FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

Similar documents
MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015

PROGRESS PARK CONNECTOR

Fairfax County Parkway Widening Fairfax County

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

Appendix 4.1 L. No-Build Project Descriptions

4. Safety Concerns Potential Short and Medium-Term Improvements

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

A. CONCLUSIONS OF THE FGEIS

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

State Project Reconstruction I-84

5.1 Traffic and Transportation

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

A VISION FOR I-95. January 12, Delaware Department of Transportation

Route 29 Solutions Projects

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

McLean Citizens Association Transportation Committee Project Briefing

Major Projects Overview

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

Replace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Install New Sign Structure

Arlington County Board Meeting Project Briefing. October 20, 2015

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

November 21, 2012 Barbara Kelleher, (954)

Score. Category. Access Aesthetics Community Resources

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

Pedestrian Safety Review Spadina Avenue

1.0 Purpose and Organization of the Community Impact Assessment Addendum

Important Lane Closures, April 3 9, 2011

I-66 Inside the Beltway Feasibility Study

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

PRIORITIES COMMITTEE MEETING

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016

HYANNIS ACCESS IMPLEMENTATION TASK FORCE NOTES April 12, PM CAPE COD COMMISSION CONFERENCE ROOM ATTENDEES. Hyannis Area Chamber of Commerce

1.2 Corridor History and Current Characteristics

PennDOT Interstate Work next week March 30-April 3:

AGENDA ITEM I-6 Public Works

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Public Meeting: Metropolitan Washington Airports Authority (MWAA) Transportation Network Company (TNC) Lot on S. Eads Street

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

FORT WASHINGTON OFFICE CENTER TRANSPORTATION IMPROVEMENTS By Orth-Rodgers & Associates, Inc., Adrienne Eiss, PTP August 8, 2008

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Concord Road Interchange. Standard hours of work

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

Transportation TRANSPORTATION PROJECTS

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

Transportation Supporting Dulles Airport

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

Report to the Strategic Development Committee

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

FDOT Treasure Coast Traffic Impact Report

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Traffic Analysis Final Report

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

CALIFORNIA HIGH-OCCUPANCY VEHICLE LANE DEGRADATION ACTION PLAN

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

Public Information Center August 12, 2010

Springettsbury Township. Road Improvement Projects

35 Downtown Mountain View to Stanford Shopping Center Effective Date 10/9/2017 Route Map

Pardon Our Dust Public Information Meeting

Northeast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Fairfax County Transportation Advisory Commission (TAC)

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

Lake Erie Commerce Center Traffic Analysis

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007

10.0 Recommendations Methodology Assumptions

ROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia

Sky Temporary Car Park Transport Statement

Construction Staging Adelaide Street West

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

State Route 8 Corridor. Northern Summit County s Path to Success

I-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

SCOPING INFORMATION PACKET

Work in 2015 and Annual Mobility- Management Plan

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

Cell: (408) Release MA June 25, 2012

Transcription:

VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp to I-95 southbound from S. Crater Road, realign Graham Road and the I-95 on-ramp to intersect, and create separate north- and southbound left-turn lanes on S. Crater Road. GENERAL ELEMENTS Montibello St Close the existing on-ramp to I-95 Southbound/Route 460 Bus. from S. Crater Road INTERSECTION-SPECIFIC ELEMENTS Intersection #1 (Graham Road/S. Crater Road/I-95 Southbound On-Ramp) Realign Graham Road and on-ramp to intersect Shift southbound lanes on S. Crater Road through intersection to develop a separate southbound left-turn lane to the I-95 Southbound on-ramp Graham Rd FUTURE PARK AND RIDE LOT Winfield Rd Develop a separate northbound left-turn lane on S. Crater Road to Graham Road Proposed traffic signal operation : - 85 second cycle - Protected/permissive NB/SB left turns FUTURE PARK AND RIDE LOT Rosewood Terrace 1 VDOT identified the area within the vacated loop ramp as a potential future location for a park and ride lot. Assuming Graham Road is realigned, there would be enough area to construct 150-250 parking spaces. The estimated cost to design and construct a park and ride lot (150-250 spaces) would range from approximately $750,000 to $1.25M. King Ave LEGEND Myrick Ave X Existing Roadway New Roadway Close/Remove NORTH

