A Line (Snelling) Bus Rapid Transit. February 24, 2014 Technical Advisory Committee Meeting #5

Similar documents
A Line (Snelling) Bus Rapid Transit. February 19, 2014 Community Advisory Committee Meeting #3

DEMOGRAPHICS AND EXISTING SERVICE

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

Citizen Advisory Committee Meeting Wednesday, June 10, :00 p.m.

Bonita to Bridgeport January 24, 2019

Managed Lanes, Transit Access, and Economic Development: Implementing the Region s First Highway BRT Corridor

rtc transit Before and After Studies for RTC Transit Boulder highway UPWP TASK Before Conditions

2355 Highway 36 W. Building Amenities FOR LEASE ROSEVILLE, MINNESOTA

Why we re here: For educational purposes only

South Bay Metro Green Line Extension

Transportation TRANSPORTATION PROJECTS

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

York Region Rapid Transit Corporation. City of Vaughan VMC Sub-Committee October 18, 2017

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

MCTC Regional Transportation Plan / Sustainable Communities Strategy (RTP/SCS)

Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects

Technical Advisory Committee. May 14, 2013

TAB LIAISON REPORT The TAB had not met since the 10/24/16 Transportation Committee meeting, so there was nothing to report.

US287 Asset Inventory FLEX Routes. Figure 3-1 FLEX Routes and Stops

REQUEST FOR COUNCIL ACTION

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

KING STREET TRANSIT PILOT

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

Project Advisory Group. May 23, 2013

RETAIL SPACE FOR LEASE. Avon Corner Victoria Crossing South Grand Place Victoria Crossing West Milton Mall

SASP Advisory Committee Meeting #3

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

Huntington Metro Station Joint Development

NEXT STOP NEWS September Extended Light Rail Service for Folsom Live

SANDAG s Regional Transportation Plan

Southwest LRT Alignment Video Narration

DOWNTOWN BRT ALTERNATIVE - 19th AVE

Train to Plane Connection Construction of the Burbank Airport North Metrolink Station

The Light Rail System Safety & Grade Crossing Equipment

These elements are designed to make service more convenient, connected, and memorable.

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

South Norfolk Jordan Bridge a private proposal by FIGG Bridge Developers. Chesapeake City Council Update June 23, 2009

Family Resource Guide

25 th Avenue Grade Separation. September 13, 2017

Draft for approval by TCC on 2/3, TAQC on 2/9 and ARC Board on 2/22. Regional Trail Plan. Mike Alexander, Director, Center for Livable Communities

2 Construction Program

Head to University Avenue and save!

Central Oregon Intergovernmental Council

Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Understanding Your I-66 Trip

Chapter 1: Introduction

Chapter 1: Introduction Draft

Additional Economic Development Strategy submissions- Klickitat County

First rail. August 2011

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Red Rock Corridor Commission Agenda 4:30 p.m. Thursday, March 24, 2016

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Learn more and comment. See page 10 for details. Proposed Fall 2018 / Spring 2019 SERVICE EXPANSION. and FARE CHANGE

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Multimodal Planning Studies

New System. New Routes. New Way. May 20, 2014

MEETING MINUTES District 1 Trail Planning Meeting 1

Public Transit Services on NH 120 Claremont - Lebanon

Metro EXTRA Service Plan. District of Columbia Rapid Bus Study. Georgia Avenue 7 th Street Corridor. November 2006

East Farmingdale Fire Department 930 Conklin Street. Source: Parsons Brinckerhoff

Service Summary. Winter Service Change Highlights WINTER 2019 CHANGES TRIP LEVEL DETAIL. Victoria Regional Transit Commission

SAN MATEO COUNTY TRANSIT DISTRICT 1250 SAN CARLOS AVENUE, SAN CARLOS, CALIFORNIA CITIZENS ADVISORY COMMITTEE MINUTES OF MEETING APRIL 30, 2014

Metrobus Service Evaluation Study Bowie Lines Bowie State University (B21, 22) Bowie-Belair (B24, B25) Final Report June 2013

Claremont Project Background and Update Community Meeting September 11, 2017

Community Advisory Panel Meeting #

Metro Green Line to LAX. January, 2012

5.1 Licence to Use Renewal Penticton & District Community Resources Society (470 & 500 Edmonton Ave.).

Freeway Volume-Crash Summary

Downtown to Defiance Trolley Key Messages Jan. 2017

STA MOVING FORWARD A plan for more and better transit services

Community Development Committee

1. PREVIOUS STUDIES/PLANNED DEVELOPMENTS... 1

77 McDonnell-Lindbergh - Monday thru Friday NORTHBOUND Effective: March 18, Shopping Center North County. Shopping Center Washington &

Glasgow Street Traffic Review

Update on Route 1 Efforts

I-66 Inside the Beltway Feasibility Study

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

Route 29 Solutions Projects

MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator

CITY COUNCIL AGENDA MEMORANDUM

ROUTE EVALUATION ROUTE 21 Denton County Transportation Authority

2009 Summary Report for: Courtney Campbell

TRANSPORTATION ELEMENT

GCTD Technical Advisory Committee (TAC) 10:00 a.m. - Wednesday, July 18, 2018 Gold Coast Transit District - Board Room.

