An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

Similar documents
Press Release March 1, Refer to: Anna Salgado

CASE STUDY The New Guayaquil International Airport

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

ANALYST BRIEFING Financial Highlights As of 1H 2018

TAPP II: Infrastructure Tracker (projects and policy reforms) As of April 3, 2018

TERMINAL DEVELOPMENT PLAN

Aviation and Airports

Birmingham Airport 2033

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

TAPP II: Infrastructure Tracker (hard and soft) As of February 25, 2018 Funding Type

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Public Meeting No. 2

Airport Planning and Terminal Design

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

6.0 AIRFIELD DEVELOPMENT PLAN

CHAPTER 1 EXECUTIVE SUMMARY

Megawide Construction Corporation FY 2017 Analysts Briefing 12 April 2018

STUDY WORK GROUP MEETING No. 4. July 12, 2017

Lake Tahoe Airport Master Plan

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013

HIGH PERFORMING AIRPORTS CASE ZURICH AIRPORT. Geert Boosten ASDA CATO Delft 21 July 2015

The CLE Master Plan Includes:

FORECASTING FUTURE ACTIVITY

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Kansas City Aviation Department. August 25, 2015

Ronan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX

Destination Lindbergh

IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT


Fort Lauderdale Hollywood International Airport

CHAPTER 4: ALTERNATIVES

Bremerton National Airport Airport Master Plan Project Update February 12, 2013

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Master Plan Update Technical Advisory Committee Meeting

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS

5 th MEXICO CITY Airport Consultative Committee (ACC) Consolidated Meeting Notes (Meeting date: June 15, 2017)

Airport Master Planning Process & Update

Appendix 6.1: Hazard Worksheet

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Supplementary airfield projects assessment

Update of the Airport Master Plan. Initial Runway & Land Use Alternatives

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Chapter 8.0 Implementation Plan

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

Westover Metropolitan Airport Master Plan Update

Chapter 2 FINDINGS & CONCLUSIONS

ACTION TRANSMITTAL

Sunshine Coast Airport Master Plan September 2007

SAN JOSÉ INTERNATIONAL AIRPORT

Grants Pass Airport Master Plan & Airport Layout Plan Update

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

CHAPTER 1: INTRODUCTION

IGI Airport : The Journey so far and the future.

Manchester Airports Group

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

Taoyuan International Airport Terminal 3 RFI presentation

Aviation Sector Services. Transportation / Aviation

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Addendum - Airport Development Alternatives (Chapter 6)

CHAPTER 5: Landside Facility Requirements and Development Concepts

EXECUTIVE SUMMARY. Master Plan Update Phase 2/3 FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 1. INTRODUCTION 2.

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

Las Vegas McCarran International Airport. Capacity Enhancement Plan

Airport Systems: Planning, Design, and Management

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

Pre-Feasibility Report (As Per The Provision Of EIA Notification 2006)

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

3.9 AIRPORT SUPPORT FACILITIES

Brief Recap of Project to Date

Punta Gorda Airport Master Plan Update

Fort Wayne International Airport Master Plan Study. Executive Summary

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

Merritt Island Airport

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

Aviation Development

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities

Chapter 1 Introduction

HKIA : OPERATIONS AND CAPACITY

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport

Chapter 4.0 Alternatives Analysis

Land Use Policy Considerations

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Transcription:

s An Overview of GMR Megawide Consortium s Unsolicited Proposal March 2018 1

Metro Manila requires a multi-airport system and NAIA shall continue to play an anchor role in this system. Multi-Airport system is a successful concept across major cities of the world. To meet the growing air-traffic demand, Manila would require a similar multi-airport system. New York London Clark Airport, being expanded to take up major part of the growth in the GCR Indicative site (Bulacan) for new airport Moscow Tokyo NAIA, the main gateway to the Philippines While Clark & a new airport (or more) can add large capacity for Manila, NAIA needs to be upgraded and maintained at least till alternatives become available. 2

Our proposal is fully aligned with the DOTr s view regarding the infeasibility of the third runway at NAIA. The third runway is not viable because of the following reasons: Land Constraints Around NAIA There is shortage of land around NAIA to make way for an independent additional runway Only an independent runway can deliver a significant capacity increase, while a dependent runway shall only result in a marginal increase Complications with Manila Bay Option With land constraints, we explored the option of building the third runway on the reclaimed land in Manila Bay Such runway would raise new challenges for passenger and aircraft flow management ultimately affecting passenger convenience and capacity Investment cost and environmental impacts associated with building the runway on reclaimed land would far outweigh any addition to the capacity Potential Conflicts with Exiting Runway system NAIA currently has a cross-runway configuration & consequently any new runway would have to be parallel to one of the existing two runways Approach, Departure and Missed Approach procedures for new runway in any orientation would conflict with these procedures on the existing system Hence, the new benefit of the new runway would be marginal at best, coupled with significant security risks Having concluded that 3 rd runway for NAIA is infeasible, we have focused on maximizing air traffic handling capabilities through the existing assets. 3

We believe with improvements to existing airside, aircrafts handling capacity of NAIA can be significantly improved. Our proposal is backed by a simulation study by MITRE, world s foremost expert in studying cross-runway capacity maximization. Firstly, we developed a masterplan for infrastructural improvements on the current airfield system We provided MITRE with our masterplan to assess the proposed airfield infrastructural improvements and conduct a simulation study to estimate runway capacity The simulation was robust with considerations for aircraft fleet mix based, distribution of arrivals/departures as well as ATC rules & procedures based on up to date data The runway capacity analysis was conducted for various scenarios/operating configurations for existing runway system MITRE recommended the best scenario for operation to maximize capacity as well as improvements to the ATC procedures Based on MITRE s detailed analysis, peak hour capacity of ~60 ATMs and daily ATMs of ~1000 is achievable on a sustainable basis MITRE has confirmed that our proposed infrastructure, combined with the improved ATC infrastructure and procedures would allow NAIA to have upto 1000 ATMs/day 4

