HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK

Similar documents
Delivering the High Speed Network the Nation Needs

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

Appendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

Editorial text from Grand Union Alliance Report of First Old Oak Common & Park Royal Charette, held in Brent on 15 November 2014:

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

London and Crossrail 2. Chris Moores Transport for London

Cross-London Inter-Regional Connections

98 Manor Way, Beckenham, Kent BR3 3LR

Doncaster Chamber of Commerce. Andy Taylor Head of Public Affairs, HS2 Ltd

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013

Crossrail / Elizabeth Line An Update

Chapter 21 Route window W6 West Ealing station. Transport for London

WEST LONDON LINE GROUP 98 Manor Way, Beckenham, Kent BR3 3LR

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

EFL CUP FINAL SUNDAY 26 TH FEBRUARY 2017

Current Contents of Website, and Version History V5.17

NORTH GOWER STREET, LONDON NW1 A CENTRAL LONDON UNBROKEN RESIDENTIAL INVESTMENT OPPORTUNITY

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 13 Route Window NE12 Harold Wood station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Elizabeth line Services

CROSSRAIL INFORMATION PAPER A1 DEVELOPMENT OF THE CROSSRAIL ROUTE

About 2M. For more information visit JOINING UP BRITAIN

Anglia Winter Key Route Strategy (KRS) 2017/18

Demand and Appraisal Report

Michèle Dix Managing Director 17 January 2018

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application...

Chapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

FAO: Sir Howard Davies, Chair, Airports Commission 21 Apr 2013

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

WEST LONDON LINE GROUP CALLS FOR NEW STATION

Chapter 2 Route window W25 Maidenhead station. Transport for London

Maidenhead Bridge. Proposed Work

RAIL HUB FOR HEATHROW?

Spending round 2013: The case for investment in transport. Mayor s Office, May 2013

High Speed Rail London to the West Midlands and Beyond. A Report to Government by High Speed Two Limited. PART 4 of 11

London TravelWatch Response to the West Coast Main Line Route Utilisation Strategy Draft for Consultation

BRENT CROSS THAMESLINK

To provide the best possible service during the Thameslink construction work at London Bridge;

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

TfL Planning. 1. Question 1

Practical Information

Proposed closure of King s Cross Thameslink station and parts of the railway network at Blackfriars station and London Bridge station.

Kent Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch

Station Improvement Proposals. Clapham Junction Action Group

10 reasons why the UK needs Crossrail 2 now

High Speed Rail London to the West Midlands and Beyond Supplementary Report. A report to Government by High Speed Two Limited

National Rail Performance Report - Quarter /16 (January-March 2016)

THE WEST LONDON LINE GROUP ENTRY TO THE RAILWAY FORUM / MODERN RAILWAYS RAILWAY INDUSTRY INNOVATION AWARDS 2007

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre

LTW 372 Annex B. Development of Train Services for Chiltern Routes. Draft for consultation

Update on the Thameslink programme

This paper outlines the development of the HS2 scheme since the then Government decided to set up HS2 Ltd and explore options in January 2009.

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London

Jubilee and Metropolitan Lines. Jubilee: Waterloo to Stanmore. Metropolitan: Aldgate to Harrow-on-the-Hill

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017

Business Forum. 16 March 2016

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017

Policy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015)

TRS018 Annex A. Development of Train Services for Chiltern Routes

National Rail Performance Report - Quarter /14

UNLOCKING THE BRIGHTON MAINLINE

WESTON HOUSE HIGH HOLBORN WC1

Thames Valley Branch Lines Notes of Meeting

National Rail Passenger Survey: User Guidance Report

Profile west. Impressive modern office environment. Excellent national and international access.

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: MANCHESTER AIRPORT. (extract from HS2 High Speed to Nowhere)

[COVER IMAGE] C2Ecampaign.com

Edgware Road Colindale London NW9 6TD

Out of Station Interchanges (October 2010)

CROSSRAIL Moving London Forward

Kick off will be at 17:00, with this event not being subject to extra time and penalties. Event timings are as follows:

National Rail Passenger Survey: User Guidance Report

Event Date 22 April Venue: University of London Senate House Malet Street London WC1E 7HU

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017

Meeting the capacity challenge: The case for new lines

Crossrail transforming travel across London - Infrarail

Economics and Business Advanced Unit 4B: The Wider Economic Environment and Business

LONDON DO NOT ALIGHT HERE WALK SUNDAY 25 FEBRUARY 2018

GB Railways Group Plc

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

The Hybrid Bill and the journey to Royal Assent. Andy Taylor Head of Public Affairs, HS2 Ltd

Transactions on the Built Environment vol 6, 1994 WIT Press, ISSN

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

HOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY

Submission by Heathrow Southern Railway Ltd.

