EAD 2019 Annual Plan

Similar documents
EAD 2018 Annual Plan

Technical Resources - Automation European AIS Database (EAD)

Airspace User Forum 2012

User Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

10+ years of EAD: picking the low-hanging fruit. guido HAESEVOETS EAD Customer Management 29/01/2015

ADQ Regulators Working Group

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

MIDAD Project IDS Vision

Curriculum for AIM Training Module 2: ARO Officer

Topic / Sub-topic L Content Ref. Material. ICAO Doc Recognise the need for

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL

AIS/AIM System in South Africa (ATNS)

- Implementation and use of European AIS Database (EAD) -

QMS for AIS/MAP Service Implementation Workshop

RMT.0464 ATS Requirements The NPA

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

NCLB-AIM Workshop (Cairo, Egypt, September 2017) Your complete AIS/AIM Training baseline

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM

Terms of Reference for a rulemaking task. Requirements for Air Traffic Services (ATS)

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

30 SEP - 02 OCT, 2014

Aeronautical Information Services Issue 1 30 May 2012

Avitech GmbH AIXM Capabilities & Experiences

MID Region AIM SG/2. AIS-AIM Study Group 31 August Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG

Development of the Global AIM Strategy (AIM Projects)

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

Introduction to Amendment 40 to Annex 15

COMMISSION IMPLEMENTING REGULATION (EU)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

Terms of Reference for a rulemaking task

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

ICAO GANP Requirements and Evolution

NNF Work-shop on Navigation, Safety and Technology. Dato: 2. February Gunn Marit Hernes Luftfartstilsynet

Managing Aeronautical Data

Terms of Reference for rulemaking task RMT Regular update of ATM/ANS rules (IR/AMC/GM)

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

Sharing UAE experience in. AIM implementation

The Importance of AIM and the Operational Concept

EASA ATM/ANS regulatory update

Change History. Table of Contents. Contents of Figures. Content of Tables

AIP KUWAIT FIR AMENDMENT 28 IMPLEMENTATION AIRAC DATE 25 NOVEMBER 2004

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

AIXM/WXXM CONFERENCE 2010

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

GEN 3. SERVICES GEN AERONAUTICAL INFORMATION SERVICES

EUROCONTROL. Centralised Services Workshop. Peter Matern CS#5 EAIMS 5 March 2014

Official Journal of the European Union L 146/7

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

SWIM Technical Infrastructure (ATC-ATC and EAD Profiles)

SERVICE LEVEL AGREEMENT. Aeronautical Information Service (AIS) NAME Page 1 of 26 AGREEMENT. Aeronautical Information Service

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

Terms of Reference for a rulemaking task

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

EUROCONTROL SPECIFICATIONS SYNOPSIS

Official Journal of the European Union L 186/27

IRELAND SAFETY REGULATION DIVISION

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

On Time. Total Airspace Management. 8 th Global ATFM Conference Cancun - Mexico. 12/30/2014 Commercial-in-Confidence 1

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

GEN 3. SERVICES GEN 3.1 AERONAUTICAL INFORMATION SERVICES. 1. Responsible service

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

European Aviation Safety Agency. Opinion No 10/2017

PRINCIPLES FOR DETERMINING THE COSTS OF AERONAUTICAL METEOROLOGICAL SERVICE FOR EN-ROUTE AND TERMINAL AIR NAVIGATION, UNITED REPUBLIC OF TANZANIA

DRAFT AGREEMENT BETWEEN THE EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION (EUROCONTROL) AND THE KINGDOM OF MOROCCO

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

Quality Management System (QMS)

TWELFTH AIR NAVIGATION CONFERENCE

AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY

CR-Text WG Ref Common requirement analysis Common acceptable means of compliance

Certification Procedure

Simone Gabriele. Digital NOTAM The Digital Age for Air Navigation

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace

Initiated By: AFS-400

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

EUROCONTROL approach to the execution of the PBN IR Mandate

AIS-AIM Study Group Working Status

Airport AIM as a Service Presented at World ATM Congress 2016

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

Official Journal of the European Union L 7/3

Air Operator Certification

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

TWELFTH AIR NAVIGATION CONFERENCE

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Part 175. Aeronautical Information Service Organisations Certification. CAA Consolidation. 10 March 2017

Civil Aviation Authority. Information Notice. Number: IN 2016/052

Official Journal of the European Union L 283/25

Guidelines for Workflow of AIP AMDT, AIP SUP & AIRAC at Iraq CAA AIS HQ

Transcription:

