Wednesday, September 12, 2018

Similar documents
Friday, September 14, 2018

American Currents. Ohio/Tennessee/Cumberland. Chicago/Illinois/Upper Miss. Lower Miss/Gulf/Canals

Tuesday, March 12, 2019 RIVER CLOSURES & RESTRICTED MOVEMENTS

Inner Harbor Navigation Canal Lock. Victor A. Landry III Operations Manager, GIWW New Orleans District U.S. Army Corps of Engineers

Funding for Inland Waterways

River Basin. River s 981 miles flow from Pittsburgh, PA to the Mississippi River at Cairo, IL. The

State Five Year Tonnage Trend. Shipping Tons Receving Tons Within Tons Total Tons

DIVISION BULLETIN NO. 2

DIVISION BULLETIN NO. 2

Joan Stemler. Water Control. St. Louis District. November US Army Corps of Engineers BUILDING STRONG

The U.S. Waterway System 2015 TRANSPORTATION FACTS & INFORMATION. Navigation and Civil Works Decision Support Center U.S. Army Corps of Engineers

2015 Transportation Facts & Information

The U.S. Waterway System 2016 Transportation Facts & Information

The Mississippi River Commission. History of the Management of the Mississippi River. US Army Corps of Engineers BUILDING STRONG

Finding Locations on a Map

Louisiana BUILDING STRONG


Challenges with recruiting small business for USCG Ship Repair Contracts in USCG District 8

Sector Upper Mississippi River All Threats All Hazards Always Ready

Waterways Council November 10, 2017

National Waterways Conference Maj. Gen. John Peabody. P.E.

State Five Year Tonnage Trend. Shipping Tons Receving Tons Within Tons Total Tons

The U.S. Waterway System 2014 TRANSPORTATION FACTS & INFORMATION

State of the Waterway 2017

Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84

GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY

A GUIDE TO THE ROSE BARGE LINE COLLECTION P-30. Copyright The St. Louis Mercantile Library Association. St. Louis, Missouri

Visit South Walton Visitor Tracking Study: Summer Phillip Downs, Ph.D. Joseph St. Germain, Ph.D. Rachael Powell Kerr & Downs Research

CHAPTER CHARTER DATES

Southwest Agribusiness Consulting, Inc.

Mississippi River & Tributaries Project History & Overview

2015 Sailing Schedule American Queen

DESCENDANTS OF CHARLES DAVIS FRIERSON JR. ( ) AND MARGARET ALICE PURIFOY FRIERSON ( )

AMERICAN QUEEN 2019 CRUISE GUIDE

MISSISSIPPI RIVER COMMISSION

Operating and modernization of the Locks on the navigable canals Constanta - Romania

Rudy McLellan, P.E. GEC, Inc., Baton Rouge, LA For Vicksburg Bridge Commission, VBC

UP TO A $500 AIR CREDIT PER PERSON

Terminal Symposium February Houston Traffic

Panama Canal Stakeholder Working Group Meeting

DREDGED MATERIAL DISPOSAL HISTORY AVOCA ISLAND LAKE

Guidance for operators of recreation craft

Birds Point-New Madrid Floodway

Justin Farrell Ports Specialist

INTRODUCTION 250,000

2012 Texas Water Conservation Association Meeting

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

TEXAS PORTS Value to the Nation

Chapter Delegate Seats Calculations Spreadsheet

Paper 1F and 3H: Decision-Making Exercise. Wednesday 4 June 2008 Morning Resource Booklet. Advance Information


MOBILE DISTRICT 2018 DREDGING PROGRAM

Interest Bearing. Availability Schedule. April For Encoded Cash Letter Deposits received in Miami. Instructions. Schedule

Visit South Walton Visitor Tracking Study: Summer Phillip Downs, Ph.D. Joseph St. Germain, Ph.D. Rachael Anglin Downs & St.