Going underground on London Underground

London All-on-One: Buses, Tubes, Train, Streets, Post Codes By Quickmap READ ONLINE

The Evergreen 3 Project

WEST LONDON ORBITAL RAIL TECHNICAL ANALYSIS AND CONCLUSIONS

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30)

H1: BIRMINGHAM CURZON STREET STATION

Route Windows Central route section

Railway Upgrade Plan Western 2017/18

Transcription:

HIGH SPEED UK..connecting in London Colin Elliff BSc CEng MICE Civil Engineering Principal, Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, www.highspeeduk.co.uk

HS2+3 GL EH GL EH NE NE LI MA LS LI MA LS SH NG CW SH NG BI BI LO LO LHR LGW LHR

High Speed Rail in London 4 Key Objectives Regions linked to central London Regions linked to the wider Metropolitan area Regions linked to Heathrow Regions linked to HS1 2 Key Questions Where do we put the principal station? What extra lines are needed to facilitate this?

Chiltern Midland North London Line East Coast LONDON MAIN LINES EXISTING NETWORK NETWORK 2015 2020 St PANCRAS KINGS CROSS Great Eastern West Coast Great Western South- Western Network M P CJ V South Central Network F HS1 LSt CX CSt FSt WATERLOO LB S London- Tilbury- Southend South- Eastern Network

THAMESLINK THAMESLINK LONDON MAIN LINES C/W THAMESLINK & NETWORK 2015 2020 St PANCRAS KINGS CROSS HS1 12tph 24tph F LSt 14tph South- Western Network 10tph OF 24tph CENTRAL LONDON SERVICE TO TURN AROUND AT PADDINGTON P South Central Network 24tph LB South- Eastern Network 12tph

High Speed Rail in London Primary Requirements for Principal Station Central London location for Tube & HS1 links Probably a terminus station Preferably on the surface Minimum impact on the neighbourhood both: During construction works and In daily operation Only practical location is at an existing mainline station. Problem - they are already full of trains!

KEY CANDIDATE SITES FOR HS2 LONDON TERMINUS SHOWN THAMESLINK ROYAL PARK THAMESLINK KINGS CROSS RAILWAY LANDS LONDON MAIN LINES C/W HS2 TERMINUS OPTIONS NETWORK 2015 2020 St PANCRAS KINGS CROSS WILLESDEN JUNCTION HS1 F LSt OLD OAK COMMON PADDINGTON South- Western Network South Central Network LB South- Eastern Network

High Speed Rail in London HS2 looked for a Principal Station at: Willesden Junction Old Oak Common Paddington St Pancras Kings Cross KX Railway Lands Beneath a Royal Park

High Speed Rail in London HS2 looked for a Principal Station at: Willesden Junction Old Oak Common Paddington St Pancras Kings Cross KX Railway Lands Beneath a Royal Park And at Euston which Meets most criteria but: Its Tube links are mediocre, and It is not connected to Crossrail or Thameslink

LONDON MAIN LINES C/W ORIGINAL HS2 PROPOSALS NETWORK 2015 2020 HS2 LINK TO HS1 VIA NLL St PANCRAS KINGS CROSS HS2 EXPANDED HS1 OLD OAK COMMON 10tph OF 24tph CENTRAL LONDON SERVICE TO TURN AROUND AT OLD OAK COMMON P WATERLOO ONLY LINES DIRECTLY CONNECTED TO HS2 SHOWN COLOURED

High Speed Rail in London Original HS2 Proposals Terminus at Euston No significant improvement to Tube links other than to Euston Square for Circle and Metropolitan Supplementary interchange at Old Oak Common for connections to Heathrow and Crossrail Large area of London still disconnected HS2 to HS1 link very controversial because of significant environmental damage and high cost

LONDON MAIN LINES C/W CURRENT HS2 PROPOSALS NETWORK 2015 2020 HS2 LINK TO HS1 VIA NLL CANCELLED St PANCRAS KINGS CROSS HS2 EXPANDED OLD OAK COMMON 2 TCR WATERLOO ONLY LINES DIRECTLY CONNECTED TO HS2 SHOWN COLOURED

