Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Similar documents
ACTION TRANSMITTAL

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

TRANSPORTATION ADVISORY BOARD. Metropolitan Council, 390 Robert Street North, Saint Paul, Minnesota 55101

General Aviation Master Plan Update

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

Chapter 1 Introduction and Project Overview

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Addendum - Airport Development Alternatives (Chapter 6)

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Dallas Executive Airport Town Hall Meeting April 3, 2014

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Westover Metropolitan Airport Master Plan Update

FINAL DRAFT Lake Elmo Airport 2035 Long-Term Comprehensive Plan (LTCP) Released for Metropolitan Council Review May 06, 2016

CHAPTER FOUR AIRPORT ALTERNATIVES

Preliminary Findings of Proposed Alternative

Agenda: SASP SAC Meeting 3

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Chapter 1 Introduction and Project Overview

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

CHAPTER 1 EXECUTIVE SUMMARY

Lake Tahoe Airport Master Plan

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

MASTER PLAN CONCEPT 1 DRAFT

CHAPTER 1: INTRODUCTION

Norfolk International Airport

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS

Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Study Committee Meeting. September 2015

BNA Master Plan Update Community Advisory Committee Meeting No. 5

Flying Cloud Airport Joint Airport Zoning Board. 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Appendix M: 2007 Preliminary System Airport Assessments

Public Information Meeting. September 2015

Appendix C AIRPORT LAYOUT PLANS

Planning Advisory Committee Meeting #4 September 12, 2017

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

Chapter 4 Airport Facility Requirements

Master Planning AirTAP Fall Forum. Mike Louis, Dan Millenacker

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

INDEPENDENCE STATE AIRPORT (7S5)

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Grants Pass Airport Master Plan & Airport Layout Plan Update

Table of Contents. Overview Objectives Key Issues Process...1-3

Aviation, Rail, & Trucking 6-1

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Metropolitan Parks and Open Space Commission Subject District(s), Member(s): Policy/Legal Reference: Staff Prepared/Presented: Division/Department:

Airport Master Plan Open House Front Range Airport February 23, 2017

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Metropolitan Airports Commission. Flying Cloud Airport (FCM)

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Preferred Alternative Summary

CHAPTER 3 ALTERNATIVES CONSIDERED

26 October 2017 JAZB Meeting #2. Flying Cloud Airport Joint Airport Zoning Board

Planning, Development and Environment Committee

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

BNA Master Plan Update Public Meeting No. 2

Technical Advisory Committee Meeting February 29, 2016

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan

CHAPTER 4: ALTERNATIVES

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

3.9 AIRPORT SUPPORT FACILITIES

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

ECONOMIC IMPACT OF THE RELIEVER AIRPORTS

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

Chapter Four ALTERNATIVES

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

BELFAST MUNICIPAL AIRPORT OVERVIEW

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport


JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

Nantucket Memorial Airport Master Plan Update

Chapter 4.0 Alternatives Analysis

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

CHAPTER 2 ALTERNATIVES

2015 PURDUE ROAD SCHOOL March 11, 2015

Chapter 1: Introduction Draft

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

Chapter 9: Aviation Investment Direction and Plan

Noise Oversight Committee

Chapter 2 FINDINGS & CONCLUSIONS

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

Chapter 1: Introduction

Merritt Island Airport

Transcription:

Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed Action That the Metropolitan Council determine that the Crystal Airport Long Term Comprehensive Plan (LTCP) conforms to the metropolitan Aviation system plan and is consistent with Council policy. Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item. Owen answered questions from Council members: This should not increase capacity for takeoffs/landings - demand levels are expected to remain steady, which can be handled by the proposed runway system; the City of Crystal has provided letters of support for the proposed plans; Whether there will be increased noise for neighbors will become more clear during the Environmental assessment but haven t had any complaints from public regarding noise - noise will essentially shift not necessarily increase; the forecaset suggests a couple small jets but the runway length won t attract bigger jets. Regarding whether this will affect the planned Blue Line extension project, Schrieber provided comment that in the last two years of public hearings, she hasn t heard many issues/concerns and she was impressed with public engagement process. Motion by Schreiber, seconded by Reynoso and passed. Page - 1

