Kenosha County Transit Development Plan:

Similar documents
RACINE COUNTY PUBLIC TRANSIT PLAN:

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES

2018 Service Changes Ada County

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT

TORONTO TRANSIT COMMISSION REPORT NO.

Study Overview and Context

Northwest Raleigh (Routes 4, 26, 27, and 36)

Southeast Raleigh (Routes 17, 18, 18S, and 19)

CHAPTER 5: Operations Plan

RECOMMENDED TRANSIT SERVICE IMPROVEMENT PLAN

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

TORONTO TRANSIT COMMISSION REPORT NO.

New System. New Routes. New Way. May 20, 2014

Terrace Regional Transit System CITY OF TERRACE COMMITTEE OF THE WHOLE SEPTEMBER 13, 2017

DEMOGRAPHICS AND EXISTING SERVICE

METROPOLITAN EVANSVILLE TRANSIT SYSTEM Part I: Comprehensive Operations Analysis Overview July 9 th, 2015 Public Information Meeting

This report recommends routing changes resulting from the Junction Area Study.

TRANSIT SERVICE IMPROVEMENT ALTERNATIVES

Approval of August 2019 Service Changes

Intercity Transit Short / Long Range Plan Short-Term Recommendations Transit Authority Meeting

Central Oregon Intergovernmental Council

Call for Public Hearing August 2019 Service Changes

(This page intentionally left blank.)

Chapter 3. Burke & Company

Restoration of Historic Streetcar Services in Downtown Los Angeles

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives

ROUTE 103. Morrisville Shopping Shuttle ROUTE OVERVIEW

SAN LUIS OBISPO TRANSIT + SAN LUIS OBISPO RTA JOINT SHORT RANGE TRANSIT PLANS: SERVICE STRATEGIES. Presented by: Gordon Shaw, PE, AICP; Principal

KING STREET TRANSIT PILOT

CobbLinc Forward Service Package

Memorandum. DATE: May 9, Board of Directors. Jim Derwinski, CEO/Executive Director. Fare Structure Study Fare Pilot Program

34500 N Highway 45 Third Lake, Illinois

East Farmingdale Fire Department 930 Conklin Street. Source: Parsons Brinckerhoff

Final Proposed Route Changes for GLTC

PLEASE READ Proposal for Sustainable Service

ROUTE 171 & SEAL BEACH CIRCULATOR

Call for Public Hearing August 2019 Service Changes

Washington County Transit Development Plan

Rochester Genesee Regional Transportation Authority

Mercer Island Town Center Stakeholder Meeting E. June 10, 2015

Ozaukee County Transit Development Plan

TTI REVIEW OF FARE POLICY: PRELIMINARY FINDINGS

KING STREET TRANSIT PILOT

Existing Services, Ridership, and Standards Report. June 2018

Public Meeting. December 19 th, 2018

List of Figures... 4 List of Maps... 6 Introduction... 7 Data Sources... 8

Draft SamTrans Service Plan Public Outreach Presentation

Transit Fare Review Phase 2 Discussion Guide

Proposed Route Changes for GLTC

First Brainstorm Session Purpose & Need Tampa Bay History Center Tuesday March 7, 2016

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

APPENDIX 2 TORONTO TRANSIT COMMISSION SERVICE STANDARDS AND DECISION RULES FOR PLANNING TRANSIT SERVICE

ROUTE EBA EAST BUSWAY ALL STOPS ROUTE EBS EAST BUSWAY SHORT

Service Change Plan Cowichan Valley Regional Transit System July 2018 Expansion. Prepared by

SRTA Year End Fixed Route Ridership Analysis: FY 2018

Title VI Service Equity Analysis

DAILY TRIPS (LOOP) Monday-Friday 6:55 AM to 6:20 PM 60/60/ 11 Saturday 7:55 AM to 5:55 PM 60/ 10 Sunday

STA MOVING FORWARD A plan for more and better transit services

Figure 1: Route 86A East Hills

Bus Operations Report

CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards

// Atlanta Streetcar System Plan

Public Transit Services on NH 120 Claremont - Lebanon

TORONTO TRANSIT COMMISSION REPORT NO.

Design Meeting Presentation

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016

Assessment of Travel Trends

BaltimoreLink Implementation Status Report

Why we re here: For educational purposes only

Review of Overnight Services. January 2005

2016 Transit Service Review, Northwest and Inner City. Verbatim Comments Route 31. Public Engagement -What We Heard February March 2016

7:00 p.m. General meeting called to order. Paul Conte, Chair 7:05 p.m. Introductions Reminder: All JWN members should fill out and return a sign-in

Service Performance 2010 Networked Family of Services

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

Request to Improve Transit along the Dufferin Street Corridor

Juneau Comprehensive Operations Analysis and Transit Development Plan DRAFT RECOMMENDATIONS January 2014

Bristol Virginia Transit

STA MOVING FORWARD A plan for more and better transit services

Transit System Performance Update

Passenger Facility Charge (PFC) Program: Eligibility of Ground Access Projects Meeting

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2007/08 Full Year Results Investor Briefing

PROPOSED FOR IMPLEMENTATION

Treasure Island Supplemental Information Report Addendum

Chapter 5 Alternatives

Presentation Outline

CHERRIOTS 2018 SERVICE PLAN 1

Wake Bus Plan. Short Range Transit Plans. Proposed Transit Service Projects and Changes. GoTriangle. Volume 2 DRAFT

Western Placer County Transit Operators Short Range Transit Plan Updates FY to FY Project Update and Alternatives Discussion

Miami Orlando Passenger Rail Project Overview

These elements are designed to make service more convenient, connected, and memorable.