EAD 2019 Annual Plan Edition no. and Approval date Version: 1.001 Last Approved Date: 30/01/2019 Author Owner Sponsor GUPTA Rajiev MATERN Peter SULTANA Joe Reference : EAIM.GEN. Annual plan 2019 Classification Document initiated by GREEN EAIM Contact person Document is accessible EAIM handbook in SharePoint library

EAD 2019 Annual Plan EAIM.GEN. Annual plan 2019 Copyright Notice Document Control 2018 European Organisation for the Safety of Air Navigation (). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of. Quality Review AUTHORITY Head of EAIM Peter Matern (Owner) Approval Table AUTHORITY Head of Contract & Sourcing Section, /NS/EAIM Rajiev Gupta (author) Head of EAIM Peter Matern (Owner) Head of NM Network Services Pascal Dias Director Network Manager Joe Sultana (Sponsor) Document Identification Full Title: EAD 2019 Annual Plan Total Number of Pages: 19 2

EAD 2019 Annual Plan EAIM.GEN. Annual plan 2019 Distribution Role EAIM Section SQSM Office Edition History - See sharepoint Edition no. Edition date Status Comment 1.000 06/11/2018 Approved 1.001 30/01/2019 Approved Minor update of table in section 3.3 re ADQ compliance and Conversion of AIXM 4.5 to 5.1. 3

EAD 2019 Annual Plan EAIM.GEN. Annual plan 2019 Table of Contents 1 Introduction... 5 2 Scope... 5 3 EAD Business Objectives... 6 3.1 Airspace/AIS Information Management Service Provision (ADS)... 6 3.2 Airspace / AIS Information Management Development (ADD)... 8 3.3 European ATM Information Management Service (EAIMS)... 9 4 Cost-base for 2018... 10 5 Performance Indicators... 12 5.1 Service availability... 12 5.2 Service capacity... 13 5.3 Service operations performance and quality... 14 5.3.1 Service operations performance... 14 5.3.1.1 Data Operations... 14 5.3.1.2 NOTAM Processing... 14 5.3.1.3 PAMS... 15 5.3.2 Service Desk... 15 5.4 DOP Data Consistency... 16 6 Revenues and business perspective... 17 7 Information on the implementation of new infrastructure... 17 8 Abbreviations... 18 4

1 Introduction In accordance with the EC Regulation 1035/2011, Annex 1 part 2.2.2 & part 9, EAD is tasked with the production of the EAD Annual Plan on its activities. The Annual plan is a summary of the information agreed by the Agency and the EAD Service Steering Group. The EADAP proposed issue will be submitted to SSG for acknowledgement. Comments received from the SSG will be evaluated and, when accepted, incorporated in the EADAP draft issue. The EADAP incorporating any last changes made by the SSG will become the EADAP final version. The EADAP final version will be published by EAD on its website. 2 Scope This Annual Plan describes the activities carried out in 2019 by EAD as a system, which entails: - /NS/EAIM as the system and service manager; - The operations carried out by the data operations and training services provider; - The operations carried out by the IT service centre and application maintenance provider. These activities are linked to the following business objectives described in the Agency Work Programme: - Airspace / AIS Information Management Service Provision; - Airspace / AIS Information Management Development; - European ATM Information Management Service. 5

3 EAD Business Objectives 3.1 Airspace/AIS Information Management Service Provision (ADS) Actions Airspace/AIS Data Management Development and maintenance of operational guidance material related to aeronautical data quality and consistency improvements; Organise the relevant consultation and working arrangements on AIS/AIM operational issues; Monitoring EU regulations and ICAO SARPS changes related to AIS/AIM relevant topics having operational and/or technical impact on EAD; Airspace/AIS Information Operations Delivery of EAD operation services encompassing the provision of static data, dynamic data, and aeronautical Publications (outsourced); Maintenance of world-wide static data and world-wide NOTAM processing (outsourced); Deliverables (Milestones/Targets) Data harmonisation and consistency operational requirements. AIM related technical specifications for implementation and maintenance in EAD. Delivery of EAD operations service according to service level specifications. Bi-yearly data consistency report. Yearly data completeness report. Monthly performance report. Provision of data quality/consistency reviews to data providers (outsourced); Ensure data providers data is complete, and that identification of missing data and data responsibility is performed; 6