Virginia Antebellum: Part C. Transportation Infrastructure 1

Census Affects Children in Poverty by Professors Donald Hernandez and Nancy Denton State University of New York, Albany

The National Beta Club. Beta on My Mind June 12-20, 2018

Moving Westward. U.S. Expansion Unit

APPENDIX D SIZING STORM WATER DRAINAGE SYSTEMS. TABLE D-1 Maximum Rates of Rainfall for Various Cities

4/28/17. Clicker Question. Clicker Question. #37 Floods IV (Case Histories-Mississippi River Flood, 1993; Red River of North Flood, 1997)

Ohio Department of Transportation Construction Update

4th Grade Third 9 Weeks Test

FY 2018 Port Security Grant Program

State of the Waterway 2017

TOTAL DOMESTIC TRADE RANK TOTAL FOREIGN TRADE

Speculative Investment in the Mississippi Delta of the Future

2017 VOYAGES Aboard the Elegant Riverboat Louisiane

RANKING OF THE 100 MOST POPULOUS U.S. CITIES 12/7/ /31/2016

Inland watercraft shall be assessed dockage charges, based upon the registered length, at the following

ALN Apartment Data, Inc. (Continued on next page)

Oct-17 Oct-18 bps %CHG Oct-17 Oct-18 %CHG Oct-17 Oct-18 bps %CHG Oct-17 Oct-18 %CHG

DIRECT FASTENING. 20V MAX * Cordless Concrete Nailer

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Appendix D: Aggregation Error for New England Metro Areas and for Places


Statistical Evaluation of BMP Effectiveness in Reducing Fecal Coliform Impairment in Mermentau River Basin

2019 VOYAGES SAVE UP TO $1,800 PER STATEROOM AMERICAN QUEEN H AMERICAN DUCHESS H AMERICAN EMPRESS

Westward Bound. Guide to Reading

The Panama Canal Update: Some Implications for Western Hemisphere Trade

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Ohio Freight Conference Great Lakes Commercial Navigation

Arkansas Department of Transportation JOB HWY. 49B - HWY. 242S (HELENA - WEST HELENA) (S) FEDERAL AID PROJECT STPC-9200(7)

FBI Drug Demand Reduction Coordinators

Residential Lead Abatement Contractors Contracts Under $20,000

GALVESTON DISTRICT Dredging Schedules

ILLINOIS INTERSTATE AND INTRASTATE LOCAL REDUCED CITY-PAIR FARES

The Corps of Engineers Dredges on the West Coast

DOCKING AND ROUTING PLAN

FY 2015 Port Security Grant Program Awards

Utility Employee Change of Operations. May Yellow Transportation, Inc.

The nation s largest, independent, nonprofit, humanitarian organization helping people prevent, prepare for and respond to all types of emergencies.

State Five Year Tonnage Trend. Shipping Tons Receving Tons Within Tons Total Tons

JOURNAL OF THE CSXT HISTORICAL SOCIETY

I-24 PARK BUILD TO SUIT. Paducah, McCracken County, Kentucky N W. I-24 Park (Build to Suit) Paducah Economic Development

Operations and Maintenance Funding Allocation via Navigation Systems Optimization

Date State County Project Description Joint Size NY Kings Shore (Belt) Parkway Bridge over Mill Basin D-160 & 320

2014 Midwest Chapter Meeting

SAND TIGER SHARK (SoC)

THE PLUS INDUSTRIAL MANUFACTURING EMPLOYER OF THE YEAR USACE BUFFALO DISTRICT BARGES MILLER BOAT LINE FERRY WILLIAM MARKET RYBA MARINE BARGES & TUG

4th Grade Social Studies 2nd Nine Weeks Test

Transcription:

