Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines.

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2005

Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter

Bumper Quarter for Atlas as Production Hits 10Mtpa

Mine Production and Shipping

For personal use only

Pilbara Iron Ore Project WESTERN AUSTRALIA

For personal use only

For personal use only

Another strong Quarter, Atlas on track to achieve fullyear production & cost guidance

JUNE 2017 QUARTERLY ACTIVITIES REPORT

Candelaria and Ojos del Salado Chile

Recent Exploration of the Olympic Dam

For personal use only

Haoma Mining NL A.B.N

December 2018 Quarterly Production Report

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation

The Evolution to a Formidable Tier One Iron Ore Major. Goldman Sachs JB Were Sixth Annual Australasian Investment Forum

Northern Territory. Ark wishes to extend the strike and further define the size of the Golden Honcho deposit, with the

ON TIME AND ON BUDGET: PROCESSING PLANT OVER 90% COMPLETE AND FIRST PRODUCTION SET FOR MARCH

Iron Ore Update. Ian Ashby President Iron Ore 6 May 2009

ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso

Overview. Mining projects map

For personal use only

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===

Haoma Mining NL A.B.N

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES

Newcrest Mining Limited. March 2007 North American Roadshow Ian Smith, MD & CEO

For personal use only

SPITFIRE RESOURCES LIMITED SPITFIRE DIVERSIFIES WITH TASMANIAN COAL ACQUISITION

For personal use only

Matilda Zircon Limited (ASX: MZI) (formerly Olympia Resources Ltd) Quarterly Activities Report for Period Ended. 30 June 2009

An emerging Pilbara Iron Ore Company Investor Presentation March 2012

For personal use only

For personal use only

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION

For personal use only

Kidman agrees to acquire 1Moz Mt Holland gold field in WA

MARCH 2018 QUARTERLY ACTIVITIES REPORT

UNLOCKING THE POTENTIAL OF THE EAST MENZIES GOLDFIELD

For personal use only

DECEMBER 2017 QUARTERLY ACTIVITIES REPORT

Quarterly Activities Report For The Period Ending 30 June 2018

2 September The Manager Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 AURORA TANK PROJECT

BHP Billiton Iron Ore Western Australia. Iron Ore. Presentation to Analysts June Ian Ashby, President and COO BHP Billiton Iron Ore

BHP Billiton Iron Ore. Asset Development Projects

For personal use only

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

Quarterly Activities Report For The Period Ending 31 March 2018

Angas Zinc Mine From Prediction to Production

39 th Annual Conference Istanbul June 2013

PROJECTS & TECHNICAL SERVICES

BHP Billiton: A Strategy of Diversification

MATRIX METALS LIMITED

Australian Site Tour Mt Keith Operation. Jaco Harwig General Manager

On The Road To Silver Mining In Mexico

For personal use only

For personal use only

Quarterly Activities Report for the period ended 30 September 2018

Legacy Iron Ore Limited (LCY)

Ramelius Resources Limited ASX:RMS

Lorena Gold Project Malachite AGM 29 November 2017

FOCUS MINERALS LIMITED

Alberto Calderon Group Executive and Chief Executive Aluminium, Nickel and Corporate Development

Quarterly Activities Report Period Ended 31 December 2017

Investor Presentation February Richard Hill Managing Director

South America Copper Site Visit Non-ferrous overview

ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA

Corporate Presentation March 2015

For personal use only

State of the Market: Latin America

Developing Papua New Guinea s first diversified world-class resources platform. UK PNG Trade and Investment Conference London 16 June 2015

Kinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

STOCK EXCHANGE ANNOUNCEMENT

BHP Billiton Iron Ore Western Australia. Iron Ore. Mining Operations. Phil Price Vice President Integrated Planning

For personal use only

QUARTERLY REPORT. ASX Code JRL HIGHLIGHTS FINANCIAL. Resources Limited ABN for the three months ended 31 March 2017

For personal use only

Ramelius Resources Limited ASX:RMS

Investor Presentation July 2013

RIU EXPLORERS CONFERENCE PRESENTATION

Uniquely positioned to be Australia s next coal producer

West African Minerals Corporation ( WAFM or the Company") Acquisition of CMC Guernsey Limited, Proposed Board Appointments and Operational Update

Bank of America Merrill Lynch Conference Iluka Resources Limited. Alan Tate, Chief Financial Officer New York September 2010

Quarterly Report for the Period Ending 30 September 2014

QUARTERLY OPERATIONS REPORT 30 JUNE Highlights: BOARD AND MANAGEMENT YAMARNA

ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014.