Airspace/AIS Information System Delivery of EAD IT services in order to perform H24 EAD data operations (outsourced); Delivery of EAD IT service according to service level specifications. Regular EAD system release. Development and maintenance of the EAD application software (outsourced); Management of the evolution of the EAD system by providing change proposals (CP) specifications for each subsystem. Monitoring of EAD system development including review, assessment and verification activities; Maintenance of EASA Certification for EAD Service EAD Service In line with European Law, mainly (EC) IR 373 (677). 1035 & 73 EAD Service Certification by EASA has been finalized in December 2016. The certification results now requires maintenance to keep up with the standards as required and to stay compliant to the above mentioned regulations. Client Migration Migration of data providers (civil and military) and data users, worldwide, including negotiation of client agreements and technical/operational support/assistance. Participating in regional hub initiatives in cooperation with ICAO. Signature of an EAD Agreement defining the rights and obligations of the parties. Establishment of a Migration Plan. The management and coordination of the transition through regular project follow up meetings with all partners involved. 7

3.2 Airspace / AIS Information Management Development (ADD) Actions EAD Data Completeness and Extensions The upgrade of the Static Data Completeness tool (SDC) in order to allow data providers to monitor the completion of their static dataset also in to AIXM5.1 (SDD) is planned for 2019. The maintenance of the SDC however, will proceed until final EAD System Shutdown (2024) as required by EASA DQR. Digital NOTAM in EAD The preparation of the transition for the deployment of the Digital NOTAM concept based on AIXM 5.1 has to be covered in a step by step approach until the deployment of eead in 2023. Deliverables (Milestones/Targets) SDC tool for data providers and associated reporting facility Interface for data providers to create digital NOTAM for airspace AIM System Service improvement and Development Analysis and deployment of additional functionalities in order to meet EU regulations and ICAO standards, Amendment 40 and 39B to Annex 15, will be part of EAD R12/13 Data Alignment with NM-Systems Extension of EAD functionalities compliant with EU regulations and ICAO standards, Amendment 40 and 39B. Data Alignment with NM-Systems Data Alignment in particular between CACD and EAD. 8

3.3 European ATM Information Management Service (EAIMS) Actions Development of eead Manage the eead project aiming at the replacement of the EAD by an enhanced EAD system and services that meet the requirements approved by stakeholders and described in CONOPS 6.0. During this reporting period will issue a Call For Tender for the replacement of the various technical components of the EAD and select the appropriate new industry partners. Deliverables (Milestones/Targets) Issue of the eead Call For Tender Selection of the appropriate new industry partners. ADQ compliance and Conversion of AIXM 4.5 to 5.1 Integrated Briefing The objective is to ensure that the EAD system is recognised as ADQ compliant. In order to reach this objective EAD will: - Develop and implement a procedure for the transition from SDO to SDD for B2B and B2C clients - Develop additional facilities to further support data provision via SDD in AIXM 5.1 format, and to aid the EAD Data Operations Provider (DOP) in supporting AIXM 5.1 during daily operations. - As a business requirement, backward mapping to AIXM 4.5 may be provided during the transition phase. Evaluation and definition of the specification and contract initiation. Implementation of Amendment 39-B to ICAO Annex 15 - SNOWTAM format change, with milestone evaluation and definition of requirements and specification Compliance with the eaip specification Service development Implement the requirements for eaip in accordance with the updated eaip specification. will operate, maintain and develop EAD in order to provide a system and services in line with the service performance level agreed with its stakeholders and in line with the related legal requirements. 9

4 Cost-base for 2019 The table below shows the total cost base of EAD for the period covered by the Annual Plan: (Amounts in k ) 2019 FTE 11,25 Staff Remuneration 2552 Staff related expenditure 195 External Effort 4020 Operating 12869 Depreciation Inv ABP 2019-2023 5 Cost of capital Inv ABP 2019-2023 0 Depreciation Investments 2018 4 Depreciation Past Investments before 2018 167 Cost of capital Past Investments 16 Staff Receipts (Acc.Ins + Special Levy) -32 Sales of services UPP -308 Sales of services UPP Indirect Costs -92 Indirect Costs 2485 Cost-Base 21.881 Note: The cost-base may change depending on the pending decisions by NM Board and the Provisional Council regarding EAD & e-ead staffing and budgets. 10

The EAD is a centralised service that relies on external industry partners for the provision of Data Provision Operations and IT development and infrastructure services. As such, investment costs are directly supported by these industry partners. EAD costs are therefore broken down by business objectives as follows: Staff Remuneration: Salaries. External Effort: Consultancy and temporary staff. Operating costs: Service, maintenance and training costs. Depreciation costs: Costs related to the depreciation of very specific investments for oversight management. Indirect costs: Costs of human resources management and facility management. Sales of services UPP: Income from Service Charges. 11

