IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City

Similar documents
Kilkenny Mobility Management age e Plan The plan sets out a series of mobility management proposals together with an implementation pro

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Major Scheme Business Case Summary Report for Programme Entry

Local Development Scheme

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

LINCOLNSHIRE PARKING POLICY DRAFT

Non-technical summary

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

LINCOLNSHIRE PARKING POLICY DRAFT

Commissioning Director - Environment. Officer Contact Details Jane Shipman;

Glasgow Street Traffic Review

Strategic Transport Forum

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

Next Generation Cycleway Design. Improving connectivity and cycling behaviours through design

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA

Borough High Street Low Emission Neighbourhood

Map showing location of public transport projects in vicinity of railway station

IAT Annual Conference 'Driving Forward

The Point Roundabout Improvement Scheme

Part 005 Implementation Strategy _

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Coca-Cola Zero Belfast Bikes.

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

Review of Highcliffe Shopping Centre

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

Decision Strategic Plan Commission Paper 5/ th May 2017

Miontuairiscí / Meeting Minutes. Trim Municipal District. Ordinary Meeting

Congestion. Addressing urban congestion in SEQ. How do you define congestion? South East Queensland is growing. Sustained growth in motorised travel

Draft Greater Sydney Region Plan

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

LISTED BUILDING AND FIRE STATION CENTRAL SITE WHITGIFT STREET OLD PARADISE GARDENS

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

1. Summary of key points 2

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

Haworth Tr T avel Plan r 10th February 2006

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

Commissioning Director - Environment

Rushmoor Local Plan 6 July 2017 Louise Piper Planning Policy & Conservation Manager Richard Ward Environment & Airport Monitoring Officer

Section A: Scheme Summary

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Congestion Charging The history, planning and implementation

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

South of England north-south connectivity

SALISBURY NHS FOUNDATION TRUST. Transport Strategy & Green Travel Update

SPOTLIGHT ON STUDENT ACCOMMODATION FABBY ERNESTA

Upper Clutha Transport Report

SUSTAINABLE AIR TRANSPORT IN THE FUTURE TEN-T

NSW GOVERNMENT RESPONSE TO THE VISITOR ECONOMY TASKFORCE REPORT

Smarter Travel Sutton

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT.

Reducing traffic: a new plan for public transport

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Chapter 2 Route window W25 Maidenhead station. Transport for London

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

GUNGAHLIN TOWN CENTRE

Council Briefing Minutes

Bus Reliability and Punctuality Performance

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Finchley and Golders Green Area Committee 27 April 2017

FUTURE AIRSPACE CHANGE

City of Hobart Transport Strategy

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

Appendix C Stage 1 Road Safety Audit

ULDA Update Yarrabilba Project The Developers Perspective Tanya Martin Project Planner Communities Lend Lease June 2011

Heathrow Consultation January March 2018

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

Submission to NSW Koala Strategy Consultation Process. March 2017

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

TRUMPINGTON MEADOWS COMMUNITY MEETING (MEETING 1) held at Trumpington Meadows Primary School Meeting Room 2 on 27th November 2017, 19:30 21:00 MINUTES

H1: BIRMINGHAM CURZON STREET STATION

CHELMSFORD CITY LOCAL HIGHWAYS PANEL MINUTES 14 MARCH 2017 at 13:00 at the Civic Centre, Chelmsford

ENVIRONMENT ACTION PLAN

Emmet Square BIRR PUBLIC REALM

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London

Investing in Greater Manchester transport 2017/2018

Pre-application submission for Committee: Phase 4 development at West Hendon

2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002

Response to the London Heathrow Airport Expansion Public Consultation

3. Coach Supporting Statement

YORKSHIRE DALES NATIONAL PARK AUTHORITY ITEM 10 CHARGING FOR THE USE OF AUTHORITY OWNED PUBLIC TOILETS

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

CONSULTATIVE GROUP 11 DECEMBER Lori Keeve Communications Grangegorman Development Agency

PRINCEGATE HOUSE DONCASTER, DN1 3EN. Well Located Strategic Investment/Development Opportunity with Short Term Government Income

Message from the Managing Director... r...

Sky Temporary Car Park Transport Statement

Display of 1 no. internally illuminated advertisement hoarding

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016

Ian Saxon Assistant Executive Director, Environmental Services

Summary of Decisions Taken Under Delegated Powers January 2015

Re: Item 7- PR13.{)35 - Region of York Municipal Parbtership Grant Application and Approval of Two Grade-Separated Underpasses

Transcription:

IRISH PARKING ASSOCIATION The use of Pay and Display in Traffic Management in Kilkenny City

Kilkenny City and Environs Draft Mobility Management Plan 2009-2014 2014

Draft Mobility Management Plan Background and Introduction. In March 2009 Kilkenny Local Authorities published their Draft Mobility Management Plan. The public inspection period expired on April 28 th and the last date for receipt of observations and submissions was Tuesday May 12 th.