Table of Contents. List of Tables

Sign Design Manual (SDM) Revision Log (TEM Section 295-2) April 17, 2009 Revision

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

City of Simi Valley Transit

St. Clair West Station Easier Access Project Community Update Open House

2013 Base Plan TransLink Technical Briefing

Transcription:

A Line (Snelling) Bus Rapid Transit February 24, 2014 Technical Advisory Committee Meeting #5 1

A Line Project Progress $10 million for A Line in Governor s proposed bonding bill $1.9 million design contract with Kimley- Horn authorized 1/22/14 A Line design Pilot station Prototypical arterial BRT station shelter 2

Agenda Design team introduction & overview of scope 2014 design schedule IRT progress Outreach activities Station concept design Roundtable/project coordination updates Next meeting 3

Issue Resolution Teams 1. 7th & Olson Pilot Station 2. Snelling & University 3. Snelling & Dayton 4. Transit Signal Priority 5. Station Technology 4

2014: Pilot Station at 7th & Olson Current Route 5 Future Arterial BRT << Metro Transit Heywood Garage Olson Memorial Highway 6th Avenue N Current Route 19 Planned C Line 5 5

Northbound Snelling & University Southbound BRT Station IRT Recommended Concept: Farside Spruce Tree Bumpout station Aligned with southbound station 6

Snelling & Dayton MN Pain & Wellness Ctr T Existing SB stop Ridership Snelling Imports Site 17307 25 / 39 201 209 80 ft x 10 ft 84 SB: 25 on / 27 off 144 EB: 1 on / 12 off Property Information T Site 17371 47 / 26 201 North Snelling Snelling The Imports Vintage on Selby 651-643- 7600 Mr. David Nadini T 80 ft x 10 ft T Redevelopment DAYTON AVE 7

Business Outreach Targeting businesses on station corners 42 letters sent 60 follow-up calls 25 one-on-one meetings during January 24-30 Ginkgo Coffeehouse owner Kathy Sundberg 8

Business Outreach Meetings held with Har Mar Mall BP Gas Station Falcon Crossing Lloyd s Pharmacy Gingko Coffeehouse Spruce Tree Centre CVS Midway Book Stoltz Dry Cleaners Sweeney Cleaners Fourleaf Enterprises R & S Crossing ProFuel Walgreens Plum s Parkway Family Physicians Gloria Dei Lutheran Church Red Robin Cleaners Highland Lifecare Highland Bank Parkway West Apartments Jakubas Dental Highland Business Assn Midway Chamber of Commerce Snelling & County Rd B Snelling & Larpenteur Snelling & Larpenteur Snelling & Minnehaha Snelling & Minnehaha Snelling & University Snelling & University Snelling & University Snelling & Grand Snelling & St. Clair Snelling & St. Clair Snelling & Randolph Snelling & Randolph Snelling & Randolph Snelling & Randolph Snelling & Highland Snelling & Highland Ford & Kenneth Ford & Kenneth Ford & Finn 46th & 46th 46th & Minnehaha 9

Roseville/Falcon Heights Open House January 23, Roseville Library Approximately 40 attendees 10 comment sheets received, many conversations & exhibit comments 10

Comments on Specific Locations Location Rosedale Transit Center Snelling & County Rd B Snelling & Roselawn Hamline & Larpenteur Hamline & Hoyt Snelling & Nebraska Snelling & Como Snelling & University Comment Would like the Park-and-Ride back at Rosedale. Target needs to make a sidewalk to the Har Mar bus stop. Almost nobody uses this stop. An 84 route option to serve as much of Hamline as possible would be a good idea (a la future Route 83). Consider restoring the 84 Local to the Hamline/Hoyt area! Can you add a stop between Larpenteur and Como, even with the limitation of the west side boundary of the State Fair? Job Corps span of service later at night. Need stop in the Como-Larpenteur gap! A dedicated bike lane is needed along Snelling between Como and Hewitt (similar to bike bridge along Lexington). The bus stop by the book store is too small for such a high usage. 11

Hoyt-Midway Feasibility Review Guardrail, no sidewalk Fence, no sidewalk Minnesota State Fair Grounds Station T T T HHH Job Corps T T Station Como T Current Bus Stop Midway Arlington Hoyt NORTH >> Larpenteur 12

Station Elements Design Custom BRT Shelter Pylon Other Station Elements Layout varies by size and location constraints Identity is consistent across sizes, locations - Iconic station identifier - Appears at EVERY station - Real-time info panel - Security cameras - Emergency telephone Must-Haves: - Ticket Vending Machine - GoTo Validator Other elements tailored by location: - Trash - Seating - Bike Parking - Etc. 3 Base Layout Concepts 10 Identity Concepts for Shelter & Pylon 13

Concept A Base Open Layout 14

Concept B Base L-Shaped 15

Concept C Base C-Shaped 16

10 Identity Concepts 17

18

19

20

21

22

Next TAC Meeting Currently scheduled for: Thursday, March 20 1:30 3:30 p.m. Metro Transit FTH Chambers (560 6th Ave N, Mpls) 23