5 Performance Indicators The performance indicators mentioned in this chapter describe the planned performance of EAD, for the provision of its services to customers (principally Data Providers and Data Users). These performance indicators are derived from the detailed performance indicators annexed to the Service Level Specifications signed between and respectively DOP, ITP and application maintenance. 5.1 Service availability The minimum availability and maximum downtime of the services provided by EAD, as agreed with the industry partners for 2018 and acknowledged by the EAD Service Steering Group, is listed in the table below: EAD Services Minimum service availability Planned unavailability Unplanned outages INO BF INO DP INO DU SDO PAMS CHARTS AIP ESI 99,975% Shall not exceed 98% 60 minutes in total and not more than two times in a month 180 minutes for release deployments Shall not exceed 30 minutes Downtime and system recovery based on best available effort EAD Basic 1 95% Downtime and system recovery based on best available effort 1 Internet access for any user Not for operational use 12

5.2 Service capacity The table below shows the average capacity per service made available by EAD to its customers: This yearly capacity corresponds to the calculated total for a year of the daily average capacity per service. EAD Services Description Yearly Capacity For Data Users (& Data Providers) Flight plans preparation Flight plans distribution Creation of flight plan through EAD interface, validation against SDO and IFPUV Submissions and reception of flight plans and associated messages 5 Million 11,5 Million PIB generation Generation of Pre-flight Information Bulletins 5,5 Million SDO reporting Graphical reporting PAMS download Retrieval pre-defined standard aeronautical data reports Graphical representation of information stored in EAD Browse and download the effective version of AIPs, AIP Supplements and Amendments, AICs and chart publications. 2,5 Million 200.000 30 Million For Data Providers NOTAM creation Number of NOTAM created through EAD 400.000 NOTAM processed SDO upload SDO download Worldwide NOTAM processed by EAD (excluding NOTAM creation through EAD) Upload of static data based on AICM/AIXM specifications and static data changes Download of static data based on AICM/AIXM specifications 1,4 Million 50.000 AIP operations Validation and publication of AIPs 5.000 500 PAMS Upload Upload of the effective version of AIPs, AIP Supplements and Amendments, AICs and chart publications. 5.000 13

5.3 Service operations performance and quality 5.3.1 Service operations performance 5.3.1.1 Data Operations EAD Data Operations maintains the ECAC full static data set and the operational worldwide (basic) data set. This data set has to be maintained as specified below, except for SDO migrated Data Providers or if otherwise agreed: Changes received at least x days before the effective date Before 25 20 Between 25 and 15 10 Less than 15 Maximum number of days for commitment before the effective date by the effective date or within 5 working days after reception, whichever is later NOTAM having an impact on static data (PERM NOTAM) are processed as follows: - All changes based on PERM NOTAM with immediate effect or effective in the future, but not related to AIRAC information shall be committed within 2 calendar days after reception at the latest unless coordination with Data Provider is previously required; - all changes based on PERM NOTAM with effective date in the future affecting incoming AIRAC information shall be committed at the latest two calendar days after the respective AIRAC information is committed unless coordination with Data Provider is previously required. 5.3.1.2 NOTAM Processing This activity includes the processing of NOTAM, SNOWTAM, and ASHTAM received via AFTN. It consists of ensuring that all messages received are validated, coherent, in the required format and that their syntax and structure conform to ICAO Annex 15 and OPADD, prior to storage in the INO database and further distribution. To increase the quality of the NOTAM, they are validated systematically against the static data object in SDO. The TAM processing service is measured in terms of time and volume. Manual processing targets for incoming TAM are as follows: - Average processing time for messages: 10 minutes (elapsed time between reception by the system and storage after manual processing); 14

