INDICATOR RESULTS FACTSHEET ΤRA04: TRAVEL-TIME

Similar documents
INDICATOR RESULTS FACTSHEET TRA01: TRAFFIC VOLUME

Egnatia Odos Observatory. Egnatia Odos Observatory Monitoring of Egnatia Motorway s s Spatial Impacts

The Egnatia Motorway, Development and Combined Transports

monitoring of egnatia motorways spatial impacts

RESULTS FACT SHEET SE-S-2: ACCESSIBILITY OF INDUSTRIAL AREAS

- Socrates Seitanidis

WORKING PAPER In the context of the placement in the Observatory of the Egnatia Odos A.E.

Tunnelling Featured Projects

INDICATOR RESULTS FACT SHEET SET08: ACCESSIBLE SITES OF CULTURAL AND TOURIST INTEREST

RESULTS FACT SHEET SE-F-3: ACCESSIBILITY OF SITES OF CULTURAL & TOURIST INTEREST

Observatory of Egnatia Odos motorway, Greece

Egnatia Odos: An axis for development and co-operation

Relocation of applicants for international protection

EGNATIA ODOS MOTORWAY - LONG TERM NOISE MONI- TORING & STRATEGIC NOISE MAPS

The results of indicators, the reports, and generally the Observatory material are available on the internet at:

beyond (Ioannina Court of First Instance: 14/ , tax id no:

ΙΕΝΕ 2011 Scientific Workshop. Highways and Wildlife: How do they coexist? Kastoria, September 22, 2011

PRESS RELEASE. Graph 1: Road traffic accidents and casualties, January January Jul-14. Jul-15. Apr-15. Jan-15. Oct-15.

DELIVERABLE COMMUNICATION PLAN ACTION 2.1: PUBLICITY, PROMOTION AND DISSEMINATION OF THE PROJECT'S RESULTS

possession rate of vehicles and basic developmental indicators in the impact zone of Egnatia motorway, Greece THESSALONIKI, Oct.

A) Corporate Portfolio B) Land Development

O T M PROJECT CHARACTER PERIOD OWNER VALUE KIND STAGE

Egnatia Odos, a tollway from the past to the future

MACEDONIA IN GREEK ADMINISTRATION

1. TU2 tunnel at Edessa Florina trunk road 2. Cut & cover (25x250m) Thessaloniki 3. Edessa bypass Cut & cover tunnel 4. Trunk tunnel road at

CURRICULUM VITAE MAY 2013

Development of the Hellenic Parts of Priority Axes No 22 & 29: A Strategic Approach

Rappahannock-Rapidan Regional Commission 2010 Travel Time Survey

PRESS RELEASE GREEK AIRPORTS TRAFFIC, 2015

PRESS RELEASE GREEK AIRPORTS TRAFFIC, 2016

HRADF: Putting Greek economy into long-term perspective

RESULTS FACT SHEET INDICATOR - SET13: COMPOSITION OF GROSS VALUE ADDED (GVA) PER SECTOR

4. Araxos airport (LGRX) Every Day 09:00-13:30 Notes : 1.- On 24/12/2016 Sat CLOSED 2.- On 25/12/2016, 01/01/2017 Sun CLOSED

PRESS RELEASE. ARRIVALS OF NON-RESIDENTS IN GREECE: January - June 2016 HELLENIC REPUBLIC HELLENIC STATISTICAL AUTHORITY. Piraeus, 13 October 2016

CURRICULUM VITAE EMILIOS M. COMODROMOS Professor Director of the Computational Geotechnical Engineering Laboratory

Corporate Presentation

Corporate Presentation

O T M PROJECT CHARACTER PERIOD OWNER VALUE KIND STAGE

Operation Report of the NNGS for the Year 2015

Asset Development Plan. 31 January, 2017

ELENA RAPTI, MP GREECE. Coordinator of the ONE in FIVE campaign in Greece

A. KARANIKOLAS & ASSOCIATES S.A. CONSULTING ENGINEERS LIST OF SELECTED PROJECTS

Corporate Presentation

Pino MUSOLINO President, North Adriatic Sea Port Authority Developing and upgrading of the East-Mediterranean Motorways of the Sea (Italy-Greece MoS

Team DEMITSIKIS Ch. - TENEKES N. & CO

PRESS RELEASE SURVEY ON MUSEUMS AND ARCHAEOLOGICAL SITES ATTENDANCE DECEMBER 2017

Inspection system for in use pesticide application equiupment in Greece. First three years of application

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

lighting road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts to bs en 12767: 2007

SOME OF OUR CUSTOMERS

CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE. By Mike Curran, Manager Strategic Policy, Transit New Zealand

Study on Identification, Analysis and Categorization of Natural Disasters in Northern Greece (Act )

PAGONI CONSTRUCTION COMPANY

A day tourism destination HELLENIC MINISTRY OF TOURISM

PERTH-ADELAIDE CORRIDOR STRATEGY

Dr. Christos Papakostas. 21, Garivaldi St., 43100, Karditsa, Greece Telephone/Fax (0030) Mobile: (0030)

