ICN All the right connections Bettina Venner 25 July 2017, SA Major Projects Conference www.icngateway.com.au
Disclaimer The information contained in this presentation has been compiled by the Department of State Development and originates from a variety of sources. Although all reasonable care has been taken in the preparation and compilation of the information, it has been provided in good faith for general information only and does not purport to be a professional advice. No warranty, express or implied, is given as to the completeness, correctness, accuracy, reliability or currency of the materials. The Department of State Development and the Crown in the right of the State of South Australia does not accept responsibility for and will not be held liable to any recipient of the information for any loss or damage however caused (including negligence) which may be directly or indirectly suffered as a consequence of use of these materials. The Department of State Development reserves the right to update, amend or supplement the information from time to time at its discretion. 2
ICN Gateway Pivotal link between major project requirements and suppliers ~65,000 company listings ~12,000 public searches/month ~$400 billion in projects 3
Torrens Road to River Torrens T2T Alliance - alliance of Leighton Contractors, Aurecon Australia and South Australian company York Civil. 4 km non-stop roadway (including 3km lowered motorway) between Ashwin Parade, Torrensville and Pym Street, Croydon Park $896 million Due for completion end 2018 20 4
Darlington Upgrade Gateway South Fulton Hogan and Laing O Rourke with design partners KBR, Jacobs and SMEC Darlington section of Main South Road traffic volumes of up to 70,000 vehicles per day $620 million Due for completion end 2018 19 5
Northern Connector Lendlease with key subcontractors McMahon Services, LR&M Constructions, Catcon, SEM Civil and Intract $985 million Due for completion end 2018 18 6
O-Bahn City Access Project Priority bus lanes along Hackney road and a guided busway tunnel from Hackney Road to Grenfell Street McConnell Dowell $160 million Completion end 2017 17 7
Torrens Rail Junction Grade separation of freight and passenger rail lines at the Torrens Rail Junction Connexion Alliance - Laing O Rourke, AECOM and KBR $238 million ICN Gateway portal during bid phase 16 8
Gawler Line Electrification Electrification of the Gawler rail line from Adelaide to Salisbury Bid stage major works contract expected to be awarded December 2017 Site works commence early 2018 Project completion by June 2020 15 9
Upper Yorke Peninsula Regional Road Network Upgrade Downer EDI $40 million Improved productivity for agricultural sector and easing holiday traffic flow Various upgrades eg: New roundabout junction of Yorke and Copper Coast Highways New overtaking lanes Yorke Highway Shoulder sealing 14 10
AIR 7000 Phase 2B RAAF Edinburgh Upgrade Construction of new facilities for delivery of P-8A Poseidon Aircraft Lendlease $400 million Works commenced Q2, 2016 Due for completion Q4, 2018 13 11
Defence Support Services and Major Service Provider Major Service Provider for CASG Bid stage Babcock portal on ICN Gateway 12 12
JP 2060 Phase 3B Deployable Health Capability Transportable health capability - Australia and overseas Bid stage Saab portal on ICN Gateway 11 13
Leigh Creek Energy In-Situ Coal Gasification Underground coal gasification Early stages pre-commercial demonstration plant 10 14
OZ Minerals Prominent Hill Ongoing operations at Prominent Hill Copper-gold mine 9 15
OZ Minerals Carrapateena Access decline Pybar ECI Contractors, eg: NRW Ausenco/ Downer ElectraNet 8 16
BHP Olympic Dam One of the world's largest deposits of copper, gold and uranium Expansion into Southern Mine Area 7 17
Great Australian Bight Exploration $1.2 billion guaranteed exploration expenditure 2011-16 $1.1 billion non-guaranteed exploration expenditure 2016-2020 Exploration permits: Chevron, Statoil, BP, Murphy Oil & Santos, Bight Petroleum Santos- Murphy BP - Statoil Chevron Bight Petroleum 6 18
Whyalla Solar Farm Adani Infrastructure 100 to 140 MW $250 million 5 19
100 MW Battery Tesla and Neoen, with CPP 4 20
SEA 1180 Offshore Patrol Vessels Shortlisted bidders: Damen, Luerssen, Fassmer Construction from 2018 in Adelaide, 2020 in WA 3 21
SEA 5000 Future Frigates SEA 5000 Future Frigate Program bid stage shortlisted: Navantia, BAE Systems, Fincantieri Supply chain eg Rolls Royce MT30 gas turbine package BAE Systems UK Type 26 Global Combat Ship Australian Supply Chain 2 22
SEA 1000 Future Submarine Program Naval Group (formerly DCNS) Lockheed Martin Australia Rest of submarine supply chain, for example Babcock bid weapons launching and handling systems 1 23
Contact us Energy Efficiency Expo: http://www.icn.org.au/events/south-australia/energy-efficiency-expo-adelaide ICN (SA) office details: Level 4, 11 Waymouth Street Adelaide SA 5000 T: 1300 553 309 E: info@icnsa.org.au www.icngateway.com.au