- 98,5% of messages processed within 30 minutes (elapsed time between reception by the system and storage after manual processing); - 99% of checklist received as TAM shall be analysed within 48 hours after reception (elapsed time between the completion of the checklist analysis and the reception time of the TAM by the system). 5.3.1.3 PAMS This service includes the maintenance of a library of last available Aeronautical Information Publications in digital format (AIP, Amendments, Supplements, Circulars, and Charts), for ECAC+ States which are not yet managing their Publications directly in EAD. Two different categories are considered for the measurement of this service: - CAT I : AMDT (Amendments), i.e. posting the PDF file of an AIP Amendment in PAMS; - CAT II: updating in PAMS of the AIP sections and charts. The maximum time allowed for the processing of the above categories is as follows: Type of amendment or update CAT I CAT II Publications received on time 2 CAT II Publications received late To be processed within 3 working days of receipt by the effective date within 5 working days of receipt 5.3.2 Service Desk The service desk manages tickets opened for any incidents and service requests. Ticket management includes the identification of the severity level, appropriate assignment according to the area of responsibility, traceability, follow up, recording of applicable solution or workaround, and an the estimated target date for the availability of the deployed solution. Tickets are classified based on the following severity classes defined by : 2 Up to 5 days prior to the effective date. 15

Severity High (A) Medium (B) Low (C) Definition Service failure or malfunctioning, which has major impact on business and/or has impact on client(s) safety operations. Business is proceeding but is impaired either at Service Provider or at client. No significant business impact The Initial Feedback Time is the period from when the Ticket has been opened until the first call back or change in status has been made in the Ticket. The Initial Feedback Time does not mean resolution time. This initial feedback time shall be in accordance with the Table below: Severity High (A) Medium (B) Low (C) Initial Feedback Time 1 hour 4 hours 24 hours 5.4 DOP Data Consistency Data Consistency service ensures that data errors loaded by DOP contained in the EAD are identified and acted upon, thus enhancing the consistency of EAD data. Data consistency review is performed according to procedures described in the EAD DOP quality system. It is performed on both, not yet published data (SDO, PAMS) and, committed/processed data (SDO, INO, PAMS). Type of service INO SDO PAMS Monthly percentage of service errors severity A/B less than 2.5% of the total number of NOTAM reviewed 2.5% of the total number of static data changes reviewed 2.5% of the total number of pages reviewed 16

6 Revenues and business perspective Depending on the type of client, different charges will be applied for the use of EAD services. These charges are Service Charges applied by and Royalty Fees defined by the Member States when EAD data is made available by the Client to third party end-users. As from 2017, the certification of EAD by the EASA will be a strong enabler for the development of the business and the resulting revenue. The services provided in 2018, for a total amount billed of 400 k, are renewed in 2019. 7 Information on the implementation of new infrastructure The following major EAD enhancements will contribute to improving the performance of the air navigation service provider: SDD/WFM HMI and supporting changes to provide B2C functionality for SDD DP Subsystem improvements Basic software upgrades (Java, Windows, Adobe etc. versions) Phase out Java in the browser since support for embedded Java is being removed for security and other reasons 17

8 Abbreviations Term ADQ AFTN AIC AICM AIM AIP AIRAC AIS AIXM ANSP ASHTAM ATC ATFM ATM BF DOP DP DU EAD EADAP EC ECAC ECAC+ EASA ECIT EAIM ESI FTE ICAO IFPUV INO IT ITP KPI MET NOTAM NSA NS PAMS OPADD Description Aeronautical Data Quality Aeronautical Fixed Telecommunication Network Aeronautical Information Circular Aeronautical Information Concept Model Aeronautical Information Management Aeronautical Information Publication Aeronautical Information Regulation and Control Aeronautical Information Services Aeronautical Information Exchange Model Air Navigation Service Provider NOTAM reporting ash hazard Air Traffic Control Air Traffic Flow Management Air Traffic Management Briefing Facility Data Operations Provider Data Provider Data User European AIS Database EAD Annual Plan European Commission European Civil Aviation Conference States surrounding ECAC Area European Aviation Safety Agency EAD Client Interface European Aeronautical Information Management EAD System Interface Full Time Equivalent International Civil Aviation Organization IFPS Validation system International NOTAM Operations Information Technologies IT Provider Key Performance Indicator Meteorological data Notification to Airmen National Supervisory Authority Network Management Directorate Network Services Published AIP Management System Operating Procedures for AIS Dynamic Data 18

Term PERM NOTAM PIB SARPS SDC SDD SDO SDM SLS SNOWTAM SP SQSM SSG SUP TAM TID TP XML Description Permanent NOTAM Pre-flight Information Bulletin Standards and Recommended Practices Static Data Completeness Static and Dynamic Data Static Data Operations Static Data Management Service Level Specifications NOTAM reporting snow hazard Service Provider Safety & Quality Systems Management Service Steering Group Supplement NOTAM, ASHTAM, SNOWTAM, BIRDTAM Test Item Discrepancy Training Provider Extensible Mark-up language --- End of document --- 19