For personal use only

Quarterly Activities Report Period Ended 31 March 2018

BHP BILLITON IRON ORE PTY LTD

QUARTERLY ACTIVITIES REPORT

For personal use only

Australian Mines increases Marymia ground holding

Mt Arthur Coal. Investor/Analyst Presentation September 2003

For personal use only

WOOLGAR PROJECT DRILL PROGRAM RESULTS NOVEMBER 2004

HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND Drill Results Include 8.0% ZnEQ and 10.

Exane BNP Paribas European Seminar

On The Road To Silver & Gold Mining In Mexico

Transcription:

Atlas Iron Limited Pilbara Iron Ore February 2007 the right place at the right time Atlas Iron Limited - Overview Emerging Iron Ore Junior in the Pilbara One of the more serious & aggressive player Within 18 months delineated 10.5 Mt of Resources at Flagship Project Pre-Feasibility Study (DSO) shows low CAPEX & good Operating Margins DFS mid07, Targeting 1 Mtpa for 12 mths, Shipment Q1 2008, 3 Mtpa ramp up Evaluation of Magnetite Potential at Pardoo, targeting inferred 800K-1Bt resource High Calibre Board, Management Team & Consultants (marketing, Ops & Project Dev.) Well Funded with $22 M in cash for aggressive Exploration & Feasibility Studies the right place at the right time 1

Atlas Iron Limited Capital Structure AGO on issue 132.5m AGO Price $0.58 AGOO Price $0.40 Market Cap $77m Cash $22m Top 20 60% IMC 17% LinQ Resource Fund 12% Merrill Lynch Natural Resource Fund 10% Atlas Iron Limited - Board David Nixon - Chairman (39 yrs) Mechanical Engineering - Project Management (CRA, BHP Billiton, Fluor, Evans and Peck) David Flanagan - Managing Director (15 yrs), Exploration, Project Development and mining (RSG Global, Normandy, Gencor, Gindalbie Metals) David Hannon - Non Executive Director (20 yrs), Merchant Banking Portfolio Manager (Jackson Securities) Jyn Sim Baker - Non Executive Director (21 yrs), LLB Law, Project Finance, banking M&A, CEO of IMC past MD of Midwest Corporation Limited 2

Atlas Iron Limited - Management Mark Gunther Exploration Manager, MSC Geol, James Cook University, (20 yrs Geol Surv Qld, Goldfields, Croesus, Placer, Ind. Consultancy) Ken Brinsden Operations Manager, B. Min Eng WASM Mining Engineering. (15 yrs, WMC, Normandy, Goldfields, Iluka) Mark Hancock Chief Financial Officer, B. Bus, CA, F Fin (20 yrs, Grant Thornton, Premier, Woodside, Lend Lease) Tony Walsh Company Secretary, B. Comm MBA, CA Bus, (14 yrs ASX, 5yrs Ernst and Young) Garry Plowright Land Tenure and Approvals Manager, Dip Cart. (25 yrs BHP, Mt Edon Gold Mines, Pacmin, Gindalbie Metals) Consultants Warwick Davies Iron Ore Marketing, BA Econ., Cert. Chem. (40 yrs BHP Steel, Hamersley, Robe River Mining, Exec. Dir. RMC), Bob Third Project Manager - Magnetite, Eng. (>35 yrs RIO, Mt Gibson, Asia Iron, Hamersley, Robe River Mining (pellet plant), Pilbara Landholding ~ 6000 sqkm Conc. 120 km radius Strategy to truck to public access port Flagship Project 75 km east Pt Hedland Road & Rail 3

