALGOLAKE@, because the responsibilities of those participating in the navigation of the vessel were neither defined nor clear. Apparent action or inaction by individuals involved in the navigation of the vessel resulted in others making false assumptions about their own and others= responsibilities. When the master arrived on the bridge, conversation not related to the vessel=s navigation took place. The conversation detracted from paying close attention to the navigation of the AALGOLAKE@, especially during a time of darkness, bad weather, and while approaching an area of constricted navigation and navigation hazards. Reliance on Untrained, Inexperienced Personnel Although the first mate=s last instruction to the cadet was to obtain a position fix every half hour and observe what was happening, given the circumstances, a half-hour period between fixes was inadequate. Despite the first mate having confidence in the cadet=s ability to assist in watchkeeping duties, the cadet lacked experience of radar watchkeeping. His level of training and experience was such that he did not, and could not, question the first mate=s instructions. If the frequency of position fixes had been increased, it would have shown that the course being steered by the AALGOLAKE@ was standing it into danger.

- 7 - Occasional glances at the radar screen, whether or not the cadet was able to interpret what was seen on the radar, were insufficient to navigate or to monitor the vessel=s progress. The first mate incorrectly assumed that the cadet would alert him to any deviation from the general course plan, laid out on the navigation chart, and of any navigating obstacles. Preoccupation with ECDIS Equipment Problems with the ECDIS unit had begun the previous day while downbound from Lake Huron and in the St. Clair River. The master had requested the shore superintendent to arrange for a manufacturer=s service representative to look at the unit upon the vessel=s arrival at Nanticoke. Until a properly qualified ECDIS technician had examined and serviced the unit, the information it provided could not be relied upon. When the master arrived on the bridge, in addition to engaging in non-essential conversation, he also became preoccupied with the ECDIS unit, which he knew had been malfunctioning. As the vessel approached Nanticoke, its manoeuvring room diminished. The master=s attempts to operate the ECDIS distracted his attention from the need to confirm the vessel=s position by the other means available. The ambient light from the unit=s display screen also affected the master=s night vision and reduced his ability to appreciate other visual clues to the vessel=s position. Standard of Watchkeeping by Bridge Personnel The Canadian Recommended Code of Navigation Practices and Procedures, TP1018, section 21, states AFixes should be taken at frequent intervals; whenever circumstances allow, fixing should be carried out by more than one method@. Between 0534, rounding Long Point Bay, and 0650, the time of running aground, there was only one position fix, at 0615. The vessel=s position at the time of the speed reduction was not confirmed by either the master or the first mate. No position check was made as the vessel approached a course-alteration point. The next course-alteration point was rapidly approaching and it would take some distance for the vessel to reduce headway. Within a few minutes of movement beyond the course-alteration point near Nanticoke Shoal, the water depth was rapidly decreasing and there was not enough time to alter course in order to keep the vessel from running aground. Although winds were strong and westerly and the vessel was proceeding at a reduced speed, no allowance was made for leeway. The vessel continued on a course of 354 G. Confidence Level Although the master of the AALGOLAKE@ came up to the bridge before being called by the first mate, his arrival may have increased the first mate=s level of confidence and relaxed his watchkeeping routine. Because the vessel was very near to the point where the master would normally have taken over the con, it is most likely that the mate expected that the master would imminently take control of the navigation of the vessel but, in the event, he did not.

- 8 - Depth Sounder Vessel and company personnel did not appear to be greatly concerned about the serviceability of the depth sounder because most of the vessel=s areas of operation throughout the Seaway and Great Lakes were well known. The paper graph depth sounder, located at the back of the wheelhouse, had not been working properly for some time. While depth sounder information is normally more useful to vessels approaching ports from a large body of water, in known shallow areas of Seaway operations, its usefulness is limited. However, had there been a working depth sounder fitted with an alarm, it could have given a warning that the vessel was approaching shallow water. Findings 1. No formal BRM environment was in place on the bridge of the AALGOLAKE@, and the responsibilities of those participating in the navigation of the vessel were neither defined nor clear. 2. The interval between position fixes was too large to effectively monitor the vessel=s progress along her intended track. 3. The influence of strong westerly winds caused the AALGOLAKE@ to drift east of her intended track, but no allowance was made for this leeway. 4. As the vessel approached a course-alteration point, the master and first mate engaged in a conversation not related to the navigation of the vessel. 5. The master, attempting to operate a defective ECDIS, became distracted by a non-essential task which also affected his night vision. 6. The master did not specifically inform the first mate that he was briefly assuming responsibility for navigation, and this was not mutually understood or agreed upon. 7. After the 0615 vessel position plot, no further position fix was plotted until the vessel ran aground at 0650. 8. The AALGOLAKE@ grounded in shallows, ESE of buoy EN10, having passed the course-alteration point by 2.1 M. 9. Considering that the vessel=s ECDIS and depth sounder were inoperative, a less-thanadequate radar watch was kept. 10. The navigation cadet was unfamiliar with the principles of BRM and was not sufficiently trained in the use of radar and other navigational aids to be able to assist effectively.

Causes and Contributing Factors - 9 - The AALGOLAKE@ grounded when the vessel proceeded past a course-alteration point, in darkness and near-gale weather. Contributing to the occurrence were the absence of a bridge resource management environment, undefined or unclear responsibilities of those participating in the navigation of the vessel, and the non-use of all available means to monitor the vessel=s progress along its intended track. Safety Action Taken As a result of this occurrence, Algoma Central Marine has taken the following actions: $ both the master and the chief officer were required to attend a refresher BRM course; $ the ECDIS unit was serviced and repaired; $ a new depth sounder was installed on board the vessel; $ instructions were sent to the fleet on the proper use of cadets while on a navigational watch; and $ a third party was recruited to carry out an independent audit of bridge practices of a number of Algoma ships. These audits will continue in the future. This report concludes the Transportation Safety Board=s investigation into this occurrence. Consequently, the Board authorized the release of this report on 2 June 2000.

- 10 - Appendix A - Sketch of the Occurrence Area

Appendix B - Photographs - 11 -

- 12 -

- 13 - Appendix C - Glossary ARPA BRM ECDIS G IMO m M T ' automatic radar plotting aid bridge resource management electronic chart display and information system gyro (degrees) International Maritime Organization metre(s) nautical mile(s) true (degrees) degree(s) minute(s)