Business Item No. 2017-191 Transportation Committee Meeting Date: August 28, 2017 For the Metropolitan Council meeting of September 13, 2017 Subject: District(s), Member(s): Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) District 2, Lona Schreiber District 6, Gail Dorfman Policy/Legal Reference: MS 473.165, 473.611 Staff Prepared/Presented: Russ Owen, 651-602-17248 Division/Department: Mark Filipi, Manager Technical Planning Support, 651-602-1725 Amy Vennewitz, 651-602-1058 Metropolitan Transportation Services Proposed Action That the Metropolitan Council determine that the Crystal Airport Long Term Comprehensive Plan (LTCP) conforms to the metropolitan aviation system plan and is consistent with Council policy. Background Under MS 473.165 and MS 473.611 the Council reviews the individual LTCP s for each airport owned and operated by the Metropolitan Airports Commission (MAC) and airports in the region. The Council reviews and comments on all plans for consistency with the metropolitan development guide including Thrive MSP 2040 and the Transportation Policy Plan. There are currently four runways at Crystal Airport, three paved runways, and one turf runway. The previous plans recommended that MAC right size the airport, which included decommissioning two of the four runways. This LTCP focuses on refining the preferred alternative from the previous plans. The primary runway (14L/32R) is 3,267 feet long. Based on FAA guidance, along with airplane operational manuals, the recommend primary runway length should be 3,300-3,900 feet. The crosswind runway is 2,499 feet, and can accommodate the lower crosswind capable light single-engine aircraft used for personal, recreational and flight training activities. In developing the alternatives for the 2035 LTCP, MAC carried over some of the improvements recommended in the 2025 LTCP which have yet to be completed. The MAC approved the Final Crystal Airport LTCP at its May 15, 2017 Commission meeting and authorized its submittal for Council review. The 2017 Update of the LTCP replaces the 2008 Plan and moves the planning horizon to 2035. Rationale Under the aviation planning process and TPP policy all airport LTCP s are to be periodically updated. The LTCP serves as the basis for identifying needed projects, maintaining funding eligibility to meet state and federal financial and plan consistency requirements, and to ensure that projects are responsive to system needs and conditions. LTCP s are used as input to the Council s update of the regional aviation system plan and community comprehensive plans. Page - 1

Thrive Lens Analysis This LTCP will continue to provide the citizens in the NW area of the region an outstanding minor airport to use for business and private flying activities (prosperity). Funding This action has no funding implications for the Council. Future facility development costs estimated in the LTCP will be used by MAC in preparing future annual capital improvement programs to match revenue with annual development costs. Copy Known Support / Opposition Supported by MAC and airport users. After many discussions with the airport users, the MAC refined the preferred alternative, in order to preserve the turf runway. TAB has reviewed and supports the findings and the recommended motion. Councilmembers from the city of Crystal support the plan as well. Page - 2 METROPOLITAN COUNCIL

ATTACHMENT 1 Crystal Airport 2035 LTCP Proposal The Crystal Airport is located in Hennepin County, approximately seven miles northwest of downtown Minneapolis. The Crystal Airport is located primarily in the city of Crystal, with small portions of airport property overlapping into the City of Brooklyn Park and the city of Brooklyn Center (Attachment 1). Crystal Airport is the closest MAC airport to downtown Minneapolis. The Crystal Airport is classified as a Minor Airport in the regional aviation system. The airport s primary role in the airport system is to attract general aviation traffic away from Minneapolis-St. Paul International Airport (MSP) to relieve congestion, which helps reduce operating costs and promotes sustainability. Crystal airport accommodates personal, recreational and some business aviation users within Hennepin County and the northwestern portion of the metropolitan area. The plan states that the airport will continue its current role in the system, and the aircraft type that the plan is designed for is not changing. There are currently four runways at Crystal Airport, three paved runways, and one turf runway. This LTCP focuses on refining the preferred alternative from the previous plans. The primary runway (14L/32R) is 3,267 feet long. Based on FAA guidance, along with airplane operational manuals, the recommend primary runway length should be 3,300-3,900 feet. The crosswind runway is 2,499 feet, and can accommodate the lower crosswind capable light single-engine aircraft used for personal, recreational and flight training activities. In developing the alternatives for the 2035 LTCP, MAC carried over some of the improvements recommended in previous plans, which have yet to be completed. The Original Preferred Alternative (Attachment 2) Carry-over items from previous plans o Decommission existing Runways 14R/32L and 06R/24L (Turf) to reduce airfield complexity and increase safety. o Convert existing Runway 14R/32L into a full length parallel taxiway and add taxiway lights o Preserve areas for future hangar development Refinements included in the final draft 2035 LTCP Preferred Alternative o Convert existing paved blast pads on Runway 14L/32R to stopways, including edge lighting and additional runway safety area. o Expand fixed base operator (FBO) apron o Reconfigure the taxiways o Pursue the establishment of a new non-precision instrument approach to the Runway 32 end. After multiple community meetings and comments from stakeholders, MAC evaluated adjustments to the original preferred alternative and developed a refined concept as follows: Primary Runway length: Convert portions of the paved blast pads on primary Runway 14L/32R to useable runway for a published length of 3,750 feet, with declared distances in effect. o Move the end of the primary runway approximately 115 feet to the northwest along its centerline to locate all of the Runway Protection Zone (RPZ) at the southeast end of Runway 32R on the MAC property. Page - 3 METROPOLITAN COUNCIL

