Open Questions & Collecting Lessons Learned

Similar documents
Status of PBN implementation in France

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

EASA RNP (AR) Workshop The Landscape Working Together

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

ICAO framework for LPV

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Título ponencia: Introduction to the PBN concept

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Flight Operations Inspector Manual

DSNA NAVIGATION STRATEGY

LPV implementation to non-instrument runways

Title: PBN Operations and Licensing Requirements - Declaration for AOC Holders

Approach Specifications

PBN Implementation in the UK

JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & EUROCONTROL RAISG MEETING

REPUBLIC OF CROATIA. LDDU - DUBROVNIK/Čilipi Airport - Temporary suspension of RNAV (GNSS) RWY12 and trial of PBN instrument flight procedures

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

REPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, POBox 103 Croatia

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

GNSS/EGNOS services and applications in civil aviation

APV Implementation in the UK Initiative

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

Appendix 2 List of regulatory references. Appendix 3 List of reference documents. Appendix 4 Background information

Challenges in Complex Procedure Design Validation

PBN and Procedure Design training

APAC PBN UPDATE Slide 1 of xx

Flight Safety Division Case Nr. Page 1 of 11

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

EUROCONTROL approach to the execution of the PBN IR Mandate

GNSS/EGNOS services and applications in civil aviation

SBAS as a solution for safe approaches in New Zealand and Australia

Guidelines for ANSP/Airports and Aircraft Operators for LPV implementation

ENAV experience on LPV implementation

Annex to Decision 2016/015/R

European Aviation Safety Agency

Advisory Circular. Required Navigation Performance Approach (RNP APCH)

FLIGHT OPERATIONS PANEL

Terms of Reference for a rulemaking task. Revision of operational approval criteria for performance-based navigation

Subject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations

ESSP EGNOS Service Provider. ICAO APV Workshop (26/05/2011)

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Regulations & Obligations

Implementation of PBN in Armenian airspace

UK Performance-based Navigation (PBN) Implementation Status

PBN Operational Approval Continental En Route Navigation Specifications

Civil Aviation Authority INFORMATION NOTICE. Number: IN 2017/034. Implementation of Performance Based Navigation Guidance for Pilots

Subject: Aircraft and Operators approval for RNP Authorisation Required Approach (RNP AR APCH) Operations

Learning Objectives. By the end of this presentation you should understand:

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Subject: Aircraft and Operators Approval For Approach Operations With Vertical Guidance/Barometric Vertical Navigation (APV/baro- VNAV)

RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS

TABLE OF CONTENTS 1.0 INTRODUCTION...

Patrizio Vanni (Project Coordinator)

V3 SPR. Abstract. Document information

E GNSS in Aviation: status and trends, aviation grants Workshop Deployment of Galileo and EGNOS in Portugal

GNSS NOTAM. Aline Troadec RNAV approach specialist EUROCONTROL. AI Operations November 2013

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

NEW FPL Transition Phase & Implementation Stages

The support of an European ANSP

Final Approach Operations Symposium

Contextual note SESAR Solution description form for deployment planning

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace

A Pilot s perspective

ADVISORY CIRCULAR. 2. RELATED SECTIONS OF THE LATIN AMERICAN AERONAUTICAL REGULATIONS (LARs) OR EQUIVALENT

E-GNSS systems for GA

TWELFTH AIR NAVIGATION CONFERENCE

NEW CALEDONIA PBN PLAN

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APPROACH (RNP APCH) OPERATIONS

ICAO EUR PERFORMANCE BASED NAVIGATION TASK FORCE & EUROCONTROL RAiSG MEETING (ICAO EUR PBN TF & EUROCONTROL RAiSG)

Performance Based Navigation (PBN) Implementation Plan. The Gambia

French DSNA approach to CNS rationalization & evolution

UK Implementation of PBN

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

FLIGHT OPERATIONS PANEL (FLTOPSP)

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

ADVISORY CIRCULAR SUBJECT: APPROVAL OF AIRCRAFT AND OPERATORS FOR RNP APCH OPERATIONS DOWN TO LP AND LPV MINIMA USING SBAS-AUGMENTED GNSS

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE

LPV implementation to non instrument runways

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APPROACH (RNP APCH) OPERATIONS DOWN TO LNAV AND LNAV/VNAV MINIMA

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

GENERAL INFO NOTICE 1. BACKGROUND

APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL

Guidance for the preparation of EGNOS National Market Analysis

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

Transcription:

Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014

Summary Objective List of Open Questions Options for making Information available Review of State Publications ICAO PBN RAiSG 2

Objective With almost 450 RNP APCH procedures published in ECAC much has been learned. Sharing the benefits of experience has been made through this group. Capturing and making available the lessons learned needs to be improved. The aim of this presentation: To stimulate discussion on the options for collecting and sharing these lessons learned. ICAO PBN RAiSG 3

Open Questions 1/4 Does an operator who wants to fly LPV procedures need approval against both AMC 20-28 and 20-27? Is LPV an NPA or PA because this has an impact on the aerodrome (Annex 14) requirements? NPA runway the minimum DH is 300ft. PA runway can have minima down to 250. Should the Orthometric Height of the FTP/LTP and FPAP be published? Is it possible to publish the MAPt before the threshold? Electronic transfer of the FAS DB is it required? ICAO PBN RAiSG 4

Open Questions 2/4 Missed approach according to PANS-OPS turn at altitude is not possible due to receiver limitations what s the problem? Will this change in the future? Can EGNOS use be authorised outside of the coverage area published in the SDD? Do adjacent SBAS channel numbers need to be sufficiently different to avoid selecting the wrong one? Why has Spain published LPV on a separate chart from the LNAV/VNAV and LNAV? ICAO PBN RAiSG 5