Our proposal involves comprehensive capacity enhancement within first 6 years to position NAIA for future growth. Years 0-2 Years 2-4 Years 5-6 Phase 1A (~52 Bn Php) Phase 1B (~55 Bn Php) Phase 1C (~38 bn Php) Three Additional Rapid Exit Taxiways (RETs) on Runway 06 Additional full length parallel taxiway for Runway 06 Additional entry/exit taxiways and holding end connecting taxiways Terminal improvements T-3 expansion (Annex A) New Cargo Terminal infrastructure Multi-Level Car Park and extension of Surface level car parks Full length parallel taxiway for Runway 31 Extension of existing parallel taxiway for Runway 31 Expansion of Terminal-1 T-1 satellite pier and connectivity with T-2 Additional aprons and aircraft parking stands for T-1 and T-2 Underground tunnel (North of Runway 31) New ATC Tower T-3 expansion (Annex B) Expansion of Terminal-2 with a satellite pier Additional apron and parking stands at T-2 and T-3 Additional remote aircraft parking stands Additional improvements on landside Proposed masterplan involves simultaneous improvements on both airside as well as terminals with a total investment of ~146 Bn Php. 5

Phase 1A, immediately upon takeover, would focus on measures to increase the airfield capacity to 60 ATM/hr. Phase 1A of the Masterplan Cargo Terminal (Relocated) Expansion of T- 3 and Apron (Annex A) Additional parallel taxiway Additional Multiple aircraft holding parallel Positions taxiway 3 Additional RETs Phase-1 entails simultaneous capacity augmentation of both airside and terminals. 6

Phase 1B continues simultaneous airside & terminal capacity enhancement along with improved connectivity b/w terminals. Phase 1B of the Masterplan Underpass/Tunnel Extension of Parallel Taxiway for Runway 13/31 Expansion of T-3 and Apron Expansion of T-1 through linear piers to increase the number of aircraft stands T-1 and T-2 Connectivity Masterplan layout has been designed such that additional land requirement is minimum. 7

Phase 1C would add significant terminal capacity to meet the demand of a passenger flow of ~72 MPPA. Phase 1C of the Masterplan Isolated Parking Stands Expansion of T-2 and Satellite Pier Expansion of T-3 and Apron Terminal area of ~700,000 Sqm & ~171 aircraft stands will be achieved at the end of Phase 1C. 8

We have also developed architectural concepts for the 3 terminals. (1/2) 9

We have also developed architectural concepts for the 3 terminals. (2/2) 10

With a short concession of 18 years, our proposal aims to maximize the value for the government. Flexibility to Govt With shorter Concession (18 Years) Proposal accrues multiple benefits to the Government. The proposed Concession Duration of 18 years offers the required flexibility to the Govt. to finalize the multi-airport strategy for GCR The proposal does not tie the hands of the Govt. for long while simultaneously resolving the problems at NAIA for the immediate to medium term Full Scale Turnaround within short span The Development plan addresses the immediate congestion issues at NAIA and proposes a large scale turnaround within a short span With >75% of the investment in the first four years, the masterplan promises to improve passenger convenience to world class levels within 4 years Preservation of Assets & Enhancement of Value Proposal offers a technically proficient solution to maximize the capacity at NAIA, revamp the existing infrastructure and enhances value at NAIA The proposal offers revenue share coupled with guaranteed payments for Govt, thereby creating value for the Govt Free Asset Transfer to Govt All assets will be handed over to Govt free of cost at the end of the Concession period Additionally, the proposal does not entail any equity, guarantee or subsidy from the Govt 11

Our proposal is comprehensive and complete; in line with the requirements of the BOT Law IRR Our proposal is comprehensive with all required deliverables as per the BOT Law IRR. Submission Requirement Compliance Cover Letter: ( With basic information about the project, implementation period and general description of the new concept or technology) Feasibility Study (Comprehensive with all requirements including detailed study on traffic projections, financial assessments & socio-economic impact analysis) Detailed description of proposed masterplan (Part of feasibility study) Technical Drawings & Renderings of Proposed Masterplan (Part of feasibility study) Proposed architectural concept for NAIA Draft Contract (Concession Agreement and Annexes) Profile of Proponents Our proposal does not envisage subsidy, equity, guarantee or other prohibited items under the BOT Law. 12

In summary, not only is our proposal tailored to NAIA s needs but also would suit long-term multi-airport plans for Manila. High Level Comparison of our proposal with that of NAIA Consortium. Particulars Manila Airport Consortium NAIA Consortium Planned Terminal Capacity Planned Airside Capacity 72 Million 65 Million 60 Movements (Peak Hour) 52 Movements (Peak Hour) Broad Infrastructure Improvements Immediate operational improvements to terminal Terminal expansion to cater to 72 Mn Significant Airside improvements to increase peak hour capacity to 60 movements Additional support with ATC/ANS equipment and procedures Improvement of facilities in the terminal Terminal expansion to cater to 65 Mn Airside improvements minimal improvements Third Runway Not applicable as the option is infeasible Proposed Concession Length 18 Years 35 years Overall, our proposal provides a technically robust solution for NAIA and attempts to maximize value for the Government in minimum time. 13

Thank You. 14