Turf Runway: Retain a portion of the existing turf runway and operate it in a manner that will reduce runway crossing points, and airfield complexity. Taxiway configuration changes: The Air Traffic Control Tower and operations staff made recommendations to make the airfield more efficient and to further simplify geometry. 2035 LTCP Final Preferred Alternative Summary (Attachment 2): The 2035 LTCP Final Preferred Alternative for improvements at Crystal Airport includes the following items: Items from previous plans o Decommission existing Runway 14R-32L to reduce airfield complexity and increase safety; o Convert existing Runway 14R-32L into a full-length parallel taxiway and add taxiway lights; o Preserve areas for future hangar development should demand arise; o Identify parcels for possible conversion to non-aeronautical revenue generating land uses. Refinements included in the 2035 LTCP Preferred Alternative o Update the runway designation to Utility and use small aircraft design standards to reduce RPZ dimensions; o Convert portions of the paved blast pads on primary Runway 14L-32R to extend useable runway for a published length of 3,750 feet with declared distances in effect, and extend taxiways to new runway ends; o Shift the primary runway approximately 115 feet to the northwest along its centerline to locate all of the RPZ for Runway 32R on MAC property, improving land use compatibility over the existing condition; o Retain a portion of the existing turf runway and operate it in a manner that will reduce runway crossing points, airfield complexity, and incursion potential while preserving turf operational capabilities at a metropolitan area airport; o Taxiway configuration changes; o Expand the FBO apron; o Pursue the establishment of a new non-precision instrument approach to the Runway 32 end, if feasible. Advantages of this preferred alternative include: Primary Runway 14L/32R is extended to 3,750 consistent with FAA runway length guidelines All Runway RPZ s will be on airport property and comply with FAA compatibility criteria Runway 6/24 alignment retains optimal wind coverage Turf Runway will still be usable, Taxiway and runway incursion spots are all but eliminated. Existing airport operational footprint is maintained with no additional property acquisition Current Minor Airport classification does not change Page - 4 METROPOLITAN COUNCIL

Disadvantages of this preferred alternative include: Taxiway extension add pavement to maintain Operational impacts during construction May require obstacle (tree) removals Runway extensions move departing aircraft closer to the airport boundary, possibly increasing ground noise for neighborhoods closest to the airport boundary The refined preferred alternative is responsive to the most prominent stakeholder concerns while still meeting the stated planning goals to: 1) better align airfield infrastructure to match existing and forecasted activity levels; 2) preserve and, if possible, improve operational capabilities for the current family of aircraft using the facility; and 3) enhance safety by simplifying the airfield movement area configuration. This plan will also give the surrounding communities assurance of the airport s future footprint for comprehensive community planning. MAC staff will continue discussions with the city of Crystal about non-aeronautical revenue-generating opportunities on airport property, and will work with the surrounding communities to ensure proper zoning exists. Page - 5 METROPOLITAN COUNCIL