APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL

Similar documents
APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

Flight Safety Division Case Nr. Page 1 of 11

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

Section I Page 1 Operator/Airframe Details Completion mandatory. Section III Page 2 Signature Block Completion mandatory

APPLICATION FOR EXTENDED OPERATIONS (ETOPS) OPERATIONAL APPROVAL

APPLICATION FOR LOW. Application received, Date:

Approach Specifications

Flight Operations Inspector Manual

GENERAL INFO NOTICE 1. BACKGROUND

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

P-RNAV GENERAL INFO NOTICE. 1. Background

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Operational Approval Overview

Implementation challenges for Flight Procedures

Advisory Circular. Radius to Fix (RF) Path Terminator

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.

EASA RNP (AR) Workshop The Landscape Working Together

PROCEDURES SPECIAL OPERATIONS

General Guidelines for Obtaining Airworthiness and Operational Approvals for PBN Navigation Specifications. Version 1.0 8/8/08

An advisory circular may also include technical information that is relevant to the standards or requirements.

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Annex to Decision 2016/015/R

PBN Operational Approval Continental En Route Navigation Specifications

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018

Navigation 101 Chapter 3 RNP-10

OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

RNP AR APCH Approvals: An Operator s Perspective

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

AMC ICAO DOC 9613 AMC 20-4 ICAO DOC 9613 TGL-10 ICAO DOC 9613 AMC AMC AMC ICAO DOC 70300

Open Questions & Collecting Lessons Learned

RNAV - RNP. July 2010

Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations

Civil Aviation Authority INFORMATION NOTICE. Number: IN 2017/034. Implementation of Performance Based Navigation Guidance for Pilots

CHAPTER 24 D APPROVAL OF SPECIAL OPERATIONS- PERFORMANCE BASED NAVIGATION OPERATION

Title: PBN Operations and Licensing Requirements - Declaration for AOC Holders

Subject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Surname:... Name of company:... Registration No:... Place of Registration:... Any other SCAA Approval held (quote Approval No.)...

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

Status of PBN implementation in France

HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

Precision and Basic RNAV (P-RNAV [RNP-1]/B-RNAV [RNP-5]) in Europe

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

Form SR FCL 1105 (JAR FCL 02) Issue 8 (Jan 2009) Page 1 of 6

What is B-RNAV? 1. 1 Adaptado de [ ]

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

Aircraft and Operators approval for RNP 2 operations

FLIGHT OPERATIONS PANEL (FLTOPSP)

AREA NAVIGATION (B-RNAV & P-RNAV) Online Course

General Information Applicant Name and Address: Tel./Fax/ Contact Person Name/Tel./Fax/

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

A Pilot s perspective

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS

Date: 1/7/05. NOTE 1: This AC does not apply to RNAV routes in the Gulf of Mexico ( Q ) or Alaska VOR/DME RNAV routes ( JxxxR ).

CIVIL AVIATION PUBLICATION CAP 10 CPDLC

NOTE: This guidance does not apply to RNP-1 routes and procedures planned in the U.S.

The name(s) provided will be reflected on the Certificate when issued. The name(s) provided is (are): Surname:... Given Name:... Name of company:...

CIVIL AVIATION PUBLICATION CAP 04 DESIGNATED AIRSPACE OPERATIONS

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION N

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

AMC Airworthiness Approval and Operational Criteria for RNP Authorisation Required (RNP AR) Operations

CASAS ADVISORY PAMPHLET

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

REQUIREMENTS FOR EXTENDED- RANGE OPERATIONS WITH TWO ENGINE AIRCRAFT (ETOPS)

Signature: Signature:

FAA RNP 10 JOB AID With FAA Order B References (20 May 2010)

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

Challenges in Complex Procedure Design Validation

IRELAND SAFETY REGULATION DIVISION

OPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS)

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

REQUIRED NAVIGATION PERFORMANCE / AREA NAVIGATION GUIDE

SECURITY OVERSIGHT AGENCY June 2017 ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS

Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations.