High Speed Rail in London HS2 to HS1 link cancelled Current HS2 Proposals Transfer to/from St Pancras by taxi, tube, bus or foot Crossrail 2 which adds another 16 billion to the bill Large area of London still disconnected Still requires a 60 metre widening of Euston station to the west

EVERSHOLT STREET PHOENIX ROAD TUBE TRANSFER BUS STATION COBOURG STREET MELTON STREET ROAD METROPOLITAN/ CIRCLE/H&C SQUARE STATION : EXISTING ARRANGEMENT

High Speed Rail in London Current services at Euston 18 Existing platforms 2 used by Watford DC electrics Hourly off peak services 19 trains per hour 9 Virgin, 7 London Midland, 3 Watford DCs That is just over 1 train per platform per hour! Hourly peak services 25 trains per hour 10 Virgin, 12 London Midland, 3 Watford DCs That is 1.4 trains per platform per hour As a rule of thumb a single platform can turnaround: 2 trains per hour with full catering facilities 3 trains per hour with catering trollies 4 trains per hour with no catering trollies Euston is hardly ticking over

CLASSIC PLATFORMS EVERSHOLT STREET PHOENIX ROAD HS2 PLATFORMS TUBE TRANSFER BUS STATION NEW COBOURG STREET ROAD METROPOLITAN/ CIRCLE/H&C SQUARE NEW ENTRANCE TO SQUARE STATION : HS2 EXPANSION TO WEST & PARTIAL REDEVELOPMENT

High Speed Rail in London HS2 Proposals for Euston Station Alterations Either partial or full reconstruction Run existing services (HS2 says 24 tph in peak) from 13 platforms That is 1.85 trains per platform per hour Build a new High Speed station with 11 platforms to serve 18 trains per hour That is 1.64 trains per platform per hour Remember the rule of thumb for a single platform: 2 trains per hour with full catering facilities 3 trains per hour with catering trollies 4 trains per hour with no catering trollies Euston is still hardly ticking over

CLASSIC PLATFORMS EVERSHOLT STREET PHOENIX ROAD HS2 PLATFORMS TUBE TRANSFER BUS STATION NEW COBOURG STREET ROAD METROPOLITAN/ CIRCLE/H&C SQUARE NEW ENTRANCE TO SQUARE STATION : HS2 EXPANSION TO WEST & FULL REDEVELOPMENT

High Speed Rail in London Alternatives to westward expansion? Double deck by building a second deck on top? Double deck by building a second deck underneath? Euston Cross underground station? All of these solutions are far from ideal because they are: Very expensive, very disruptive and still leave Euston badly connected and isolated

High Speed Rail in London Alternatives to westward expansion? Double deck by building a second deck on top? Double deck by building a second deck underneath? Euston Cross underground station? All of these solutions are far from ideal because they are: Very expensive, very disruptive and still leave Euston badly connected and isolated The alternative is obvious but dismissed by HS2 Divert the LM services and Watford electrics to Crossrail Euston just handles WCML residual services and

LONDON MAIN LINES OPPORTUNITY NETWORK 2015 2020 St PANCRAS KINGS CROSS WCML F LSt NEW GRAND UNION LINK FROM WCML TO 2km LONG OLD OAK COMMON P LB

High Speed Rail in London Crossrail Opportunity The Grand Union Link Short surface link from Old Oak Common to Harlesden on the WCML connecting to both the Slow lines and the Watford DC Electric lines 2 km in length, no serious obstacles London Overground and London Midland services diverted to Crossrail 10 trains per hour on Crossrail planned to reverse at Old Oak Common, instead can access the WCML Great improvement to commuter journeys Euston becomes mostly an intercity terminus

LONDON MAIN LINES OPPORTUNITY NETWORK 2015 2020 10tph St PANCRAS KINGS CROSS WCML 12tph 14tph NEW GRAND UNION LINK FROM WCML TO OLD OAK COMMON P 24tph F LB LSt 12tph

High Speed Rail in London HS2 s reasons for not diverting to Crossrail 4km tunnel required from Old Oak Common to Wembley simply not necessary Impacts on residential property not on our route 4 years to construct hardly Programming difficulties only with HS2 Old Oak Common box 600M cost notional cost 100M It would not avoid the need to expand Euston?? They just did not want to do it!!

