Project Scope: New City Hall New Police Department New Mixed-Use Parking Structure Community Improvements

Similar documents
San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee

IAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines

Calgary River Access Strategy Priority Sites and Proposed Funding

Madison Metro Transit System

RIVER ACCESS STRATEGY

Fort Lauderdale City Commission Transit Presentation. July 21, 2009 CAR

Sevierville, TN. Technical Appendices

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

4countries. We understand the fundamentals. A trusted partner. We have delivered million sqm. 1.8 million car spaces.

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

Westover Metropolitan Airport Master Plan Update

TRACK: B TERMINAL/LANDSIDE

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

TERMINAL DEVELOPMENT PLAN

Treasure Island Supplemental Information Report Addendum

Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan

Chairman and Trustees of the Oklahoma City Economic Development Trust

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

NOW, THEREFORE, BE IT ORDAINED BY THE COUNTY COUNCIL OF VOLUSIA COUNTY, FLORIDA, AS FOLLOWS:

COMMENT PERIOD. August 2, 2017 to September 1, 2017 INTRODUCTION

Funding Package TOTAL $15,172,000

Restoration of Historic Streetcar Services in Downtown Los Angeles

CVG Overview Connect with CVG March 29, 2017

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio

EP8.2 Presentation Exhibition GO Station Improvements

AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS

Considerations for Facility Consolidation

North Beach Redevelopment Initiative Alternative 1 Corpus Christi, Texas

Lender Owned REO Land

Civil and military integration in the same workspace

To apprise Council of the process and timeline for the preparation of the Final Concept Plan and report; and

I-579 Urban Open Space CAP Project. Final Land Development Plan (FLDP) Pittsburgh Department of City Planning

KING STREET PILOT STUDY PUBLIC MEETING

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#

LOVE FIELD MODERNIZATION EVOLUTION

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

60 acres. Brazos Valley, walkable urban destination. work shop play connect. that redefine. creating a

230 CHURCH AVENUE CHULA VISTA, CA 91910

95 KING STREET EAST, TORONTO

Laxon Terrace - Sarawia. Click to add title. Street Rail Level Crossing. Public Forum. December

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities

FORWARD LOOKING STATEMENTS

Work in 2015 and Annual Mobility- Management Plan

EC108 May Omar Valdez. UNWTO.Themis Foundation Executive Director

2016 Regional Transportation Alternatives Program (TAP) Grant Application

Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities Multimodal Station

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

SR 934 Project Development And Environment (PD&E) Study

Creating a High Quality Business District

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Welcome. Green Line in Your Community

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2)

MASTER PLAN FOR NORTH REGION

MEDIUM SIZE STADIUM STRATEGY

Downtown Hotel Development

THE SHOPS AT #PLAYREDBIRD #SHOPREDBIRD #LIVEREDBIRD #WORKREDBIRD #STAYREDBIRD

A. CONCLUSIONS OF THE FGEIS

Traditional and Alternative Financing of Cruise Terminals

MAC Meeting. February 2, 2017

FLIGHT PATH FOR THE FUTURE OF MOBILITY

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Draft Environmental Assessment and Draft Section 4(f) Determination. Appendix A Station Headhouse Alternatives Analysis

Sandton Gate Content. Content. Introduction. Locality. Precinct Offering. Design Ideology. Precinct Plan. Development Phasing

Port Everglades Master Plan Update Tenant Workshop. July 12, Port Everglades Master Plan Update 2006

Greater Orlando Aviation Authority

LOVE FIELD MODERNIZATION PROGRAM (LFMP)

COMMENT PERIOD INTRODUCTION

Roberts Bank Terminal 2 Project

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

CHURCH AVENUE CHULA VISTA, CA 91910

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

ALL THE ELEMENTS FOR WORK AND PLAY 147,000 SF MIXED USE THE NATIONS

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

The Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Lancaster Square

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN

Criteria Based System for MPRB Regional Park and Trail Capital Project Scheduling

Circular 330-AN/189 Civil/Military Cooperation in Air Traffic Management. Sven Halle ICAO- Paris

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

Burke Lakefront Airport (BKL) Master Plan Update

Galt Ocean Mile Bar. Last Call Bar & Lounge 3270 NE 33 St Ft Lauderdale, FL Sponsored By:

95 KING STREET EAST, TORONTO

DOWNTOWN LOS ANGELES NEIGHBORHOOD COUNCIL PLANNING & LAND USE COMMITTEE

CHAPTER 4: ALTERNATIVES

Update of MDX Open Road Tolling

Network of International Business Schools

1500 Centre Parkway, East Point, GA. Up to 97,969 SQ FT corporate office user opportunity in Airport submarket

Sandton Gate Content. Content. Introduction. Locality. Precinct Offering. Design Ideology. Precinct Plan. Development Phasing

West Gate IAC Hearing. Review of vibration and regenerated noise from construction

LATAM Airlines Group presents technical airport infrastructure requirements for the Northeast hub based on study by the consulting firm Arup

Key Center. Enjoy a close proximity to Downtown Bellevue s lively entertainment and shopping center, surrounded by a wide variety of dining options.

CIAB Report to Legislature September 30, 2014 Highlights of key recommendations/findings.

