SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

Similar documents
SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

MANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING

MANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING

MANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING

SOLUT SPREAD 9 30 TH. Calgary, AB, Canada T2R 0K1

SGS MUSCOWPETUNG ABORIGINAL CONSTRUCTION MONITORING

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

Third Parties/Crossing

What are you getting into?

A Publication of. Ten Creative USes For Wet/Dry Vacs

PART 3. RESPONSE SPILL PREPARATION

DRAFT. Dorabelle Campground Rehabilitation

Aboriginal Traditional Knowledge

KP Lasnaya 1 River

APPENDIX F List of Commitments

MUNICIPAL DISTRICT OF GREENVIEW NO. 16

Advisory Circular CT

14' x 32' x 12' Round Top Round Style Shelter Assembly Instructions

Hi, I m Coral the Cat, and I m here to talk to you about the building of Coral Springs.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

Statement of Work Medicine Bow-Routt National Forests, Hahns Peak/Bears Ears Ranger District Lay-down fence in California Park.

RESPONSIBLE EXPLORATION CHECK LISTS

AGAWAM CONSERVATION COMMISSION April 26, 2018

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

TRAILS WHERE TO FIND TRAILS IN NOVA SCOTIA

SAND HILL RIVER WATERSHED DISTRICT November 1, 2016

Minimum Impact Suppression Tactics Implementation Guidelines

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

Rainfall Simulator Guidebook

BUNKHOUSE ASSESSMENT REPORT

Investigative Report #2 Old Montauk Highway May 18, 1999

Tenders. Manitoba Infrastructure

Peace Project Water Use Plan

Moose River Consolidated (MRC) Project Community Liaison Committee (CLC) Meeting. Meeting Minutes

Section 13. Job Safety Analysis

Water safety box leader s notes page 1

Backpacking and Hiking LEAVE NO TRACE

Code: T-II-16 Progressive Hose Lay and Packing the Modified Gasner Pack

Hydro-Electric Schemes Compliance Report June June 2013

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

Group similar facilities together separate dissimilar facilities.

Mt. Hood National Forest

JOHNSON SELECTBOARD EMERGENCY MEETING MINUTES JOHNSON MUNICIPAL BUILDING SUNDAY, FEBRUARY 18, 2018

Bear Creek Habitat Improvement Project

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

Summer Camp Registration Opens February 12, 2018!! Bubolz Nature Preserve 4815 North Lynndale Dr Appleton, WI (920)

PLANNING COMMISSION MEETING MINUTES October 25, :00 p.m.

BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016

Sasagiu Rapids Provincial Park. Draft Management Plan

Sample Estimate Reports Estimate Reports were created in XL-Pro Software

9/16" deep socket Socket wrench (ratchet) 3/16" drill bit 5/8" spade bit Electric drill or power screwdriver Safety glasses

Tank. Part B, Section 1. This section covers the following unit configurations. Pump Piston Pump (E or G)

HIGH SPEED RAIL CROSSING WITH FLANGE-BEARING CROSS TRAFFIC. UPRR/TPW Crossing in Chenoa, IL

Bloomsbury Children s Books An imprint of Bloomsbury Publishing Plc 50 Bedford Square London WC1B 3DP UK

The Two-Row Cultivator Converted into a Weed Control Machine

Mather Restoration Advisory Board (RAB) Meeting Draft Summary Meeting Minutes. Mather, California. 11 March 2009

CAPITAL ASSET MANAGEMENT PLANNING Updated February 26, Bridges & Large Culverts Storms Sewers Vehicles (Rolling Stock), Machinery & Equipment

Ashford Lake Property Owners Association Annual Meeting October 6, 2018 Ashford Town Hall, Lower Level Meeting Room

WARNING: IMPROPER INSTALLATION WILL RESULT IN LINER FLYING OUT OF THE TRUCK. FOLLOW INSTRUCTIONS EXACTLY

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

Site Coordinator Guide

PLANNING BOARD MINUTES March 13, 2017 CASCO COMMUNITY CENTER 7:00 P.M. MEMBERS PRESENT: Stan Buchanan, Ray Grant & Lynne Potter Bob Barnes, Ted

4-21/4-68 A-CR-CCP-118/PH-001 CHAPTER 4: LESSON SPECIFICATIONS COURSE TITLE: GREEN STAR COURSE CTS NUMBER: A-CR-CCP-116/PC-001

INSTRUCTION MANUAL (0)

Long water shutdown scheduled for Tuesday, September 18

Community Advisory Panel Meeting #

π H-3505 GARAGE CANOPY PARTS SAFETY uline.com TOOLS NEEDED 10' X 20' X 8'