Pardoo Project Main focus since mid 2005 Initial low key follow up Goldsworthy_BHP late 60- mid 90s Traverse 69 m@ 62.7%Fe Initial Program included 52 m @ 60.6% Fe Total 580 RC for 34,500 m 10 diamond holes for 670 m Mapping, rock chip, remote sense, ground gravity 21 Prospects, 9 Resources Atlas Iron Limited Resources and Reserves Pardoo Project Resources Category Kt Fe% Indicated 5,581 57.3 Inferred 4,916 56.9 Total 10,497 57.1 SiO2% 7.0 7.1 7.0 Al2 O3 1.6 1.9 1.8 P% 0.15 0.11 0.13 LOI% 8.6 8.8 8.7 S% Pardoo Project Probable Reserves Prospect Kt Fe% SiO2 % Al2 O3 % P% LOI% S% Glenda Bobby South Limb Total 0.17 0.13 0.16 0.14 9.4 8.3 8.9 8.6 0.01 0.01 194 2,521 1,686 4,401 58.2 57.4 57.1 57.3 5.0 7.3 6.1 6.7 1.0 1.2 2.2 1.6 CaFe % 62.6 62.4 62.5 CaFe % 64.2 62.6 62.7 62.7 Strip Ratio 3.4:1 1.9:1 1.5:1 1.8:1 High conversion of resources to reserves 4

Pardoo Direct Shipping Ore (DSO) Project Bobby Typical Section Supergene style go-he ore Near surface blanket like High-grade core Tapering at depth Ore geometry favors lower strip ratios & conversion of resources to reserves Pardoo Direct Shipping Ore (DSO) Project Prospective Mineralised Trends Mineralisation controlled by stratigraphy & structure 6 Main Prospective Trends Numerous targets from grassroots to extensions Newly discovered Floyd & Olivia Trend 5

Atlas Pardoo Iron Ore Project Excellent Exploration Potential Adjacent to existing resources Under Shallow Cover Gravity anomaly 1st phase delineation RC 2.7 Mt Resource Remains Open particularly along strike Atlas Pardoo Iron Ore Project Floyd Section 724200 me S N Near Surface Thick Ore Zone Shallow Dipping Remains Open Step out Drilling 6

Atlas Pardoo Iron Ore Project Olivia Trend Mapping by consultants have identified significant areas of surface iron enrichment Area of no previous work Recent reconnaissance trip exciting Conceptual Exploration target 5-10 Mt 55-60% Fe Initial drill testing within coming months Atlas Iron Ore Projects Farrel Well & Abydos Grant Prospect Prospect - Rock Chip traverse 27m at 60.2 % Fe, 500 metres long, Drilling Target Projects in Pt Hedland Environs Farrel Well & Abydos Prospective Archaean Iron Formation host rocks Bedded surface Fe enrichment Abydos greater potential Pincunah North Trend Rock Chip sample 59.9 % Fe ~4km strike of prospective host Combined ~10 km of strike prospective iron Fm host rocks Strelley Trend - Rock Chip samples up to 61.5 % Fe, ~6km strike prospective host Initial Exploration target 10-15 Mt at 55-60%Fe of bedded DSO Further potential in CID Plans to commence drill testing in first half 2007 7

Pardoo Magnetite Project RIDLEY 1 to 1.5 Bt Ridley Magnetite Target Favourable Metallurgical Test Work Remarkably Thick & Uniform 600-800 m thick & near vertical dip Infrastructure Plus Pardoo Project DSO Mining Operation Pre-feasibility Study confirms Robust Economics Traditional contractor operated open pit mining operation. Start-up CAPEX $8.3 M for 1 Mtpa operation, commissioned 1 Qtr 08 Ramp up 3 Mtpa, CAPEX $13 M, 2010 Strip ratio 1.8:1 (waste:ore) Pit depths up to 75 metres Road train haulage 75km to port Profit Margin $10 to 18 per tonne Announced new Port Expansion timely for Atlas 8

Atlas Iron Limited - Conclusion Aggressive & successful iron ore junior Rapid transition from Explorer to producer Very good ground with money in the bank First class team With a more-than-favorable commodity climate we are in the right place at the right time Atlas Iron - we are worthy of a good look Atlas Iron Limited Pilbara Iron Ore the right place at the right time 9