Infrastructure in Greece

M4 Junctions 3 to 12 Smart motorway

Novelty and opportunities in the Greek PPP market

PRESS RELEASE SURVEY ON MUSEUMS AND ARCHAEOLOGICAL SITES ATTENDANCE JANUARY 2017

N11 Arklow / Rathnew & N7 Newlands Cross PPP Contract. Kieran Kelly

PRESS RELEASE SURVEY ON MUSEUMS AND ARCHAEOLOGICAL SITES ATTENDANCE FEBRUARY 2018

PRESS RELEASE SURVEY ON MUSEUMS AND ARCHAEOLOGICAL SITES ATTENDANCE JULY 2017

Regional fact sheets Municipality of Langadas

PRESS RELEASE SURVEY ON MUSEUMS AND ARCHAEOLOGICAL SITES ATTENDANCE JANUARY 2018

Chapter 2 Route window W25 Maidenhead station. Transport for London

MisRAR REGION OF EPIRUS REGIONAL UNIT OF THESPROTIA PRESENTATION BATZIAS NIKOLAOS MIRANDELA APRIL Regional Unit of Thesprotia

The Egnatia Motorway a chance for Northern Greece to catch up?

Project s activities report

Stay in touch both with the University and your fellow students not only for the duration of the course but also throughout your career.

Have you got any real estate property?

Road Safety Campaigns in Greece

M621. Junctions 1 to 7 Improvement scheme. Share your views

HELLENIC REPUBLIC ASSET DEVELOPMENT FUND. 1st GREEK INVESTMENT FORUM China, 11 December 2017

RECLAIMING - THE CASE OF

Special Coordination Service for Implementation (SCOS) - ROLE

From S to sigma: towards a new development pattern of the Hellenic space? Is there a role for Mega Transport Projects in spatial restructuring?

THE WELSH MINISTERS STATEMENT OF REASONS

in Northumberland Preferred Route Announcement September 2017

Hydrological study for the operation of Aposelemis reservoir Extended abstract

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

ΑΠΟ ΠΙΑ ΜΕΡΗ ΤΟΥ ΚΟΣΜΟΥ ΚΑΙ ΤΗΣ ΕΛΛΑ ΟΣ ΜΑΣ ΒΛΕΠΟΥΝ

INTRAKAT ANALYST PRESENTATION FY RESULTS 2013

Proposed M9 Spur Extension. Kirkliston

EXPLANATORY STATEMENT

Total expenditure by international tourists visiting Spain in August increases by 3.8% compared with the same month last year

Hidden Greece Greece & Cyprus 233

WELCOME US 83 Public Meeting

A Macroscopic Tool for Measuring Delay Performance in the National Airspace System. Yu Zhang Nagesh Nayak

Technical Regulation

MINISTRY OF RURAL DEVELOPMENT AND FOOD GENERAL DIRECTORATE OF VETERINARY SERVICES DIRECTORATE OF VETERINARY PUBLIC HEALTH

Elvan S.A. COMPANY PROFILE. 20 km Lavriou Ave., Peania, Greece

How, when, what & why to access Structural Funds in Romania

PRESS RELEASE MUSEUMS AND ARCHAEOLOGICAL SITES ATTENDANCE SURVEY JULY 2016

Total expenditure by international tourists visiting Spain in March rose by 10.0% compared with the same month last year 1

Financial Crisis in Greece, Economical Evaluation of Replacement of Heating Diesel Oil with a Heat Pump System

INTERREG III C. POLYMETREXplus RINA: North-South Interface Inception Meeting ATHENS JULY, 2006

4 Are you responding on your own behalf or on behalf of an organisation or group?

MACEDONIA IN THE GREEK ECONOMY

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

Transcription:

INDICATOR DEFINITION - PURPOSE This indicator assesses the average travel-time between two points (beginningend of section), including various delays. The purpose of assessing this indicator is to determine travel-times between specific points of Origin - Destination and provide data on the cost involved in the transportation of goods along the Egnatia Motorway axis. RESULTS - ASSESSMENT The counts concern the Egnatia Motorway sections that had been opened to traffic by 31/12/2008, as well as the alternative road network servicing the traffic at sections that are under construction, during a typical period in the day. In December 2008, when 562km of the Egnatia Motorway were in full operation, the total travel time from Igoumenitsa to Kipi was estimated at seven (7) hours approx., i.e. 50 minutes less than the time needed in December 2007 (when 536km of the road axis were in operation). At the beginning of January 2009, an additional length of 57km was opened to traffic (the main new road section being the one extending from Strimonas to Agios Andreas, Kavala, 41km long). The whole Egnatia Motorway length thus in operation amounted to 619km out of which 516km was a continuous modern motorway in full operation extending from Grevena to Kipi. So, according to current estimates, the total travel time has been reduced even more (by 23 minutes).