Implementing this concept would eliminate the approximately 250-foot weaving section between the I-85 northbound off-ramp merge with the I-95 southbound collector-distributor road and the Graham Road off-ramp. It would shift traffic demand from the existing Graham Road off-ramp to a new off-ramp that would ultimately connect to S. Crater Road approximately one-half mile south of the current Graham Road/S. Crater Road intersection. Eliminating the weaving section and developing an additional lane on C-D road in advance of the three-way split would include overhead lane signs to direct travelers to the desired lane. The potential risk of wrong-way movements at an isolated on-way off-ramp that violates driver expectancy remains, but risks can be mitigated by providing signage in accordance with 2009 Manual on Uniform Traffic Control Devices (MUTCD) and VDOT Supplement. New off-ramp avoids Poor Creek pumping station and sanitary force mains. VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT B

REFINED CONCEPT 1 PROJECT B COST: $8.1M Eliminate the I-95 southbound C-D road offramp to Graham Road and construct a new off-ramp to S. Crater Road from the Route 460 Bus./I-95 southbound split. Graham Rd Winfield Rd Key consideration: The new off-ramp alignment is designed to avoid the Poor Creek pump station and sanitary force mains. GENERAL ELEMENTS Close the existing I-95 Southbound C-D road off-ramp to Graham Road Rosewood Terrace Construct a new off-ramp to S. Crater Road Widen I-95 Southbound C-D Road to accommodate new exit Re-design placement/design of overhead guide signs to account for a third option at the downstream I-95 Southbound/ Route 460 Bus./S. Crater Road off-ramp at diverge point Remove the yield condition on I-85 northbound to I-95 southbound C-D Road. A two-lane C-D road can accept singlelane ramps from I-95 southbound and I-85 northbound in a free-flow condition. INTERSECTION-SPECIFIC ELEMENTS Intersection #2 (New I-95 Southbound Off- Ramp/S. Crater Road) Install new traffic signal at S. Crater Road and new off-ramp Develop dual westbound left-turn lanes and a single right-turn lane on off-ramp Proposed traffic signal operation - 100 second cycle - Two-phase signal operation Continued on Reverse Side LEGEND Existing Roadway New Roadway X Close/Remove NORTH 2

Intersection #2 (Winfield Road/S. Crater Road) Remove the Off-Ramp from I-95 Northbound to S. Crater Road Realign Winfield Road to S. Crater Road to provide full movements - Construct a separate southbound left-turn lane on S. Crater Road - Construct a separate northbound right-turn lane on S. Crater Road (beyond the I-95 bridge structure) Intersection #6 (Winfield Road/Route 460 Bus.) Construct channelized right-turn lane from eastbound Winfield Road to the I-95 Northbound onramp Implementing this concept would eliminate the approximately 360 foot weaving section between the S. Crater Road on-ramp to I-95 northbound movement and the off-ramp to the E. Wythe Street/E. Washington Street couplet in downtown Petersburg. Introduces approximately one total mile of out-of-direction travel for drivers traveling from S. Crater Road to I-95 northbound/i-85 southbound/e. Wythe Street. Elimination of the I-95 northbound off-ramp to S. Crater Road northbound increases the overall weaving distance between on- and off-ramps on C-D road. Potential environmental, right-of-way, and utility impacts of improvements: Winfield Road should not be widened to the north to avoid impacting existing cultural resources. Increased traffic volumes on Winfield Road require further investigation of access management policies and should include outreach to affected business and property owners along this corridor. Realigning the Graham Road off ramp with Rosewood Terrace (the existing offset subdivision road across from the Graham Road off ramp) or vice versa will require some right of way. Widening along Graham Road is assumed to be towards the Limited Access Right of Way in lieu of towards the outside to reduce right of way impacts. Impacts to properties along S. Crater Road south of Graham Road are anticipated. VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 2 PROJECT A