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Form SR FCL1175 Issue 1 (Nov 2007) Page 1 of 5

PBN Implementation in the UK

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Intentionally left blank

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

AREA NAVIGATION RNAV- MANAGEMENT

Photo by Goh Weiyang

Seychelles Civil Aviation Authority SAFETY DIRECTIVE. This Safety Directive contains information that is intended for mandatory compliance.

Transcription:

SEYCHELLES CIVIL AVIATION AUTHORITY APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL Applicants are strongly advised to read the 'P-RNAV Notes for Completion' before completing the form. Please complete the form in BLOCK CAPITALS using black or dark blue ink. This form is designed to elicit all the required information from those operators requiring Precision Area Navigation (P-RNAV) operations approvals. The completed form and supporting documentation should be submitted to the Flight Operations and Flight Crew Licensing Inspectorate of the Safety Regulation Division at the address listed in the 'Notes for Completion'. Section I Page 1 Operator/Airframe Details Completion mandatory Section II Page 2 P-RNAV Notes For Completion Section III Page 2 Signature Block Completion mandatory Section IV Pages 3 to 10 Operator's P-RNAV Submissions Matrix Completion mandatory SECTION I OPERATOR/AIRFRAME DETAILS 1 Applicant Details - required for all Approval requests Please give the official name and business or trading name(s), address, mailing address, e-mail address and contact telephone/fax numbers of the applicant. Note: For AOC holders - company name, AOC number and e-mail address will suffice. 2 Aircraft Details - required for all Approval requests Aeroplane type(s), series and registration mark(s). Aeroplane Type Aeroplane Series Registration Form SR OPS 1815 Issue 1 Aug 2009 Page 1 of 10

SECTION II P-RNAV NOTES FOR COMPLETION 1 Applicability P-RNAV is a European RNAV specification with a required track keeping accuracy of ±1 NM for 95% of the flight time, together with advanced functionality and a high integrity navigation database. P-RNAV capability can be achieved using inputs from DME/DME or GNSS and/ or I NS. T ypically P-RNAV c an be u sed t o f ly P -RNAV des igned S IDs and STARs i n A erodrome T erminal C ontrol Airspace. The requirements for Operator Approval to carry out P-RNAV operations are laid out in JAA TGL 10 (available via the Eurocontrol Website - see below). Additional Guidance can be found in: OPS SN-2012/4 UK AIC 92/2003 (Yellow 116) - P-RNAV in Terminal Airspace - Application UK AIC 125/2006 (Yellow 226) - Introduction of P-RNAV Procedures in UK Terminal Airspace ICAO Doc 9613 Manual of Performance-Based Navigation ICAO Doc 8168 Procedures for Air Navigation Services - Aircraft Operations (PANS-OPS) Other useful information is provided on the Eurocontrol Website: http://www.ecacnav.com/prnav. 2 Operator's P-RNAV Submissions Matrix Section IV of this form is the Operator's P-RNAV Submissions Matrix. All applicants should complete Column 4 of this matrix in full. If more than one type of aircraft/fleet is included in a single a completed matrix should be included for each aircraft/fleet. Failure to complete the P-RNAV Submissions Matrix may result in a delay in processing your. 3 Documents to be included with the Copies of all documents referred to in Column 4 of the Operator's P-RNAV Submissions Matrix should be included when returning the completed form to the Authority. Original documents should not be sent, photocopies are sufficient. Do not send complete manuals, only the relevant sections/pages will be required. Failure to include all relevant documentation may result in a delay in processing your. 4 Submissions and Enquiries Address for submissions: Contact details for enquiries: Seychelles Civil Aviation Authority Safety Regulation Tel: +248 438 4181 Flight Operations and Flight Crew Licensing Inspectorate Fax: +248 438 4033 P.O Box 181 morr@scaa.sc Victoria, Mahe Seychelles SECTION III SIGNATURE BLOCK Signature:... Name (BLOCK LETTERS)... Appointment:... Date:... Please note that a minimum of 30 working days will normally be required to check and confirm the information given above - if data is missing or omitted the process may take considerably longer. Form SR OPS 1815 Issue 1 Aug 2009 Page 2 of 10

