SR 520 Program. The road to the world s longest floating bridge. August 2015

Similar documents
Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division

I-405 Express Toll Lanes Coming in 2015

Sound Transit. Tunnels and Underground Structures Committee January 24, 2011

RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS

Director King County Department of Transportation. King County Department of Transportation

2018 Service Implementation Plan Executive Summary

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits

Updating the vision for regional transit

CENTRAL AND EAST CORRIDORS

Organization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

WELCOME AND AGENDA DOWNTOWN REDMOND LINK EXTENSION

A Tour Across America s Managed Lanes Mike Heiligenstein, Executive Director Central Texas Regional Mobility Authority

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor

Strategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze

Washington State Transportation Commission

25 th Avenue Grade Separation. December 13, 2017

Report to the Dulles Corridor Advisory Committee

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

Silver Line Rail Project Update

CENTRA OFFICE PARK. now leasing. CentraOfficePark.com. For leasing information contact: NORTHUP WAY, BELLEVUE, WA

Dulles Toll Road Rate Setting Process

All questions in this survey were voluntary; all results are based on number of respondents who answered the relevant question.

East Link Extension. Redmond stations Open House November 17, 2016

Revolutionary Mobility

Virginia Association of Railway Patrons 2008 Annual Meeting March 1, 2008

BEFORE THE HEARING EXAMINER

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

Sound Transit Operations March 2017 Service Performance Report. Ridership. Total Boardings by Mode

October to provide

2016 YEAR END waterfront activity report THEWATERFRONTREPORT.COM. mercer island, seattle and the greater eastside

EAST LINK EXTENSION 2017 SEPA Addendum

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

FROM THE SEATAC AIRPORT (509 NORTHBOUND - ALTERNATE ROUTE)

Introducing all-electronic tolling in the Puget Sound Region

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

October 12th 2015 DRAFT Service Implementation Plan

DEIS Comments 1. Page iv, Permit or Approval, Federal, Franchise for use ofinterstate Right-of-Way (ROW)

Sound Transit Operations March 2018 Service Performance Report. Ridership

178 WG - IAA Reachback Team Situational Awareness Brief Current As of: 7June PST. This Briefing is: UNCLASSIFIED

Outer Banks Bridges Update:

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

CENTRA OFFICE PARK. now leasing. CentraOfficePark.com. For leasing information contact: NORTHUP WAY, BELLEVUE, WA

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018

The Risk Management of Vessel Traffic

Sound Transit Operations August 2015 Service Performance Report. Ridership

Metropolitan Washington Airports Authority (MWAA)

Measure R Program Update

APPENDIX H Transportation Projects Considered for Cumulative Impact Analysis

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet

November 9, Society of American Military Engineers

5.1 Traffic and Transportation

25 th Avenue Grade Separation. Community Meeting November 13, 2018

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON

FOR SALE Elliott Avenue W, Seattle, WA PROPERTY HIGHLIGHTS A DEVELOPMENT AND INVESTMENT OPPORTUNITY HIGH VISIBILITY 30,100 SF LOT SIZE

Proposed Dulles Toll Road Rate Adjustments

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

Key Center. Enjoy a close proximity to Downtown Bellevue s lively entertainment and shopping center, surrounded by a wide variety of dining options.

IRONTON-RUSSELL BRIDGE REPLACEMENT

REPORT TO THE PARKS AND RECREATION COMMISSION rd Avenue NE, Woodinville, WA

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts

Thanks! Detail by option.

Major Projects Overview

CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA (206)

Sound Transit Operations January 2017 Service Performance Report. Ridership. Total Boardings by Mode

DESIGN AND CONSTRUCTION OPEN HOUSE

Sound Transit Operations January 2018 Service Performance Report. Ridership

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Engineers Conference Nassau, Bahamas. October 31, 2014

Arkansas State Highway and Transportation Department. Fayetteville Commerce District

Key Center. Enjoy a close proximity to Downtown Bellevue s lively entertainment and shopping center, surrounded by a wide variety of dining options.

25 th Avenue Grade Separation. September 13, 2017

Phoenix Sky Harbor transit guideway bridge

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

Overview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016

A BOAT RAMP TO NOWHERE

Corridor Program. Summary. I-405/SR 167 Executive Advisory Group Meeting. Tuesday, Dec. 11, 2018 Renton Community Center 2 p.m. 4 p.m.

Coralville Limestone

ENA General Membership Meeting

Dick Trammel. Senior Democrats of Northwest Arkansas. Chad Adams. Chairman, Arkansas Highway Commission. District 4 Engineer

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION

Electric System Serving Pierce County Current system and future investments

FASTRAK PROGRESS REPORT

13th Coast District 2017 Bridge Inspection List

CDOT North I-25 Express Lanes Update April 28, 2016

Seattle Center Director s Report

Mr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012

DRAFT Service Implementation Plan

PIERCE COUNTY-THUN FIELD AIRPORT MASTER PLAN MASTER PLAN ADVISORY COMMITTEE (MPAC) AIRPORT TOUR RD AVE. E., PUYALLUP, WA WEDNESDAY,