Open Questions 3/4 Is Flight validation always required? With what objective? Obstacles, procedure, database, flyability, interference. Is signal-in-space validation required locally before publishing a procedure? Real-time monitoring of GPS status. What is required? Is anybody collecting examples of GPS jamming/interference? When would an LP approach be implemented instead of an LPV? ICAO PBN RAiSG 6

Questions 4/4 Are LPV equipment all capable to fly APV Baro procedures when the use of EGNOS is allowed? Who is to sign EWA with ESSP (ANSP, airport, NSA?) Is there a need for an agreement between NSA and EASA (equivalent to EWA)? Non RNP approach related questions on PMS, operators approval status against PRNAV, deployment status of PRNAV and other PBN specs, etc Forwarded to other people in EUROCONTROL, NAV User Support Cell, other stakeholders group, etc ICAO PBN RAiSG 7

Review of different State publications Looking at several AIPs/AICs To compare what different States have published on RNP APCH operations. Capture experience and current best practice ICAO PBN RAiSG 8

Sources of information AIC Finland : AIC NR A1/2010 13 January 2010 UK AIP GEN 1.5-8 13 December 2012 DFS AIC IFR 3 12 February 2009 AIP Germany ENR 1.5-12 12 January 2012 AIP Germany GEN 1.5 18 January 2007 AIC A21/12 France 20 September 2012 ICAO PBN RAiSG 9

Generic content of Aeronautical Information relevant to RNP APCH (1/3) Introduction make reference to ICAO Resolution 37-11, ICAO PBN Manual (doc 9613) LSSIP NAV 10 objective, national plans/strategy and Background/Rational: reduced CFIT risk with the provision of vertical guidance Definitions: APV, LNAV, NPA, RAIM, ABAS, SBAS, VNAV, LPV, VPA, 2D, 3D and Approach classification (PA vs NPA) Procedure design standards and Aerodrome Operating Minima Aerodrome Licensing Minimum aircraft navigation system requirements Pilot training and Licencing (AOC, General Aviation, Training, State aircraft and Military) ICAO PBN RAiSG 10

Generic content of Aeronautical Information relevant to RNP APCH (2/3) Use of databases Pre-flight planning including: NOTAM and RAIM prediction, availability of non-gnss based approach at destination or alternate Flight plan data (PBN codes) ICAO PBN RAiSG 11

Generic content of Aeronautical Information relevant to RNP APCH (3/3) Method of operation: pilot requests clearance, clearance to fly, RTF examples, IAF or IF in case of radar vectoring, proc./minima chosen as a function of qualification, conditions, etc Missed approach (e.g. based on conventional navaids or not) Contingency procedure What to do in case of loss of communication Implementation schedule/plans Contact point for additional information (e.g. AIS) ICAO PBN RAiSG 12

Concerning APV Baro (1/3) Vertical guidance based on Baro VPA from a single waypoint (RDH) or geometric path between 2 waypoints Use of a DA/H instead of MDA/H for NPA procedures Availability of distance / altitude table on FAS Impact of Temperature effect Description of Temperature Limit, accounted for in the procedure design, and below which conducting the approach is forbidden (exception made for aircraft equipped with approved cold temperature compensation in some countries or of aircraft able to apply temperature corrections) Unavailability in case of absence of local QNH setting information ICAO PBN RAiSG 13

Concerning APV Baro (2/3) Relevance of RAIM prediction Publication details: Minimum temperature, VPA, OCA/H (LNAV/VNAV), Procedure name (RNAV (GPS) or RNAV (GNSS)) Step Down Fixes not usable for APV Baro RTF (in particular confirmation of QNH «prior to commencement of the approach» or «before FAF» to minimise the potential for missetting of baro reference) Reference to relevant airworthiness and ops approval standards (EASA AMC 20-27) + contact for further information ICAO PBN RAiSG 14

Concerning APV Baro (3/3) If the use of EGNOS for vertical guidance on APV Baro procedures is approved: Reference to suitable navigation on board equipment Availability of EGNOS NOTAM for APV Baro Reference to relevant EASA SB ICAO PBN RAiSG 15

Concerning APV SBAS Description of the EGNOS service and coverage area + link to ESSP website (SDD) Final approach segment definition (FAS DB) Use of a DA/H instead of MDA/H for NPA procedures Description of EGNOS NOTAM No need for RAIM check Publication details: SBAS channel number, OCA/H (LPV) Step Down Fixes not usable for APV SBAS Distance / altitude table not usable for APV SBAS Reference to relevant airworthiness and ops approval standards (EASA AMC 20-28) + contact for further information ICAO PBN RAiSG 16

Other sources of information France: Operational guidelines to conduct RNAV(GNSS) approaches LNAV, LNAV/VNAV and LPV http://www.developpement-durable.gouv.fr/img/pdf/st-guideo1-_pbn-rnav_gnss ENGv3.pdf AIP Austria 13 December 2012 RNP AR Approaches UK CAA information regarding RNAV(GNSS) Approach Operations: http://www.caa.co.uk/default.aspx/default.aspx?catid=1340&pagetype=90&pageid=13338 Swiss FOCA material: Guidelines for Instrument Rated (IR) pilots conducting RNAV GNSS Approaches (formerly GPS Approaches) in categories NCO Aeroplane and NCO/NCC Helicopter ICAO PBN RAiSG 17

Options for Making Information Available OneSky Team ICAO & Eurocontrol Web Sites Library Wiki Draft example AIC Update/Expand Doc 025 or develop annexes on particular topics ICAO PBN RAiSG 18

ICAO PBN RAiSG 19