CENTRAL OREGON REGIONAL TRANSIT MASTER PLAN

Transit in Toronto. Chair Adam Giambrone Sunday, October

Presentation to the Southeast Corridor High-Performance Transit Alternative Study Public Forum. Overview of MTA. presented by

Perth Noise Abatement Procedures - Change to Preferred Runways

Prior to reviewing the various performances of Red Apple Transit, it is important to point out some key terminology, including:

Appendix H: North Corridor Alternatives Through Western University - July 2017

RIDERSHIP TRENDS. August 2018

Like many transit service providers, the Port Authority of Allegheny County (Port Authority) uses a set of service level guidelines to determine

Transcription:

Kenosha County Transit Development Plan: 2012-2016 #156174 March 2011 1

Overview of Presentation 1. Recent changes to Kenosha Area Transit routes 2. Unmet needs in eastern Kenosha County 3. Potential transit service improvements in eastern Kenosha County 4. Transit service deficiencies in western Kenosha County 5. Potential transit service changes in western Kenosha County 6. Unmet needs for service between Kenosha County and surrounding Counties, and potential transit services to be considered 7. Remaining steps in plan development 2

Recent Changes to Kenosha Area Transit (KAT) Routes Service to Village of Pleasant Prairie has been cut: Route 35, which served Lakeview Corporate Park Route 31, which used to serve multiple destinations south of STH 50, now only serves St. Catherine s hospital, which is paying for the service. Small changes to Routes 2, 4, 5 to eliminate/reduce service that passes through the Village of Pleasant Prairie Two other routes have been eliminated: Route 36 replaced with restructured Route 31 Route 30 service Route 1 serving UW-Parkside no longer goes into main campus area 3

2010 KENOSHA AREA TRANSIT ROUTES ROUTE NO. 1 ROUTE NO. 2 ROUTE NO. 3 ROUTE NO. 31 ROUTES ELIMINATED FOR 2011 STREETCAR ³ ROUTE NO. 4 TRANSFER POINT GRAPHIC SCALE ROUTE NO. 5 ROUTE NO. 6 0 0.5 1 2 Miles 3a Source: I:\Tran\WORK\Kenosha TDP\Maps\Chapter 2 Maps\ 2010 KAT routes.mxd

2011 KENOSHA AREA TRANSIT ROUTES ROUTE NO. 1 ROUTE NO. 2 ROUTE NO. 3 ROUTE NO. 6 ROUTE NO. 31 ROUTE SEGMENTS THAT WERE ELIMINATED TRANSFER POINT ³ ROUTE NO. 4 NEW ROUTE SEGMENTS (HIGHLIGHTED) GRAPHIC SCALE ROUTE NO. 5 STREETCAR 0 0.5 1 2 Miles 3b Source: I:\Tran\WORK\Kenosha TDP\Maps\Chapter 2 Maps\2011 KAT routes changed.mxd

Unmet Needs for Transit Service in Eastern Kenosha County Unmet needs include: Lakeview Corporate Park and the RecPlex in the Village of Pleasant Prairie Shoppes at Prairie Ridge along STH 50 in the Village of Pleasant Prairie Commercial development at Somers Market Center (Walmart and Sam s Club) Evening service later than 7:30 p.m. More extensive weekend service Shorter, more convenient transit travel times. 4

Potential KAT Service Changes to be Considered in Eastern Kenosha County Restore service to Lakeview Corporate Park and the Shoppes at Prairie i Ridge, taking into account the concerns of the City of Kenosha and the Village of Pleasant Prairie on local funding for routes operated outside City. Extend service to Somers Market Center, taking into account the funding concerns of the City of Kenosha and the Town of Somers. Change route alignments to eliminate duplication of service along routes, possibly resulting in the elimination of a route. Use the savings from service reductions to extend transit service hours later than 7:30 p.m. 5

Transit Service Deficiencies in Western Kenosha County County uses five vehicles to provide Western Kenosha County Transit (WKCT) service; fewer vehicles could be used to provide the service more efficiently. Ridership on WKCT needs to increase substantially to be comparable with peer systems and forecasted demand for the system. 6

Potential Transit Service Changes to be Considered for WKCT Two alternatives will be considered: 1. Maintain Service Levels, which would maintain most of the WKCT service but improve efficiency: Reduce the number of trips to Antioch Coordinate the vehicles to reduce the number of vehicles needed to four 2. Financially Constrained Alternative, which would substantially reduce the amount of WKCT service in order to maintain the County s current level of funding in 2012: Next year WKCT will transition from Federal STRAP funds (90% of net operating costs) to Federal 5311 funds and State Operating Assistance (65% of operating costs). 7

Unmet Needs for Transit Travel between Kenosha County and Surrounding Area Unmet need for frequent and convenient transit service connecting downtown Kenosha and downtown Racine. Need to restore transit service to the University of Wisconsin-Parkside for students residing in the City of Racine Consider potential for express transit service between downtown Kenosha and downtown Racine, along with potential costs and sources of funding. 8

Remaining Steps in Plan Development Hold public informational meetings on study findings to date Review public comments and finalize unmet transit service needs Develop alternative transit service improvement plans for both eastern and western Kenosha County Finalize recommended transit service improvement plans for KAT and WKCT 9