Draft Mobility Management Plan The document sets out (a) The purpose, objectives and benefits of the Plan (b) Outlines the Planning and Legislative requirements (c) Examines traffic growth, current traffic conditions and the existing road network (d) Reviews previous traffic studies up to present day (e) Outlines the proposed new traffic management measures (f) Summarises the implementation aspects

Main Objectives Draft Mobility Management Plan to reduce demand for and use of cars by increasing the attractiveness and practicality of other modes of transport to improve facilities for pedestrians and access for people with special mobility needs in line with aims of the European Charter of Pedestrian Rights to promote and improve sustainable active travel modes such as walking cycling and public transport to effectively manage the movement of people and goods within the City Environs

Main Objectives Draft Mobility Management Plan to provide and control the development of parking for both long and short term parking demands to optimise the use of all spaces to investigate the provision of improved bus services within the city to investigate the establishment of a Transport Forum to oversee transport policy for the City and County, in conjunction with the County Development Board to establish guidelines for the preparation of mobility plans for private development where appropriate

Draft Mobility Management Plan JOHN STREET PINCH POINT

HIGH STREET PINCH POINT

The Proposals Draft Mobility Management Plan 1. Widening of footpaths on John Street, Rose Inn Street, High Street and the completion of Kieran Street 2. An option for full pedestrianization of High St from its junction with Friary Street to its junction with James Street. 3. The introduction of a one-way street system encompassing John St, Rose Inn St, High St and Michael Street. A smaller one-way system is also proposed for Upper Patrick St / Jacob Street for implementation in late 2009. 4. The introduction of special speed limits of 30kph on John St,, High Street, The Parade, Patrick St ( part of), Friary St and James St. S

The Proposals Draft Mobility Management Plan 5. The introduction of more than 50km of cycleway lanes through out the city environs street network and on proposed new road developments. This scheme is currently in delivery, with the first phase due for completion by the end of 2009. 6. The consideration of a bus shuttle service for the inner city and two bus routes servicing the city environs on an east-west and north- south alignment. These services would be subject to considerable financial subvention and it is considered that the services could d be introduced within the lifetime of the Mobility Management Plan with w support from central government. 7. Initial findings in relation to the provision of park and ride facilities suggest that the proposal would not be currently viable on financial or practical grounds at the moment.

The Proposals Draft Mobility Management Plan 8. The rollout of parking charges proposals with the provision of the t necessary equipment and resources to implement the introduction of these charges in 2009. 9. The introduction of intelligent signage to provide motorists with h real time information on the availability of city car parking spaces. 10. School safety programme,, personal travel plans, education and awareness.

Draft Mobility Management Plan Some Observations All the proposals accord with the provisions of the Kilkenny City and Environs Development Plan 2008 to 2014. Accords with latest national policy Smarter travel-a A Sustainable Transport Future Full cognizance of Accessibility (Disability Act 2005). Use of UK Manual for Streets in design approach. (Irish manual due shortly)

Existing Section

General Section

Pinch Point Section

THE PARADE

THE PARADE

THE LIBRARY

THE TOWN HALL (BEFORE)

THE TOWN HALL (AFTER)

The Benefits Draft Mobility Management Plan Prioritization of pedestrians over motor cars in core city centre. Improvements to the quality of the urban realm. Meeting environmental targets by reducing air pollution, CO2 emissions, greenhouse gasses and noise emissions Resolution of transport and access problems such as travel delay, access and parking. Encouragement of better health through walking and cycling.

Draft Mobility Management Plan Implementation and Phasing One way systems and alterations to traffic flows to commence in Sept 09 following completion of The Parade Project. This includes works in the Jacob Street/Upper New Sreet and Michael Street areas. Footpath improvement works and undergrounding of overhead cables on John St and other Conservation areas to commence in Oct 09 and continue in 2010. New speed limit signage and City Signage Scheme to commence in Q4 2009. Cycle ways to continue to be implemented in 2009. Application to be made to Dept. of Transport to seek support for Kilkenny city as pilot for green public transport scheme.

Estimate of Cost Draft Mobility Management Plan Pedestrian improvements on John Street, Rose Inn St, High Street estimated at 2.0 million. Patrick Street, Jacob St 0.1m Signage Scheme... 0.35 m City Centre Shuttle bus service..???

Summary Draft Mobility Management Plan Major Investment in City Centre. Kilkenny Goes Pedestrian. A new identity for the Central Business District

Strategic Approach to On-Street Parking in Kilkenny A report was commissioned by Kilkenny Borough Council to assess the feasibility of a paid parking scheme for the City in 2008. The feasibility of the scheme was based on 850 available spaces within the parking zone and assuming 50% occupancy by residents across the day. It was recommended that the on-street parking charges should be collected using machines Pay & Display

Pay & Display scheme The scheme provided for : Short stay spaces in the City Centre Medium stay spaces in close proximity to the City Centre Reduced charges in peripheral car parks Designated residents access only areas Residents parking permits Free parking for disabled use

Pay & Display Kilkenny Borough Council adopted a scheme for on street parking charges in January 2008. The scheme set out to: Reduce City Centre Congestion Assist business by increasing availability of on street parking spaces Allow residents park close to their homes Control commuter parking

Machine selection and location 65 No Solar Powered coin only machines were procured through etender. Full back office software was procured with direct communication to each machine. Two zones were created within the paid parking area, short term stay area and medium term stay with a scale of charges. In house operation for front line maintenance and cash collection of the pay and display machines. Projected 600,000 income in 2010

Scale of Charges o Short Stay (Max 1 Hour) {Inner Zone} 0-15mins 0.50c 15-30mins 1.00 30-60mins 1.50 o Medium Stay {Outer Zone} 0-2hours 1.50 2-4hours 2.50 4-10hours 5.00