Wednesday, September 12, 2018 American Currents Key Issues - Reduced tow sizes SB from St. Louis to Cairo by one string (5 barges) - Upper Miss at Lock 17 (UM 437) has reopened - Calcasieu Lock (WC 238) Closure, major delays, 12 boats in queue - NB test tows at Newburgh Lock (OR 776) have been successful, possible SB test tows tomorrow RIVER CLOSURES & RESTRICTED MOVEMENTS For additional details on the information noted below, please contact your ACBL Salesperson or Logistics Representative at (800) 899-7195 Ohio/Tennessee/Cumberland Olmsted (OR 964) and Lock 52 (OR 939): Traffic is now passing through the Nav Pass at Olmsted. Newburgh Lock (OR 776) closure The NB test tows that ran through today have been successful. They are currently working on getting the smaller NB tows through before nightfall as activity is restricted to daylight only. Tomorrow they are considering running a couple small SB test tows. Beginning on 6/7 and ending on 10/4, the main chamber will be closed, boats will use the auxiliary chamber. Expect around 24 hours of delay during this time period. Current queue is 50 boats. River is closed at Pike Island Lock (OR 84) - Lock is back in service Montgomery Lock (32) - Lock is back in service Dashields Lock (13) primary chamber intermittent closures between 8/13 and 9/14 - The primary chamber will be closed from 06:30-16:30 on the following dates: 8/13-17, 8/20-24, 8/27-31, 9/4-7, and 9/10-14. The auxiliary will be in use during this time, but can only lock one barge at a time. Expect 12-24 hour delay each way. Daylight only SB through Cincinnati (OR 470-480) bridges begins at 45 - River is above 45 and expected stay above 45 until 9/15. Industry is tracking Hurricane Florence closely, trying to determine the impact it might have on the Ohio river system next week. Here is a link to the NOAA Hurricane page for Florence. Hurricane Florence Cone Chicago/Illinois/Upper Miss High water on the Upper Miss has reduced our max tow size to 12 barges for the full river High water between St. Louis and Cairo - Tow size between St. Louis and Cairo has been reduced by one string, 5 barges. Transit through St. Louis harbor is daylight only when the river is above 25. The river stage in St. Louis is over 25 and expected to stay above 25 until 9/14-15. We also have daylight only transit through the Thebes bridge (UM 44). Upper Miss Lock 17 (UM 437) is closed due to high water - Lock is back in service Peoria Lock is up and locking, Lagrange is expected to go up today Lower Miss/Gulf/Canals Bayou Sorrel (PA 36) Closure to Refurbish South Gates - This is a full closure of the Port Allen Canal 7 days a week from 07:00 on 8/31 until approximately 11/30. Boats will use Algiers Lock as the alternate route. This closure has the potential to cause major delays, 24-48 hours in each direction. Old River Lock (Mouth of the Red River, around LM 304) Delays - Contractors will be working on Old River Lock through 9/22. Boats arriving during working hours (07:00-19:00 daily) will be subject to delays. Calcasieu Lock (WC 238) Closure Beginning on July 30, the lock will only be closed Monday-Thursday from 07:00-17:00. The river will be open from Friday-Sunday. This change is an effort to help control the major delays occurring at this lock. Contractors will demolish the south chamber guide wall and start construction of a new guide wall. The lock will be closed Monday-Thursday from 07:00 17:00 each day. Current queue is 12 boats, expect an additional 4-6 days of delay in each direction. Special Note - Please be aware, ACBL s standard contract, under the River Closures and Restricted Movements section, gives ACBL the right to bill for lock delays.

Upper/Lower Mississippi Current Loading Drafts Illinois (Dry and Liquid) St. Paul to PDC (UM 635) SBD 9'0" Max Lemont to Starved Rock (IR 231) SBD 9'3" Max PDC to Linwood (UM 475) SBD 9'3" Max Starved Rock to Meredosia (IR 71) SBD 9'6" Max Linwood to St. Louis SBD 9'6" Max Meredosia to St. Louis SBD 10'0" Max St. Louis to Cairo SBD 12'6" Max Gulf Cairo to Gulf SBD 12'6" Max Gulf NBD to St. Louis (UM 174) 11'6" Max Ohio Gulf NBD to Point Pleasant (OR 266) 10'0" Max Pittsburgh to Bellaire (93) SBD 10'0" Max Gulf NBD to Hennepin (IR 207) 9'0" Max Bellaire to Cairo SBD 11'6" Max Gulf NBD Starved Rock to Lemont 9'0" Max Lock Closures and Information Gulf and Intercoastal Bayou Boeuf 985-384-7626 93.3 9/4-10/15 Lock will be closed from 9/4 until approximately 10/15 to install gates and make necessary repairs. Boats will use Bayou Chene as the alternate route. Bayou Boeuf 985-384-7626 93.3 August 2019 Tentative dewatering closure expected to last 60 days Bayou Sorrel 225-659-7773 36 8/31-11/30 Dewater & Refurbish south gates, complete closure, will use Algiers as alternate route Calcasieu 337-477-1482 238 5/21/18-12/1/19 Illinois Waterway Demolition of south chamber guide wall and construction of new guide wall. Closed M-F from 07:00-17:00, as of 7/30 contractor will only work Monday-Thursday O'Brien 773-646-2183 327 2018 2-3 36 hour closures, Dates TBA Starved Rock 2019 815-667-4114 231 Marseilles 2019 815-795-2593 245 Illinois River Complete Lock Closures 2020 Multiple Locks Brandon Road 2023 815-744-1714 286 Dresden Island 2023 815-942-0840 271 June through August 2019 June through September 2020 June through August Upper Mississippi Work is for installation of new miter gates, both upper and lower will be replaced with vertical framed miter gates. Work will be closed during the day for 8-10 hours. Lockings will take place during off hours with an 80' width restriction. Will need a helper boat for 15 barges tows. Starved Rock and Marseilles: Total Closure, work is dewatering the lock chamber for major maintenance, 90-120 day closures. Dresden Island and Brandon Road: 90-120 days (105 days of width restriction of 70' with a 15 day total closure) Lagrange and Peoria: 60-120 day closures 90 day closures, will be total closures. Work is dewatering the lock chamber for major maintenance Ohio Dashields 724-457-8430 13 8/13-9/14 Primary Chamber will be closed from 06:30-16:30 on the following days, 8/13-17, 8/20-24, 8/27-31, 9/4-7, 9/10-14. The auxiliary will be used during these times, this chamber can only hold one barge at a time Robert C Byrd 304-576-2272 279 10/3-11/3 Primary Chamber - Repair Miter Gates Newburgh 812-853-8470 776 6/7-10/4 Primary Chamber - Miter Gate Pintle Ball Replacement Arkansas Chouteau 918-687-4501 401 9/12-13 Closed from 07:00-17:30 both days, full river closure Toad Suck Ferry 501-327-0853 156 9/19-20 Closed from 06:00 on 9/19 until 18:00 on 9/20 to test new cofferbox Dardanelle 479-890-4987 205 9/19-20 Closed from 06:00 to 18:00 each day to repair miter gates, full river closure Robert S Kerr 918-775-2091 336 9/10-11 and 9/17-18 Closed from 07:00-12:00 each day, full river closure Cumberland River Tennessee River Chickamauga 423-875-6230 471 9/25-30 Closed from 07:00 9/25 through 18:00 9/30, full closure