TRAVEL-TIME ON THE EGNATIA MOTORWAY CORRIDOR, December 2008 code EGNATIA MOTORWAY SECTION Travel-time (minutes) Comments 01_01A IC IGOUMENITSA IC VASSILIKOS 5 01A_02 IC VASSILIKOS IC NEOHORI 6 02_03 IC NEOHORI IC SELLES-TIRIA 15 03_04 IC SELLES-TIRIA IC DODONI 11 04_04A IC DODONI IC IONIA 04A_05 IC IONIA IC IOANNINA 5 05_05Α IC IOANNINA IC PAMVOTIDA 2 05Α_06 IC PAMVOTIDA IC ARAHTHOS / ZAGORI 20 06_06A IC ARAHTHOS / ZAGORI IC PERISTERI 12 06A_07 IC PERISTERI IC METSOVO 5 07_07Β IC METSOVO IC PANAGIA 07Β_08 IC PANAGIA IC VOLOS (AG. PARASKEVI) 50 08_08A IC VOLOS (AG. PARASKEVI) IC VENETIKOS 08Α_08Β IC VENETIKOS IC WEST GREVENA 3 08Β_09 IC WEST GREVENA IC EAST GREVENA 4 09_09Α IC EAST GREVENA IC KASTORIA 9 09Α_10 IC KASTORIA IC EAST SIATISTA 1 10_11 IC EAST SIATISTA IC KALAMIA 6 11_12 IC KALAMIA IC KOZANI 6 12_13 IC KOZANI IC POLIMILOS 11 13_14 IC POLIMILOS IC VERIA 14 14_15 IC VERIA IC KOULOURA 5 15_16 IC KOULOURA IC NISELI 7 16_17 IC NISELI IC KLIDI 6 17_18 IC KLIDI IC MALGARA 5 18_19 IC MALGARA IC AXIOS 4 19_20 IC AXIOS IC SINDOS 4 20_21 IC SINDOS IC KALOHORI (K1) 2 21_22 IC KALOHORI (K1) IC IONIA (K2) 3 22_23 IC IONIA (K2) IC EFKARPIA (Κ4) 5 23_24 IC EFKARPIA (Κ4) IC LANGADAS, SERRES 4 (1) (2) (3) (4) 2

code EGNATIA MOTORWAY SECTION Travel-time (minutes) Comments 24_25 IC LANGADAS, SERRES IC PROFITIS 11 25_25A IC PROFITIS IC VAGIOHORI 5 25A_26 IC VAGIOHORI IC RENTINA 9 26_27 IC RENTINA IC VRASNA, ASPROVALTA 5 27_28 IC ASPROVALTA IC STRIMONA 11 28_29 IC STRIMONA IC AGIOS ANDREAS 30 (3) 29_30 IC AGIOS ANDREAS IC PALIO 3 30_31 IC PALIO IC AG. SILLAS 5 31_32 IC AG. SILLAS IC ASPRA HOMATA 7 32_32A IC ASPRA HOMATA IC PERNI 8 32A_33 IC PERNI IC HRISOUPOLI 2 33_34 IC HRISOUPOLI IC VANIANO 15 (3) 34_35 IC VANIANO IC VAFEIKA 5 35_36 IC VAFEIKA IC IASMOS 10 36_37 IC IASMOS WEST IC KOMOTINI 8 37_38 WEST IC KOMOTINI EAST IC KOMOTINI 3 38_39 EAST IC KOMOTINI IC MESTI 12 39_40 IC MESTI IC MAKRI 9 40_41 IC MAKRI IC ALEXANDROUPOLI 5 41_42 IC ALEXANDROUPOLI IC ALEXANDROUPOLI INDUSTRIAL ZONE 42_43 IC ALEXANDROUPOLI INDUSTRIAL ZONE IC ARDANIO 13 43_00 IC ARDANIO - KIPI 4 TOTAL TRAVEL TIME (Igoumenitsa-Kipi, Dec. 2008) 414 Comments (1) It contains an Egnatia Motorway section and a Rural Road section. (2) It contains an Egnatia Motorway section and a National Road section. (3) The Egnatia Motorway section had not yet been completed. Use of the National Road. (4) The Egnatia Motorway section had not yet been completed. Use of the Rural Road. 4 The Egnatia Motorway has been designed and constructed as a dual closed carriageway of international standards with a central reserve. Each carriageway typically consists of two traffic lanes and a hard shoulder, with the exception of the section Klidi IC- Langadas- Serres IC, which consists of three traffic lanes and a hard shoulder. These technical features, in conjunction with the fact that the current traffic volumes are not near the motorway s capacity, enable the users to achieve and maintain a high speed, thus shortening the corresponding travel times. 3

METADATA Sources - Methodology The counts have been carried out following the moving-vehicle technique on Egnatia Motorway sections that were given to traffic within the year 2008, while for the remaining sections, the data used were the results of the counts carried out in 2006 and 2007. Scientific coordination processing of count results: Traffic Unit- Operations Department - Operations and Maintenance Division of EGNATIA ODOS AE. URL: http://www.egnatia.gr/flash/operations_traffic_gr.html, Email: traffic@egnatia.gr 4

Map 1: Egnatia Motorway junctions and operation status, Dec. 2008 5

Map 2: Egnatia Motorway junctions and operation status, Jan. 2009 6