With the first portion of this process complete, we anticipate the general timeline for the remainder of the process to be:

Scottsdale Airpark amenities:

Go Safe Scotland. Delivering Road Safety Education. Road Safety in Glasgow

Transcription:

Project Scope: New City Hall New Police Department New Mixed-Use Parking Structure Community Improvements CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Development Considerations Improve quality of city services Increase operating efficiencies Obtain equitable return on investment Promote staff collaboration Embrace electronic technology Allow flexibility and adaptability to change Support the safety, health, and welfare of staff Enhance Redevelopment of Downtown Cocoa Beach CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Enhance Redevelopment of Downtown Cocoa Beach Promote New Business & Land Development Make the Downtown a Destination Enhance Public Lands & Open Spaces Incorporate & Expand Community Based Art Make Cocoa Beach a Walkable Community Improve Outdoor Spaces, Amenities and Infrastructure. Create an area that is clean, safe, and secure. CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Dynamic Public Space CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Social Well-being / Walkability CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Sense-Of-Place CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Occupied Street-Scape CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Development Considerations Option A: Co-Located City Hall & Police Department @ Downtown Site Option B: Combined City Hall & Police Department @ Downtown Site Option C: City Hall @ Downtown Site / Police Department Offsite CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Development Considerations Option C: City Hall @ Downtown Site / Police Department Offsite Option C-1: Police Department @ Fischer Park Site Option C-2: Police Department @ Ramp Road Site Option C-3: Police Department @ South 9th Street Site Option C-4: Police Department @ Brightwaters Site CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Existing Conditions CN DISTRICT SOUTH ORLANDO AVE. MINUTEMEN CAUSEWAY PS-1 DISTRICT SOUTH 1ST STREET SOUTH BREVARD AVE. Site Options A, B & C: Downtown CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Existing Conditions B-1 DISTRICT SUNRISE DRIVE PS-1 DISTRICT SOUTH BREVARD AVE. RM-1 SOUTH 5TH STREET SOUTH ORLANDO AVE. RAMP ROAD Site Option C-1: Fischer Park Site Option C-2: Ramp Road CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Existing Conditions SOUTH BREVARD AVE. RM-1 SOUTH ORLANDO AVE. SOUTH ATLANTIC AVE. B-1 N. BANANA RIVER BLVD. SOUTH 9TH STREET BRIGHTWATERS DR. Site Option C-3: South 9th St. Site Option C-4: Brightwaters CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Site Selection Matrix No. Evaluation Criteria Criteria Value Option A City Hall Option B City Hall Option C-1 Fischer Park Option C-2 Ramp Road Option C-3 South 9 th St. Option C-4 Brightwaters 1. Appropriate Surrounding Land Use Out of 7 7 7 7 3 2 2 2. Proximity to other City Facilities / Functions Out of 6 6 6 5 4 2 2 3. Site Size: Ease of Future Expansion Out of 10 7 7 8 3 0 0 4. Zoning Out of 6 6 6 5 5 5 3 5. Site Development: Relocation/ Demolition/ Ect. Out of 9 4 4 8 8 8 6 6. Access: Vehicular / Pedestrian / Public Transportation Out of 8 8 8 7 5 3 2 7. Impact on Redevelopment Out of 6 5 5 6 3 2 2 8. Proximity to Potential Hazards Out of 9 9 9 9 9 9 9 9. Cost Land Aquisition Out of 7 7 7 7 7 7 7 10. Adequacy of Infrastructure Out of 8 8 8 6 6 6 0 Total Out of 76 67 67 68 53 42 33 CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P WEIGHTED CRITERIA OF SITE CANDIDATES JULY 26, 2016

Site Selection Matrix No. Evaluation Criteria Criteria Value Option A City Hall Option B City Hall Option C-1 Fischer Park Option C-2 Ramp Road Option C-3 South 9 th St. Option C-4 Brightwaters 1. Appropriate Surrounding Land Use Out of 7 7 7 7 3 2 2 2. Proximity to other City Facilities / Functions Out of 6 6 6 5 4 2 2 3. Site Size: Ease of Future Expansion Out of 10 7 7 8 3 0 0 4. Zoning Out of 6 6 6 5 5 5 3 5. Site Development: Relocation/ Demolition/ Ect. Out of 9 4 4 8 8 8 6 6. Access: Vehicular / Pedestrian / Public Transportation Out of 8 8 8 7 5 3 2 7. Impact on Redevelopment Out of 6 5 5 6 3 2 2 8. Proximity to Potential Hazards Out of 9 9 9 9 9 9 9 9. Cost Land Aquisition Out of 7 7 7 7 7 7 7 10. Adequacy of Infrastructure Out of 8 8 8 6 6 6 0 Total Out of 76 67 67 68 53 42 33 RANK 2 2 1 4 5 6 CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P WEIGHTED CRITERIA OF SITE CANDIDATES JULY 26, 2016

Suggested Option Site Option C: Downtown Site Option C-1: Fischer Park CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Next Steps Confirmation of scope and selected site option Design Charette with City and Design Committees Approval of Final Design Design production of Design Criteria Package Funding Workshop CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016

Potential Funding Opportunities Bonding Public Private Partnership CDBG Community Development Block Grant PDM Pre-Disaster Mitigation Grant CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R O U P JULY 26, 2016