SECTION IV APPLICANT'S P-RNAV SUBMISSIONS MATRIX 1.0 Reference Documents used in compiling submission Your submission should be based on current up to date regulatory material. You should publish a compliance statement showing how the criteria of TGL 10 have been satisfied TGL 10 ICAO Doc 9613 ICAO Doc 8618 PANS-OPS AIC 92/2003 (Yellow 116) AIC 125/2006 (Yellow 226) FODCOM 04/08 2.0 Airworthiness Navigation System Capability compliance statement Give reference to Navigation System capability, e.g. GNSS stand-alone equipment should be approved in accordance with ETSOC129a. ETSO-C129a/ETSO-C145 (In CS-ETSO on the EASA website http://www.easa.europa.eu.) Is FMGS/FMS compliant with TGL 10 for PRNAV operations? TGL 10 Is FMGS/FMS compliant with performance requirements of ED-75/DO-236 for RNP RNAV operations? (e.g. All Airbus 320/321/ 330/340 are compliant.) TGL 10 2.1 Aircraft Flight Manual (AFM) A statement or copy of the AFM showing the aircraft certification standard for RNAV operations. 2.2 Navigation System FMS/Autopilot interface capability Full details of the Navigation System including type and number, e.g. specific capability. TGL 10 Fly by waypoint (WP). Fly over WP. Direct to function. Define vertical path (FPA to a WP). At or above Altitude constraint. At or below Altitude constraint. At Altitude constraint. Vertical Path control (provide guidance from WP to a vertically constrained WP). Entire procedures loadable from aircraft database. Form SR OPS 1815 Issue 1 Aug 2009 Page 3 of 10

2.2 Navigation System FMS/Autopilot interface capability (continued) Database that can be updated in accordance with the AIRAC cycle. Display active WP. Display validity period of database. Continuous display of computed RNAV (GNSS) desired path. RNAV/GNSS system failure/integrity downgrade alerting capability. Display of active sensors. Database protection against flight crew modification. Distance/bearing to WP. Automatic leg sequencing. Means to retrieve and display data, e.g. Master Control and Display Unit (MCDU). 2.3 Navigation Lateral Accuracy P-RNAV ± 1NM for 95% of the flight time. 2.4 Quality Control. Navigation database integrity checks Database obtained from a supplier holding a type 1 and type 2 Letter Of Acceptance (LOA). This demonstrates compliance with EUROCAE/RTCA document ED-76/DO-200A. (See http://eurocae.eu and http:// www.rtca.org.) 2.5 SID/STAR plate supplier Has ED-76 Approval? Show how you audit your supplier of SIDs and STARs in order to establish the effectiveness of your supplier's quality system. Form SR OPS 1815 Issue 1 Aug 2009 Page 4 of 10

2.6 Feedback and reporting of errors found Outline your process for error reporting/ withdrawal of operational use of procedures. Note: In particular, significant errors (i.e. those that would affect the flight path of the aircraft) must be reported to the database supplier immediately, and the affected procedures withdrawn from company operations by company instruction without delay. Any database or chart anomaly identified during RNAV operations must be reported to the SCAA through the MOR scheme. 2.7 Loading of Navigation Database Process to ensure that there is no possible corruption in the content of the database on the RNAV/GNSS system. 3.0 Standard Operating Procedures Manufacturer/operator developed. Manufacturer's procedures recommended as starting point and must include at least the following. MEL handling: Items required for P-RNAV operations. Required equipment list. Statement that autopilot/flight director should be used whenever possible. SOPs for which pages should be displayed on the FMC for P-RNAV (PF and PNF). Database Validity Check. Monitoring of system navigation accuracy. SID/STAR Validity Check including confirmation of procedure track and distance. Navigation System Downgrade Procedure. Contingency procedures if unable P-RNAV. Statement that crew should not manually insert WPs into the procedure. Form SR OPS 1815 Issue 1 Aug 2009 Page 5 of 10

