Preparation for ASBU B1 (PBN)

Similar documents
MID Region Air Navigation Strategy

International Civil Aviation Organization. Fifth Meeting of MID Region AIM Database Task Force Fourth Meeting of MIDANPIRG AIM Sub-Group

MID AIR NAVIGATION PLAN VOLUME III

AIR NAVIGATION REPORT ICAO Middle East Region

International Civil Aviation Organization. Runway and Ground Safety Working Group. Fourth Meeting (RGS WG/4) (Cairo, Egypt, November 2017)

ATFM/CDM ICAO s Perspective

International Civil Aviation Organization. Runway and Ground Safety Working Group. Fifth Meeting (RGS WG/5) (Cairo, Egypt, November 2018)

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

MID ROC Implementation Plan

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

TWELFTH AIR NAVIGATION CONFERENCE

INTERNATIONAL CIVIL AVIATION ORGANIZATION REPORT OF THE FIRST MEETING OF THE AIR NAVIGATION SYSTEMS IMPLEMENTATION GROUP ANSIG/1

International Civil Aviation Organization. Runway and Ground Safety Working Group. Fourth Meeting (RGS WG/4) (Cairo, Egypt, November 2017)

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN

Russian Federation ATM modernization program

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules

Packaging Tomorrow s Aviation System

2012 Performance Framework AFI

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

Sudan PBN Implementation Plan PBN SG/2

TWELFTH AIR NAVIGATION CONFERENCE

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

(Presented by United States) EXECUTIVE SUMMARY

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

TWELFTH AIR NAVIGATION CONFERENCE

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

MID AIR NAVIGATION PLAN VOLUME I

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

SAMPLE TEMPLATE APPENDIX 3.5C-1

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

Block 0 to Block 1 Vaughn Maiolla

NACC/WG/4 WP/16 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

ICAO Initiatives on Aircraft Noise

Measurement of environmental benefits from the implementation of operational improvements

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

ICAO GANP Requirements and Evolution

ICAO framework for LPV

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

ICAO EUR Region Performance Framework

(RN R A N V A V & & RN R P N

Continuous Improvement of the Global Air Traffic Management System

Welcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group

TWELFTH AIR NAVIGATION CONFERENCE

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

TWELFTH AIR NAVIGATION CONFERENCE

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

Presented by: Trinidad and Tobago

Status of PBN implementation in France

Performance Based Navigation (PBN) Implementation Plan. The Gambia

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

Sudan PBN Implementation Plan PBN SG/3

APAC AIR NAVIGATION PLAN VOLUME III

Honeywell.com PBN Concepts Krakow, Poland

PROPOSED AMENDMENT OF THE RPBANIP. (Prepared by Canada and United States) EXECUTIVE SUMMARY

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Regional Air Navigation Plan - Planning Methodologies and Tools. H. Sudarshan

Performance based Decision making Method

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

Air Navigation Bureau ICAO Headquarters, Montreal

FIJI s STATE ACTION PLAN FOR THE REDUCTION OF AVIATION GREENHOUSE GAS EMISSIONS

Measurement of environmental benefits by ICAO Secretariat

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

NANSC VISSION AND MISSION. NANSC CNS/ATM Roadmap FUTURE ASBU. 3 Future works. alignment 3/13/2014


WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

UK Implementation of PBN

TWELFTH AIR NAVIGATION CONFERENCE

The support of an European ANSP

PIRG and RASG Global Coordination Meeting Setting the Stage. Nancy Graham. Director, Air Navigation Bureau

SESAR Solutions. Display Options

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

AIM in support of ATM

FIJI s STATE ACTION PLAN FOR THE REDUCTION OF AVIATION GREENHOUSE GAS EMISSIONS

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Approach to implementation Process and checklist

International Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Home LIST OF ACRONYMS

MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN

Efficiency and Automation

Transcription:

Preparation for ASBU B1 (PBN) Elie El Khoury ICAO Regional Officer, ATM/SAR Middle East Office, Cairo Cairo 12 February 2018