10 X 20 X 8 Dome Canopy

Archaeology Internship in the Great Smoky Mountains National Park Summer 2010, Leila Donn

Finn Creek Park. Management Direction Statement Amendment

DR LEAF & LAWN VACUUM

Glenbow Archives, RCT Turner Valley Oral History Project, Ralph E. Steen, interviewed by David Finch, November 20, 1992

Emergency Preparedness for Farm Animals

Appendix A2 Traffic and Transportation Management Plan

New Jersey Department of Transportation

Ditch flows slowly to the north

September 5, 2013 Volume 3, Issue 9

TRAIL MAINTENANCE AND CONSTRUCTION MANUAL

Uganda operational logistics INTERIM RESULTS Tullow Oil plc Uganda Analyst Visit October 2007 Slide 1

Hospital Link Project Project Update Winter 2018

SDTrucksprings. Arkansas Off-roading/4x4 Guide Copyright 2015 We Specialize In:

Mason Street Bike/Pedestrian Trail Project

Margaret N. Rees University of Nevada, Las Vegas,

Board of Supervisors Meeting July 12, :30pm MEETING MINUTES

Chapter 51 DIGGING TOOLS

Maggie s Activity Pack

KENNESAW MOUNTAIN TRAIL CLUB WORKDAY

Evaluation Report 569

2018 SPRING MELT: FLOOD PREPAREDNESS

This environmental science unit will teach students how trash and litter travel through urban watersheds and impact coastal environments.

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS

Whakapirau and Kaipara District Council Working in Partnership

Capital Planning City of Ocean City 1

Transcription:

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 AUGUST 13 TH - AUGUST 18 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606 F 403.263.2493 www.matrix-solutions.com

1. PURPOSE OF THIS REPORT The report is a weekly summary of the daily reports submitted by the Aboriginal Monitors that are working on spread two. The social and cultural findings have been tabulated with locations and mitigation measures below. A summary of the construction activities has been summarized for August 13 th August 18 th 2018. 2 Matrix Solutions Inc.

Field Observation Social and Cultural Features # of occurrences Description and Mitigation Measures Mitigation Status Further Action Required (Yes/No) Traditional Use Area (hunting, fishing, gathering, trapping) Rock Formations (rocks of significance, tipi rings, etc.) Artifacts Bones Potential Gravesites. Field Observation Medicinal or Cultural Plants Environmental Features # of occurrences Description and Mitigation Measures Mitigation Status Further Action Required (Yes/No) Aquatic Life Animal Observations or Burrows Bird Nests Trees (Red Willow) 3 Matrix Solutions Inc.

Wetlands Watercourse Crossing Yes 4 Matrix Solutions Inc.

Additional Observations and Summary of Activities or Concerns Attended daily safety meetings and discussed daily scopes each morning with the Contractor Liaison Dean Pooyak, and/or the Senior Construction monitor Drayton Kasokeo. Weekly activities included spot-checking km 144,146,149,150,158,159,161,165, 166,172,178,181,187,188, 189,193,196,197, 200-206,216-221,223, and shoofly 90-94, 97,102,107,114,115,118,119, 121-124,126-130,136,137,138,139,142. On August 13, the daily safety theme was to be aware of traffic when crossing the highway. Weather forecast was cloudy. AT SF 142 and km 223+600, not mobbed in for the heritage sensitive area. Access crew were building ramp and moving topsoil at km 218+400. At SF 136, grading and stripping was being done. At SF 123, hydro vac and crews were setting up ramp. At SF 122, hydro vac was day lighting the existing Enbridge pipeline (km 196+346). The access crew laid swamp mats on Sasktel lines at km 196+407. After day lighting is complete, access crew will build ramp over Sasktel lines. At SF 126, access approach is completed and crews were blowing off dirt from excavator at the wash station. Tractor was mowing canola. Track bore was at km 161+000, the excavators started to dig bore pit on the south side of Enbridge lines. Track bore pit will be set up in track bore machine once completed. At km 165+100 aqua dam is being installed. At SF 118, bridge construction and welding was taking place. At SF 102, two dozers and excavators were working. Two dozers and track hoe were working at km 172+100. Bore crew were setting up, mechanic was servicing side boom, picker with mats on site and track hoe was digging out bore pit at SF 94 and km 161+100. On August 14, the safety theme was wildlife awareness. Weather forecast was sunny. At SF 102, two excavators and dozers were working at km 172+000. Meridian survey was at km 171+000. At SF 118 the crew was working east of the wetland, they were welding an extension pipe to the screw piles and sinking them in deeper; and bridge construction was still underway. Goal posts for high voltage area were set up between SF 118 and 119. Medcor services were located at SF 121. Welding and construction was of bridge at km 193+100. At SF 122, a D6T cat dozer was levelling the ramp that was built over the Sasktel lines at km 196+407. Excavator was stripping topsoil on the south side of Sasktel lines. The excavator and dozer continued to strip the east side of ROW. AT SF 124, topsoil stripping on the east side of the road to the power line buffer. At km 197+427, top soil stripping at the access approach. The crew needed to place swamp mats over the Sasktel lines to finish the access ramp. At Larry Hills (SF 126) crews were stripping topsoil, so that the crews could use seconds to build access approach. After ramp completion the D6T kept stripping. Meridian survey and mechanic were onsite. Hydro vac was day lighting exposed hotlines. Wash station was built at km 200+900. At km 201+452, stripping took place at the TENINE Energy crossing. Swamp mats were places over hot line crossing, and then the ramp was built over the mats. At SF 136, grading and stripping were taking place. At SF 201, no swathing or stripping has taken place. At SF 142 and km 223+600, the heritage site, equipment hasn t been mobbed in. Access crew was building ramp and moving topsoil at km 218+400. 5 Matrix Solutions Inc.