4.0 Operations Manuals Part A RNAV concepts. Navigation accuracy assessment at dispatch, for destination and alternates. RTF phraseology. MEL handling. SOPs. Crew Authorisation required/validation. Part B Technical information and MEL. 4.1 Pre-Dispatch Part D Training programme (Modular) in accordance with P-RNAV operations. MEL. RAIM/AIME. NOTAMs/Navigation infrastructure. Crew qualified. Database valid. 4.2 Training package Compliant with Flight Crew Training and Testing requirements for P-RNAV Operations. Form SR OPS 1815 Issue 1 Aug 2009 Page 6 of 10

All RNAV Operations Basic Area Navigation Concepts: Theory of RNAV including differences between B-RNAV, P-RNAV and RNP-RNAV. RNAV/RNP Definitions. The meaning of RNP/ANP. Limitations of RNAV. Limitations of Baro-VNAV. GPS concepts and limitations (if applicable). Charting, database and avionics issues including: 1 WP naming and depiction concepts. 2 Fly-by and fly-over WPs. 3 Use of RNAV equipment including, where appropriate: a) Verification and sensor management. b) Tactically modifying the flight plan. c) Addressing discontinuities. d) Entering associated data such as: i) Wind. ii) Altitude/speed constraints. iii) Vertical profile/vertical speed. Some or all of: Operations Manual content; handouts (paper or electronic); Computer-Based Training (CBT); and classroom. RTF phraseology for RNAV/RNP. The implications for RNAV/RNP operations of systems malfunctions which are not RNAV related (e.g. hydraulic failure or engine failure). NOTE: Training in Basic Area Navigation concepts is required for all types of RNAV/RNP operations. However, credit may be given/taken for previous Basic Area Navigation concept training when adding a qualification for further type(s) of Area Navigation operations. Form SR OPS 1815 Issue 1 Aug 2009 Page 7 of 10

B-RNAV Basic Area Navigation concept training and training in the following topics: Airspace where B-RNAV is required. Changes to charting and documents to reflect B-RNAV. Some or all of: Operations Manual content; handouts (paper or electronic); CBT; and Navigational equipment required to be operational for flight in designated B-RNAV airspace, and the limitations associated with RNAV equipment. Use of lateral navigation mode and associated lateral control techniques. classroom; and: Line Training. Flight planning requirements. Contingency procedures. Note: Credit may be given/taken for previous basic RNAV concept training when adding a qualification for B-RNAV operations. Form SR OPS 1815 Issue 1 Aug 2009 Page 8 of 10

P-RNAV B-RNAV concept training and training in the following topics: Airspace where P-RNAV is required. Performance requirements for P-RNAV. Navigational equipment required to be operational for flight in designated P-RNAV airspace, and the limitations associated with PRNAV equipment including MEL issues. Some or all of: Operations Manual content; handouts (paper or electronic); CBT; and classroom; and Flight planning requirements. Flight Simulator Training including: Charting, database and avionics issues including RNAV path terminator concepts, especially: a) Use of the 'CF' path terminator. b) Use of the 'TF' path terminator. a) at least one P-RNAV procedure flown as PF by each crew member; and b) failures such as map shift, sensor failure etc. Use of RNAV equipment including: a) Retrieving a procedure from the database. b) Using the autopilot, flight director and autothrottle at different stages of the procedure. c) Flight mode annunciations. Flying the procedure including: a) Use of lateral navigation mode and associated lateral control techniques. b) Use of vertical navigation mode and associated vertical control techniques. Contingency procedures. Note: Credit may be given/taken for previous Basic Area navigation concept training when adding a qualification for P-RNAV operations. Form SR OPS 1815 Issue 1 Aug 2009 Page 9 of 10

Any Further Comments to Support Your Application: Form SR OPS 1815 Issue 1 Aug 2009 Page 10 of 10