A T B E A R C R E E K NE UNION HILL ROAD BUILDING A NE UNION HILL ROAD BUILDING B. Redmond, Washington 98052

PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE

Classifications, Inventory and Level of Service

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

PORT OF SEATTLE PRESENTATION TO THE WESTERN STATES INSTITUTIONAL INVESTORS CONFERENCE MAY 15, 2018

Transcription:

SR 520 Program The road to the world s longest floating bridge August 2015 Chris Christopher, P.E. Director of Construction - WSDOT AASHTO Subcommittee on Construction August 2015 Little Rock, Arkansas

SR 520 corridor connects major regional employment centers 2

Improving safety by replacing vulnerable bridges Portage Bay Bridge West Approach Bridge Floating bridge Waves batter the SR 520 floating bridge (top). Example of earthquake-vulnerable hollow columns (bottom). 3

SR 520 Program overview and timeline Program map Program schedule Eastside Transit and HOV Project: Opened 2014 Pontoon Construction Project (Aberdeen): Completed 2015 New floating bridge: Opening spring 2016 West Approach Bridge North: Construction began fall 2014; opening summer 2017 Remaining west side corridor: Funded / In design 4

SR 520 major construction contracts Project and contract type SR 520 Pontoon Construction Design-Build Project Contract amount (as awarded) $367 million (awarded to Kiewit-General Joint Venture Feb. 2010) Timeline (major construction) 2011 2015 Eastside Transit and HOV Design-Build Project SR 520 Floating Bridge and Landings Design-Build Project Montlake to Evergreen Pt. Bridge West Approach Bridge North Design-Bid-Build Project $306 million (awarded to Eastside Corridor Constructors Nov. 2010) $586.6 million (awarded to Kiewit/General/Manson, A Joint Venture August 2011) $199.5 million (awarded to Flatiron West Inc. July 2014) 2011 2014 2011 2016 2014 2017 5

SR 520 costs and funding (design & construction) SR 520 program cost estimate 2009 legislative budget cap: $4.65 billion Funding received Based on 2015 Legislative authorization State funding (primarily Motor Vehicle Fuel Tax) SR 520 Account (tolling and future federal funds) Federal TIFIA loan Other federal funding Deferred sales tax * Includes $1.64 billion in new revenue authorized in 2015 via ESSB 5988, Includes $15 million authorized in 2015 via 2ESHB 1299, Includes $10 million in existing agency resources authorized in 2014 via ESSB 6001. $4.56 B * $4.56 B $2.15 B $1.65 B $0.30 B $0.20 B $0.26 B Updated: July 2015 6

SR 520 construction around Washington State A: Grays Harbor pontoon construction B: Tacoma pontoon construction C: Kenmore precast element construction D: Floating bridge assembly on Lake Washington and West Approach Bridge North construction in Seattle E: Eastside corridor construction Note: Pontoons built in Tacoma and Aberdeen must be towed up to 200+ nautical miles to the bridge assembly site on Lake Washington. 7

Types of pontoons for the new SR 520 floating bridge The three types of pontoons that support the new SR 520 floating bridge. Example of new longitudinal pontoons being stored in Grays Harbor prior to traveling to Lake Washington. 8

Pontoon journey to Lake Washington A new pontoon travels through the Hiram M. Chittenden Locks in Seattle. There is very little extra clearance on either site of the pontoon (less than two feet on either side). A new pontoon arrives on Lake Washington following its journey from Aberdeen, Wash. 9

Construction update: Floating bridge assembly Updated: July 30, 2015 10

Floating bridge: boater clearance 11

Old and new SR 520 floating bridge by the numbers 12

Old and new SR 520 floating bridge cross-sections Existing SR 520 New SR 520 Bridge width 116 feet 13

SR 520 construction photos Grays Harbor pontoon site Tacoma pontoon site 14

SR 520 construction photos Pontoon post-tensioning 15

SR 520 construction photos 16

SR 520 construction photos Kenmore site Lake Washington site 17

SR 520 construction photos Pontoon joining and bridge assembly Credit: HDR 18

SR 520 construction photos Supplemental pontoon Bird ramp Credit: HDR 19

SR 520 construction photos SR 520 anchor types 20

SR 520 construction photos Anchor transportation and placement 21

SR 520 construction photos Coffer cell 22

SR 520 construction photos West Approach Bridge North (WABN) temporary work bridge 23

SR 520 construction photos Eastside corridor Seattle (WABN) site 24

Eastside corridor aerials new highway lids Evergreen Point Road lid 84th Ave NE lid 92nd Ave NE lid 25

26

Eastside environmental mitigation Environmental mitigation on the Eastside improves fish migration and other ecological systems. Pictured above is the Yarrow Creek mitigation site, near Bellevue Way. Pictured to the right is the Evans Creek mitigation site, near Redmond. 27

SR 520 highway tolling Current toll rates: 28

Next steps Floating bridge construction continues new bridge to open in spring 2016. Removal of the existing floating bridge scheduled for late 2016. West Approach Bridge North construction continues new bridge to open in summer 2017. Rest of the West project elements continue practical design efforts and prepare for construction. 29

Questions? For more information: Visit: E-mail: www.wsdot.wa.gov/projects/sr520bridge SR520Bridge@wsdot.wa.gov Call: 1-888-520-NEWS (6397) Mail: SR 520 Bridge Replacement and HOV Program 999 3rd Avenue, Suite 2200 Seattle, WA 98104 30