REFINED CONCEPT 2 PROJECT A COST: $11.6M Intersection improvements on S. Crater Road north of I-95, Winfield Road corridor improvements, and modifications to the Winfield Road/Route 460 Bus. intersection as well as the I-95 northbound on-ramp and C-D road. Key considerations of this Concept include the following: 1 Winfield Road should not be widened to the north to avoid impacting existing cultural resources. Increased traffic volumes on Winfield Road require further investigation of access management policies and should include outreach to affected business and property owners along this corridor. 2 Winfield Rd GENERAL ELEMENTS Reconstruct the I-95 Northbound on-ramp merge from Winfield Road/Route 460 Bus. to provide adequate merge and decision distance requirements INTERSECTION-SPECIFIC ELEMENTS Intersection #1 (I-95 NB On-Ramp/S. Crater Road) Rosewood Terrace Graham Rd 6 County Dr Remove the existing on-ramp to I-95 Northbound from S. Crater Road Eliminate the free-flow I-95 NB off-ramp movement to southbound S. Crater Road and reconstruct the approach to intersect S. Crater Road at a controlled intersection - Develop separate left- and right-turn lanes on the off-ramp LEGEND Existing Roadway Continued on Reverse Side X New Roadway Close/Remove NORTH

VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 2 PROJECT B

REFINED CONCEPT 2 PROJECT B COST: $3.8M Monitbello St Improvements to the I-95 southbound offramp to Graham Road, Graham Road widening, and modifications to the Graham Road/S. Crater Road intersection. Key considerations of this Concept include the following: Realigning the Graham Road off ramp with Rosewood Terrace (the existing offset subdivision road across from the Graham Road off ramp) or vice versa will require some right of way. Widening along Graham Road is assumed to be towards the Limited Access Right of Way in lieu of towards the outside to reduce right of way impacts. Impacts to properties along S. Crater Road south of Graham Road are anticipated. Graham Rd 3 Winfield Rd GENERAL ELEMENTS Develop a second eastbound lane on Graham Road between the Off-Ramp and S. Crater Road. INTERSECTION-SPECIFIC ELEMENTS Intersection #3 (Graham Road/S. Crater Road) Construct a second eastbound right-turn lane from Graham Road to S. Crater Road Rosewood Terrace 4 King Ave Intersection #4 (I-95 Southbound Off-Ramp/ Graham Road) Develop dual southbound left-turn lanes on the I-95 Southbound off-ramp and a separate shared through-right lane Realign off-ramp and Rosewood Terrace to intersect one another Myrick Ave LEGEND X Existing Roadway New Roadway Close/Remove NORTH

VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 + 2 PROJECT A

Columbia Rd REFINED CONCEPT 1 + 2 COMBINED PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp to I-95 southbound from S. Crater Road, realign Graham Road and the I-95 on-ramp to intersect, and create separate north- and southbound left-turn lanes on S. Crater Road. GENERAL ELEMENTS Montibello St Close the existing on-ramp to I-95 Southbound/Route 460 Bus. from S. Crater Road INTERSECTION-SPECIFIC ELEMENTS Intersection #1 (Graham Road/S. Crater Road/I-95 Southbound On-Ramp) Realign Graham Road and on-ramp to intersect Shift southbound lanes on S. Crater Road through intersection to develop a separate southbound left-turn lane to the I-95 Southbound on-ramp Graham Rd FUTURE PARK AND RIDE LOT Winfield Rd Develop a separate northbound left-turn lane on S. Crater Road to Graham Road Proposed traffic signal operation : - 85 second cycle - Protected/permissive NB/SB left turns Rosewood Terrace 1 FUTURE PARK AND RIDE LOT King Ave VDOT identified the area within the vacated loop ramp as a potential future location for a park and ride lot. Assuming Graham Road is realigned, there would be enough area to construct 150-250 parking spaces. The estimated cost to design and construct a park and ride lot (150-250 spaces) would range from approximately $750,000 to $1.25M. LEGEND Myrick Ave X Existing Roadway New Roadway Close/Remove NORTH