Outline Background MID ASBU Block 0 APTA, CCO and CDO GANP ASBU Coverage Area ASBU Block 1 APTA and CDO (2016) GANP ASBU 2019 ASBU Block 1 APTA, CCO, CDO (2019) Action by the meeting

Background The Strategy was endorsed by MSG/4 meeting (Cairo, 24-26 November 2014), based on the outcome of the relevant MIDANPIRG subsidiary bodies and inputs received from stakeholders. The Strategy was further reviewed and updated by MIDANPIRG/15 meeting (Bahrain, 8-11 June 2015) and endorsed as ICAO MID Doc 002, The current version was updated by MIDANPIRG/16 (Kuwait, 13-16 February 2017) MID Doc 002 is available on the MID Office website.

The Strategy presents a 15 year rolling approach for the implementation of the ASBU Modules in the MID Region in accordance with GANP (2013-2028) as follows: Near-term (2013-2018): ASBU Block 0 Mid-term (2019-2024): ASBU Block 1 Long-term (2025-2030): ASBU Block 2

MID ASBU Block 0 APTA, CCO and CDO B0 APTA: Optimization of Approach Procedures including vertical guidance Elements Applicability Performance Indicators/Supporting Metrics Targets States PBN Implementation Plans LNAV LNAV/VNAV All States All RWYs Ends at International Aerodromes All RWYs ENDs at International Aerodromes Indicator: % of States that provided updated PBN implementation Plan Supporting metric: Number of States that provided updated PBN implementation Plan Indicator: % of runway ends at international aerodromes with RNAV(GNSS) Approach Procedures (LNAV) Supporting metric: Number of runway ends at international aerodromes with RNAV (GNSS) Approach Procedures (LNAV) Indicator: % of runways ends at international aerodromes provided with Baro-VNAV approach procedures (LNAV/VNAV) Supporting metric: Number of runways ends at international aerodromes provided with Baro- VNAV approach procedures (LNAV/VNAV) 100% by Dec. 2018 All runway ends at Int l Aerodromes, either as the primary approach or as a backup for precision approaches by Dec. 2016 All runway ends at Int l Aerodromes, either as the primary approach or as a backup for precision approaches by Dec. 2017

MID ASBU Block 0 APTA, CCO and CDO B0 CCO: Improved Flexibility and Efficiency Departure Profiles Continuous Climb Operations (CCO) Elements Applicability Performance Indicators/Supporting Metrics PBN SIDs Indicator: % of International Aerodromes/TMA with PBN SID implemented as required. International aerodromes/tmas with CCO OBBI, HESN, HESH, HEMA, HEGN, HELX, OIIE, OISS, OIKB, OIMM, OIFM, ORER, ORNI, OJAM, OJAI, OJAQ, OKBK, OLBA, OOMS, OOSA, OTHH, OEJN, OEMA, OEDF, OERK, HSNN, HSOB, HSSS, HSPN, OMAA, OMAD, OMDB, OMDW, OMSJ OBBI, HESN, HESH, HEMA, HEGN, HELX, OIIE, OIKB, OIFM, ORER, ORNI, OJAM, OJAI, OJAQ, OKBK, OLBA, OOMS, OOSA, OTHH, OEJN, OEMA, OEDF, OERK, HSNN, HSOB, HSSS, HSPN, OMAA, OMDB, OMDW, OMSJ Supporting Metric: Number of International Aerodromes/ TMAs with PBN SID implemented as required. Indicator: % of International Aerodromes/TMA with CCO implemented as required. Supporting Metric: Number of International Aerodromes/TMAs with CCO implemented as required. Targets 100% by Dec. 2018 for the identified Aerodromes/TMAs 100% by Dec. 2018 for the identified Aerodromes/TMAs