LINK TO HEATHROW VIA CHILTERN LINE THAMESLINK THAMESLINK BRENT CROSS LINK TO HS1 VIA MML LONDON MAIN LINES C/W PROPOSALS NETWORK 2015 2020 St PANCRAS KINGS CROSS HS1 NEW GRAND UNION LINK FROM WCML TO OLD OAK COMMON INTERCONNECTOR SOUTH- WESTERN NETWORK TCR SOUTH CENTRAL NETWORK WATERLOO SOUTH- EASTERN NETWORK ONLY LINES DIRECTLY CONNECTED TO SHOWN COLOURED

High Speed Rail in London Proposals for London Euston to be the primary London terminus also linked to St Pancras via Midland Main Line Suburban station at Brent Cross providing interchange with Thameslink and Heathrow services Direct route from at Brent Cross to Heathrow Express platforms at LHR through trains from North WCML suburban services diverted to Crossrail via the new 2km Grand Union Link (Old Oak Common to Harlesden) No need to expand Euston outside the existing footprint Interconnector for seamless dispersal of passengers to Crossrail, Thameslink, HS1 & Southern network services

High Speed Rail in London The vision for Euston Station All construction is within the existing station footprint Still 18 platforms 14 platforms 400 metres long 4 platforms 280 metres long New passenger departure deck above the platforms Interconnector access at mid platform with Interconnector directly below the trains New entrance to Euston Square station with underground travelator connection Euston Gardens and Melton Street unaffected

CLASSIC PLATFORMS EVERSHOLT STREET PHOENIX ROAD KINGS CROSS & St PANCRAS PLATFORMS TUNNELLED INTERCONNECTOR TUBE TRANSFER A BUS STATION COBOURG STREET MELTON STREET TOTTENHAM COURT ROAD & WATERLOO SQUARE A ROAD METROPOLITAN/ CIRCLE/H&C NEW ENTRANCE TO SQUARE STATION : REDEVELOPMENT WITHIN EXISTING FOOTPRINT

STAIRS/LIFTS/ ESCALATORS TO INTERCONNECTOR PLATFORMS STAIRS/LIFTS/ ESCALATORS TO UNDERGROUND SECTION A-A SHOWING SCHEMATIC OF CONNECTION TO INTERCONNECTOR AND LONDON UNDERGROUND

High Speed Rail in London The Rail Interconnector Initially proposed to link King s Cross/St Pancras with Euston, Tottenham Court Road and Waterloo 1 minute to KX/St P and 4.5 minutes to Waterloo Has the potential for a second phase to complete the circle linking Waterloo to London Bridge, Fenchurch Street, Liverpool Street, Farringdon and back to King s Cross/St Pancras Designed to handle ⅔ incoming arrivals Remaining ⅓ of arrivals will use tube, bus taxi and foot

UNDER CONSTRUCTION WCML THAMESLINK THAMESLINK WCML REGIONAL & INTERCITY SERVICES TO PADDINGTON, St PANCRAS & LONDON MAIN LINES SERVICE DIVERSIONS FOR REBUILD NETWORK 2020 2015 St PANCRAS KINGS CROSS HS1 WCML SUBURBAN SERVICES TRANSFERRED TO VIA GRAND UNION LINK OOC PADDINGTON

High Speed Rail in London The Impact of reconstruction of Euston All suburban services diverted to Crossrail Potential to divert some Virgin Services to Paddington (via Grand Union Link) and St Pancras (via MML link) Services to Euston are then reduced to less than 50% Then possible to reconstruct the station one half at a time All construction work is on the existing railway land Most material brought in by rail All spoil removed by rail to HS1 link via MML no impact on the community all within the existing railway boundaries

LINK TO HEATHROW VIA CHILTERN LINE THAMESLINK THAMESLINK BRENT CROSS LINK TO HS1 VIA MML LONDON MAIN LINES C/W PROPOSALS NETWORK 2015 2020 St PANCRAS KINGS CROSS HS1 NEW GRAND UNION LINK FROM WCML TO OLD OAK COMMON INTERCONNECTOR SOUTH- WESTERN NETWORK TCR SOUTH CENTRAL NETWORK WATERLOO SOUTH- EASTERN NETWORK ONLY LINES DIRECTLY CONNECTED TO SHOWN COLOURED

www.highspeeduk.co.uk