Intersection #7 (Winfield Road/Route 460 Bus.) Construct channelized right-turn lane from eastbound Winfield Road to the I-95 Northbound onramp Construct a new traffic signal - Proposed traffic signal operation 85 second cycle Protected/permissive NB left turn VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 + 2 PROJECT B

REFINED CONCEPT 1 + 2 COMBINED PROJECT B COST: $11.6M Intersection improvements on S. Crater Road north of I-95. Winfield Road corridor improvements, and modifications to the Winfield Road/Route 460 Bus. intersection as well as the I-95 northbound on-ramp and C-D road. GENERAL ELEMENTS Reconstruct the I-95 Northbound on-ramp merge from Winfield Road/Route 460 Bus. to provide adequate merge and decision distance requirements. 2 1 INTERSECTION-SPECIFIC ELEMENTS Intersection #1 (I-95 NB On-Ramp/S. Crater Road) Winfield Rd Close the existing on-ramp to I-95 Northbound from S. Crater Road Intersection #2 (Winfield Road/S. Crater Road) Remove the Off-Ramp from I-95 Northbound to S. Crater Road northbound Realign Winfield Road to S. Crater Road to provide full movements Rosewood Terrace Graham Rd 7 County Dr - Construct a separate southbound leftturn lane on S. Crater Road - Construct a separate northbound right-turn lane on S. Crater Road (beyond the I-95 bridge structure) LEGEND Existing Roadway Continued on Reverse Side X New Roadway Close/Remove NORTH

Construct dual westbound left-turns and a separate right-turn lane on Route 460 Bus. Extension Construct a new traffic signal - Proposed traffic signal operation 100 second cycle Protected/permissive SB left turn Intersection #5 (I-95 Southbound C-D Road/Route 460 Bus. Extension) Construct a separate left-turn, two through, and separate right-turn lane on the I-95 Southbound C-D Road approach Construct a new traffic signal - Proposed traffic signal operation 85 second cycle Permissive SB left turn and NB right turn Intersection #6 (I-95 Northbound Off-Ramp/Route 460 Bus.) Reconstruct off-ramp to intersect Route 460 Bus. at a controlled intersection Construct a new traffic signal - Proposed traffic signal operation 85 second cycle Permissive WB right turn VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 + 2 PROJECT C

REFINED CONCEPT 1 + 2 COMBINED PROJECT C Winfield Rd County Dr COST: $18.5M Includes the elimination of the I-95 southbound off-ramp to Graham Road (similar to Concept #1 Project A), but creates a new intersection with a two-way extension of Route 460 Bus. as opposed to a one-way free-flow off-ramp connection to S. Crater Road. Key considerations of this Concept include the following: The alignment of the two-way extension of Route 460 Bus. to S. Crater Road is designed to avoid the Poor Creek Sanitary Pump Station and sanitary force mains. The design assumes that the existing Route 460 Bus. underpass of I-95 is not modified or widened to accommodate Route 460 Bus. two-way travel (two travel lanes total, one in each direction) underneath the bridge. GENERAL ELEMENTS Close the existing I-95 Southbound C-D road off-ramp to Graham Road. Construct two-way extension of Route 460 Bus. west to S. Crater Road. Re-construct I-95 Southbound C-D road extension to intersection with new Route 460 Bus. extension. Yield condition on I-85 northbound ramp to I-95 southbound C-D road can be removed. Two-lane C-D road can accept both singlelane ramps from I-95 southbound and I-85 northbound in a free-flow condition. INTERSECTION-SPECIFIC ELEMENTS Intersection #4 (Route 460 Bus. Extension/S. Crater Road) Construct a separate southbound left turn lane on S. Crater Road Construct a separate northbound right-turn lane on S. Crater Road Continued on Reverse Side LEGEND Existing Roadway New Roadway X Close/Remove NORTH