From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

Similar documents
AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

30 SEP - 02 OCT, 2014

QMS for AIS/MAP Service Implementation Workshop

AIXM/WXXM CONFERENCE 2010

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

2012 Performance Framework AFI

MIDAD Project IDS Vision

ICAO GANP Requirements and Evolution

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

TWELFTH AIR NAVIGATION CONFERENCE

Introduction to Amendment 40 to Annex 15

AIM in support of ATM

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

SAMPLE TEMPLATE APPENDIX 3.5C-1

Airport AIM as a Service Presented at World ATM Congress 2016

The Importance of AIM and the Operational Concept

Technical Resources - Automation European AIS Database (EAD)

Managing Aeronautical Data

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

Avitech GmbH AIXM Capabilities & Experiences

Development of the Global AIM Strategy (AIM Projects)

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

International Civil Aviation Organization. Second Meeting (AIM SG/2) (Kish Island, Iran, 31 August-2 September 2015)

TWELFTH AIR NAVIGATION CONFERENCE

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

Quality Management System (QMS)

10+ years of EAD: picking the low-hanging fruit. guido HAESEVOETS EAD Customer Management 29/01/2015

FLIGHT OPERATIONS PANEL (FLTOPSP)

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Aeronautical Information Management

Work Programme of ICAO Panels and Study Groups

On Time. Total Airspace Management. 8 th Global ATFM Conference Cancun - Mexico. 12/30/2014 Commercial-in-Confidence 1

ADQ Regulators Working Group

Change History. Table of Contents. Contents of Figures. Content of Tables

Providing the Context Air Navigation Integrated Work Programme

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System

TWELFTH AIR NAVIGATION CONFERENCE

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

Packaging Tomorrow s Aviation System

Continuous Improvement of the Global Air Traffic Management System

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas

Lufthansa Systems AIM from a navigation data house perspective

TWELFTH AIR NAVIGATION CONFERENCE

THE GLOBAL PERSPECTIVE ON GASP/GANP/GASOS

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

ICAO EUR Region Civil/Military Cooperation Seminar/Workshop

User Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

AMXM Airport Mapping picking-up SWIM

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

MID Region Air Navigation Strategy

TWELFTH AIR NAVIGATION CONFERENCE

Optimizing trajectories over the 4DWeatherCube

NNF Work-shop on Navigation, Safety and Technology. Dato: 2. February Gunn Marit Hernes Luftfartstilsynet

AIM AUTOMATION. Raul Martinez, RO/AIM International Civil Aviation Organization North American, Central American and Caribbean Office

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

International Civil Aviation Organization. Performance Framework for AIM implementation in the MID Region

Implementation of PBN in Armenian airspace

AFI Region AIXM-e AIP Implementation Workshop Dakar, Senegal, 3-5 October 2016

Regional air navigation planning and implementation performance framework: Review of programmes and projects

Terms of Reference for a rulemaking task

ORGANISER HOST LEAD SPONSOR

ATFM/CDM ICAO s Perspective

IAC 2011 Cape Town, October th

MID Region AIM SG/2. AIS-AIM Study Group 31 August Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

NCLB-AIM Workshop (Cairo, Egypt, September 2017) Your complete AIS/AIM Training baseline

Russian Federation ATM modernization program

ICAO EUR Region Performance Framework

ICAO s Third Remotely Piloted Aircraft Systems (RPAS/3) Symposium Chengdu, Sichuan Province, China September 2018

Regional implementation of Electronic Terrain and Obstacle data (e-tod) (Presented by Jeppesen)

European RPAS Roadmap RPAS Activities in SESAR th USA/Europe Air Traffic Management R&D Seminar

PENS Symposium How to join PENS

Circular 330-AN/189 Civil/Military Cooperation in Air Traffic Management. Sven Halle ICAO- Paris

AIXM Coding guidelines for the ICAO data sets

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

Airspace User Forum 2012

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

Circular 330-AN/189 Civil/Military Cooperation in Air Traffic Management

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

Sharing UAE experience in. AIM implementation

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

NORTH ATLANTIC VISION

Global Air Navigation Planning

ATC PROCEDURES WORKING GROUP. Transition Level

International Civil Aviation Organization. ICAO Updates. 13 th COSCAP-NA Steering Committee Meeting

EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

Transcription:

From AIS to AIM COMSOFT AIS to AIM Lima, Peru 24-28.11.2014 Context and Overview Isabel Zambrano Rodriguez

Context: Challenges to AIS Worldwide AIS throughout the world face a number of challenges : Air traffic growth More users of AIS information Need for more air traffic capacity More data coming from data originators More automation in aircrafts A380 uses aerodrome mapping to calculate more efficient Drones Need for interoperability Within ANSPs With other organisations Budgetary pressure COMSOFT GmbH From AIS to AIM November 2014 Page 2

Context: Solutions to Address These Challenges Improve data quality Ensure data integrity Exchange data More automation Manage and control data Staff training Aeronautical Information Management COMSOFT GmbH From AIS to AIM November 2014 Page 3