August 15, the safety theme was making sure that all member of tailgate meeting have a proper understanding of what is being discussed. Weather forecast was sunny with a special air quality warning for this area. The monitors had a discussion with the NEB, they talked about how they determine what areas they visit daily and the reporting process. Four hoes and two dozers were stripping at SF 91. The heritage site at SF 92 was swept. Canadian North and Meridian survey were doing some work on the Native Prairie at km 150+900 to 158+500. At SF 94, bore crew was setting up; proper procedures for pumping water and PPE were noted. Crews were pumping water at km 161+100. At SF 97, monitored the aqua dam crew. AT SF 107, crews were wacking weeds. At SF 110, the access crew were moving rig mats around and building a ramp for hotline crossing. At SF 112, dozer and backhoe were pushing dirt. At SF 118, extended screw piles were on the east end, and on the west end screw pies were completed. At SF 137, stripping and pipe being set up on the ground to the culvert for drainage; and geotec was laid over pipe. AT SF 107, crews were sweeping and cutting weeds at wetlands. Flags were used by the access crew as the dozer was crossing the municipal road at km 182+000. At SF 142, the Heritage Site (Poundmaker FN), equipment has not been mobbed in. August 16, the daily safety theme was keeping an eye out for new hires, help to teach them about safety culture and be your brother s keeper. Also be aware of air quality due to wildfires. The weather forecast was sunny, with poor air quality warning. At SF 137, the Native prairie (sensitive area), two dozers and one excavator was stripping grass, the monitors walked the area to check spill piles. The crew was stock piling the topsoil of the Native prairie on the bottom of the hill along the buffer for drainage. Crews started to strip transition soils. At SF 136, success crew was finished stripping soil and completed the ramp over the hotlines at km 216+300. A silk fence was built through the wetland with culvert for drainage (km 219+400). Swathing of fields at SF 129 and 128. At SF 127 and km 202+600, dozer and backhoe were stripping on ROW. Work was still being done on the dam at SF 97. Track bore crew was working at km 161+000. Bore pit had been dug and the track bore machine was placed inside. Rig mats were and clear stones were placed at the bottom of the ditch due to water seepage at the bottom of the pit. The crew had the bore machine set up and ready to bore by the end of the day. August 17, the safety theme was congestion on the ROW, and to be aware of surroundings during this time. Use a spotter if possible. The weather forecast was hazy with poor air quality. At SF 89, welding bore section crew picked up all the welding rods as well as garbage. At SF 90, bell hole was being dug for bore. At km 165+100, aqua dam is still being completed. At SF 93, excavators and dozers were stripping the ROW and grading, cleaning station needs to be set up at this location. At SF 110, excavator was stripping the ROW. At SF 92, stringing heavy wall for bore at km 150+000. At SF 114, topsoil and transition spill piles were scanned in the Native Prairie. They were stripped from a heritage sensitive area. Two ramps were built, one at Sasktel line (km187+475), and the second was over the natural drainage at km 187+604. Nothing of cultural significance was found in the area. The access crew built a ramp over the 6 Matrix Solutions Inc.