River Stages Milepoint River Stages Current/24 hr Change 24hr 48hr 72hr Flood Stage St. Paul UM 837 4.9/-0.4 4.9 4.6 4.2 14 Dubuque UM 579 14.2/+0.1 14.0 13.5 12.5 17 Morris IR 265 5.3/-0.2 5.3 5.3 5.3 13 Beardstown IR 88 11.8/-0.9 11.5 11.0 10.4 14 St. Louis UM 174 26.6/-0.3 26.0 25.2 24.5 30 Chester UM 107 28.9/-0.4 28.6 27.6 26.5 27 Cape Girardeau UM 50 33.3/+0.3 33.3 33.0 32.4 32 Pittsburgh OR 0 17.5/-7.3 16.8 16.7 16.7 25 Cincinnati OR 480 46.1/+3.7 47.1 47.0 43.2 52 McAlpine Upr OR 605 17.1/+0.5 17.3 17.6 17.4 23 McAlpine Lwr OR 606 42.2/+2.1 43.8 45.2 44.9 55 Evansville OR 795 31.2/+2.9 32.3 33.3 34.2 42 Paducah OR 930 26.6/+4.2 28.0 29.5 30.5 39 Cairo OR 976 36.8/+3.2 38.2 39.3 40.0 40 Memphis LM 725 15.3/+4.8 17.9 20.0 21.3 34 Little Rock AK 118 7.7/+0.3 7.5 7.7 7.8 23 Greenville LM 536 22.6/+1.4 25.2 29.9 32.8 48 Vicksburg LM 435 17.2/+0.5 18.3 21.1 25.9 43 Natchez LM 364 24.5/+0.3 24.9 26.0 28.7 48 Baton Rouge LM 237 12.2/+0.2 12.3 12.7 13.2 35 New Orleans LM 107 3.9/+0.2 4.0 4.2 4.3 17 Red Orange Flood Stage 2' + increase Inland Waterway Weather Report Current Lock Delays Lock Milepoint Queue Lock 25 UM 241 1 Peoria/Lagrange IR157/IR80 N/A Melvin Price UM 201 2 Kentucky Lock TR 22 5 Montgomery OR 32 10 Newburgh OR 776 50 Olmsted OR 964 2 Calcasieu WC 238 12 Bayou Sorrel PA 36 0 Port Allen LM 228 0 Algiers LM 88 4 Industrial LM 92 17 Precipitation Forecast Flooding and Florence highlight the weather today. A stationary front will remain over MS/LA today bringing moderate to locally heavy rain. A cold front will move slowly through the Upper Mississippi Valley tomorrow-wednesday with light to moderate rain predicted. 7day QPF totals (through Wednesday morning): ½-2 of rain is forecasted for the region north of Rock Island. 1 ½ or less of rain is forecasted for the region south of Cairo. Bill Frederick, USACE

2018 Upper Miss Closeout Letter