ATM community expectations: The ATM community will depend extensively on the provision of timely, relevant, accurate, accredited and quality-assured information to collaborate and make informed decisions. Sharing information on a system-wide basis will allow the ATM community to conduct its business and operations in a safe and efficient manner. Global Air Traffic Management Operational Concept (Doc 9854) COMSOFT GmbH From AIS to AIM November 2014 Page 4

From an airspace user perspective Greater equity in airspace access, greater access to timely and meaningful information for decision support, and more autonomy in decision making, including conflict management, will provide the opportunity to better deliver business and individual outcomes within an appropriate safety framework. Global Air Traffic Management Operational Concept (Doc 9854) COMSOFT GmbH From AIS to AIM November 2014 Page 5

From a service provider perspective The ability to operate within an information-rich environment, with real-time data, as well as system trend and predictive data, fused with a range of automated decision-support or decision-making tools, will enable optimization of services to airspace users. Global Air Traffic Management Operational Concept (Doc 9854) COMSOFT GmbH From AIS to AIM November 2014 Page 6

From a regulator perspective Safety systems shalls be robust and open, allowing safety not only to be more easily measured and monitored, but also compared and integrated on a global basis, not for its own sake, but as a platform for continuous improvement. Global Air Traffic Management Operational Concept (Doc 9854) COMSOFT GmbH From AIS to AIM November 2014 Page 7

How to meet with the expectations? AIM Roadmap expands Doc 9750 for the future development of aeronautical information. AIM Roadmap offers practical guidance and advice to regional planning groups and States The most efficient way to meet ATM expectations is to implement the 21 steps of ICAO Roadmap from AIS to AIM. COMSOFT GmbH From AIS to AIM November 2014 Page 10

Required Steps for a Transition from AIS to AIM P-01 Data quality monitoring P-02 Data integrity monitoring P-03 AIRAC adherence monitoring P-04 Monitoring of States differences to Annex 4 and Annex 15 P-05 WGS-84 implementation P-06 Integrated aeronautical information database P-07 Unique identifiers P-08 Aeronautical information conceptual model P-09 Aeronautical data exchange P-10 Communication networks P-11 Electronic AIP P-12 Aeronautical information briefing P-13 Terrain P-14 Obstacles P-15 Aerodrome mapping P-16 Training P-17 Quality P-18 Agreements with data originators P-19 Interoperability with meteorological products P-20 Electronic aeronautical charts P-21 Digital NOTAM COMSOFT GmbH From AIS to AIM November 2014 Page 11

21 Steps in Three Phases P-09 Aeronautical data exchange P-21 Digital NOTAM P-20 Electronic aeronautical charts P-19 Interoperability with meteorological products P-18 Agreements with data originators Phase 3 P-16 Training P-12 Aeronautical information Briefing P-10 Communication networks P-02 Data integrity monitoring Time P-01 Data quality monitoring P-15 Aerodrome Mapping P-06 Integrated aeronautical Information database P-07 Unique identifiers Phase 2 P-14 Obstacles P-08 Aeronautical information conceptual model P-13 Terrain P-11 Electronic AIP P-04 Monitoring of Annex differences P-17 Quality P-03 AIRAC adherence monitoring P-05 WGS 84 implementation Phase 1 COMSOFT GmbH From AIS to AIM November 2014 Page 12

Three Phases for the Transition from AIS to AIM Phase 1 Consolidation Improving existing products Standards compliance Phase 2 Going digital Data driven processes Aeronautical Information Conceptual Model Phase 3 Information management New products Central Aeronautical Database COMSOFT GmbH From AIS to AIM November 2014 Page 13

Carry Out the Transition from AIS to AIM To carry out the transition successfully, the states need: A sound understanding of the roadmap and its objectives A sound understanding of each step and their requirements This is achievable by training all stakeholders involved in the Data Flow, from data originators to AIS office to users Human and material resources dedicated to each step This is achievable only with the firm commitment of the States to be compliant with the international standard COMSOFT GmbH From AIS to AIM November 2014 Page 14

Carry Out the Transition from AIS to AIM (continued) To carry out the transition successfully, the states need: A clear implementation plan for each step A well-defined organization of the implementation teams This is achievable thanks to close collaborations with other States and stakeholders to ensure global compatibility and harmonization via their feedbacks of their experiences COMSOFT GmbH From AIS to AIM November 2014 Page 15

Conclusion A global effort is on-going to change AIS into AIM AIS to AIM is a change management process Inside ANSPs But also over the whole aeronautical data flow AIS offices are key partners in ATM evolution The ICAO AIS to AIM roadmap is a clear way forward Now, it's up to you to drive the road! COMSOFT GmbH From AIS to AIM November 2014 Page 16

by Manfred Schmid, Managing Director Thank you! Contact me: isabel.zambrano@comsoft.aero COMSOFT GmbH From AIS to AIM November 2014 Page 17