MID ASBU Block 0 APTA, CCO and CDO B0 CDO: Improved Flexibility and Efficiency in Descent Profiles (CDO) Elements Applicability Performance Indicators/Supporting Metrics Targets PBN STARs International aerodromes/tmas with CDO OBBI, HESN, HESH, HEMA, HEGN, HELX, OIIE, OISS, OIKB, OIMM, OIFM, ORER, ORNI, OJAM, OJAI, OJAQ, OKBK, OLBA, OOMS, OOSA, OTHH, OEJN, OEMA, OEDF, OERK, HSNN, HSOB, HSSS, HSPN, OMAA, OMAD, OMDB, OMDW, OMSJ OBBI, HESH, HEMA, HEGN, OIIE, OIKB, OIFM, OJAI, OJAQ, OKBK, OLBA, OOMS, OTHH, OEJN, OEMA, OEDF, OERK, HSSS, HSPN, OMAA, OMDB, OMDW, OMSJ Indicator: % of International Aerodromes/TMA with PBN STAR implemented as required. Supporting Metric: Number of International Aerodromes/TMAs with PBN STAR implemented as required. Indicator: % of International Aerodromes/TMA with CDO implemented as required. Supporting Metric: Number of International Aerodromes/TMAs with CDO implemented as required. 100% by Dec. 2018 for the identified Aerodromes/TMAs 100% by Dec. 2018 for the identified Aerodromes/TMAs

Contents of the 2016 2030 GANP Aviation System Block Upgrades (ASBU) Methodology Technology Roadmaps and Module Dependencies

ASBU Modules coverage over time

GANP PBN Roadmap

GANP Navigation Roadmap

GANP 2016 KPIs

ASBU Block 1 APTA and CDO (2016)

ASBU Block 1 APTA and CDO (2016)

Creating a Multilayer Structure 2019 Update of GANP

GANP 2019 KPIs KPA Efficiency Capacity Predictability Focus Area(s) Additional flight time & distance Vertical flight efficiency Additional fuel burn Capacity, throughput & utilization Capacity shortfall & associated delay Punctuality Variability Core KPIs KPI02 Taxi out additional time KPI13 Taxi in additional time KPI09 Airport peak arrival capacity KPI10 Airport peak arrival throughput KPI01 Departure punctuality KPI14 Arrival punctuality KPI15 Flight time variability Additional KPIs KPI04 Filed flight plan en route extension KPI05 Actual enroute extension KPI08 Additional time in terminal airspace KPI17 Leveloff during climb KPI18 Level capping during cruise KPI19 Leveloff during descent KPI16 Additional fuel burn KPI06 En route airspace capacity KPI11 Airport arrival capacity utilization KPI07 En route ATFM delay KPI12 Airport/Terminal ATFM delay KPI03 ATFM slot adherence

ASBU 2019 Framework basic definitions Aviation System Block Upgrades (ASBUs): a global operational framework that allows all Member States to advance their air navigation capabilities based on their specific operational requirements. ASBU Performance Improvement Area: main area of the air navigation system that requires improvement in order to achieve the vision outlined in the Global ATM Operational Concept. ASBU Thread: key feature area of the air navigation system that needs improvement in order to achieve the vision outlined in the Global ATM Operational Concept. ASBU Element: a specific change in operations designed to improve the performance of the air navigation system under specified operational conditions. ASBU Enabler: component (standards, procedures, training, technology, etc.) required to implement an element. ASBU Block: a six year timeframe whose starting date defines a deadline for an element to be available for implementation. ASBU Module: a group of elements from a thread that, according to the enablers roadmap, will be available for implementation within the defined deadline established by the ASBU Block. Key Performance Areas: expectations of the ATM community as defined in Doc 9854 Global ATM Operational Concept. Key Performance Indicator: specific and measurable metric within a key performance area.

ASBU Block 0 APTA (2019)

ASBU Block 1 APTA (2019)

Action by the meeting The meeting is invited to take into consideration the latest developments related to the update of GANP and ASBU framework during the discussions on the u[date of the MID Air Navigation Strategy Part related to PBN.