TENINE Energy line at km 188+637. Another access ramp was built at SF 115, the Sasktel line crossing. Excavator and dozer continued to topsoil to the next line crossing at km 189+552. Hydrovac daylighting on the two line was getting prepared to lay down geotec and swamp mats, to build the last access ramp in the organic area. At SF 127, working and stripping and access crew working east. At 128, crews were stripping topsoil and crews were laying geotec on the west side of the road to build access approach. At SF 137, D8T and D6T were finishing access road on the east side of the drainage. A grader was stripping a path on the topsoil from km 219+600 to the end of the cultivated land at km 220+634. Crews were hydro vac daylighting the Sasktel line on the west side of SF 139 (km221+187) and lighted a Sask power cable at km 221+172. When hydro vac moved out of the area, excavators and dozers started to strip topsoil from the buffer west. On August 18, the safety theme was driving conditions and air quality. The weather forecast was cloudy and smoky. Bell hole digging was taking place at SF 90. At SF 92, four dozers were being washed at washing station, before entering sensitive area. At 93, grading was being done, and monitored east side of native Prairie at km 157+700. At SF 94, boring resumed and the excavator was digging the catch pit. At SF 137, access continued and was working east. At SF 139, stripping and grader were starting and working west up the hill. Also, one excavator dug up a telephone cable and a piece of flagging tape was on the topsoil. Line locators came onsite to sweep the area to determine if the items were garbage. The line locator detected another signal at km 221+143 and the crew dug it up with a shovel and excavator. The locators onsite hooked up the line locating machine to send signals to find other lines, it was determined that the second line was abandoned. At SF 129, monitored the construction of access approach being built on the north side. Crews were stripping topsoil from SF 128 access approach from km 204+500 to km 204+786; the labourers were laying geotec on the shoulder of the ditch, and started to build the access approach. At km 204+815, excavator was stripping topsoil away from existing Enbridge buffer. At SF 124, access ramp was being built; and topsoil was stripped from the Sasktel buffer line. The crew laid geotec on the ground and then rig mats across the line. The excavator proceeded to build the ramp. AT SF 114, grader was stripping topsoil away from existing Enbridge buffer. The location of these features was documented and photos were collected (see below). No additional cultural or environmental features were observed within the scanned areas. 7 Matrix Solutions Inc.

Photos of Sites Visited & Topics Discussed This Week Bore pit and track bore machine km 161+000 Aug 13, 2018 Aqua dam bags km 165+100 -Aug 13, 2018 Spotter assisting track hoe - Km 218+ 400 Aug 13, 2018 Digging bore pit km 161+090 Aug 13, 2018 Excavators stripping top soil on ROW - Km 218+ 988 Aug 13, 2018 Digging slip bore pit km 161+000 Aug 13, 2018 8 Matrix Solutions Inc.

Wetland - Km 206+300 Aug 14, 2018 Biosecurity km 171+300, Aug 14, 2018 Wash station km 200+900 - Aug 14, 2018 Building ramp and soil removal Km 201+350 Aug 14, 2018 Stripping topsoil SF 124 Aug 14, 2018 Men at work km 195+620 Aug 14, 2018 9 Matrix Solutions Inc.

Bore hole pumping water km 184+005 Aug 15, 2018 Native prairie sensitive area km 150+900 Aug 15, 2018 Pumping water - km 161+100 Aug 15, 2018 Weed wacking - km 178+200 Aug 15, 2018 Access ramp before dirt put - Km 219+500 Aug 15, 2018 Ramp built over Sasktel lines SF 124 Aug 15, 2018 10 Matrix Solutions Inc.

Native prairie being stripped km 259+500 Aug 16, 2018 Track bore set up km 161 + 000 Aug 16, 2018 Dozer and excavator stripping km 202+600 Aug 16,2018 Silk fence km 187+600- Aug 16, 2018 Side boom unloading wall km 150+000 Aug 17, 2018 Dozer cleaning at wash station - 150+850 - Aug 17, 2018 11 Matrix Solutions Inc.

Installing access ramp over Sask Power line km 187+600 Aug 17, 2018 Access crew stripping topsoil SF 139- Aug 17, 2018 Enbridge and OJ crew doing sweep on abandoned line - Aug 18,2018 Access approach being built SF 129 Aug 18, 2018 Stripping on Native Prairie - km 151+900 - Aug 18, 2018 Mechanic working on hydraulic hose km 158+300 - Aug 18, 2018 12 Matrix Solutions Inc.

APPROVALS Drayton Kasokeo Senior Construction Monitor August 23, 2018 Date Daniel Tober Senior Environmental Scientist August 23, 2018 Date 13 Matrix Solutions Inc.